Home

to read User Manual & Installation Instructions

image

Contents

1. Packing list 1 three pieces of ABS board two pieces of sliding glass 10 Packing 1 door two pieces of fixed glass door 2 11 12 3 13 one tray one roof two pieces of up and down bended 14 aluminum column two pieces of deluxe shower holding l bar one set of foot massage one piece of steam pipe with 4 15 Packing 2 plastic pad 16 s two pieces of T shaped pillow one piece of remote control two pieces of round shaped handle one piece of 6 17 drainage cover four pieces of plastic seal for the post two Spare parts list Sets of handle 22 two sets of shower M6 25 T 18 P P screw 1 M6 35 screw 2 ST4 16 screw 3 ST4 25 g 19 screw 4 ST4 12 screw 5 M5 25 screw 6 one instruction 20 9 SCREW 1 M6x25 Camm 18pcs SCREW 2 M6x30 Qun 6 10pcs SCREW 3 St4x35 Quam 4pcs SCREW 4 ST4x25 Onc 48pcs 21 SCREW 5 St4x20 em 8pcs SCREW 6 M4X20 Cum 4pcs 1 body roof 9 steam room body 16 handrail 2 movable shower 10 top lamp ifs SOAPBOX 3 exhaust fan 11 top shower 18 foot massage 4 decorated lamp 12 movable shower 16 19 nozzle 5 function switch handrails with glass 20 Steam outlet box 6 cold hot water 13 control panel 21 bottom bathtub switch 14 temperature sensor 7 towel handrail 15 decorated lamp 8 nozzle IE WS 608P ws 6osP WZ SANIT AR Y WARE ATTENTION SANIT AR Y WARE 1 t f 1 In order to be tripped and fell down pay more attention when get into the waterTa steam
2. _Sidelight Fan _ Waterinlet valve water arain vavo a ee eee eee eee ee IKE ws 608P SANITARY INSTALLATION PROCESS LAssembly of tray STEP 1 If the ground is not smooth please adjust the nail under the tray to keep the balance of the tray and ground The steam pipe is in the package box ST4X25 8 mm 9 P 2 Pls Lock the aluminum 0 o a columns on acrylic panel left side amp right side per ready G screw holes by factory i i ts 0 O 0 STEP2 ws 6osP Mug SANIT AR Y LWARE SANIT AR Y LWARE e a o S 3 Pls lock the big blue 1 The electrical pitch coated glass next to the aluminumcolumns per ready Press CQ pitch can open the machine the temperature screws holes by factory o After the blue coated glass is the room temperature T he time will show 30m At the same installation pls put oe z ina time it will open the ceiling lamp Press lt again will close all the functions After the closure of the machine the water case z DO r 5 S S S ooooooo o eooococoeo eaccoa0cn ee rr rr oe 4 4 2 e e2 3333 E Ss Ss Ss o COU oO eA oO aluminumcolumns STEP3 will drainfor 2 minutes 2 The application of the back lamp Press the sidelight is on Press again the ceiling
3. oy EE Wws 608P ws 608P BE SANIT AR Y LWARE SANITAR Y WARE 0 Put the blue clear glass with one side aluminum pole onthe bathtub next to the back side blue coated A ar glass and lock them together by lock screws on these 2 ity aluminum poles 2 ja sides blue clear BB 88 glass with one side aluminum pole installation way is the same NS KJ 2 aqga00cdao N eaqcda oo vIcco C f 3 fo kas L AS ia 5 Z 5 x Ss g acgeesD eooaaesod SoD oaov x z s gt Y el f io ao oo ao S g x h i Da D300 eA oO Time adjustment pitch 5 Temperature adjustment pitch S Fan Pitch NAIV Z n 2 Temperature adjustment pitch ANG O 7 Atter the fixed door installation pls lock 2pcs aluminumpoles base on bathtub per ready screw holes Later pls 8 Main Cock Pitch insert the aluminum poles with hinges into the base At the same time pls insert 2 sides fixed door glass into the groove of these aluminum poles first amp put glass glue into the groove later WS 608P 06
4. room Please don t shut the finger in the door in order to be hurt 2 x d ralna o e SWI tC h 2 In order to avoid damaging the surface of products please do not use hardness water pump swich air adjuster recycle net water jet 6PC and sharpness tool to curve the products 3 In order to course fire no smoking inside the bathroom 4 the jets of steam and drainage pipe both are high temperature when products working in order to be hurt please be careful 5 In order to be tripped and fell down please keep clear of the bathtub after dA dA taking shower each time 6 It will be leaking if the glass glue plastic sheet be off then please add some aH U1 B W l more for recover N d raina Q e 7 If there are marks of water please clear with soft cloth and toothpaste 8 In order to be blocked of drainage device please keep clean of the surface of bathtub 9 Please do not hang up heavy things on the steam room or the handle of steam INSTALLATION SKETCH room 10 Please deal with the products according to the local laws when it is no The socket longer be use of power 11 Any request please contact with local dealer ATTENTION FOR USAGE Cold water pipe 1 check if power and cold hot water switch be turn on or be turn off each time before Hot water pipe 1506 use this product S eee 2 check if power of electronic leakage device be get through or not Checking way Press te
5. Cold hot water switch lt ao o Movable shower head shower head O i Q Q d z O Q 53 O 3 se j Q 0 Q g 5 Nozzle _ Foot Nozzle oe massage Nozzle 7 Water fall nA T2 ZA oy Steam generator no rele clean system steam outlet R ws cosp SANITAR Y WARE 10 After the steamroominstallation pls install the rest spare parts Such as movable shower foot massage 11 Pls p N tg inside a n glue on fixed door bottom outside amp t lass side top part 12 Finish cable amp water pipe connection pls kindly check the attached picture WS 608P 08
6. D Steam Pitch EF Y i U NI 3 CeilingLamp Back Lamp pitch 4 Time adjustment pitch put glass glue here IKE VWS 608P SANIT AR Y WARE doq 8 Pls put ceiling on the steam room body and make sure the ceiling is not Over the steam room body Then lock the screws as picture and fix the room body amp ceiling One person should hold the ceiling inside the room STEP8 9 Install strips amp magnetic strip on left right amp bottomside of 2pcs movable glass door Carry the glass door to the top of bathtub Loose the protruding hinge part and lock the glass inside the hinge per ready glass hole After the movable door installation pls install door handle on 000TS x p ei a p Strip Q K Strip B _ Lee 1 Strip A SANITAR Y WARE DRAWING OF ELECTRICITY CONNECTION yclean system steam outlet gt vy water inlet Control a water outlet WS 608P 10 SANIT AR Y LWARE DRAWING OF WATER CONNECTION As the 9 from the picture please make the connection according to the serial number v1 v2 etc Top shower CE A AND
7. lamp is out press a third press the sidelight is out too 3 The steam function Press startup the steam function the water case will pump water automati cally After 60minutes or so it will generate steam When the water case is lack ofwater the controller will replenish automatically 4 The air draft function Under the condition of turnning on press can start up air draft function pressagain will colse it 5 The setting of time or temperature 1 Press pitch can adjust the time from 1 99 2 Press Je Je pitch can adjust the temperature from 30 60 eA ALT AS a A Pes pI 0 4 Install spare parts on ger ee Pa eee They rie are movable shower holder a e towel handrail glass shelf amp TE j soap box This step requires 2 people one hold the part in front and another one tighten the screws at back side Soap box makes up Dy one bottom shelf amp 2pcs boxes pls lock the bottom shelf on ready screw holes first and put the boxes on the bottom shelf later 5 Pls carry the backside body to the top of bathtub and lock screws on ready screws holes on their contact surface behind the steamroombody In this way it is fixed
8. omic rise and fall changes are quite big so during usage pay more attention of be slipped Please shut down the system when not to use O TECHNIQUE PARAMETER Water Power of steam vogs generator Power of Power of Power of Storage Storage Voltage Frequency water pump heatpump airpump capacity capacity Ac 110 V 10 60Hz 0 1 0 2Mpa 2 65KW 1 2HP 1KW 0 2KW 48gallon 0 22m CAUTIONS Heat pump and air bubble pump is optional purchase WS 608P SANITAR Y WARE Self clean system Step 2 i Pour into cleaning _liguid from here Step 1 Step 3 Step 4 DO iD Cleaning method 1 Clean the steam engine regularly at least once by every 2weeks or after using 20 times 2 Inject citric acid as main cleaning liquid add 1 5L each time after 10 minutes turn on and When the system turns on press button to start the steam function for about 30seconds and then shut down the system After vent the stagnant water repeat 2 or 3 times 3 CAUTION The system must be shut down before injecting ws 60sP BAS SANITAR Y WARE SANITAR Y WARE CONSTRUCTION SKETCH
9. sting button light of power be off press button of restart then light of power be on lt is not being what mentioned above after operated step by step then that 1250 49 2 shows the electronic protection device out off control or there is something wrong with the electronic leakage device so should ask professional to check and maintain the product 3 Turn off the main power of control panel after stop usage The plug of power should be pull out because only turn off all the functions of control panel that is not stop the power 4 People with hypertension or drunk are not allowed to have sauna steam bath 5 Children should have sauna steam bath under adult s instruction 6 Please don t shut the finger in the door in order to be hurt when get into the steam S 1ze 1600X 1600X 2250mm 63 X 63 X 88 6 room 7 In order to be tripped and fell down pay more attention when get into the steam room 8 keep clean of the tray in order to be tripped and fell down 9 Pay attention to the steam sprayer and water tank drainage they are in high OS Ws 608P temperature while working WS 608P SANITAR Y WARE Attention The machine must be fixed in the circuit which protected by creepage protectionand should be well connected with the ground Nontechnical people can not be fixed or removed at random 6 Technical parameter Current protecting electrifying Waterproof Grade 110V 2650W l Toplight
10. www eaglebath com No advanced advice will be submit before we change our design and size The pictures may be a little different from the real products Our company keep the final explanation right Install manual Steam bathroom MODEL WS 608P Intertek C 177789 SANITAR Y WARE Dear Guest Thank you very much for purchasing our sanitary ware To enable you to use this product safely and effectively please read this installation and operation manual carefully before use CAUTIONS 1 Please ensure that the product installed reliable electric leakage protection device the power plug contains earth line and make sure itis reliable earth line Check the protect system of leakage protection each time before use 2 Do not turn on water pump heat pump or air bubble pump without water 3 Before turn on water pump check 1f the water level over jets 10 to 20 mm or not make sure regular usage of water pump otherwise it will be destroy because of water leakage 4 People with Hypertension symptom after drink or heart disease are not allowed to use the bathtub Children have a bath must under adult s guidance 5 During use please noticed that don t blocked the jets and avoiding the air adjustment valve overflowing Also keep the bathtub clean and don t let it blocked by hair or mess 6 During use please firstly adjust the water temperature or it will be burned 7 The bathtub is designed with ergon

Download Pdf Manuals

image

Related Search

Related Contents

file - eLib  Manual del usuario - CONRAD Produktinfo.  User Manual  Samsung LW46G15W Керівництво користувача  LG VK810 Brochure (Spanish)  HP 2012i User's Manual  mode d`emploi bombes d` artifice et pots a feu du groupe k4  取扱説明書(AUDI/VW編) - G-scan  Operating Instructions Pilot Test  FY-25LSS の取扱説明書  

Copyright © All rights reserved.
Failed to retrieve file