Home

REVOLUTION REFERENCE GUIDE

image

Contents

1. Kessler Revolution Pan amp Tilt System REVOLUTION REFERENCE GUIDE The Kessler REVOLUTION Pan and Tilt System is our answer to the need for an affordable quality motorized pan amp tilt head After years of development we have produced a motorized head that addresses the failings of other pan tilt heads in this price range When paired with the ORACLE Controller we feel the REVOLUTION is the most feature rich and best motorized head solution on the market for under 5000 CRANE INSTALLATION The REVOLUTION can be easily mounted to any of the Kessler Crane kits Both upright and under slung configurations are possible 1 Locate the four 4 stainless steel bolts four 4 wing nuts and eight 8 washers included with the REVOLUTION installation kit 2 Secure the crane or have someone assist while installing If installing by yourself lower the crane all the way to the ground to prevent drops 3 Align the 4 hole bolt pattern on the crane s camera sling to the bottom of the REVOLUTION 4 Insert a bolt with washer through the four holes and secure on other side with wing nut and another washer 5 Tighten all four bolts securely and check all connections on the crane to assure a solid mount 6 If desired the camera sling on the crane can be flipped for under slinging the REVOLUTION Follow the same installation procedure as above to mount to an under slung crane camera cradle SLIDER INSTALLATION
2. The REVOLUTION can be mounted to the Kessler CineSlider systems for a third axis of movement 1 Mount the CineSlider to a Hercules head or attach outrigger feet as shown before installing the REVOLUTION head to prevent the slider from tipping 2 Locate the four 4 3 4 stainless steel bolts and four 4 washers 3 Align the four corner holes on the base of the REVOLUTION to the corresponding holes on the slider Cart 4 Insert a bolt with washer through the four holes and secure NOTE Use 3 4 length bolts only as longer bolts may hit and damage the track 5 Tighten all four bolts securely and check all connections before mounting camera equipment SHUTTLE POD INSTALLATION The REVOLUTION can be mounted to the Kessler ShittlePod systems for longer sliding shots 1 Locate four 4 3 4 stainless steel bolts and four 4 washers 2 Align the four corner holes on the base of the REVOLUTION to the corresponding holes on the ShuttlePod cart 3 Insert a bolt with washer through the four holes and secure 4 Tighten all four bolts securely and check all connections before mounting camera equipment USING THE OPTIONAL VERTICAL ADJUSTMENT KIT This upgrade kit allows for vertical adjustment of the camera mounting platform on the Revolution Head Use this when the center of gravity of the camera needs to be adjusted 1 With your camera securely mounted to the Revolution head loosen the the two knobs
3. on the vertical adjustment posts 2 Raise or lower the camera as necessary to center the body with the rotational access of the Revolution head 3 Once aligned tighten the two knobs to hold vertical position in place CONNECTING THE ORACLE The ORACLE is required for operating the REVOLUTION head It can be used for both live motion control and time lapse control 1 Attach the included splitter and cat5 cable to the two 2 motor drive cables on the REVOLUTION head 2 Plug the other end of the cat5 cable into an ORACLE controller 3 Power up the ORACLE and select Head Unit from the startup screen Reference the ORACLE user manual for detailed operation information AENU ENTER PLAYIREC PLAYIREC F MAXSEED DAMPING DEADBAYE

Download Pdf Manuals

image

Related Search

Related Contents

"取扱説明書"  Qware WII1067  MSP-EXP430G2 LaunchPad Experimenter Board User's Guide (Rev  User Manual - basICColor GmbH  Philips Streamium SL400i  JVC LT-37E488 LCD TV  Emjoi AP-3MPR User's Manual  Patient Slings  Fisher-Price J9632 User's Manual    

Copyright © All rights reserved.
Failed to retrieve file