Home
        PRO Facemask Drink System User Manual
         Contents
1.      3 NOY a a X  CPs TX 4  1    J XY          Page 12 of 13    A47D430    PRO Facemask Drink System    Revision  A    User Manual    7 2 PRO Facemask Drink System Test Fixture    ITEM   QTY     REF    1                     oon OAOA WN      Nena    EE  E 35  r  D          PART NUMBER  B5 02 5003 18 0    B2 03 0002 00 0  B3 04 0300 00 1  B4 03 5404 02 0    B2 06 6001 75 0  B4 02 9037 00 0  B4 03 4404 03 0    B4 03 4302 00 0  B4 03 4404 00 0  B4 02 6025 00 0    B4 02 9037 01 0    DESCRIPTION  PRO Mask Hydration Test Fixture    Hand Pump  Securing Tie  Tube Adapter Fitting    Pinch Clamp  3 8    Tubing Specify 6 inch length upon order      Male Barb Fitting       Street Tee Fitting     1 8 Male Barb Fitting     w  Tubing Specify 18 inch length upon order    3 8    Tubing Specify 18 inches upon order    1  Indicated fittings require Teflon Thread Sealant Tape  part number B5 07 1000 00 0  be applied to male    thread prior to assembly           Kya  QY  Q       Page 13 of 13    
2.     Siorak lt    Ho  REVO TION    f       PRO Facemask Drink System  User Manual       Biomarine    Biomarine Ntron  Inc   456 Creamery Way  Exton  Pennsylvania 19341  USA    www biopak240r com    A47D430  Revision A  Part Number  B5 06 6000 42 0  ECO 9039  December 2010    A47D430 PRO Facemask Drink System Revision  A  User Manual    CONTENTS  Topic  Warnings  1 0 Introduction    1 1 Drink System Use  1 2 Personnel Training  1 3 Servicing    1 4 Spare Parts  2 0 Description    2 1 Storage Reservoir  2 2 Feed Tubing  2 3 Interface Connection    2 4 PRO Facemask  2 5 Supply Tube    3 0 Preparation for Use    3 1 Fitting  3 2 Filling  3 3 Donning  4 0 Use  4 1 Drinking  4 2 Drink System Leaks  4 3 Accidental Disconnect During Use  4 4 Feed Line Severing  4 5 Reservoir Exchange During Mission  4 6 Doffing    5 0 Maintenance Procedures    5 1 Cleaning  5 2 Testing Procedure        Q   D    6 0 Specifications    7 0 Illustrated Parts Lists 12  7 1 PRO facemask Drink System 12  7 2 PRO Facemask Drink System Test Fixture 13    Page 2 of 13    A47D430 PRO Facemask Drink System Revision  A  User Manual    WARNINGS  Please Read Carefully and Fully Understand    This manual is for use by personnel trained in the use and care of compressed oxygen   closed circuit breathing apparatus  and MUST NOT be used as a s self teaching guide by  untrained users  Failure to understand or adhere to these instructions may result in injury or  death     Biomarine has taken great care to ensure that the
3.  feed line becomes  severed during a mission the user should     4 4 1 Disconnect the interface to the  facemask     4 4 2 Immediately retire to a safe  location to doff the BioPak  or     4 4 3 Immediately disconnect the  interface connection from the  PRO mask if it is not desired to  leave the mission  The PRO  mask drinking port is supplied  with an automatic shut off valve  that will close upon removal of  the interface connection     4 5 Reservoir Exchange During  Mission    Should the user consume the contents of  the reservoir during a mission  the  reservoir can be replaced with a freshly  filled reservoir without doffing the BioPak  and with minimal breathing gas loss     It is NOT recommended to exchange  reservoirs during missions that are  conducted in atmospheres that may  contain toxic elements dangerous to  human health that may become  depositied on the quick disconnect  fitting surfaces     1  Disconnect the feed tubing by  depressing the button on the quick  disconnect coupler  The quick  disconnect nipple will automatically  seal against external atmospheres        2  Remove the spent reservoir and  replace with a fresh reservoir     3  Route the reservoir feed tubing to the  interface connector and connect the  quick disconnect fittings together     Page 7 of 13    A47D430 PRO Facemask Drink System  User Manual    4 6 Doffing    When the mission is complete  the user  shall retire to a known safe location to doff  the BioPak as per procedures provided in 
4.  information in the manual is accurate   complete and clear  However  Training  amp  Technical Support Services will be pleased to  clarify any points in the manual and answer questions concerning Biomarine products     The following warnings are in accordance with certifying authority requirements and  apply to the use of breathing apparatus in general     Breathing apparatus users must be fully trained in the use and care of closed   circuit  self contained  compressed oxygen breathing apparatus     Ensure that the selection of the apparatus type is sufficient for the tasks being  undertaken and the hazards likely to be encountered  Please refer to National  Regulations for guidance     Certain toxic substances which may occur in some atmospheres can be absorbed  by the skin  Where these do occur  respiratory protection alone is not sufficient  and the whole body should be protected     Ensure that a good seal can be obtained between the face and facemask  The  wearing of beards  side burns or spectacles may adversely affect the sealing of the  facemask to the user   s face     Failure to properly use and maintain this product could result in injury or death     Never substitute  modify  add or omit parts  Use only exact replacement parts in  the configuration as specified by Biomarine     The Drink System is suitable for use only with the Biomarine BioPak 240R  respirator and associated PRO Facemask with the proper drinking port installed     The Drink System components ha
5.  potable  water  Ensure that no tablet remnants  remain in the bladder  tubing or  interface connection     7  Allow the system to air dry  Do not  seal the reservoir until it is completely  dry     8  Reinstall the bladder into the pouch   9  Submit to the testing procedure     The PRO facemask shall be cleaned  and serviced according to procedures  provided in the BioPak Benchman  Manual     5 2 Testing Procedure    The Drink System should be tested  after each cleaning procedure and prior  to each use to verify proper function  and leak tightness     1  Inspect all components of the Drink  System and replace any worn   damaged or suspect component     2  Connect the large diameter tubing of  the Hydration Test Fixture to the  barbed fitting of the BioPak 240R Test  Kit     3  Install the interface connection of the  Drink System to the drinking port of  the PRO facemask and secure into  position using the retaining clip     4  Disconnect the supply tube from the  internal side of the PRO facemask  drinking port and connect the small  diameter tubing of the Hydration Test  Fixture to the drinking port barbed  fitting     5  Use the hand pump of the test fixture  to pump the internal volume of the  Drink System to 6 8 inches water  column pressure as read by the  pressure gauge of the test kit     Hand Pump Operation    a  Squeeze the large bulb while  depressing on both sides of the    S     button to push air into he  assembly     b  Depress both sides of the    A     butt
6.  the BioPak User Manual     To assist in the doffing  disconnect the  Drink System from the PRO facemask  prior to doffing the BioPak either by  disconnecting the feed line quick  disconnect fittings  or  removing the  interface connector from the PRO  facemask drinking port     After use  immediately conduct the  washing and testing procedures on the  Drink System as outlined in section 5 0 of  this manual     Page 8 of 13    Revision  A    A47D430 PRO Facemask Drink System    Revision  A    User Manual    5 0 MAINTENANCE  PROCEDURES    5 1 Cleaning    The Drink System should be cleaned  after each use to prevent the  transmission of germs or bacteria     1  Remove all components of the Drink  System from the PRO facemask and  BioPak     2  Wipe down the exterior of the  components with a mild soap and  water to remove accumulated dirt     3  Open the reservoir pouch flap and  remove the bladder from the pouch   Keep the feed tube and interface  connector installed to the bladder     4  Fill the bladder with 1   2 to 1 liter of  warm water and add one cleaning  tablet  part number B2 06 6001 74 0     5  Replace the cap on the bladder and  wait 15 30 minutes  During the  waiting period shake the bladder often  and allow some of the water to travel  through the feed tube and interface  connection     6  After the 15 30 minute period  open  the bladder and discard the wash  water  Rinse the inside of the bladder   the feed tube and interface connection  several times with clean
7.  to  the PRO facemask and provide the user  with access to the drinking liquid without  breaking to the seal of the BioPak  breathing loop  This will allow for the user  to be hydrated during missions without the  worry of introducing the external  atmospheres into the breathing gas supply  while drinking     The Drink System is supplied with a  sealed quick disconnect in the feed tubing  as well as in the PRO facemask  This  permits disconnection of the storage  bladder from the feed tubing or the feed  tubing from the PRO facemask without  inducing leaks into the BioPak breathing  loop     Liquid is supplied to the user from a  storage bladder  through feed tubing   through the PRO facemask drinking port  and into an internal mask supply tube   The supply tube will permit the passage of  liquid through the facemask nose cup to a  bite valve positioned in front of the mouth  of the user  The user simply needs to  position the supply tube bite valve into  their mouths  bite down slightly and draw  liquid from the supply bladder  When the  bite valve is released  the flow of liquid to  the user will end     The Drink System has not been evaluated  for use in applications that involve direct  contact with open flame  high radiant heat  or agents of mass destruction  CBRN  agents      1 2 Personnel Training    Personnel who use closed circuit  self   contained  positive pressure  compressed  oxygen breathing apparatus must be fully  trained in accordance with instructions and  n
8. ational regulations governing the use of  such equipment     These instructions cannot replace an  accredited training course provided by  qualified instructors in the proper and safe  use of Biomarine breathing apparatus  products     Please contact Training  amp  Technical  Support Services or your local distributor  for training course details     Training  amp  Technical Support Services     Biomarine Inc    456 Creamery Way  Exton  PA 19341   United States of America    tel   1 610 524 8800  Fax   1 610 524 8807  Web  biopak240r com  1 3 Servicing    The Drink System must be serviced after  each use to provide disinfection and leak  testing  This manual will provide full  details of required servicing for the Drink  System     1 4 Spare Parts    Spare parts  general information and  factory service can be obtained by  contacting Training  amp  Technical Support  Services or your local distributor     Reference details in this manual  concerning spare part identification and  factory service     Page 4 of 13    A47D430 PRO Facemask Drink System    Revision  A    User Manual    2 0 DESCRIPTION    2 1 Storage Reservoir    Up to 1 5 liters of liquid can be stored in  the reservoir  The reservoir consists of a  polyester skin covering a low density  polyethylene liquid contact layer to provide  odor free and clean storage of liquids    The bladder is equipped with a threaded  port for ease of filling and an exit feed tube  constructed of silicone tubing capped with  a sealed 
9. by the user positioning the bite  valve of the supply tube into the mouth  and slightly biting down  This will open the  bite valve and allow the user to draw liquid  from the reservoir     Purge the system of air prior to use to  avoid a large draw to fill liquid to the  bite valve  Purging is accomplished by  slightly squeezing the reservoir while  the bite valve is open until liquid is  present at the bite valve     When drinking is finished the user simply  releases the bite valve     4 2 Drink System Leaks    If at any time during a mission the Drink  System develops a leak  the user should     4 2 1 Immediately retire to a safe  location to doff the BioPak  or     4 2 2 Immediately disconnect the  interface connection from the  PRO mask if it is not desired to  leave the mission  The PRO  mask drinking port is supplied  with an automatic shut off valve  that will close upon removal of  the interface connection     4 3 Accidental Disconnect During  Use    In the event that an accidental disconnect  occurs during use  the user will be  protected against the ingress of external  toxins into the breathing by the automatic  sealing valves  Accidental disconnect of  the feed line quick disconnect coupler will  result in automatic sealing of the end of  the interface fitting nipple and the end of  the feed tubing coupler  Disconnect of the  interface fitting to the PRO mask will result  in automatic sealing of the pass through  fitting of the PRO mask     In the event that the
10. ed leak tight  This verifies  that the quick disconnect fitting of the  interface connection is functioning  properly    When testing has completed  remove  all test equipment and reestablish the    supply connection to the PRO  facemask drinking port barbed fitting     Page 10 of 13    A47D430    6 0 SPECIFICATIONS  Reservoir Capacity   Reservoir Dimensions     Reservoir Weight  Empty     Reservoir Bag Weight  Full  Water      Interface Assembly Weight   Operational Temperature Range   Storage Temperature Range   Materials of Construction    Reservoir Assembly     Interface Connection     FEATURES     PRO Facemask Drink System    Revision  A  User Manual    1 5 liters   165 X 356 x 51 mm  6 5 x 14 0 x 2 0      368 grams  13 ounces    1 9 kg  4 2 pounds    41 grams  1 5 ounces    2 to 43  C  35 to 110  F     40 to  49  C   40 to  120  F     Pouch  Nylon  Acetal  Steel  Bladder  Polyester  Polyethylene  Tubing  Silicone Rubber  Connectors  Acetal    Plastic  Flame Rated Polycarbonate  O Ring Seal  EPDM Rubber  Tubing  Silicone Rubber   Metal  Stainless Steel     gt  Provides zero residue taste or smell     Y VV WV    Company     v     gt  Bladder EPA approved     Super tough bladder construction results in maximum abrasion resistance   Quick disconnect tube assembly provides easy on  easy off functionality   Bladder protected by an antimicrobial formulation     Large 80mm Rapid Fill    bladder cap  Rapid Fill    is a trademark of the Nalgene    Bladder in compliance with FDA n
11. er to the cut end of tube     The Drink System is now ready for use     Prior to filling or use  the entire Drink   System shall have been fully serviced  as per the maintenance procedures of  this manual     In a location free of containments  fill the  reservoir with up to 1 5 liters of drinkable  liquid as follows     1  Open the flap of the pouch to access  the bladder cap     2  Remove the bladder cap by  unthreading     3  Fill the bladder with drinkable liquid up  to 1 5 liters     DO NOT fill the bladder with more than  1 5 liters of liquid to prevent bladder  weakening or rupture     It is advised to NOT utilize liquids  containing a high amount of sugar or  carbonated drinks     4  Replace the bladder cap by threading  into position     5  Close the pouch flap   3 3 Donning    1  Prior to donning the BioPak and PRO  mask  install the Hydration interface  connector into the drinking port of the  PRO mask and secure with the  retaining clip        2  When ready for use  don the BioPak  and PRO mask as per procedures set  forth in the BioPak User Manual     3  When the BioPak is fully donned and  operating  position the Hydration  reservoir where desired     4  Route the Hydration feed tube to the  interface connection and connect the  components together via the quick  disconnect coupler     Page 6 of 13    A47D430 PRO Facemask Drink System Revision  A  User Manual  4 0 USE 4 4 Feed Line Severing    4 1 Drinking    While under use  liquid is drawn from the  reservoir 
12. iquid through the facemask nose cup to  the user  The tube is equipped with a bite  valve that will control the flow of liquid out  of the tube to the user        Page 5 of 13    A47D430 PRO Facemask Drink System Revision  A  User Manual  3 0 PREPARATION FOR USE 3 2 Filling    3 1 Fitting    The Drink System must be fitted to each  specific user in order to properly size the  length of the supply tubing     The user should first decide upon the  method by which the reservoir will be  carried  The reservoir can be slipped over  the waist belt of the BioPak  as pictured  below  or can be strapped elsewhere  using the side rings of the pouch        Install the interface connection into the  drinking port of the PRO mask by  uncapping to the drinking port cover   pressing the interface connector into the  port and positioning the retaining clip into  the locked position        The user should don the BioPak  position  the reservoir in the desired location and  don the PRO mask  With assistance   route the feed tube from the reservoir in  the desired position and determine the  proper length of tubing required  It is not  advisable to leave loops or dangling  lengths of tubing that could become  tangled or snagged on external objects  during use  Mark the feed tube from the  reservoir for the proper length     Doff the equipment and trim the reservoir  feed to length by removing the quick  disconnect coupler  cutting the tube to  length and reinstalling the quick  disconnect coupl
13. on to admit additional air in the  pump bulb     c  Repeat steps a and b multiple  times until the proper pressure  level is achieved     d  Once the proper pressure level is  achieved  tightly close the pinch  clamp located on the short tubing  run of the test fixture to hold the  pressure steady     e  To depressurize the assembly   open the pinch valve and remove  the test fixture connection from the  PRO facemask drinking port     6  Note the pressure reading of the test  kit gauge and allow the assembly to sit  undisturbed for a 1 minute period    The pressure reading shall not drop by  more than 0 40 inches water column   in the 1 minute period to be  considered leak tight     7  Should the Drink System indicate  leakage  use Leak Tek detection fluid   or submerge the entire assembly  to  locate the leak point  Repair or  replace components that show  evidence of leakage     8  When the leak test has passed  it is  necessary to test the quick    Page 9 of 13    10     A47D430 PRO Facemask Drink System Revision  A  User Manual    disconnect  Disconnect the quick  disconnect fittings of the feed tubes   Verify that the pressure gauge of the  test kit is reading between 6 8 inches  of water column pressure  Pump up  the pressure if required     Note the pressure reading of the test  kit gauge and allow the assembly to sit  undisturbed for a 1 minute period    The pressure reading shall not drop by  more than 0 40 inches water column   in the 1 minute period to be  consider
14. otification Number 193     Page 11 of 13    A47D430 PRO Facemask Drink System Revision  A    7 0    7 1  ITEM      REF  REF  REF  REF    ooN OOK WH       User Manual    ILLUSTRATED PARTS LISTS  PRO Facemask Drink System    QTY  PART NUMBER DESCRIPTION     B6 02 5003 1 7 0 PRO Mask Drink System Complete        B6 02 5003 1 7 1 PRO Mask Drink System Less Test Fixture        B6 02 5003 19 0 Interface Connection Complete       B6 02 5002 70 1 Reservoir Assembly Complete    1 B6 02 5003 19 1 Interface Connection Fitting Assembly   1 B4 04 7070 18 0 Interface Connection O Ring Seal      1 B4 02 9563 00 0 Feed Tubing Specify 6 inch length upon order  1 B4 03 4404 02 0 Quick Disconnect Nipple   1 B4 03 4404 01 0 Quick Disconnect Coupler   1 B4 02 9563 00 0 Feed Tubing Specify 60 inch length upon order  1 B2 02 4001 40 0 Reservoir Bladder  located internal to pouch    1 B2 02 4001 40 0 Reservoir Pouch   1 B2 06 6002 46 0 Supply Tube with Bite Valve     2 B2 06 6001 74 0 Cleaning Tablet  Packet of 12 Tablets  not depicted   1 B5 06 6000 42 0 Drink System User Manual  not depicted     Includes full Drink System plus Test Fixture    Includes full Drink System less Test Fixture    Includes factory assembled items 1 through 4    Includes factory assembled items 5 through 8    O ring  item 2  is to be lubricated using Dow 11 o ring lubricant  part number B5 01 3000 1 1 0   Supply Tube  item 9  installs onto barbed fitting of PRO Facemask drinking port      i                          9  A  N
15. quick disconnect coupler        The bladder is contained within a nylon  pouch that provides the user with various  connection point options to support  mounting of the reservoir to the user         2 2 Feed Tubing    All feed tubing is constructed of large bore  silicon tubing and provides the route by  which liquid is drawn from the reservoir to  the facemask  The tubing is supplied with  a sealed quick disconnect coupler and  nipple to allow ease of removal from  service while maintaining the BioPak  breathing loop seal integrity     2 3 Interface Connection    The interface connects the feed tubing to  the PRO facemask drinking port via an o   ring sealed connection that is secured into  position with a retaining clip  The  connection will provide for rotation in the  drinking port so as not to disrupt the seal  against external atmospheres        2 4 PRO Facemask    The PRO facemask is provided from the  factory fitted with the required drinking  port  The drinking port will provide a  sealed pass through in the skirt of the  facemask to allow liquid transfer to the  user        The PRO facemask must be factory  supplied with the drink port installed   Field retrofit of the PRO facemask to  add the drinking port requires special  tools and knowledge and is not  supported by Biomarine     2 5 Supply Tube    The flexible supply tube is positioned  internal to the facemask and connects  directly to the internal side of the drinking  port  The tube will provide passage of  l
16. ve not been evaluated for use in applications  involving direct open flame or high radiant heat     The Drink System components have not been evaluated for use in applications that  may expose the user to chemical  biological  radiological or nuclear agents   CBRN      DO NOT attempt to fit the Drink System to any other manufacture or model of  respirator or facemask other than the BioPak 240R and PRO Facemask     The Drink System must be tested and serviced in accordance with this manual     Hydration of a user is critical when working in hot conditions or when experiencing  heavy work loads  Biomarine makes no claim that the use of the Drink System will  prevent a user from experiencing over heating of core body temperature or  preventing user dehydration     It is the sole responsibility of the user to adequately select and utilize the drinking  fluid to be placed in the Drink System  The Drink System was designed for non   alcohol based liquids     Page 3 of 13    A47D430 PRO Facemask Drink System    Revision  A    User Manual    1 0 INTRODUCTION  1 1 Drink System Use    The Drink System is designed for use with  the BioPak 240R closed circuit respirator  in combination with the PRO Facemask   The Associated PRO Facemask must be  fitted with the proper drinking port as  received from the factory     The Drink System will permit the user to  store up to 1 5 liters of drinkable liquid in a  bladder system that is carried by the user   An interface hose will connect directly
    
Download Pdf Manuals
 
 
    
Related Search
    
Related Contents
Vantec CB-USBARC USB cable  Vectorbeam Series  Tupperware Co., Ltd.  Instruction manual  Téléchargez ici le Cité mag n°40 - Office municipal HLM de Nanterre          Copyright © All rights reserved. 
   Failed to retrieve file