Home

Essex Installation & User Manual

image

Contents

1. 16 Please refer to the labels with icons on the wires of the various low voltage components They may include Telephone CD player radio loudspeaker LED lights fan control panel and the ozonizer O3 shower self cleaner Connect the wires sharing the same labels and or properly mated connector pairs The radio antenna will need to be unrolled and placed for best reception See figure 18 Figure 18 17 Connect the hot and cold water hoses the red one is for hot water while the blue one is for cold Both the hot and cold water supply lines are half inch NPT pipe thread All electrical high voltage input wiring is to a terminal block as follows 110 volt AC as pictured to the right is Ll or hot neutral and ground All 220 volt AC is LI and L2 with ground ho neutral Mote this is the inside of the box The outside of the box and where the wires come from are Tva volts Ll LZ no neutral Ground wo 1 This side is fed and connected by your electrician 110 volts to power the tub or 220 volts when energizing This wire when coming from the tub is 110 volts the steam generator When it comes from the steam generator 1t 1s 220 volts If you have purchased the optional tub water heater the following image and instructions are for you If you have not then please skip and disregard this section and you may pick up on the next page water jet pipe Cut
2. Back tempered Left tempered FN001 aluminum Water pipe FN00 aluminum rubber pad Bottom basin Fig 10 11 After inserting the left side tempered glass and back side tempered glass into the FN001 aluminum collumn then insert the single sided gasket where glass and collumn meet as seen in Fig 11 below Single sided gasket EN001 Collumn Fig 11 12 Using M6x40 screws attach FN001 and FN002 aluminum collumns to top of tub with corresponding holes as seen in figure 12 below FNO01 aluminum material back M6 x 40 hexagonal screw M8 stainless steel nut Gasket FN001 aluminum rubber pad Tub MS stainless steel nut M6 nut Fr aluminum material back M6 x 40 hexagonal screw M8 stainless steel nut asket Tub gt MIS stainless steel nut de M nut Fig 12 13 Place shower cover on top of shower frame and secure using M6x30 hexagonal screws and M4x20 self tapping screws as shown in Fig 13 below M6 x 30 hexagonal screw e M6 stainless steel nut Shower cover En002 aluminum materials v FN0 4A aluminum material Fig 13 14 Steam generator diagram and tips Steam outlet Cold water feed connector Electrical feed Steam drain Steam generator Figure 14 Connect all hoses to and from the steam generator The appropriate outlets inlets are labeled in the above diagram and are visible in the photo belo
3. in the illustration below Figure 20 Attention Within your warranty period please do not break the seal on the electrical box or the steam generator Doing so will void your warranty There are no user serviceable parts inside DO NOT repair or replace these units on your own If you do experience any problems please contact Aquapeutics Toll Free Customer Service line 1 800 290 6812 for after sale service ESSEX OPERATION MANUAL Contents a Operation instruction Of E BF600 9 MM FUNCTION ave e tt aaa B a E a a MM SES MEME a m The control Control system features Pr ennenen nennen ennenen ennnen eenen eee aeee i Remete rr eee res BS cubsedi egri id eii ia oi a da CAT CA i stm Electronic control system E BF600 installation and wiring diagram a E BF600 control system key description MMMMeeemM M MMMeMM Remote controller keys CCS OE ptu e spa UD Sieb PE peIMR SDN MF D DN M MED M MEM NUM PUE a Computer LCD description EE a E BF600 control panel function description nm _ P A WH N Electrical control system E BF600 function and usage Function overview E 5 Exhaust Fan 6 Radio 1 Handheld infrared remote controller 1 2 Control panel 1 3 Control electric box 1 4 Steam Generator 1 5 Top light 1 1
4. will raise or lower each corner as needed Once the unit is level and flat lock each leg into position with its locking nut NN Fig 1 Glass door installation 2 First remove aluminum profile FN002 FNOO4A and fixed glass FN006 from packaging Then affix the fixed glass to the FN004A aluminum profile using the m4x16 self tapping screws as shown in Figure 2 below Fig 2 step 1 FNOO4A aluminum profile FN002 aluminum Fixed glass panel M4X16 countersunk head self tapping screw FNO0AA aluminum material Fixed glass panel 3 Insert single sided seal to outside fixed glass then connect the FN002 aluminum profile to both sides of the elbow aluminum profile using M4x30 self tapping screws as seen in Fig 3 FN004A aluminum profile countersunk Selfttapping Fixed glass 002 aluminum profile Single sided seal FN002 aluminum profile Fixed glass door WOOL WEIS JO opene a a H 3 Fig 3 4 Connect side aluminum panels First remove FN009 aluminum profile and FN004A aluminum profile Using M6x30 self tapping screws affix FN004A aluminum profile to FN009 aluminum profile in corresponding holes as seen in figure 4 below Be sure to distinguish top and bottom FN0044A profiles and repeat steps for opposite side M6X30 countersunk head E NUS screw FNO 4 aluminum En009 Aluminum profile F
5. 1 5 seconds and the time icon will flash on the display When the time icon begins to flash press the hour icon Za to change the hour and press the i key to adjust the minutes T Alarm When there is an emergency press the E C key on the panel or remote control and the speakers will give off an alarm sound The alarm will also sound when there is something wrong with the system When this happens there will be an EE message on the LCD screen To turn off the alarm you must turn on the overhead light and exhaust fan at the same time and make sure all other functions are turned off Only then can you disengage the alarm by pressing the on off icon 9 Overhead light When you turn the steam shower on the overhead light will turn on automatically To turn off simply touch the overhead light icon on the display or remote
6. ESSEX INSTALLATION MANUAL Thank you for choosing the Aquapeutics Essex luxury computerized steam shower whirlpool bath Please read the following manual in its entirety before assembling your unit Itis also very important to follow the safety suggestions outlined below at every use 1 Please keep in mind that like most shiny bathroom surfaces when they get wet they may become slippery Take care not to slip or fall 2 Children should only use this product under adult supervision 3 Users who suffer from heart disease or have high blood presser should exercise greater care when using this product 4 Senior citizens pregnant women and those who are of ill health are advised to get a doctors opinion on the recommended frequency of use of this product 1 Technical parameters amp package information Electrical data Dimensions inches NW capacity Power frequency Length 1 110V 8 amps 900w 20 60H 1 220V 16 amps and 59 3 8 390 lbs 40 Gal 3600W Please note If you have purchased a tub with the additional heater option it is very important understand that the electrical requirements for your unit have changed The heater requires a second separate electrical circuit that can supply 13 amps at 110 volts with GFI in addition to what your tub had originally needed Installation instructions for your optional heater are in the installation section of this manual 1 2 Package informa
7. Rated voltage AC 240V 2 Maximum radio volume 20 decibals 3 Rated frequency 60Hz 4 Temperature range 20 55 C 5 Steam time 5 50 minutes 6 Temperature measuring error 2 C 7 Power amplification output 1OWX1 8 Operating ambient temperature 5 C 40T 9 Standby power lt 10W Remote controller features 1 Operating voltage 3 0VDC 2 Power supply 7 batteries 2 pieces 3 Expected service life of battery over one year 4 Transmit range at least three meters between the receiver and the infrared sensor 5 Transmit angle usually about 60 6 Transmit medium infrared Controlled devices 225 1 Steam Generator AC240V 60Hz 3 6KW 3 Exhaust fan DC12V 3W 2 Electromagnetic valve DC12V 6W 4 Top light AC12V 3W Instruction Manual for Massage bathtub 2 BF600 ELECTRICAL SCHEMATICS X AC240V Fan DC12V RATED VOLTAGE C240 RATED FREQUENCY 50Hz 60Hz MAIN CONTROL BOX RATED POWER 3 6kw RATED CURRENT 15 MODEL E BF600 amp TOP light AC12Y Gi Back Light AC12V 4C220V 240V Supp ly Steam Out Rem Drain gt Y BY BL BY B BW BW XI AX OI Steam Engine Instruction Manual for Massage bathtub 3 BF600 CONTROL PANEL 9909000 GOO LcD Panel n Power N A O Accupuncture Jets 5 Steam Temperature Y Volume C Temperature O Volume 10 Radio Overhead light D Exhaust fan D Time D Time D Radio station m
8. and discard Ze m m m m um Pick side wall water jet pipe that is convenient to work on Measure the distance taken up by the water heater Approximately 7 and 5 8 inches Cut this part out Glue the ends of the water heater and wait until the glue sets as per the manufactures instructions Plug the heater in It has its own thermostatically controlled on off and temperature controls It will turn on when there is water present and the temperature is below 102degrees and will shut off at 104 degrees Remember that this heater is plugged into a separate GFI 110 volt circuit as discussed 1n two other sections of this manual While the Essex shower spa is still 16 24 inches away from its final installed position all joints and seams should be calked with a high grade silicone sealant Then fully test the unit before sliding into final installed position 18 Spray and foot massage installation Connect the hose of the hand held shower head B by screwing it into nozzle A as depicted below and then put the hand held shower head into its cradle C Figure 19 Figure 19 19 Use the same technique to install the foot massage unit Its nozzle is located approximately 16 inches below the right side as you enter hand held sprayer nozzle When using the foot massager open the cover of the unit as depicted
9. electrician The length of the wire going to the steam generator from the wall should be 5 feet while the length of the telephone line needed is 7 feet This allows the unit to be pulled out from the side walls if maintenance is ever needed C Drainage The diameter of the drain pipe needs to be at least 2 inches The position of the drain hole can be within 6 inches from the hole shown in the drawing on the previous page Notes 1 The distance from the top of the steam room to the ceiling of the area where it 1s installed should be 4 inches or greater The room should be at least 4 inches taller than the spa 2 It is recommended that the water pressure be at least 43 PSI and both the cold and hot water pressure should be as equal as possible If the pressure 1s lower than required have your plumber install the necessary equipment to increase the water supply pressure 3 Please have ground fault interrupter GFI protection on all power supply lines to the spa 4 It is easier to line up all panels with the hardware loose During initial assembly please attach all fasteners loosely then when the unit is completely erected snug up all bolts and screws 4 Installation Steps 1 Place the shower floor unit as pictured below 1 16 24 inches from its final installed location Now adjust the leveling feet to bring the unit flat and level by using a 3 foot level and an open end or adjustable wrench to turn the adjusting nuts This
10. emory Function button 17 Steam generator cleaning function D Alarm D Power light Instruction Manual for Massage bathtub 4 REMOTE CONTROL Power Alarm N A Steam Volume Volume Function button Radio Exhaust fan Accupuncture Jets Radio station memory cGeoocoooococooe Overhead light Computer LCD description sees 9 Exhaust fan d Y amp p Water intake 3 E 88 88 D Time 4 T 5 Temperature display 5 1 Radio station LI Min HE Radio frequency 6 Q Alarm Steam 7 dB 188 e H MHz 6 D Spray a E 11 Steam generator cleaner Instruction Manual for Massage bathtub 5 E BF600 control panel function description 1 To turn the power on press the b icon from the control panel or remote control To This will turn on the overhead light as well as display the room temperature time and overhead light icon on the display Press b icon again to shut down 2 Accupuncture J Jet Operation The Aspen accupuncture jets offer a series of options The lower iets and upper iets can be operated independently or simultaneously depending on yothe number of times you press the accupuncture jet icon First press bg Second Press EP Third Press EPs Fourth Press b Upper Nozzles On pper nozzles off Upper and Lower pper and Lower Operate Lower Nozzles off ower Nozzle On Indepe
11. ig 4 5 Using M4x10 self tapping screws connect the mounted glass panels Fig 3 with side aluminum panels Fig 4 as seen in Fig 5 diagram below Repeat steps for opposite side FN 002 aluminum materials Aluminum Side EXOO aluminum materials FNO09 aluminum materials FN 2 aluminum materials gt MAD countersunk head screw Fig 5 6 Install side fixed glass panel to side aluminum profile as seen in figure 6 below Slide side fixed glass panel into both top and bottom grooves of FN004A aluminum profiles Once completed then secure the ends of both top and bottom FN004A aluminum profiles to FN002 aluminum corner post using M4x30 self tapping screws as seen in bottom right image of Figure 6 FN004A aluminum profile Side fixed glass panel FNO004A aluminum FN002 aluminum corner Fig 6 7 Remove sliding glass doors and install upper eccentric wheels onto upper FNOO4A grooved tracks as seen in figure 7 Repeat steps with lower tracks once upper tracks have been installed FNOO4A aluminum profile Eccentric wheel installation um d fa a Pd yp Sliding pulley Washers Self tapping screw Glass Fig 7 Note Eccentric roller detail The eccentric wheel assemblies are used in both the upper and lower tracks of the sliding doors The top ones are installed first By turning the grey eccentric wheel the white wheel is raised or lowered This allows you to adjust the ride heigh
12. ndently urn Off 5th Press AC 3 Steam Operation Turn controller on and press key on control panel or remote control Once button is depressed you will see the steam icon appear on the control panel Water will begin to fill in the steam generator and the room temperature will be displayed on your control panel The steam setup time automatically defaults to 45 minutes and the temperature automatically defaults to 45 degrees celsius If there is no water running to the steam generator then the LCD screen will indicate a lack of water If this happens press the steam icon again to shut off Af One minute after the steam has been shut off the solsteam generator will automatically drain any excess water from the steam basin 4 Steam duration and temperature setup While the control panel is on press the D or 5 key on the panel to increase or decrease the steam time keeping in mind that the default time is 45 minutes To adjust the temperature click on the r lU key to increase or decrease by one degree celsius Press and hold the Or _ for 1 5 seconds to adjust the time automatically continuously The temperature ranges from 5 50 degrees celsius 5 Exhaust Fan When the panel is on press the KR key on the panel or remote control to start up the exhaust fan Press again to turn off Instruction Manual for Massage bathtub 7 6 Clock instructions To adjust the time press the FUN key for
13. rtight beam FN001 aluminum rubber pad Recommended Tools E Screwdriver Rubber mallet Tape Measure Level Drill Wrench Installation of screws q gt d i M4X30 countersunk head M4X16 countersunk head M4X20 self tapping M6 nut self tapping screw self tapping screw screws Round M6X30 countersunk head X 40 hexagonal screw stainless steel nut M6 stainless steel nut M4 stainless steel nut Screw Installation instructions Rough Plumbing amp Electrical 220 V 16 amps Drain pipe can be offset as much as 6 inches from tub drain 2 2 Installation drawing for waste plug Tub or shower Edel Ah A BA tl AA LAA A e A exibl dram i PCAC A gt floor and sub MODEL Essex Installation instructions A Water supply Hot and cold water supply lines are half inch NPT pipe thread Power supply A220Volt 16 amp service with GFI is necessary to energize the steam room spa and a 110 volt 8 amp circuit with GFI 1s needed for the whirlpool bath Please note If you have purchased a Tub with the additional heater option it is very important to understand that the electrical requirements for your unit have changed The heater requires a second separate electrical circuit that can supply 13 amps at 110 volts with GFI in addition to what your tub had originally needed B The size of breakers and wire gages needed is determined by local state and national codes as interpreted by the installing
14. t of each side of the sliding glass door You want the door to be as plumb as possible After the correct positions for the top eccentric wheels have been determined then you can tighten them as needed Now the bottom eccentrics may be installed using a similar method only no fine tuning is necessary The bottom ones are simply inserted first their lowest position and then twisted 180 degrees to their highest position to lock them into the track 8 Affix FN002 rubber pad to FN002 aluminum corner post as seen in right diagram of figure 8 below Then mount the entire glass frame panel onto the top of tub basin using a minimum of two people FN002 corner post FN002 aluminum rubber pad bottom basin 9 Remove non transparent back tempered safety glass and affix a 305B diamond gasket along the top of each glass and a B307 waterproof gasket along the bottom of each glass Join the two fixed glass panels using the FN007 aluminum panel as shown in right diagram of figure 9 below 10 Remove FN001 aluminum collumn and 2 FN001 rubber pads and affix to the top and bottom end of collumn as seen in lower right diagram of fig 10 below Once pads have been attached then install FN001 aluminum collumn onto tub by inserting 3 water pipes into corresponding tub holes Once installed insert the left opaque tempered safety glass and back tempered safety glass into FN001 collumn grooves as seen in Fig 10 FN001 aluminum rubber pad FN001 aluminum collumn
15. tion 1 Upon the arrival of your Aquapeutics spa take care to make a thorough inspection for any visible damage to the shipping container Visible damage should be reported to your carrier immediately All SHIPPING DAMAGE should be noted on the assigned shipping document 2 Itis recommended that all rough plumbing and electrical work be completed before the assembly of your Essex begins 3 At least two people are required to lift the larger pieces into position during installation 2 Parts Diagram Rainfal Shower Overhead Light Aluminum Side FNO04A 305B Seal Shower head Soap Shelf Support rail Accupuncture Jets Chrom shower hose Foot massager 307 seal Water filler Pillows Shower Cover Speaker FN002 Aluminum Profile SE REE Reel xD to em ya E i A Gasket e Control Panel N001 Aluminum Profile 2 Faucet Handle e Accupuncture Jets Handrails A Fixed glass panel Fn001 aluminum rubber pad FN009 Aluminum profile Steam dispenser Shower head water supply c Fn002 aluminum rubber pad amp tub body Apron plate pron ED FNO004A Seal Fixed glass door D 304C Seal Kf Sliding glass door ED Stainless steel handle 139 LC 13 aluminum material 40 Fn006 aluminum material Fa alumavers matenals n ghi 304C waterproof 305B diamond AT IES Single sided gasket aded ebe IEN mares et Wate
16. w The steam generator drain hose is pushed onto the fitting straight or elbow connected to the steam generator It is secured to this fitting by a clamp and a 3 16 X 5 8 inch round head fastener as is shown in the above figure Drain hose from steam generator needs to be plumbed to the main drain It is also shown assembled in the photo below When bending the insulated steam hose please use Extreme Care not to crimp the hose as you feed it through the appropriate hole in the tub section gt Photo 15 not of Essex but connections are the same The placement of components may be different The all silver hose is the watersupply feed hose to the steam generator It is attached here The rubber washer gasket that is secured by a wire tie is inserted into the end of steam hose 4 Connect the insulated black high temperature steam pipe which is on the steam outlet to the steam jet s connector on the spa s back panel Figure 15 15 Rainfall shower and steam dispenser connections Black insulated high temperature x 2 steam pipe LE se w 4 l VNB _ Em Figure 16 Front and side view of Steam outlet 4 5 The water hose for the ra it to the elbow fixture of the afall shower goes through the hole in the shower roof ceiling and then connect hower head wi h a clamp as is shown in the below figures Figure 17 Rainfall shower hose Figure 17

Download Pdf Manuals

image

Related Search

Related Contents

CONTROLE DIGITAL DE ACESSO AM-CDA100 Manual  Table of Contents  BANDE D`ÉTANCHÉITÉ PLOMB  V7 Metro Anti-Slip Case for GALAXY S4 Blue  MODE D`EMPLOI  Manual  WorldNote PC User Manual  警告 - ネットショップどうやトップページへご案内  USER`S MANUAL – S-SERIES ----------------------------- ---------------------  ASUS Pad(TF701T) User's Manual  

Copyright © All rights reserved.
Failed to retrieve file