1. 122 The letter j in the above diagram represents 123 The letter K in the above diagram represents 124 Vent pipes if installed connect to the upper half of the gravity flow distribution laterals and extend up to at least 12 inches above finish grade A True B False 125 Vent pipes terminate with the vent opening facing upward by the means of a vent cap or fittings A True B False 126 Vent caps must allow a free flow of air between the distribution lateral and the atmosphere A True B False 127 All vent pipes have a nominal pipe size of ____ inches KRW bp A B C D all of the above 128 When a vent pipe is connected to an observation pipe the point of connection shall be made at a point below the stone aggregate for stone aggregate systems and terminate as required for vent pipes A True www garyklinka com Page 7 of 10 B False 129 An observation pipe may serve as a combination observation vent pipe providing it terminates in the same manner as required for vent pipes A True B False Use Figure 6 Vent and combination observation vent pipes for questions 130 138 130 The letter a in the above diagram represents 131 The letter b in the above diagram represents 132 The letter c in the above diagram represents 133 The letter d in the above diagram represents 134 The letter e in the above diagram represents
2. 135 The letter f in the above diagram represents 136 The letter g in the above diagram represents 137 The letter h in the above diagram represents 138 The letter i in the above diagram represents VII SITE PREPARATION AND CONSTRUCTION 139 Prior to the construction of the component a sanitary permit obtained for the installation must be posted in a clearly visible location on the site Arrangements for inspection s must also be made with the department or governmental unit issuing the sanitary permit A True B False 140 Check the moisture content and condition of the soil If the soil at the infiltrative surface can be rolled into a 1 4 inch wire the site is too wet A True www garyklinka com Page 8 of 10 B False 141 Excavate the distribution cell s to the correct bottom elevation s taking care not to smear the infiltrative surface If the infiltrative surface or sidewalls are smeared loosen it with the use of a rake or similar device The infiltration surface can be left rough and should not be raked smooth A True B False 142 Place the distribution pipes as determined from the design below the stone aggregate Connect the distribution box drop box or manifold to the pipe from the treatment or dosing chamber A True B False 143 If stone aggregate is used place stone aggregate over the distribution pipe and the entire distribution cell until the elevation of the stone aggregate is
3. 63 44 3 Wis Adm Code www garyklinka com Page 4 of 10 Cover Material 100 A minimum of 12 inches of cover material must be placed over the top of the geotextile fabric or leaching chamber A True B False 101 Finished grade of the cover material must be at or above the surrounding land surface elevation A True B False 102 Depressional areas over the distribution cell that collect and retain surface water runoff must be avoided A True B False Distribution Network and Dosing Component 103 The effluent application to the distribution cell may be by Gravity Pressure May consist of piping or leaching chambers All of the above Iaw p 104 Distribution piping for a gravity component has a nominal inside diameter of 3 inches A True B False 105 The distribution header is non perforated pipe A True B False 106 The slope of gravity flow perforated distribution piping is less than or equal to 4 inches per 100 feet away from A distribution boxes B drop boxes C header D all of the above 107 When a drop box design is used the invert of the drop box overflow pipe must be at least inches lower than the invert of the treatment tank outlet or force main connection www garyklinka com Page 5 of 10 UAW p AB WN 108 The pump alarm activation point must be at least 2 inches above the pump activation point A True B False 109 Allow dead space below the pump intake
4. at least 6 inches above the top of the distribution pipe A True B False 144 Place the cover material on top of the geotextile fabric and or leaching chamber Avoid backfilling the first 24 inches with cobbles stones or frozen material that could damage pipe chamber or fabric A True B False VII OPERATION MAINTENANCE AND PERFORMANCE MONITORING 145 The component owner is responsible for the operation and maintenance of the component A True B False 146 The county department or POWTS service contractor may make periodic inspections of the components checking for surface discharge wastewater levels etc A True B False 147 Design approval and site inspections before during and after the construction are accomplished by the county or other appropriate jurisdictions in accordance to ch Comm 83 Wis Adm Code A True B False 148 Routine and preventative maintenance aspects include A Treatment and distribution tanks are to be inspected routinely and maintained when necessary in accordance with the applicable plan or product approval www garyklinka com Page 9 of 10 B Inspections of the in ground soil absorption component performance are required at least once every three years These inspections include checking the liquid levels in the observation pipes and examination for any seepage around the in ground soil absorption component C none of the above D Both A amp B 149 Routine and preventa
5. 8 Mandella Ct Neenah WI 54956 5 Questions office 920 727 9200 fax 888 727 5704 including Saturday and Sundays 6 Cell 920 740 4119 or 920 740 6723 amp by email garyklinka hotmail com Attendee s Name Date Address Credential Number Phone Course Title and Name_ Powtsingroundquiz part 2 Fax List the name of each credential held by attendee Credited Hours 6 hours Fee 55 00 Email To be completed by Gary Klinka My credential link 70172 Course Password Course ID 8356 Attendee passed the course with a greater than 70 score on Date Instructor Signature
6. or 7 inches gnaws 81 This provides a minimum space of inches beneath the distribution pipe and inches above the distribution piping as specified in the specification section of this manual A 6 3 B 6 2 C 10 9 D 12 9 As required by Table 64 443 Wis Adm Code 82 The letter a in the above diagram represents 83 The letter b in the above diagram represents 84 The letter c in the above diagram represents www garyklinka com 85 The letter d in the above diagram represents 86 The letter e in the above diagram represents 87 The letter f in the above diagram represents 88 The letter g in the above diagram represents 89 The letter h in the above diagram represents 90 The letter i in the above diagram represents Page 3 of 10 Use Figure 4 Height of system using leaching chambers to answer questions 91 99 g a AFO b 91 The letter a in the above diagram represents 92 The letter b in the above diagram represents 93 The letter c in the above diagram represents 94 The letter d in the above diagram represents 95 The letter e in the above diagram represents 96 The letter f in the above diagram represents 97 The letter g in the above diagram represents 98 The letter h in the above diagram represents 99 The letter i in the above diagram represents As required by Table
7. tive maintenance aspects include A Winter traffic on the in ground soil absorption component is not permitted to minimize frost penetration and to minimize compaction B A good water conservation plan within the house or establishment will help assure that the inground soil absorption component will not be overloaded C none of the above D Both A amp B 150 User s Manual A user s manual is to accompany the component The manual is to contain the following as a minimum A Diagrams of all components and their location This should include the location of the reserve area if one is provided B Names and phone numbers of local health authority component manufacturer or POWTS service contractor to be contacted in the event of component failure or malfunction C Information on the periodic maintenance of the component including electrical mechanical components D All of the above www garyklinka com Page 10 of 10 To obtain your Continuing Education Credits follow the below instructions 1 Click on course print out circle answers mail in the course only amp keep the manual 2 Fill in all fields applicable 3 Include your certification or license number 4 We ll take care of crediting with the state and mailing back to you the quiz results Send by mail www garyklinka com 1 Course sheets Fee 55 00 2 Fill out this form below completely 3 Applicable fees by check payable to Gary Klinka 4 Mail to Gary Klinka at 22
8. to permit settling of solids in the dose chamber This can be accomplished by placing the pump on concrete blocks or other material that can form a pedestal A True B False 110 The pump manufacturer s requirements shall be followed This shall include the pump off switch being located high enough to allow for complete immersion of the pump in the dose chamber A True B False 111 Leaching chamber tops are at or above the original grade Leaching chambers are placed directly on the bottom of the distribution cell The locations of leaching chambers are in accordance with Table 3 of this manual A True B False 112 The portion of the observation pipe below the distribution pipe for stone aggregate systems is slotted while the portion above the distribution pipe is solid wall A True B False Use Figure 5 Observation pipes for questions 113 123 www garyklinka com Page 6 of 10 113 The letter a in the above diagram represents 114 The letter b in the above diagram represents 115 The letter c in the above diagram represents 116 The letter d in the above diagram represents 117 The letter e in the above diagram represents 118 The letter f in the above diagram represents 119 The letter g in the above diagram represents 120 The letter h in the above diagram represents 121 The letter i in the above diagram represents
9. www garyklinka com Page 1 of 10 Course 8356 POWTS Inground Quiz Part 2 Fees 55 This course is valid for these credentials Credential Description Cred Code Credit Hours Journeyman Plumber PJ 6 0 Journeyman Plumber Restricted Service PJRS 6 0 Master Plumber PM 6 0 Master Plumber Restricted Service PMRS 6 0 POWTS Inspector PI 6 0 POWTS MAINTAINER PO 6 0 Soil Tester ST 6 0 Instructions www garyklinka com 1 Print these pages 2 Circle the correct answers 3 Page down to the last page for the verification forms and mailing instructions 4 Print the manual for this course Click here Use Table 4 Public Facility Wastewater Flows for questions 76 79 76 What is the wastewater flows for a beauty salon per station gpd A 90 B 80 C 100 D 65 77 What is the wastewater flows for a bowling alley per bowling lane gpd A 90 B 80 C 100 D 65 78 What is the wastewater flows for an apartment per bedroom gpd A 90 B 80 C 100 D 65 79 What is the wastewater flows for a motel room gpd A 90 B 80 www garyklinka com Page 2 of 10 C 100 D 65 80 The distribution cell height provides effluent storage and support of the piping within the distribution cell The minimum height of the distribution cell when stone aggregate is used in gravity distribution components is inches or inches when pressure distribution is used 14 inches or 9 inches 12 inches or 9 inches 10 inches or 9 inches 12 inches

Download Pdf Manuals

image

Related Search

Related Contents

Gunnar Optiks Vinyl Onyx Gunmetal  Télécharger la fiche technique  Silverstone ML01S-R  MaSSC CLEAN    n.14 GIUGNO-SETTEMBRE 2012  Neff B45E54  Samsung UHD Blu-ray Player  Variotrack VT 65_VT 80  PixDoc Manual  

Copyright © All rights reserved.
Failed to retrieve file