Home

Artizan™ Ortho Cabinet Installation / User Manual

image

Contents

1. Floor Layout 0C2429 L R M2 13 em NPT x E DS E E 2 5 64 cm 2 5 64 cm Note max max Have licensed electrical and plumbing contractors position and install electrical outlet receptacles and related 2 5 1 cm 2 5 1 cm plumbing using the pre installation template or layout Assure floor is of such construction that the unit will be miam min min adequately supported and anchored If necessary contact a licensed contractor to reinforce the flooring i a k Va Note WARNING A full size pre installation floor template is available upon request Electrical box must be installed un OC2429 L Ortho Delivery Cabinet P N 003 2201 00 der cabinet as far from water bottle OC2429 R Ortho Delivery Cabinet P N 003 2201 01 as possible 5 8 1 6 cm OD carona Finished Floor 2 o E gt C ae L 3 Hie 3 Es Bits 4 j bake 4 E 18 ere 1 ise gl 4 E T lg 1 IE E TT DN A sas i ii a Ist a LT Wot n x gt gt ia al J 1 go dus E vadia er 6 F E ELSE Ea LD 28 A i fle a en a Re kii Le 5 z Al l 4 sb C be E re
2. ao GREEN a dE as GREEN e Wane WHITE E vELLOW E wire mie at O z E o CABLE 5 o o Al o So wg BLACK BLA mo dia fh gE W GREEN E dg s a zu SN e og gt AS 28 Se 3 BLACK Z GREEN z BLACK POWER REEN GREEN GROUND JELE JE WHITE NEUTRAL Midmark Corporation 2010 Style A 18 LE Wiring Diagram OC2429 Mobile REEN YELLOW Failure to comply could result in an overload of the e E electrical circuit and or components Midmark cannot be m held responsible for installations that do not conform to local codes Z E GREEN BLACK O REEN YELLOW E Equipment Alert y 1 Dedicated branch circuit rated at 20A 115V 60Hz GREEN a lt LO GREEN BLACK BLACK aa H Note H a LS All wiring must be installed by a licensed electrician ty following applicable local city and national codes y a 8 3 a 5 s WHITE WHITE ay z A A L fa
3. i MIDMARK Artizan Ortho Cabinet Installation User Manual Applies to Models OC2421 R OC2429 L OC2429 R Special Tools 3 8 Masonry drill bit 9 32 Wood drill bit Level Language of origin English F Note Midmark casework unit must be connected to a dedicated circuit with disconnect rated at 20A 115V 60HZ Failure to comply could result in an overload of the electrical circuit and or components All wiring including disconnect and plumbing must be installed by a licensed electrician or plumbing contractor following applicable local city and national codes Midmark casework unit contains electrical duplex outlets which are rated at a combined 15 amps This rating must be taken into consideration when plugging device s into the available outlets Equipment Alert 1 Inspect all components for shipping damages A concealed damage report must be filed with the carrier by the person receiving the goods within 15 days of delivery Note Refer to cabinet mounted Procenter Delivery Unit User Guide 003 2196 00 for information on the delivery unit installed in the Ortho Cabinet KL GA1014 Midmark Corporation 2010 Style A 1 003 2202 00 Rev C Important Information and Symbols These symbols may appear on your equipment and or in the manuals WARNING Indicates a potentially hazardous situation which could resul
4. When using disinfectants Carefully read the product label and directions for use Do not exceed the dilution rate Re carefully GA083 Read all labels carefully Midmark Corporation 2010 Style A 21 Cleaning and Maintenance Solid Surface GA1082 Caring for your Solid Surface countertop is as simple as wiping the surface with a damp cloth If a stain develops wipe it away with soap and water Or if you prefer wipe it clean with ammo nia based cleaner Ifa stain doesn t respond to soap and water for a matte finish apply an abrasive cleanser and buff with a Scotch Brite pad using a circular motion The same technique can be used for burns If you have a gloss finish please contact your dealer or fabricator before attempting repairs For minor cuts and scratches simply sand lightly with a medium 220 grit sandpaper then follow with a fine 320 grit sandpaper Finally touch up the finish by buffing with a Scotch Brite pad Caution A Do not expose the surface to harsh chemicals such as paint remover turpentine nail polish remover or stove and drain cleaners If these chemicals come in contact with the surface immediately wash them off with water using appropriate safety measures to avoid injury 22 Midmark Corporation 2010 Style A Midmark Corporation For additional contact information go to www midmark com Midmark Corporation 2010 Style A 23 MIDMARI lt Because
5. A 20 LE Cleaning Maintenance Casework Disinfecting Procedures for External Surfaces Attention Midmark assumes no responsibility or liability for any result expressed or implied These are suggested practices based on the best information available at this time Equipment Alert Users should not use cleaning or decontamination methods different from those recommended by the manufacturer without first checking with the manufacturer that the proposed methods will not damage the equipment Midmark s dental equipment is manufactured from the most chemical resistant materials available However no material is impervious to every chemical Using protective barriers is the most effective method to prevent equipment damage Use only moist cloth with appropriate cleaner for cleaning casework Cleaning and Disinfectant Procedures Use cleaners and disinfectants that are appropriate for the situation such as warm water and mild detergents or an ammonia based cleaner NOTE Every dental practice is different and no single disinfectant is the best choice for every facility Listed below are some organizations to assist you in choosing the best disinfectants available for your practice Organization for Safety amp Asepsis Procedures http www osap ora American Dental Association http www ada org Dept of Health amp Human Resources Centers for Disease Control amp Prevention CDC http Awww cde gov
6. Extend the cord for the CPU fan found in the CPU compartment door and attach it to the USB power supply receptacle located in the rear of the CPU compartment See figures GA1038 found in step 3 of the Stainless Steel Base Application Caution Ay Fan must be connected to the USB power supply provided and not to the computer itself for safe and efficient operation Equipment Alert O Be sure not to over tighten hex bolts as this will result in the machined inserts to twist out of the bottom of the cabinet 11 Installation Mobile Caster Applications Step 4 Doors and Drawers A Re install cabinet drawers see Drawer Removal Installation and Adjustment in this manual and make adjustments as needed B Re Install cabinet doors If OC2429 L R see Door Removal Installation and Adjustment in this manual and equipment make adjustments as needed WARNING During transportation the cabinet drawers and doors should remain closed and all attachments placed in their lowest and most central positions possible Failure to comply may result in injury and or damage to 1 WARNING fo Equipment Alert Be sure to adjust drawer adjustments to the down position before re installing drawers For cabinet stability the CPU stored in the CPU compartment should not exceed 34lbs GA1035 Midmark Corporation 2010 Styl
7. PT al a 3 8 Fal s il erect ris a L cmos L E a r n a EEE do 2 i E 13 qe iLa S ento ae ott 3 Note Ifthe ortho delivery cabinet is a mobile version the cutout in the drawers and utility compartments will not exist The stainless steel base will be replaced with casters and utilities specified on this template will need to be installed in an exterior J Box Refer to Utility Layout Small J Box in this manual Midmark Corporation 2010 Style A 4 Utility Layout Small J Box J Li gy 4 P 5 5 Ci E GION CABLE GOING a TO CBNET o A DOUBLE GANG BOX TERMINAL ie BLOCK a z 7 es Connecting the Electrical 3 A Strip wire ends on incomming wire 3 8 Erro from the end and bend the stripped end at a 45 angle B Using a screw driver press the push On buttons on the terminal block which will AIR o allow the stripped end of the wire to be inserted into the terminal block Note 42 000 o o Give a gentle tug on the wires connected to the terminal to ensure a good connection has been made 7 000 mo 4 250 m l H Q He 5 E di 2 000 fe 2 250 WATER wire 2500 10 000 GA1079 Midmark Corporation 2010 Style A 5 Installation Stai
8. g Ea a A full size pre installation floor template is available upon request Electrical box must be installed under OC2421 L Ortho Delivery Cabinet P N 003 2200 00 cabinet as far from water bottle as OC2421 R Ortho Delivery Cabinet P N 003 2200 01 possible 5 8 ue cm Finished Floor L GA1003 3 248 UuaiICA SONY 248 SIGA Sony NERSONS Or ONTO 1 ns oram Sa CRE e gt ENEN one 16 25 26 E HED D P DRAWER DRAWER A 2 I COMPARTMENT te amp x F o cer o fuer p we ole er ng ait ost VAGUUM anlon VACUUM sour Es o le Bo mer mgo L E ii a O COMPARTHENT go Lio COMPARTMENT i q q O ii t J L So Coca Se L Coca E 4230 126 aus 16 Note Ifthe ortho delivery cabinet is a mobile version the cutout in the drawers and utility compartments will not exist The stainless steel base will be replaced with casters and utilities specified on this template will need to be installed in an exterior J Box Refer to Utility Layout Small J Box in this manual GA1015 Midmark Corporation 2010 Style A 3 LES
9. necessary Note Use a level to ensure the door is level and plumb Preferred gaps are approximately 1 8 between doors and 1 16 between accents and doors Hinge 1 amp 2 Removal E Press button at point E at the back of the hinge and pull away from cabinet iy Midmark Corporation 2010 Style A Hinge 1 amp 2 Installation F Hook the hinge to the mounting block at point F G Latch at point G by pressing the hinge against the hinge block Hinge 1 amp 2 Adjustment Direction Guide 15 180 Hinge Adjustments D Loosen screw D and adjust door gap and angle using a level Tighten screw D when positioned correctly GA1044 Electrical Fan Adjustment Turn the knob B clockwise to increase or counter clockwise to decrease fan speed A thermostat in the CPU Compartment will turn the fan on and off as needed Gators ho GA1085 To Reset the Integrated Circuit Breaker Open the door of the utility compartment and locate the integrated circuit breaker To reset the integrated circuit breaker depress the reset button A Note The integrated circuit breaker is located on the front face of the outlet box located on the rear wall inside the utility compartment See floor layout in this manual for compartment location Midmark Corporation 2010 Style A Wiring Diagram OC2421 Mobile 2 Equipment Ale
10. we care
11. B power supply provided and not to the computer itself for safe and efficient operation GA1037 Midmark Corporation 2010 Style A 8 Installation Stainless Steel Base Application Step 5 Doors Drawers and False Bottoms Equipment Alert A Unwrap false bottoms and install into bottom of Q the cabinet to cover access points B Re install cabinet drawers see Drawer Removal Installation and Adjustment in this The CPU stored in the CPU compartment should not exceed 34lbs manual and make adjustments as needed C Adjust doors accordingly see Door Removal Installation and Adjustment in this manual Equipment Alert 1 Be sure to adjust drawer adjustments to the down position before re installing drawers Equipment Alert 1 Maximum recommended weight for contents in drawers is 5lbs for medium 3 15 HGT drawer boxes and 10lbs for large 5 9 HGT drawer boxes GA1030 Midmark Corporation 2010 Style A 9 Installation Mobile Caster Applications Aaah Step 1 Remove from Shipping Pallet r WARNING A Cut metal bands securing cabinet to shipping Top not to be utilized for lifting See illustrations for pallet proper lifting points B Remove cabinet drawers see Drawer Removal Installation and Adjustment in this manual C Remove cabinet from shipping pallet Note 0C2429 Ortho Delivery Cabinet will require that the CPU com
12. de Humidity Limit Temperature Limit R Type B Applied Part Protective Earth Ground m s AC Alternating Current LS Corrugated Recycle SE Electrical Specifications 115V 60Hz 15A No Stacking This cabinet is a class Device and must be connected to a protective earth ground Approved for indoor use only Transportation Storage Operating Conditions Transportation Storage Temperature Range 0 F to 140 F 18 C to 60 C Relitive Humidity 0 to 90 Non Condensing Atmospheric Pressure 2 PSI to 15 3 PSI 50 kPa to 106 kPa Operating Temperature Range 59 F to 95 F 15 C to 35 C Disposal of Equipment Consumable Goods At the end of this products life the unit accessories and other consumable goods may be contaminated from normal use Consult local codes and ordinates for proper disposal of this equipment and other consumables 2 Floor Layout 0C2421 L R 1 2 1 3 cm NPT j 2 5 6 4 cm LS Note 2 eee Have licensed electrical and plumbing contractors position and install electrical outlet receptacles and related min plumbing using the pre installation template or layout Assure floor is of such construction that the unit will be am adequately supported and anchored If necessary contact a licensed contractor to reinforce the flooring o 1 2 5 6 4 cm max 2 5 1 cm min i Note WARNING
13. e A 12 WARNING Maximum recommended weight for contents in drawers is Slbs for medium 3 15 HGT drawer boxes and 10lbs for large 5 9 HGT drawer Monitor Mount Installation and Adjustment Installation A Insert threaded rod into monitor mount base B Put the monitor mount into position by inserting the threaded rod into the pre drilled 3 8 hole in the countertop C From the underside of the countertop use the supplied nut and washer to fasten the monitor mount to the countertop Midmark Corporation 2010 Style A cr Note For further installation instructions and adjustments see instructions provided with monitor mount in the hardware bag WARNING Loading of monitor mount must not exceed 15 9 Ibs monitor and 2 Ibs keyboard 13 GA1088 Drawer Removal Installation and Adjustment Drawer Removal A Open drawer completely B Lift up on the drawer front until the front of the box releases from the glide C Pull out on the drawer slightly D Lower the drawer back down while pulling out on the drawer Drawer Installation A Fully extend drawer glides from the cabinet Optional B Place the drawer on the glides C Push the drawer in completely D Cycle drawer a couple times to ensure that the drawer is securely attached to the glides Full Extension Glide Removal amp Installation Removal A Extend the glide to its outermos
14. ng pallet and secure the cabinet to floor of the building If the floor is concrete then utilize supplied floor anchors Note To make installation easier and to prevent damage to area surrounding screw hole in floor drill pilot holes Use a 3 8 masonry drill bit for concrete and a 9 32 wood drill bit for composite flooring GA1027 Adjustable Camar Leg Leveler Cabinet Height Adjustment A Utilize a flat head screwdriver and place down into hollow bolt in bottom of cabinet Tum screw driver clockwise to extend leg to floor and turn counterclockwise to adjust leg off of floor GA1028 GA1022 Midmark Corporation 2010 Style A 7 LES Installation Stainless Steel Base Application f Step 3 Utilities A Connect appropriate plumbing cold water air vacuum etc see the Technical Reference Guide for routing information B Make appropriate electrical connections under cabinet C If applicable route fiber optic handpiece power supply from unit to the electrical outlet in the rear of the utility compartment 1 See figures GA1038 GA1039 D If applicable route the USB power supply to the utility compartment and plug it into the top outlet 2 Extend the cord for the CPU fan found on the CPU compartment door and attach it to the USB power supply receptacle 3 located in the rear of the CPU compartment GA1038 Caution A Fan must be connected to the US
15. nless Steel Base Application Step 1 Remove from shipping pallet A Remove cabinet drawers see Drawer Removal Installation and Adjustment in this manual B Accessing under the cabinet through false bottom cutouts use a 3 8 socket to remove lag screws securing base clips and cabinet to shipping pallet Note Be sure to save base clips and lag screw to use later in the installation process to secure cabinet to floor of the building oe A Caution A Cabinet weighs approximately 175 200 pounds Lift with two people on the bottom edge of the cabinet Only lift the cabinet in designated locations after drawers have been removed See illustrations for proper lifting points GA1027 Midmark Corporation 2010 Style A GA1026 WARNING Top not to be utilized for lifting See illustrations for proper lifting points GA1010 Installation Stainless Steel Base Application Base Clip Removal Installation LT f Step 2 Securing the cabinet A Set cabinet in desired location over the utility provisions B Using a level as necessary unscrew the leg levelers using a screwdriver through the hollow leg bolt in the bottom of the cabinet see Adjustable Camar Leg Leveler or by hand through the false bottom cutout to level the cabinet until cabinet counter top is level C Use the lag screws if floor is made of composites and base clips that were used to secure the cabinet to the shippi
16. partment door be removed as well see Door Removal Installation and Adjustment Caution A Cabinet weighs approximately 175 200 pounds Lift with two people on the bottom edge of the cabinet Only lift the cabinet in designated locations after drawers have been removed See above illustration for proper lifting points Midmark Corporation 2010 Style A 10 Installation Mobile Caster Applications step 2 Attaching Casters A Set cabinet on its side so that the bottom of the cabinet is accessible B Use the supplied HexBolt 25 20 UNC X 0 625in LG Grade 5 Znc Pltd P N 040 4001 00 and attach casters to the bottom of the cabinet as shown Equipment Alert When orienting cabinet so that the casters can be installed onto the bottom be sure not to place cabinet on side with the umbilical exiting the cabinet as this will cause the umbilical tubings to kink and the equipment will not function property Midmark Corporation 2010 Style A Step 3 Utilities A Make appropriate connections from building to J Box supplied with the unit see J Box Tubing Connections in this manual C If applicable route fiber optic handpiece power supply from unit to the electrical outlet in the rear of the utility compart ment See figures GA1038 GA 1039 found in step 3 of the Stainless Steel Base Application D If applicable route the USB power supply to the utility compartment and plug it into the top outlet
17. rt D Dedicated branch circuit rated at 20A 115V 60Hz GA1058 id Fr Note All wiring must be installed by a licensed electrician following applicable local city and national codes Failure to comply could result in an overload of the electrical circuit and or components Midmark cannot be held responsible for installations that do not conform to local codes EE E GREEN WHITE Low E Wane WHITE z WANE at E ol ra ET lh E chal LuvenicaL we 5 BLACK BLA nO BLACK z L GS GREEN S o o 22 A e Z YB 6 WANS 26 BLACK Xe 5 GREEN REEN BLACK POWER YELLOW ae GREEN GROUND WHITE NEUTRAL Midmark Corporation 2010 Style A 17 Wiring Diagram OC2421 Stainless Steel Base Equipment Alert D Dedicated branch circuit rated at 20A 115V 60Hz be Note All wiring must be installed by a licensed electrician following applicable local city and national codes Failure to comply could result in an overload of the electrical circuit and or components Midmark cannot be held responsible for installations that do not conform to local codes
18. t in serious injury if not avoided J Caution A Indicates a potentially hazardous situation which may result in minor or moderate injury if not avoided It may also be used to alert against unsafe practices Equipment Alert Indicates a potentially hazardous situation which could result in equipment damage if not avoided Note Amplifies a procedure practice or condition Contact Information Midmark Corporation 115 G L Comer Road Glasgow Kentucky 42141 Phone 1 800 643 6275 ext 88015 Fax 270 651 1732 Intended Use The Midmark Artizan Ortho Cabinet Mobile Cart can be used as the primary Orthodontic workstation providing the needed storage and support at the essential delivery positions in either a cabinet or cart configuration Midmark delivery systems are intended to provide dental professionals with air water and suction to operate dental handpieces syringes and Midmark authorized acces sories during dental examinations and procedures Electromagnetic Interference Midmark dental operatory components are designed and build to minimize electromagnetic interference with other devices however if interference is noticed between another device and this operatory remove the interfering device from the room and or plug the product into an isolated circuit Midmark Corporation 2010 Style A Pressure Limits t t Proper Shipping Orientation y Fragie am Keep Dry Consult User Gui
19. t position Push the release levers in and remove the drawer member of the sides Cabinet Member Drawer Front Adjustment and Removal 1 Remove the cover caps on the drawer side by hand 2 Height Adjustment Rotate in either direction to adjust the drawer front vertically 3 Tilt Adjustment Adjust after the drawer front is installed to ensure the drawer sides meet square with the drawer front Only available on large drawer boxes 3 2 5 3 z Q 4 Side Adjustment Adjusts the drawer front horizontally Turn in either direction 5 Tension Removal For large drawers turn the screw toward the front of the drawer until the front detaches from the box Repeat this procedure on both sides of the drawer For small and medium drawer boxes turn the screw toward the back of the drawer to remove the front Installation A Line up the drawer member to the cabinet member and push the drawer into its compartment GA1105 Midmark Corporation 2010 Style A 14 Door Removal Installation and Adjustment Hinge 1 amp 2 Adjustments Use a phillips head screw driver for the following steps A Screw A adjusts the door in direction A seen in the Adjustment Direction Guide B Screw B adjusts the door in direction B Equal adjustment must be made to all hinges on the door for it to move the desired distance C Screw C adjusts the door in the C direction Make adjustments to top and bottom hinge as
20. x E G 5 go H UMBILICAL Ela BLACK wo ZE lt a oncen 9 REEN jz E BLACK YELLOW p2 50 O BLACK 2 E GREEN Ga1080 BLACK POWER GREEN GROUND WHITE NEUTRAL 19 Midmark Corporation 2010 Style A LE Wiring Diagram OC2429 Stainless Steel Base REEN YELLOW se B lo o REEN YELLOW wane E E GREEN y E GREEN 9 BLACK BLACK H o Si WHITE WHITE Equipment Alert E 1 Dedicated branch circuit rated at 204 115V 60Hz E SG MAITE WHITE E Note E wae z 3 All wiring must be installed by a licensed electrician o H O Z following applicable local city and national codes Us A CABLE 9 5 Failure to comply could result in an overload of the LI INS OFS ag electrical circuit and or components Midmark cannot be BLAGK LA no held responsible for installations that do not conform to Fan local codes G GREEN aj 6 ug REEN Zz sf emo YELLOW DW a 4 ez SN E no A amp O BLACK a GREEN Garogo BLACK POWER GREEN GROUND WHITE NEUTRAL Midmark Corporation 2010 Style

Download Pdf Manuals

image

Related Search

Related Contents

  Craftsman SV800 Manufacturer's Warranty  

Copyright © All rights reserved.
Failed to retrieve file