Home

10.7 CSI Technical Specifications - (ICF): SmartBlock Insulating

image

Contents

1. of components or modification of formwork must be prearranged B If erection of the formwork results in insufficient concrete cover over reinforcement stop construction and request instructions from the Architect Engineer of record PART 2 PRODUCTS 2 01 MANUFACTURERS PREFABRICATED FORMS A American ConForm Industries Product SmartBlock SF10 Standard Form B Two opposing faces of EPS foam connected with an EPS foam bridge An interlocking tongue and groove is along top and bottom horizontal surfaces Surface of exterior is scored 1 16 deep on 2 increments to facilitate measuring and cutting C Expanded Polystyrene Foam 1 Density 1 5 2 0 pcf 2 Flame spread ASTM E 84 25 or less 3 Smoke Developed ASTM E 84 450 or less D Substitutions Under provisions of Section 01600 2 02 MANUFACTURERS UNASSEMBLED FORMS A American ConForm Industries Product SmartBlock 12VWE Variable Width Form B Two opposing faces of EPS foam connected with polypropylene connectors manually inserted into preformed T slots in the foam Connector flange is 1 14 wide by 6 long and after proper positioning is 14 below the surface of the foam panel An interlocking tongue and groove is along top and bottom horizontal surfaces Surface of exterior is scored 1 16 deep on 2 increments to facilitate measuring and cutting 146 C Expanded Polystyrene Foam 1 Density 1 5 2 0 pef 2 Flame spread ASTM E 84 2
2. 10 7 CSI TECHNICAL SPECIFICATIONS This document is arranged in agreement with the recommended section and page format developed by CSI Construction Specifications Institute All versions of this document are copyrighted by American ConForm Industries and may not be used or duplicated without permission SECTION 03135 EXPANDED POLYSTYRENE CONCRETE FORMWORK PART 1 GENERAL 1 01 SECTION INCLUDES A American ConForm Industries SmartBlock for cast in place insulated concrete with shoring bracing and anchorage B Required access for other work C Form accessories 1 02 INSTALLED BUT NOT FURNISHED PRODUCTS D Section 03300 Cast In Place Concrete Supply of concrete accessories for placement by this section E Section 04300 Supply of masonry accessories for placement by this section F Section 05500 Metal Fabrications Supply of metal fabrications for placement by this section 1 03 RELATED SECTIONS A Section 03200 Concrete Reinforcement B Section 03300 Cast In Place Concrete 1 04 REFERENCES C ACI 301 Structural Concrete for Buildings D ACI 318 Building Code Requirements for Reinforced Concrete E ASTM C 578 Standard Specification for Preformed Cellular Polystyrene Thermal Insulation 144 F American ConForm Industries User s Manual for SmartBlock Forms G Structural Calculations for SmartBlock Forms 1 05 DESIGN REQUIREMENTS A A All designing engineering and construction of formwork shoring and braci
3. 5 or less 3 Smoke Developed ASTM E 84 450 or less D Substitutions Under provisions of Section 01600 2 03 ACCESSORIES A Bracing Commercially available systems or nominal lumber or steel framing members B Cleat or Sleepers Nominal lumber or steel framing members C Tape Release tape for securing protecting and sealing slots corners adjustment cuts interlocking tongue and groove D Nails Tie Wire Lag Bolts Through Bolts Anchorages Sized as required of sufficient strength and composition to maintain formwork positioning while placing concrete PART 3 EXECUTION 3 01 EXAMINATION A Dimensional lines levels and centers of foundation must be verified before erecting formwork Dimensions must agree with drawings B Strength of foundation concrete to be verified before proceeding with erecting formwork 3 02 ERECTION FORMWORK A American ConForm Industries SmartBlock Forms must be installed in accordance with manufacturer s recommendations Erect SmartBlock forms in a running bond Corners are overlapped log cabin style Protect forms and connectors from damage B Erect formwork shoring and bracing to achieve design requirements All work must conform to ACI 301 requirements 147 Bracing and shoring must ensure stability of formwork and support construction loads Design erect support brace and maintain formwork to support axial lateral dynamic and static loads and moments that may occur unti
4. e water to clean out forms Use compressed air or other method approved by the Architect Engineer of record to remove foreign matter 148 E Wall finishes requiring bonding to the EPS foam can only be applied to a clean surface Oxidation from UV exposure in the form of yellow dust must be removed from the exterior surfaces Mild detergent and a stiff brush or pressure washers may be used Rinse thoroughly with water 3 05 TOLERANCES OF FORMWORK A Tolerances of formwork must be maintained in accordance with ACI 301 3 06 FIELD QUALITY ASSURANCE A Before placement of concrete inspect erected formwork shoring and bracing Ensure formwork conforms to design stability and cleanliness and that shoring bracing supports fastenings ties accessories and other items are secure and maintain their positions END OF SECTION 149
5. l such forces can be resisted by the concrete structure Resultant concrete members and structures must be of correct shape size position elevation and alignment E Plumb and align all joints Approval of the Architect Engineer of record must be obtained before framing openings not indicated on drawings 3 03 EMBEDDED PARTS OPENINGS AND INSERTS A B C Locate set in place and stabilize items to be cast directly into concrete Openings where required must be formed and stabilized Work with other sections must be coordinated before locating forming placing and stabilizing openings sleeves slots pockets recesses bolts anchors other inserts and components Positioning of items must conform to the appropriate section Masonry anchors must conform to spacing and intervals specified in Section 04300 Manufactures instructions for installation of accessories must be followed Positioning must not be compromised during placement of the concrete 3 04 FORM MAINTENANCE A Remove foreign matter on exterior and interior of forms before placing into position Cavities must be clear of debris prior to concrete placement Compressed air or water can be used to remove remaining foreign matter Ensure clean outs allow water and debris can drain to exterior In cold weather remove ice and snow from interior cavity of forms Do not use de icing salts or other chemicals Unless formwork is within heated space do not us
6. ng must conform to design and applicable code requirements Concrete must conform to required shape lines and dimensions 1 06 SUBMITTALS A Shop Drawings identify required dimensions materials and arrangement B Product Data denotes form materials and installation requirements 1 07 QUALITY ASSURANCE A Work is to conform to ACI 347 B Erection of formwork is the contractor s responsibility Approval of the shop drawings by the architect of record as submitted or as corrected does not relieve the contractor of their responsibility to appropriately construct and maintain the forms so that they will function properly 1 08 REGULATORY REQUIREMENTS A Conform to applicable codes for designing fabricating and erecting of formwork B ICBO Evaluation Service Inc Report 4572 ConForm SmartBlock Polystyrene forms for reinforced concrete walls C BOCA International Evaluation Services Inc Report 95 46 DIVISION 03 CONCRETE Section 03130 Permanent Forms 1 09 DELIVERY STORAGE AND HANDLING A Deliver American ConForm Industries SmartBlock Forms installation instructions and user reference manual as provided by manufacturer B Store as strapped banded or other prepackaged bundles and boxes provided by the manufacturer to prevent damage Protect from UV deterioration due to prolonged exposure to direct sunlight 145 1 10 COORDINATION A Coordination of this section with other sections requiring attachment or embedment

Download Pdf Manuals

image

Related Search

Related Contents

FRI-0104 取扱説明書  Hamilton Beach 26030 waffle iron  AxiUm Payment Plan User Manual  FUJITSU Public Sector Solution 環境放射線監視  Petra FS 40  取扱説明書 ハウジング一体型 LED付きカメラ 付きカメラ SCL  Kerr Newsletter_10  User`s Manual Model 6500 Thunderstorm/Lightning  Panasonic KX-UT248NE LCD Wired handset Black IP phone  5000-AVD - Cal Media Engineering  

Copyright © All rights reserved.