Home
Pergola Half Room - Yardistry Structures
Contents
1. LR _ 10 Top and Bottom Rail Lengths Vary D 1 Y 8 x 2 1 4 Wood Screw 6 4x4 Post 57 810 x 1 1 2 Pan Head Screw 88 x 1 1 2 Wood Screw STEP 1 ASSEMBLE SCREENS FOR MAIN WALL 1 Remove the upper metal connectors on both sides of PL2 Two High Lattice Panel Reattach the metal connectors to PL2 by securing the bottom two holes of the metal connectors to the top two holes on PL2 so that the metal connectors stick out from the top Slide PX1 One High X Topper between the two protruding metal connectors on the top of PL2 Attach the metal connectors to the factory drilled holes in PX1 Fig 1A Ensure Panels are oreinted correctly Fig 1B 2 Secure panels with a S4 2 1 4 Wood Screw the location indicated by the large arrow in the direction of the arrow 3 Repeat until 4 panel assemblies are created Fig 1B Filler TRITT on Bottom of Panel Y D I 1 1 f e lpngdrt dies tothe rignt lt EErEE EN Fig 1B Filler Strips on Bottom of Panel 4X ONE HIGH X TOPPER 4X Pe TWO HIGH LATTICE PANEL Coo IHC
2. 1 1 EL d N 60 0 DU 5 4 Go 2 Fig 1A PL2 4x s 8 2 1 4 WOOD SCREWS STEP 2 ASSEMBLE MAIN WALL X 1 Assemble panels together in configuration shown Fig 1 Insert male connector into female Slide down until flush with adjacent panel as shown Fig 1A oecure Panels with S4 2 1 4 screws provided in pre drilled PTTL B holes as indicated by arrows in D Seo the direction of the arrow Fig 1 EEEIGEEEEEEE EEPEISEEEEEEE SCO oecure R Top Bottom Rails to Panel Assembly with S4 2 1 4 Wood Screws locations indicated by arrows in the direction of the arrow Fig 2 R Top and Bottom Rails will overhang 1 4 on either side of panel R Top and Bottom Rails may need to be cut to 6 6 1 2 2m It is recommended to use a Mitre Box or Mitre Saw F 1 E 2x k amp BOTTOM RAIL AT 6 6 1 2 2M 21x 54 8 2 1 4 WOOD SCREWS STEP 3 ASSEMBLE SINGLE SCREENS 1 Remove the upper metal connectors on both sides of PL2 Two High Lattice Panel Reattach the metal connectors to PL2 by securing the bottom two holes of the metal connectors to the top two holes on PL2 so that the metal connectors stick out from the top Sl
3. 3 WOOD SCREWS
4. 8 2 1 4 WOOD SCREWS 2x TWO HIGH X PANEL STEP 5 ASSEMBLE SIDE WALL X 1 Assemble panels together in configuration shown Fig 1 Insert male connector into female Slide down until flush with adjacent panel as shown Fig 1A oecure Panels with S4 2 1 4 screws provided in pre drilled holes as indicated by arrows in the direction of the arrow Fig 1 Pre Drill holes with a 1 8th drill bit as required 3 Secure R Top and Bottom Rails to Panel Assembly with S4 2 1 4 Wood ocrews locations indicated by arrows in the direction of the arrow Fig 2 R Top and Bottom Rails will overhang 1 4 on either side of panel Except with Arch Topper R Top and Bottom Rails may need to be cut to size indicated in material list below It is recommended to use a Mitre Box or Mitre Saw 4 Repeat to create two walls 2x x amp BOTTOM RAIL AT 373 1 2 1M 18x 8 2 1 4 WOOD SCREWS 2X amp BOTTOM RAIL AT 2 23 4 67 9CM STEP 6 ATTACH PANEL CLIPS TO BACK POSTS SEPE 1 On a flat surface place P 4x4 Post on its side and position Panel Clips in Fig 2 locations indicated in Figures 1 and 1A Ensure Panel Clips are oriented as shown in Diagrams 2 Panel Clips should be placed in the centre of the post or the leading edge of the clip should be 1 3 8 or 3 5cm away from the side of the post as shown in Fig 2 3 With Panel Clips in place mark screw hol
5. Some structures may require two or more people to install safely Check for underground utilities before digging or driving stakes into the ground General Information Wood components are manufactured with Cedar C Lanceolata which is protected with factory applied water based stain Knots small checks cracks and weathering are naturally occurring and do not affect the strength of the product Annual application of a water based water repellent sealant or stain will help reduce weathering and checks Warranty Yardistry Limited products are backed by a 5 year limited lifetime warranty from the date of original retail purchase for manufacturing defects and if installed as per manufacturer s installation instructions Patents Pending Tools Required Tape Measure e 2 Phillips or Robertson Adjustable Wrench 8 Step Ladder Carpenters Level 1 8 Drill Bit e Safety Glasses Ratchet with extension Carpenters Square 7 16 sockets Pencil Adult Helpers e or Cordless Open End Wrench 1 4 Drill Bit 7 16 e 3 16 Hex Key Keys Assemble Success This identifies information that requires special Check that set or assembly is properly level attention Improper assembly could lead to an before proceeding unsafe or dangerous condition WW Where this is shown 2 or 3 Pre drill 1 8 8 3 16 Bit people are required to safely Pre drill a pilot hole complete the step To avoid E 3 bef
6. TRI GSS 8X gt 1 4X 21 2 HEX LAG BOLT W 4x 144 VAX 4 X 1 1 4 HEX BOLT x 2X 6 X 80 1 8 BEAM 16x 12 3 WOOD SCREW 4x 2 2x 2 X 40 BRACE 2X z 2X 6X 66 5 8 BEAM 1x DX 1 x 6x 11 PLAQUE 8 1 1 27 WOOD SCREW 7 STEP 12 MOUNTING BEAMS TO CONNECTORS LE 1 Attach two B 2 x 6x 71 5 8 Beams to Post Top Connectors with WH 7 16 Hex Bolt as shown in Fig 1 and 1A Fig 1 2 Attach two F 2 x 6 x 16 3 4 Beams Ends to Post Top Connectors with WH 7 16 Hex Bolt as shown in Fig 1 and 1A 3 Attach one A Back Beam and one Z Front Beam to Post Top Connectors with WH 7 16 Hex Bolt as shown in Fig 2 and 2A 4 Attach four H 2 x 6 x 13 1 2 Beam Ends to Post Top Connectors with WH 7 16 Hex Bolt as shown in Fig 2 and 2A 5 Attach two E 2 x 6 x 21 5 8 Beams to Post Top Connectors with WH 7 16 Hex Bolt as shown in Fig 2 and 2A 2X 2 6 715 8 BEAMS 2X 2X6 X21 5 8 BEAMS 2X F 2X6 X 16 3 4 BEAM ENDS 48X wit 7 16 HEX BOLT W NUT 4X 4 2X6 X 13 1 2 BEAM ENDS STEP 13 INSTALLING PERGOLA ROOF 1 Layout nine C 5 4 x 4 x 59 3 4 Trellis on the beams centering the middle beam as shown in figure 1 2 Allow for a 12 3 4 or 32cm gap between each Trellis outside face to outside face 3 Fasten Trellis roof to beams with S2 8 x 3 Wood Screws Fig 1 amp 1A 9x 9 5 4 x4 x 59 3 4 TRELLIS 18 52 8
7. holes of the metal connectors to the top two holes on PX2 so that the metal connectors stick out from the top Slide PA1 Arch Topper between the two protruding metal connectors on the top of PX2 Attach the metal connectors to the factory drilled holes in PA1 Fig 1A Ensure Panels are oriented correctly Fig 1B 2 Secure panels with a S4 2 1 4 Wood Screw the location indicated by the large arrow in the direction of the arrow 3 Repeat until two panel assemblies are assembled SR E r 2 2 S A N Mz ur 5 H i e b 2X ONE ARCH TOPPER 2X 8 2 1 4 WOOD SCREWS 2x TWO HIGH X PANEL STEP 4B ASSEMBLE WINGS CONTINUED 4 Remove the upper metal connectors on both sides of PX2 Two High X Panel Reattach the metal connectors to PX2 by securing the bottom two holes of the metal connectors to the top two holes on PX2 so that the metal connectors stick out from the top Slide PX1 One High X Topper between the two protruding metal connectors on the top of PX2 Attach the metal connectors to the factory drilled holes in PA1 Fig 4A Ensure Panels are oriented correcly Fig 4B 5 Secure panels with a 54 2 1 4 Wood Screw the location indicated by the large arrow in the direction of the arrow 6 Repeat until two panel assemblies are created PZN X X EST Fig 4B Filler Strips on Bottom of Panel O O Go 2X ONE HIGH X TOPPER 2X 6
8. INSTALLATION MANUAL 4X12 PERGOLA ROOM KIT Yardistry North America Toll Free Customer Support 1 888 509 4382 info yardistrystructures com www yardistrystructures com Yardistry Selwood Products Europe Customer Support 444 1284 852569 parts selwoodproducts com www selwoodproducts com 6 6 1 2 1 99m 3 10 1 2 1 18m 211712 3 37m Revised 04 16 2012 IMPORTANT SAFETY NOTICE Yardistry components are intended for privacy decorative and ornamental use only Product is NOT INTENDED for the following A safety barrier to prevent unsupervised access to pools hot tubs spas or ponds Safety railings for elevated platforms or decks As load bearing support for a building structure heavy objects or swings Used in structures that trap wind rain or snow that would create extra load on the product Permanent structures may require a building permit As the purchaser and or installer of this product you are advised to consult local planning zoning and building inspection departments for guidance on applicable building codes and or zoning requirements Wood is NOT flame retardant and will burn Grills fire pits and chimneys are a fire hazard if placed too close to a Yardistry structure Consult user s manual of the grill fire pit or chimney for safe distances from combustible materials During installation follow all safety warnings provided with your tools and use OHSA approved safety glasses
9. es with a pencil and pre drill holes with a 1 8 drill bit Not provided Pre drill holes and secure with S7 8 x 1 1 2 Wood Screws 4 Secure Panel Clips in locations indicated in figure 1 and 1A with S7 8 x 1 1 2 wood screws Tr Front View 56 1 4 142 9cm 40 101 6cm L 4x4 POST 24x PANEL CLIPS 48x 7 8 x 1 1 2 WOOD SCREW STEP 7 ATTACH PANEL CLIPS TO SIDE POSTS D Ux 1 flat surface place P 4x4 Post on its side and position Panel Clips in Fig 2 locations indicated in Figures 1 and 1A Ensure Panel Clips are oriented as shown in Diagrams Use posts A and D from previous step 2 Panel Clips should be placed in the centre of the post or the leading edge of the clip should be 1 3 8 or 3 5cm away from the side of the post as shown in Fig 2 With Panel Clips in place mark screw holes with a pencil and pre drill holes with a 1 8 drill bit Not provided SE LO ee 4 Secure Panel Clips in locations indicated in figure 1 and 1A with S7 8 x 1 1 2 wood screws 5 Repeat for each post configuration EA Top View Aen ni Top View 31 Left Side View Right Side View Use posts A and D from previous step 120 0cm 47 1 4 AQ 101 6cm 2x 4 4 Posts 6X PANEL CLIPS 12x 48 X 1 1 2 WOOD SCREW 5 1 Place panel assemblies on posts shown Fig 1 allowing a 4 gap between the bottom of the p
10. ide PX1 One High X Topper between the two protruding metal connectors on the top of PL2 Attach the metal connectors to the factory drilled holes in PX1 Fig 1A Ensure Panels are oriented correctly Fig 1B 2 Secure panels with a S4 2 1 4 Wood ocrew the location indicated by the large arrow in the direction of the arrow 3 Secure R Top and Bottom Rails to Panel Assembly with S4 2 1 4 Wood Screws locations indicated by arrows and in the direction of the arrow R Top and Bottom Rails will overhang 1 4 on either side of panel R Top and Bottom Rails may need to be cut to 20 50 8cm It is recommended to use a Mitre Box or Mitre Saw OLOTINI 6605 1660 4 Repeat until two panel assemblies assembled e I O O Go VOX TA IT LI JA Pilot holes to the right e HWAILLILLILILLI HE AA LL dec E os Fig 1B Filler Strips on Bottom 1111111111 of Panel 11111111111 WE 2X pa ONE HIGH X TOPPER 8x s 8 2 1 4 WOOD SCREWS 2x TWO HIGH LATTICE PANEL 4X amp BOTTOM RAIL AT 20 50 8CM STEP 4 ASSEMBLE WINGS 1 Remove the upper metal connectors on both sides of PX2 Two High X Panel Reattach the metal connectors to PX2 by securing the bottom two
11. ore fastening screw injury or damage to the 8 AG or lag to prevent assembly make sure to get help splitting of wood Tighten Bolts Measure Check that assembly is square Square Distance i i Assembly EE This indicates time to tighten bolts but 1 2 U usc not too tight Do not crush the wood This may create splinters and cause proper location structural damage MATERIAL LIST 1 2x 6 x 80 1 8 Y50100 024 2 2 x6 x 71 5 8 Y50100 023 5 4 4 x 59 Y50100 025 D 4 2 x 2 x 40 Y50100 026 a NN CN NN RN Nominal Actual 2 2x6x 21 5 8 1 1 11 Y50100 019 5 8 x 5 3 8 el 1 1 2 x 1 1 2 1 1 2 x 5 1 2 F 3 1 2 x 3 1 2 4 2x 6x 13 2 2 x 6 x 66 5 8 Y50100 027 omy 2 2x6x 16 1 1 4 x 174 9277211 4 1 4 9253200 Rm 4 1 4 9285200 12 1 4 9251200 81 4 88 x 172 9290512 x 18 8 x 3 9290530 2 s 62 8 1 4 x 2 9272222 7 16 Hex Bolt Assembly lt Post Top Connector With 6 Q 30 Panel Clips MATERIAL LIST 8 One High X Topper PL2 211111 4 Two High X Panel 2 One ArchTopper
12. ost and the ATTACH PANELS TO POSTS bottom edge of the bottom rail on the panel assembly Note Assemble with the help of another adult 3 Fasten the panel assembles to the post and Panel Clips with a S5 1 Pan Head Screw provided in location of circles Fig 1 2 With a 1 8 drill bit predrill holes as shown in figure 2 STEP 9 AREE SE em e En 95 FN A SM d o S ke ei D DEE LL HERMES ands CL IS EI EI LI EL Fe EI E To 2 4 gc Li Ei EJ Ed EI ID E ES E BJ IJ omo RR d Cal IB LI AHA EI IA UU LR EE oe d Ee EC S BEI EI EI Si EB 5 1111 JM dE K 1111111111111111111111 1 1 1111111111111111 un 2 5 OQ un Z gt lt vA 9 gt lt Sei 4 10 2cm Fig 1 Back View with S5 1 Pan Head Screw Fig 2 Predrill Holes and Fasten 11111111111 GL 13111111114 21111111111 LI LI Lal LIA NL EE CIEN EL UI LEI II LU LLLI LI 131111 Gi E ES LEI Ri KN Teo 1 11 TT TOT 533 Side View STEP 10 LAYOUT POSTS AND A CONNECTORS 1 Layout pergola bases in configuration shown in figure 1 Posts must be securely installed to support structure Consult local building codes and ground conditions for required footing design It is recommended the struct
13. ure be secured to existing stone concrete or deck with the Yardistry Post Base YM21016 or equivalent hardware 2 Install Post Top Connectors with S6 1 1 2 Pan Head Screws provided Fig 2 Ensure the direction of the Post Top Connector is the same direction as indicated by the arrows in figure 1 Install on a flat level surface Fig 2 Attach Post Top Connectors with S6 1 1 2 Pan Head Screws 24 621 1 2 PAN HEAD SCREWS 6X POST TOP CONNECTOR STEP 11 ASSEMBLE FRONT AND BACK BEAMS 1 Secure two 2 2 x 6 x 66 5 8 Beams together with 1 4 1 1 4 Hex Bolts as shown in Figure 1 2 Attach Y 1 x 6 x 11 Plaque with S1 8 1 1 2 Wood Screws as shown in Fig 1 3 Complete Z Front Beam by securing two Z 2 x 6 x 66 5 8 Beams and two D 2 x 2 x 40 Brace with 1 4 x 272 Hex Lag Bolt and S3 12 x 3 Wood Screws as shown in Figure 1 Note Hex Lag Bolt assembly in diagram below 4 Assemble A Back Beam by attaching one A 2 6 x 80 1 8 Beam and two D 2 x 2 x 40 Brace with 1 4 x 272 Hex Lag Bolt and S3 12 x 3 Wood Screws as shown Note Hex Lag Bolt assembly in diagram below 435 Fig 1 Laminate ront Beam Fig 2 Front Beam Pre drill all holes using a 1 8 drill bit before installing screws Predrill 1 8 pilot hole Use factory drilled hole as a guide
Download Pdf Manuals
Related Search
Related Contents
ascan updated - Akas medical Bande d`Etanchéité DSLR-A850 Lancom Systems IAP-332 CH - CBradio.nl Ar-130 Alemán - Migros 取扱説明書 - Panasonic TCA-1MEG High Impedance Buffer Amplifier Instruction Manual AVT 200HD Tuner • Setup Guide Copyright © All rights reserved.
Failed to retrieve file