Attach Vacuum System And Leak Check Probe C

image

Contents

1. Check Probe C check mode Indicate the event in a D Log entry along with the results of the leak check Switch the Gate Valve Protect Switch to Protect Close VLV Flow Meter Controller Double check that the system is now in the following state The probe is being pumped on by the turbo pump the foreline valve is open and all foreline bypass valves are closed The bypass to the spinup manifold is open and the system is pumping all the way to the spinup valves on Probe C and back to SSV on the He bottle side of the manifold Do not proceed to the next section until the probe pressure is less than 1 x10 torr P0410 Rev Attach Vacuum System and Leak Check Probe C TABLE 1 PROBE PUMPDOWN Note it is recommended that the pressures be recorded every 15 minutes during the first stage of the pumpdown when the probe pressure is less than 10 torr If the pressure is such that a gauge is not in range draw a mark through the entry for that gauge at that time Time CG Probe IG Probe CG A CG B IG Manifold Notes P0410 Rev Attach Vacuum System and Leak Check Probe C TABLE 1 PROBE PUMPDOWN con t Use additional space as needed Time CG Probe IG Probe CG A CG B IG Manifold Notes 10 6 3 P0410 R
2. Gammah Gaskets Cleanroom Test for Mating Pumping Cart to Probe 1 4 3 Software No software is required 4 4 Tools and Miscellaneous Various Wrenches Start Date Start Time 5 PRE PUMPDOWN INSPECTION Visually verify the following 5 1 Probe C is horizontal with the Y axis up 5 2 All four exhaust valves are sealed for vacuum either using the flight VAT valve or an appropriate blank off plate 5 3 The cleanroom tent is positioned over the 6 pumpout ports on the probe is turned on and operating 5 4 The surfaces of all fittings that will mate to the probe are free from scratches and particles and are in good condition 5 5 Make sure all valves on Probe C are closed 5 6 Monitor particles for class 10 environment within the tent 6 1 6 1 1 6 1 2 6 1 3 6 2 6 2 1 6 2 2 6 2 3 6 2 4 6 2 5 P0410 Rev Attach Vacuum System and Leak Check Probe C INITIAL PUMPDOWN OF PROBE This section is intended for connecting the pumping system GSE to the probe and completing the initial pump down If the probe is already at high vacuum e g immediately after rotating the probe after testing gyroscope 3 and 4 in preparation for testing gyroscopes I and 2 then proceed to Section 10 Connect Pumping Cart GSE to Probe C Connect the pumpout manifold GSE to the appropriate pumpout port such that it is possible to connect to the pumping cart and the probe s Y axis pointing up If possible connect the pumpout manif
3. approved and released version The QA Program Engineer shall be notified of the start of this procedure A Quality Assurance representative designated by D Ross shall review any discrepancy noted during test Redlines shall be approved by the QA representative The QA representative will nominally be Russ Leese Upon completion of this procedure the QA Program Engineer D Ross or R Leese shall certify his or her concurrence that the effort was performed and accomplished in accordance with the prescribed instructions by signing and dating the appropriate approval line at the end of the procedure Red Line Authority Authority to red line make minor chances during execution this procedure is given to the qualified personnel listed in section 3 2 2 All redlines must be approved by the QA representative In addition approval by the Hardware Manager shall be required if in the judgement of the test director or the QA representative experiment functionality may be affected REQUIRED EQUIPMENT Flight Hardware e Probe C assembly with vacuum can installed no sunshade Ground Support Equipment P0410 Rev Attach Vacuum System and Leak Check Probe C The following GSE equipment is necessary to perform this procedure Item Quantity Probe C Pumping Cart GSE 1 Probe C to Pumping Cart Pumpout Manifold GSE 1 connected to the pumping cart 6 ISO O ring 1 Pumping Cart Spinup Manifold to 2 Gammah 1 Fitting Adapter
4. 1 3 Monitor the pressure rise for at least 15 minutes Record in the following table Time IG B Notes 18 P0410 Rev Attach Vacuum System and Leak Check Probe C 8 1 4 8 2 8 2 1 Open the VAT valve on the pumping cart Pre Levitation Spinup Practice optional This will practice the spinup procedure before the gyroscope is levitated It is optional and may be performed at the discretion of the ITD Although the rotor will not spin it can be used to practice the valve sequence and to verify rates of pressure rise etc Complete P0505 Gyroscope Spinup If performed check here 19 8 3 P0410 Rev Attach Vacuum System and Leak Check Probe C Section Completion Record completion of this procedure in the traveler as appropriate Record any abnormalities or deviations from this procedure in the D Log If the QA representative decides it is appropriate open a Discrepancy Report to document the event This test has been completed according to the procedure contained herein All redlines used have been integrated into this document Test Director print sign optional Test Engineer print sign optional Test Engineer print sign QA Representative print sign 20 9 1 1 9 1 2 9 1 3 9 1 4 9 1 5 9 1 6 9 1 7 9 2 P0410 Rev Attach Vacuum System and Le
5. SSV lt Closed SIV lt Open SBPV lt Open MV 1 lt Closed IV 5 lt Open V V 1 amp Closed V V 2 amp Closed IV 4 lt Closed Foreline Valve IV 3 lt Closed Foreline Bypass Valve PV 2 to Open a a aaaoaoaeoaeoaoaoaeoaaioa 6 VAT valve on Probe OPEN if the probe is currently at atmospheric pressure Record Ionization Gauge Sensitivity Range Gas Correction Factor torr Open 6 VAT valve on the main pumpout port of Probe C Turn on the Pumping System This is the yellow button marked on off on the Turbo Controller Identify the readout for the convectron pressure gauge nearest the probe this should be CG B This will be used to regulate the speed of the pumpdown of the probe Slowly Open MV 1 until a pumpdown rate of 10 torr minute is established When CG B reads 10 torr open IV 3 Record in Table 1 the Pumpdown Progress Maintain this 10 torr minute pump down rate until the convectron gauge reads lt 10 torr If the pumpdown stalls then open the bypass valves VV 1 and V V 2 be sure IV 4 is closed The turbo pump will automatically turn on when a sufficiently low pressure is reached When this happens open IV 3 if it is not already and close MV 1 then IV 5 VV 1 and VV 2 Note If the probe will not pump down reasonably per these instructions then proceed directly to Section 7 and leak check in gross 6 2 12 6 2 13 6 2 14 6 2 15 P0410 Rev Attach Vacuum System and Leak
6. STANFORD UNIVERSITY W W HANSEN EXPERIMENTAL PHYSICS LABORATORY GRAVITY PROBE B RELATIVITY GYROSCOPE EXPERIMENT STANFORD CALIFORNIA 94305 4085 Kote ATTACH VACUUM SYSTEM AND LEAK CHECK PROBE C GP B SCIENCE MISSION PROCEDURE P0410 June 7 1999 PREPARED R Brumley Gyroscope RE APPROVED C Gray Gyroscope Verification APPROVED D Ross Quality Assurance and Safety APPROVED S Buchman Hardware Manager 3 12 3 2 P0410 Rev Attach Vacuum System and Leak Check Probe C SCOPE This procedure covers the following items in preparation for the room temperature checkout of the science mission gyroscopes in Probe C e Install the pumping system onto Probe C e Pump down of Probe C e Leak checking Probe C It takes place inside the Class 1000 clean room REFERENCES Plans and Procedures P0481 Levitation of Gyroscopes in Probe C P0505 RT Spinup of Gyroscopes in Probe C P0178 Room temperature Checkout of SM Gyroscopes in Probe C GENERAL REQUIREMENTS Environmental Requirements Cleanliness This procedure takes place in the Class 1000 cleanroom in the HEPL building Minimum protective garments for personnel working in the clean rooms shall be the standard Tyvek clean room apparel All activities taking place within this room must be in accordance with the guidelines established by the cleanroom manager Particulate Contamination All connectors shall be inspected and verified fre
7. ak Check Probe C VENTING AND DISCONNECTING THE PUMPING SYSTEM Shutdown and Vent Pumping System Please review Sections 1 5 before proceeding with this section for Quality Assurance and Safety considerations Close the VAT valve on Probe C Make sure the spinup valve S1 S2 S3 S4 are closed Set all valves to the following states Gate Valve Protect Switch IV 3 lt Override 6 Electropneumatic Gate Valve Open IV 1 lt Open VLV Flow Controller lt Closed REG 1 lt Open SSV lt Closed SIV lt Open SBPV lt Open MV 1 lt Closed IV 5 lt Closed VV 1 lt Closed VV 2 Closed IV 4 lt Closed Foreline Valve IV 3 lt Open a aaoaaaeoaaeoaeoaeoa oaeaoaioa Foreline Bypass Valve PV 2 to lt Closed Close IV 3 Foreline Valve Turn off the pumping system the on off switch on the turbo controller and wait for the turbo pump to spin down Open IV 4 VV 2 and IV 5 Slowly open MV 1 to vent the system Disconnect Pumping System 21 9 2 1 92 2 9 2 3 9 2 4 9 2 5 9 2 6 P0410 Rev Attach Vacuum System and Leak Check Probe C Disconnect the spinup manifold from Probe C Cap the ends of the spinup lines on Probe C Cover the exposed ends of the spinup manifold with vacuum clean aluminum foil Carefully disconnect the main pumping manifold from Probe C If necessary it is OK to remove it in sections if it seems to minimize the risk of accidentally banging the probe during this proce
8. and Leak Check Probe C IV 1 lt Open VLV Flow Controller lt Closed REG 1 Open SSV lt Closed SIV lt Open SBPV lt Open MV 1 amp Closed IV 5 lt Closed V V 1 amp Closed V V 2 amp Closed IV 4 Closed Foreline Valve IV 3 lt Open a aaoaoaeoaeoaoaeoaeoaeoaeoaioa Foreline Bypass Valve PV 2 to lt Closed Disconnect Leak Detector from pumping cart GSE If desired the leak detector may now be turned off according to the procedure in its user manual 16 7 3 P0410 Rev Attach Vacuum System and Leak Check Probe C Section Completion Record completion of this section in the traveler as appropriate Record any abnormalities or deviations from this procedure in the D Log If the QA representative decides it is appropriate open a Discrepancy Report to document the event This test has been completed according to the procedure contained herein All redlines used have been integrated into this document Test Director print sign optional Test Engineer print sign optional Test Engineer print sign QA Representative print sign 17 P0410 Rev Attach Vacuum System and Leak Check Probe C POST PUMPDOWN CHECKOUT 8 1 Probe Pressure Rise This experiment will measure the rate at which pressure rises when the probe is valved off 8 1 1 Record initial pressure on IG B P torr 8 1 2 Close the VAT valve on the pumping cart 8
9. bject to the delicate flight flange See Figure 1 Connect the pumpout manifold to the pumping cart GSE Connect the VCR to twin Gammah fitting adapter to the pumping cart GSE Initiate a light flow of gas through the spinup manifold by opening IV 1 REG 1 SSV SIV and adjusting VLV the flow controller until a light flow of Helium is blowing Note The specific flow rate is not important This step is intended to positively pressurize the manifold to remove any dust particles that might have settled into it Stop the flow of gas by closing SSV and immediately connect the two gammah fittings to the lines for Gyroscope 1 and 2 on Probe C These are S1 and S2 Connect the leak detector to the pumping cart Open the valve between the leak detector connection port and the main pumping line This should be labeled LTV Verify that the valves are in the following state Gate Valve Protect Switch lt Override 6 Electropneumatic Gate Valve Open IV 1 lt Open VLV Flow Controller lt Closed REG 1 Open SSV lt Closed SIV lt Open SBPV lt Open a aaaaaaoa 24 10 1 9 10 1 10 10 1 11 10 1 12 10 2 10 2 1 10 2 2 10 2 3 10 2 4 10 2 5 10 2 7 10 2 8 10 2 9 10 2 10 10 2 11 10 2 12 P0410 Rev Attach Vacuum System and Leak Check Probe C MV 1 lt Open IV 5 lt Open V V 1 Open V V 2 Open IV 4 lt Closed Foreline Valve IV 3 Closed Foreline Bypass Valve PV 2 to lt Cl
10. e of particulate contamination before they are mated to Probe C Itis also desirable to keep the probe in general clean and free of particulate contamination Magnetic Contamination This procedure takes place after the vacuum can is sealed making the experiment much less sensitive to magnetic contamination However great care shall still be taken to avoid cross contamination between any magnetic e g steel item and the probe particularly on the probe s cold end Therefore no magnetic items may be used in the immediate vicinity of the cold end of the probe Test Personnel 3 2 1 3 2 2 3 2 3 3 3 3 3 1 3 3 2 P0410 Rev Attach Vacuum System and Leak Check Probe C Test Director The test director for this procedure shall be Robert Brumley or his appointed replacement Personnel The following personnel have received extensive training in the testing of GP B gyroscopes and are qualified to perform this procedure David Hipkins Bruce Clarke Chris Gray Robert Brumley Charles Warren Dr Sasha Buchman See section 3 4 for details on the requirements for Quality Assurance notification and witnessing of this procedure Minimum Personnel No activity shall be performed on the science mission probe without at least two people in the room i e at least one person to perform the procedure and one person to observe the procedure Safety Hardware Safety General It is important to be cognizant at all times o
11. eak detector and of the turbo pump If this is not possible then continue leak testing with pumping split between the turbo and the leak detector 13 7 2 5 Notes P0410 Rev Attach Vacuum System and Leak Check Probe C WARNING NEVER VENT PROBE C THROUGH THE LEAK DETECTOR BE SURE PROBE C AND THE PUMPING MANIFOLD ARE ISOLATED FROM THE LEAK DETECTOR WHENEVER THE LEAK DETECTOR IS VENTED NEVER LEAVE THE LEAK DETECTOR PUMPING OVERNIGHT ON PROBE C Perform a complete leak check of the entire system Note the results i e base He leak rate and any leaks in the lines below 14 7 2 6 7 2 1 7 2 8 7 2 9 P0410 Rev Attach Vacuum System and Leak Check Probe C Optional Now encompass the probe in a plastic bag The bag should be assembled from clean room bags Positively pressurize the bag so that it is filled with He Observe the leakage rate for at least half and hour and record in the following table Note There should be no long term rise in leakage rate during this process Time Leakage Rate sccs Restart turbo pump Valve off leak detector from probe Verify that the pumping cart GSE is pumping on the probe and the valves are in the following state m Gate Valve Protect Switch IV 3 lt Protect m 6 Electropneumatic Gate Valve Open 15 7 2 10 P0410 Rev Attach Vacuum System
12. ev Attach Vacuum System and Leak Check Probe C Section Completion Record completion of this section in the traveler as appropriate Record any abnormalities or deviations from this procedure in the D Log If the QA representative decides it is appropriate open a Discrepancy Report to document the event This test has been completed according to the procedure contained herein All redlines used have been integrated into this document Test Director print sign optional Test Engineer print sign optional Test Engineer print sign QA Representative print sign 11 7 1 7 1 1 P0410 Rev Attach Vacuum System and Leak Check Probe C LEAK CHECK Connect Leak Detector Make sure that the leak detector is on properly calibrated and waiting for a cycle Note that the procedure for this is recorded in the leak detector s user manual Record the following Leak Detector Model Leak Detector S N Date of Leak Calibration Note The leak detector should not be allowed to pump overnight on Probe C Great care should be taken at all times to ensure that the cold trap has liquid Nitrogen in it at all times while it is pumping on the probe Connect the leak detector to the quick flange blank off valve on the pumping cart station Verify the states of the following valves Note that open means gas can low through the valve and closed means gas can not flow throug
13. f the position of the probe Be extremely careful not to accidentally bump into the probe If any connector does not connect smoothly and securely do not try to force it Instead remove the connector and inspect it to find the reason for the difficulty Great care must be taken at all times during the performance of this procedure WARNING The vacuum flanges on Probe C are extremely delicate Great care must be taken to not scratch the mating surfaces All fittings shall be inspected for scratches prior to being mated to the probe Electrostatic Discharge 3 3 3 3 4 3 5 4 1 4 2 P0410 Rev Attach Vacuum System and Leak Check Probe C Grounded wrist straps shall be worn at all times when mating or demating to an electrical connector on Probe C Personnel Safety All operations shall take place according to Stanford University safety guidelines Any person observing a situation which they deem unsafe shall report the fact immediately to the test director The Quality Assurance representative shall be responsible for monitoring that all activities are performed in a safe manner Quality Assurance e Stanford QA must be notified at least one hour before beginning this procedure e ONR QA must be notified at least one hour before beginning this procedure e D Ross or her designate must be present to monitor the completion of this procedure This procedure shall be conducted on a formal basis to its latest
14. h the valve Gate Valve Protect Switch IV 3 4 Protect 6 Electropneumatic Gate Valve Open IV 1 4 Open VLV Flow Controller lt Closed REG 1 Open SSV lt Closed SIV lt Open SBPV lt Open MV 1 lt Closed IV 5 lt Closed V V 1 amp Closed V V 2 amp Closed IV 4 lt Closed a a aaaeoaeoaoaeoaeoaeoaeoaoaoa Foreline Valve IV 3 lt Open 12 P0410 Rev Attach Vacuum System and Leak Check Probe C m Foreline Bypass Valve PV 2 to lt Closed T Automatic Vent Switch on Leak Detector is off 7 2 Leak Test Probe 7 2 1 Cycle the leak detector to test T 2 2 When the leak detector port has pumped down to less than 10 sccs leak rate slowly open the valve to the pumping manifold LTV Note that at this stage that pumping is being split between the leak detector and the turbo pump on the pumping cart 1 2 3 Perform a preliminary leak check at this stage First blow He gas around the pumping cart and the connections to the probe Next blow He gas around the entire probe Note the results of the leak check in the following lines i e base He leak rate and any leaks found Notes 7 2 4 When the base He leakage rate is in the 10 this number may be adjusted by the ITD should in his opinion the circumstances warrant it sccs range turn off the turbo pump Attempt to get the leak detector to stay in test with the turbo pump off This may take several cycles of the l
15. losed The bypass to the spinup manifold is open and the system is pumping all the way to the spinup valves on Probe C and back to SSV on the He bottle side of the manifold 26 11 0 P0410 Rev Attach Vacuum System and Leak Check Probe C PROCEDURE COMPLETION Record completion of this procedure in the traveler as appropriate Record any abnormalities or deviations from this procedure in the D Log If the QA representative decides it is appropriate open a Discrepancy Report to document the event This test has been completed according to the procedure contained herein All redlines used have been integrated into this document Test Director print sign optional Test Engineer print sign optional Test Engineer print sign QA Representative print sign 27 P0410 Rev Attach Vacuum System and Leak Check Probe C Se go 0000 ie 8 6777 Ty xy 7 Z12300 7 Figure 1 Pumping System Connection to Probe C 28 P0410 Rev Attach Vacuum System and Leak Check Probe C Flow Meter 0 50 sccm Gyro Spinup Line Valves on Probe C peda D HS pea D Ka SI Gyro1 fee Nt Reg 1 Fl SSV VLV SIV F2 S2 Gyro 2 Xq S3 Gyro 3 GHe Convectron S4 Gyro4 Z Leena SA SBPV A Blank off s Resa Ea uge Z 6 Electropneumatic Convectron A 7 VAT Valve VV 1 V Vi a IV 3 A 7 A Ion A ION lt pi O L Probe PV 2 VV 2 H IV4 Pump Spool Disconnected AN I
16. nterface Spool i Ea i F3 PY T Convectron 4 C 2 N Reor AX p Pump Spool Spool GN in Interface Support Clamps Clamp Scroll o Turbo Controller VAT Valve Controller Foreline Valve IV 3 aus Pump low O Override O On HTR speed on off Ee R A RED GRN YEL O Protect Figure 2 Pumping System and Spinup Manifold 29
17. old in sections with the section closest to the probe going on first This makes it possible to connect a small easily maneuverable object to the delicate flight flange See Figure 1 Connect the pumpout manifold to the pumping cart GSE Connect the VCR to twin Gammah fitting adapter to the pumping cart GSE Initiate a light flow of gas through the spinup manifold by opening IV 1 REG 1 SSV SIV and adjusting VLV the flow controller until a light flow of Helium is blowing Note The specific flow rate is not important This step is intended to positively pressurize the manifold to remove any dust particles that might have settled into it Stop the flow of gas by closing SSV and immediately connect the two gammah fittings to the lines for Gyroscope 3 and 4 and Probe C Initiating Pumpdown Plug in Pumping Cart Make sure all circuit breakers accessible from the side of the pumping cart are on Make sure that the Heater and Low Speed switches on the turbo controller are NOT on Turn on the Auxiliary Power Switch Verify the following states of the valves note that closed means gas can not flow through the valve open means gas can flow through the valve T Gate Valve Protect Switch lt Override m 6 Electropneumatic Gate Valve lt Open 6 2 6 6 2 7 6 2 8 6 2 9 6 2 10 6 2 11 P0410 Rev Attach Vacuum System and Leak Check Probe C IV 1 4 Open VLV Flow Controller lt Full Open REG 1 Open
18. osed 6 VAT valve on Probe CLOSED Probe is already pumped out a a a a aaa a Cycle the leak detector to test Note that now the leak detector is pumping down the spinup and pumping manifold The pumping cart itself is not on at this time Carefully leak check all new joints to the probe Do NOT open any valves on the probe itself However if necessary to isolate various sections for leak checking it is OK to cycle any combination of the following SSV VLV SIV SBPV IV 5 MV 1 VV 1 VV 2 Isolate the leak detector from the pumping system by closing LTV Vent and disconnect the leak detector Restart Pumping on Probe Plug in the pumping cart Make sure all circuit breakers accessible from the side of the pumping cart are on Make sure that the Heater and Low Speed switches on the turbo controller are NOT on Turn on the Auxiliary Power Switch Turn on the turbo pump and open IV 3 the foreline valve Turn on the Pumping System This is the yellow button marked on off on the Turbo Controller Wait until the turbo pump has turned on and the pressure on IG A is less than 1x10 torr Close IV 5 and MV 1 Close VV 1 and VV 2 Close VLV Slowly open the VAT valve on Probe C 25 10 2 14 P0410 Rev Attach Vacuum System and Leak Check Probe C Double check that the system is now in the following state The probe is being pumped on by the turbo pump the foreline valve is open and all foreline bypass valves are c
19. ss Replace the protective cover on the VAT valve on Probe C Cover the end of the spinup manifold with vacuum clean Al foil if necessary 22 9 3 P0410 Rev Attach Vacuum System and Leak Check Probe C Section Completion Record completion of this procedure in the traveler as appropriate Record any abnormalities or deviations from this procedure in the D Log If the QA representative decides it is appropriate open a Discrepancy Report to document the event This test has been completed according to the procedure contained herein All redlines used have been integrated into this document Test Director print sign optional Test Engineer print sign optional Test Engineer print sign QA Representative print sign 23 10 10 1 10 1 1 10 1 2 10 1 3 10 1 4 10 1 5 10 1 6 10 1 7 10 1 8 P0410 Rev Attach Vacuum System and Leak Check Probe C RECONNECT PUMPING SYSTEM RESTART PUMPING Please review Sections 1 5 before proceeding with this section for Quality Assurance and Safety considerations Reconnect Pumping System Connect the pumpout manifold GSE to the appropriate pumpout port such that it is possible to connect to the pumping cart and the probe s X axis pointing up If possible connect the pumpout manifold is sections with the section closest to the probe going on first This makes it possible to connect a small easily maneuverable o

Download Pdf Manuals

image

Related Search

Related Contents

BW Technologies GasAlertClip Extreme Gas Detector  Metra Electronics 95-7866B User's Manual  autonics pr30 proximitive sensor user manual  autonics mt4y user manual  Baumatic PI645 hob  276/09Manual Bated BAT MT300.ai  Sandberg BatteryCase for iPhone 4+4S  CERTIFICADO DE GARANTÍA Para Máquinas de Coser y Bordar  Philips HTB5575D  Multibrackets 7350022732629 projection screen  

Copyright © All rights reserved.
Failed to retrieve file