Home
Elnet GR\PQ
Contents
1. Denon Description Remarks Vi Linel Supplied Through a 6Amp fuse Voltage V2 Line2 Supplied Through a 6Amp fuse Voltage V3 Line3 Supplied Through a 6Amp fuse Voltage N Neutral Measurement neutral Line HA From Current Note the correct direction to Transformer on insert the lead Linel BA From Current Note the correct direction to Transformer on insert the lead Line2 BA From Current Note the correct direction to Transformer on insert the lead Line3 Power Supply 110 Or 110 260 VDC external power 260 VAC supply or bridged from phase measurement Np Neutral Neutral of external power supply Dout Alarms see chapter 5 6 1 Din For monitoring 24 CONTROL APPLICATIONS Ltd Sales FENIKS PRO d 0 0 Slovenia www feniks pro com RS485 RS485 Comm Line RS485 RS485 Comm Line RS232 TXD RS232 Comm Transmit RS232 RXD RS232 Comm Receive GR model only RS232 COM RS232 Comm Common RJ45 10 BASE T line to Via standard Network Communications plug Table 2 1 Rear Panel connections Elnet GR PQ 25 CONTROL APPLICATIONS Ltd Sales FENIKS PRO d 0 0 Slovenia www feniks pro com 2 5 Digital Outputs and Inputs ElNet GR PQ Energy Powermeter amp Power Quality Analyzer has as default 3 Digital Output and 5 Digital Input connections at its back side additional IO can be implemented by using additional external modules Digi
2. Back 4 2 Electrical Connection Check To avoid any problems arising from incorrect Voltage Connections or accidental reversal of Current Transformer Connections it is necessary to perform a Phase Order Check before continuing 36 gt CONTROL APPLICATIONS Ltd r Sales FENIKS PRO d 0 0 Slovenia www feniks pro com To perform Electrical connection Check 1 Scroll to Technical menu and press Enter 2 Insert password 11 in the password menu check chapter 4 1 for explanation of how to set password 3 The Connection Check screen appears Connection check _vatase current u ox o e ox B ox o a LLALL Figure 4 7 Connection Check Voltage and Current Messages Table 4 1 Voltage and Current Messages Message Voltage Current OK Voltage OK present on Current present in Lines and Lines If OK is not synchronized with Voltage present on 3 Lines then its Lines If OK is not present not connected correctly on 3 Lines then its not connected correctly Wired in incorrect direction OPP Not Apt NO No Voltage No current 37 CONTROL APPLICATIONS Ltd Sales FENIKS PRO d 0 0 Slovenia www feniks pro com Phase Order Messages OK Correct Phase Order of Voltage Connections OPP Incorrect Phase Order i e Line 2 does not follow Line 1 and or Line 1 does not follow Line3 Table 4 2 Phase Order Messages 38
3. Elnet GR PQ Electrical Measurements amp Power Quality Ver 1 7 CONTROL APPLICATIONS Ltd Sales FENIKS PRO d 0 0 Slovenia www feniks pro com gt CONTROL APPLICATIONS Ltd r Sales FENIKS PRO d 0 0 Slovenia www feniks pro com Table of Contents CHAPTER 1 INTRODUCTION sssssssssosssssssosssesssossssssees 5 1 1 About the ElNet Meter sccsscssssssssceees 5 1 2 How to use this manual cccssssssssereeoees 6 1 3 Safety Information cccccscsssssssssscsreeeeees 8 1 4 Warranty spin setdivinsetaveisdsshacdeeeviivestetace tienes 9 1 5 Your comments are welcOME ccssseeee 11 1 6 DISC AMEE siisnccssensessincsersisaccastavesseisscasseis sevens 12 CHAPTER 2 INSTALLATION ccccsssssssscsssssscccssssceses 13 2 1 Contents Of packaging ccccsssssssssseeees 14 2 2 Mechanical mounting seseesesssssssooooeessssssses 15 2 3 Wiring Schematics ccccssccccsssssssssssecccoes 17 2 4 Rear Panel Connections esssssssssooooooesesssso 21 2 5 Digital Outputs and Inputs cceeeee 26 2 6 Manufacturing Data eoessssoooocsssssssssssoooo 27 CHAPTER 3 USING THE ElNet Metet scs000000 28 3 1 Front Panel ssciscsscssesssaevvnccntecnnaianesessiaeesnatianss 28 3 2 Control ButtonS eesesessessssooococssssessssssssoooee 29 3 3 Lock Utility sssisissssiossssiissssissoisi sssi 30 CHAPTER 4 NECESSARY ElNet SETTINGS 32 4 1 Se
4. F2 to read Energy at Phase at Linel Line2 and Line 3 5 Click F4 to read Export Import Energy 6 To return to Main Menu click Back 56 2 CONTROL APPLICATIONS Ltd r Sales FENIKS PRO d 0 0 Slovenia www feniks pro com 5 11 Power Quality Poor Harmonics could invoke a fine and damage to the electrical system and can be improved by adding filters The ElNet Energy amp Powermeter GR Model is capable of displaying Harmonics in Wave Form Graph Harmonics Bar Graph Harmonic Tables and Total Harmonic Distortion for Voltage and Current 5 11 1 Wave Form Graphs To display Wave Form Graphs 1 From Main Menu scroll to Power Quality 2 Click Enter the Power Quality screen appears e7 12 11 08 39 17 Power qualit Wave Form Graphs Harmonics Graph Harmonics Table Current THD TDD KF Phasor Display pd tt Figure 5 13 Power Quality 3 Scroll to Wave Form Graphs 57 CONTROL APPLICATIONS Ltd Sales FENIKS PRO d 0 0 Slovenia www feniks pro com 4 Click Enter the Wave Form Graphs screens appear A vot 1 ji tine _ Figure 5 14 Voltage Graph 5 Press F4 to switch between Voltage Graph Line 1 Line 2 and Line 3 To display Current Wave Form Graphs 1 Click F2 the Current Graph screens appears J Ree ivoa 1 tine _ Figure 5 15 Current Graph
5. The Frequency screen appears Freduency clear Table _IJ Figure 5 3 Frequency for all 3 Phases 47 CONTROL APPLICATIONS Ltd Sales FENIKS PRO d 0 0 Slovenia www feniks pro com 4 In order to view the readings in online graphical mode press on the Enter button You can reset the Peak values by using the CLEAR button Read the Frequency in Line 1 Line 2 Line3 5 3 Current in Neutral Line ElNet GR By using the Vector value of L1 2 3 Current Lines calculates the Current in the Neutral Line ElNet PQ measures the Neutral Line current via additional current transformer If the reading for neutral line is 0 i e there is no current in the neutral line then either there is no current in system OR the current for all three phases is balanced To display Current in the Neutral Line 1 From Main Menu scroll to Current amp Voltage 2 Click Enter the Current amp Voltage screen appears as described in section 5 1 5 Click F3 TABLE 6 The Current amp Voltage table screen appears 48 CONTROL APPLICATIONS Ltd Sales FENIKS PRO d 0 0 Slovenia www feniks pro com Current amp Voltage L Vot Current L3 229 8 v 21 31 A TO 2 V Current L23 asta v te 4 W cee 0 Current in Neutral line A N 811 Figure 5 4 Combined Displays 5 4 Voltage for 3 Phases To display Voltage for all 3 Phases and across Phases 1 From
6. ssssoosesscssssssooosee 59 5 11 3 Voltage Total Harmonic Distortion THD 61 5 11 4 Current Total Harmonic Distortion THD 61 gt CONTROL APPLICATIONS Ltd r Sales FENIKS PRO d 0 0 Slovenia www feniks pro com 5 11 5 Current THD TDD KF ssoessesssoessssssceessso 62 5 11 6 EN50160 event monitoring and Wave FECOLAS osisssssicissooossioassosssssosesssosoosssisso sississssis 63 5 11 7 Long PQ event special record 00 65 CHAPTER 6 ALARM REPORT cccsssssssscssssesecsssseces 70 6 1 Alarm setting seeesesssssssssoocccseesessssosessssessso 71 6 2 Display Alarms Report essssseoosoessssesssssseo 73 6 3 Display EN50160 Event Report 74 CHAPTER 7 DEMAND REPORT ccccssesssssssssees 75 CHAPTER 8 DATA LOGGING cccssssssscsssssscccsssseeces 76 CHAPTER 9 COMMUNICATION ssccccsssssssccssssseees 79 9 1 Communication Connections sseeee 79 9 2 Communication Settings ccscssssssssees 79 9 3 PRGAVESS diss sesucesausnsinasehsvanduenseauchsbaxaasauevistucbens 79 9 4 Baud FRAG i sesnasacsnaccnivcncesecodecaunsacaneincasoensacanses 80 9 5 DP ARMY wisn savenssanenssuasnatoceseiassunsevausivaxercoxssavaceors 80 9 6 Communication Set Up ccsssssssseeeees 81 9 7 Communication with UniArt Software 84 CHAPTER 10 Specifications ssccccccccccssescssssscceeeees 86 10 1 Measurement amp Display cccc
7. 3 The Demand Setting screen appears Demand Setting e oeme ee ee ee ee Figure 4 14 Demand Setting 4 Use F1 F2 in order to change the cycle time The cycle steps are 1 2 3 4 5 10 15 20 30 and 60 minutes 5 Click Enter for saving the change 45 gt CONTROL APPLICATIONS Ltd rx Sales FENIKS PRO d 0 0 Slovenia www feniks pro com CHAPTER 5 FRONT PANEL DISPLAYS In this chapter you will find instructions on how to obtain the readings that the ElNet GR PQ Electrical Measurements amp Power Quality provides e g Current Voltage Power Power Factor Energy and Power quality 5 1 Current for 3 Phases To display Current for all 3 Phases 1 From Main Menu scroll to Current amp Voltage 2 Click Enter The RMS Current screen appears RMS Current Figure 5 1 Current Display 3 Read the Current for Linel Line2 and Line3 4 In order to view the readings in online graphical mode press on the Enter button 46 CONTROL APPLICATIONS Ltd Sales FENIKS PRO d 0 0 Slovenia www feniks pro com 5 The online graphical data screen appears 45 64 48 54 47 43 116 33 15 23 L Tera voit Table en TFS Figure 5 2 Current graphic Display 5 2 Frequency for 3 Phases To display Frequency for all 3 Phases 1 Display the current screen as described in section 5 1 2 Click F3 TABLE 3 Click F3 Hz
8. See Section 3 2 for description of button functions 6 Ifthe incorrect password is inserted into the Password field an Error message appears Check Password At the end click et tt Figure 4 3 Error Message 7 Return to step 3 and start again 34 2 CONTROL APPLICATIONS Ltd r Sales FENIKS PRO d 0 0 Slovenia www feniks pro com 8 Click Enter the Technical Menu screen appears 11 12 11 12 38 46 Technical menu Set date TOU Setting Transformer Ratio Communication setting Alarm setting Set Connections Next ee ee a Figure 4 4 Technical Menu 9 Scroll to Transformation Ratio 10 Click Enter The Current Transformer screen appears Transformer Ratio Current Transformer 5 A 80 A ELNET External To update Current Transformer Press ENTER Lt Pulsefl_t_f_vort _ Figure 4 5 Current Transformer The present setting for the Current Transformer is shown If it is a new installation the ratio will show 5 A 5A 35 2 CONTROL APPLICATIONS Ltd rx Sales FENIKS PRO d 0 0 Slovenia www feniks pro com 11 Click Enter the Insert Value screen appears Insert value 00008380000 To save push ENTER To cancel push BACK ee ee N Figure 4 6 Insert Value 12 Use Button F3 or F4 to move the cursor left or right and Button F1 or F2 to decrease or increase the value or 13 To save Click Enter 14 To cancel Click
9. 2 CONTROL APPLICATIONS Ltd r Sales FENIKS PRO d 0 0 Slovenia www feniks pro com 4 3 TOU Setting ElNet Energy amp Powermeter is capable of working in several TOU Settings The user can choose the TOU Setting according to the country requested To set TOU See Section 4 1 for instructions to arrive at the Technical Menu From Technical Menu scroll to TOU Setting Click Enter The TOU Setting screen appears TOU Setting Israel Mexico Uruguay 2Rt Uruguay 3Rt Slovenia Bulgaria Serbia Chile Argentina None List ti tii Figure 4 8 TOU Setting Then scroll to the relevant country and press on the Set button Active will appear next to the country name To exit from that screen press on Back or Enter button 39 gt CONTROL APPLICATIONS Ltd r Sales FENIKS PRO d 0 0 Slovenia www feniks pro com 4 4 Change language To change language on the display screen 1 On the main screen click F2 for 6 seconds 2 The Select language screen appears Bge z ETA TENET HEBREW ENGLISH RUSSIAN FRENCH POLAND SPANISH ee ee a Figure 4 9 Select Language 3 Scroll to the relevant language 4 To save Click Enter 5 To cancel Click Back 40 2 CONTROL APPLICATIONS Ltd r Sales FENIKS PRO d 0 0 Slovenia www feniks pro com 4 5 Time Settings To set Time See Section 4 1 for instructions to arrive at the Technical Men
10. 2 Press F4 to change between the Current Graph Line 1 Line 2 and Line 3 58 CONTROL APPLICATIONS Ltd Sales FENIKS PRO d 0 0 Slovenia www feniks pro com 5 11 2 Harmonics Bar Graphs To display Harmonics Bar Graphs 1 From Main Menu scroll to Power Quality Display Click Enter the Power Quality screens appears Figure 5 14 Scroll to Harmonic Graphs 4 Click Enter the Harmonics Volt Bar Graph screens appears ww Figure 5 16 Harmonics Bar Graph 5 Press F3 to change Harmonics Volts Bar Graph to Line 1 Line 2 Line 3 and Lines 1 2 3 together 1 Harmonics is normally 100 If shown together with the other Harmonics distortion to the rest of the Harmonic Bar Graph will occur By toggling F4 the ElNet Energy amp Powermeter is able to separate 1 Harmonics to prevent this distortion 59 CONTROL APPLICATIONS Ltd Sales FENIKS PRO d 0 0 Slovenia www feniks pro com To display Harmonics Current Bar Graph 1 Click F2 the Harmonic Current Bar Graph screens appears Figure 5 17 Harmonic Current Bar Graph 2 Press F3 to change Harmonics Current Bar Graph to Line 1 Line 2 Line 3 Neutral Line L0 and Lines 1 2 3 together 60 2 CONTROL APPLICATIONS Ltd r Sales FENIKS PRO d 0 0 Slovenia www feniks pro com 5 11 3 Voltage Total Harmonic Distortion THD The ElNet Energy amp Powermeter is capable of measuring Voltage and Current Harmoni
11. Active Power Kw L1 L2 L3 2 Total 4 Power factor alarms L1 L2 L3 General 5 Harmonics alarms L1 L2 L3 LO 12 45 33 Alarm setting Currents Active Power KW Power Factor Harmonics Set Delay Timer re eee aa Figure 6 1 Alarm Setting For each one of the above alarms the user can define two alarms low value alarm and high value alarm The user can select one of sixteen different timers in order to delay each one of the alarms 70 2 CONTROL APPLICATIONS Ltd r Sales FENIKS PRO d 0 0 Slovenia www feniks pro com 6 1 Alarm setting See chapter No 4 1 how to get in the Technical Menu from the main screen From the Technical Menu select Alarm setting and press Enter The Alarm Setting Screens appear See figure 6 1 From this screen you will be able to set alarms for Voltages Currents Active Power Power Factor Harmonics alarms and to set the values for 16 delay timers that can be linked to each one of the alarms For each alarm the user can define High alarm The set point above which the alarm will be generated Low alarm The set point below which the alarm will be generated Delay timer One of sixteen timers that define the time duration that the alarm should be ON in order to be written in the memory Voltage L1 Out Value Alarm a m ian vane afoso fonva e perme SRI ARE Figure 6 2 Alarm user defines 71 2 CONTROL APPLICATIONS Ltd r
12. Current Table to Line 1 Line 2 Line 3 Neutral Line LO and Lines 1 2 3 together 5 11 5 Current THD TDD KF 1 From Main Menu scroll to Power Quality Display and Click Enter 2 Scroll to THD TDD KF Current 62 2 CONTROL APPLICATIONS Ltd rx Sales FENIKS PRO d 0 0 Slovenia www feniks pro com 3 Click Enter the Current THD TDD KF Table screens appears Current THD TOD KF Figure 5 21 Current THD TDD KF 4 In order to enable the system to calculate properly the TDD value user should set the max line current value by using F4 5 11 6 EN50160 event monitoring and Wave records When a power quality event occurs as specified in the EN50160 standard Elnet PQ stores the record of it in its memory This record can be downloaded to the PC later on for detailed analyze Before starting the EN50160 events record mode the nominal 63 2 CONTROL APPLICATIONS Ltd r Sales FENIKS PRO d 0 0 Slovenia www feniks pro com voltage range must be defined 1 Access the Technical Menu see chapter 4 1 2 Scroll to Next and click Enter 3 Scroll to PQ Parameters and click Enter 4 The PQ Parameters screen appears 11 12 11 17 63 06 PQ Parameters Set V Nominal Start EN50160 Long Event Sec Before Long Event Length Long Event High Cur L1 Long Event Cur HYS Force Long Event Now se ee A Figure 5 22 PQ Parameters 5 Scroll to Set V Nominal 6 Click Enter the
13. Installation provides detailed instructions for unpacking mechanical mounting and electrical wiring up instructions for the Installation Technician CHAPTER 3 Using the ElNet Energy amp Powermeter describes in detail front Panel the functions of the control buttons and the Lock Utility gt CONTROL APPLICATIONS Ltd r Sales FENIKS PRO d 0 0 Slovenia www feniks pro com CHAPTER 4 Parameter Configuration amp Settings explains in detail the minimum parameters settings needed by the Senior Electrical Engineer to set up and configure the ElNet Energy amp Powermeter CHAPTER 5 Front Panel Displays is an easy to follow step by step guide to obtain readings graphs tables and histories for the User CHAPTER 6 Alarm reports gives details about how to program the Alarms in the EUNet Energy amp Powermeter CHAPTER 7 Demand reports is an easy to follow step by step guide to obtain the Demand reports up to 2 years CHAPTER 8 Data Logging is an easy to follow step by step guide to obtain all the stored peaks of current voltage energy power factor etc up to 2 years of data logging CHAPTER 9 Communications gives details about the Communication capabilities of the ElNet Energy amp Powermeter and how to Set Up CHAPTER 10 Specifications is a detailed list of specifications of the ElNet Energy amp Powermeter APPENDIX A Installation amp Configuration Check List provides a Check List to insure no importa
14. Ltd r Sales FENIKS PRO d 0 0 Slovenia www feniks pro com 5 6 Reactive Power for all 3 Phases Q To display Reactive Power for all 3 phases 1 From Main Menu scroll to Power Display 2 Click Enter the Active Power screen appears Figure 5 5 3 Click F3 the Reactive Power screen appears Reactive Power Figure 5 7 Reactive Power Refer to section 5 4 for description of peaks The CLEAR button resets the Peak values 4 In order to view the readings in online graphical mode press on Enter button 52 gt CONTROL APPLICATIONS Ltd rx Sales FENIKS PRO d 0 0 Slovenia www feniks pro com 5 7 Apparent Power for all 3 Phases S To display Apparent Power for all 3 phases 1 From Main Menu scroll to Power Display 2 Click Enter the Active Power screen appears Figure 5 5 3 Click F2 The Apparent Power screen appears APParent Power Figure 5 8 Apparent Power Refer to section 5 4 for description of peaks The CLEAR button resets the Peak values 4 In order to view the readings in online graphical mode press on Enter button 53 2 CONTROL APPLICATIONS Ltd r Sales FENIKS PRO d 0 0 Slovenia www feniks pro com 5 8 Power Factor for each Phase To display Power Factor for each phase 1 From Main Menu scroll to Power Display and click Enter 2 Click F3 to display TABLE format The Power Table screen appears
15. Set V Nominal screen appears Insert value Set V Nominal 00023530000 To save push ENTER To cancel push BACK 64 Lt Le CONTROL APPLICATIONS Ltd Sales FENIKS PRO d 0 0 Slovenia www feniks pro com Figure 5 23 Set V Nominal 7 Use button F3 or F4 to move the cursor left or right and Button F1 or F2 to decrease or increase the value or In order to start the EN50160 mode 8 To activate the EN50160 mode scroll to Start EN50160 and click Enter 9 The line will change to Stop EN50160 When in the line written STOP EN50160 it means that EN50160 is Active 5 11 7 Long PQ event special record Most of the power quality events as specified in the EN50160 standard occur in a very short time periods less than a second If a demand to make a special not according to EN50160 and long record several seconds exists the following definitions must be done 65 2 CONTROL APPLICATIONS Ltd rx Sales FENIKS PRO d 0 0 Slovenia www feniks pro com 1 Activate the EN50160 mode by repeating the steps from chapter 5 11 6 Scroll to Long Event Length 3 Click Enter the Long Event Length screen appears N Insert value Long Event Length tO0000F000 To save push ENTER To cancel push BACK Lt Le N Figure 5 24 Long Event Length 4 In order to set the value in seconds recommended is no more than 8 seconds use button F3 or F4 to move the cursor lef
16. length of the wiring of the transformer no longer than 3m 21 CONTROL APPLICATIONS Ltd Sales FENIKS PRO d 0 0 Slovenia www feniks pro com Insert the lead from side K of the Current Transformers of Line 1 through the bottom of the CT core I1A top left looking from back of the EUNet Energy amp Powermeter Ensure the leads from leg K of the Current Transformer on Line 1 pass through the bottom of CT core I1A Ensure the other end of the lead emerging from the top of C T core 1A is connected to leg L of the Current Transformer on Line 1 WARNING Never allow an open circuit between the two Current Transformers Repeat the procedure for Line 2 and Line 3 In ElNet PQ repeat also for Neutral Line In Connect the rest of the connections to the EUNet Energy amp Powermeter by means of terminal connector plugs The Rear Panel See Figure 2 7 has all connections printed and are simple to follow See table 2 1 for connections 22 CONTROL APPLICATIONS Ltd Sales FENIKS PRO d 0 0 Slovenia www feniks pro com LETE N V1 V2 V3 Np DDAA Ethernet Elnet GR i 1RJ451 sal RS 485 _ R5232 D OU TRE DN 12 3 4C 7 8 9 1011 12 13 14C 6 Figure 2 7 Rear Panel Elnet GR e Elnet PQ Ethernet rae D IN 7 8 9 10 11C Figure 2 8 Rear Panel Elnet PQ 23 2 CONTROL APPLICATIONS Ltd r Sales FENIKS PRO d 0 0 Slovenia www feniks pro com Pin
17. pro com 3 3 Lock Utility To lock and unlock the Control Buttons The Control Buttons can be locked against any unauthorized or accidental usage Only sub menus can be locked The Lock Utility does not work on the Main Menu To lock press Enter for six 6 seconds A Keyboard Locked message appears on the screen when any button is pressed WOLTAGE RHS PEHE mt 231 2 2558 2 n Volt Keybord lLockedt T2307 4229 F Figure 3 3 Keyboard locked 30 2 CONTROL APPLICATIONS Ltd r Sales FENIKS PRO d 0 0 Slovenia www feniks pro com To Unlock simply press Enter for six 6 seconds A Keyboard Unlocked message appears on the screen and normal functions can resume WOLTAGE FHS Pt 2305u 238 2 va Lt keybord un foes Figure 3 4 Keyboard Unlocked NOTE In the event of a general power failure the EUNet GR will return to the screen that was showing before the power failure occurred 31 CONTROL APPLICATIONS Ltd Sales FENIKS PRO d 0 0 Slovenia www feniks pro com CHAPTER 4 NECESSARY ElNet SETTINGS In this chapter you will find instructions to set the minimum settings that are necessary to allow the ElNet Energy amp Powermeter to function properly WARNING The selection installation and settings of the Current Transformer are the most vital and fundamental actions required to ensure the accuracy of the ElNet Energy amp Powermeter It
18. 8 parameters the information contained in the ElNet fields is stored in several files File number is determined by the Item number File 0 contains Item number 1 128 File 1 contains Item number 129 256 File 2 contains Item number 257 384 File 3 contains Item number 385 512 4 Go to the correct Point number within that file Point number is determined by the formula Item number FILE X 128 Point Number 84 2 CONTROL APPLICATIONS Ltd r Sales FENIKS PRO d 0 0 Slovenia www feniks pro com E G 1 If the user the wishes to read Voltage Line 2 Item No 2 By applying the formula 2 0 X 128 2 File 0 and Point within that file 2 E G 2 If the user the wishes to read 30 Harmonics for Volts Linel Item No 330 By applying the formula 330 2 X 128 74 File 2 and Point within that file 74 E G 3 If the user the wishes to read 7 Harmonic for Current Line 3 Item No 467 By applying the formula 467 3 X 128 83 File 3 and Point number within that file 83 More Examples E G No Item Field Description File Point No 1 2 Voltage Line 2 0 2 2 330 30 Harmonics for Volts Linel 2 74 3 467 7 Harmonic for Current Line 3 3 83 4 128 0 128 5 129 1 1 6 256 1 128 7 257 2 1 8 384 20 Harmonics for Volts Line 3 2 128 9 385 21 Harmonics for Volts Line3 3 1 Table 6 6 Examples how to calculate Point for UniArt 85 2 CONTROL APPLICATIONS L
19. Hz Active power total phase 0 000 W 99999MW Reactive power total phase 0 000VAR 99999MVAR Apparent power total phase 0 000VA 99999MVA Power Factor cap ind 1 000 1 000 1 000 1 000 1 000 1 000 Active Energy total phase 0 001 WH 99999999MWH Reactive Energy total phase 0 001 VARH 99999999MVARH Apparent Energy total phase 0 001 VAH 99999999MVAH Harmonic THD V I 0 000 100 Partial Harmonic V I 0 000 100 Operating hour meter Table 7 1 GR Measurement amp Display 99999 HH MM SS 87 CONTROL APPLICATIONS Ltd Sales FENIKS PRO d 0 0 Slovenia www feniks pro com Elnet PQ Measurement amp Displa Measurement Parameter Current Display Range in direct connection scaling factor 1 0 001 6A scaling factor 1 Measuring in direct connection scaling factor 1 0 001 6A Display Range 0 001 99999KA Neutral Current 0 001 6A 0 001 6A 0 001 99999KA Voltage L N 0 000 510 V 0 000 510 V 0 001 99999KV Voltage L L 0 000 510 V 0 000 510 V 0 001 99999KV Frequency Hz 45 001 65 001 Hz 45 001 65 001 Hz 45 001 65 001 Hz Active power total phase 0 000 W 99999MW Reactive power total phase 0 000VAR 99999MVAR Apparent power total phase 0 000VA 99999MVA Power F
20. NIKS PRO d 0 0 Slovenia www feniks pro com To wire up the ElNet PQ Energy amp Powermeter in Star connection f Supply oL2 Load Alterante External Power Supply Figure 2 5 PQ Schematic Star Wiring Diagram 19 CONTROL APPLICATIONS Ltd Sales FENIKS PRO d 0 0 Slovenia www feniks pro com To wire up the ElNet PQ Energy amp Powermeter in Delta connection Alterante External Power Supply a ee Figure 2 6 PQ Schematic Delta Wiring Diagram 20 CONTROL APPLICATIONS Ltd Sales FENIKS PRO d 0 0 Slovenia www feniks pro com 2 4 Rear Panel Connections Please re read section 1 3 for safety instructions To connect the Rear Panel All Connections except those to the CT core of the ElNet Energy amp Powermeter are made via terminal connector plugs Voltage input Power Supply Communication etc Maximum recommended tightening torque for the connector screws is 0 5 Nm The CT cores of the ElNet Energy amp Powermeter are located externally on the rear of the instrument and the lead from the leg of the external Current Transformer must pass through in the correct direction NOTE Ensure all the connections to the leads of the current transformer wiring are secure and there is no mechanical strain on the wire The cross section of the leads to the current transformer must be compatible to the power of the current transformer We recommend a power transformer with at least 3VA and the
21. Net Energy amp Powermeter boasts a new innovative built in Flash Memory which pioneers a new frontier into electrical measurement It has a 1 MB of FLASH MEMORY with a capacity of recording up to 2 years of power malfunctions and interruptions gt CONTROL APPLICATIONS Ltd r Sales FENIKS PRO d 0 0 Slovenia www feniks pro com Readings graphs tables amp history are shown on the graphic display of the ElNet Energy amp Powermeter This display is a state of the art screen with a resolution of 160X128 Each ElNet Energy amp Powermeter is carefully and meticulously manufactured using quality components and the latest production methods Before leaving the factory each ElNet Energy amp Powermeter is calibrated and sent to the customer accompanied by the test certificate and Certificate of Compliance C O C 1 2 How to use this manual We at CONTROL APPLICATIONS Ltd envisage this manual to be used by three types of people i e the Installation Technician the Senior Electrical Engineer and the end User For this reason this manual is divided into chapters for ease of reference by each of these different people There could be a situation where two of the abovementioned tasks can be combined or in a rare instance one person could handle all three tasks CHAPTER 1 Introduction describes the EUNet Energy amp Powermeter its potential users the readings it can provide and some of its features in brief CHAPTER 2
22. ONTROL APPLICATIONS Ltd Sales FENIKS PRO d 0 0 Slovenia www feniks pro com 9 4 Baud Rate The Baud Rate is the communication speed in Bits Per Second BPS that the EUNet Energy amp Powermeter communicates with the PC master The better the communication line Quality the faster the communications may be If the communication line is routed through a noisy environment it may be necessary to decrease the Baud Rate Available Baud Rates for the ElNet Energy amp Powermeter 600 bps 1200 bps 2400 bps 4800 bps default 9600 bps 19200 bps 38400 bps 9 5 Parity The choices of parity are either NONE or EVEN 80 2 CONTROL APPLICATIONS Ltd r Sales FENIKS PRO d 0 0 Slovenia www feniks pro com 9 6 Communication Set Up To set up Serial Communications 1 See Section 4 1 for instructions to arrive at the Technical Menu 2 From Technical Menu scroll to Communication Settings 3 Click Enter the Communication Setup screen appears 16 15 07 Communication Setup Erion Ethernet IP Comm Ethernet MAC comm Ethernet Speed H10MB ModBus Float Swapped tt Figure 9 1 Communication Setup 4 From Communication Setup Menu scroll to Serial Comm 5 Click Enter the Communications Settings screen appears 81 2 CONTROL APPLICATIONS Ltd r Sales FENIKS PRO d 0 0 Slovenia www feniks pro com Communication setting a e et Figure 9 2 Communications Settings 6 Use Bu
23. PLICATIONS Ltd supplies this User Manual as is without warranty of any kind either expressed or implied and reserves the right to make improvements and or changes in the manual or the product at any time While it is the intention of CONTROL APPLICATIONS Ltd to supply the customer with accurate and reliable information in this User Manual CONTROL APPLICATIONS Ltd assumes no responsibility for its use or for any infringement of rights of the fourth parties which may result from its use This User Manual could contain technical or typographical errors and changes are periodically made to the information herein these changes may be incorporated in new editions of the publication 12 CONTROL APPLICATIONS Ltd Sales FENIKS PRO d 0 0 Slovenia www feniks pro com CHAPTER 2 INSTALLATION 13 In this Chapter you will find the information and instructions that the Installation Technician needs to mount and connect the EtNet Energy amp Powermeter WARNING e During operation hazardous voltages are present in connecting cables and terminal blocks e Fully qualified personnel must do all work Failure to follow this rule may result in serious or even fatal injury to personnel and or damage to equipment e Refer to Section 1 3 Safety information before carrying out any installation e Read this manual thoroughly and make sure you understand the contents before connecting the ElNet Energy amp Powermeter to any power sour
24. Power disPlay Power units KW KVAR KVA Pei of sj Prt Figure 5 9 Power Table Parameter Description Unit P Active Power for each Line Watts Q Reactive Power for each Line VAR S Apparent Power for each Line VA xP Total Active Power for all 3 Lines Watts ZQ Total Reactive Power for all 3 Lines VAR 2S Total Apparent Power for all 3 Lines VA PF Overall Power Factor Table 5 2 Power Readings 54 2 CONTROL APPLICATIONS Ltd rx Sales FENIKS PRO d 0 0 Slovenia www feniks pro com 3 Click F4 PF The Power Factor for each Line screen appears Power Factor Figure 5 10 Power Factor for each line 5 9 Overall Power Factor To display Overall Power Factor 1 From Main Menu scroll to Power Display 2 Click Enter and then click F4 3 The Power Table screen appears Power disPlay Power units KW KVAR IKVA Overall Power Factor Figure 5 11 Power Table CONTROL APPLICATIONS Ltd Sales FENIKS PRO d 0 0 Slovenia www feniks pro com 5 10 Active Reactive Apparent Energy To display Overall Active Reactive Apparent Energy 1 From Main Menu scroll to Energy Display 2 Click Enter the Energy Meter screen appears Total Energy IMPORT fkwh Energy a 38 Aa Ds Energy OU kVAh 03323565 Fines Uyrorn J Energy Figure 5 12 Energy Meter 3 Click F1 to read Energy in each Rate at Ratel Rate 2 and Rate3 4 Click
25. Sales FENIKS PRO d 0 0 Slovenia www feniks pro com Set Delay Timers Up to sixteen delay timers can be defined in the ElNet Meter user can link for each one of the timers one or more alarms the delay timer will check that the alarm is stable and will not write the alarm in the memory of the ElNet unless the alarm is in ON position for the time duration as set In order to set the time duration for the sixteen timers select Set Delay Timer form the screen described in Figure 6 1 Alarm Setting Screens the following screen appears Set Delay Timer Timer 1 Time Sec 1 a tt se l Figure 6 3 Timer Delay By using T T F2 F3 the timer number can be changed By using SEC F4 the time delay value can be changed 72 2 CONTROL APPLICATIONS Ltd r Sales FENIKS PRO d 0 0 Slovenia www feniks pro com 6 2 Display Alarms Report Two alarm reports can be generated Historical alarm report includes all the information about fixed alarms return to normal status Current alarm report includes all the information about existing alarms 1 In order to generate an alarm report from the Main Menu scroll to Alarm report and press Enter 2 Scroll to Historical Repot or Current report and select one of them by using F3 or F4 and press Enter A list of alarms appear 3 Press INFO F1 in order to get detailed information The
26. Set Digital Out 4 Use F2 F3 or F4 to scroll to the relevant mode and digital out number 5 Use F1 for set the mode 43 2 CONTROL APPLICATIONS Ltd r Sales FENIKS PRO d 0 0 Slovenia www feniks pro com 4 8 Delta Star Electrical network definition The ElNet GR PQ can be installed in two types of electrical networks DELTA a system without neutral line STAR a system with neutral line In order to change the type of the electrical network definition in the Elnet GR PQ see section 4 1 for instructions how to arrive at the Technical Menu 1 From Technical Menu scroll to Set Connections and Click ENTER 2 The Connection screen appears Delta Star Figure 4 13 Delta Star Connection 3 Use F3 F4 in order to change the connection type When you are using DELTA networks the currents line currents and the voltages between phases are not in the same phase therefore part of the measurements are not applicable and part of the display screens are not applicable 44 2 CONTROL APPLICATIONS Ltd r Sales FENIKS PRO d 0 0 Slovenia www feniks pro com 4 9 Demand Setting The ElNet GR PQ can determine the demand cycle time In order to change the cycle time connected to the Elnet GR PQ See Section 4 1 for instructions to arrive at the Technical Menu 1 From Technical Menu scroll to Next and Click Enter 2 Scroll to Demand Setting and Click Enter
27. actor cap ind 1 000 1 000 1 000 1 000 1 000 1 000 Active Energy total phase 0 001 WH 99999999M WH Reactive Energy total phase 0 001 VARH 99999999M VARH Apparent Energy total phase 0 001 VAH 99999999M VAH Harmonic THD WM 0 000 100 Partial Harmonic V I 0 000 100 Operating hour meter Table 7 2 PQ Measurement amp Display 99999 HH MM SS 88 2 CONTROL APPLICATIONS Ltd r Sales FENIKS PRO d 0 0 Slovenia www feniks pro com Appendix A Installation amp Configuration Check List INSTALLATION CHECK LIST Description Date Signature Check contents of packaging Remove from packaging Prepare hole Mount Meter Connect Meter power supply Connect 3 Current Transformers Connect 3 Voltage lines Connect Neutral line Set Current Transformer Ratio Connect Communication lines Check Phase Order Connections Set Time and Date Appendix A Table Installation amp Configuration Check List 89
28. ant power factor the time The date for all three phases the demand is the maximum value within the predefine time interval specified by the user Press F1 in order to select I PF Current power factor maximum Demand Press F2 in order to select P Q S active reactive apparent power Demand Press F4 in order to see the power factor together with the power demand Press F3 DATE in order to change the time interval within which the ElNet will check the maximum demand 75 2 CONTROL APPLICATIONS Ltd r Sales FENIKS PRO d 0 0 Slovenia www feniks pro com CHAPTER 8 DATA LOGGING ElNet meter collects automatically important electrical data day by day for approximately two years From the Main Menu scroll to Data Logging and press Enter The following screen appears Daily Peaks Power Demand Total Energy Daily Energy Set Fast Trend es ee E E E A Figure 8 1 Data Logging Daily peaks Scroll to Daily peaks and press Enter then you will be able to get the following information Daily Peaks Current Peaks Voltage Peaks Active Power Reactive Power Apparent Power Power Factor es ee ee A Figure 8 2 Daily Peaks 76 CONTROL APPLICATIONS Ltd Sales FENIKS PRO d 0 0 Slovenia www feniks pro com For each one of the above options you will have the ability to get for each phase the lowest level value and the highest level value as specified in the
29. ble 2 2 Production Data 27 CONTROL APPLICATIONS Ltd Sales FENIKS PRO d 0 0 Slovenia www feniks pro com CHAPTER 3 USING THE ElNet Meter In this chapter you will find descriptions and functions of the front panel and the control buttons and how to use them 3 1 Front Panel To operate the front panel The Front Panel has a graphic screen and 6 operating buttons All the readings are shown on a state of the art 160 X 128 resolution graphic screen and are explained in detail in Chapter 5 The Control Buttons and their functions are fully explained in Section 3 2 Figure 3 1 Front Panel 28 CONTROL APPLICATIONS Ltd Sales FENIKS PRO d 0 0 Slovenia www feniks pro com 3 2 Control Buttons To operate the Control Buttons on Front Panel The ElNet Energy amp Powermeter has six Control Buttons With these buttons the user can achieve all the functions necessary The Control Buttons are arranged on a keypad below the display screen and require slight finger pressure to click ea a ee rc Figure 3 2 Control Buttons accepts the choice and executes the Button commands performs the function that the arrow above is pointing to e g move the curser or selects the prompt that the arrow is pointing to Punoi 2 Fs performs exactly same actions as button F1 returns to the previous step or to the Back Main Menu 29 2 CONTROL APPLICATIONS Ltd r Sales FENIKS PRO d 0 0 Slovenia www feniks
30. c Distortion for the first 64 Harmonics These are presented in a table format with the Total Harmonics Distortion THD also shown To display Harmonics Tables 1 From Main Menu scroll to Power Quality Display 2 Click Enter the Power Quality screens appears 3 Scroll to Harmonic Table 4 Click Enter the Harmonics Volt Table screens appears L1 Voltage Harmonics 12 0 279 0 252 4 0 853 2 673 13 6 0 320 14 0 254 f 0 442 15 0 307 8 0 385 16 0 178 Lf vot lne f ne fl Figure 5 18 Harmonic Volt Table 5 Click F4 to scroll down the Table to observe all Volt Harmonics till 60 6 Click F3 to change Harmonics Volt Table to Line 1 Line 2 Line 3 and Lines 1 2 3 together 5 11 4 Current Total Harmonic Distortion THD To display Harmonics Current Table 61 2 CONTROL APPLICATIONS Ltd rx Sales FENIKS PRO d 0 0 Slovenia www feniks pro com 1 Repeat steps 1 4 from Section 5 13 3 2 Click F2 The Harmonic Current Table screens appears L1 Current Harmonics value Value a 100 0 9 4 525 2 443 3 623 O 2 795 0 549 3 996 0 801 1 165 0 682 Lf vott ft tine Next _ 1 1 1 2 11 3 0 801 14 1 5 1 6 Figure 5 19 Harmonic Current Table 3 Click F4 to scroll down the Table to observe all the Current Harmonics till 60 4 Click F3 to change Harmonics
31. ce CONTROL APPLICATIONS Ltd Sales FENIKS PRO d 0 0 Slovenia www feniks pro com 2 1 Contents of packaging The ElNet Energy amp Powermeter is packed and shipped in a carton approximately 24 5 cm long X 19 cm wide X 12 and cm high Before opening the package ensure the area clean and dry Without using any sharp instruments carefully open the carton of the ElNet Energy amp Powermeter Please check the contents of the carton it should contain Elnet GR Elnet PQ 1 Your new Elnet Energy amp Your new Elnet Energy amp Powermeter Powermeter 2 Elnet GR PQ User Manual Elnet GR PQ User Manual this book this book 3 Test Certificate and Test Certificate and Certificate of Compliance Certificate of Compliance C O C C O C 4 Apair of Panel mounting A pair of Panel mounting clips clips 5 1 X two pole connector 2 X two pole connector plug plug 6 1 X three pole connector 1 X Four pole connector plug plug 7 1 X Four pole connector 1 X Five pole connector plug plug 8 1 X Five pole connector plug 14 CONTROL APPLICATIONS Ltd Sales FENIKS PRO d 0 0 Slovenia www feniks pro com 2 2 Mechanical mounting To Mount the ElNet Energy amp Powermeter Do not mount the ElUNet Energy amp Powermeter too close to any main electrical conductors Allow sufficient space to carry out maintenance to the back of the ElNet Energy amp Powerme
32. et for new event 5 Repeat on steps 1 to 4 from chapter 5 11 7 6 Scroll to Long Event Cur Hys 7 Click Enter the Long Event Cur Hys screen appears 68 2 CONTROL APPLICATIONS Ltd r Sales FENIKS PRO d 0 0 Slovenia www feniks pro com Insert value Long Event Cur Hys t00000M 000 To save push ENTER To cancel push BACK ae ee l Figure 5 27 Long Event Cur Hys 8 Set the low current value that will stop the special record by using button F3 or F4 to move the cursor left or right and Button F1 or F2 to decrease or increase the value or 4 2 Activating by communication 1 Writing value of 1 to Modbus register 1299 1300 Check Chapter 9 Communication 4 3 Activating from PQ menus 1 Repeat on steps 1 to 4 from chapter 5 11 7 2 Scroll to Force Long Event Now 3 Click Enter to start recording 69 2 CONTROL APPLICATIONS Ltd r Sales FENIKS PRO d 0 0 Slovenia www feniks pro com CHAPTER 6 ALARM REPORT Every second automatically the ElNet monitors all the electrical values and compare them to the pre setting alarm values The ElNet can handle and store up tol 000 alarms in the EtNet memory with their time amp date data The ElNet has three alarm relays each one of them can be linked to one or more pre defined alarms The following alarms can be defined Lines 1 Voltage alarms L1 L2 L3 2 Current alarms L1 L2 L3 Neutral line 3
33. following screen Current Peaks Lowest Value L1 3 Lowest Value L1 Lowest Value L Lowest Value L3 Highest Value L123 Highest Value L1 Highest Value L2 Highest Value L3 re ee a a Figure 8 3 Current Peaks Select one of the above options and press Enter the following screen will appear Figure 8 4 Current Min L1 F1 F2 change the interval time base between week month 128 days F3 F4 change the date each press will increase decrease the date by week month 128 days 77 2 CONTROL APPLICATIONS Ltd r Sales FENIKS PRO d 0 0 Slovenia www feniks pro com Power Demand The operation metod is very similar to the above paragraph Daily peaks and the informatin includes the maximum average for 15 minutes of the active power reactive power and apparent power demand Total Energy The operation metod is very similar to the above paragraph Daily peaks and the informatin includes the toatl energy values for active energy reactive energy and apparent energy for each phase and total energy Daily Energy The operation metod is very similar to the above pragraph Daily peaks and the informatin daily energy consumption for active energy reactive energy and apparent energy for each phase and total energy Set Fast Trend Selecting Set Fast Trend form the screen described in Figure 8 1 will enable you to set a trend report The size of the trend report is 6939 samples
34. following screen appears Alarm Details Low Power KW L0 14 10 28 OFF 08 12 11 Alarm Set Point Measured Value lt Number Of Events Figure 6 4 Alarm Details 73 2 CONTROL APPLICATIONS Ltd r Sales FENIKS PRO d 0 0 Slovenia www feniks pro com 6 3 Display EN50160 Event Report In addition to alarm reports an EN50160 event report can also be generated 1 In order to generate an event report from the Main Menu scroll to Alarm report and press Enter 2 Scroll to EN50160 Events and press Enter A list of EN50160 events appear 3 Press Enter in order to get detailed information The following screen appears EN50160 Events Description Value Voltage Transient 3 10 09 2012 07 03 09 MicroSecond 741000 V Nominal 230 Value 396 4h 1722 Length 0 00013 Event ID 23 ee J Figure 6 5 EN50160 event Details 74 CONTROL APPLICATIONS Ltd Sales FENIKS PRO d 0 0 Slovenia www feniks pro com CHAPTER 7 DEMAND REPORTS ElNet Meter can generate reports that will inform the user the date of the maximum demand The reports include Maximum Demand for active power and power factor Maximum Demand for reactive power and power factor Maximum Demand for apparent power and power factor Maximum Demand for current The ElNet informs the value of the demand and the relev
35. is essential to know the ratio of the Current Transformer being installed into the system in order to set the parameter for the Current Transformer correctly All three main current Lines MUST have Current Transformers of the same ratio installed onto them 32 2 CONTROL APPLICATIONS Ltd r Sales FENIKS PRO d 0 0 Slovenia www feniks pro com 4 1 Settings for Current Transformer To set or change settings for Current Transformer The most important setting necessary for the proper functioning of the ElNet Energy amp Powermeter is the Current Transformer setting The cross section of the leads to the current Transformer must be compatible to the power of the current transformer We recommend a power transformer with at least 3VA and the length of the wiring of the transformer no longer than 3m 1 From Main Menu scroll to Technical Menu 2 Click Enter the Check Password screen appears Check Password password At the end Let gt it tt Figure 4 1 Check Password The default password is 1 33 2 CONTROL APPLICATIONS Ltd rx Sales FENIKS PRO d 0 0 Slovenia www feniks pro com 3 Move the cursor with the F1 F2 F3 amp F4 buttons to number 1 See Section 3 2 for description of button functions 4 Click Enter the number 1 will appear in the password field password At the end click Figure 4 2 Password Field 5 Move the cursor to the Sign with F1 F2 F3 amp F4 buttons
36. nt steps will be missed during the initial set up gt CONTROL APPLICATIONS Ltd r Sales FENIKS PRO d 0 0 Slovenia www feniks pro com 1 3 Safety Information The purpose of this manual is to help you Please read the instructions carefully before performing any installation and note any precautions e Ensure that all incoming AC power and other power sources are turned off before performing any work on the ElNet Energy amp Powermeter Failure to do so may result in serious or even fatal injury and or equipment damage e Ifthe ElNet Energy amp Powermeter is damaged in any way do NOT connect it to any power source e To prevent a potential fire or shock hazard never expose the ElNet Energy amp Powermeter to rain or moisture e Keep the surrounding area free of dirt and clutter especially metal objects Good housekeeping pays e Inspect the cables periodically for cracks kinks or any other signs of wear e Keep children away e Do not pull the cords e Users should stay alert and not approach the rear of the ElNet Energy amp Powermeter while tired or under the influence of alcohol medicines or any other chemical substance that would tend to make a person drowsy e Do not wear loose clothing or dangling jewelry e Above all use common sense at all times gt CONTROL APPLICATIONS Ltd r Sales FENIKS PRO d 0 0 Slovenia www feniks pro com 1 4 Warranty CONTROL APPLICATIONS Ltd provides a 12 Month warran
37. of all the measurements currents voltages power power factor and more for all phases The user can set only the cycle time sampling rate and the range is from one second up to 3600 seconds one hour Set Fast Trend Max Trend Records 6939 Current Record 48 Cycle Time Seconds 0 _ _IL stor clear _ Figure 8 5 Set Fast Trend 78 CONTROL APPLICATIONS Ltd Sales FENIKS PRO d 0o 0 Slovenia www feniks pro com CHAPTER 9 COMMUNICATION 79 9 1 Communication Connections The ElNet Energy amp Powermeter supports RS485 and Ethernet The connection is provided on the Rear Panel see Figure 2 5 or 2 6 and is made by means of the connectors provided The same information can be transmitted along both but only one at a time The user can choose the one that best suits his current situation and equipment The RJ45 sockets support a standard connection to any Ethernet network 9 2 Communication Settings To enable the User connecting the ElNet Energy amp Powermeter to a PC master computer for successful communications the Communication Setup parameters of both must match i e the port of the PC master and the configuration settings of the Powermeter 9 3 Address Each Powermeter in a communication system must have its own unique address Since the ElNet Energy amp Powermeter works on MODBUS the available addresses are from 1 to 247 BACnet communication is also available C
38. r replacement or for the remainder of the original product s warranty period whichever is longer CONTROL APPLICATIONS Ltd is always at your service to advise the customer on any problem that may be encountered regarding any installation operation parameter amp configuration settings or maintenance 10 CONTROL APPLICATIONS Ltd Sales FENIKS PRO d 0 0 Slovenia www feniks pro com 1 5 Your comments are welcome 11 CONTROL APPLICATIONS Ltd sincerely thanks you for choosing our ElNet Energy amp Powermeter We are confident that it will provide you with many years of trouble free service and give you all the power and energy information and history that you expected from the instrument when you bought it While every effort was made to keep the information as reliable helpful accurate and up to date as possible all possible contingencies cannot be covered Technical or typographical errors could occur and we would be happy to receive any comments criticisms or notifications of any such errors from you our valued customer Street Address 24A HaBarzel St Tel Aviv 69710 Israel Tel 972 3 647 4998 Fax 972 3 647 4598 Electronic Address cal ddc co il gt CONTROL APPLICATIONS Ltd r Sales FENIKS PRO d 0 0 Slovenia www feniks pro com 1 6 Disclaimer Information in this User Manual is subject to change without notice and does not represent a commitment on the part of CONTROL APPLICATIONS Ltd CONTROL AP
39. sssssseees 87 Appendix A Installation amp Configuration Check List 89 gt CONTROL APPLICATIONS Ltd r Sales FENIKS PRO d 0 0 Slovenia www feniks pro com CHAPTER 1 INTRODUCTION 1 1 About the ElNet Meter Large consumers of electricity e g factories hotels hospitals municipalities need to know the history of their consumption and the quality of the power supply Details such as Voltage Current Power Factor Hertz Neutral Current Energy Demands and all electricity related events are recorded in the ElNet Energy amp Powermeter An additional feature of the Meter is the ability to measure Harmonics Part of the Electricity Supply Authority s bill reflects poor or good Harmonics in the consumer s system therefore it is in his interest to monitor Harmonics and try to improve it These are all recorded on a continual basis and can be recalled and shown on the front panel display of the instrument with a few simple key strokes any time the user wishes The ElNet Energy amp Powermeter is a compact multi functional three phase Meter simple to install and is especially designed to integrate into Building Management Systems It requires no special mounting and is ideally suited for mounting on the front face of any standard electrical panel The Configuration and Setup is menu driven with password protection Communication with external devices is simple and is based on standard known technology The El
40. t or right and Button F1 or F2 to decrease or increase the value or 66 2 CONTROL APPLICATIONS Ltd r Sales FENIKS PRO d 0 0 Slovenia www feniks pro com If a demand to start the record a few seconds before the long event begins 1 Repeat on steps 1 to 4 from chapter 5 11 7 2 Scroll to Long Event Sec Before 3 Click Enter the Long Event Sec Before screen appears Insert value Long Event Sec Before tOO000E 000 To save push ENTER To cancel push BACK t et N Figure 5 25 Long Event Sec Before 4 Use button F3 or F4 to move the cursor left or right and Button F1 or F2 to decrease or increase the value or There are 3 triggers to start the special long record 4 1 Changes in current of Line 1 1 Repeat on steps 1 to 4 from chapter 5 11 7 2 Scroll to Long Event High Cur L1 3 Click Enter the Long Event High Cur L1 screen appears 67 2 CONTROL APPLICATIONS Ltd r Sales FENIKS PRO d 0 0 Slovenia www feniks pro com Insert value Long Event High Cur iL1 000010 000 To save push ENTER To cancel push BACK EAIC N Figure 5 26 Long Event High Cur L1 4 Set the high current value that will start the special record by using button F3 or F4 to move the cursor left or right and Button F1 or F2 to decrease or increase the value or Setting hysteresis value in line 1 to return to normal and res
41. tal Output The Digital Output of the GR PQ can be used to transmit pulses of energy to external BMS controller chapter 4 6 or to close contact upon alarm chapter 5 4 3 which can be defined in the GR PQ same output cannot be used for both simultaneously The Digital Out closes contact of Relay between pins 1 2 3 to 4c the maximum load is 1 Amp Digital Inputs In order to change the status of the Digital Inputs of the GR PQ a 220 VAC contact must be provided The indication voltage should be supplied from one of the measured phases The digital inputs status can be monitored by communication Figure 2 9 Digital In Digital Out wiring example 26 2 CONTROL APPLICATIONS Ltd r Sales FENIKS PRO d 0 0 Slovenia www feniks pro com 2 6 Manufacturing Data Press F1 on the keyboard for 6 seconds The following screen will appear Elnet Information Er Date Nov 16 2011 Ep Time 12 34 51 Version 660 PQ Comm 1 Unit ID 15037425 IP 192 168 47 254 MC 00 02 79 A8 2F FE Conn Type STAR Lt Shen Figure 2 10 Elnet Information Number Screen Description l Ep Date Production date of software operating system 2 Ep Time No of times the program has been updated 3 Version Program version no 4 Comm Address of MODBUS Protocol 5 Unit ID Consecutive calibration no 6 IP Ethernet IP address 7 MC Ethernet MAC address 8 Conn Type Connection type Star Delta Ta
42. td r Sales FENIKS PRO d 0 0 Slovenia www feniks pro com CHAPTER 10 Specifications Item Description Power requirements 110 230VAC 60 50 Hz 30VA Dimensions HxWxD 144x144x100 mm Shipping Weight 750 gr Measuring voltage limits 700 VAC Measuring current limits 6A Operating Voltage limits 1000VAC Operating Current limits 50A Enclosure material ABS Anti flame Display Graphic 160x128 Operating temperature 20 50 C Storage temperature 20 80 C Humidity 0 90 RH Voltage input terminals VL E10 1708 Communication port RS232 GR only RS485 TCP Mounting Front Panel Mounting All technical specifications are subject to change without notice 86 CONTROL APPLICATIONS Ltd Sales FENIKS PRO d 0 0 Slovenia www feniks pro com 10 1 Measurement amp Display Elnet GR Measurement amp Display scaling factor 1 Measurement Parameter Current Display Range in direct connection scaling factor 1 0 001 6A Measuring in direct connection scaling factor 1 0 001 6A Display Range 0 001 99999KA Neutral Current calculated 0 001 6A 0 001 6A 0 001 99999KA Voltage L N 0 000 510 V 0 000 510 V 0 001 99999KV Voltage L L 0 000 510 V 0 000 510 V 0 001 99999KV Frequency Hz 45 001 65 001 Hz 45 001 65 001 Hz 45 001 65 001
43. ter Choose a suitable location and prepare a rectangular hole according to the dimensions shown in Figure 2 1 Height 138 mm Figure 2 1 Panel Cutout 15 CONTROL APPLICATIONS Ltd Sales FENIKS PRO d 0 0 Slovenia www feniks pro com Slide the ElNet Energy amp Powermeter into the pre prepared rectangular hole ensure it is the right way up then push the two mounting clips provided in the packaging into position Use mild force to ensure the clips are securely positioned on the outer case of the ElNet Energy amp Powermeter Tighten the two mounting screws and ensure the ElNet Energy amp Powermeter is firmly in place Figure 2 2 Mounting Clips 16 CONTROL APPLICATIONS Ltd Sales FENIKS PRO d 0 0 Slovenia www feniks pro com 2 3 Wiring Schematics To wire up the EUNet GR Energy amp Powermeter in Star connection Option2 External Power Supplay VDC w NVAC o 9 Option 1 Self Power Supply Only one power su ly option must be used Figure 2 3 GR Schematic Star Wiring Diagram 17 CONTROL APPLICATIONS Ltd Sales FENIKS PRO d 0 0 Slovenia www feniks pro com To wire up the EUNet GR Energy amp Powermeter in Delta connection Option2 External YDC Power Supplay gt N VAC Only one option must be used Option 1 Self Power Supply Figure 2 4 GR Schematic Delta Wiring Diagram 18 CONTROL APPLICATIONS Ltd Sales FE
44. the Main Menu scroll to Current amp Voltage 2 Click Enter The Current amp Voltage screen appears 3 Click F2 VOLT The Voltage screen appears RMS Voltage Figure 5 5 Voltage Displays 49 2 CONTROL APPLICATIONS Ltd r Sales FENIKS PRO d 0 0 Slovenia www feniks pro com Parameter Description Units L1 Voltage from Linel to Neutral Volts L2 Voltage from Line2 to Neutral Volts L3 Voltage from Line3 to Neutral Volts L12 Voltage across Linel and Line2 Volts L23 Voltage across Line2 and Line3 Volts L13 Voltage across Linel and Line3 Volts 5 1 Voltage Readings 5 5 Active Power for all 3 Phases P To display Active Power for all 3 phases 1 From Main Menu scroll to Power Display 2 Click Enter The Active Power screen appears Active Power Figure 5 6 Active power Table 50 CONTROL APPLICATIONS Ltd Sales FENIKS PRO d 0 0 Slovenia www feniks pro com Peak is the highest value reached for the adjacent reading since the EUNet Energy amp Powermeter was first switched on OR Since the last time the reset button was pressed Peak is the lowest value reached for the adjacent reading since the ElNet Energy amp Powermeter was first switched on OR Since the last time the reset button was pressed The CLEAR button resets the Peak values only for the screen presently being shown 51 2 CONTROL APPLICATIONS
45. ttings for Current Transformer 33 4 2 Electrical Connection Check ccccsses 36 gt CONTROL APPLICATIONS Ltd r Sales FENIKS PRO d 0 0 Slovenia www feniks pro com 4 3 TOU Sttaitiaisiicnnincincnminsiinntions 39 4 4 Change language sessessssssoocccessesessssooocseseee 40 4 5 Time Settings ssssooocsssssssssssoccccssssssoocsessee 41 4 6 Date Settings ssssoooccsessssssssosocsesssssssssosoee 42 4 7 Setting digital out esssssooooessessssssooecssssse 43 4 8 Delta Star Electrical network definition 44 4 9 Demand Settig scssccscsesscsconseccsssescecsovssccnnes 45 CHAPTER 5 FRONT PANEL DISPLAYS 0000000000 46 5 1 Current for 3 Phases cccccsssssssssessseeees 46 5 2 Frequency for 3 Phases essssssooescesesssosooe 47 5 3 Current in Neutral Line sssoooooeesessssso0000 48 5 4 Voltage for 3 Phases eeosoesessssssosoccesssssooeoe 49 5 5 Active Power for all 3 Phases P 50 5 6 Reactive Power for all 3 Phases Q 52 5 7 Apparent Power for all 3 Phases S 53 5 8 Power Factor for each Phase ssseee 54 5 9 Overall Power Factor ccccssssssssssscees 55 5 10 Active Reactive Apparent Energy 56 5 11 Power Quality scisscsissesassnsdiccssrscasasiandiassasecavese 57 5 11 1 Wave Form Graphs essssessssssosoosesessessssoooeo 57 5 11 2 Harmonics Bar Graphs
46. tton F1 or F2 to change value in selected field 7 Use Button F3 or F4 to select Address Baud Rate Parity When the selection is made it takes immediate affect with no further action required To set up Ethernet Communications 1 From the Communication Setup Menu scroll to Ethernet Comm 2 Click Enter the Set IP Address screen appears 82 2 CONTROL APPLICATIONS Ltd r Sales FENIKS PRO d 0 0 Slovenia www feniks pro com Ethernet IP Comm Set IP Address 192 168 ERG 246 Aled Figure 9 3 Set IP Address 3 Use Button F1 or F2 to change IP Address 4 Use Button F3 or F4 to move the cursor Click Back to return to Technical menu Click Back to return to Main menu 83 CONTROL APPLICATIONS Ltd Sales FENIKS PRO d 0 0 Slovenia www feniks pro com 9 7 Communication with UniArt Software CONTROL APPLICATIONS Ltd propriety software UniArt is used to Read and Write Registers of the ElNet Energy amp Powermeter Each Item number in the Registers Table is a unique field containing information The UniArt software manages each Item number as a parameter Refer to the UniArt manual how to set up parameters To read fields using UniArt 1 Find the reading required in the MODBUS Registers Table 2 Note the Item Number from the Registers Table 3 Go to the correct File number Because File capacity in UniArt is limited to 12
47. ty against faulty workmanship or components from date of dispatch provided that the product was properly installed and used CONTROL APPLICATIONS Ltd does not accept liability for any damage that may be caused by natural disasters such as floods fire earthquake lightening etc CONTROL APPLICATIONS Ltd does not accept liability for any damage that may be caused by malfunction of the ElNet Energy amp Powermeter CONTROL APPLICATIONS Ltd will advise the customer on the proper installation and use of the ElNet Energy amp Powermeter but will not accept any responsibility that the instrument is suitable for the application for which it was originally purchased This warranty may become void if the Installation Parameter Configuration amp Setting Instructions are not carried out according to the instructions set out by CONTROL APPLICATIONS Ltd The ElNet Energy amp Powermeter has no user serviceable parts and should be opened and serviced by a duly qualified authorized representative only The sensitive electronics could become damaged if exposed to a static environment This action would void the warranty CONTROL APPLICATIONS Ltd Sales FENIKS PRO d 0 0 Slovenia www feniks pro com This warranty is limited to the repair and or replacement at CONTROL APPLICATION Ltd sole discretion of the defective product during the warranty period Repaired or replaced products are warranted for ninety 90 days from the date of repair o
48. u 1 From Technical Menu scroll to Set Clock 2 Click Enter The Set Clock screen appears Set Clock Lels i I Figure 4 10 Set Clock 3 Use Fl or F2 buttons to select Hour Minute Second 4 Use F3 or F4 to change time 5 Use Back to return to Technical menu 41 gt CONTROL APPLICATIONS Ltd r Sales FENIKS PRO d 0 0 Slovenia www feniks pro com 4 6 Date Settings To set Date See Section 4 1 for instructions to arrive at the Technical Menu 1 From Technical Menu scroll to Set Date 2 Click Enter The Set Date screen appears Set date Set date ORI 12 11 Pe gt t Figure 4 11 Set Date 3 Use F1 or F2 to select Day Month Year 4 Use F3 or F4 to change Day Month Year 5 Use Back to return to Technical menu 42 2 CONTROL APPLICATIONS Ltd r Sales FENIKS PRO d 0 0 Slovenia www feniks pro com 4 7 Setting digital out The digital output chapter 2 5 can be used as an alarm pulse time table or trip PQ only output in order to set the digital output See section 4 1 for instructions to arrive at the Technical Menu From Technical Menu 1 Scroll to Next and click ENTER Scroll to Digital Out Setup and click ENTER 3 The Digital Out Setup screen appears Digital Out SetUp 1 2 Alarm Pulse T Tbl Trip Opt J Test pt et tl Figure 4 12
Download Pdf Manuals
Related Search
Related Contents
ANTI-HORMIGAS DMM Modular USB U2741A de Keysight Disposable Grasping Foreceps GMC-RM001 - Rockwell Automation Quick Start Guide Catheters Accu-Chek TenderLink 株 主 各 位 第40期定時株主総会招集ご通知 Intermec PC43t Home Decorators Collection 2689200410 Instructions / Assembly Copyright © All rights reserved.
Failed to retrieve file