Home
M3CONDENSING WATER BOILER
Contents
1. sS WHT NS os z E wi agi SQ a BRN ESSI SS LWCO PROBE P21 H2 02 0 HIGH LIMIT CONDUIT OR TUBING LENGTH IN INCHES Lr GAS PNK COM OW GA HIGH GAS PNK NC LOW GAS PNK COM HIGH LIMIT RED COM GAS PRESS SWITCHES TUBING amp SENSOR WIRES USE HEYCO BUSHING 43 34 1115 12 15 16 M3 CONDENSING WATER BOILER PERIODIC MAINTENANCE Listed below are items that must be checked to ensure safe reliable operations Maintenance must be performed by a qualified service or maintenance provider To ensure proper maintenance the following instructions should be posted near the appliance and maintained in legible condition Verify proper operation after servicing WARNING When servicing the controls use exact Factory authorized replacement parts and label all wires prior to disconnection Verify proper operation after servicing Incorrect parts substitution and wiring errors can cause damage improper operation fire carbon monoxide exposure to toxic fumes or other unexpected and unsafe conditions that can result in fire personal injury or death 1 Examine the appliance and venting system at least once a year Check more often in first year to determine inspection interval a Check all joints and pipe connections for tightness corrosion or deterioration Check the electronic ignit
2. 0 from the sides and back of the boiler The M3 can be installed directly on a combustible floor Distance minimale aux mat riaux combustibles est gale z ro 0 cm sur les c t s et l arri re avant les 61 cm 38 cm de haut et peut tre install directily sur un plancher combustible Service Clearances Additional clearance beyond the minimum required to combustible material should be considered to facilitate easy access for inspection and service of items such as the burner gas controls and plumbing connections Also allow sufficient space for installing and servicing building water gas vent combustion air electrical pump and other auxiliary optional equipment and connections Other Code and Regulatory Clearances and Requirements Additional clearance beyond the minimum required to combustible materials and other requirements may be required to comply with local state or national codes and regulations It is to the responsibility of the installer to comply with these requirements Examples of codes or regulations that may apply are the National Electric Code State Regional National drain water and flue emissions regulations the National Fuel Gas Code Building Construction and Safety Codes the Americans with Disabilities Act ADA Safety Code for Controls and Safety Devices for Automatically Fired Boilers CSD 1 and other applicable Boiler Installation Code and Regulatory requirements 34 1115 12 15 M3 CONDENSING
3. Based on NAT GAS 1025BTU s per Cubic Foot of Gas and 0 60 Specific Gravity Length of Pipe in Straight Feet 369 256 205 174 155 141 128 121 113 106 95 79 697 477 384 328 292 267 246 256 210 200 179 164 138 Nominal Iron Pipe Size Inches 1400 974 789 677 595 543 502 472 441 410 369 333 308 287 923 830 769 707 636 564 513 472 441 e n e e m m m n en m m s s we we rr rm se s See NFPA 54 National Fuel Gas Code for actual pipe size selection and for sizing Propane gas piping 6 6 Appliance Isolation During Gas Supply Piping Pressure Test 1 The appliance and its provided manual shutoff valve must be disconnected from the gas supply piping system during any pressure testing of that system at test pressures in excess of PSI 3 5 kPa 2 The appliance must be isolated from the gas supply piping system by closing its individual manual shutoff valve during any pressure testing of the gas supply piping system at test pressures equal to or less than PSI 3 5 kPa 3 The appliance and its gas connection must be leak tested before placing it in operation 6 7 Gas Connection 1 Safe operation of unit requires adequate gas supply with the required static and dynamic flow pressures Actual piping selection depends on many variables that must be carefully considered by the gas piping system
4. portion of the boiler water tank A second sensor for use external to the boiler is coiled and located in the control enclosure along with the Sensor Thermal Well The Sensor Thermal Well can be installed in the piping going to or from the boiler based on application As shipped the sensor located in the upper portion of the boiler is used as the operator and is connected to P1 see wiring diagram and the 25 foot long sensor coiled in the control enclosure is used as the monitor and is connected to P2 see wiring diagram The operating sensor location is based on the boiler application The operating and monitoring sensor wiring to the TempTrac control can be swapped to make the 25 foot long monitoring sensor serve as a remote operating sensor Multiple boiler installations or adding outdoor reset requires a communication based non analog BMS such as an Ontrac control IMPORTANT See boiler application guidelines regarding placement of multi sensor well as well as sensor configuration and Ontrac operation Filling the Boiler 1 Fill the system with water To be sure that the unit is not air bound open the relief valve Leave the valve open until a steady flow of water is observed Close the valve and complete filling the system 2 In hard water areas fill water should receive water treatment to reduce the introduction of minerals into the system Excessive buildup of minerals in the heat exchanger can cause a non warrantable failure 3
5. 120V is applied to the step down transformer 24V b 120V is applied to the L W C O terminal L1 if used c 120V is applied to the Fenwal Flame Ignition Control d 24V is applied to the TempTrac operating temperature control terminal L1 e Full time power to the Variable Frequency Drive 3 Control Device Pre check Power flows through the following control devices before reaching call for heat control The following devices are listed in circuit order a The Electronic Low Water Cut Off control when installed is the first device in the control circuit b The High Gas Pressure and Low Gas Pressure Switch are energized and their monitored pressures are proved c The High Temperature Limits are energized d Terminals P1 P2 terminals close to activate a pump if used or to activate any connected remote devices The circuit between Terminals C1 C2 is closed by the jumper or by any connected remote proving switches enabling the boiler to continue the sequence of operation C1 C2 see Section 11 2 f Isolation valve terminals are energized 31 34 1115 12 15 M3 CONDENSING WATER BOILER 4 Call For Heat If the TempTrac operating control senses a call for heat condition and the previous safety devices are energized the following sequence will begin a b The enable contacts for the VFD are energized for the modulating burner models or the blower contacts close for the fixed input burner models The Airflow Proving
6. Chaudi res M3 sont con us pour fonctionner avec le PVC CPVC ou en polypropyl ne ou simple ou double paroi en acier inoxydable syst me indiqu par ETL UL ULC ou CSA pour la cat gorie IV pression positive appareil gaz vacuation de ventilation Ne s lectionnez pas la taille du tuyau de ventilation bas e uniquement sur le diam tre raccord de l appareil WARNING Use only solid PVC or CPVC pipe or use a Polypropylene or Stainless Steel venting single or double wall system listed by a nationally recognized testing laboratory for Category IV positive pressure gas appliance venting Use of ABS pipe or use of PVC or CPVC pipe with cell foam type construction or use of use of venting materials other than specified in these instructions can result in failure of the venting system and or exposure to carbon monoxide or other toxic fumes which can result in property damage personal injury or death Vent Material Selection Condensing boilers like the M3 utilize colder building return water to increase boiler efficiency and lower flue gas temperatures Higher building return water temperatures result in higher flue gas temperatures requiring higher temperature rated venting system materials For proper operation the vent system material selected and installed must be adequate for the maximum building return water temperature Once the vent material has been selected follow all of the requirements in Section 8 2 Vent Installation General and
7. Grounding Check for proper ground from the flame control to the burner housing 38 34 1115 12 15 15 REPLACEMENT 15 1 Burner Assembli Burner Assembly Illustration for Model 400 Optional components may not be shown M3 CONDENSING WATER BOILER PARTS es LIST OF MATERIALS ITEM QTY P N DESCRIPTION BURNER ASSEMBLY COMPONENTS 1A 1 119467 BLOWER FIXED SPEED 1B 1 119466 BLOWER VARIABLE SPEED 2 4 3475 1 4 HEX NUT 3 4 3494 1 4 LOCK WASHER 4 4 15607 1 4 FLAT WASHER 5 110697 WIRE HARNESS 6 1 114154 3 4 X 2 1 2 NIPPLE 7 1 122576 CAP ORIFICE 3 X 1 3 4 ID 8 1 119469 FLEXIBLE ADAPTER 9 1 118016 ELL BRASS HOSE CONNECTOR 10 1 121704 4 PVC X 12 PIPE 11 1 116929 4 TO 6 PVC BUSHING 12 1 121853 AIR INLET SCREEN 6 63 OD 13 3 76797 3 4 SS TEK SCREW 14 1 115276 BURNER 15 2 120493 BLOWER FLANGE GASKET 16 4 79972 1 4 WING NUT 17 1 113960 IGNITER COVER 18 1 107775 HOT SURFACE IGNITER 19 1 111791 IGNITER GASKET 20 1 128538 BURNER BULKHEAD 21 1 122232 CONDUIT CONNECTOR GB 22 1 120333 1 4 NYLON HOSE CLAMP 23 2 FT 101923 3 16 ID SILICONE TUBING 24 1 5995 3 4 X 6 NIPPLE 25 3 5991 3 4 X 2 NIPPLE 26 1 5928 3 4 UNION 27 3 6160 3 4 ELL 28 1 5993 3 4 X 4 NIPPLE 29 2 5336 3 4 SHUTOFF VALVE 30 1 114262 3 4 X 3 1 2 NIPPLE 31 1 109509 3 4 GAS VALVE 32 4 38607 ST
8. Make sure there are no system leaks DO NOT use petroleum based stop leak products All system leaks must be repaired The constant addition of make up water to a closed loop boiler system can cause minerals to collect in the heat exchanger Excessive buildup of minerals in the heat exchanger can cause a non warrantable failure 4 For systems requiring freeze protection use only hydronic system antifreeze with a maximum concentration of 5096 Follow the glycol manufacturer s instructions DO NOT use undiluted or automotive type antifreeze Building Return Temperature Condensing boilers like the M3 utilize colder building return water to increase boiler efficiency and lower flue gas temperatures to allow the use of plastic vent pipe like PVC Higher building return water temperatures can result in higher vent temperatures that exceed the temperature limits for plastic venting systems See Section 8 Venting for the maximum building return water temperatures allowed for the selected venting system material to be installed 34 1115 12 15 M3 CONDENSING WATER BOILER CONDENSATE DRAIN TRAP amp DISPOSAL The M3 boiler produces a significant amount of condensate The condensate drain is under slightly positive flue pressure therefore the 3 4 CPVC condensate trap supplied with the product must always be used This trap is sized and designed to create a liquid barrier to prevent flue gases from escaping through the condensate drain into the inst
9. Switch then proves the operation of the burner blower The thermostat contact on the Fenwal Flame Ignition Control is energized 5 Heat Up Following the pre purge delay the hot surface igniter will be energized a The flame control will send 120V to the hot surface igniter for 20 seconds 6 Ignition When dwell time is completed a 4 second Trial for Ignition TFI period is initiated a b The Delay On Low Fire Hold Relay and the Gas Safety Valves are energized During TFI the flame safeguard control will monitor the flame using flame rectification through the hot surface igniter If the flame control senses the presence of flame before the end of the period the igniter will be de energized and the flame control will continue to monitor the flame through the igniter until the operating thermostat ends the call for heat condition 7 Modulation Release Once the Delay On Low Fire Hold relay has timed out the TempTrac will regulate the speed of the blower through the VFD a b The TempTrac will continue to monitor the water temperature in the boiler When the setpoint temperature is reached the call for heat signal to the flame safeguard control is discontinued When the call for heat condition ends the gas valve will close and the burner will end operation The VFD will ramp the blower speed down and stop after 10 seconds As the water temperature in the loop drops below setpoint the TempTrac will sense
10. System closed during appliance operation can cause property damage personal injury exposure to hazardous materials or death Condensate Trap with Optional Condensate Neutralizer M3 VENT CONNECTION ALL 1 2 ID HEAVY WALL HOSE EXCEPT BYPASS LINE MUST STAY BELOW THIS LINE SUITABLE DRAIN BYPASS LINE FOR CONDENSATE NEUTRALIZER FILL CAP FIELD INSTALLED HOUSEKEEPING CONDENSATE PAD NEUTRALIZER OPTION 1 SUPPLIED pe L ig CONDENSATE FLOOR x TRAP 13 34 1115 12 15 6 1 6 2 6 3 6 4 6 5 M3 CONDENSING WATER BOILER GAS SUPPLY AND PIPING Verify the type of gas specified on rating plate is supplied to the unit This unit is orificed for operation up to 2000 feet altitude Appliance Btu h input derates 4 per 1000 feet elevation above sea level Consult Factory for installations above 2000 feet elevation Gas Train and Controls Certification NOTE The gas train and controls assembly provided on this unit have been tested under the applicable Nationally Recognized Standard to comply with safety and performance criteria such as ignition combustion and safety shutdown operation Gas Control Trains All models include the following gas control train components manual shutoff valve two safety shutoff valves zero governor type regulator manual test valve and manifold pressure taps These components may be separate or combined in a common housing WARNING Do not adjust or remove any screw
11. an Energy Management System eO O0 O0000Q00 Q0 zESXSELPOBLS 30 34 1115 12 15 12 M3 CONDENSING WATER BOILER L1 L2 Used for incoming 120VAC power supply connection Terminal L1 is the HOT terminal and L2 is NEUTRAL See the product catalog or specification document for circuit ampacity rating R1 R2 Used to activate de activate boiler from remote master control When switching this low current circuit a relay with gold plated contacts or the use of two relay contacts in parallel must be used Terminals are wired to a relay in a remote Energy Management System When the relay closes the circuit from R1 to R2 is completed and appliance controls are enabled This appliance ships from factory with a jumper between terminals Remove jumper when connecting to a remote controller The indication of this function is described in section 10 8 LED Display Alarm Messages A1 A2 Used to activate a remote alarm signaling shutdown of combustion control Provides a maximum 3 amp relay contact closure when the flame safeguard terminates combustion due to a tripped safety interlock i e air proving switch high limit switch or flame sensor etc P1 P2 Provides a low amperage dry contact to control remote equipment i e mechanical room air louvers draft inducer or power vent etc Do not directly energize pumps or motors through these terminals If operation or repositioning of the remote equipment is required for safe operati
12. condition The burner operating sequence should begin check safety devices or Remote Proving Interlock On The R1 R2 terminals have been J The remote enable disable has The small flame icon will flash indicating the opened by the remote master been triggered standby state control The boiler will remain in Flashing standby 29 34 1115 12 15 M3 CONDENSING WATER BOILER 11 REMOTE CONNECTIONS TERMINAL STRIP 11 1 Making BMS BAS remote connections for analog and binary on off signals A terminal strip for the remote connection is located behind the bottom control panel door and is accessed removing the four thumb screws a lifting the hinged door WARNING Turn off all electrical service to the appliance when accessing the remote connection terminal strip located inside the bottom control panel door and close and fasten bottom control panel door before restoring electrical service to the appliance The control panel contains High Voltage wiring and terminals If the electrical service is not turned off and these terminals are touched a dangerous shock could occur causing personal injury or death Coupez l alimentation avant intervention sur l appareil 1 If BMS BAS provides remote on off control directly to each boiler but allows boiler to control modulation on its own e Remove the jumper connecting terminals R1 and R2 e Connect the BMS output leads for the enable disable function to terminals R1 and R2 e leave all other wire
13. connected or is Check wiring and sensor reading incorrectly Terminals 15 amp 17 Temperature sensor is not connected or is Checkcwirina and sensor TP3 probe failure reading incorrectly or flue gas temperature 9 Terminals 16 amp 17 protection is disabled HA High temperature limit setpoint Audible alarm sounds operation continues Manual reset required exceeded LA Low temperature alarm Audible alarm sounds operation continues AL1 Digital input 1 is activated Unit de energized after imer delay Audible Manually reset required alarm sounds Digital input 2 is activated Unit de energized after timer delay Audible MAP N alarm sounds Alarm contacts close for remote AL2 e indication of alarm Internal alarm register will Manually reset required E di n Any Failure feature o communicate an alarm condition though the this product Modbus RTU communication link AL3 Digital input 3 is activated Unit de energized after timer delay Audible alarm sounds Mn1 Maintenance alarm for output 1 Buzzer sounds operation continues Check wiring and sensor Mn2 Maintenance alarm for output 2 Buzzer sounds operation continues Check wiring and sensor Mn3 Maintenance alarm for output 3 Buzzer sounds operation continues Check wiring and sensor rtc 2 Energy saving function disabled Reprogram clock CONTROL CAUSE RESULTS OF CONTROL CONDITION NOTES MESSAGE If the burner does not operate call for heat
14. designer 2 Do not select gas pipe sizes based only on the supplied tables These tables are for use by the gas piping system designer as a reference in checking pipe size selections 3 Gas pipe size may be larger than boiler connection 4 Installation of a union is suggested for ease of service 15 34 1115 12 15 7 1 M3 CONDENSING WATER BOILER 5 Install a manual main gas shutoff valve on the gas supply piping connected to the appliance to isolate the burner and gas train from the main supply gas in compliance with NFPA 54 National Fuel Gas Code and most local Codes 6 The gas system installer must clearly identify the emergency shut off device A sediment trap drip leg MUST be provided in the inlet of the gas connection to the unit 8 The combination gas valves and or gas regulators incorporate either an internal vent limiter or an externally mounted vent limiting orifice and 1 4 aluminum tube located in a attached to the regulator vent port Venting to outdoors is not required Never remove cut splice or alter the flexible tubing attached directly to the regulator vent port or to a vent limiting fitting attached externally to the regulator as this will cause unreliable ignition and can cause improper operation Although not required a connection to the open end of the 1 4 aluminum tube can be made and routed to the outdoors No other connection point is allowed Do not remove the aluminum tubing and connect di
15. gas in order to maintain the desired in the combustion products between 8 5 and 9 5 for natural gas 9 5 to 10 5 for LP gas b When High Fire combustion has been reached and combustion is within the proper range return to low fire to confirm settings again c If at any point of the modulation range the carbon monoxide level is in excess of 200 and cannot be successfully adjusted below that level contact RIVERSIDE HYDRONICS customer service for assistance WARNING Do not continue to operate the appliance with carbon monoxide levels above 200 ppm Carbon monoxide is a colorless odorless and poisonous gas that commonly results from gas combustion High concentrations of Carbon Monoxide are extremely dangerous to humans and animals Operation of an appliance at carbon monoxide levels above 200ppm can cause unsafe operation and the potential for poisonous carbon monoxide to enter occupied areas Such improper installation can cause property damage personal injury exposure to hazardous materials or death d Close and seal the opening in the vent through which the combustion analyzer probe was inserted Use a plug or seal with heavy adhesive backed aluminum tape with an adhesive suitable for the vent temperatures expected inside the selected and installed vent system and for condensing conditions Return the PS4 modulation parameter value to nu for automatic operation Enable or reconnect any BMS BAS control interface removed
16. prior to the setup and adjustment of each boiler 35 34 1115 12 15 M3 CONDENSING WATER BOILER Dual Safety Shutoff Valve and Regulator Check Supply Pressure Here Valve Orifice Adjustment Check Manifold Pressure Here Regulator Adjustment Gas Train Illustration for Model 400 Check Supply Fixed Gas Train Check Manifold Pressure Here Orifice in Union Pressure Here Valve Orifice Adjustment Safety Shutoff Valves Regulator Adjustment Gas Train Illustration for Models 500 through 800 Optional components may not be shown 36 34 1115 12 15 M3 CONDENSING WATER BOILER Fixed Gas Train Check Manifold Dual Safety Orifice in Union Pressure Here Shutoff Valve and Regulator Valve Orifice Adjustment Check Supply Pressure Here I Regulator Adjustment Alternate Gas Train Illustration for Models 500 through 800 Optional components may not be shown 37 34 1115 12 15 M3 CONDENSING WATER BOILER 14 TROUBLESHOOTING GUIDE Problem Probable Cause Corrective Action Starting or Pre purge Failure Flame Failure Power Supply Check fuse and or circuit breaker On Off Switch Check if On Off switch is illuminated when on If not check panel fuse or incoming power Temperature Control TempTrac Ch
17. the most common cause at startup is air in the gas supply This can usually be corrected with multiple cycles or bleeding the line manually If the burner lights but blows out ensure that the burner firing rate is locked in low fire and check for improper combustion or weak flame signal as a possible cause Once the main burner flame is established the firing rate will be controlled by the TempTrac control Burner Combustion Adjustment CAUTION Use a combustion analyzer to adjust combustion Do not attempt to adjust the burner by sound or sight With the burner firing insert the combustion analyzer probe in the flue vent approximately two feet from the appliance All models are adjusted as follows With the burner firing and adjusted to Low Fire adjust the regulator screw clockwise counter clockwise for the 400 requires Allen wrench to increase gas flow or counter clockwise to decrease flow The desired CO in the combustion products must be between 8 5 and 9 5 for natural gas 9 596 to 10 596 for LP gas Do not attempt to adjust combustion based on manifold pressure alone Manifold pressure should only be used as a reference point It should not be necessary to adjust the regulator for these models See Gas Train Illustrations for details a Once the desired combustion is achieved at Low Fire raise the burner firing rate to High Fire Adjust the valve orifice clockwise to reduce the flow of gas and counter clockwise to increase the flow of
18. this condition and begin the call for heat sequence again 8 Loss of Flame Signal If the hot surface igniter fails to sense flame during an attempt to light the burner trial for ignition the ignition control will lockout However if the hot surface igniter fails to sense the flame at any time during normal burner operation flame failure the gas valve will be closed and another call for for heat sequence will be initiated to attempt to relight the burner If this attempt to relight the burner and sense flame fails single retry the ignition control will shut down and lockout The blower will complete post purge operation to exhaust any remaining combustion products until the call for heat ends 9 Alarm on Any Failure a When any safety device or remote proving interlock prevents the burner from firing within the allotted time period once the call for heat is initiated approx 7 minutes the TempTrac will initiate an alarm notification This notification is indicated in the following ways e A flashing alarm message 2 is displayed on the TempTrac screen e A high pitch beeping audible alarm e The dry contacts at terminals A1 amp A2 will close amp max load e The alarm register accessible through the Modbus RTU communication option shows alarm To reset the TempTrac once the alarm is activated attempt to determine the safety device which caused the condition and correct the condition Once the condition is correcte
19. with any other appliance except as provided in the section titled Combining Category IV Vents Such venting could result in failure of the venting system and or exposure to carbon monoxide which can result in property damage personal injury or death 8 2 1 Maximum Vent Length Equivalent Length The maximum length of field supplied Category IV vent is shown in the chart below Maximum Vent Length in Equivalent Feet Vent Size 4 6 Vent 8 Vent Use only on Models 400 500 All Models Models Max Equivalent Length 100 eq feet 150 eq feet 200 eq feet Vent pipe fittings reduce the maximum allowable vent length For listed Polypropylene or Stainless Steel Category IV venting systems use the vent manufacturer s equivalent length deduction for all elbows terminations etc For PVC and CPVC vents or if the information is not readily available from the vent manufacturer use the Vent Pipe Fitting Equivalent Length chart below to find the total equivalent length for all vent fittings in your combustion air system Then subtract this number of feet from the total equivalent length allowed in Maximum Vent Length in Equivalent Feet chart above The sum of this calculation is the maximum length of straight vent allowed If a longer length is required repeat the calculation using a larger vent size When using this chart no additional deduction is required for the addition of the vent system terminal Vent Pipe F
20. 4 222 222 7 2222 OY BOILER L 3 TT Burner Attachment Layering Illustration 45 34 1115 12 15 17 M3 CONDENSING WATER BOILER RECOMMENDED MAINTENANCE SCHEDULE Regular service by a qualified service agency and routine maintenance must be performed to ensure safe reliable and efficient operation Yearly Beginning of Each Heating Season Schedule annual service call by qualified service agency 1 Check for piping leaks around pumps relief valves and tank connections Repair if found 2 Check to ensure area is free from combustible materials gasoline and other flammable vapors or liquids 65 Visually inspect venting system for proper function deterioration or leakage Check relief valve Refer to manufacturer s instructions on valve Inspect condensate drain and ensure condensate is directed to an appropriate condensate system or drain as required by local codes Check all operation of safety devices Refer to manufacturer s instructions Inspect burner and gas train components for wear or deterioration Check the electronic ignition system for quick ignition and proper flame signal Check safety shut off valves for proper operation and tightness oO ON O Follow startup procedure in Installation amp Maintenance Manual Semi Annually Every Six Months 1 Test Low water cut off if equipped Refer to manufacturer s instructions an
21. AR WASHER 1 4 2x NOTE A CONNECT TUBING TO HOSE BARB ON AIR INTAKE B CONNECT TUBING TO GAS VALVE REGULATOR AND SECURE WITH CLAMP ATTACH SCREEN TO BUSHING WITH 3 TEK SCREWS TIGHTEN ELBOW TO THE ANGLE INDICATED FOR PROPER POSITIONING OF THE GAS TRAIN 39 34 1115 12 15 M3 CONDENSING WATER BOILER Burner Assembly Illustration for Models 500 through 800 Optional components may not be shown ATTACH TAG FOR REGULATOR VENT THIS SIDE FACES ee 29 LIST OF MATERIALS ITEM QTY PART NO DESCRIPTION BURNER ASSEMBLY COMPONENTS 1 1 119467 BLOWER FIXED SPEED 1B 1 119466 BLOWER VARIABLE SPEED 2 4 3475 1 4 HEX NUT 3 4 3494 1 4 LOCK WASHER 4 4 15607 1 4 FLAT WASHER 5 1 5940 BLACK PLUG 1 4 6 1 101216 PRESSURE SWITCH HIGH GAS 7 1 122575 CAP ORIFICE 3 X 2 8 1 119469 FLEXIBLE ADAPTER 9 2 118016 1 8 NPT X 1 4 HOSE BARB 10 1 121704 4 PVC X 12 PIPE 11 1 116929 4 TO 6 PVC BUSHING 12 1 121853 AIR INLET SCREEN 6 63 OD 13 3 76797 3 4 SS TEK SCREW 14 1 115276 BURNER 15 2 120493 BLOWER FLANGE GASKET 16 4 79972 1 4 WNG NUT 17 1 113960 IGNITER COVER 18 1 107775 HOT SURFACE IGNITER 19 1 111791 IGNITER GASKET 20 1 128538 BURNER BU
22. ER LOOP Fill Line DUPLICATE PIPING kK FOR PRESSURE RELIEF VALVE DRAIN AND CONDENSATE DRAIN FOR ALL BOILERS Motorized Isolation Valve CONDENSATE DRAIN LINE WITH NEUTRALIZER Building Supply FLOOR DRAIN Example of a Multi Boiler Primary Only Installation OnTrac Multiple Boiler Control 4 Pipe Diameters Air Separator With primary secondary piping flow through building loop Maximum must always be 125 of the flow through all operating boiler pumps Distance Building Return ax Fill Line DUPLICATE PIPING FOR PRESSURE RELIEF VALVE DRAIN AND CONDENSATE DRAIN FOR ALL BOILERS Multiple Boiler Control Sensor Well MAINTAIN A MINIMUM 12 PSI STATIC PRESSURE IN BOILER LOOP Boiler Boiler Supply Return Expansion Tank size common pipe Manual diameter for anticipated Isolation flow of all boilers Valve at 10 ft sec 6 ft sec if copper Union Y Relief Valve Boiler Pump energized on a call for heat Dain N CheckValve Valve 3 4 Well CONDENSATE DRAIN LINE WITH NEUTRALIZER for Boiler Sensor Example of a Multi Boiler Primary Secondary Only Installation 10 34 1115 12 15 4 2 4 3 4 4 M3 CONDENSING WATER BOILER Sensor Locations and Thermal Well The boiler uses an operating sensor and a monitoring sensor One sensor is located in the thermal well in the upper
23. Follow the relief valve manufacturer s installation and operating instructions and all local regional and national codes applicable to relief valve installation and discharge piping e relief valve discharge pipe must not be smaller than the relief valve opening and must be secured to prevent it from lifting out of the drain under discharge pressure and must be routed to allow complete drainage of the valve and piping e Do not plug the relief valve s or install a reducing coupling valve or other restriction in the relief valve discharge line s as this will eliminate the critical water pressure protection it provides e Thermal Expansion A relief valve that periodically discharges may result from thermal expansion To control these periodic discharges the boiler system must be provided with means to control expansion Contact a boiler professional to resolve this situation Electronic Low Water Cut Off When the water level is above the electrode position in the tank the reset pushbutton will energize the control LED will be lit The control remains energized until the water level drops below the electrode position LED will not be lit Unless otherwise specified there is a three second time delay on decreasing level Water level must be below tank probe location for full three seconds before control de energizes The Electronic Low Water Cut Off is located in the top head of the boiler IMPORTANT Probe Sensitivity 26K ohms mo
24. LKHEAD 21 1 6437 BRASS TEE 1 8 22 3 6157 BLACK ELL 1 4 23 2 FT 101923 3 16 SILICONE TUBING 24 1 5995 3 4 X 6 NIPPLE 25 6 6011 1 X 2 NIPPLE 26 1 5929 1 UNION 27 3 6163 1 ELL 28 1 6018 1 X 7 NIPPLE 29 2 52823 1 SHUTOFF VALVE 30 1 6013 1X 3 1 2 NIPPLE 31 2 118269 SAFETY GAS VALVE 32 1 79524 REGULATOR 33 1 6012 1 X 3 NIPPLE 34 1 6164 3 4 X 1 ELL 35 1 115770 ADAPTER FLANGE 36 1 115786 SHUTTER VALVE 37 1 101201 PRESSURE SWTCH LOW GAS 38 1 6508 BRASS NIPPLE 1 8 X CL 39 1 5196 SNUBBER 90DEC 80 40 0 5 FT 3299 ALUMINUM TUBING 1 4 41 1 6547 BRASS BUSHING 1 4 X 1 8 42 5 5972 BLACK NIPPLE 1 4 X 1 43 1 22264 BLACK NIPPLE 1 4 X4 44 1 5839 BLACK TEE 1 4 45 4 38607 STAR WASHER 1 4 46 1 122828 BRASS BARB HOSE BARB NOTE 37 THIS SIDE FACES UP A CONNECT TUBING TO HOSE BARB ON AIR INTAKE B CONNECT TUBING TO GAS VALVE REGULATOR HOSE C D E BARB POSITION ATTACH SCREEN TO BUSHING WITH 3 SCREWS TIGHTEN ELBOW TO THE ANGLE INDICATED FOR PROPER POSITIONING THE GAS TRAIN HIGH GAS PRESSURE SWITCH IS CONNECTED HERE TO THE UPPER PORT ON THE REGULATOR LOW GAS PRESSURE SWITCH IS CONNECTED HERE TEST PORTS MUST BE ORIENTATED AS DEPICTED REMOVE HANDLE AND INSTALL 180 FROM ORIGINAL 40 34 1115 12 15 M3 CONDENSING WATER BOILER 15 2 Control Panel Enclosure Component Layout a
25. Riverside M3 CONDENSING WATER BOILER INSTALLATION amp MAINTENANCE MANUAL MODELS 400 500 600 650 700 750 800 WB 130 A CBM Installation and service must be performed by a qualified service installer service agency or the gas supplier IMPORTANT THIS MANUAL CONTAINS INFORMATION REQUIRED FOR INSTALLATION OPERATION AND MAINTENANCE OF THIS EQUIPMENT READ AND FOLLOW THE INFORMATION IN THIS MANUAL AND ALL OTHER PROVIDED INSTRUCTIONS LABELS AND MARKINGS BEFORE INSTALLING OPERATING OR SERVICING THIS UNIT TO THE INSTALLER After installation these instructions must be given to the equipment user or left near the appliance SPECIAL INSTRUCTIONS TO THE OWNER Retain this manual for future reference These instructions contain important information that will help you in maintaining and operating this appliance Riverside Hydronics LLC 3220 Galvez Ave Fort Worth Texas 76111 1 800 990 5918 www riversidehydronics com 34 1115 12 15 M3 CONDENSING WATER BOILER TABLE OF CONTENTS Safety Considerations Product Description Boiler Installation 3 1 3 2 3 3 3 4 3 5 3 6 3 7 Checking Equipment Before You Install Codes Electrical Requirements Handling and Locating the Boiler Clearances to Combustible Surfaces Service Clearances Other Codes and Regulatory Clearances and Requirements General Piping Guidelines 4 1 4 2 4 3 4 4 Supply and Return Connections Sensor Locations and Thermal Well Fille
26. WATER BOILER GENERAL PIPING GUIDELINES 4 1 Supply and Return Connections 1 Connect the boiler system return piping water to be heated to the Return fitting located near the bottom and rear of the boiler 2 Connect the system supply piping hot water out of the unit to the Supply fitting located and accessed at the top of the boiler 3 Install shut off valves and unions on the Return and Supply piping for servicing Use caution when threading pipe nipples into tank connections to prevent cross threading or over tightening Always use a back up wrench on tank nipples when tightening unions valves etc 4 Take those steps necessary to avoid the risk of boiler water freezing in the boiler or system piping such as adding glycol up to 50 insulating pipes heat trace etc 5 Pipe the drain valve to a suitable open drain capable of receiving discharge temperatures up to 212 F IMPORTANT Do not use the plumbing connected to the appliance as a ground for welding or any other purpose Building Supply MAINTAIN A MINIMUM 12 PSI STATIC PRESSURE IN BOILER LOOP Air Separator Building Return Fill Line CONDENSATE DRAIN LINE WITH NEUTRALIZER FLOOR DRAIN Example of a Single Boiler Primary Only Installation 34 1115 12 15 Building Supply M3 CONDENSING WATER BOILER OnTrac Multiple Boiler Control Air Separator Building Return Sensor Well MAINTAIN A MINIMUM 12 PSI STATIC PRESSURE IN BOIL
27. all of the requirements for the selected vent material located in either Section 8 3 PVC Vent Installation or Section 8 4 CPVC Vent installation or Section 8 5 Polypropylene or Stainless Steel Vent Installation VENTING MATERIAL SELECTION BASED ON BUILDING RETURN WATER TEMPERATURE Vent System Material Maximum Return Water Temperature Other Allowed Vent Specified Maximum allowed by boiler Vent Safety Switch System Materials CPVC Polypropylene PVC Up to and including 100 F 37 or Stainless Steel CPVC or CPVC Polypropylene Polypropylene Up to and including 140 F 60 or Stainless Steel Stainless Steel Return temperatures greater than 140 F 60 Stainless Steel Polypropylene and Stainless Steel venting systems must be ETL UL ULC or CSA listed as Category IV The Vent Safety Switch is set to protect the vent system material specified when ordering the boiler Higher temperature rated vent materials can be used but the maximum allowed return water temperature for the vent material specified is unchanged unless the Vent Safety Switch is revised and new markings are applied by a factory authorized service agency NOTE The M3 boiler ships with a Vent Safety Switch that will keep the boiler from operating with a flue gas temperature that exceeds the maximum allowable temperature of the vent material originally specified for use with the boiler If the boiler is installed with a vent material su
28. alled space Prior to startup or after extended periods of non use manually fill the trap with water before operating the boiler WARNING The trap included with this unit must be installed and maintained as described in these instructions and must be included as part of the condensate piping system This trap is required to keep hazardous products of combustion from continually entering the installed space where the condensate piping terminates Failure to properly install this trap can cause personal injury exposure to hazardous materials or death 1 Attach the supplied 3 4 CPVC condensate trap to the mating CPVC union connection on the boiler condensate drain pipe located near the flue outlet The trap must be rotated so the offset in the pipe aims down toward the floor Do not rotate the offset toward the ceiling Do not use tools to tighten the CPVC union Hand tighten the CPVC union to seat the internal gasket Do not combine condensate drains from multiple condensing appliances into a single drain line Route each drain line into a drain suitable for condensate and make certain the end of the drain lines are not submerged or otherwise blocked All condensate plumbing must be protected from freezing Do not locate the condensate piping such that an ice dam of frozen condensate can block condensate from leaving the outlet The condensate is only slightly acidic 3 5 PH however local codes may require it to be neutralized prior to enteri
29. and exposure to hazardous materials or death 34 1115 12 15 M3 CONDENSING WATER BOILER PRODUCT SAFETY INFORMATION REFRACTORY CERAMIC FIBER PRODUCT WITH CRYSTALLINE SILICA WARNING This product contains or may come to contain crystalline silica which has been identified by the International Agency for Research on Cancer IARC as carcinogenic to humans This product also contains refractory ceramic fibers which have been identified by the IARC as possibly carcinogenic to humans Avoid breathing fiber particulates and dust RISKS Air borne fibrous insulation is a possible cancer hazard by inhalation Airborne crystalline silica may cause silicosis lung disease by inhalation May cause temporary irritation to eyes skin and respiratory tract PRECAUTIONARY MEASURES Minimize airborne fibers with engineering controls Use NIOSH MSHA approved respirators as required see MSDS Wear long sleeved loose fitting clothing eye protection and gloves FIRST AID MEASURES If any of the irritations listed persists seek medical attention Eyes Flush with water Skin Wash with soap and warm water Ingestion Do not induce vomiting Get medical attention if gastrointestinal symptoms develop Inhalation Remove to fresh clean air WARNING If you are unfamiliar with the safe handling of refractory ceramic fiber products or if you wish additional information prior to beginning any disassembly
30. aterial attached to the M3 when using PVC venting 5 Dry fit the length of 6 PVC pipe onto the vent connector Then remove the pipe and apply a liberal coating of room temperature vulcanizing RTV adhesive to the outside of the vent connector and to the inside of the plastic pipe Before the RTV sets slide the pipe over the vent connector while rotating approximately 1 8 of a turn Inspect and apply additional RTV to the joints if needed to provide a sound air and water tight seal 6 Drill a pilot hole through the PVC pipe and into the center of the stainless steel vent connector flange in three equally spaced locations around the pipe Drive stainless steel sheet metal screws through the pilot holes to attach and firmly hold the plastic pipe onto the vent connector flange 7 Clean and deburr all solid PVC pipe ends then trial assemble the entire vent system vent before joining with cement Mark the pipe and fittings to identify their locations then disassemble Reassemble the vent system using fresh PVC cement to connect the PVC pipe If both solid PVC and solid CPVC pipe are used in the same vent system all joints between the two types of pipe must be made with fresh cement suitable for both materials Follow the cement manufacturer s instructions for making sound air and water tight joints 8 Vent support The PVC vent system must be supported at intervals no greater than four feet to prevent sagging distortion and stress on pi
31. bill of lading Inspect the appliance and all accompanying parts for signs of impact or mishandling Verify the total number of pieces shown on packing slips with those actually received Contact the freight carrier immediately if any damage or shortage is detected e Check the data decal on the appliance Be sure the electrical water and gas supply is adequate for the installation e Carefully remove all side and top shipping supports and bracing If possible do not remove the wooden base skid assembly until the product has been moved to its final location for installation and operation see Handling and Locating the Boiler Codes The equipment must be installed in accordance with those installation regulations in force in the local area where the installation is to be made Authorities having jurisdiction must be consulted before installation is made In the absence of such requirements the installation must be in accordance with the instructions in this manual appliance markings all supplemental instructions and in compliance with the latest edition of the National Fuel Gas Code ANSI Z223 1 NFPA 54 Where required by the authority having jurisdiction the installation must also conform to American Society of Mechanical Engineers Safety Code for Controls and Safety Devices for Automatically Fired Boilers CSD 1 Where required by the Canadian authority having jurisdiction the equipment must be installed in accordance with the latest edit
32. connection the vent size can be increased or reduced using vent system parts available from the manufacturer of the listed vent system See Section 8 2 1 Maximum Vent Length Equivalent Lengths 1 2 Read and follow the information instructions and warnings in VENTING section Obtain the correct adapter from the manufacturer of the listed Polypropylene or Stainless Steel venting system being installed to attach and seal their venting system to the M3 5 7 8 inch vent connection outlet Attach the adapter to the M3 vent connection following the instructions provided by the adapter s manufacturer 24 34 1115 12 15 M3 CONDENSING WATER BOILER 3 Follow the ETL UL ULC or CSA listed Polypropylene or listed single or double wall Stainless Steel Category 4 positive pressure gas appliance vent system manufacturer s instructions for installing sealing supporting and terminating their vent system Do not insulate plastic vent pipe 4 Support the venting system following the venting system manufacturer s installation instructions The vertical pipe must be supported to prevent putting excessive weight on the appliance vent connection 5 Seal the vent pipe at the point where it passes through a wall or roof following the venting system manufacturer s installation instructions 6 For proper vent operation and to protect the gas vent from wind and weather attach vent system s termination cap following the listed venting system manufacturer s in
33. d the TempTrac can be reset by pressing any button If the lockout is caused by the ignition control power must be re cycled in order to reset the ignition module See the troubleshooting guide Section 15 of this manual for more details 32 34 1115 12 15 13 13 1 13 2 13 3 13 4 M3 CONDENSING WATER BOILER INITIAL STARTUP Initial Startup Requirements Installation must be complete prior to the required factory authorized initial startup The factory authorized startup must be complete prior to placing the boiler into service Starting the boiler without proper piping combustion air venting or electrical connections or control settings can be dangerous and may void the product warranty The following startup instructions must be followed precisely in order to achieve safe and efficient operation to assure trouble free service life WARNING Proper startup must be made by a qualified installer or service agency who must read and follow the supplied instructions and appliance markings Failure to complete proper startup before use tampering with controls or not following all instructions and markings may damage this equipment void the warranty and may result in property damage personal injury or death A Start up Form is included with each product and must be completed by the qualified installer or service agency conducting the startup and must be returned to the manufacturer to register the warranty Copies are available at w
34. d use the procedures described in items 4 5 amp 6 below All gaskets on disassembled components must be replaced on reassembly with exact Factory Authorized replacement parts only Gasket kits are available from your RIVERSIDE HYDRONICS Representative or by contacting RIVERSIDE HYDRONICS LLC Burner and or Heat Exchanger Inspection and Cleaning Procedure a Turn off main power to unit b Turn off gas supply Write notes and or take pictures during this process to aid in correct reassembly d Disconnect electrical the components by disconnecting the wires going to terminal strip in the top control enclosure and the respective conduit connections on the back of the control enclosure If a wiring diagram is not attached to the back of the enclosure door or otherwise provided with the boiler make careful notes of the locations for all the wires e Remove the metal cover on top of the appliance by disconnecting the fasteners holding it to the plastic jacket f Remove the hot surface igniter HSI from the burner Be very careful not to bump the igniter element due to the fragility of the igniter Break the unions that connect the gas train to the blower and the gas supply pipe Remove the gas train Remove the nuts that secure the burner top plate to the combustion chamber and lift the blower burner assembly up until it is completely extracted from boiler i Inspect top plate refractory for damage The refractory must provide a
35. d reset 2 Test the electronic ignition flame failure detection system Refer to manufacturer s instructions and reset Monthly 1 Check condensate drain system 2 Visually inspect venting system for proper function deterioration or leakage 3 Confirm the low water cutoff and alarm are operating 4 Check combustion air filter if equipped and replace as required Daily 1 Check for and remove any obstruction to the flow of combustion or ventilation air to the unit 2 Check to ensure area is free from combustible materials gasoline and other flammable vapors or liquids 3 Check gauges monitors and indicators 46 34 1115 12 15 M3 CONDENSING WATER BOILER 47 34 1115 12 15 M3 CONDENSING WATER BOILER Since RIVERSIDE HYDRONICS LLC cannot control the use of the appliance water conditions or maintenance the warranty on the heat exchanger does not cover poor performance structural failure or leaking due to an excessive accumulation of precipitants MODEL NUMBER SERIAL NUMBER INSTALLATION DATE Riverside Hydronics LLC e 990 Haltom Road Ft Worth TX 76117 1 800 990 5918 www riversidehydronics com 34 1115 12 15
36. eck that the operating temperature control is set higher than the temperature of the boiler See Table 10 8 for indications of control or sensor faults Remote enable disable open See Table 10 8 for indication of condition Enable boiler or place jumper between terminals R1 R2 Electronic Low Water Cut off when installed Check internal ELWCO board for indication of failure The red LED indicates a safe condition Manual reset is required Gas Pressure Switches when installed Gas pressure switches are attached to the gas train Check for a tripped condition indicated by the manual reset button on the switch Correct low gas pressure condition at the supply High Temperature Limiting Device One manual one auto reset limit device set at 210F and 200F respectively located at the control well on the top head of the tank A high temperature condition may be caused by a failure of the TempTrac temperature sensors The failure can require manual reset depending which limit is tripped Combustion Air blower Check if fan control relay is closed Blower motor may have failed Fan VFD may be defective Verify proper voltage Air proving Switch if blower is functioning Check switch contacts are closed Check for 120V at the N O side of air switch Check for 120V at the common side of air switch Check if switch tubing is connected on both ends Flame Safeguard Control Check
37. ed by waiting for the time out to expire 10 7 To Lock and Unlock the Keyboard Push and hold the UP DOWN keys for more than three seconds The PoF message will be displayed and the keyboard is locked At this point it is only possible to view the set point Push and hold the UP DOWN keys again for more than three seconds to unlock the keyboard The Pon message will display 10 8 To Change Other Parameters Push the SET and DOWN arrow simultaneously for 3 seconds Select the required parameter The name of the parameter is on the upper display its value is on the lower display Press the SET key the value of the parameter will start blinking Use UP or DOWN to change the value Press SET to store the new value and move to the following parameter To Exit Press SET UP or wait 15s without pressing a key 28 34 1115 12 15 M3 CONDENSING WATER BOILER 10 9 LED Display Alarm Messages Alarm messages are displayed in the upper LED readout and alternate with the default display An alarm LED ICONs also illuminated ALARM RECOMMENDED CAUSE RESULTS OF ALARM CONDITION MESSAGE ACTION Return temperature sensor is not connected or is Check wiring and Sensor PI TP1 probe failure reading incorrectly Call for heat and burner 9 Terminals 14 amp 17 modulation output signal will revert to low fire po TP2 probe failure Temperature sensor is not
38. em operates with positive vent pressure and will not operate safely with a barometric damper 23 34 1115 12 15 M3 CONDENSING WATER BOILER 8 4 CPVC Vent Installation Follow the instructions below for installing schedule 40 solid CPVC venting The stainless steel vent connection located near the rear of the boiler is 5 7 8 O D to accept 6 inch 1 0 schedule 40 CPVC pipe After installing a short length of 6 inch CPVC pipe to the vent connection an increasing or reducing fitting can be connected to adapt to a larger or smaller vent systems See Section 8 2 1 Maximum Vent Length Equivalent Lengths 1 2 3 10 11 Read and follow the information instructions and warnings in VENTING section Do not insulate the plastic vent pipe Design the vent pipe route so that normal expansion pipe getting longer and contraction pipe getting shorter due to on and off temperatures does not bind or put stress on cemented pipe fittings A length of 6 schedule 40 CPVC pipe must always be the first venting material attached to the M3 when using CPVC venting Do not use PVC pipe or other PVC components in a CPVC vent installation Dry fit the length of 6 CPVC pipe onto the M3 vent connector Then remove the pipe and apply a liberal coating of room temperature vulcanizing RTV adhesive to the outside of the vent connector and to the inside of the plastic pipe Before the RTV sets slide the pipe over the vent connector while rotatin
39. er of feet from the total equivalent length allowed in Maximum Air Inlet Duct Equivalent Length chart above The sum of this calculation is the maximum length of straight duct allowed If a longer length is required repeat the calculation using a larger duct size No additional deduction is required for the addition of the duct system terminal Duct Fitting Equivalent Length Duct Pipe 4 Duct 6 Duct 8 Duct 90 Elbow 22 feet 16 feet 11 feet 90 Long Radius Elbow 12 feet 10 feet 6 feet 45 Elbow 12 feet 10 feet 6 feet The following remote air duct information is provided for use in design calculations if needed Remote Air Duct Specifications Input MBtu h Required Air SCFM 399 87 500 108 600 130 650 141 700 152 750 163 800 173 Remote Combustion Air Cap A suitable remote air termination must be used to prevent water debris animals or obstructing material from entering the remote air supply 34 1115 12 15 7 4 7 5 M3 CONDENSING WATER BOILER Vertical or Horizontal Remote Air Duct Termination e Air inlet must be located no less than 3 feet 0 91m below the exhaust terminal if they are within 10 feet 3 05 m of each other unless the flue outlet terminates with a straight discharge If the flue outlet terminates with a straight discharge the air inlet can be located no less than 18 inches 0 46m below the exhaust terminal e f terminating t
40. ew the Setpoint 10 6 To Change the Setpoint 10 7 To Lock and Unlock the Keyboard 10 8 To Change Other Parameters 10 9 LED Display Alarm Messages Remote Connections Terminal Strip 11 1 Making BMS BAS Remote Connection for Analog and Binary Signals 11 2 Terminal Functions 11 3 Connecting Isolation Valves Sequence of Operation Initial Startup 13 1 Initial Startup Requirements 13 2 Tools and Instrumentation Required 13 3 Resources 13 4 On Site Considerations 13 5 Startup Procedure Troubleshooting Guide Replacement Parts 15 1 Burner Assemblies 15 2 Control Panel Enclosure Component Layout and Replacement PN s 15 3 Replacement TempTrac Kit Part 15 4 Component Wiring and Conduit Routing Details Periodic Maintenance Recommended Maintenance Schedule Warranty forms ship separately with each product 34 1115 12 15 M3 CONDENSING WATER BOILER SAFETY CONSIDERATIONS WARNING If the information in the supplied manual s is not followed exactly a fire explosion or exposure to hazardous materials may result causing property damage personal injury or death AVERTISSEMENT Assurez vous de bien suivre les instructions donn es dans cette notice pour r duire au minimum le risque d incendie ou d explosion ou pour viter tout dommage mat rial toute blessure ou la mort FOR YOUR SAFETY e Do not store or use gasoline or other flammable vapors or liquids in the vicinity of this or any other appliance e Ne pa
41. f the TempTrac operating control switch is closed indicated by the e icon the burner blower should come on and pre purge begins If nothing happens check for a safety device lockout Some safety devices such as the Low Water Cut off Gas Pressure Switches and the High Temperature limit will require manual reset after lockout and therefore can be easily identified When the blower motor starts the Flame Ignition Control will not be energized until positive air flow is established and the Remote Proving Interlock when used has closed If the Flame Ignition Control does not energize see the troubleshooting guide for help The Air Proving Switch can be easily identified by checking for 120V on both sides of the switch If the amber colored call for heat indicating light is not illuminated it is likely that the Remote proving interlock is open Check remote device After the pre purge the flame control energizes the HSI for the heat up period approximately 20 seconds At the end of that period the gas valve is opened for approximately 4 seconds After the burner lights and the primary safety control senses a flame the burner will remain on until the call for heat is satisfied or operation is interrupted by a safety device If the burner fails to light the flame control will lockout When lockout occurs cycle the main power switch to reset the flame ignition control before the alarm on any failure occurs When the burner fails to ignite
42. for bad ground or bad control Replace if necessary Remote Proving Interlock When terminal C1 and C2 are used a proving circuit for remote equipment failure to close this circuit within the allotted time for Call for Heat will prevent operation and cause an alarm indication Check for proper operation and proving of remote equipment Loose Wire Connections Power Supply Check connections to all components 120 VAC is required for operation Low voltage can cause failure Voltage below 110 VAC must be investigated Flame Safeguard Control Check for bad ground or bad control Replace if necessary Hot Surface Igniter Check resistance at room temperature and then the amperage draw during heat up Replace if the measured amperage is not within 3 5 to 5 0 Amps or if measured resistance is not within 40 100 ohms at room temperature Also check for overheating condition due to damaged refractory around igniter Air proving Switch Check if switch is bouncing Adjust or replace Check VFD for proper speed settings Gas Pressure Check for proper inlet static and dynamic gas pressure 3 5 WC minimum Inadequate flame signal may result from improper combustion Adjust to proper CO2 levels at low fire Inability Combustion to achieve proper CO2 throughout the modulation range may be caused by a defective gas valve a defective regulator or blockage in the in the burner or combustion air supply
43. g approximately 1 8 of a turn Inspect and apply additional RTV to the joints if needed to provide a sound air and water tight seal Drill a pilot hole through the CPVC pipe and into the center of the stainless steel vent connector flange in three equally spaced locations around the pipe Drive stainless steel sheet metal screws through the pilot holes to attach and firmly hold the plastic pipe onto the vent connector flange Clean and deburr all solid CPVC pipe ends then trial assemble the entire vent system vent before joining with cement Mark the pipe and fittings to identify their locations then disassemble Reassemble the vent system using fresh CPVC cement to connect the CPVC pipe Follow the cement manufacturer s instructions for making sound air and water tight joints Vent support The CPVC vent system must be supported at intervals no greater than four feet to prevent sagging distortion and stress on pipe fittings Vertical pipe must also be supported to avoid stress on all cemented pipe fittings and to prevent putting excessive weight on the appliance vent connection The vent pipe must be sealed at the point where it passes through a wall or roof to prevent rain insects or flue products from entering the living space or interior of the building For proper vent operation and to protect the gas vent from wind and weather attach a UL listed vent termination to the outdoor end of the vent or otherwise provide suitable termination
44. halogenated compounds most commonly present as refrigerants or solvents such as Freon trichloroethylene perchlorethylene chlorine etc These chemicals when in contact with the equipment or when burned form acids which quickly attack the tubes flue collector stack and other appliance and auxiliary equipment Failure to provide adequate clean combustion air or operating under negative pressure can cause premature unwarranted product failure or unsafe operation producing carbon monoxide that could escape into the building Exposure to carbon monoxide can lead to personal injury or death Maximum Allowed Remote Combustion Air Inlet Length Equivalent Length A vertical or horizontal remote air inlet system can be connected to this appliance without modification The maximum length of field supplied single wall pipe such as PVC or galvanized ventilation pipe is shown in the chart below titled Maximum Air Inlet Duct Equivalent Length Use metal tape or RTV sealant to seal each pipe joint Maximum Air Inlet Duct Equivalent Length Duct Size 4 4 6 Duct 8 Duct Model 400 Only Model 500 Only All Models All Models Max Equivalent Length 100 eq feet 60 eq feet 150 eq feet 200 eq feet To determine the maximum straight length of duct allowed use the Duct Fitting Equivalent Length chart below to find the total equivalent length for all duct fittings in your combustion air system Then subtract this numb
45. he duct design firm s system installation and operation requirements must be in place their instructions followed and the system must be properly maintained WARNING Do not combine remote air ducting of multiple appliances into a single remote air duct unless the combined remote air ducting system has been evaluated and designed by a specified duct design firm and the combined remote air duct system is installed operated and maintained following instructions from that firm Combining remote air ducting without following these requirements can result in failure of the boiler and venting system and or exposure to carbon monoxide and can result in property damage personal injury or death 34 1115 12 15 M3 CONDENSING WATER BOILER 7 6 Optional Filter Box for Dusty or Dirty Combustion Air The field installed optional air inlet filter box must be attached to the combustion air inlet on any appliance located where it is exposed to dusty dirty or lint filled combustion air Replace the filter on a 3 to 6 month schedule or more often based on severity of contamination Inadequate combustion air or non combustible particulate matter such as dust dirt dryer lint concrete dust dry wall dust or the like can be drawn in with combustion air and block burner ports This can cause unreliable operation and non warrantable failures When the optional field installed filter box is required do not operate the appliance without a suitable filter See the fol
46. hrough the roof the air inlet must terminate at least 12 inches 0 3 m above roof level and at least 12 inches 0 3 m above snow levels e f terminating through a sidewall the air inlet must terminate at least 12 inches 0 3 m above grade and or at least 12 inches 0 3 m above possible snow levels Vertical Remote Air Horizontal Remote Air 36 in MIN 12 in ABOVE HIGHEST are SNOW LEVEL VERTICAL HORIZONTAL Notes REMOTE AIR REMOTE AIR 1 PROTECTIVE DEBRIS MINIMUM SCREEN WITH A CLEARANCE CLEARANCE MINIMUM 1 4 TO A MAXIMUM 3 4 MESH RECOMMENDED FOR AIR SS INLET AND FLUE OUTLET 2 AIR INLET TERMINATION SHOULD BE rae DIRECTED DOWNWARD A DRIER VENT TYPE AIR ABOVE HIGHEST REGISTER WITH SNOW LEVEL ADEQUATE INLET AREA OR ELBOW WITH SCREEN AS DESCRIBED IN NOTE 1 c CAN BE USED When flue outlet is terminated with a straight discharge separation of terminations must be a minimum of 18 Combining Remote Air Ducting Each boiler MUST have separate intake piping unless the air inlet piping exhaust duct and other system considerations have been fully evaluated and a combined duct system designed by one of the duct design firms identified at www Riverside Hydronics com vent design html Before operation of a combined remote air ducting system all of t
47. independent setup and adjustment of each boiler Turn unit on using the rocker switch on the front of the control enclosure When the burner fails to light the flame control will lockout The burner combustion must be checked during startup using a combustion analyzer to verify it is operating in accordance with the requirements of 13 5 24 Burner Combustion Adjustment during startup at both Low and High Fire Start the burner in Low Fire operation by setting the TempTrac Control for manual modulation output e Push and hold the EXT key for more than 3 seconds The M LED switches ON and the PS4 parameter is displayed in the upper display while the PAS label is shown in the lower display e Release the key and insert the password 3 2 1 The value of the modulation parameter PS4 will be displayed in the lower display nu stands for Not Used Return to this condition for automatic operation e To adjust modulation manually push the SET key the value starts flashing Then use UP or DOWN keys to modify it 100 High Fire 0 2 Low Fire e To exit press SET UP or wait 30s without pressing any key NOTE After a modification it will be possible to enter the Modulation output setting without entering the password for 10min After this time you will be asked for the password again Turn on main gas shutoff valve 34 34 1115 12 15 16 17 18 19 20 21 22 23 24 25 26 M3 CONDENSING WATER BOILER I
48. input rating of all appliances in the enclosure if directly communicating with the outdoors or communicating to the outdoors through vertical ducts Each opening requires a minimum free area of 1 square inch per 2000 Btu hr of the total input rating of all appliances in the enclosure if communicating with the outdoors through horizontal ducts e All Air From Inside The Building Follow the requirements of NFPA 54 National Fuel Gas Code ANSI Z223 1 section Indoor Combustion Air Combination Of Air From The Indoors And From The Outdoors Follow the requirements of NFPA National Fuel Gas Code ANSI Z223 1 section Combination Indoor and Outdoor Combustion Air e From Outdoors Through One Opening Follow the requirements of NFPA National Fuel Gas Code ANSI Z223 1 section Permanent Opening Method NOTE This unit may be installed with a remote air intake system which uses a make up air duct to draw combustion air directly from outdoors 34 1115 12 15 7 2 7 3 M3 CONDENSING WATER BOILER WARNING Adequate clean combustion air must be provided to the appliance The appliance must never operate under a negative pressure Particular care must be taken when exhaust fans compressors air handling units etc may rob air from the appliance The combustion air supply must be completely free of any chemicals or fumes which may be corrosive to the appliance Some common chemical fumes to avoid are fluorocarbons and other
49. ion of B149 1 10 Natural Gas and Propane Installation Code and applicable Provincial Regulations All appliances conform to the current edition of the ASME Boiler and Pressure Vessel Code Section IV Electrical Requirements See appliance rating decal for electrical service requirements The appliance must be electrically supplied and grounded in accordance with the requirements of the authority having jurisdiction or in the absence of such requirements with the latest edition of the National Electrical Code ANSI NFPA No 70 In Canada the electrical service must conform to local electrical codes and or CSA C22 1 Canadian Electrical Code Part 1 e All wiring between the unit and field installed devices must be made with type T copper wire e Line voltage wire exterior to the appliance must be enclosed in approved conduit or approved metal clad cable e To avoid serious damage DO NOT energize the unit until the system and appliance is full of water Utiliser du fil de cuivre de la taille appropri e pour le service lectrique entrant Les dommages r sultant de l utilisation de fil d aluminium seront exclus du champ d application de la garantie de cet appareil Handling and Locating the Boiler WARNING Use industry standard safe rigging methods such as strapping around the boiler base skid assembly and using spreader bars when attempting to lift or move this product Failure to follow industry standard safe rigging methods can result in pro
50. ion system for quick ignition and a proper flame signal Check all safety controls including thermostats for proper operation Check safety shut off valves for operation and tightness Have the entire system including but not limited to the burner heat exchanger and venting system periodically inspected by a qualified service agency Exposure to Dusty or Dirty Combustion Air An appliance installed in a dust or dirt contaminated atmosphere will require an optional air inlet filter box Replace the filter on a 3 to 6 month schedule or more often based on severity of contamination Without an inlet air filter contaminants or non combustible particulate matter such as dust dirt dryer lint concrete dust dry wall dust or the like can block burner ports and cause unsafe operation and a non warrantable failure Do not remove filter until a suitable replacement is available The air filter is available through your RIVERSIDE HYDRONICS Representative or use any standard capacity MERV 7 pleated air filter 12 x24 x1 vapo Any sign of soot on the heat exchanger or in the flue indicates the need for a combustion inspection Properly installed and adjusted units seldom need heat exchanger cleaning If soot has formed the most common causes are restricted combustion air or excessive gas A blocked heat exchanger can cause unsafe operation and will reduce efficiency To inspect and clean the heat exchanger a qualified service agent or installer shoul
51. itable for operation with flue gas temperatures that exceed the original vent material specified and if a higher maximum boiler return water temperature is needed the vent safety switch must be changed by a factory authorized service agency to allow the boiler to operate with the higher flue gas temperatures resulting from the higher maximum boiler return water temperature Markings will also be affixed to the boiler stating that vent materials with lower temperature ratings must not be used 20 34 1115 12 15 M3 CONDENSING WATER BOILER 8 2 Vent Installation General The MS boiler can be vented either vertically through a ceiling or roof or horizontally through a wall The M3 boiler is a Category IV positive pressure gas appliance so venting and can be routed to the outdoors in any direction from the vent connection of the boiler except down Unless the list vent system manufacturer states otherwise the vent must be installed and supported at least every four feet to slope downward toward the boiler vent connection with at least inch drop per linear foot of horizontal vent run to allow proper drainage of accumulated condensation All penetrations through walls and roofs must be weather and gas tight such that rain and products of combustion cannot pass from outdoors back indoors WARNING Do not connect this appliance to an existing or traditional gas vent or chimney do not use a barometric damper in the vent and do not combine the vent
52. itting Equivalent Length Vent Pipe Other PP Other PP Other 4 Vent 4 Vent 6 Vent 6 Vent 8 Vent 8 Vent 90 Elbow 22 feet 22 feet 22 feet 16 feet 18 feet 11 feet 90 Long Radius Elbow 12 feet 12 feet 14 feet 10 feet 8 feet 6 feet 45 Elbow 12 feet 12 feet 14 feet 10 feet 8 feet 6 feet PP polypropylene Other PVC CPVC or Stainless Steel The following vent information is provided for use in design calculations if needed Venting Specifications LENS CA 399 135 0 5 500 170 0 5 600 205 0 5 650 221 0 5 700 239 0 5 750 255 0 5 800 273 0 5 21 34 1115 12 15 M3 CONDENSING WATER BOILER 8 2 2 Vertical or Horizontal Vent Termination 1 10 The vent terminal must have a minimum clearance of 4 feet 1 22 m horizontally from and in no case be located above or below unless a 4 foot 1 22 m horizontal distance is maintained from electric meters gas meters regulators and relief equipment The vent cap must terminate at least 3 feet 0 91 m above any forced air inlet within 10 feet 3 05 m The vent shall terminate at least 4 feet 1 22 m below 4 feet 1 22 m horizontally from or 1 foot 0 3 m above any door window or building air inlet to the building The vent system shall terminate at least 1 foot 0 3 m above grade and at least 1 foot 0 3m above possible snow accumulation levels and shall terminate at least 7 feet 2 13 m above g
53. l compliance with the instructions provided in this manual is required for safe and reliable operation of the M3 Do not connect the M3 to a masonry chimney WARNING Before operating the appliance connected to an existing vent system confirm the vent system complies with all guidance and requirements for a new vent system specified in this manual Failure to confirm the existing vent system complies can result in unsafe operation and the potential for poisonous carbon monoxide to enter occupied areas and can cause property damage personal injury exposure to hazardous materials or death PVC Vent Installation Follow the instructions below for installing schedule 40 solid PVC venting The stainless steel vent connection located near the rear of the boiler is 5 7 8 O D to accept 6 inch 1 0 schedule 40 PVC pipe After installing a short length of 6 inch PVC pipe to the vent connection an increasing or reducing fitting can be connected to adapt to a larger or smaller vent systems See Section 8 2 1 Maximum Vent Length Equivalent Lengths 1 Read and follow the information instructions and warnings in VENTING section 2 Do not insulate the plastic vent pipe 3 Design the vent pipe route so that normal expansion pipe getting longer and contraction pipe getting shorter due to on and off temperatures does not bind or put stress on cemented pipe fittings 4 length of 6 schedule 40 PVC pipe must always be the first venting m
54. lacement part only Inspect low water cutoffs and relief valves for proper operation at every six months or more often if indicated by inspection Keep appliance area clear and free from combustible materials gasoline and other flammable vapors and liquids Check frequently to be sure the flow of combustion and ventilation air is unobstructed to the appliance When electrical controls are serviced or replaced label all connections as they are removed to know the proper placement on the replacement part All replacement parts are available through your RIVERSIDE HYDRONICS Dealer If need assistance identifying or contacting your local dealer you may contact RIVERSIDE HYDRONICS LLC directly at the address and telephone number located on the first and last page of this manual If the appliance is to be shut down for an extended period of time the primary gas valve should be shut off When the appliance is returned to service a thorough inspection of all utilities and general appliance condition should be conducted 19 17 HEX NUT 1 122 LOCK WASHER FLAT WASHER BLOWER FLANGE BLOWER FLANGE GASKET Se BURNER 19 d STAR WASHER BLOWER FLANGE GASKET BULKHEAD REFACTORY DISK Z 7 7 P4 SS OG 7 Z 277 2 2 V 22 227 22 A 227 27 DAD 2 072 22 2 A 22 0722 2 4 7 252 7 27 27 7 Z thy Z thes CL LY Zz 27 227
55. lowing illustration for filter and filter box kit part numbers and installation instructions FILTER BOX INSTALLATION KIT PART NUMBER 125810 Slide filter box over the air intake A NE connector and secure the metal collar to the PVC connector with the three self drilling screws provided Remove screen from air inlet connector before installing air filter option Attach the anchor foot to the plastic poe jacket by drilling a 1 4 hole through the jacket behind the mounting hole in the foot Secure the foot to the jacket using the plastic push rivet provided REPLACEMENT FILTER PART NUMBER 110265 NOTE Can Use Any Standard Capacity MERV 7 Pleated Air Filter 12 X 24 X 1 19 34 1115 12 15 8 1 M3 CONDENSING WATER BOILER VENTING All M3 models use the positive pressure generated by the burner system blower to push combustion products out of the vent Since the vent system is under positive pressure and must be capable of containing condensate it must be constructed using schedule 40 solid PVC or CPVC pipe or using a Polypropylene or Stainless Steel venting system single or double wall listed by ETL UL ULC or CSA for Category IV positive pressure gas appliance venting Do not use ABS pipe and do not use PVC or CPVC pipe with cell foam type construction such as CellCore or other non solid PVC or CPVC plastic pipe
56. n programming mode it browses the parameter codes or decreases a displayed value CLOCK Changes lower display from the stored water temperature to current time and day Changes upper display to show the temperature at Probe TP1 TP2 or TP3 the percent of the EAT modulating range or the temperature at Probe TP1 minus the temperature at Probe TP2 ON OFF Switches the control ON or OFF See TempTrac User Manual 34 80 for full description 27 34 1115 12 15 M3 CONDENSING WATER BOILER 10 5 To View the Setpoint Push and release the SET key to see the set point value To return to normal display press SET UP or wait 15 seconds without pressing any key 10 6 To Change the Setpoint Push the SET key The upper display will show the St1 parameter name while the lower display will show its value Use the UP or DOWN key to cycle through the parameter names Push the SET key to modify a parameter value The value starts flashing in the lower display To change it push the UP or DOWN keys Push the SET key again to confirm the value and pass to the setting of next set point Repeat this process as needed to change other parameters To Exit press SET UP or wait 15 seconds without pressing any key NOTE Each point has a time out of 15 seconds If any key is pushed within 15 seconds the controller exits the set points programming procedure NOTE The set value is stored even when the procedure is exit
57. nd Replacement PN s 4 o EEO ta llooooc COCO 17 2 El La rj 988 lol ON wor 4 Q 666 LIST OF MATERIALS DESCRIPTION CONTROL PANEL COMPONENTS page Reset Test Switch N C Momentary 6 1 5613 FuseHoler 1 7667 Fuse 1 121250 MetalFacePlate 9 1 121 75 j BoadMout 0 O O 6 122319 TermialBlok BlweVFD 9 O 41 34 1115 12 15 M3 CONDENSING WATER BOILER 15 3 Replacement TempTrac Kit Part List Outdoor Temptrac Reset Kit PN 400 MBH Stainless Steel 124567 500 MBH Stainless Steel 124568 600 MBH Stainless Steel 124569 Venting Material Used 124564 124565 125724 125725 125726 125727 125728 125729 125730 125731 125732 125733 y osom 42 34 1115 12 15 M3 CONDENSING WATER BOILER 15 4 Component Wiring and Conduit Routing Details SINE QZ o 8855 a LSE 205 SEE 11 3 3 i
58. ng boilers into a common unpowered or gravity vent is never recommended i e venting as Category 11 boilers are too efficient and their flue products are too cold to generate the natural buoyancy required for such combined vent systems to function reliably and safely WARNING Do not connect multiple boilers vents into a single unpowered or fixed speed powered vent This could cause unsafe operation and the potential for poisonous carbon monoxide to enter occupied areas Such improper installation can cause property damage personal injury exposure to hazardous materials or death Conventional Venting Through the Wall Venting Combining Vents with a Draft Inducer HORIZONTAL CONVENTIONAL REMOTE AIR VENTING CLEARANCE 4 pu SEE SECTION 7 4 LEE e END OF COMMON FLUE MINIMUM 3 ya lt MIN 12 IN 5 ABOVE HIGHEST SNOW LEVEL 22 34 1115 12 15 M3 CONDENSING WATER BOILER 8 2 4 Connecting to an Existing Vent System 8 3 Do not connect the M3 to an existing vent system until it has been confirmed the existing vent system complies with all requirements for a new vent system A venting system in ful
59. ng the drainage system An optional field installed Condensate Neutralization System is available from the factory Connect a condensate drain line or the Riverside Hydronics Condensate Neutralization System to the barbed hose connection sized for 1 2 ID heavy wall Vinyl tubing rated for 170 F or higher located at the end of the condensate trap All piping from the condensate trap to the suitable drain must remain below the highest point top of the condensate outlet pipe on the properly attached condensate trap Condensate Trap without Optional Condensate Neutralizer M3 VENT CONNECTION 1 2 ID HEAVY WALL HOSE OR 3 4 CPVC PIPE MUST STAY BELOW THIS LINE FILL CAP HOUSEKEEPING Xe PAD SUPPLIED INSTALLED SUPPLIED AND CONDENSATE FLOOR ad TRAP 7 34 1115 12 15 M3 CONDENSING WATER BOILER 5 1 Condensate Neutralization System optional Condensate is only slightly acidic 3 5 PH however this slight acidity can be neutralized by routing it through an optional Condensate Neutralization System Some authorities having jurisdiction require such neutralization before condensate disposal through a suitable drain Condensate is neutralized while slowly flowing through a container filled with renewable crushed limestone The condensate neutralizer reduces or avoids the need for separate chemical treatment or dilution using substantial quantities of tap water Contact your local Riverside Hydronics represen
60. of the water heater or boiler that might expose refractory ceramic fiber materials contact Unifrax Corporation 2351 Whirlpool Street Niagara Falls NY 14305 2413 1 800 322 2293 IDENTIFICATION OF REFRACTORY CERAMIC FIBER MATERIALS RCF The burner assembly utilizes RCF material The RFC materials are located within the product and not generally exposed except during service disassembly or assembly 34 1115 12 15 M3 CONDENSING WATER BOILER 2 PRODUCT DESCRIPTION Component Controls and Connection Locations Locations May Vary CONDENSATE DRAIN 4 HOSE BARB VENT CONNECTION 5 A O D REFER TO MANUAL FOR VENT SIZING BOILER WATER RELIEF RETURN VALVE GAS CONNECTION CONNECT FROM TOP SUPPLY OUTLET 2 NPT TOP ACCESS CONNECT FROM TOP OPENING 8j ELECTRICAL ENCLOSURE COMBUSTION AIR CONNECTION eg O D REMOVABLE FOR DOORWAY CLEARANCE TEMPERATURE PRESSURE GAUGE REMOVABLE FOR DOORWAY CLEARANCE 4 REMOVABLE TOP SECTION FOR DOORWAY CLEARANCE RELIEF VALVE TIE DOWN POINT BAS amp ELECTRICAL SERVICE CONNECTION INSPECTION 2 NPT ON BACK BOILER WATER DRAIN VALVE RETURN 2 NPT ON BACK ah VENT CONNECTION FRONT VIEW SIDE VIEW 34 1115 12 15 3 2 3 3 3 4 M3 CONDENSING WATER BOILER BOILER INSTALLATION Checking Equipment Before You Install e Inspect the unit completely upon receipt from the freight carrier before signing the
61. on of the appliance the remote equipment must send a return proving signal to terminals C1 C2 via its proving switch to confirm proper operation or repositioning to enable the appliance to energize C1 C2 Used for proving operation of remote equipment Terminals are wired to a proving switch on a remote device such as an isolation valve primary pump a power venter louvers or a combination of these in series When all remote proving switches close the circuit from C1 to C2 is completed and the appliance controls are enabled This appliance ships from the factory with a jumper between terminals C1 and C2 that must be removed when a proving switch is connected Connecting Isolation Valves Motorized isolation valves can be controlled by the building automation system or through an OnTrac boiler management system If an OnTrac boiler management system is used the motorized isolation valve must be energized by a field provided isolation relay connected to the low amperage terminals CIRCULATOR 1 2 located on the terminal strip shown in the pictorial drawing in section 16 3 Component Wiring and Conduit Routing Details Do not energize an isolation valve connected directly to these low amperage terminals These terminals are not for use with a circulator pump SEQUENCE OF OPERATION 1 Incoming 120VAC a Full time power to the Fuse b Full time power to the Main Control Switch 2 Power On When the main control switch is turned on a
62. pe fittings Vertical pipe must also be supported to avoid stress on all cemented pipe fittings and to prevent putting excessive weight on the appliance vent connection 9 The vent pipe must be sealed at the point where it passes through a wall or roof to prevent rain insects or flue products from entering the living space or interior of the building 10 For proper vent operation and to protect the gas vent from wind and weather attach a UL listed vent termination to the outdoor end of the vent or otherwise provide suitable termination to prevent wind water debris or animals from obstructing or entering the vent Testing for leaks Once the vent system is installed it must be checked to confirm all joints in the vent system are air and water tight After the vent is assembled close the end of the vent with a taped plastic bag or some other temporary closure With the gas supply turned off energize the M3 combustion blower to apply air pressure to the vent system Spray each joint and vent connection with commercially available leak detection liquid to confirm no air is escaping from any point Repair any leaks and retest After testing is complete de energize the combustion blower wipe clean the leak detection liquid and REMOVE the temporary vent closure 11 Do not use a barometric damper with the venting system Barometric dampers are designed for use with certain Category negative pressure vent systems The M3 Category IV vent syst
63. perty damage serious injury or death 1 The boiler must be located indoors 2 This boiler can be installed directly on a combustible floor 3 Locate the boiler in an area that is not exposed to freezing temperatures 4 This boiler must be installed on a level housekeeping pad at least 3 above the floor for proper condensate drainage and boiler operation 5 Locate the boiler near a floor drain Locate the unit so if the tank or water connections should leak water damage will not occur to the adjacent area or to lower floors of the building When such locations are unavoidable install an adequately drained metal drain pan underneath the boiler The manufacturer s warranty does not cover water damage 6 Protect associated electrical components and electrical connections from water dripping spraying rain etc during appliance operation and service 7 Locate the boiler where the vent and air intake piping when installed will remain within the maximum equivalent lengths allowed See Venting 34 1115 12 15 3 5 3 6 3 7 M3 CONDENSING WATER BOILER 8 Use the following diagram to locate anchors or attachment points when connecting the boiler to the floor Typical concrete anchors 5 16 x 1 3 4 double expansion shields Anchoring Attachment Points for Connection to Floor Clearances To Combustible Surfaces The minimum clearance to combustible material is 15 from the top 24 from the front and zero clearance
64. r is equipped with two temperature limit controls One is an automatic reset limit control with a maximum set point of 200 F and one is a manual reset high limit control with a maximum set point of 210 F Either of these limit controls will turn off the burner when the water temperature in the tank exceeds the set point of the control These controls are located inside the burner vestibule and are accessed from the top of the M3 The manual reset high limit control is reset by pressing the limit reset button accessible through a hole in the metal cover on top of the appliance Pressing the reset on the high limit control will not cause the control to reset until the water temperature has dropped below the set point of the manual reset high limit control WARNING Turn off all electrical service to the appliance when accessing the limit or high limit controls located inside the burner vestibule and close and fasten the burner vestibule cover before restoring electrical service to the appliance The burner vestibule contains High Voltage wiring and terminals If the electrical service is not turned off and these terminals are touched a dangerous shock could occur causing personal injury or death 26 34 1115 12 15 10 10 1 M3 CONDENSING WATER BOILER TEMPTRAC Electronic Controller Panel Principle Of Operation The boiler operates to satisfy the setpoint of the TempTrac digital control whose operating sensor is located near the top of the boile
65. r tank or in the return line of a Hydronic system depending on the application Demand flow will typically create a drop in temperature thus activating the boiler to add heat to the hot water supply This setpoint is the desired boiler water temperature to maintain as measured at the operating sensor location UPPER LED READOUT LOWER LED READOUT 10 2 Upper LED Readout The upper readout is normally configured to display the monitoring probe TP2 temperature reading This readout can display additional information by pushing the EXT button to cycle through the following items e The temperature reading from probe TP3 which is located in the vent connection and monitors the flue gas temperature if equipped e The modulating range of the burner indicated by 0 to 100 e The temperature difference between TP1 and TP2 All of the display information described above is available for monitoring through the optional MODBUS RTU interface 10 3 Lower LED Readout The lower readout is normally configured to display the control sensor TP1 temperature reading 10 4 Control Buttons Displays and modifies the temperature set points SET 1 1 In programming mode it selects a parameter or confirms an operation UP Displays and modifies the energy saving Night Time setback settings In programming mode it browses the parameter codes or increases a displayed value DOWN Displays the working hours of the load relays I
66. r the boiler Building Return Temperature Condensate Drain Trap amp Disposal 5 1 Condensate Neutralization System optional Gas Supply and Piping 6 1 6 2 6 3 6 4 6 5 6 6 6 7 Gas Train and Controls Certification Gas Control Trains Inlet Pressure Manifold Pressure Gas Piping Size Appliance Isolation During Gas Supply Piping Pressure Test Gas Connection Combustion and Ventilation Air 7 1 Equipment Located in Confined Spaces 7 2 Maximum Allowed Remote Combustion Air Inlet Length 7 3 Remote Combustion Air Cap 7 4 Vertical or Horizontal Remote Air Duct Termination 7 5 Combining Remote Air Ducting 7 6 Optional Filter Box for Dusty or Dirty Combustion Air Venting 8 1 Vent Material Selection 8 2 Vent Installation General 8 2 1 Maximum Vent Length Equivalent length 8 2 2 Vertical or Horizontal Vent Termination 82 3 Combining Category IV Vents 8 2 4 Connecting to an Existing Vent System 8 3 PVC Vent Installation 84 CPVC Vent Installation 8 5 Polypropylene or Stainless Steel Vent Installation 2 34 1115 12 15 10 11 12 13 14 15 16 17 M3 CONDENSING WATER BOILER Operating and Safety Controls 9 1 Pressure Relief Valve s 9 2 Electronic Low Water Cut off 9 3 Operating Temperature Control 9 4 High Water Temperature Limit Controls TEMPTRAC Electronic Controller Panel 10 1 Principal of Operation 10 2 Upper LED Readout 10 3 Lower LED Readout 10 4 Control Buttons 10 5 To Vi
67. rade when located adjacent to public walkways or gathering areas To avoid a blocked flue condition keep the vent cap clear of snow ice leaves debris etc The vent must not exit over a public walkway near soffit vents or crawl space vents or other areas where condensate or vapor could create a nuisance or hazard or cause property or could be detrimental to the operation of regulators relief valves or other equipment A horizontal vent must extend one foot beyond the wall A horizontal vent terminal must not be installed closer than 3 feet 0 91m from an inside corner of an L shaped structure A vertical vent must exhaust outside the building at least 3 feet 0 91m above the point of the exit and at least 2 feet 0 61 m above the highest point of the roof within a 10 foot 3 05 m radius of the termination A vertical termination less than 10 feet 0 91 m from a parapet wall must be a minimum of 2 feet 0 61 m higher than the parapet wall 8 2 3 Combining Category IV Vents Combined M3 Category IV gas vent systems must incorporate an Exhausto Tjernlund or US Draft variable speed modulating mechanical draft inducer capable of maintaining the appropriate negative draft at the end of the common flue to assure that all boilers in the combined vent system operate with a negative draft Do not exceed negative 0 25 W C See the Combining Vents with a Draft Inducer illustration below Combining the exhaust vents of multiple M3 condensi
68. rectly to the as damage to the required vent limiter and improper gas control could result COMBUSTION AND VENTILATION AIR Provisions for adequate combustion and ventilation air to the mechanical room must be in accordance with Section Air for Combustion and Ventilation in the latest edition of the NFPA 54 National Fuel Gas Code ANSI Z223 1 and or CAN CSA B149 Installation Codes or applicable provisions of the local building codes Any method addressed in NFPA 54 National Fuel Gas Code section Air for Combustion and Ventilation is acceptable and several are outlined below Equipment Located In Confined Spaces Equipment located in confined spaces requires two openings one commencing within 12 30 5 cm from the top of the enclosure room and one commencing within 12 from bottom of the enclosure room to assure adequate combustion air and proper ventilation The total input of all gas utilization equipment installed in the room must be used to determine the required minimum air volume needed for combustion ventilation and dilution of flue gasses Also consider makeup air requirements from other equipment within the mechanical room or other rooms that are pressure connected with the mechanical room Some examples of other makeup air requirements are from kitchen exhaust hoods clothes dryers powered exhaust fans etc All Air From Outdoors Each opening requires a minimum free area of 1 square inch per 4000 Btu hr of the total
69. s entreposer ni utiliser d essence ou ni d autres vapeurs ou liquides inflammables proximit de cet appareil ou de tout autre appareil WHAT TO DO IF YOU SMELL GAS e Donottry to light any appliance e Donottouch any electric switch do not use any phone in your building e Immediately call your gas supplier from a location away from your building and the smell of gas Follow the gas supplier s instructions e f you cannot reach your gas supplier call the fire department QUE FAIRE SI VOUS SENTEZ UNE ODEUR DE GAZ e pas tenter d allumer d appareil e touches aucun interrupteur ne pas vous server des t l phones se trouvant dans le b timent e Appelez immediatement votre fournisseur de gaz depuis un voisin Suivez les instructions de fournisseur e Sivous ne pouvez rejoinder le fournisseur appelez le service de incendies Installation and service must be performed by a qualified installer service agency or the gas supplier L installation et l entretrien doivent tre assur s ou un service d entretien qualifi ou par le fournisseur de gaz This product contains or may come to contain materials that have been identified as carcinogenic or possibly carcinogenic to humans Before installing servicing or removing this product read and follow the supplied instructions Clearance in accordance with the local installation codes and the requirements of the gas supplier D gagement conforme aux codes d installation loca
70. s in their initial positions 2 BAS connection over network with MODBUS RTU protocol requires option ALMMB e An optional serial connection cable part no 106624 enables the TempTrac to communicate via Modbus RTU to a Building Automation System or to the OnTrac multiple boiler control Connections are made using shielded twisted pair wiring in a daisy chain arrangement 3 BAS Protocol Gateways When communicating over a network connection the standard protocol of the TempTrac control is Modbus RTU The standard protocol between the OnTrac and the BAS is Modbus TCP IP A gateway will be required to communicate with the BAS if it uses a different protocol Riverside Hydronics offers pre mapped gateways that support BACnet MSTP BACnet IP Lonworks or Johnson Controls N2 Consult factory for other protocols For a general overview of the application of this gateway refer to Setup Manual 34 525 These third party supplied gateways are custom programmed components that must be sourced through Riverside Hydronics IMPORTANT Do not use single strand bell wire for remote field connections to terminals R1 R2 and C1 C2 Use only multi strand copper wire See table below for wire length and gauge Wire Gauge 18 16GA 14 GA 12 GA Maximum Length 30FT SOFT 75FT 100FT 11 2 Terminal Functions The following describes the functions of each of these terminals and the proper method for interfacing with
71. s or bolts on gas train control components which are secured with a red or blue sealing compound In addition to voiding warranties and certification listings such adjustment or disassembly can cause improper operation which could result in property damage personal injury or death Inlet Pressure Measure at the inlet pressure tap located at the main gas cock The inlet pressure must remain within the minimum and maximum values while the unit is at rest and while the unit is operating at maximum firing rate INLET PRESSURE NAT GAS Propane Maximum Static Pressure Inches Water Column 14 14 Minimum Flow Pressure Inches Water Column 3 5 8 Manifold Pressure Measure at the pressure tap located downstream side of the manual valve closest to the burner The rated manifold pressure appears on the product data label located near the front of the appliance Gas Piping Size Do not use the gas pipe connection size to determine the gas supply piping Designing and sizing a gas supply piping system requires consideration of many factors and must be done by a gas supply piping expert Always follow NFPA 54 National Fuel Gas Code for gas pipe sizing and gas pipe system design The following charts provide examples of some of the information used by the gas supply piping expert to determine proper pipe sizes Use the values in the following table to add the equivalent straight pipe for each elbow or tee to obtain the total di
72. st water glycol mixtures up to 5096 concentration may be used 25 34 1115 12 15 9 3 9 4 M3 CONDENSING WATER BOILER WARNING Turn off all electrical service to the appliance when accessing the limit or other controls located inside the control cabinet or inside the burner vestibule inside the top of the appliance Close and fasten the control cabinet and burner vestibule cover before restoring electrical service to the appliance The cabinet and burner vestibule contain High Voltage wiring and terminals If the electrical service is not turned off and these terminals are touched a dangerous shock causing property damage personal injury or death could occur Coupez l alimentation avant intervention sur l appareil Operating Temperature Control An adjustable digital operating control is located in the front control panel To adjust the setpoint push the SET key The upper display will show St1 while the lower display shows its value Push the SET key again to modify St1 The value of St1 will flash in the lower display Adjust the set point by pushing the UP or DOWN keys Push the SET key again to confirm the value To exit press SET UP or wait 15 seconds without pressing any key For more information see TempTrac Electronic Control Panel Section 10 1 in this manual Suivez les instructions dans le manuel d installation pour modifier la temp rature de l eau de la chaudi re High Water Temperature Limit Controls The boile
73. stallation instructions 7 Test the completed venting system for leaks following the venting system manufacturers installation instructions 8 Do not use a barometric damper with the M3 venting system Barometric dampers are designed for use with certain Category negative pressure vent systems The M3 Category IV vent system operates with positive vent pressure and will not operate safely with a barometric damper 9 OPERATING AND SAFETY CONTROLS 9 1 9 2 Pressure Relief Valve s A Pressure Relief Valve s sized in accordance with the ASME Boiler and Pressure Vessel Code Section IV is installed in the boiler WARNING Secure the relief valve discharge pipe to a suitable floor drain such that very hot water does not openly splash during a significant relief valve discharge If the relief valve discharge pipe is not routed and secured to a suitable drain hot water discharge can result in property damage scalding and personal injury or death WARNING Do not plug the relief valve s use discharge piping smaller than the relief valve opening or install a reducing coupling valve or other restriction in the relief valve discharge line Failure to comply with these relief valves and discharge piping requirements can prevent the relief valve from providing its intended pressure protection which can result in a sudden loss of pressure containment that can cause property damage exposure to hazardous materials personal injury or death e
74. stance from the meter CONVERT FITTINGS TO EQUIVALENT STRAIGHT PIPE Diameter Fitting inches 3 1 1145 15 2 3 4 5 Equivalent Length of Straight Pipe feet 2 2 3 4 5 10114120 34 1115 12 15 Installation using Schedule 40 Metallic Gas Pipe M3 CONDENSING WATER BOILER Use the following table to determine the possible pipe size based on distance from gas meter for a Single Unit SINGLE UNIT INSTALLATION POSSIBLE SCHEDULE 40 METALLIC GAS PIPE SIZE Distance from meter in equivalent feet of schedule 40 metallic gas pipe Based on inlet pressure less than 2 psi specific gravity of 0 60 and a pressure drop of 0 5 in w c MODEL 0 10 11 25 26 50 51 100 101 200 201 300 301 500 400 1 1 1 1 4 1 1 4 1 1 2 2 2 500 1 1 1 4 1 1 4 1 1 2 2 2 2 1 2 600 1 1 1 4 1 1 2 1 1 2 2 2 2 1 2 650 1 1 1 4 1 1 2 1 1 2 2 2 2 1 2 700 1 1 4 1 1 4 1 1 2 2 2 2 1 2 2 1 2 750 1 1 4 1 1 4 1 1 2 2 2 2 1 2 2 1 2 800 1 1 4 1 1 4 1 1 2 2 2 1 2 2 1 2 3 See NFPA 54 National Fuel Gas Code for actual pipe size selection and for sizing Propane gas piping MULTIPLE UNIT INSTALLATIONS SCHEDULE 40 METALLIC GAS PIPE SIZE CHART Maximum Capacity of Pipe in Thousands of BTU s per hour for gas pressures of 14 Inches Water Column 0 5 PSIG or less and a pressure drop of 0 05 Inch Water Column
75. tative to obtain a Condensate Neutralization System and follow the instructions included for assembly and connection Condensate Neutralization Systems CNS Installation Requirements 1 Follow the steps 1 through 6 in the Condensate Drain Trap amp Disposal section above 2 The Condensate Neutralization System CNS must be mounted horizontally and level with the mounting strap legs on the floor 3 Locate the CNS in a convenient place between the condensate outlet and a suitable drain and where the 3 threaded end cap can be removed to recharge the Neutralizer with crushed limestone a The CNS must be located such that condensate will flow downhill from the condensate trap outlet to the inlet on one end of the CNS and downhill from the other end of the CHS to the drain If this continuous downhill flow is not maintained the trap will not properly operate and condensate could back up into the boiler b Follow the instructions included in the Condensate Neutralization System for connecting the supplied 1 2 Vinyl tubing 4 Keep the Condensate Neutralization System closed at all times except when the appliance is turned off for maintenance to recharge the condensate neutralizer with limestone WARNING Keep the Condensate Neutralization System closed at all times the appliance is operating The system must remain closed to prevent hazardous products combustion from continually enter the room Failure to keep the Condensate Neutralization
76. tight seal against the top edge of the burner deck j Inspect the burner surface for signs of cracking or thermal fatigue 44 34 1115 12 15 10 11 12 13 M3 CONDENSING WATER BOILER k If internal inspection of the burner is desired or the burner or blower must be replaced remove the nuts that attach the blower to the burner top plate to remove the blower The burner can now be extracted Be careful not to damage the refractory when removing the burner With the burner removed inspect the deck surface of the burner for lent or other blockage carried in the fuel air stream If blockage has accumulated use brush to loosen debris and use a vacuum or water to remove it from the burner cavities Replace any damaged components reassemble in reverse order 6 ft Ibs m Cycle unit and test to verify all safety and operating controls are properly functioning and the burner top plate flange is free of leaks If equipped the combustion air filter should be replaced every six months To avoid nuisance shutdown in dirty environments check and replace filter more frequently The vent connector is connected to the flue collector shell by 8 studs and the seal between them is maintained by die cut elastomeric gasket A leak at this joint may be evidenced by condensate forming on the surrounding surfaces or pooling below the connection Any leak must be addressed immediately by replacing the gasket with the factory authorized rep
77. to expose control circuit A wiring diagram is attached to the back of this panel Visually check that all components are intact and no damage has occurred during transit Check all connections within the control cabinet A loose connection could cause intermittent shutdowns The burner uses use a hot surface igniter 51 as the ignition source The gas control system may use a single gas pressure regulator and valves valve regulator combinations or multiple gas trains Connect a test meter to the ignition control to read the flame current in microamps NOTE Some flame controls read the flame signal in micro amps and some in volts DC CAUTION Be sure the tank is filled with water Dry firing can cause unwarranted damage to the appliance Check the inlet gas pressure before start up using a manometer or a 0 to 28 W C pressure gauge for inlet gas pressure This is the pressure measured before all components in the gas train This manometer must stay connected throughout the testing as the inlet pressure must be monitored during the firing of the burner Record static pressure it must not exceed 14 W C Pressures above this could cause damage to the diaphragm in the gas valve or pressure regulator The inlet gas pressure must not fall below 3 5 W C Connect a second manometer to the manifold test port at the shutoff valve closest to the burner Turn off main gas shutoff valve Disable or jumper out any BMS BAS control interface to allow
78. to prevent wind water debris or animals from obstructing or entering the vent Testing for leaks Once the vent system is installed it must be checked to confirm all joints in the vent system are air and water tight After the vent is assembled close the end of the vent with a taped plastic bag or some other temporary closure With the gas supply turned off energize the M3 combustion blower to apply air pressure to the vent system Spray each joint and vent connection with commercially available leak detection liquid to confirm no air is escaping from any point Repair any leaks and retest After testing is complete de energize the combustion blower wipe clean the leak detection liquid and REMOVE the temporary vent closure Do not use a barometric damper with the M3 venting system Barometric dampers are designed for use with certain Category negative pressure vent systems The M3 Category IV vent system operates with positive vent pressure and will not operate safely with a barometric damper 8 5 Polypropylene or Stainless Steel Vent Installation Follow the instructions below for installing an ETL UL ULC or CSA listed Category IV Polypropylene or Stainless Steel venting system The stainless steel vent connection located near the rear of the boiler is 5 7 8 O D to accept the venting system adapter available from the manufacturer of the listed Polypropylene or Stainless Steel venting system After installing the adapter to the M3 vent
79. urned to the proper operating condition prior to start up 33 34 1115 12 15 10 11 12 13 14 15 M3 CONDENSING WATER BOILER Be sure all connections into the tank are tight as leaks at tank fittings will damage the insulation CAUTION Conduct the following gas train leakage test before start up at annual intervals and prior to investigating the cause of any reported occurrences of delayed ignition a Using an appropriate bubble detection solution thoroughly coat all gas train pipe connections If any bubbles are detected the leaking connection must be tightened recoated and rechecked to assure stoppage of the leak b Attach a manometer to measure the gas pressure at the manual gas shutoff valve located just upstream of the gas train Adjust gas train inlet pressure to the specified value e g 14 W C and tightly close the gas train manual shutoff valve closest to the burner c Reattach the manometer to the gas train manual shutoff valve at the burner and record the measured gas pressure in inches of water column W C Measure gas pressure again after 15 minutes If gas pressure has increased 0 5 W C or more the gas leak must be isolated to one or more of the operating gas valves For example a solenoid actuated gas shutoff valve After any leaking valve is replaced the reassembled gas train must be leak tested again before start up is attempted Open the hinged top enclosure panel cover on the appliance
80. ux et aux exigencies du foumisseunde gaz Should overheating occur or the gas supply fail to shut off turn off the manual gas control valve to the appliance En cas de surchauffe ou si l alimentation en gas ne s arr te pas fermez manuellement le robinet d arr t de l admission de gaz WARNING Installation and service must be performed by a qualified installer service agency or the gas supplier who must read and follow the supplied instructions before installing servicing or removing this appliance Refer to the information contained in this manual Improper installation adjustment alteration service or maintenance can cause property damage personal injury exposure to hazardous materials or death WARNING Do not use this appliance if any part has been under water Immediately call a qualified service technician to inspect the unit and to replace any part of the control system all gas controls and all other items affecting safe appliance operation and which has been under water AVERTISSEMENT N utilisez pas cet appareil s il a t plong dans l eau m me partiellement Faites inspecter l appareil par un technicien qualif et remplacez toute partie du systeme de contr le et toute commande qui ont t plong s dans l eau WARNING In an emergency shut the main gas supply valve to the appliance from a location safely away from the emergency Failure to follow these instructions can cause property damage personal injury
81. ww riversidehydronics com WARNING Turn off all power to the boiler when servicing or accessing the blower drive The blower drive still has power when appliance switch is off Failure to turn off all power to the boiler can cause personal injury property damage or death Tools and Instrumentation Required e Stack Temperature Gauge e Stack Draft Gauge e Electronic Combustion Analyzer e Two U tube Manometers or pressure gauges e AC DC Multi meter with 20 000 OHM Volt rating e Amp Meter e Normal Hand Tools Resources e Product Installation amp Maintenance Manuals e Start up Report with instructions e Local State amp Federal Codes e Toll Free 24 Hour Technical Support 1 800 433 5654 On Site Considerations e Electrical Supply in accordance with Nameplate Rating e Uncontaminated Combustion Air e Adequate Fuel Supply e Treated Water Supply Boilers 13 5 Startup Procedure 1 Carefully study the burner start up information included in this manual 2 Fill system tank with water a Close the drain valve b Open the pressure relief valve or other air vent valve if equipped located above the tank to permit the air in the system to escape Open the makeup water fill valve d Close the pressure relief valve or other air vent valve opened in step b when water starts for flow from the valve e If venting through the pressure relief valve was used when filling the boiler ensure the relief valve has been ret
Download Pdf Manuals
Related Search
Related Contents
Toshiba P100 Laptop User Manual Convergence-enabled DVD and web system Philips HDMI cable SWV3433W Bedienungsanleitung - GSD Scorpion for Universities, Colleges & Schools Manual de instrucciones Notice radiateur Sèche serviette Noirot Corélia Copyright © All rights reserved.
Failed to retrieve file