Home

MAN-REC-SS

image

Contents

1. reserved MAN REC SS R06 5 Split Shot Cutter Core Lab 0 875 in and 1 000 in 2 5 Install the Brass Shear Screw item 4 in to the Bottom Sub so that the Segment Holder Bottom Sub assembly is secured to the Housing 2 6 Now set the Housing aside while the detonator is armed electrically 3 0 Arming Electrically 3 1 Install the two remaining O rings item 3 onto the Magnetic Top Sub item 6 and lubricate 3 2 Remove the Detonator item A from it s package Twist the ends of the lead wires together to electrically shunt the detonator Note Refer to the User Manual specific to the detonator being used 3 3 Slide the Plastic Tubing item 12 over the shunted wires and down to the detonator body where the wires are joined The Plastic Tubing will help protect the wires from being damaged which could cause a misrun during assembly 3 4 Place the detonator in to an RP 67 approved detonator safety shield with the lead wires hanging out for access 3 5 Make sure the wires stay shunted together while the wires are run through the Magnetic Top Sub from bottom to top SHUNTED LEAD WIRES DETONATOR MAGNETIC TOP SUB PLASTIC TUBING 3 6 Keeping the wires run through the Magnetic Top Sub electrically arm the detonator while keeping the detonator contained within the RP 67 approved detonator safety shield 6 MAN REC SS R06 2007 2015 Owen Oil Tools All rights reserved Ph Split Shot Cutter Core Lab 0 87
2. screwdriver bend over the two Segment Holder tabs into the slots in the Bottom Sub 4 I MAN REC SS R06 2007 2015 Owen Oil Tools All rights reserved Split Shot Cutter Core Lab 0 875 in and 1 000 in PISTON ALIGNMENT SLOT BOTTOM SUB 2 0 Loading Segments into the Holder Note oading may require slightly spreading the sides of the Segment Holder 2 1 Both the 0 875 and 1 000 in tools use three 6 in long Segments Insert Segment AB into the segment Holder and shoulder the end labeled A up against the Detonator Holder item 7 and under it s alignment pin The Segment should seat firmly into the Segment Holder with its inner angle facing outward refer to the graphic below 2 2 Install Segment CD by shouldering the end labeled D up against the Piston item 9 and under its alignment pin making sure its inner angle is also facing outward Lastly install segment BC while depressing the Piston to allow insertion between the previous two segments All of the Segments should fit tightly in the Segment Holder without gaps 2 3 Check alignment of Segments from one to another making sure their profiles line up as closely as possible 2 4 Slide the Segment Holder Bottom Sub assembly into the Housing Push the assembly into the Housing until the O rings seat onto their lands and the Bottom Sub threaded hole aligns with the through hole in the Housing 2007 2015 Owen Oil Tools All rights
3. 4 Core Lab Split Shot Cutters 0 875 inch 1 000 inch MAN REC SS R06 OWEN OIL TOOLS 12001 Cr 1000 Godley Texas 76044 USA Phone 1 817 551 0540 Fax 1 817 551 1674 www corelab com owen Warning use of owen equipment contrary to manufacturer s specifications or operating instructions may result in property damage serious injury or fatality If you are not trained in the handling and use of explosive devices do not attempt to use or assemble any owen perforating systems or owen firing devices This technology is regulated by and if exported was exported from the united states in accordance with the export administration regulations EAR Diversion contrary to U S Law is prohibited Export and or re export of this technology may require issuance of a license by the bureau of industry and security BIS U S Department of Commerce Consult the BIS the EAR and or Owen Compliance Services Inc To determine licensing requirements for export or re export of this technology This document contains confidential information of Owen Oil Tools LP Owen and is furnished to the customer for information purposes only This document must not be reproduced in any way whatsoever in part or in whole or distributed outside the customer organization without first obtaining the express written authorization of owen This document is the property of owen and returnable upon request of Owen 2007 2015 Owen Oil Tools All rights reserve
4. 5 in and 1 000 in 4 0 Arming Ballistically 4 1 Remove the detonator from the RP 67 approved detonator safety shield and slide it into the Detonator Holder that sits just inside the Housing 4 2 Push the Magnetic Top Sub in to the Housing until the O rings seat onto their lands and the Magnetic Top Sub threaded hole aligns with the through hole in the Housing Caution Be sure not to pinch the detonator wires between the Magnetic Top Sub and Detonator Holder when pushing the Magnetic Top Sub into the Housing 4 3 Install the Screw item 4 into the Magnetic Top Sub so that the Magnetic Top Sub is secured to the Housing 4 4 The tool is now armed and ready to run in hole 2007 2015 Owen Oil Tools All rights reserved MAN REC SS R06 T
5. d Split Shot Cutter Core Lab 0 875 in and 1 000 in Description Owen s New Split Shot Cutter has been redesigned with the customer in mind and allows for easy electrical arming before loading the explosive segments Split Shot Cutters are designed for use where traditional jet cutters were not effective or could not be used The Split Shot Cutter s linear configuration allows it to be positioned adjacent to the collar or connection and secured by inline magnets After detonation the collar or connection is split allowing the pipe to be freed for easy removal Benefits Capabilities In addition to the benefits of its predecessor the New Split Shot Cutter incorporates a number of improvements to enhance performance and improve operator safety One piece precision cut segment holder e Uses Owen s DET 3050 009LS or 2 300750 1 Split Shot Detonator Magnetic Top Sub is reusable with the available redress kit sold separately e HMX Split Shot Cutters are available by special order Parts should be ordered by replacing the 3 with a 4 ie SSC XXXX 4XX e f shooting in a connection with a premium thread i e VAM Hydril etc please contact your local Owen representative for recommendations Note Owen Split Shot Cutters can be run with Owen s RF Safe Green DET as a replacement to the DET 3050 009LS Specifications Housing Material Steel Aluminum 18 in 18 in Explosive Lengt
6. h 45 7 cm 45 7 cm Explosive Load 500 grain ft 500 grain ft Minimum Running Restriction 1 000 in 25 4 mm 1 290 in 32 8 mm 1 315 2 375 Im 1 660 to 2 375 in Recommended Tubing Applications 33 4 60 3 mm 42 2 to 60 3 mm Maximum Pressure psi MPa psi MPa Up to 200 F 93 C 10 000 68 9 11 000 75 8 200 F to 325 F 93 C to 163 C 9 500 65 5 10 500 72 4 325 F to 400 F 163 C to 200 C 9 000 62 0 9 500 65 5 Pressure Ratings are based on 1 hour exposure For durations exceeding 1 hour please contact Owen Engineering Refer to the Time vs Temperature Chart for Explosives for allowable operating temperatures 2 MAN REC SS R06 2007 2015 Owen Oil Tools All rights reserved amp a m Core Lab 1 ITEM QTY PART NUMBER SSC 0875 361 Split Shot Cutter 0 875 in and 1 000 in DESCRIPTION Split Shot 0 875 in 500 gr ft 18 in long AES AS3347 Contact Sub OOO V569 110 O Ring Viton 110 KR IO IN SSC 0875 O10 Magnetic Top Sub gt DET 3050 O09LS or 2 300750 1 Detonator 1 ITEM QTY PART NUMBER SSC 1000 361 DESCRIPTION Split Shot 1 000 in 5OOgr ft 18 in long AES AS30042 Contact Sub OOO V569 115 O Ring Viton 115 KR WIN gt SSC 1000 010 DET 3050 O09LS or 2 300750 1 Magnetic Top Sub Detonator 1 68 ee iii 2007 2015 Owen Oil Tools All rights
7. reserved MAN REC SS R06 3 Split Shot Cutter Core Lab 0 875 in and 1 000 in 1 0 Pre Assembly 1 1 1 2 1 3 1 4 1 5 1 6 STOP Warning Explosives are destructive by nature Do not attempt to disassemble or alter the explosive in any manner Do not crush hammer pinch impact pull wires or abuse any explosive STOP Warning Be sure to follow safe operating practices as found in API RP 67 in accordance with governmental regulations company policies and manufacturer s recommendations Unpack the hardware and explosive Segment s item B The Se gments are lettered in alphabetical order for assembly Remove the Brass Shear Screw item 4 securing the Housing item 1 1 to the Bottom Sub item 10 Remove the Bottom Sub and Segment Holder item 8 from the Housing Pull the Segment Holder and Bottom Sub apart Note Make sure that the Spring item 5 remains inside the Segment Holder Remove the O rings items 3 from their package and visually inspect them for cuts or cracks 1 Caution The O rings should never be rolled or twisted into their grooves as spiral failure could occur through no fault of the producer Care must also be taken not to pinch or cut the O ring during installation Install two O rings onto the Bottom Sub and lubricate Insert the Bottom Sub into the Segment Holder and align the magnets with the piston alignment slot Using a small flat blade

Download Pdf Manuals

image

Related Search

MAN REC SS manresa manresa castle manresa clothing manresa bread manresa spain manresa state beach manresa retreat manresa st aloysius manresa island manresa harare manresa annapolis manresa detroit manresa school bf homes

Related Contents

Samsung 32" J6300  Ata do Pregão.xps  Arctek V7100S Instructions / Assembly  T'nB DCCSP21  製品カタログ(PDF:8.4MB)  Manual - Hanna Instruments    Severin PG 1525  

Copyright © All rights reserved.
Failed to retrieve file