Home

G-Set Installation Manual

image

Contents

1. o M Battery controller C1013 KLGS C1013 Screw the 25mm backnut onto the valve socket The solar panel can be cemented into the PVC socket with PVC solvent cement if necessary Double check at this point that the solar panel will be facing the direction that captures maximum sunshine hours The solar cable is then fed down through the socket to connect on to the controller Plug the cable from the solar panel to the cable from the controller as shown Battery controller C1013 KLGS C1013 Taking the included wire nuts you are then able to connect the solenoid latch coil to the controller See controller data sheet for instructions Installing the Connectors Strip wires 1 2 Align frayed strands or conductors Do not pre twist Place stripped wires together with ends even lead stranded wire slightly Twist connector onto wires pushing firmly until hand tight DO NOT over torque Swipe excess sealant in and around conductors Do not reuse Connect black latch wire to black controller wire and the green latch wire to the red controller wire This is achieved by the use of the wire nuts included This is how the C1013 controller should be mounted RX PLASTICS LTD PO Box 360 Ashburton Phone 64 3 307 9081 Email sales rxplastics co nz www rxplastics co nz JULY 2014 an OAliaxis company RX PLASTICS
2. Wireless controller IPC mounting instructions KLGS RX2000 Drill 2 x 4mm holes for the zip clip to affix the aerial to the inner rim of the G Set Ensure that the aerial is captured by the zip clip then tighten the zip and remove any excess length of the zip clip Wireless controller IPC mounting instructions KLGS RX2000 Connection of the solenoid wires is simply connecting green IPC wire to green solenoid wire and the black IPC to the black solenoid wire This is achieved by the use of the wire nuts included Installing the Connectors Strip wires 1 2 Align frayed strands or conductors Do not pre twist Place stripped wires together with ends even lead stranded wire slightly Twist connector onto wires pushing firmly until hand tight DO NOT over torque Swipe excess sealant in and around conductors Do not reuse This is how the IPC should be mounted o Battery controller C1013 KLGS C1013 Battery controller C1013 install tools Q Phillips head screwdriver Q 32mm hole saw for the attachment of the socket to the lid of the G Set Q piii Programming of the controller should be completed before mounting Connect the controller to the coil on the Baccara valve Drill a 32mm hole to mount the 25mm valve socket for the solar panel making sure that it faces the best solar collection direction generally this will be North
3. IRRIGATION K Line M G Set Irrigation olid Set Irrigation for pasture Installation and user manual an OAliaxis company RX PLASTICS LTD ato a PO Box 360 Ashburton geiles earned ae edi Fite potent zt rn 2 gar san AVL ARE e gue ih p Js y E Dnus a m T X kc f Bal z RX PLASTICS fa a f L T6 pet i 3 i lC i fn Ex e Ti Fi A E DAS L A r 2 E eu nts P Email sales rxplastics co nz p den www rxplastics co nz eae ry RT M s d Vir Tae ain UTI GEN GNE CLA DEO Iu TEN Vue dpi Tut r ca ES Loa e ume oae K Line G Set irrigation G Set is an irrigation system and to achieve the desired outcome must be approached and treated as such and not an accumulation of components G Set is a solid set fixed system that minimises labour for the day to day operation of irrigation It is suitable for all land areas and is not restricted by the shape terrain size or topography Due to this flexibility there are numerous configurations of valves pressure regulation and sprinkler selection to accommodate the various design requirements These installation instructions apply to all of these options RX Plastics has developed two control options to operate the system The first is a wireless radio mesh system of control which allows the operator to communicate with the units remotely from any point from which a single unit is vis
4. ible With this system we do not require direct line of sight to all of the units The second is an individual battery operated control These units need to be synchronised and programmed prior to installation and any future adjustment must be done individually or on a group basis Contents G Set installation guide 3 6 This is a guide to the best practice of installing G Set Failure to follow these instructions can lead to instability and poor performance Wireless Controller IPC mounting instructions f es ANZ Guides to ensure you get the optimum performance from your IPC KLGS RX2000 Battery controller C1013 13 15 A guide to ensure you get the optimum performance from your K Line G Set C 1013 control KLGS C1013 G Set unit installation guide G Set install tools A 30mm hole saw for the tapping saddle installation E 2 13mm long socket 3 8 drive for the tapping saddle nuts Q 150mm socket bit 3 8 drive extension for the long socket 5 16 socket adaptor bit for type17 tek screws 3 3 drill adaptor Q Drill Optional Q Ratchet wrench for tapping saddle nuts The system comprises of a main line telescoping through the property feeding 63mm MDPE ring mains This ring main will have the G Set pods directly attached to it using tapping saddles at predetermined locations to suit the paddock layout and terrain 30m to 40m spacing The ring main of 63mm MDPE
5. ler IPC install tools 3mm drill bit for the IPC plate mounting holes 4mm drill bit for the zip clip mount holes 10mm drill bit to drill the aerial tube holes Q rii Q Phillips head screwdriver to screw the IPC down B Side cutters to cut the zip clip ends Place the IPC mounting block behind the tray on the support lids Fix this in place with the two supplied self tapping screws in the recessed holes p p Wireless controller IPC mounting instructions KLGS RX2000 Drill 3mm holes into all of the holes through the bracket into the polyethylene lid Make the oblong hole fully drilled using a 10mm drill for this process Sit the IPC on the mounting bracket with the wires and aerial fed down into the valve area of the G Set Screw in the IPC mounting screws attaching the IPC to the lid and bracket Wireless controller IPC mounting instructions KLGS RX2000 Screw in the IPC mounting screws attaching the IPC to the lid and bracket Drill 2 x 10mm holes into the G Set immediately behind the IPC for placement of the 10mm aerial tubing through which the aerial will be threaded Wireless controller IPC mounting instructions KLGS RX2000 Thread the aerial through the lower hole to the outside and thread the tubing onto the aerial Thread the aerial and top of tubing into top hole
6. overage The unit is now ready for the valve sprinkler assembly to be fitted This is simply a matter of sliding this preassembled unit onto the riser tube ensuring the bottom fitting s sealing o ring is in the relaxed cavity down to the required height top sprinkler flush with the top of the pod Hold the blue nut and rotate the assembly until the bottom fitting is tight Attention needs to be given to ensure the 32mm riser tube is not too long and going to foul the finger filter in the valve The riser tube will need to be shortened if the 63mm pipe is mole ploughed to the minimum depth G Set unit installation guide Locate the first half of the cover support into the pod and screw into place with the dish indent facing north or best orientation to capture maximum sunshine hours At this point fit the chosen control option following the installation guide for that control system Locate the second half of the cover sprinkler Support and screw into place ensuring the base of the sprinkler is firmly held around the orange slip ring on the sprinkler Three tek screws are supplied to attach each cover half Install the stock guard and the unit is ready for commissioning Nar he APR Me i Fa i ty 4 1 NOTE Use a drill with a clutch to avoid the stripping of the PE on the tek screw hole Wireless controller IPC mounting instructions KLGS RX2000 Wireless control
7. pipe needs to be installed below ground to a depth of greater than 550mm particularly at the points where the G Set pod is to be located installed This pipe can be trenched or mole ploughed A combination of a GPS a survey and visual assessment will be required to ensure correct placement of the G Set to achieve the desired coverage DU At the desired location dig down and expose sufficient pipe to allow for the fitting of the 63mm e tapping saddle i s gt E G Set unit installation guide Drill a 30mm hole perpendicular to the lay of the land It is important to ensure this so that there is no undue force on the tapping saddle that can result in it being difficult to achieve a good long term seal uA n VeL RETE m ae na minimum of 550mm It is desirable to dig the hole required for the G Set no bigger than necessary to allow the installation and compaction of soil around the pod The larger the hole the harder and more time consuming it is to get good compaction and secure placement Fit the tapping saddle complete with male coupler and 600mm riser tube securely to the pipe Fill and firmly compact the soil in the hole to a height of 350mm from finished ground level G Set unit installation guide Lower the G Set pod over the riser tube back fill and firmly compact ensuring the rim of the pod is parallel with the lay of the land This will result in the optimum c

Download Pdf Manuals

image

Related Search

Related Contents

Greenshades Mag.NET User Manual  2 Wählen Sie über die Tasten  BEDIENUNGSANLEITUNG - Icon Heath & Fitness  45-PHPM Metro pH Portátil - Advance Laboratorios Panamá  19” – 32” High Definition Digital Advertising Display User`s Manual  Samsung T22A350 Наръчник за потребителя  Mini hélicoptère télécommandé à 4 canaux „GH-245“  

Copyright © All rights reserved.
DMCA: DMCA_mwitty#outlook.com.