Home
        RTU - GAIL
         Contents
1.                                                          ON              5 WE RE      1  ALL VENTS SHALL BE LOCATED MIN  HEIGHT OF 3 MIR   ABOVE THE HIGHEST OPERATING LEVEL      2  NOTE DEED            eee      3  ALL BALL VALVES 2     amp  BELOW SHALL BE FULL BORE ONLY    4  ALL UNMANNED STATION SHALL BE PROVIDED WITH CO2 FLOODING   SYSTEM AND ALL MANNED STATION SHALL BE WITH FM 200 FIRE   SUPPRESSION SYSTEM    5  ALL SV  EXTENDED STEM  BW  FULL BORE BALL VALVE    6  BURRIED VALVE SHALL BE PROVIDED WITH CORROSION PROTECTION COATING    7  FOR SV  amp  GOV DETAIL REFER DRG  NO  MEC 23ME 05 28 M 001 0023 0030    8  ALL SV STATIONS  amp                CHAINAGES HAS      BE CONFIRMED BY GAIL     9  FOR SV 2 SEE         DRG              25     05 28    001 0028   10  ALL SV STATIONS WITHIN KERALA STATE  5     HAVING FIXED CONSUMERS  amp       SV 26  27  NEAR CITY  ARE CONSIDERED WITH FUTURE TAP  OFF  HOWEVER  OUT OF REST NINE No  SV   s FIVE No  OF THEM ARE WITH FUTURE TAP OFF   amp  FOUR No  ARE WITHOUT FUTURE TAP OFF  TO BE DECIDED ON THE BASIS  OF GEOGRAPHICAL LOCATION OF SV STATON                                                UNIT     02 UNIT 03 UNIT   04 UNIT 05     UNIT     06                FLUID       NATURAL  CAS RLNG                           FLOW     17 66 MMSCMD             WORKING    0 55     DESIGN    29      65C    PRESSURE   78 85 KG Cm2 G DESIGN CLASS   6004  OESIGN   92 KG Cm2 G              NOTE 5 6 7 9 NOTE 5 6 7 NOTE 5 6 7 NOTE 5 6 7  CH  32 982Km         45 
2.                       a             5  e  T     gt  uJ    5 i  on                    PS  Jo     MM   5 c   a    24     40 4002 01            N     00     4001        0     1           dU                     PE         ED ERR                                       1  ALL VENTS SHALL BE LOCATED MIN  HEIGHT OF  ABOVE THE HIGHEST OPERATING LEVEL             2  SCRAPPER LAUNCHER RECENER SHALL HAVE SCRAPPER HANDLING  gt    FACILITY COMPIRING OF    JIB CRANE  amp     TROLLY AND SHALL HAVE                         UNIT 40      3 MR                    s            QUICK OPPENING CLOSURE              3  SCRAPPER LAUNCHER RECENER SHALL BE SUITABLE FOR HANDLING            MEC         0018                            Ei INTELLIGENT  PIGS     gie  AN    amp  pur 4  DELETED   o         5  w  g     1   1    5  SCRAPPER DOOR MECHANISM TO BE CONSTRUCTED SUCH THAT THE DOOR               Po    TR CAN        BE OPENED UNLESS SCRAPPER TRAP IS FULLY DEPRESSURISED  22  T 2165 6  ALL BALL VALVES 2    amp  BELOW SHALL      FULL BORE              Vue tem    ELE     rieu                                    EE es     4004  secs 2    7  ONLNE RETRIVEL TYPE CORROSION MONITORING COUPON AND 2  FWI 4002   1  4002 E CORROSION PROBE SHALL BE PROVIDED  f ze  24 24 324 alls           8  FOR SV  amp  GOV DETAIL REFER DRG              2       05 28    001 0023 0030  24    NB  PG 4001  amp  4003 SHALL HAVE    RANGE OF 0 1 Kg Cm2 g  WITH    GAUGE SAVER       0  DIRECT SURFACE CONTACT                     24    40 4003 01 
3.                    MECON LI MI TED  REGD  OFF  RANCHI    TECHNI CAL SPECI FI CATI ON       834002    REMOTE TERMI NAL UNI TS    ELECTRI CAL  amp  INSTRUMENTATI ON  OIL  amp  GAS SBU  DELHI    DOCUMENT NO     AMENDMENT STATUS    MEC  S  05  E5  099       d    A  So  S051 Cat    Page 2 of 22  REVISION   1  EDITION   1               Clause  Paragraph    No    Annexure  Exhibit    Drawing Amended    1   Additional reqmt added    Page   Revision Date    No     27 09 10    By   Name     Verified   Name     PS                                                                                                   LIMITED TECHNICAL 5                                      OFF               834002 ELECTRI CAL  amp  INSTRUMENTATI      Nu    OIL  amp  GAS SBU  DELHI ee       DOCUMENT NO  Page 3 of 22    REMOTE TERMI NAL UNI TS         S  05  E5  099 REVISION   1  EDITION   1       Table of Contents    1 0 GENERAL    2 0 RTU SUBSYSTEMS    2 1 DIGITAL INPUT    2 2 DIGITAL OUTPUTS    2 3 ANALOG INPUTS    2 4 ANALOG OUTPUTS    2 5 PULSE INPUT MODULE    3 0 COMMUNICATIONS    4 0 RTU FEATURES    5 0 INTERLOCKING LOGIC    6 0 DATABASE STORAGE AND RETRI EVAL    7 0 SERIAL LI NK REQUI REMENT  8 0 PACKAGING   9 0 DATA AND DRAWING DETAIL    10 0 RTU SPARE SUPPORT    PREPARED BY  CHECKED BY  APPROVED BY  ISSUE DATE          M KASH J AI N   RAKESH SHUKLA   PANKAJ SHI VASTAVA  24 09 2010                            MECON LI MI TED TECHNI CAL SPECI FI CATI ON  REGD  OFF  RANCHI    834002 ELECTRICAL  amp  INSTRU
4.                 9  GAS TAPPING TO VALVE ACTUATOR    10  GAS TAPPING FOR VALVE AP SWITCH    11  FOR PG  PT  DPT DETAIL REFER            DRG  NO                MEC 05 E5 SD PT 001                                            05              003  PG     MEC 05 ES SD PG 004  12  EXTENDED STEM VALVE   13  DIRECT SURFACE CONTACT                                        8                 as w umasa Gm us sm mwa      wa                                   FWT     30 x30 x12     i TS   0 6 PAL         I   I                            TYPICAL ARRANGEMENT FOR 30    SV 2  REMOTE OPERATED       L                                                     E                  Sa SUS S Ice                                R NO   CONS         CONS              l AP OFF  CONS  01   CHEEMENY POWER PLANT  12             FWT   4524008  24         P L  VALVE LEGEND    ima Tr 80988          Gr  X 70 80                  VALVE FLANGE END    pi         VALVE BW END UPTO 1 2  SW END   pK  PLUG VALVE BW END UPTO 1 2    SW END            PLUG VALVE FLANGE ENO   di GLOBE VALVE     PRELIMINARY DRAWING               ISSUED FOR  CONSTRU                      INDIA  LIMITED  MECON LIMITED    KOCHI   KOTTANAD BANGLORE MANGLORE   NATURAL GAS PIPELINE PROJECT     PHASE 2     b es        7                4                               ES       TYPICAL ARRANGEMENT FOR 24  SV 13 M   REMOTE OPERATED                          TYPICAL ARRANGEMENT FOR  30  SV 2  amp  24  SV 13 M   STATION          OBL       ECT              DRG  NO  ME
5.                E T        18 18 5 8 31 04 0 3 07 02 00 02 08                              15 900                                                        KOCHI KOTTANAD BANGALORE MANGALORE NATURAL GAS PIPELINE PROJECT  PHASE II   MECON LIMITED DELHI PJS OF RTU FOR CENTRALISED SCADA SYSTEM  ees ar JOB Spec          23ME  05 E5 1 PJS 094 RTU  BID Doc No    05 51 23 ME  GAIL 094  RTU   ELECT   amp  INST  SECTION  ANNEXURE        to PJS Rev 0 Page 3 of 4  RTU SV  24  SV 2 M   CH   33 2     31 455Km  05 1440 19 04 17 0 21 02 3 0 05 00 00 00 03  RTU SV  24    SV 3 M   CH   RTU SV  24    SV 4 M   CH   35 4 M    63 739Km  25 04 17 8 29 02 3 3 08 00 00 00 04  RTU SV    24 SV 5 M   CH   36 5       80 859Km  25 04 17 8 29 02 3 3 08 00 00 00 04  RTU IPS  IPS  1      37 1 M     CH  96 423Km  22 20 1748 45 06 343 12 00 00 00 06  24  SV 6 M   CH   38 111 256Km  25 04 1748 29 02 343 08 00 00 00 04  24  SV 7 M   CH   E 181 008Km  25           a o2 laa  68 oo    00 i  24    SV 8 M   CH   40 148 303Km  25 04 1748 29 02 343 08 00 00 00 04  dn  SV  24    SV 9  ai  CH   ilo SV  24    SV 10 M         SV  24    SV 11 M       SV  24    SV  12 M       SV  24    SV  13     mU SV  24  SV  14 M  47 254     14 6 25 04 17 8 29 02 3 3 08 00 00 00 04  ATU SV    24  SV 15 M          48 15 M   275 644      05 1446 25 04 1748 29 02 343 08 00 00 00 04                     LIMITED DELHI    KOCHI KOTTANAD BANGALORE MANGALORE NATURAL GAS PIPELINE PROJECT  PHASE ID  PJS OF RTU FOR CENTRALISED SCADA SYSTEM       ELECT  
6.              set point value from MS   EMS  9 0 COMMUNI CATI ONS  The RTU shall support both internal and external communications functions     The communication network internal to the RTU shall be designed and implemented in such  a way that the passing of data and commands between modules shall not be prevented by  the failure of any module not directly involved in the communication exchange  In addition  the internal network shall not become overloaded under the heaviest traffic possible in the  RTU s ultimate expansion configuration     Each RTUs will be polled from both the communication ports of        simultaneously from  SCADA FEP Servers  to be kept at two end of the pipeline section  Accordingly RTU to have  buffer availability for replying to both the FEP Servers simultaneously in real time     The SCADA FEP Servers shall initiate communications with a selected RTU by IP addressing  function  Each RTU shall recognize its own unique address and shall have the capability of  being assigned any address within a range of possible addresses  It shall be possible to  address all or selected number of RTUs from the SCADA FEP Servers in order that global or  broadcast message may be sent     The LED indication shall be provided in the RTU to check the health of RTU communication     The RTU shall support both DNP 3 00  TCP IP  protocol for communicating with SCADA  system FEP Servers  This will be standard Protocol for all the station communications     The RTU shall be p
7.          PROCESS DATA    FLUID       NATURAL GAS RLNG                           WORKING   0 TO 55 C  DESIGN    29 T0 65      DESIGN CLASS   600             FLOW   7 04 MMSCMD                      PRESSURE   68 70          2 6   DESIGN   92 KG Cm2 G                 UNE LEGEND          PROPOSED LINE A G              PROPOSED UNE U G    24  P   40   4001 D1A  8  P   40   4001   D1A      L_ MATERIAL SPEC       LINE NO        NO  G    PROCESS FLUID  RLNG   UNE SIZE  NOMINAL   VALVE LEGEND                       BALL VALVE FLANGE END i      BALL VALVE BW END UPTO 1 2  SW END          PLUG VALVE  BW END UPTO 1 27  SW END   pj     PLUG VALVE FLANGE END   pod          VALVE       PRELIMINARY DRAWING                  INDIA  LIMITED           0            LIMITED        ISSUED FOR    CONSTRUCTION                                            CH  96 423 Km   APPR0X      KOCHI KOTTANAD   BANGLORE   MANGLORE  NATURAL GAS PIPELINE PROJECT     PHASE 2            FOR INTERMEDIATE PIGGING STATION    IP 1 M          SECTION VI     DRG  NO  MEC 23ME 05 28 M 001 0017             1  ALL VENTS SHALL BE LOCATED       HEIGHT OF 3 MIR       ABOVE THE HIGHEST OPERATING LEVEL         2  NOTE DELETED        z  E   3  ALL BALL VALVES 2       BELOW SHALL BE FULL BORE ONLY     _ 14  ALL UNMANNED STATION SHALL BE PROVIDED WITH   02 FLOODING  SYSTEM AND ALL MANNED STATION SHALL BE WITH      200 FIRE    SUPPRESSION SYSTEM   5  ALL SV EXTENDED STEM BW  FULL BORE BALL VALVE   6  BURRIED VALVE SHALL BE PROVIDED WITH 
8.        PRESSURE   60 63 KG Cm2 G   DESICN            92 KG Cm2 G         LINE LEGEND                PROPOSED LINE A G                PROPOSED LINE U G           24   P 45 4601 D1A  8  P 45 4601 D1A           MATERIAL SPEC        UNT  NO   PROCESS FLUID  RLNG   UNE SIZE  NOMINAL          VALVE LEGEND                     VALVE FLANGE END    pkj BALL VALVE BW END UPTO 1 27 SW END   pk   PLUG VALVE BW END UPTO 1 2  SW END        PLUG VALVE FLANGE END   od     GLOBE VALVE           ex GAIL 800 LIMITED  Wk     MECON LIMITED       macs   KOCHI KOTTANAD BANGLORE MANGLORE   uu     NATURAL GAS PIPELINE PROJECT     A N             PHASE 2            P  amp  ID FOR INTERMEDIATE PIGGING STATION  IP 2 M    SECTION MI        ne                ORG      MEC 23ME  05 28 M 001  0019                 1  ALL VENTS SHALL BE LOCATED MIN  WENT OF                      HIGHEST OPERATING LEVEL        2  NOTE DELETED     3  AL BALL VALVES 2     amp  BELOW SHALL BE FULL BORE ONLY     4  ALL UNMANNED STATION SHALL BE PROVIDED WITH CO2 FLOODING  SYSTEM AND ALL MANNED STATION SHALL BE WITH FM 200 FIRE  SUPPRESSION SYSTEM   5  ALL SV EXTENDED STEM BW  FULL BORE BALL VALVE   6  BURRIED VALVE SHALL BE PROVIDED WITH CORROSION PROTECTION COATING   7  FOR SV  amp  GOV DETAIL REFER DRG  NO  MEC 23ME 05 28 M 001  0023 0030  8  ALL SV STATIONS  amp  TAP OFF CHAINAGES HAS TO BE CONFIRMED BY GAIL     9  FOR SV 13 H  SEE         DRG  NO  MEC 23ME 05 28 M 001  0028     10  FOR SV 14 M  SEE TYP  DRG  NO         23     05 
9.       188 00 Km                                    5   80    x439 085 Km  API SL  Gr     70  U G  PIPELINE    ____245439085 Km       ON       2                     0008                                            1  ALL VENTS SHALL      LOCATED MIN  HEIGHT OF 3 MIR     ABOVE THE HIGHEST OPERATING LEVEL  gc PR    2  SCRAPPER LAUNCHER RECEIVER SHALL HAVE SCRAPPER HANDUNG 2     FACIUTY COMPIRING OF A JIB CRANE  amp  A TROLLY  AND SHALL HAVE      QUICK OPPENING CLOSURE     3  SCRAPPER LAUNCHER RECEIVER SHALL BE SUITABLE FOR HANDLING  INTELLIGENT PIGS                               4  DELETED        5  SCRAPPER DOOR MECHANISM      BE CONSTRUCTED SUCH THAT THE DOOR  CAN NOT BE OPENED UNLESS SCRAPPER TRAP IS FULLY DEPRESSURISED     6  ALL BALL VALVES 2     amp  BELOW SHALL BE FULL BORE ONLY     7  ONLINE RETRMEL TYPE CORROSION MONITORING COUPON AND       CORROSION PROBE SHALL BE PROVIDED       8  FOR SV  amp  GOV DETAIL REFER              MEC 23ME 05 28 M 001 0023 0030    PG 1301  amp  1303 SHALL HAVE    RANGE OF 0 1 Kg Cm2 g  WITH A GAUGE SAVER  1D  DIRECT SURFACE CONTACT TYPE                             DATA      FLUID   NATURAL GAS RLNG TEMPERATURE    WORKING    TO 55 C  DESIGN    29   0 65C    DESIGN CLASS   600                  FLOW       10 557 MMSCMD                      PRESSURE   61 64 KG Cm2 6   DESIGN            92 KG CmA G             LINE LEGEND             PROPOSED LINE A G              PROPOSED LINE U G        24  P 13 1301 D1A  8  P 13 1301 D1A      L MATERIAL SPEC   U
10.       RTU FOR CENTRALISED SCADA SYSTEM  JOB Spec  No    MEC   23ME  05   E5  I   PJ S 094  RTU         BID Doc No    05 51 23        GAIL  094  RTU              ANNEXURE VI to PJ            1 of 1          ANNEXURE   VI    PI PELI NE SCHEMATIC ROUTE    DI AGRAM  a                          b  KKBMPL PH I          LO6 W 8Z SO ANEZ OSW                    RECEIVING TERMINAL               MANGALORE       H          9 1   B        11 6                            08    a      y  KOCHI KOOTTANAD BANGALORE MANGALORE PIPELINE PROJECT  PHASE II  SCHEMATIC ROUTE DIAGRAM  PIPELINE SIZE   30 0   24 O  TOTAL LENGTH APPROX    884 00 KM   ll SECTION DESCRIPTION               354 328          METERING SKID                             OFFICE       MANGALORE      TAP OFF POINT  INSIDE MCF  g       347 328 KM                    341 051                                    STATE    CH  324 72 KM                    SECTION  VIII  2479 MANGALORE SPUR LINE                         CH  312 495 KM   KERALA CH  308 000 KM          STATE           3          292 315                     CH  275 644 KM            Z       CAMP OFFICE      KASARGOD  v       251649          ili          CH  242 175 KM                 SECTION  VII       CH  208 323 KM                 H                      225 937 KM               L   LI                                                                                    e SV 11M  ZA      CAMP OFFICE  x KANNUR       zm      S YARD  05 2    KANNUR   7      ui    GAIL STORE      x T 
11.       controls shall be in fail safe mode  A fail safe mode is defined as a plant equipment or system fail it shall be  safe to the system     Provision shall be made to isolate all 230 V AC incoming signals to a cabinet  for utility socket on RTU  before  gaining access to cabinet internals  Shrouding terminal with warning labels shall be provided with these terminals  being segregated from other incoming terminals  Non UPS 230 V AC will be provided separately by client     RTU vendor must ensure that the equipments will not be damaged due to blackouts   burnouts     RTU vendor shall provide the start up procedure of the system  Further RTU vendor to indicate steps to be taken for  fail safe operations of the system under following criterion    A  power failure  B  voltage variation more that   10   C  frequency variation more than   3   D  Air Conditioning Failure  SYSTEM AVAILABILITY REQUIREMENTS  The vendor shall ensure the system availability shall be 99 98 96  The vendor shall ensure that the MTTR of RTU as 8 hrs and MS equipments as 2 hrs   System Design covering future expansion takes calculation of availability in to account    ELECTROMAGNETIC COMPATIBILITY   EMC    The equipment shall be efficiently screened against EMI  RFI and conductive interference and shall not interfere  with other equipment in the vicinity or installed in the same building     The equipment shall be required to meet one of the relevant EMC standards  IEC  MIL  VDE  BS  IEEE etc     INSTALLATI
12.       for  testing purpose and shall be confirm during detailed engineering  One for Bangalore shall be supplied along with  mounting cabinet of size 800 mm  W  x 800 mm  L  x 600 mm  H  and for Noida with 19  rack only  If order  will be placed on the vendor who is already supplied RTU to GAIL and test Jig is available at Noida then only one  test Zig RTU is to be supplied i e for Bangalore  Accordingly the same should be kept in the scope     Storage  amp  Safety of the equipment at site is in vendor s scope  However for extended storage  it will be  reimbursed as per the terms  amp  conditions of contracts define in the contract     Performing all works required for designing  engineering  testing  supply  installation  interfacing with the  communication channels  IEDs and instrumentation  amp  electrical systems  etc  commissioning  with supply of  commissioning spares including consumables   site testing  test run and putting into commercial operation of the  system complete in all respects     The civil works associated with the installation of supplied equipments at various stations as define elsewhere   This includes restoration works at various stations as necessary     Vendor shall note that inspection will be done by Client   MECON Personnel at Vendor s shop  For this  inspection  labour  consumables  equipment and utilities as required shall be in vendor s scope or as define  elsewhere in the tender documents     Training to Owner s Owner Representative in the op
13.      5     i pe   gt  858                                 e              1  5       24               W 460    24     46 4603 01      6 4602 01      24  P 4    ACTED s s    KL  A ISSUED FOR    CONSTRUCTIO             lt   MEC        0020    5                 x1  gl           lt            lo  3      1      815          S  1 M    gt  lt           zl        24  15      ala        ja    t e t     5          4602        ZA   9  26 4601    4603 SHALL HAVE A RANGE OF 0 1 Kg Cm2 g  WITH A GAUGE SAVER    PRELIMINARY DRAWING                4  ALL VENTS SHALL BE LOCATED MIN  HEIGHT OF 3 MIR   ABOVE THE HIGHEST OPERATING LEVEL          2  SCRAPPER LAUNCHER RECENER SHALL HAVE SCRAPPER HANDUNG         FACILITY COMPIRING OF         CRANE  amp  A TROLLY AND SHALL HAVE     QUICK OPPENING CLOSURE     3  SCRAPPER LAUNCHER RECEIVER SHALL BE SUITABLE FOR HANDLING  INTELLIGENT PIGS                      4  DELETED        5  SCRAPPER DOOR MECHANISM TO BE CONSTRUCTED SUCH THAT THE DOOR  CAN NOT BE OPENED UNLESS SCRAPPER TRAP IS FULLY DEPRESSURISED     6  ALL BALL VALVES 2   amp  BELOW SHALL BE FULL BORE ONLY     7  ONLINE RETRIVEL        CORROSION MONITORING COUPON AND          CORROSION PROBE SHALL BE PROVIDED   8  FOR SV  amp  GOV DETAIL REFER DRG  NO  MEC 23ME 05 28 M 001 0023   0030            10  DIRECT SURFACE CONTACT TYPE         FLUID         NATURAL  GAS RLNG         TEMPERATURE  WORKING   0 TO 55 C  DESIGN    29      65      DESIGN CLASS   600                 FLOW   688 WMSCMD  APPX        
14.      CONSIDERING            1 FLOW MAX  8 5               APPX            HAS      CONFIRM             lt   a  1  e  N  e  I  N  e          1   amp           FLUID       NATURAL GAS RLNG  TEMPERATURE  WORKING    FLOW   17 705 MMSCMD             DESIGN    m              gt       o                          t            Uu    OF PHASE 1     lt  gt   p     30  P 01 0110 D  A    FWT 0202   30   30   18     DESIGN  9 2          2        LINE LEGEND  EXISTING LINE A G  EXISTING LINE U G  PROPOSED LINE A G              PROPOSED LINE 0 6  30  P 01 0101 D1A  10  P 01    0101   D1A    D aa        L_ MATERIAL SPEC   D 0     UNE NO       i   UNIT NO     3 4 NOTE  2813 ip E PROCESS FLUIO  RLNG        LINE SIZE  NOMINAL     mum pam MN VALVE LEGEND    DETALL A    0102         NOTE 1          2                          VALVE FLANGE END     pid   BALL VALVE BW END UPTO 1 2  SW ENO     pk PLUG VALVE BW END UPTO 1 2  SW ENO               VALVE FLANGE END  pod GLOBE VALVE       PRELIMINARY DRAWING      GAIL  INDIA  LIMITED  7 DESPATCH FACILITY AT IPS 1 OF PHASE 1 PIPELINE          UNY        OR BANGALORE  GAL PHASE 2 PI              LIMITED    KOCHI KOTTANAD BANGLORE MANGLORE  NATURAL GAS PIPELINE PROJECT   PHASE 2    P  amp  ID FOR DESPATCH FACILITY AT IPS 1  OF PHASE 1 PIPELINE FOR                2 PIPELINE   SECTION I       sv      30  P   01   0101   D1A    FWT 0201   30 x30 x30      30  P 01   0102 01A       0201        16          01   0106   01          1   51  Gr   U G PIPELINE           
15.      KOCHI KOTTANAD BANGALORE MANGALORE     NATURAL GAS PIPELINE PROJECT  PHASE II   PJS OF RTU FOR CENTRALISED SCADA SYSTEM  Job Spec         MEC   23ME   05   E5   1  PJS 094           2 BID Doc        05 51 23 ME  GAIL 094                   0 Page 21 of 24                         22 1    22 2    22 4    22 5    22 6    23     Bill of Material  Quality assurance plan  Billing procedure  Installation  amp  Test procedure  which also includes the  mounting arrangement of each cabinet   Site execution plan     As Built Manuals    The operating and maintenance manuals and drawings shall be updated with changes made to the equipment   configuration  and parameters or operating procedures during the installation and commissioning     Final IO list along with cabling termination detail carried out between different panels by RTU vendor  in GAIL s  format  has to be submitted along with the as built    As Built Operating and Maintenance Manuals shall be supplied prior to taking the Final Acceptance of the  System     RTU Vendor shall take care of project specific customizations for RTU system for meeting the project specific  functionalities     The review by OWNER S OWNER S REPRESENTATIVE however does not absolve the RTU vendor of his  responsibilities to satisfy  the requirements of contract document and install  amp  commission the RTU system  accordingly  RTU vendor is required to make necessary rectification in the RTU system to meet the requirements of  the contract document 
16.      TOSS C  DESIGN    29      65 C    DESIGN CLASS   600           FLOW   5 5 MMSCMD  APPX               PRESSURE   53 56          2      DESIGN          92 KG Cm2 G                LEGEND    PROPOSED LINE                    PROPOSED LINE 0 6         24  P 52   5201 D1A  8  P   52 5201 D1A      _ H MATERIAL SPEC   UNE NO     UNT ND   PROCESS FLUID  RLNG   UNE SIZE  NOMINAL        VALVE LEGEND              BALL VALVE FLANGE END  epp  BALL VALVE BW END UPTO 1 2  SW END             PLUG VALVE BW END UPTO 1 2  SW END   HPF   PLUG VALVE FLANGE END   pode   GLOBE              4 PRELIMINARY DRAWING                      GAIL  INDIA  LIMITED  Tre fates                                                                    NATURAL GAS PIPELINE PROJECT     PHASE 2     P  amp  ID POR INTERMEDATE PIGGING STATION  IP 3 M      SECTION VIII                 1  ALL VENTS SHALL      LOCATED MIN  HEIGHT  OF 3 MIR   ABOVE THE HIGHEST OPERATING LEVEL   2  SCRAPPER LAUNCHER RECEIVER SHALL HAVE SCRAPPER HANDLING    FACIUTY COMPIRING OF A      CRANE  amp     TROLLY AND SHALL HAVE  A QUICK OPPENING CLOSURE     5  SCRAPPER LAUNCHER RECEIVER SHALL BE SUITABLE FOR HANDUNG                               UNIT 56    es c qu            4  DELETED     5  SCRAPPER DOOR MECHANISM TO BE CONSTRUCTED SUCH THAT THE DOOR  CAN NOT BE OPENED UNLESS SCRAPPER TRAP IS FULLY DEPRESSURISED     6  ALL BALL VALVES 2     amp  BELOW SHALL BE FULL BORE ONLY       7  ONLINE RETRIVEL TYPE CORROSION MONITORING COUPON AND  CORROSION PRO
17.      To the extent that the Standard of the works has not been specified in the Contract  the Bidder  shall use good quality materials  techniques and standards and execute the Contract with the  care  skill and diligence required in accordance with best engineering practice     Bidder shall at his own expense supply and provide all the equipment  tools  temporary works  material both for temporary and for permanent works  labour  supervisors  engineers and  specialist  movement of the supplied equipment at the site  required for installation   commissioning  execution and completion of the works  The Bidder shall make his own  arrangements at his own cost for the transport where necessary of his staff and labour to and  from the site of the works     The Bidder shall provide and maintain an office at the Site  during Installation  Testing  amp   Commissioning phase  for his staff  and such office shall be open at all reasonable hours to  receive instructions  notice or other communications as per the advice of the Client    Consultant     Appropriate storage of the materials to be supplied in this contract will be arranged at the site  by the Bidder at the various stations after the materials have been delivered by the Bidder   The Bidder shall be responsible for the storage  security and safety of all other materials  tools  etc  brought by the Bidder for the installation and commissioning of the system at the site                         LIMITED    DELHI    KOCHI KOTTANAD 
18.      j  gt        SECTION  VI      ALL CHANAGES INDICATED ARE IN KMS     DEPENDING ON AVAILABILITY OF PLOT     PREVIOUS SECTION     CONCURRED BY    N                                  J                          2       138 704                                       SECTION II  24 9 BANGALORE MAIN LINE      ABOVE PIPELINE SCHEMATIC ROUTE DIAGRAM PREPARED BASED ON SURVEY DOCUMENT  amp  DRAWING     LOCATION IP  SV STATION  amp  DUMP SITES ARE INDICATIVE ONLY AND EXACT LOCATIONS SHALL BE FINALISHED      BATTERY LIMIT OF SECTION WILL BE 5 0M OUTSIDE THE BOUNDARY WALL OF LAST STATION  IP SV  OF                                                                    5   9 SV 10 SV 11 SV 12 SV 13 SV 14 SV 15 SV 16 SV 17 5   18 5   19 SV 20 Sv 21 SV 22 SV 25                OFFICE    CAMP OFFICE       CAMP OFFICE CAMP OFFICE    CAMP OFFICE  COIMBATORE TIRUPUR KRISHNAGIRI BANGALORE              SECTION III  24 9 BANGALORE MAIN LINE                         2470 BANGALORE MAIN LINE    SECTION   V  2470 BANGALORE MAIN LINE          PIPE STORAGE YARD  DS   GAIL STORE    CAMP OFFICE   RECEIVING TERMINAL   DESPATCH TERMINAL  SECTIONALISING VALVE STATION  INTERMEDIATE PIGGING STATION    MECON LIMITED                                             22222 20 AND     Q copyright MECON        right reserved        KOCHI KOTTANAD BANGALORE MANGALORE  NATURAL GAS PIPELINE PROJECT  PH II     PIPELINE NETWORK  SCHEMATIC DIAGRAM    SUNIL KUMAR    VERIFIED  REVNO  DATE  70     DESCRIPTION   ev         THIS DRAWING
19.     11 2 Automatic time synchronization of Remote Telemetry Units shall be implemented from MS    EMS   from various FEP Servers along the pipeline with a resolution of 100 msec     11 3 The RTUs shall have a self diagnostic feature and software watchdog timer devices to  monitor  amp  report the healthiness of CPU  memory  power supply  comm  interfaces and  Input Output modules at the local level  Further the RTUs shall support remote diagnostics  from MS   EMS   various stations so that all these status shall be transmitted to MS   EMS  and displayed in the RTU status graphic     11 3 1 Analog input card and Analog output card shall be self calibrating type and event shall be  sent to MS  EMS for out of calibration  Analog input card shall generate an event  if it is out  of calibration  which shall be sent to MS  EMS  Further if Analog output card is not self   calibrating type then all Analog outputs shall be wired back as along inputs and calculations  performed on each channel to detect AO card out of calibration  This provision should be  available in the SCADA system  however separate card  AO   DO  is not required  This out of  calibration shall be available as part of RTU status graphics along with set point value  displayed in the graphics  next to the corresponding controller symbol     11 4 It shall scan and acquire parameters from process as per programmed scan cycles   11 5 RTUs shall be intelligent in support of the following     a  It shall process the analo
20.     MANGALORE API 5L   Gr X   70 80   10 3            10 3  15 9            SIZE OF SV 26  amp  SV 27 IS 25Mx25M   S YARD  GAIL STORE      05 3          STORE  SALEM ERODE                     BANGALORE  SECTION   III              1   SECTION  V  SECTION  II SECTION   III SECTION IV  KERALA TAMILNADU  STATE STATE  TAMILNADU KARNATAKA    STATE ui    RECEIVING TERMINAL AT    CH  157 001 KM   Ip 2   CH  188 80 KM   IP 3   CH  295 60 KM          376 60        Ip 4   CH  395 85 KM    CH  455 50 KM                          EXISTING IP FACT                                                 z  a                  s   5     5  CH  439 29 KM     z  z                 2    e             ce N       a    5 5     x  CH  212 92 KM                       x  CH  235 45 KM        260 16 KM    x  CH  283 25 KM   CH  312 30 KM   CH  329 95 KM    x  CH  344 29 KM    5  CH  362 06 KM     z               e  be               5                                                                                                       UDYOGMANDAL  CH 0 000 KM                 17 000             32 982              45 506                 1      KOOTTANAD     CAMP OFFICE CH 90 615 KM     CAMP OFFICE     THRISSUR                    S YARD  05 1        CAMP OFFICE    GAIL STORE THRISSUR     PALAKKAD    KOCHI                     307  BANGALORE MAIN LINE       KERALA  STATE                30 0  BANGALORE MAIN LINE     240 BANGALORE MAIN LINE A    240 MANGALORE SPUR LINE      R T    D T  SV  IP            11             
21.     Notes     1  Fold all drawing to 210mm x 297mm    2  Vendor to provide all printed matter        the soft                         LIMITED    3  Legends   A C  As completed  W S  With Shipment  W  Weeks  Final technical document file shall be supplied in hard copy as indicated and in electronic format   pdf  Acrobat files  on two  2 Nos   CD ROM   All these documents shall be submitted along with dispatch of the system to site   FAT procedure documents must include clause wise reference of tender specification for its compliance   This document shall be prepared in consultation with owner   owner s representative   The documents   information required with offer sheets to be furnished otherwise the offer shall be liable  for rejection   During detail engineering stage  3 sets of printed matter and 2 soft copy shall be submitted till the final  approval of documents drawings  After approval 4 sets has to submitted   As Built documents   6 sets Printed Matter  6 sets Soft Copy           KOCHI  KOTTANAD BANGALORE                      NATURAL GAS PI PELI NE PROJ ECT  PHASE 11   RTU FOR CENTRALISED SCADA SYSTEM    BID Doc No    05 51 23 ME  GAIL 094  RTU   GAIL  INDIA  LTD  Page 1 of 1                      VENDOR DRAWING  DATA APPROVAL PROCEDURE           FOR CENTRALISED SCADA SYSTEM OF KKBMPL PHASE I1  PROJ ECT  BID DOC         05  51  23       GAIL  094             Vendor must take care of the following while submitting drawings and documents  for review as indicated in Vendo
22.     VALVE BW END UPTO 1 2  SW END     1                      Vic WW pK      PLUG VALVE BW END UPTO 1 27 SW END   Me    WR             PLUG VALVE FLANGE END                 lt  lt             PRELIMINARY DRAWING                   GU                  XL             2222 ER 7277 W  sss    MECON LIMITED      KOCHI KOTTANAD   BANGLORE MANGLORE  NATURAL GAS PIPELINE PROJECT     PHASE 2                         12          1  0 100    82                         ON                    1  ALL VENTS SHALL      LOCATED MIN  HEIGHT OF 3 MTR      ABOVE THE HIGHEST OPERATING LEVEL                                                   T                    3  ALL BALL VALVES 2     amp  BELOW SHALL BE FULL          ONLY             4  ALL UNMANNED STATION SHALL      PROVIDED WITH   02 FLOODING  SYSTEM AND ALL MANNED STATION SHALL BE WITH FM 200 FIRE   SUPPRESSION SYSTEM      5  ALL SV EXTENDED STEM BW  FULL BORE BALL VALVE    6  BURRIED VALVE SHALL BE PROVIDED WITH CORROSION PROTECTION COATING    7  FOR SV  amp  GOV DETAL REFER DRG  NO  MEC 23ME 05 28 M 001  0023  0030   8  ALL SV STATIONS  amp  TAP OFF CHAINAGES HAS TO BE CONFIRMED BY           9  FOR SV 15 SEE         DRG  NO         25     05 28    001 0026    10  SV 18  amp  19 FUTURE TAP OFF SHALL BE USED FOR JSW STEEL  amp          11  FOR SV 18 4 19 SEE         ORG  NO  MEC 23ME 05 28 M 001 0030    12  ALL SV STATIONS WITHIN KERALA STATE  SV s HAVING FIXED CONSUMERS  amp    SV 26  27  NEAR         ARE CONSIDERED WITH FUTURE TAP OFF  HOWEVER 
23.     equipments with leather bag        PDT with all accessories       Test equipments   a  4  gt  Digit Multi meter   b  Portable Power Source cum  Calibrator  Current  amp  Voltage     c  Protocol Analyser   d  RTU configurator software       G Special Tools and Tackles     separate List with unit price has to  be furnished with un           offer           H Any other items                         Signature of the Bidder authorized signatory  Name of the Bidder authorized signatory    Stamp and Date                MECON LIMITED   KOCHI KOTTANAD BANGALORE MANGALORE NATURAL GAS  DELHI PIPELINE PROJ ECT  PHASE I1   PJ S      RTU FOR CENTRALISED SCADA SYSTEM      ELECT   amp  INST  JOB Spec  No    MEC   23ME  05  E5  1   PJS 094          4 2  no BID Doc No    05 51 23        GAI L  094                                 1   to PJ S Page 1 of 1                   ANNEXURE           POWER CONSUMPTI       amp  UTI LI TI ES REQMT     PUCR  FORM             KOCHI KOTTANAD BANGALORE MANGALORE NATURAL GAS  PIPELINE PROJECT  PHASE II   PJS OF RTU FOR CENTRALISED SCADA SYSTEM    MECON LIMITED  DELHI          JOB Spec  No    MEC 23ME 05 E5 I  PJS 094           BID Doc No    05 51 23 ME  GAIL 094           ANNEXURE IX to PJS Page 1 of 1    ELECT   amp  INST   SECTION                            ANNEXURE IX to PJS  RTU FOR CENTRALISED SCADA SYSTEM    POWER CONSUMPTION  amp  UTILITIES REQUIREMENTS  PUCR  FORM       This form shall be duly filled and signed by bidder and it shall be submitted alo
24.    MEC S 05 ES T 23ME GAIL 094           Bid Document No    05 51 22M E GAIL 094  RTU     Prepared  amp  Issued by       9051    ELECTRICAL  amp   INSTRUMENTATION SECTION  MECON LIMITED  DELHI   110 092  Pages  1 of 4                                        GAIL  India  Ltd RTU FOR CENTRALISED SCADA SYSTEM    KOCHI KOTTANAD BANGALORE MANGALORE NATURAL  GAS PIPELINE PROJECT  PHASE II   MATERIAL REQUISITION          BID Doc       05 51 23                  094           Page2of 4       2               LIMITED       MATERIAL REQUISITION       ITEM          FOR CENTRALISED SCADA SYSTEM  PROJECT   KOCHI KOTTANAD BANGALORE MANGALORE NATURAL GAS  PIPELINE  PHASE ID  MR NO    MEC S  05    5  T  23 ME   GAIL   094           BID Doc NO   05 51 23 ME             094           CLIENT            India  LIMITED  Sr  No  DESCRIPTION Unit   Quantity       Project Management  Design  Engineering  Procurement of Materials  fabrications   manufacturing  Inspection  amp  Factory Acceptance Testing at works  Supply  Packaging   Shipping  Insurance  Port Handling  Custom Clearance  Inland Transportation to site   Storage  amp  Safety  Installation along with necessary software  installation material  cables   connectors  RTU panels  erection of foundation support channel on trench for panel  erection  cable trays  test instruments  equipments  Site Acceptance testing  amp  Integration  with Centralised SCADA system  Test Run  Pre commissioning activity  Commissioning   Integration Telecom System  am
25.    furnished     Weather the Supplied RTU integrated with a single SCADA system    Whether the supplied RTU can integrated with any IP based SCADA system  Whether RTU offered for KKBMPL          project is similar or higher in  specification of this tender for implemented project   Yes No    Bidder has to provide commitment letter from OEM to extend complete technical  support for the proposed make of RTU during the project tenure and warranty  period if the bidders is not a manufacturer   Documents provided Yes No   Bidder has to provide commitment letter from OEM to provide support for the  SPARES for proposed make of RTU for as define in specification   Documents  provided Yes No     Bidder s Office   Service center   Service associates to take care of post sales  services  warranty and post warranty support   Yes  No     Name  amp  address of Office   Service Center   Service associate   Name of contact person   Telephone  FAX No  Email No  of Contact person   Having adequate trained manpower in India  Yes  No     Documents for fulfilling all the above furnished  yes no        Project       Bidder   Signature of the authorized signatory  Name of the authorized signatory  Stamp and Date                         INDIA  LTD        KOCHI KOTTANAD BANGALORE MANGALORE NATURAL  GAS PIPELINE PROJECT  PHASE ID  RTU FOR CENTRALISED SCADA SYSTEM  BID Doc No    05 51 23       GAIL 094           Page 1 of 2             VENDOR DATA REQUIREMENTS    The table hereunder specifies the quant
26.    posee                                  T  8     56 5601   1       I           i  lt         M S  a i i   UNIT NO   i       a PROCESS FLUID  RLNG       aj 8 LINE SIZE  NOMINAL   13    v    S   E       i ae VALVE_LEGEND  1    1           4 uyr      BALL VALVE FLANGE END      ej 4     BALL VALVE      END UPTO 1z SW END   1 12           PLUG VALVE BW END UPTO 1 2  SW END     pat MRPL        PLUG VALVE FLANGE    Z  1   pking DEALE    xd  GLOBE                xx      PRELIMINARY DRAWING  i 1  Cn GAIL  INDIA  LIMITED    adr                   MEC CM a   3              LIMITED    KOCHI KOTTANAD  BANGLORE MANGLORE  NATURAL GAS PIPELINE PROJECT   PHASE 2     P  amp  ID FOR RECEIVING TERMINAL  AT MANGALORE  CH  354 328 Km     SECTION VIII       DRG  NO  MEC 23ME 05 28 u 001 0022 EN                                         LOCATED MIN  HEIGHT OF    MTR  ABOVE THE HIGHEST             1  ALL VENT SHALL  OPERATING LEVEL    72  AL BALL VALVES 27    BELOW SHALL BE FULL BORE ONLY      2 5  NOTE DELETED  oce sene EC RP    EL MM LO MEL           4  ALL GOV  GAS OVER OIL OPERATED VALVES  SHALL BE FAILED TO  STAY PUT TYPE  VALVE     5  FOR ALL TAPPING FROM        LINE  THE FIRST ISOLATION VALVE SHALL       WELDED END TYPE AND OTHER SECOND VALVE MAY BE FLANGED  gt   CONNECTION        6  ALL UNMANNED STATION SHALL BE PROVIDED WITH CO2 FLOODING    SYSTEM AND ALL MANNED STATION SHALL      WITH FM 200 FIRE  SUPPRESSION SYSTEM       7  INTEGRATED INTERLOCK SHOULD BE PROVIDED IN THE GAS ACTUATED  VALVE 
27.   23ME  05  E5  1   PJS 094          4 2  no BID Doc No    05 51 23        GAIL  094  RTU        ANNEXURE XI to PJ S Page 1 of 1                   ANNEXURE   XI    RESPONSIVE OFFER CRITERIA     ROC  FORM                      INDIA  LTD        KOCHI KOTTANAD BANGALORE MANGALORE  NATURAL GAS PIPELINE PROJECT  PHASE ID  PJS of RTU FOR CENTRALISED SCADA SYSTEM   JOB Spec  No    MEC   23ME   05   E5   I   PJS 094           BID Doc No    05 51 23 ME  GAIL 094  RTU   ANNEXURE XI to PJS Page 1 of 1          MECON LIMITED       ANNEXURE XI to PJS  RTU FOR CENTRALISED SCADA SYSTEM    RESPONSIVE OFFER CRITERIA  ROC  FORM       Column to be filled          A 1 Scope of supply and works complied with as        the Bid package                2 RTU specifications  amp  configuration as per the Bid specifications  yes no   1  Bidder must categorically state compliance that all    deviations comments from all sections of Bid package are only listed in  deviation form and all remaining clauses        deemed to be fully complied  by the Bidder    2       the forms are duly filled  stamped and signed by authorized  representatives at the required places  yes no     3  Bidders proposal as per bid outline requirements  yes no           Signature of the authorized signatory    Name of the authorized signatory    Stamp and Date                      MECON LIMITED   KOCHI KOTTANAD BANGALORE MANGALORE NATURAL GAS  eds PIPELINE PROJ ECT             11   PJ S OF RTU FOR CENTRALI SED SCADA SYSTEM     JOB 
28.   BURRIED VALVE SHALL BE PROVIDED WITH CORROSION PROTECTION COATING   7  FOR SV  amp  GOV DETAIL REFER ORG  NO  MEC 23ME 05 28 M 001 0023 0030  8  ALL SV                 amp  TAP OFF CHAINAGES HAS TO BE CONFIRMED BY GAIL    9  ALL SV STATIONS WITHIN KERALA STATE  SV s HAVING FIXED CONSUMERS  amp  A  10  ALL SV STATIONS WITHIN KERALA STATE  SV s HAVING FIXED CONSUMERS   amp       SV 26  27  NEAR CITY  ARE CONSIDERED WITH FUTURE                HOWEVER     OUT OF REST NINE No  SV s FIVE      OF THEM ARE WITH FUTURE TAP OFF    amp  FOUR No  ARE WITHOUT FUTURE TAP OFF  TO BE DECIDED ON THE BASIS   OF GEOGRAPHICAL LOCATION OF SV STATION      FROM  MEC         0011      UNIT 25      UNIT 26          27 UNIT 28   UNIT 29                 t    r         WORKING   o TO 55     FLOW   2 3 MMSCMD             i DESIGN    29 TO 65C  DESIGN CLASS   600             5 6 7 NOTE 5 6 7      CH  412 80Km    CH 42880Km  0  f 2460  CH 476 80Km     PRESSURE   45 48 KG Cm2 C     SECTION  V DESIGN   92 KG Cm2 G     24 x439 085 Km  APPX   API SL  Gr  X 70 80 U G PIPELINE    ul  z  5  ul             e      A D          8              o  gi    the  45         N   T       SECTION IV       LINE LEGEND        r PROPOSED UNE A G              PROPOSED UNE U G    24  P 24 2401 D1A           MATERIAL SPEC            NO   UNIT NO   PROCESS FLUID  RLNG     LINE SIZE  NOMINAL   VALVE LEGEND           BALL VALVE FLANGE END                    VALVE BW END UPTO 1 2  SW END     ISSUED To Se ye on poro rmn  CON STRUCTI O
29.   DONE BY ULTRASONIC FLOW METER WITH  CONTROL PANEL MOUNTED FLOW COMPUTER  INSTALLATION SHALL  BE AS PER AGAS LATEST EDITION  HOWEVER THERE SHALL BE  THREE STREAMS OF METERING  2  15     13  ENVIRONMENTAL ENCLOSURE REQUIRED FOR METERING INSTRUMENTS   INSULATION OF USM METER RUN  amp  IMPLUSE LINES OF METERING  INSTRUMENT 15 REQUIRED     14  PROMSION SHALL BE KEPT TO HOOK UP METERING PR    amp  TEMP   FLOW PARAMETERS WITH SCADA   15  THESE VALVES ACROSS THE USM SHALL BE PROVIDED WITH LIMIT SWITCHES     PROCESS DATA    FLUID   NATURAL GAS RLNG  TEMPERATURE  WORKING    O TOSS C  DESIGN    29 TO 65      DESIGN CLASS   600         SECTION II                SECTION   I                           FLOW   10 607 MMSCMD                        PRESSURE      75 78 KG Cm2 6   DESIGN       92 KG Cm2 6     LINE LEGEND       PROPOSED UNE A G              PROPOSED UNE U G          07 0701 01    12  PED7    0701   D1A    CONSTRUCTION  LL RT   ir              NIT NO   PROCESS FLUID  RLNG   UNE SIZE  NOMINAL        VALVE LEGEND            BALL VALVE FLANGE END       BALL VALVE BW END UPTO 1 2  SW END             PLUG VALVE BW END UPTO 1 2  SW END               VALVE FLANGE END   od GLOBE VALVE     PRELIMINARY DRAWING  GAIL  INDIA  LIMITED    MECON LIMITED    KOCHI KOTTANAD  BANGLORE MANGLORE  NATURAL GAS PIPELINE PROJECT     PHASE 2     P  amp  ID FOR INTERMEDATE PIGGING STATION 1   SECTION       DRG              25      05 28    001 0005                                                 1  ALL VEN
30.   Location Power Source Power Supply   Watts       RTU location UPS  Grid  Solar Panel  24 V DC  250 Watts     Non UPS 230 V AC for Utilities socket                                                         LIMITED    KOCHI KOTTANAD BANGALORE MANGALORE  NATURAL GAS PIPELINE PROJECT  PHASE II     DELHI PJS OF RTU FOR CENTRALISED SCADA SYSTEM          ELECT   amp  INST     Job Spec  No    MEC   23ME   05   E5   I   PJS 094           BID Doc No    05 51 23 ME  GAIL 094  RTU     Rev  0 Page 15 of 24          SECTION                9 2    9 3    9 4    10 0    10 1    10 2    10 3    10 4    RTU vendor shall furnish power consumption details with detailed break up for each subsystem equipments  including inrush current and its duration during detailed engineering  Refer I O list  ANNEXURE   ID for  details of station wise power supply     Reliable and rugged SMPS power supply shall be supplied as required with equipment to generate isolated and  stable voltage levels required for equipment operation     SURGE PROTECTION  TRANSIT SUPPRESSORS  RFI FILTERS    AII the equipment shall be designed with built in safety to protect against the effects of monitor induced high  voltages  effects of surges  transients  RF     Necessary surge protection devise shall be provided as per the recommendation of the equipment supplier for all  the power supply   signals     EARTHING    Each supplied RTU cabinet shall be provided with earthing lugs with their frames       these lugs  strips shall be  p
31.   U G                T   gt    Gr  X 70 80     4   24      QOEC              4 12      2 1          12          12 N       8       CONS  05   SRI VELA SMELTERS                        BALL VALVE FLANGE END    6          5  06            ALLOYS epit  BALL VALVE BW END UPTO 1 2  SW END            PLUG VALVE BW END UPTO 1 2  SW END    se A pre  x       PLUG VALVE FLANGE END     E           2     Nor  pot GLOBE VALVE   OS                 NC    1   Ux A    ISSUED FOR  CONSTRUCTIO         8484440                           TYPICAL ARRANGEMENT FOR 24    SV 15  REMOTE OPERATED         MECON LIMITED                   pog ed ee ee E   eae        KOCHI KOTTANAD BANGLORE MANGLORE  ie aes uu 2  gt                   Ea        NATURAL GAS PIPELINE PROJECT  E  eec  EL qp  ue              PHASE 2   pp          e P J pace cc wee du   ew  ur x sl TYPICAL ARRANGEMENT FOR  Expiry Apaj   nemam pm              oss   24    SV 11  amp  15 STATIONS  poil              o                           cw     copri                       an rit   Esch qe pe ewe                              p sn a a eee se re                                                                               Se       STAY PUT    CONNECTION     6  ALL UNMANNED STATION SHALL BE PROVIDED WITH CO2 FLOODING  SYSTEM AND ALL MANNED STATION SHALL BE WITH      200 FIRE    TAP OFF DETAILS AT SV 9 SUPPRESSION SYSTEM                   PRE CONT                           12   coNs o2   MALABAR CEMENTS   6                   VALVE SUCH THAT WITH HIGH 
32.   amp  cost implications to the Client     The bidder shall carry out the activities related to project management  system design  engineering  integration   configuration  training  testing fully by themselves and the remaining activities may be sub contracted to         other agency having experience in erection  cabling  installation of RTU with SCADA system     In the tender  the terms Owner  GAIL  Purchaser  Company and Client been used synonymously  The terms  Contract document  Contract specifications  tender specification have been used synonymously     The Bidder shall give an undertaking in line with PMR form enclosed as Annexure to PJS that system support for  maintenance  upgradation and enhancement expansion shall be provided for 05 years and spare part support shall  be provided for the period of 10 year of the offered RTU from the expiry of the Warranty period  The ROC form  as per Annexure of PJS and source of supply  SOS  as per Annexure of PJS has to be furnished with bid  In  addition to warranty bidder shall quote for extended warranty as defined in the tender  amp  SOR     Bidder shall furnish all documentation  drawings  and other information required Operation and Maintenance  Manuals  Handbook of inventory of all the equipment supplied and installed     Bidder must have coordination with Instrumentation   Telecommunication   Electrical   CP system contractor    KKBMPL PH II and Centralised SCADA system vendor  YIL  during installation  amp  commissioni
33.   in conjunction with the Bid package  shall constitute the  contract requirements for the award of job to the Bidder                                S No  Page No  Clause No  Requirement Deviations Clarification  Remarks  as per Comments  Bid package by Bidder   1   2   3   4   5   6   7                         Signature of the Bidder authorized signatory  Name of the Bidder authorized signatory    Stamp and Date          
34.  02 1343 08 04  3   RrU SV2             14 0 19 04  17 0 21 02   340 05 03  NE je        T     8 Fuss                    E es 26   18                    s 7            NE           7  11   RTU SV 9      14 6 25 04   1748 29 02  343 08 00 00 00 04  12   RTU SV 10      14 0 19 04   17 0 21 02  3 05 00 00 00 03  13   RTU IPS 2   S s 1446 22 16   17 8 41 04  343 10 00 00 00 06           aa eC                   MECON LIMITED DELHI    KOCHI KOTTANAD BANGALORE MANGALORE NATURAL GAS PIPELINE PROJECT  PHASE II     PJS OF RTU FOR CENTRALISED SCADA SYSTEM       ELECT   amp  INST  SECTION    JOB Spec            23ME   05   E5   I   PJS 094                BID Doc No    05 51 23 ME  GAIL 094  RTU                                               ANNEXURE        to PJS Rev 0 Page 2 of 4   16        FON 05 14 6 25 04 17 8 29 02 3 3 08 00 00 00 04  17 a Sain 05 1446 25 04 17 8 29 02 3 3 08 00 00 00 04  18   RTU IPS 3        02   1446 22 20   1748 45 06  343 12 00 00 00 06  19 eee    05 14 6 25 04 17 8 29 02 3 3 08 00 00 00 04     e         05  14 6 25 04   1748 29 o2  3 3 08 00 00 00 04   21               pm 05 04 1748 3 3 lo   00 00 00 04  EE ARE RT    fo s fe  m  m o fo      04 mme      s fe  m  m m                  0     oe pee  m  m  vm e fe pe              s   m                    gt      e                                w a a     a      e  6  e      m mes        e T a     e  e         x   fe fo fo  e                 fa Te           fo  a       RTU SV 25 qi  Ori  19 04 17 0 21 02 3 0      T 
35.  18  MTBF for a fully equipped R TU h   19  Equipment availability     20           for a fully equipped RTU h       21  Power requirement for a fully equipped RTU      22  Maximum number of I O modules per RTU  separately for    each type to be given   23  Spare capacity for each type of I O                                              MECON LI MI TED TECHNI CAL SPECI FI CATI ON  REGD  OFF  RANCHI                                                                      834002 ELECTRI CAL  amp  INSTRUMENTATI ON  OIL  amp  GAS SBU  DELHI        DOCUMENT NO  Page 20 of 22  REMOTE TERMINAL UNITS         S  05    5  099  Item Description Particulars  24  Rack dimensions  Main Processing Module  25  Module designation  26  Microprocessor type  21  Word length  28  Basic clocking rate  29  Engineering unit conversion yes no  30  Arithmatic processor facility with floating point capability  yes no  31  Programe location  i e                      32  EPROM k bytes  33  RAM k bytes  34  RAM battery back up for one month yes no  35  Type of data bus available for communication among the I O  modules  serial parallel   36  MTBF h  37  Equipment availability    Response Times  38  Time taken to access and display information requested by the  user from the Master Station  39  Time taken to write one modified entry to the data base from  Master Station  40  Time taken to write one modified entry to the data base from  RTU maintenance facility  41  Time taken to validate a complete database fo
36.  50 02 Fieldbus Standard for use in Industrial Control Systems Part   2  Physical Layer Specification and Service Definition     ISA RP55 1 Hardware testing of digital process computers     ISA RP60 3 1985 Human Engineering for Control centres     ISA S71 04 Environmental conditions for process measurement and control  System  Airborne contaminants     ISA S72 1 LAN Industrial data highway     EWICS 1998 Guidelines for the use of Programmable Logic Controllers in Safety    Related Systems     EWICS 1997 Guidelines for Achieving Safety in Distributed Systems    Indian Standards       IS 732 1989      IS 3034 1993      IS 3043      IS 5572 1994      IS 5887 1916  Other Standards      API MPMS 12 2      IEEE 472      IEEE C37 1      IEEE 730      IEEE 830      IEEE 802 3      IEEE 829      ANSI     8 1      ITU V 23      ITU V 24           BS 5501  Part 6 1977    Code of Practice for Electrical Wiring installations   Fire Safety of Industrial Buildings  Electrical  Generating and  Distribution Stations  Code of Practice   Code of Practice for Earthing    Classification of Hazardous Areas  other than mines  having  Flammable Gases and vapours for Electrical Installation  Classification of Maximum Surface temperatures of Electrical  Equipment for use in explosive Atmospheres    Calculation of petroleum Quantity Using Dynamic Measurement  Methods and Volume Correction Factors  Guide for surge Withstand Capability  Automatic and Supervisory Station Control and Data Acquisition  Soft
37.  BE WITH FM   200 FIRE  SUPPRESSION SYSTEM       EE   pet ta    7  INTEGRATED INTERLOCK SHOULD BE PROVIDED IN THE GAS ACTUATED     7  VALVE SUCH THAT WITH HIGH AP ACROSS THE VALVE   gt 3 BAR            VANE SHOULD NOT OPEN DURING START UP  i s                   Em 5   8    72   cons 02         PUMP DMSON   s      3  coNs o5                     DMSION   6      LGB                        8              SR NO   CONS  NO    CONS                   CONS    01 RI KANAPPIRAN MILLS  i N  N                     es       vue uS Mg en ane     8  ALL       PT CONNECTION SHALL BE TAKEN FROM 27 TWO ISOLATION    VALVES AND THEN AFTER 17 SHOULD BE CONVERTED TO REQUIRE    NPT CONNECTION          9  GAS TAPPING TO VALVE ACTUATOR       10  GAS TAPPING FOR VALVE AP SWITCH   11  FOR PG        OPT DETAIL REFER MECON  DRG  NO    ee  PT          05   5 50      001      aru             MEC 05 E5 SD DPT 003  PG            05   5 50      004  12  EXTENDED STEM VALVE   13  DIRECT SURFACE CONTACT TYPE                       24 U G P L           Se T           Gr     70 80  1  1                                      S              TYPICAL ARRANGEMENT FOR 24  SV 11  REMOTE OPERATED    agp d EIE I LL    cM ao CV                        M CR ee                                           7  7         3       TAP OFF DETAILS AT SV 15     i eos   am sm   e    ROCHA PARRYWARE          3  05 03   RA NDA STEEL           4  cms or                PIPER   6             ES                             VALVE LEGEND         24
38.  CRITERIA   EQC   TECHNICAL     The RTU for Centralised SCADA System proposed to be supplied shall be from the existing range and should  have successfully tested for similar application  If bidder is not a manufacturer of RTU then bidder has to  provide the commitment letter from the OEM for offered RTU along with bid documents  RTU Vendor shall  provide all the required configuration data  necessary support  assistance for interfacing with Telecom system   local IEDs  amp  Centralised SCADA system and the supports for spares for next 10 year to client  Format of  logistic support duly signed by the bidder and the OEM has to be provided along with bid     COMPATIBILITY    The supplied RTU has to integrate with existing Centralised SCADA system  therefore  bidder s proposed RTUs  shall meet the following requirements     The centralized SCADA system is supplied by YOKOGAWA India limited  RTU has to be compatible with  Yokogawa s Centrlized SCADA    The communication Protocol for RTU shall be standard DNP 3 0  TCP IP   For the compatibility testing bidder  has to follow the test plan and procedure  enclosed as Annexure     XIV  suggested by YOKOGAWA for  interfacing with GAIL s Centralised SCADA system     Before the bidding the compatibility testing has to be done and certificate has to be provided along with  offer  without the compatibility certificate bidder offer may not be considered for further evaluation as  per terms and condition of contract     To facilitate bidder 
39.  Doc        05 51 23 ME  GAIL 094                   0 Page 5 of 24                      4 0    5 0    5 1    5 2    Bidder shall note that the evaluation will be done package wise  all the items together  strictly             the terms  and the conditions define in the tender     The complete requirement as contained in the Bid Document shall meet bid  its objectives  functional  specific  requirements describe in the specification  taking care of complete P amp ID requirement  operation  amp  control  philosophy  The specification shall be read in conjunction with scope of work  specification  drawings   documents and other requirements indicated in the tender documents     COMPLETION PERIOD    Complete Scope for RTU of Centralised SCADA System at all the specified stations of KKBMPL PH II  shall  be handed over to the purchaser on turnkey basis after successful supply  installation  testing  commissioning   Integration with Centralised SCADA system   SAT and trail Run and shall be as define in the contract  documents  The time schedule will be reckon from date of FOA  Fax of Acceptance      BIDDER S QUALIFICATION CRITERIA  BEC   TECHNICAL     This will be as define in the Vol   I of II of Bid documents  Bidder must fill the BQC provided at respective  section without fail and provide all the necessary supporting documents along with offer  otherwise GAIL   PMC reserves the right to evaluate the offer as per the terms  amp  conditions of contracts     EQUIPMENT QUALIFICATION
40.  IS THE                                  AND ISSUED    A SCALE   NTS  FOR THE SPECIFIQ PROJECT MENTIONED THEREIN  THIS IS  APPROVED       5                                                gt  j       s       REV        SH 1 OF 1     DRG  NO  MEC 23ME 05 28 M 901    REVISION 02 11 2011       NOT      BE COPIED OR USED FOR OTHER PROJECTS  UNLESS EXPRESSLY PERMITTED BY              2    10   5 000    12   0       2   3                              DESPATCH  RMINAL AT PPL   PUTHUVYPEEN    KOCHI KOTTANAD BANGALORE MANGALORE PIPELINE PROJECT  PHASE I  PETRONET LNG TERMINAL AT PUTHUVYPEEN TO IP AT UDYOGMANDAL          CH  0 00KM           TRAVENCORE COCHIN  CHEMICALS          30 x16 42 Km     4 x0 372 Km        APPOLO TYRES LTD    PREMIER              8 x0 88 Km     TAP OFF POINT 4  PR 1  CH  0 3783 KM                       FACT I U M           CH  0 88 KM     PR   3          BPCL  REFINERY          8   1 380 Km                         487         3    FACT I    ITOP SPUR LINE  1 CH     16 420 KM         a wm  a         s    IP 1   amp     STN              4 x0 697 Km                 SV CUM TAP OFF  POINT    CH  5 80 KM                   POINT        12 63 KM                          SPUR DT       UDYOGMANDAL       8   1 747 Km  RELIANCE    CONSUMER    TAP   OFF POINT  CH  3 013 KM     6 758 Km        4 x0 125 Km  PROTEINS LIMITED   NITTA GELATIN IND     LIMITED              12 x3 064 Km              8     3 167 Km              1  MAIN LINE FROM PUTHUVYPEEN TO SPUR LINE TAP   0FF  LE
41.  Input Modules to be supplied is as given below     Input Type   Min  16 nos  of Potential free contacts  2 wire isolated   Contact Wetting   2 4 mA per input at 24V DC   Resistance recognized   Not exceeding 1 Kilo Ohms as a closed contact  Resistance recognized    Not less than 50 Kilo Ohms as      open contact  Isolation   Using optocouplers   Insulation Resistance    20    ohms at 500 V Dc inputs   Debounce circuitry    10 m sec   Indicators    Loop  amp  State LEDs for each DI point   Voltage withstand Capacity   1 5 KV RMS    No NC contacts mixing of NO NC contacts in the same card   6 0 DIGITAL OUTPUTS    Typical specification of Digital Output Modules to be supplied is as given below     Output Type   Min  08 nos  of relay contacts   Indicators   LED indication for each DO point   Relay Type   Miniature power            Contact arrangement   1 NO   1 NC relay contacts configuration to be provided  up to the RTU terminal block   Contact Rating    Potential free contact rating of output interposing relay    for each DO point   Contact rating 48 V DC  2A  230V AC  5A    SCADA vendor to provide interposing relays for each digital output point including spare    point   Isolation   2KV     5 Contacts to Logic  DO command activation   Configurable Pulse duration  min 2 sec   Security   Output contacts shall be monitored      Opto isolators    and must be short circuit proof and protected by suitable  mechanism like fuse with suitable fuse blow indication  provided    7 0   
42.  OUT OF REST NINE No  SV s FIVE No  OF THEM ARE WITH FUTURE TAP OFF     amp  FOUR No  ARE WITHOUT FUTURE  TAP OFF  TO BE DECIDED ON THE BASIS  OF GEOGRAPHICAL LOCATION OF SV STATION                                                                     UNIT 19   UNIT 20            21 UNIT 22   UNIT 23        PROCESS              FLUID       NATURAL GAS RLNG TEMPERATURE            434          gt   gt                       wec      0011   lt  NOTE 5 6 7 9   NOTE 5 6 7 NOTE 5 6 7 10 NOTE 5 6 7 10                      WORKING 10   0 58     DESIGN    29 70 65 C    DESIGN CLASS   6007                 FLOW   266 MMSCMD  APPX                  316 80      CH  332 80Km  CH  348 80Km    CH  364 80Km       CH  380 80Km     PRESSURE  gt  46 48 KG Cm2 C   DESIGN   92 KG Cm2 G         SECTION   IV       24 x439 085 Km  APPX   API 5L  Gr  X 70 80 0 6 PIPELINE    24   439 085 Km  APPX                                 LINE LEGEND    PROPOSED LINE A G                PROPOSED LINE 0 6                 24  P 18   1801   D1A        WARN  spec   UNE NO   UNIT  NO    I PROCESS FLUID  RLNG   UNE  SIZE  NOMINAL        VALVE LEGEND       pide BALL VALVE FLANGE  END                VALVE BW END UPTO 1 2  SW END               VALVE BW END UPTO 1 2  SW END            PLUG VALVE FLANGE END   Pod GLOBE VALVE     PRELIMINARY DRAWING                               INDIA  LIMITED  MECON LIMITED    KOCHI KOTTANAD BANGLORE MANGLORE  NATURAL GAS PIPELINE PROJECT     PHASE 2                     i P  amp  ID FOR SV STATI
43.  PUCR Form    Bill of Material  Supply  for RTU  submitted  Yes  No    Submit Data Sheets Technical Specifications RTU  Yes   No    RTU Configuration Drawing Submitted  Yes No    Submit signed  amp  stamped tender documents   Submit Clause wise technical compliance of PJS with Annexure   Have you filled up         DEVIATION FORM  and submitted the same    Have you provided list of spares for operation and maintenance along with unit rates   Have you provided list of commissioning spares    Have you enclosed the catalogs literature in ENGLISH language including model decoding  details  drawing etc necessary for evaluation of your offer        Have you confirmed that documents required as per vendor data requirement will be supplied  after placement of order        16     Have you furnished System Architecture for RTU             Have you furnished PERFORMANCE GUARANTEE CERTIFICATE           ee    Have you furnished    Vendor Data Requirement    with all necessary documents             You quoted                  System Integrator            gt     You have 24 hr service support for    amp          N          Indicate deviation   discrepancy with supporting documents   reasons etc        N  Nyt    Letter from RTU vendor for discontinuation of product one year in advance        N          Certificate for compatibility of RTU with Centralised SCADA of GAIL           U    Is  2        Compliance to    Noted  Yes   No        Quoted for all the items       Time Schedule        Furni
44.  RTU shall report the status of the point after control  execution  In case the status has not changed within fixed specified time it shall report to MS    EMS  various stations for not having executed the control   11 10 RTU shall not generate any false control signal due to power supply on off conditions     11 11 RTU shall support communication protocol supporting report by exception to prevent  unnecessary data communication when the data is not changing     11 12 It shall provide error detection and control feature for data communication with  MS EMS FEP to ensure data integrity     11 13 It shall have feature of connecting a pluggable Programmable Diagnostic Test unit  PDT   with keyboard  amp  monitors diagnostic and programming aid to trouble shoot and  configuration tool for        and 1    boards  It shall be possible to exercise all the functions  of the RTU without disconnecting the RTU from process     11 14 RTU shall have provision for applying filtering on the input signals and scaling for  engineering units conversion     11 15 From MS EMS FEP it shall be possible to off scan complete RTU individually in addition to  off scan RTU points  In case of failure of complete RTU or off scan of complete RTU only  one alarm shall be generated and the RTU along  amp  digital points shown in various graphics  and printed in reports shall correspondingly have data integrity qualifier flag     11 16 The RTU shall be able to store the configuration data and the process data
45.  amp  INST  SECTION    JOB Spec            23ME   05   E5   I   PJS 094          BID Doc No    05 51 23       GAIL 094                                                 ANNEXURE        to PJS Rev 0 Page 4 of 4  RTU IPS  IPS  3 M   49 3 M     CH  292 315Km  02 1446 22 20 1748 45 06 343 12 00 00 00  24  SV 16 M   CH   308 00Km  00 00  24  SV 17 M   CH   324 72Km 99 09  RTU SV  24    SV 18 M   CH   52 18 M    341 05Km  05 1446 25 04 1748 29 02 343 08 00 00 00 04  RTU R T Receiving Terminal  53 Manaalore     2 Mangalore 12 0 6 18 18 5 8 31 04 0 3 07 02 00 02 08  9        354 328                      1  In addition to above quantities  25  Spare I Os shall be provided for each station    2  The I Os marked           are the tentative I Os as per P  amp  ID  Refer Instruments Index enclosed  Detail Engineering based      P amp ID and Instruments   Index for finalization of I O counts is in bidder s scope    3  The I Os marked           are the tentative I Os typically has to be considered for Electrical  Solar  Fire  amp  Safety and UPS   amp  Cathodic Protection   System CP     4  The counts of I Os will be finalized during detail engineering    5  Bidder shall provide station wise maximum power consumption details    6  Minimum 4 nos  of Spare serial each of RS 232 and RS 485 ports shall be provided to all RTU s in addition to above indicated quantity as per PJS  Clause no  6 6  Page no  06 of 24     7  Serial port includes for Electrical  Solar  Fire  amp  Safety and UPS  and Cath
46.  amp  INSTRUMENTATI ON    OIL  amp  GAS SBU  DELHI       DOCUMENT NO  Page 19 of 22  REMOTE TERMI NAL UNI TS         S  05  E5  099 REVISION   1    EDITION   1       ANNEXURE 1    TECHNICAL SCHEDULE TO BE FILLED BY THE TENDERER    The Vendor shall fill the following technical particulars and submit the same with the offer  for selected Remote Telemetry Unit                          Item Description Particulars  GENERAL  1            2  Model        3  Degree of protection  IP No    4  Operating temperature range  degree centigrade   5  Operating relative humidity range    6  Maximum number of I O modules per subrack    Main subrack  Extension subrack    7  Maximum number of communication modules per subrack                8  Selectable communication speed range   09  Resolution of time tagging   10  High low limit checking yes no   11    Whether RTU supports self checkback execute and time out  feature yes no   12  Interfacing with flow computers of different makes   Instromet Spectra Tek  etc   yes no   13  Remote configuration and downloading of parameters from    Master Station supported yes no  14  Self diagnostic of RTU and reporting it to Master Station                   yes no   15  Number of serial ports supported in addition to redundant  communication links with Master Station  minimum 4 nos     16    Whether RTU supports connection of portable maintenance  diagnostic test unit yes no   17    Whether hardware for 25   spare installed I O s for RTU  included yes no  
47.  as per ITU T G655  amp  18 Fibre as per ITU T  652 shall be laid by Blowing  Technique in    40 mm        HDPE Telecom duct by other contractor     To ensure effective and reliable Control  Management and Supervision of the pipeline  the pipeline is envisaged  to be monitored and controlled from existing Centralised SCADA system having Master Control Stations  MSs   located at GAIL  Noida and Back up Emergency Control Station  BMS  at Jaipur  The MS   BMS will be  interlinked with KKBMPL PH II Remote Telemetry Units  RTUs  located along the pipeline through FEP   Front End Processors  server by dedicated optical fibre communication system and Leased line links     The tentative station wise I Os are indicated in tender in ANNEXURE II  The major IED  Intelligent Electronic  Devices  to be connected with the RTU s through RS 232   RS 485 are Flow computers  Gas chromatograph   LEL panel  cathodic protection panel  UPS panel  Battery chargers panel of Solar Power Supply or Grid power  supply along with some critical hardwired signal from instrumentation panels                                                           3 0    KOCHI KOTTANAD BANGALORE MANGALORE  a NATURAL GAS PIPELINE PROJECT  PHASE ID  PJS OF RTU FOR CENTRALISED SCADA SYSTEM  Job Spec  No    MEC   23ME   05   E5  1  PJS 094           2  BID Doc        05 51 23       GAIL 094                   0 Page 4 of 24  5              WORK    This tender is for the procurements  amp  commissioning of RTU for KKBMPL PH II wit
48.  be supplied     6 22 BATTERY LIMIT WITH OTHER CONTRACTORS    SL Item Scope of Pipe Laying Contractor Scope of RTU Vendor  No  or other contactor    Cathodic  Protection   CP     Fire  amp  Gas  Detection  System    Door  Switches    Corrosive  Monitoring  System    Hardwired  Signal Cable  for field  instruments   field I Os     Soft Signals  from TIC   INST to  RTU    Solar System    Supply  amp  laying of cable for hardwired  signals  which shall be interfaced with RTU   from CP panel to Inst  TIC panel including  glanding  termination  ferruling  dressing etc   both end   Supply  amp  laying of cable for hardwired  signals  which shall be sent to RTU  from Fire   amp  Gas panel to TIC INST panel including  glanding  termination  ferruling  dressing etc   both end   Supply of Door switches  amp  Supply  amp  laying  of cable for hardwired signals  which shall be  sent to RTU  from Switches to TIC INST  panel including glanding  termination   ferruling  dressing etc  both end   Supply  amp  laying of cable for hardwired  signals  which shall be sent to RTU  from  CMS to TIC INST panel including glanding   termination  ferruling  dressing etc  both end  Supply of cable  amp  laying of cables from field  instruments to JB  JB to TIC INST panel  including  gas actuated valve  amp  manual valves  to TIC INST panel including glanding   termination  ferruling  dressing at Panel end     Provide modbus details to RTU SCADA    vendor    Supply of solar system  amp  provision for RS4
49.  change of alarm             resident accumulator points driven by analog points    Remote configurations of RTU from MS EMS FEP through PDT  PC   n  Compatible with IP based telecom system   o         should have event logging and buffering feature  In case of communication loss          shall store the events in the buffer and transmit to Master Station on restoration of link    p  RTU should have calculation features in it for defining RTU resident calculation points    q  RTU should have surge lightening protection for power supply          EJ                            MECON LI MI TED TECHNI CAL SPECI FI CATI ON  REGD  OFF  RANCHI  834002 ELECTRI CAL  amp  INSTRUMENTATI ON Nu    OIL  amp  GAS SBU  DELHI ee       DOCUMENT NO  Page 9 of 22    REMOTE TERMI NAL UNITS         S  05  E5  099 REVISION   1    EDITION   1    r  Mandatory spares shall include at least 10 96 or as define in the tender all types of installed  cards   convertor   Power supply   terminating boards etc    s  Test jig with configuration of all 1 0 points to be supplied  installed with required power         communication cabling and made online with SCADA system    t  RTU shall have provision to configure following settings minimuma        IP Address Settings    IP Address for LAN     RTU IP for LAN A  amp  4 IP address for Master SCADA with 2 unique  domain    IP Address for LAN     RTU IP for LAN B and 4 IP address for Master SCADA with 2 unique  Domain    Source Address   0  DNP Master SCADA Address 
50.  d 6  Destination Address  d 7  Source Address    5  RTU Software Name and Version  6  Location of Testing    2  DNP3 0 Test cases    2 1 Dual DNP 3 0 Station      DNP3 0    ETHERNET      RTU IP for LAN A and 4 IP address for Master      RTU IP for LAN B and 4 IP address for Master       DNP RTU Device Address     0  DNP Master SCADA Address     Action  This test is to check simultaneous communication between minimum 2 SCADA Servers  and a RTU over DNP3 0  Establish the necessary network connection between SCADA Servers  and existing RTU and check for data transfer from RTU to each of the SCADA Server    simultaneously   Result   Remarks     2 2 RTU Time Stamps    SCADA RTU Testing Over DNP3 0       Action  Compare the SCADA system clock with the equipment clock  When these are equal or  nearly equal set the equipment clock for instance 5 minutes back in time  Generate a number of  events with time stamp     Result   Remarks   2 3 Analog Input Data for Integer and Float    Action  Add Analog Input Items and vary data using Calibrator and check the Real type values  with quality flag at SCADA with DNP3 0 Object and Variations  30 and 32       Result   Remarks   2 4 Digital Input Data    Action  Add Digital Input Items and check the values with quality flag at SCADA with DNP3 0  Object and Variations 01  02  03 and 04      Result   Remarks   2 5 Analog Output Data for Integer and Float    Action  Add Analog Output Items and check the Real values at Calibrator with Select  Execu
51.  data with SCADA for Event changes in the RTU   Result     Remarks     SCADA RTU Testing Over DNP3 0       2 12 On demand Scan from SCADA for AI and DI based on Class 0  Class 1  Class 2 and Class 3 request     Action   RTU should be able to exchange the Complete data with SCADA for On Demand poll   Class O   Class 1  Class 2 and Class 3   The Application fragment should not exceed 4 Kbyte  The data link frame  size should not exceed 292 bytes     Result    Remarks    2 13 Minimum Object and Variation supports from RTU   Action   DNP 3 Objects   30 32 01 02 03 04 40 41 42 43 10 11 13 80 and  object 12  amp  variation 01    Result     Remarks                            LIMITED KOCHI  KOTTANAD BANGALORE MANGALORE NATURAL GAS  DELHI PI PELI NE PROJ ECT             11   PJ S OF RTU FOR CENTRALI SED SCADA SYSTEM                JOB Spec         MEC   23ME  05   E5  I   PJ 5 094          AN            SE EH   N   BID Doc No    05  51  23        GAIL  094          reo  ANNEXURE XV to PJ 5 Page 1 of 1                   ANNEXURE   XV    MODBUS RTU DATA FORMAT DETAILS TO BE    PROVIDED BY RTU VENDOR       Customer GAIL Sub System Mapping List Yokogawa India Ltd  End User  GAIL    Modbus Device    ion RTU Tag No Signal Type Data Type Read   Write Register I fusum  Tag No 8              Address i Priority          S j       x 2 d Gm                                                                Negative       Receive Positive       L   Receive Negi              Page  1 1       KOCHI  KOTT
52.  engineers  technicians  capable of trouble shooting  amp  looking after the health of the system during  the warranty period  shall be made available all through the period of 24 months  two years    extended period     During the Warranty   Extended Warranty  the vendor shall use his own instrument  spares  man hour   communication facilities  hardware  software  materials  etc  for the rectification of any problem     In case of failure of any equipment  replacement is send immediately within 15 days  It is advice that Vendor  should keep sufficient spare for warranty support in its stores  designated store to be informed during detailed  engineering      If the replacement is not send within specified time then penalty at the rate of Rs 5000   per week has to be  imposed  In case bidder still not responds then same may be deducted from the CPBG as per the terms and  condition of the contract     Also vendor to provide RTU firmware upgrades and configurator software upgrade free of cost to GAIL within  warranty extended warranty period     System Warranty including all services and spares including consumables for operation and maintenance of the  system     Technical Support Service   Technical Support Services that extends coverage for GAIL after handover of the system  This includes 24 x 7  24  hours x 7 days a week  on line support  GAIL shall utilize this service by intimating the bidder in case of any  contingency and Vendor in turn provide telephonic support  Depend
53.  including support welding etc work as required as per the base frame of RTU shall be provided by the bidder     The vendor shall extend the power from GAIL provided power point to the DCDB  to be installed in the  equipment room using the armoured DC cable  For the same  the DCDB and armoured cable shall be supplied    and installed by the vendor     Any item of goods services not specifically mentioned  but considered essential for completion of the work in all  respects shall be deemed to be included in the scope of work of the successful Vendor  As the work has to be  executed as a turnkey responsibility  any erection material required for supply  amp  commissioning has to be    provided as per the site requirements     ANNEXURE      ANNEXURE   I to ANNEXURE  XVI     Refer Index sheet                                        MECON LIMITED KOCHI  KOTTANAD BANGALORE MANGALORE NATURAL GAS    DELHI PI PELI NE PROJ ECT  PHASE 11    PJS OF RTU FOR CENTRALISED SCADA SYSTEM      JOB Spec         MEC 23ME 05 E5 I PJS 094  RTU     grt                amp  INST  BID Doc        05 51 23       GAIL 094                SECTION ANNEXURE I to PJS Page 1 of 1                                            ANNEXURE                 CAL SPECI FI CATION  FOR RTU                   Rev    1  Edition   1    SPECI FI CATION    FOR  REMOTE TELEMETRY UNITS    SPECI FI CATION NO   MEC  S  05    5  099       ELECTRICAL  amp  INSTRUMENTATION   OI L  amp  GAS SBU   MECON LI MI TED  DELHI 110 092               
54.  made from seventh month  No payment upto six months from date of completion  onward from actual date of  completion as per the certifications by EIC  client  In this situation  after intimation from GAIL  the site work has  to be completed within the time stipulated for site works as per tender     SITE PREPARATION    This includes all electrical and civil works and site preparation activities as define above for installation and  commissioning of the equipments     ACCESSORIES   OTHER ASSOCIATED ITEMS    Supply  amp  Installation of necessary equipment  cables trays  cables  amp  accessories to meet the overall system  requirements along Natural Gas Pipeline at respective sites  separate earthing  amp  lighting protection of indoor  equipment  not earth pit  at respective locations etc  Furniture as required for various systems  sub systems   equipment etc shall be supplied by the Vendor                                           LIMITED  DELHI    KOCHI KOTTANAD BANGALORE MANGALORE  NATURAL GAS PIPELINE PROJECT  PHASE II   PJS OF RTU FOR CENTRALISED SCADA SYSTEM          ELECT   amp  INST   SECTION    Job Spec  No    MEC 23ME 05 E5 I PJS 094           BID Doc No    05 51 23 ME  GAIL 094  RTU           Rev  0       Page 24 of 24       29    System integration including requisite interfaces and accessories to realize the complete system shall be in    bidder s scope     Civil Trench inside the control room will be provide by client  however  the erection of foundation channel 
55.  referred projects  the bidder as OEM has requisite experience in his own  name from same work location  amp  address  and not in the name of its parent company  located elsewhere  Yes No   2 3   Weather the work executed in single  In same pipeline  order  3 0   Whether the RTU supplied had been successfully commissioned within last seven year  from the bid due date  Completion certificate   satisfactory working certificate from  end user    yes no   4 0   Scope of responsibility of the Bidder  5 0   Project Management  yes no   5 1   Design  amp  Engineering  yes no   5 2   Supply  yes no                                   INDIA  LTD        KOCHI KOTTANAD BANGALORE MANGALORE NATURAL  GAS PIPELINE PROJECT  PHASE ID  RTU FOR CENTRALISED SCADA SYSTEM  BID Doc No    05 51 23 ME  GAIL 094          Page 2 of 2          MECON LIMITED          BIDDER QUALIFICATION CRITERIA  BQC  FORM  PART  I    Column to be filled for the  implemented projects          6 7    6 9    6 10    6 12    1 1    1 2    1 3    1 4    1 5       Details    Installed  yes no   Testing  yes no   Integration  yes no    SAT  amp  Test run  yes no   Commissioned  yes no     Make  Model No of RTUs proposed for this line  a  Documents for fulfilling BEC furnished  yes no     b  Reference List of similar job execution of SCADA  supply of RTU   with atleast the details of Purchase Order  Client name  Completion status etc  furnished   yes no    c  Client s letter for successfully completion with cross reference of PO
56.  shall have additionally 04 nos  of RS 485 and 04 nos  of RS  232 Serial ports as spare for communication in future over  amp  above the requirements indicated in I O list  enclosed with ANNEXURE II to PJS and Technical specifications of RTU ANNEXURE I  The  requirements of internal communications between the RTU CPU module and RTU I O modules is to be taken  care separately while designing and sizing of RTU  The details of configuration of each port will be provided in  detailed engineering  Any serial port present at CPU cards will not be considered spare     Communication protocol between MS   BMS   RWS and RTUS shall confirm to OSI Communication model                                         KOCHI KOTTANAD BANGALORE MANGALORE     NATURAL GAS PIPELINE PROJECT  PHASE II   PJS OF RTU FOR CENTRALISED SCADA SYSTEM  Job Spec  No    MEC   23ME   05   E5   1  PJS 094           2  BID Doc        05 51 23       GAIL 094                   0 Page 7 of 24                      6 8    6 9    6 10    6 11    6 14    6 15    6 16    6 17    6 18    6 19    6 20    DNP 3 0  TCP IP  and it will be standard protocol for all the station communications     RTU Vendor shall ensure the completeness of the Bill of materials   Schedule of Rates  SOR  to meet the  complete requirements of this tender as part of their responsibility and any change   modifications required for  the same during detailed engineering to meet the requirements of the tender shall be done by the Vendor  without any delivery
57.  t3          p lt     gt  lt       2272625                  LINE  ZIE                        o        CORROSION COUPON    PRESSURE REDUCING VALVE   IN AUXILIARY AND CONTRAL FACILITIES  PRESSURE CONTROL VALVE  GENERAL    PROCESS SECONDARY LINE    ISSUED FOR    EW    FB            GOV         GAS OVER OIL OPERATED VALVE    HOV    MOV    SAV    _ SSV    SBV  PRV    SP                         PGS             i    ABBREVIATIONS              ESD        HYDRAULIC OPERATED VALVE     LOCKED POSITION       INTRUMENT AIR SUPPLY    NORMAL CLOSED  NORMAL OPEN                         EMERGRNCY SHUT DOWN 000  DRAIN       FAIL  BLOCKED                  GAS   OPERATED CONTROL VALVE            LOCKED CLOSED  LOCKED OPEN           LOW POINT          MOTOR  CONTRAL VALVE  MANHOLE              MOTOR OPERATED VALVE  SOLENOID VALVE    PRESSURE CONTROL VALVE       SAFETY SHUT OFF VALVE        PRESSURE RELIFE VALVE       SETPOINT  THERMOCOUPLE  THERMOWELL              NON RETURN VALVE       CHECK VALVE  FLOW CONTROL VALVE        POWER GAS SUPPLY           12      19000 100 m sz so ancz oan  ON                    VP PLUG VALVE                         pa VB BALL VALVE WELDED END      VB BALL VALVE FLANGED END     GATE VALVE 0500            5        GV   GLOBE VALVE EEEN    i PRESSURE RELIEF OR       SAFETY VALVE   PSV        1           PRESSURE  REGULATING VALVE  PCV     4  SELF ACTUATING TYPE      24H NON RETURN VALVE            CONTROL VALVE WITH          SLAM SHUT OFF VALVE E      d         SOLENOI
58.  terms  amp  condition of the contract     The scope of work for bidder to supply RTU for Centralised SCADA system which including but not limited to  Design  Engineering  Procurement of Materials  fabrications  manufacturing  Inspection  amp  Factory Acceptance  Testing at works  Supply  Packaging  Shipping  Insurance  Port Handling  Custom Clearance  Inland  Transportation to site   store at site all inclusive for Remote Terminal Unit  RTU  along with RTU panels  necessary software  and Supervision of Erection    Pre commissioning  Commissioning  Integration with  Telecom System  amp  local IEDs Site Acceptance testing  amp  Integration with Centralised SCADA system         Trial Run  Warranty  commissioning spares  Documentation etc and shall be executed as per details in scope  of work  Technical Specification of RTU     ANNEXURE I to PJS   amp  various documents provided in the tender   For IO counts of typical Sectionalising Valve station  Intermediate Pigging Station  and Receiving Station type  RTU  refer Annexure     II of PJS     Price break  up as per the enclosed format 1 for supply and works shall be provided as per SOR MR  This will  be utilised for any addition or deletion of work as required during detailed engineering   future requirements                                         KOCHI KOTTANAD BANGALORE MANGALORE  a NATURAL GAS PIPELINE PROJECT  PHASE ID  PJS OF RTU FOR CENTRALISED SCADA SYSTEM  Job Spec  No    MEC   23ME   05     5 1   5 094           2  BID
59. 0        24  P 07 0718 D1A                      0015           I     t     1           I     I                 I     l     1           i    ULTRASONIC  METER            FE 0701          12413     15 _ NOTE 15  DEYAIL A             4     07  0705 01      24     07 0706 01      pad    24     01  0705 01      2     P 07 0710 01A         07 0707 01        T TRIER LETER  pido                FE 0702 pea     T2 NOTE 15  NOTE  15       177 42 8  12   P 07 0708 D1A 0  Boge                      L                                           S 1  ALL VENTS SHALL BE LOCATED MIN  HEIGHT OF 3 MTR     ABOVE THE HIGHEST LEVEL    f        2  SCRAPPER LAUNCHER RECEMER SHALL HAVE SCRAPPER HANDLING  Ng FACILITY COMPIRING OF         CRANE  amp  A TROLLY AND SHALL HAVE       QUICK OPPENING CLOSURE       3  SCRAPPER LAUNCHER RECEIVER SHALL BE SUITABLE FOR HANDUNG  zi INTELLIGENT PIGS     a          4  DELETED     g  g  ol 5  SCRAPPER DOOR MECHANISM TO BE CONSTRUCTED SUCH THAT THE DOOR    SE CAN NOT BE OPENED UNLESS SCRAPPER TRAP IS FULLY DEPRESSURISED   Bis  YR 6  ALL BALL VALVES 2    amp  BELOW SHALL BE FULL BORE ONLY    10  alo 7  ONUNE RETRMEL TYPE CORROSION MONITORING COUPON AND     5 CORROSION PROBE SHALL BE PROVIDED     8  FOR SV  amp  GOV DETAIL REFER ORG  NO  MEC 23ME 05 28 M 001  0023 0030  9  FUTURE PROVISION  TAP OFF  PROVIDED FOR COMPRESSOR STATION         PG 0701  amp  0706 SHALL HAVE    RANGE OF 0 1 Kg Cm2 g  WITH A GAUGE SAVER   11  DIRECT SURFACE CONTACT TYPE     12  METERING SHALL    
60. 1801                      ww    wa a m m s      ww m      wa d      wa m m                x      wama 5  GS usa C9 s                     s wa m x w 5  m wm m 99 w    4  DELETED     5  SCRAPPER DOOR MECHANISM TO BE CONSTRUCTED SUCH THAT THE DOOR  CAN NOT BE OPENED UNLESS SCRAPPER TRAP IS FULLY DEPRESSURISED     2     6  ALL BALL VALVES 2     amp  BELOW SHALL BE FULL BORE ONLY                          O  UNE RETRIVEL TYPE CORROSION MONITORING COUPON AND  FWI 1802   u 1802 CORROSION PROBE SHALL BE PROVIDED  f  24 x24 x24 di 8  FOR SV  amp  GOV DETAL REFER DRG  NO         23     05 28    001 0023 0030    24  MN te 2m         26 1801  amp  1803 SHALL HAVE A RANGE OF 0 1 Kg Cm2 g  WITH A GAUGE SAVER    5L  Gr  X 70 80  U G PIPELINE    24 439 085 Km  APPX     API     t  LAUNCHER  SRL 1801  24  x30     SLR 1801  30  x24    DESIGN         92 Kg Cm2  g       DESIGN PR    92          2  g     10  TAP OFF PROVIDED FOR COMPRESSOR STATION IN FUTURE   11  DIRECT SURFACE CONTACT TYPE       24  P 18 1803 D1A    8  P 18 1804 D1A  FLUID   NATURAL GAS RLNG TEMPERATURE    WORKING   o   0 55 C  FLOW   4997 MMSCMD  APPX   DESIGN    29 TO 65C      DESIGN CLASS   600  PRESSURE   48 51 KG Cm2 G  d    DESIGN   92          2          LINE LEGEND    PROPOSED LINE A G              PROPOSED        0 6    24  P 18 1801   D1A    IS UED FOR 8  P 18 1801   D1A u             Lt      PE    UNIT        1   PROCESS FLUID  RENG          UNE SIZE  NOMINAL   VALVE LEGEND    d    pidh BALL VALVE FLANGE END i  pij     
61. 28    001 0029   10  ALL SV STATIONS ALONG MANGALORE LINE ARE CONSIDERED WITH  FUTURE                      miso                               FROM    MEC         0019                                                               4 UNIT    47 UNIT 48 UNIT 49 UNIT 50 UNIT 51        2    A    24 f8 24  FB 2   1                  _                 lt 4     1    gt   gt   u z MEC         0021                       x NOTE 5 6 7     NOTE 5 6 7 NOTE 5 6 7 9    NOTE   5 6 7 10 NOTE 5 6 7    P WORKING   O TOSS                212 127        08   225 937              242 388      CH  254 898Km  CH e275 644Km  SS FLOW   5 383 MMSCHD  APPX  DESIGN 2 29 TO 65  C  Ele 7     8   DESIGN CLASS    ES es PRESSURE   56 60 KG Cm2 G  So             a SECTION  VIII   Br DESIGN   92 KG Cm2 G       lt           lt            do SECTION  MI 1      x  LINE LEGEND  PROPOSED LINE A G              PROPOSED LINE  U G  24     46 4601 01        L _ MATERIAL SPEC   UNE         UNIT NO   PROCESS FLUID  RLNG   LINE SIZE  NOMINAL               VALVE  LEGEND               BALL VALVE FLANGE END             BALL VALVE BW END UPTO 1 2  SW END             PLUG VALVE BW END UPTO 1 2    SW END          PLUG VALVE FLANGE END   Dod GLOBE VALVE     90          o  um            cas       KOCHI KOTTANAD BANGLORE MANGLORE   o                NATURAL GAS PIPELINE PROJECT     e           PHASE 2      sa      gt       P  amp     FOR SV STATIONSALONG THE  PIPELINE FOR BANGALORE  MANGALORE    PHASE 2 PIPELINE  Ec SECTION   VII  amp  
62. 4  ports for IED interface    6 Extension Rack  Module for mounting in the same RTU Panel   Cabinet Nos  00 00 02   if applicable    a Extension Rack   Chassis   Back plane having minimum 10 slots with Lot 00 00 02  mounting arrangements along with power supply unit  CPU   IO Scanner  module   7 Lot 01 01 06  RTU Configuration for IO Points  Serial communication with IEDs and     testing of signals from SCADA System to Tag blocks in the RTU and  IEDs                                   Page 2 of 4                            1  Price Break  RTU for Centralised SCADA system  GAIL  KKBMPL Phase   II                                                                                     8   Packing       Packing of RTU Panel including RTU Accessories Lot 01 01 01  9   Supply of Software               Configuration   Diagnostic Software Nos  01 01 01  b Configuration Software along with software license  for 5 users  Nos  01 01 01       Hardware Dongle  in case software license key is not available  Nos  00 00 00  10   All design  detailed engineering and approval of documents  Inspection Lot 01 01 01  and submission of final documentations   11   Transportation  Loading  amp  Unloading  Insurance of RTU Panel  IO Lot  01 01 01  Modules  cables and accessories from Vendor s factory in India to Vendor  main site office godown  By reputed transporter approved by GAIL       SOR A 1 SOR A2 SOR A 3  Total for the Supply of one quantity as per SOR item  Must be  same as unit rate of RTU     s
63. 506      CH  63 364Km  CH  76 774Km            MEC         0003   mee        ee            30  x90 615 Km  APPX     API SL  Gr  X 70 80 U G PIPELINE          30   90 615 Km  APPX   API 5L  Gr  X 70 80 U G PIPELINE       LINE LEGEND  EXISTING        A G          EXISTING LINE U G  PROPOSED LINE A G              PROPOSED LINE 0 6                     30  P 01 0101   D1A      L MATERIAL SPEC   LINE NO   UNIT   NO     NO   PROCESS FLUD  RLNG   UNE SIZE  NOMINAL         VALVE LEGEND      Hpk BALL VALVE FLANGE END   pk  BALL VALVE BW END UPTO 1 2  SW END                PLUG VALVE BW END UPTO 1 2    SW END                PLUG VALVE FLANGE END              GLOBE VALVE                      KOCHI KOTTANAD    BANGLORE MANGLORE  NATURAL GAS PIPELINE PROJECT     PHASE 2   P  amp  ID FOR SV STATIONS ALONG THE  FOR BANGALORE MANGALORE                   PHASE 2 PIPELINE   SECTION I          rev                           ORS NO  MEC 230   05 28 M 001 0004 2                      FROM  MEC         0004          30 590 15       ____    U G PIPELINE    Vu durs                              2   it au S E E S ee         API 5L  Gr  X 70 80    r     I        Enn          YY YY c                LX                          ITY      IPS 1                        3    30     07 0701 01    24     07 0717 01      I  XXLS  0701       0701 FWT 0701  gt      FWI 0702        30  x30  x24      30 30 24         Gr     30       FWT 0705      W 0702  247  247  24                10     07 0713 01      247    07 0711 
64. 85  in Solar system for interfacing with RTU by  Solar panel vendor also provide modbus  details in modocon modbus format to  RTU SCADA vendor     Supply  amp  laying of cable for hardwired  signals   serial communication from Inst   TIC panel to RTU including glanding   termination  ferruling  dressing etc  both  end    Supply  amp  laying of cable for hardwired  signals from TIC INST panel to RTU  including glanding  termination  ferruling   dressing etc  both end    Supply  amp  laying of cable for hardwired  signals from TIC INST panel to         including glanding  termination  ferruling   dressing etc  both end     Supply  amp  laying of cable for hardwired  signals from TIC INST panel to         including glanding  termination  ferruling   dressing etc  both end          the hardwirded signal of field  instrument   IEDs from TIC to            Supply of communication cable with  connectors at both ends from TIC INST  to RTU including glanding  termination   ferruling  dressing etc  at TIC INST  cabinet end and laying of the same cable  up to RTU cabinet also Configuration at  RTU end by RTU vendor   Supply of communication cable with  connectors at both ends from Solar panel  to        including Laying  glanding   termination  ferruling  dressing etc  at  both ends                                                                 6 23    6 24    6 25    6 26    6 27    6 28    6 29    6 30    6 31    6 32    6 33    6 34    KOCHI KOTTANAD BANGALORE MANGALORE  MU      NATU
65. AD BANGALORE MANGALORE NATURAL  GAS PIPELINE PROJECT  PHASE ID  RTU FOR CENTRALISED SCADA SYSTEM  BID Doc No    05 51 23 ME  GAIL 094          Page 1 of 2             MECON LIMITED          BIDDER QUALIFICATION CRITERIA  BQC  FORM  KKBMPL                 Project of               Bidder  quoted under clause 4 1 1 criteria of NIT                 A  Details of Bidder Column to be filled by bidder  1  Name and address of Bidder  Tel No  Fax No  E mail No  and website address  Works location and address  2  Bidder has proven facilities for design  engineering  integration  testing as per cl   4 1 1  yes no   3  Area of operation of Bidder  3 1 Vendor of RTU  Yes No   3 2 Own RTU offered  Yes No   3 3 If not OEM of RTU then OEM name with Address    4  Letter from OEM for support for supplied RTU  if not OEM   Yes  No   B  Details of SCADA   supply of RTU for SCADA projects as executed by the Bidder  to ascertain fulfillment of tender conditions  BIDDER QUALIFICATION CRITERIA  BQC  FORM Column to be filled for the  PART   I  details for clause no  4 1 1  implemented projects  S N Details Project  1 0   Project Name  amp  Description  1 1   Details of the application  1 2   Details of pipe line  amp  services  1 3   No  of RTUs  1 3 1   Name of RTU owner  1 3 2   Make  amp  model no of RTU  1 4   Name  amp  address of owner s contact person  2 0   Telephone  FAX No  Email No  of owner s contact person  2 1  a  Any system breakdowns  b  Cause and duration of breakdown  2 2   For above
66. ANAD BANGALORE MANGALORE NATURAL GAS    MECON LI MI TED PI PELI NE PROJ ECT  PHASE 11              DELHI PJ      RTU FOR CENTRALISED SCADA SYSTEM  JOB Spec  No    MEC   23ME  05   E5  I   PJ S 094  RTU         BID Doc No    05 51 23 ME   GAI L  094  RTU                    ANNEXURE XVI to PJ            1 of 1                                  DEVIATION FORM             GAIL  INDIA  LTD  BID Doc No    05 51 23 ME  GAIL 094  RTU   ANNEXURE XVI to PJS Pagelof 1   MECON LIMITED    KOCHI KOTTANAD BANGALORE MANGALORE  NATURAL GAS PIPELINE PROJECT  PHASE II   PJS of RTU FOR CENTRALISED SCADA SYSTEM  JOB Spec  No             23       05   E5   I   PJS 094                         ANNEXURE XVI to PJS  RTU FOR CENTRALISED SCADA SYSTEM    DEVIATION FORM    Name of Bidder  Schedule of Deviation  Bidder shall  note that this is a    NO DEVIATION TENDER       Bidder may given here a consolidated list of deviations  clarifications  comments of all sections of the  bid package  which for an appropriate offer are considered unavoidable by him     Deviations  clarifications mentioned elsewhere in the offer shall not be bidding on the Client    Consultant and any such deviations if indicated elsewhere other than this form will render the offer  non responsive and shall liable to be rejected    Bidder shall state the reasons for the deviations in the    Remark    column          other clauses of the bid package shall be deemed to be fully complied by the Bidder     Only the deviations listed herein
67. ANALOGINPUTS    Typical specification of Analog Input Modules to be supplied is as given below     Input Type   Min 16 isolated  Current Inputs   Ranges    4   20 mA  0 5 V   Input impedance   Not less then 100 K for Voltage input  Not more then 0 4 K for current Input   Multiplexer        vendor   ADC type   12 bit binary   exclusive of sign bit    Series Mode Rejection   Greater than 30 db at 50 Hz    Common Mode rejection   Greater than 100 db at 50 Hz                                       LIMITED TECHNICAL 5                                      OFF                       834002 ELECTRICAL  amp  INSTRUMENTATION Nu  OIL  amp  GAS SBU  DELHI ce  DOCUMENT NO  Page 7 of 22  REMOTE TERMI NAL UNI TS         5  05  E5  099 REVISION   1  EDITION   1  Roll over error   1 bit  Temperature coefficient   0 00596 per degree C  Accuracy     0 1  of range including drop in resistor    8 0 ANALOG OUTPUTS    Specifications of Analog Output modules to be supplied is as given below     Output type   Min 4 Completely Isolated current  4 20 mA  outputs   DAC Type   12 bit binary  exclusive of sign bit    DAC span   10Vor5V   Output Range   4 20 mA DC   Isolation   Each output shall      isolated from logic and others to  500 Volts   Loading   1K ohm for Current outputs   Differential Linearity i   L S B    Accuracy     0 1  of range   Temperature coefficient   0 01         degree    of FSD   Update   within 10 msec    Retentivity    Set point value to      held                    till update   
68. AP ACROSS THE VALVE   gt 3 BAR       VALVE SHOULD NOT OPEN DURING START UP        8  ALL PG  PT CONNECTION SHALL BE TAKEN FROM 2  TWO ISOLATION     VALVES AND THEN AFTER If SHOULD BE CONVERTED TO REQUIRE    NPT CONNECTION        TY      9  GAS TAPPING TO VALVE ACTUATOR   10  GAS TAPPING FOR VALVE AP SWITCH                            24  U G PA 1 JOE 11  FOR PG  PT  DPT DETAL REFER MECON DRG  NO          4                   MEC 05 ES SD PT 001   gt              r     70 80 TAP OFF DETAILS AT 5   13 EDU LADY  PG            05 PG 004             12  EXTENDED STEM VALVE   13  DIRECT SURFACE CONTACT TYPE     SR NO   CONS  NO    CONS            Sk TOMES  CONS  02   GOMUKI SPINING MILLS                                             ee ee ee ee ee ee ee ee ee ee m    TYPICAL ARRANGEMENT FOR 24    SV 9  amp  13  REMOTE OPERATED    UO p re nee LRL  IER                     TAP OFF DETAILS      5   12  SR N0   CONS         CONS  NAME         AP OF                 fe                   S             03   oo PLLAPALAAN PLANT 8                                                                 VALVE LEGEND         24    U G             4                                                 i     Gr     70 80      1 2   12 NOTE   12  8  8     NOTE 12 X NOTE 13 J    tpp          BALL VALVE FLANGE END   pkr  BALL VALVE BW END UPTO 1 27 SW END            PLUG VALVE BW END UPTO 1 2    SW END            PLUG VALVE FLANGE END              VALVE                    PRELIMINARY DRAWING           ISSUED FOR  CON
69. BANGALORE MANGALORE NATURAL  GAS PIPELINE PROJECT  PHASE ID  PJS OF RTU FOR CENTRALISED SCADA SYSTEM          ELECT   amp  INST   SECTION    JOB Spec  No    MEC   23ME   05   ES I PJS  094           BID Doc No    05 51 23 ME  GAIL 094  RTU     ANNEXURE IV to PJS Page 3 of 3                      The Bidder s responsibility at site shall include all the activities necessary to be performed to  complete the entire job as per the contract requirements including the following as a  minimum     a   b            9   e   f     5     h     Receipt of hardware  software and checking the adequacy and completeness of supply   Storage  safety  security of the equipments  amp  other materials including software at site     Installation of the complete system including power supply  earthing  cable terminations   calibration  civil and electrical works     Checking of equipment installation    Checking of interconnection and overall system functionality    On line Offline debugging of the system    Coordination  interfacing  including obtaining relevant details  with Instrumentation   APPS sub vendor  CP system  amp  Electrical contractor  Telecom sub vendor directly or    through client for any disputes     On line testing and commissioning of SCADA system and testing of APPS system with  sub vendor     For installation  RTUs online testing and commissioning as per the specification of RTU  supplier recommendation  After these test  the SCADA system shall be put for SAT     RTU   SCADA ven
70. BE SHALL BE PROVIDED    8  ALL SY EXTENDED STEM BW  FULL BORE BALL VALVE       S   9  BURRIED VALVE SHALL BE PROVIDED WITH CORROSION PROTECTION COATING    10  FOR SV  amp  GOV DETAIL REFER DRG  NO  MEC 23ME 05 28 M 001  0023 0030   11  ALL SV STATIONS  amp  TAP OFF CHAINAGES HAS TO BE CONFIRMED BY GAIL    12  PG 5601 SHALL HAVE A RANGE OF 0 1 Kg Cm2 g  WITH    GAUGE SAVER                 2                                                   0021                                                   1          f             2 3 4 5   13  DIRECT SURFACE CONTACT TYPE        05602 FWT 5602_      14  AL S      ALONG MANGALORE LINE ARE CONSIDERED WITH  PENNE    5 Jh 242424 DESIGN PR    92 Kg Cm2  g  Pd TE     584 5601  24730         u           amp         PIG  HANDUNG  ELSE DEVICE         NOTE 8 9 10 NOTE 8 9 10          89 0          ISS UED FOR    2159 CH S308 00Km  CH 32472Km    CHe34105IKm                      a    CONSTRUCTI    2 jp a GOV        2  P 56 5605 DIA O       5602 8  P 56 5604 D1A        E     PROCESS DATA 4  e 1 2           ae           ome m       S  FLUID       NATURAL GAS RLNG  TEMPERATURE    6    WORKING    TO 55C   0    8 8    56 5603                       CH 347 0 Km     q FLOW       35 MMSCMD  APPX       E di e5c         600        onu         PRESSURE   52 55 KG Cm2 G   f   D  DESIGN   92 KG Cm2 6         1   68   he 5  68  1690              1                LEGEND                 PROPOSED LINE A G              PROPOSED LINE 0 6            24  P 56 5601 D1A     
71. C 234E 05 28 M 001  0028                  uu en TEMERE EIE SE         PxX           r                          24        NOTE 4 12      a    TYPICAL ARRANGEMENT FOR 24  5   2      amp  10 M   REMOTE OPERATED          J    24  U G P L l                                                            70 80           TYPICAL ARRANGEMENT FOR 24  14 M   REMOTE OPERATED                        A       CAS OVER OIL OPERATED VALVES  SHALL BE FAILED TO _   AL eo  OS oR    5  FOR ALL TAPPING FROM MAN UNE  THE FIRST ISOLATION VALVE SHALL       MEDE END TYPE AND OTHER SECOND VALVE MAY BE FLANI    T E TIN CEPI DI  TAP OFF DETAILS AT SV 2 M SUPPRESSION  SYSTEM     SR NO   CONS         CONS             AP OFF INTEGRATED INTERLOCK SHOULD      PROMDED N THE S ACTUATED         1    CONS  01   ARYA VAIDYASHALA n                  8       PG  PT CONNECTION SHALL BE TAKEN FROM 2  TWO ISOLATION  VALVES AND THEN AFTER IT SHOULD BE CONVERTED TO REQUIRE 2  NPT CONNECTION     E   9  GAS TAPPING TO VALVE ACTUATOR                     DETAILS AT 5   10       10  GAS TAPPING FOR VALVE AP SWITCH     11  FOR PG  PT  DPT DETAIL REFER MECON bRG               i  oso   WESTERN                           12  EXTENDED STEM VALVE   13  DIRECT SURFACE CONTACT TYPE     TAP OFF DETAILS AT 5   14        SR NO   CONS         CONS  NAME AP OFF    1    CONS  01   KASARGAD POWER CORP   8       VALVE  LEGEND    pide BALL VALVE FLANGE END  BALL VALVE BW END UPTO 1 27 SW END           PLUG VALVE BW END UPTO 1 2    SW END     HDG PLU
72. CORROSION PROTECTION COATING   7  FOR SV  amp  GOV DETAIL REFER DRG       MEC 23ME 05 28 M 001  0023 0030  8  ALL SV STATIONS  amp  TAP OFF CHAINAGES HAS TO BE CONFIRMED BY GAL   9  FOR SV 10 M  SEE         DRG  NO  MEC 23ME 05 28 M 001 fer   10  ALL SV STATIONS ALONG MANGALORE UNE ARE CONSIDERED WITH    FUTURE TAP OFF        FROM    MEC        0017    UNIT   41   UNIT 42          43 UNIT 44 UNIT 45    r    FLUID       NATURAL GAS RLNG   TEMPERATURE   s WORKING 8  FLOW       6 88 MMSCMD             DESIGN    29 TO 65 C  DESIGN CLASS    NOTE 5 6 7    6           5 6 7 9  CH e111 256Km     CH  131 008Km  44148    CH 162 424Km  f CH  178 507Km     PRESSURE   63 68          2        SECTION   VII DESIGN   92 KG Cm2 G     24   354 328 Km  APPROX     API   5L  Gr     70 80  U G PIPELINE                        x        e   m     i  De   x        e    SECTION M    API 5L  Gr     70 80 0 6 PIPELINE    LINE LEGEND      PROPOSED  LINE A G              PROPOSED LINE V G    24     40 4001 01        H MAGRAL SPEC       LINE        UNT NO       PROCESS FLUID  RENG   UNE SIZE  NOMINAL     VALVE LEGEND    pki BALL VALVE FLANGE END  pi  BALL VALVE BW END UPTO 1 2  SW END   pk  PLUG VALVE      END UPTO 1   2 SW END   HPQ PLUG VALVE FLANGE END   pod GLDBE VALVE     KOCHI KOTTANAD    BANGLORE MANGLORE  NATURAL GAS PIPELINE PROJECT     PHASE 2   P PED ID n sv                              THE   SECTION WAN VI  amp  VII    DRG       MEC 23ME 05 28 M 001 0018       FROM          gt                   
73. D DPT 003  PG     MEC O5 E5 SD PG 004  12  EXTENDED STEM VALVE   13  DIRECT SURFACE CONTACT TYPE             TAP OFF DETAILS AT 5   18                                                                  m I      wama m s ma    s ms s Qm m                                 I               2424187      i                     NOTE 12     NOTE 12  NOTE 12                      4       EEE pene ar ere M c                                              1          TAP OFF DETAILS      SV 19     T  ows o sumsit Paw                       EC  MAC E         VALVE LEGEND             BALL VALVE FLANGE END        BALL VALVE BW ENO UPTO 1 2  SW END          PLUG VALVE BW END UPTO 1 2  SW END        l m 24  U G PA                                 qM CHE ecc                LL Vey re    Gr     70 80  1 1  1 I                            4          TYPICAL ARRANGEMENT FOR 24  SV 18  REMOTE OPERATED    RN ur              E          2 NOTE 42      PLUG VALVE FLANGE END  KN  u JA wen  E POTERE bot     GLOBE VALVE   8 8         pkp    4              PR A        ISSUED FOR  CONSTRUCT  ON                        INDIA  LIMITED    MECON LIMITED                       PRELIMINARY DRAWING             KOCHI KOTTANAD   BANGLORE MANGLORE  NATURAL GAS PIPELINE PROJECT   PHASE 2     TYPICAL ARRANGEMENT FOR 24    SV 18   amp  SV 19 STATIONS    DRG              25     05 28    001  0030                         MECON LI MITED    KOCHI  KOTTANAD BANGALORE MANGALORE NATURAL GAS  PIPELI NE PROJ ECT  PHASE 11           DELHI PJ
74. D VALVE         x  i d     i        GAS ACTUATED ISOLATION VALVE         mE    PO ip     GAS ACTUATED ISOLATION VALVE                WITH HANDWHEEL           REDUCER      3        FLANGE       DX FLAME ARRESTOR  FA     p   DE    i WE REMOTE TERMINAL UNIT    B 3     8      1  j       E DIAPHRAM                          SIGNALLER          f VENT    lis e       RI SPECTACLE BLIND                 MATERIAL 5           LINE NO     UNIT                   AREA 00    FLUID 00 00 A1A B1A C1A D1A D4A    LINE SIZE  NOMINAL           NG NATURAL GAS  V VENT  D DRAIN     KOCHI KOTTANAD BANGLORE MANGLORE PH  2               pod   B                TURBINE METER    INSULATION JOINT  13      FLOW TEE                FIELD MOUNTED INSTRUMENT       CONTROL PANEL MOUNTED INSTRUMENT     ULTRASONIC METER    SCADA INDICATOR  CONTROLLER OR  OTHER DEVICES WITH OPERATOR  ACCESS TO ADJUSTMENT                       SYMBOLS  amp  ABBREVIATIONS                         ABBREVIATIONS  AE    ANALYZER SENSOR       GAS CHROMATOGRAPH                 ANALYZER INDICATOR   AT ANALYZER TRANSMITTER   FY FLOW COMPUTER    FQI   FLOW TOTALIZER  amp  INDICATOR  LG       LEVEL GAUGE    ZSH ZSL   LIMIT SWITCHES  OPEN CLOSE   TI TG TEMPERATURE INDICATOR  GAUGE  TE TEMPERATURE ELEMENT         THERMOWELL ax       DPI DPG DIFF  PRESSURE INDICATOR  GAUGE  DPT DIFF  PRESSURE TRANSMITTER   PI PG    PRESSURE INDICATOR  GAUGE   pT PRESSURE TRANSMITTER    FC FO       FAILURE       CLOSE OPEN          10    LOCK OPEN   FIC PIC  FLOW PR
75. Designation of communication protocol   51  Type of protection   52  Type of isolation   53  MTBF h   54  Equipment availability     55  Power requirement W   56  The standards to which modem conforms to   POWER SUPPLY MODULE   57    Module designation  58    Nominal input voltage V  59    Operating voltage range    60    Output voltage range V  61    Input voltage protection kV  62  Output voltage protection kV  63    MTBF h  64    Equipment availability    65    Power requirement for a fully equipped RTU W                                     KOCHI KOTTANAD BANGALORE MANGALORE NATURAL GAS  a m PIPELINE PROJ         PHASE 11   PJ S OF RTU FOR CENTRALISED SCADA SYSTEM       JOB Spec  No    MEC  23       05    5  1  PJS 094  RTU    V4    J  ELECT   amp  INST  BID Doc No    05  51  23        GAI L  094  RTU  rur  S CION ANNEXURE II to PJ S Page 1 of 1                   ANNEXURE   II    I  O COUNT  amp  POWER SUPPLY    DETAILS FOR NEW RTUS          KOCHI KOTTANAD BANGALORE MANGALORE NATURAL GAS PIPELINE PROJECT                  PJS OF RTU FOR CENTRALISED SCADA SYSTEM  BID Doc No    05 51 23 ME  GAIL 094  RTU     MECON LIMITED DELHI       JOB Spec            23ME   05   E5   I   PJS 094                ELECE a SECUN ANNEXURE   II to PJS Rev 0    Page 1 of 4                                    1   gt  Port   H bl M     bem   A     eem         sem   Do    M   uum    EL  CP      EL        DI  EL cP    DO  EL CP           7   me  egenum     2 RTU SVA    sva          14 6 25 04   1748 29
76. EL     27 SCRAPPER LAUNCHER RECEIVER    SHALL HAVE SCRAPER HANDUNG     FACILITY COMPIRING OF    JIB CRANE  amp     TROLLY AND SHALL          QUICK OPPENING CLOSURE       3  SCRAPPER LAUNCHER RECENER SHALL BE SUITABLE FOR  HANDUNG  INTELLIGENT PIGS                               4  DELETED        5  SCRAPPER DOOR MECHANISM TO BE CONSTRUCTED SUCH THAT THE DOOR         CAN        BE OPENED UNLESS SCRAPPER TRAP IS FULLY DEPRESSURISED       6  ALL BALL VALVES 2   amp  BELOW SHALL      FULL BORE ONLY     7  ONUNE RETRMEL TYPE CORROSION MONITORING COUPON AND  CORROSION PROBE SHALL BE PROVIDED        8  ALL SV EXTENDED STEM BW  FULL BORE BALL VALVE   9  BURRIED VALVE SHALL BE PROVIDED WITH CORROSION PROTECTION COATING   10  FOR SV  amp  GOV DETAIL REFER DRG  NO  MEC 23ME 05 28 M 001  0023 0030    11  ALL SV STATIONS  amp  TAP OFF CHAINAGES HAS TO BE CONFIRMED BY                     Bis e                             3  DIRECT SURFACE CONTACT TYPE    4  SV 26  amp  27 BOTH ARE MANUALLY OPERATED    15  ALL SV STATIONS WITHIN KERALA STATE  SV s HAVING FIXED CONSUMERS  amp     SV 26  27  NEAR CITY  ARE CONSIDERED WITH FUTURE TAP   OFF  HOWEVER  OUT OF REST NINE No  SV s FIVE No  OF THEM ARE WITH FUTURE                 amp  FOUR No  ARE WITHOUT FUTURE TAP OFF  TO BE DECIDED ON THE BASIS    16  SUPAY        Wini BAL VUE ALONG wm BUND FLANGE     17  FOR INTERCONNECTION OF KKBMPL  PHASE 2  WITH DABHOL BANGALORE        SEE  DETAL B                 FLUID       NATURAL GAS RLNG   TEMPERATURE  WOR
77. END    PROPOSED UNE A G         PROPOSED LINE 0 6    24     30 3001 01    8  P 30   3001 D1A         MATERIAL SPEC   UNE NO   k UNIT NO   PROCESS FLUID  RLNG   UNE SIZE  NOMINAL     VALVE LEGEND             BALL VALVE FLANGE END  pk        VALVE BW END UPTO 1 2  SW END   epp      PLUG VALVE BW END UPTD 1 2  SW END                     VALVE FLANGE END    IS SUED FOR        GLOBE VALVE   CONSTRUCTION     77               LIMITED      KOCHI KOTTANAD   BANGLORE MANGLORE    NATURAL GAS PIPELINE PROJECT     PHASE 2   P  amp     FOR SV STATIONS ALONG THE  PIPELINE        BANGALORE   MANGALORE               2 PIPELINE   lt   SECTION V                            6013              API  EL Gr  5270780          247x247x24      VOX                UNIT 31 UNIT 32            10 3301  TJeTJ            alls  A           8 9 10 14          8 9 10 14  CH  514 00Km  CH  522 00Km     NOTE 10                Au Ne    18   DABHOL BANGALORE         METERING SKID FOR INTERCONNECTION OF DABHOL   BANGALORE PIPELINE WITH KKBMPL         PIPELINE    DD            24     33 3301 01      24  x24 x24     NOTE   1  40     3301  3 4   8    an      SS    pe     24  P 33 3302 D1A    3 4           1    NOTE 7                  DETAIL B                        ISSUED FOR    CONSTRUCTION   1            ALL VENTS SHALL BE LOCATED MIN             OF           PIG  HANDLING  DEVICE        2  PC 3301 SHALL HAVE    RANGE OF 0 1 Ka cma a  WITH A GAUGE SAVER     18  DABHOL BANGALORE P L                 ABOVE  THE HIGHEST LEV
78. ENERAL         SYMBOLS                                   lt                                               a  ated OLS Nt       SPRING_OPERATED ACTUATOR     AUTOMATICALLY OPERATED ACTUATOR   GENERAL       ELECTRIC MOTOR OPERATED ACTUATOR       GENERAL    VALVE CLOSED ON FAILURE OF ACTUATING  ENERGY        ENERGY     VALVE RETAINS POSITION ON FAILURE OF  ACTUATING ENERGY        TURBINE  GENERAL   COMPRESSOR  GENERAL   ROTARY PISTON COMPRESSOR   PISTON COMPRESSOR   JET BOOSTER   FAN  GENERAL   HEAT EXCHANGER WITHOUT COUNTERFLOW    COUNTERFLOW HEAT EXCHANGER     Lp  PDQ  PLATE HEAT EXCHANGER                 FINNED HEAT EXCHANGER WITH VENTILATOR      BLIND PLATE     FIGURE 8  PLATE  BLIND PLATE       FUNCTION  gt o      FIGURE 8  PLATE  GOGGLE PLATE IN  FUNCTION   ORIFICE PLATE   INSULATING FLANGE   INSULATING COUPLING  STRAIGHTENING VANES   RUPTURE DISK     SIGHT GLASS  GENRAL   EXPANSION JOINT   SILENCER   PULSATION DAMPENER   MIXING NOZZLE              FLANGE CONNECTION                                 VALVE OPENED ON FAILUR   OF ACTUATING      SYMBOLS  GAS FILTER  GENERAL    CARTRIDGE FILTER    GAS SORPTION FILTER _   HQUID FILTER  GENERAL     Y  TYPE STRAINER    PROCESS PRIMARY LINE      ELECTRIC LINE  PNEUMATIC LINE  CAPILLARY LINE  INSTRUMENT LINE  HEAT TRACING LINE      JACKETED  amp  HEATED LINE    VENT STACK  SCRAPER TRAP     LIQUID PUMP GENERAL     CENTRIFUGAL PUMP     LIQUID RING PUMP   PISTON PUMP  DIAPHRAGM PUMP                  CORROSION PROBE    Lil                 
79. ESS  INDICATING CONTROLLER          INTERLOCK   XR oC IOCAL REMOTE INDICATION  XSL   gt    LOCAL REMOTE SWITCH         HAND SWITCH HIGH       HAND SWITCH LOW    FLOW TRANSMITTER       FE FLOW ELEMENT       9 0        QUICK OPENING END CLOSURE        ISSUED FOR    QUOND CT        A                            1     1    C1A D1A                    SP    NG                                                 PRESSURE SWITCH               Cauri s          FLOW RECORDER    PRESSURE IND RECORDER        TEMP  IND  RECORDER 22          PRESSURE SWITCH LOW  LEVEL SWITCH HIGH  LEVEL SWITCH LOW   LEVEL ALARM HIGH  LEVEL ALARM LOW  CONDENSATE DRAIN  1504 3004 RATING  4004 6004 RATING     PNEUMATIC  ELECTRIC  SIGNAL TRANSMITTER  FULL BORE  gt      L  SAMPLER    2 NATURAL GAS    VENT   AUTO SAMPLER  CORROSION PROBE  CORROSION COUPON  ACTUATED VALVE  SHUT DOWN VALVE  LEVEL CONTROL VALVE    PRESSURE CONTROL VALVE   FLOW CONTROL VALVE       GAIL  INDIA  LIMITED       KOCHI KOTTANAD  BANGLORE MANGLORE  NATURAL GAS PIPELINE PROJECT     PHASE 2                na 207      Edo    s a See                       ee          2       E LS es m  N d          oS          1  ALL VENTS SHALL BE LOCATED MIN  HEIGHT OF 3 MIR      i    ABOVE THE HIGHEST OPERATING LEVEL    IB c   2  ALL BALL VALVES 2   amp  BELOW SHALL BE FULL BORE ONLY  i   3  ALL UNMANNED STATION SHALL BE PROVIOED WITH   02 FLOODING  SYSTEM              MANNED STATION SHALL BE WITH      200 FIRE  SUPPRESSION SYSTEM       4  SCRAPPER TRAP SHALL HA
80. G      1           Eu                 ds    os              LINE LEGEND         JE                                                1        PROPOSED UNE A G    3 5 j           T wen F              PROPOSED UNE U G  1 A 5 4      24  P 34   3401 D1A    x       LH         ISSUED FOR        S 1 X             FROM   gt _2     07 0718  1A   DAE   e zX      CONSTRU CTION          SPEC                  0005       z      fee     PROCESS FLUID  RLNG     411      uh   i VALVE LEGEND                    a one                   VALVE FLANGE END    E                          VALVE BW END UPTO 1 2  SW END   a     0           VALE      END uPTO 1V2  sw END         Hats GLOBE VALVE   E          PRELIMINARY DRAWING  A i    Pg   ARTRIOGE FLIER   bp                      INDIA  LIMITED  ME uM ui EM              DESPATCH FACILITY      1  OF PHASE  FOR  MANGALORE SPURLINE    MECON LIMITED    KOCHI KOTTANAD  BANGLORE  MANGLORE  NATURAL GAS PIPELINE PROJECT     PHASE 2     P  amp  ID FOR DESPATCH              AT IP 1  OP PHASE 2  FOR MANGALORE SPURLINE   SECTION           FROM                   0015    UNIT   35    2    24 FB  pep    NOTE 5 6 7  CH  15 900Km      SECTION M     gt  lt                                     m     D  De           EA  e    SECTION II    API 5L  Gr  X 70 80 U G PIPELINE    UNIT 37    UNIT 38     CH  63 739Km     UNIT 39    NOTE   5 6 7  CH  80 859Km     24   354 328 Km  APPROX     ISSUED FOR    CONSTRUCTION     1  ALL VENIS SHALL      LOCATED       HEIGHT  OF 3 MR   ABOVE THE 
81. G CABLES SHALL BE AS PER RESPECTIVE CLAUSE OF PJS RTU WITH OTHER PANEL             copyright MECON        right reserved                            7  EO asas    monn  1                 CSCC           DRG  N  DRC NO VE0 05 F5 054 RTU 01    01                                        INLET             SUPERVISORY             amp                amp  SDV SYSTEM   4    LAPTOP  amp   COLOUR  PRINTER    DOTMATRIX  PRINTER  amp  FLOW    2E COMPUTER      TURBINE RPD    METER  METERING PARAMETERS    METERING  PT  amp  TT    L              PULSE INPUT  P        ELECTRICAL HARDWIRED SIGNAL  SERIAL COMMUNICATION    5 485 232     1  ALL SERIAL PORT      RTU SCADA SHALL BE   5 485  amp  PROTOCOL FOR COMMUNICATION SHALL      MODBUS                           o    o j U j  o   REV WO  DATE ZONE                                        99          Rs       REFERENCES      Copyright                   right reserved     THIS DRAWING IS THE PROPERTY OF MECON AND ISSUED FOR THE SPECIFIC PROJECT MENTIONED THEREIN  THIS IS NOT TO BE COPIED OR USED FOR OTHER PROJECTS UNLESS EXPRESSLY PERMITTED BY MECON   SECTION  INSTRUMENTATIUN     ws                    pam              prese         PROPOSED SYSTEM        MECON LIMITED  Form fom        ARCHITECTURE FOR del    METERING SKID SCALE   NTS  SH 1 OF 1    REV  APPROVED  R  SHUKLA  DRG  NO  MEC SD 05 E5 1 SA   01 9    3    2                           MECON LIMITED   KOCHI KOTTANAD BANGALORE MANGALORE NATURAL GAS  eds PI PELI NE PROJ                    11   PJ 
82. G VALVE FLANGE END    poy          VALVE     ISSUED FOR    CONSTRUCTION                                               LIMITED        KOCHI KOTTANAD    BANGLORE   MANGLORE     NATURAL GAS PIPELINE PROJECT       PHASE 2     TYPICAL ARRANGEMENT FOR  24  SV 2 M   10 M   amp  14 M    STATIONS    DRG  NO   MEC 234E 05 28 M  001  0029                 1  ALL VENT SHALL BE LOCATED MIN  HEIGHT OF 3 MTR  ABOVE THE HIGHEST       OPERATING LEVEL  ey ue       2  ALL BALL VALVES 2     amp  BELOW SHALL      FULL          ONLY    3  NOTE DELETED       o oig            4  ALL GOV  GAS OVER OIL OPERATED VALVES  SHALL BE FAILED TO La  STAY PUT VALVE        5  FOR ALL TAPPING FROM MAIN LINE  THE FIRST ISOLATION VALVE SHALL  BE WELDED END TYPE AND OTHER SECOND VALVE MAY BE FLANGED  CONNECTION      6  ALL UNMANNED STATION SHALL BE PROVIDED WITH CO2 FLOODING  SYSTEM AND ALL MANNED STATION SHALL BE WITH FM   200 FIRE  SUPPRESSION SYSTEM               7  INTEGRATED INTERLOCK SHOULD BE PROVIDED IN THE GAS ACTUATED       VALVE SUCH THAT WITH HIGH AP ACROSS THE VALVE   gt 3 BAR                  SHOULD NOT OPEN DURING START UP              2                                   gt  DR D SEEM Fal bpd  8  ALL PG  PT CONNECTION SHALL BE TAKEN FROM 2   TWO ISOLATION  VALVES AND THEN AFTER IT SHOULD BE CONVERTED TO REQUIRE  NPT CONNECTION   3  GAS TAPPING  TO VALVE ACTUATOR   10  GAS TAPPING FOR VALVE AP SWITCH   11  FOR PG  PT  DPT DETAIL REFER MECON DRG          PT   MEC 05 E5 SD PT 001      DPT     MEC 05 E5 S
83. GAIL  India  Limited   A Govt  of India Undertaking   A Navratna Company  NEW DELHI  INDIA    KOCHI  KOTTANAD BANGALORE  MANGALORE  NATURAL GAS PI PELI NE PROJ ECT  PHASE 11     BI D DOCUMENT FOR  PROCUREMENT OF    RTU FOR CENTRALI SED SCADA SYSTEM    UNDER OPEN I NTERNATI ONAL  COMPETI TI VE BIDDING    E Tender no  8000004252    BI D DOC  NO    05  51  23 ME  GAIL   094    VOLUME  II OF II  PREPARED AND I SSUED BY    MECON LI MI TED   A Govt  of India Undertaking     Delhi  India  MAY   2012          KOCHI KOTTANAD BANGALORE MANGALORE NATURAL  GAS PIPELINE PROJECT                  RTU FOR CENTRALISED SCADA SYSTEM    BID Doc No    05 51 23 ME  GAIL 094 Page 1 of 1  GAIL  INDIA  LTD                       INDEX                    OF II           FOR CENTRALISED SCADA SYSTEM  FOR KKBMPL  PHASE II  PROJECT    BID DOC  NO   05 51 23 ME  GAIL 094    MATERIAL REQUISITIONS   BIDDER QUALIFICATION CRITERIA  BQC  FORM   VENDOR DATA REQUIREMENT   VENDOR DRAWING  DATA APPROVAL PROCEDURE  VENDOR DRAWING  DOCUMENT SUBMISSION SCHEDULE    PARTICULAR JOB SPECIFICATION FOR RTU FOR CENTRALISED  SCADA SYSTEM      JS No   MEC   23ME  05  E5     PJS 094  RTU         0 31 05 2012 ISSUED FOR BID Harsha Rakesh Pankaj                Revision Date Description Prepared by Checked by Approved by                                  GAIL  INDIA  LIMITED  New Delhi       KOCHI KOTTANAD BANGALORE MANGALORE  NATURAL GAS PIPELINE PROJECT  PHASE ID    MATERIAL REQUISITION  RTU FOR  CENTRALISED SCADA SYSTEM    MR NO
84. HALL BE PROVIDED WITH CO2 FLOODING  SYSTEM AND ALL MANNED STATION SHALL BE WITH FM 200 FIRE  SUPPRESSION SYSTEM        7  INTECRATED INTERLOCK SHOULD BE PROVIDED IN THE GAS ACTUATED  VALVE SUCH THAT WITH HIGH      ACROSS THE VALVE   gt 3 BAR       s          SHOULD NOT OPEN DURING START UP       8  ALL PG  PT CONNECTION SHALL BE TAKEN FROM 2    TWO ISOLATION    Do VALVES AND THEN AFTER M SHOULD BE CONVERTED TO REQUIRE             gt           CONNECTION       2     p oF E       9  GAS TAPPING TO VALVE  ACTUATOR   y    ES 7     10  GAS TAPPING FOR               SWITCH      Se Se OR ees      gt  AES 11  FOR PG        DPT DETAIL REFER MECON DRG  NO      MM Ee UTI  r        BETA  3         S QR ot  OPERATED VALVES  SHALL BE FAILED lt TO                PG          05   5 50  12  EXTENDED STEM VALVE          13  DIRECT SURFACE CONTACT                          14  THIS IS TYPICAL ARRANGEMENT FOR 30    SV STATIONS        FOR 30    SV 2 SEE TYP  DRG  NO         2       05 28    001 0028        1 30    U G P L   I                               y          TYPICAL ARRANGEMENT FOR 30    SV  REMOTE OPERATED       i              VALVE LEGEND   Dk BAL VALVE FLANGE END  pid BALL VALVE BW END UPTO 1 2  SW END   pk      PLUG VALVE BW END UPTO 1 2    SW END      PK    PLUG VALVE FLANGE END                VALVE  2          PRELIMINARY DRAWING  y GAIL  INDIA  LIMITED    KOCHI KOTTANAD BANGLORE  MANGLORE  NATURAL GAS PIPELINE PROJECT       PHASE 2        TYPICAL ARRANGEMENT FOR 30    SV STATIONS   
85. HANISM TO BE CONSTRUCTED SUCH THAT THE DOOR       CAN NOT BE OPENED UNLESS SCRAPPER TRAP IS FULLY DEPRESSURISED       ONLINE RETRIVEL TYPE CORROSION MONITORING COUPON AND  lt  lt   CORROSION PROBE SHALL BE PROVIDED         FOR SV  amp  GOV DETAIL REFER ORG  NO  MEC 23ME 05 28 M 001  0023 0030  10  METERING SHALL BE DONE BY ULTRASONIC FLOW METER WITH  CONTROL PANEL MOUNTED FLOW COMPUTER  INSTALLATION SHALL         AS PER AGA9 LATEST EDITION  HOWEVER THERE SHALL BE          THREE STREAMS OF METERING  2W 1S      11  ENVIRONMENTAL ENCLOSURE REQUIRED FOR METERING INSTRUMENTS   INSULATION OF USM METER RUN  amp  IMPLUSE LINES OF METERING  INSTRUMENT IS REQUIRED        12  PROVISION SHALL BE KEPT      HOOK UP METERING PR     amp  TEMP   FLOW PARAMETERS WITH SCADA   13  THESE VALVES ACROSS THE USM SHALL BE PROVIDED WITH LIMIT SWITCHES     14  PG 3405 SHALL HAVE    RANGE OF 0 1 Kg Cm2 g  WITH A GAUGE SAVER           Vx 5       t    D                               API 5L  Gr     70 80 0 6 PIPELINE      24   354 328       APPROX                            DESIGN PR      92 Kg Cm2  9   98 3401  307247     E   d     EN                      SECTION II        5                      FLUID         NATURAL GAS RLNG I TEMPERATURE  WORKING   0 55     DESIGN    29 TO 65  C    5                CLASS   600  PRESSURE   75 78 KG Cm2 G  909              24  P 34 3409   D1A    FLOW    7 053 MMSCMD                                                                                         DESIGN   92 KG Cm2 
86. HIGHEST OPERATING LEVEL         3  ALL BALL VANES 2  amp  BELOW SHALL      FULL BORE ONLY     4  ALL UNMANNED STATION SHALL BE PROVIDED WITH C02 FLOODING  SYSTEM AND ALL MANNED STATION SHALL BE WITH FM 200 FRE  SUPPRESSION SYSTEM   5  ALL SV EXTENDED  STEM BW  FULL BORE BALL VALVE     6  BURRIED VALVE SHALL BE PROVIDED WITH CORROSION PROTECTION COATING   7  FOR SV  amp  GOV DETAIL REFER DRG              2       05 28    001 0023 0030    8  ALL SV STATIONS  amp  TAP OFF CHAINAGES HAS TO BE CONFIRMED BY GAL          9  FOR SV 2 M                 DRG  NO  pe hp la head ys     FLUID   NATURAL GAS RLNG TEMPERATURE    WORKING     FLOW   7 04 MMSCMD             DESIGN    29 TO 65      DESIGN CLASS  PRESSURE   70 76 KG Cm2 G     DESIGN   92 KG Cm2 G     LINE LEGEND    PROPOSED LINE A G              PROPOSED LINE U G    24 P 34   3401 D1A        L_ MATERIAL SPEC          LINE Ng   UNIT  PROCESS FLUID  RUNG     UNE SIZE  NOMINAL   VALVE_LEGEND           BALL VALVE FLANGE END  pk  BALL VALVE BW END UPTO 1 2  SW END           VALVE BW END UPTO 1 2  SW END   IT PLUG VALVE FLANGE END   GLOBE VALVE     PRELIMINARY DRAWIN G    OCHI    KOTTANAD BANGLORE MANGLORE  NATURAL GAS PIPELINE PROJECT     PHASE 2   P  amp  ID FOR SV STATIONS ALONG THE  PIPELINE FOR BANGALORE MANCALORE  PHASE 2 PIPELINE    SECTION   1  amp      CA em B       caoz                  NO  MEC 23ME 05 28 4 001  0016                     gt   5  a         8  lt                      5     El B                   p E ws        2  
87. INE PROJECT  PHASE II     DELHI PJS OF RTU FOR CENTRALISED SCADA SYSTEM          Job Spec  No             23       05   E5   I   PJS 094           BID Doc No    05 51 23 ME  GAIL 094  RTU   Rev  0 Page 3 of 24    ELECT   amp  INST   SECTION                      1 0    1 1     1 2     1 3     2 0    INTRODUCTION     The purpose of this specification is to define the outline requirement of Remote Terminal Unit           for  Supervisory Control and Data Acquisition  SCADA  System for GAIL s Kochi Kottanad Banglore Mangalore  Natural Gas Pipeline     Phase II  referred as KKBMPL PH II  including all despatch terminal  Sectionalising  Valve  SV  stations  Intermediate Pigging stations  Receiving Terminals used for RLNG transporting services     In case of any conflict between the specifications  enclosed data sheets  enclosed attachments  related codes and  standards etc  Vendor shall refer the matter in writing to the purchaser  and shall obtain clarification in writing  before starting the manufacturing  Supply   Engineering of the item  The decision of the purchaser shall be  binding on the vendor     Vendor shall be responsible for selection of the correct system to meet the purchaser s specifications  In case of  any modification   change in selected equipment model has to be changed at a later date to meet the Purchaser   s  Specifications  the same shall be done by the vendor without any price and delivery implications     BRIEF PROJECT DETAIL    M s GAIL  INDIA  LIMITED h
88. KANNUR      O        516     2    2 CH  195 114 KM        gt      LI  X       178 507                                CH  162 351 KM   x s      gt         Pah LI               148 303                  e     am                      131 096        x  s          CAMP OFFICE     CALICUT           111 256 KM   x          2     E IP 1M  5       96 261          DB    gt   0        55        CH  80 705 KM   x       lt   LU               L         CH  63 739 KM                      N  CH  46 008 KM  H         CAMP OFFICE     MALAPPURAM CAIL STORE  MALAPPURAM  SECTION II       SECTION  VI                 SECTION  II SECTION  I       SECTION II       SECTION   II    SECTION                    108 545 KM   CH  123 730                        SV STATION    GRADE  amp  THICKNESS    DESPATCH TERMINAL  RECEIVING TERMINAL IP STATION   THICKNESS IN MM        em    s    em    sus          SEE   oy    SIZE  7    SECTION DESCRIPTION SIZE  amp  LENGTH    SECTION I IP FACT UM TO IP   1 KOOTTANAD API   5L Gr X   70   12 7  15 9         1 KOOTTANAD TO IP   2  amp        1 KOOTTANAD TO 5   1      IP 2 TO SV 15    SECTION II API   5L   Gr X   70 80   10 37     710 3    SECTION  III    SECTION V SV   21 TO R T AT SINGASANDRA    SV 1M TO SV    7M    SV    M TO 5   13      API 5L   Gr X   70 80      API 5L Gr X 70 80   10 3        10 3    API 5L 6r X 70 80   10 3              710 3  159       SECTION VI API   5L    Gr X    70 80      SECTION  VII API   5L    Gr X    70 80      SECTION VIII   SV 13M TO R T  
89. KING          TO 55C  DESIGN    29 TO 65C    FLOW       23 MMSCMD                 DESIGN CLASS   6004    PRESSURE   45 47          2      DESIGN   92 KG cm2 6     LINE  LEGEND     PROPOSED UNE A G                PROPOSED LINE 0 6             EXISTING UNE 0 6  BL                  EXISTING UNE A G  EIL     24  P 33 3301   D1A  B  P 33 3301 D1A      L    MATERIAL SPEC           PROCESS FLUID  RLNG   UNE SIZE  NOMINAL     VALVE LEGEND    pk  BALL VALVE FLANGE END   pr         VALVE BW END UPTO 1 27 SW END   pk      PLUG VALVE BW END UPTO 1 2    SW END               VALVE FLANGE END    pod GLOBE VALVE     PRELIMINARY DRAWING      G amp D             LIMITED             _             LIMITED    KOCHI KOTTANAD    BANGLORE MANGLORE  NATURAL GAS PIPELINE PROJECT     PHASE 2     P amp ID        RECEIVING TERMINAL AT BANGALORE   CH  529 70 Km     SECTION V     NO  MEC 234E 05 28 M 001 0014                                1  ALL VENTS SHALL      LOCATED MIN  HEIGHT OF 3 MIR       ABOVE THE HIGHEST OPERATING LEVEL                  2  DIRECT SURFACE CONTACT          3  ALL BALL VALVES 2    amp  BELOW SHALL BE FULL BORE ONLY    4  ALL UNMANNED STATION SHALL BE PROVIDED WITH CO2 FLOODING  SYSTEM AND ALL MANNED STATION SHALL BE WITH FM 200 FIRE  SUPPRESSION SYSTEM      5  SCRAPPER TRAP SHALL HAVE FEATURE FOR WORKING AS LAUNCHER    AS WELL AS RECEIVER i e  BI  DIRECTIONAL     6  SCRAPPER LAUNCHER   RECEIVER SHALL BE SUIATABLE FOR HANDLING  INTELLIGENT PIGS               ed  7  SCRAPPER DOOR MEC
90. LORE  a NATURAL GAS PIPELINE PROJECT  PHASE ID  PJS OF RTU FOR CENTRALISED SCADA SYSTEM  Job Spec  No            23       05   E5   I   PJS 094  RTU   z            BID Doc No    05 51 23       GAIL 094           Rev  0 Page 18 of 24  20 0 TEST EQUIPMENTS   20 1 Vendor shall include adequate test equipments  amp  tools for testing  calibration as required for supplied items   20 2 Vendor to supply 6 nos of licensed software needed for configuration and programming of         Diagnostics  software for RTU along with necessary cables connectors  documentation and accessories       the supplied  software should be licensed to GAIL  Two set of software to be installed in PDT and other to be installed at  Server Workstation in Noida  Bangalore  Mangalore  and Kochi  Software should have provision for remote  configuration download of configuration to RTU through RTU polling channels from MS   20 3 Portable Programmable Diagnostic Test Unit  PDT Unit  shall be supplied with latest configuration  The PDT    shall be latest Intel Pentium with active matrix display and fully configured and loaded with all the RTU  configurations and diagnostic software  All the necessary cables and connectors shall be supplied with the    PDTs     MINIMUM SPEC FOR PORTABLE PROGRAMMABLE DIAGNOSTIC TEST UNIT  PDT UNIT      The hardware shall be provided from proven sources  hand held service terminal equipment of Manufacture    Laptop computer from LENOVO  HP DELL     It shall be possible to use the PDT 
91. M   SV 13 M   amp  SV 14 M  SEE TYP  DRG  NO             23ME 05 28 M 001 0026 0030              a ae                 24424127  24          P L  24    U G P L     gt  1  amp      ERE          9      I    MOTE I2     NOTE 12  NOTE 12    I         7                       w                                                               we           Ll MEME    TYPICAL ARRANGEMENT FOR 24  SV  REMOTE OPERATED                  VALVE  LEGEND        p amp js BALL VALV   FLANGE END  pir  BALL VALVE BW END UPTO 1 2  SW END   pK  PLUG VALVE BW END UPTO 1 2    SW END          PLUG VALVE FLANGE END      px GLOBE VALVE                     ISSUED FOR  CONSTRUCTION                 KOCHI KOTTANAD    BANGLORE MANGLORE  NATURAL GAS PIPELINE PROJECT     PHASE 2                            TYPICAL ARRANGEMENT FOR 24  SV STATIONS   REMOTE OPERATED  DES    DRG  NO  MEC 23ME  05 28 M  001  0025                                      51  ALL VENT SHALL   2  OPERATING LEVEL 2252 ag  2  ALL BALL VALVES 2     amp  BELOW SHALL BE FULL BORE  NOTE DELETED       puto                       LOCATED MIN  HEIGHT OF 3 WIR  ABOVE THE HIGHEST                     Y                              4  ALL GOV  GAS OVER OIL OPERATED VALVES  SHALL BE FAILED       A              OL OF      5  FOR ALL TAPPING FROM        LINE  THE FIRST ISOLATION VALVE SHALL  BE WELDED END TYPE AND OTHER SECOND VALVE MAY BE FLANGED  CONNECTION    6  ALL UNMANNED STATION SHALL BE PROVIDED WITH CO2 FLOODING      SYSTEM AND ALL MANNED STATION SHALL
92. MENTATION        OI L  amp  GAS SBU  DELHI ee       DOCUMENT NO  Page 4 of 22    REMOTE TERMI NAL UNITS         S  05  E5  099 REVISION   1    EDITION   1       1 0 GENERAL    The RTU s shall be 32 bit microprocessor based programmable units with both erasable RAM  and ROM memory  Each of the RTUs shall have its own processor  memory  battery backed  power supply unit  amp  communication processors confirming to communication protocol like  DNP 3  Ethernet etc and 1 0 cards complete in all respects  The RTUs shall have TCP IP port  and serial port for polling from Master Station  amp  Emergency Master Station     All RTU shall be modular and from the same model product line with identical capabilities   The RTU 1 0 Modules shall be interchangeable without any interruption  RTU shall be  reliable  field proven and evolutionary state of the art     The 1    cards shall not be combined for the functionalities i e  each card shall dedicated  modules for Analog input  Analog output  digital Input  Digital output etc  The RTU s shall be  designed to function such that no single point of failure or the inadvertent leaving of a  printed circuit board out of the RTU shall cause a control mal operation or result in any false  operation or continuous communication transmission     The complete RTUs shall be supplied with all its components including the cabinets  The  cabinets should be weather proof and suitable for non air conditioned room  The actual  layout of RTU along with its int
93. N               VALVE     PRELIMINARY DRAWING                INDIA  LIMITED    KOCHI KOTTANAD  BANGLORE  MANGLORE  NATURAL GAS PIPELINE PROJECT     PHASE 2          amp     FOR SV STATIONS ALONG THE  PIPELINE FOR BANGALORE MANGALORE    PHASE 2 PIPELINE   SECTION  IV amp  V                 DRG  NO         23  6 05 28    001 0012                         3  ALL BALL VALVES 2 NO E T T    4  ALL UNMANNED STATION SHALL BE PROVIDED WITH CO2 FLOODING  SYSTEM AND ALL MANNED STATION SHALL BE WITH FM 200 FIRE  SUPPRESSION SYSTEM   5  ALL SV EXTENDED STEM BW  FULL BORE BALL VALVE   6  BURRIED VALVE SHALL BE PROVIDED WITH CORROSION PROTECTION COATING   7  FOR SV  amp  GOV DETAIL REFER DRG  NO  MEC 23ME 05 28 M 001 0023 0030  8  ALL SV STATIONS  amp                CHAINAGES HAS TO BE CONFIRMED BY GAL     9  ALL SV STATIONS WITHIN KERALA STATE  SV s HAVING FIXED CONSUMERS  amp             ccs     SV 26  27  NEAR         ARE CONSIDERED WITH FUTURE                HOWEVER     a M i px  OUT OF REST NINE No  SV s FIVE No  OF THEM ARE WITH FUTURE TAP OFF       amp  FOUR No  ARE WITHOUT FUTURE TAP   OFF        BE DECIDED ON THE BASIS  OF GEOGRAPHICAL LOCATION OF SV STATION      UNIT 30    API 5L  Gr     70 80  U G PIPEUNE    24 x439 085  Km  APPX     API SL  Gr         2  U G PIPELINE  FLUID       NATURAL GAS RLNG TEMPERATURE    WORKING  CH  499 00Km     FLOW   2 3 MMSCMD  APPX  DESIGN     REMOTE OPERATED           DESIGN CLASS  A   PRESSURE   45 48 KG Cm2 G     DESIGN   92 KG Cm2 6            LEG
94. NE NO       UNIT NO   PROCESS FLUID  RUNG   UNE SIZE  NOMINAL                VALVE LEGEND               BALL VALVE FLANGE END        pq         VALVE BW END UPTO 1 2  SW END               PLUG VALVE BW END UPTO 1 2  SW ENO          PLUG VALVE FLANGE END                 GLOBE VALVE     KOCHI KOTTANAD  BANGLORE   MANGLORE  NATURAL GAS PIPELINE PROJECT     PHASE 2              MEC         0007     gt  lt               x                    3  Ped              API 5L  Gr     70 80 U G PIPELINE    UNIT  14    CH S212 80Km     UNIT 15    NOTE 5 6 7 9       236 80         UNIT 16    CH S260 B0Km     UNIT  17    24 x439 085 Km  APPX   API SL  Gr     70 80 U G PIPELINE    ISSUED FOR  CONSTRUCTIO         PRESSURE   51 60 KG Cm2 G     1  ALL VENTS SHALL BE LOCATED MIN  HEIGHT      3 MIR   ABOVE THE HIGHEST OPERATING LEVEL    2  NOTE DELETED         3  ALL BALL VALVES 27    BELOW SHALL      FULL BORE ONLY     4  ALL UNMANNED STATION SHALL BE PROVIDED WITH CO2 FLOODING  SYSTEM AND ALL MANNED STATION SHALL BE WITH FM   200 FIRE    SUPPRESSION SYSTEM   5  ALL SV EXTENDED STEM BW  FULL BORE BALL VALVE    6  BURRIED VALVE SHALL BE PROVIDED WITH CORROSION PROTECTION COATING    7  FOR SV 4 GOV DETAIL REFER DRG       MEC 23ME 05 28 M 001 0023 0030   8  ALL SV STATIONS  amp  TAP OFF CHAINAGES HAS TO BE CONFIRMED BY GAIL    9  FOR SV 11  12  amp  13 SEE TYP  DRG  NO         25     05 28    001 0026 4  MEC 23ME 05 28 M 001 0027      10  ALL SV STATIONS WITHIN KERALA STATE  SV s HAVING FIXED CONSUMER
95. NGTH 16 420         2  SPUR LINE FROM               16 420 KM   TO FACT COCHIN AMBALAMUGAL  LENGTH 15 980 KM      RECEIVING  TERMINAL  NEAR              CH  15 980 KM     DETAIL OF CONSUMERS FOR PHASE I    CAPACITY  CONSUMER  MMSCMD      6020000   06 00   37245                T e E  Kg Cm2  mtr       1    TRAVENCORE COCHIN CHEMICALS             ess     340000 5000                 5                 6 08000   0600   1258  _     76                TERMINAL  0 088000   1000  1698043       77                           DIESEL POEWR PIANT  KSEB    5 000000   2500   306480                              REFINERY               2000000   4500   318720                                            1290      DETAIL OF CONSUMERS FOR PHASE II    ep              b dE    1    CARBARANDUM UNIVERSAL LIMITED   0 024000   2500   3487 95           60600              6368             0 00260 06 00 4476 26    LEGENDS        PHASE I        5                            TERMINAL          L         Copyright              All right reserved                      GAIL  INDIA  LIMITED             fees  LIMITED    MECON     HI KOTTANAD    BANGALORE  MANGALORE    NATURAL GAS PIPELINE PROJECT    PIPELINE NETWORK    THIS DRAWING IS THE PROPERTY OF MECON AND ISSUED  SH 1 OF 1    FOR THE SPECIFIC PROJECT MENTIONED THEREIN  THIS IS            SCHEMATIC DIAGRAM               REV                  KOCHI KOTTANAD BANGALORE MANGALORE NATURAL           GAS PI PELI NE PROJ         PHASE I1   PJS OF RTU FOR CENTRALISED SCADA S
96. ON MATERIALS        installation materials such as ac and dc cables  telecom interface cables  serial interface cables  data cables  all  necessary cable trays  relays  connectors  switches  fuses  terminations  distribution boxes and other items required    but not mentioned herein shall be provided by the RTU vendor     Vendor to note that detailed scope of cables including power cables with other accessories for interfacing with  different equipments shall be supplied by the vendor     The quality of materials used shall be of the highest order and shall conform to the international standards and safety  standards as per relevant hazardous area classification     Trench in the control room will be provided by client  However  erection  welding  foundation channel to suit the  RTU base frame and grouting is in vendor s scope     FINISH    Shall be as follow                                           LIMITED    KOCHI KOTTANAD BANGALORE MANGALORE  NATURAL GAS PIPELINE PROJECT  PHASE II     DELHI PJS OF RTU FOR CENTRALISED SCADA SYSTEM          ELECT   amp  INST     Job Spec  No    MEC   23ME   05   E5  1    75 094           BID Doc No    05 51 23 ME  GAIL 094  RTU     Rev  0 Page 17 of 24          SECTION                   16 0    17 0    18 0    19 0    All the frame and the steel work of the cabinets shall be degreased then phosphate treated or coated with primer  followed by at least two undercoats and a final coat of matte finished enamel paint of light admiralty grey colo
97. ONS ALONG THE  PIPELINE FOR BANGALORE MANGALORE    PHASE 2 PIPELINE   SECTION   1  amp         DRG  NO  MEC 23   05 28 M 001 0010                                                                3    2API SL  Gr     70 80            U G PIPELINE    FROM                   0010  24  P 24 2409 01A           A           v      va m wz   e Qam m s wa wm m f sms sa ee            22224459005 Km       247  439 085 Km  APPX   API SL  Gr     70 80            PIPELINE                                             2    518 2401  30     24      LAUNCHER  SRL 2401  24   30      DESIGN PR      92 Kg Cm2  9     DESIGN PR    92 Kg Cm2               8  P   24 2407 D1A A       24     24 2403 01      8     24 2404   01          24     24 2402 01                ISSUED FOR    CONSTRUCTION       WES    EM Tc                                         396 8 Km   APPROX              1  ALL VENTS SHALL      LOCATED MIN  HEIGHT OF 3 MIR    1  ABOVE THE  HIGHEST OPERATING LEVEL     E   2  SCRAPPER LAUNCHER RECEIVER SHALL HAVE SCRAPPER HANDLING        FACILITY COMPIRING OF A JIB CRANE  amp     TROLLY AND SHALL HAVE  A QUICK OPPENING CLOSURE  P   3  SCRAPPER LAUNCHER RECEIVER SHALL BE SUITABLE FOR HANDLING    INTELLIGENT PIGS                  4  DELETED        5  SCRAPPER DOOR MECHANISM TO BE CONSTRUCTED SUCH THAT THE DOOR  CAN        BE OPENED UNLESS SCRAPPER TRAP IS FULLY DEPRESSURISED   6  ALL BALL VALVES 2    amp  BELOW SHALL BE FULL BORE ONLY     7  ONUNE RETRVEL TYPE CORROSION MONITORING COUPON AND   CORRO
98. RAL GAS PIPELINE PROJECT  PHASE ID  PJS OF RTU FOR CENTRALISED SCADA SYSTEM  Job Spec         MEC   23ME   05   E5   I   PJS 094           CIN BID Doc No    05 51 23 ME  GAIL 094  RTU   Rev  0 Page 9 of 24  Note    1  Distance between Telecom Panel               equipment at stations        R WS shall      considered as    15 meters  However  these distances shall be firmed up during detail engineering      11  Distance between IEDs  TIC         Solar and RTU Panel to      considered      30 meters  However   these distances shall be firmed up during detail engineering      ii  RTU vendor has to supply  amp  lay the cable tray  supply  amp  erection of foundation channel on  trench provided by client as required      iv       the serial cables shall be laid in the conduits from various panels to RTU     AII the signals from CP panel  door switches  CMS system and Fire  amp  gas detection system shall connect with  RTU through hardwired signal or serial communications  on MODBUS  as per the provisions available in the  respective panels  If the signals are not available then it will be treated as spare I os     Cable trench in the control room will be provided by client  However support channel erection on trench as per  panel base frame will be in bidder s scope     Bidder shall provide the information   documents as built document  Bidder s offer  catalogues  drawings  instrument  manuals etc  shall be in English     Supply of all the items   equipments including test equipm
99. RE   64 76 KG Cm2 G             DESIGN 92 KG Cm2 G         24   439 085                  API SL  Gr     70 80 U G PIPELINE    24   439 085 Km  APPX   API SL  Gr  X 70 80 U G PIPELINE         LINE LEGEND        PROPOSED UNE A G              PROPOSED LINE U G              24  P 07 0701 D1A    1 MATERIAL SPEC      UNE NO     UNIT  NO   PROCESS FLUID  RLNG      UNE SIZE  NOMINAL         VALVE  LEGEND    ISSUED FOR  CONSTRUCTION     k                       BALL VALVE FLANGE END   pj         VALVE BW END UPTO 1 2  SW END   pK      PLUG VALVE BW END UPTO 1 27 SW END            PLUG VALVE FLANGE END   xi GLOBE VALVE            cur  ND                 KOCHI KOTTANAD    BANGLORE MANGLORE  NATURAL GAS PIPELINE PROJECT                   2             ID FOR SV STATIONS ALONG THE  PIPELINE FOR BANGALORE   MANGALORE  PHASE 2 PIPELINE   s SECTION II               086       MEC 234   05 28 M 001  000      2                                                   L000 100 N 8Z S0 3NCZ 23  ON  oua                     UNIT 13             2220 22          ssp              DLE s                            OTE 1  C 1301        N  QOE     API 5L  Gr     70 80    U G PIPELINE       247  439 085 Km   APPX              SRL 1301  24 30    DESIGN PR    92 Kg Cm2  g     SLR 1301  30  x24    DESIGN PR      92 Kg Cm2  9        SECTION I    24  P 13 1303 D1A       8  P 13 1304 D1A      24  P 13 1302 D1A            w    w   c       w s om w w s m w ma    w s                     ISSUED FOR    CONSTRUCT      gt     
100. RE FAT signed and approved reports and thereafter  clearance for conducting the FAT by Client   Consultant shall be given as above     FACTORY ACCEPTANCE TESTING  FAT     The Bidder shall prepare FAT documentation covering all hardware  software including SCADA  software and system functionalities including system expansion requirements and submit it 3  months in advance for Client   Consultant review and approval  Factory acceptance test will be  done based on the stipulations in the approved FAT document  which shall completely fulfil the  contract requirements and approved SCADA R TU FDS documents     FAT shall be carried out in SCADA         vendor s premises  FAT shall cover the testing 4  Integrated SCADA RTU System with RTUs    Testing shall systematically  fully and functionally test all the hardware and software in the  presence of Client   Consultant inspectors to ascertain compliance with the contract document and  approved FDS documents  Test Bed shall be prepared with all the equipments  SCADA Servers   HMI  RWSs  RTUs  Routers  and Peripherals etc  interconnected to actual configuration to perform  the testing of integrated SCADA system       the workstation desks  cabinets with mounting  wiring   interconnection of the equipments shall be available for this testing     The equipment to be supplied shall be type tested for electromagnetic Compatibility     The SCADA system   RTU testing shall cover the following aspects as a minimum     a    Visual and mechanica
101. REMOTE OPERATED                            LOCATED MIN  HEIGHT OF 3 WTR  ABOVE THE HIGHEST          1  ALL VENT  SHALL        4i OPERATING LEVEL 2  D Du                 2  ALL BALL VALVES 2    amp  BELOW SHALL BE FULL BORE ONLY       3  NOTE DELETED  e edges    wu    Done nuo              A            4  ALL GOV  GAS OVER      OPERATED VALVES  SHALL BE FAILED TO  A Rr WS DE        5  FOR ALL TAPPING FROM MAIN UNE  THE FIRST ISOLATION VALVE SHALL  BE WELDED END TYPE AND OTHER SECOND VALVE MAY BE FLANGED  CONNECTION        6  ALL UNMANNED STATION SHALL BE PROVIDED WITH CO2 FLOODING  SYSTEM AND ALL MANNED STATION SHALL BE WITH FM   200 FIRE     SUPPRESSION SYSTEM  E ae   7  INTEGRATED INTERLOCK SHOULD BE PROVIDED IN THE GAS ACTUATED    VALVE SUCH THAT WITH HIGH AP ACROSS THE VALVE   gt 3 BAR   N          NAME  SHOULD NOT OPEN DURING START UP                           8  ALL PG  PT CONNECTION SHALL BE TAKEN FROM 2  TWO ISOLATION   VALVES AND THEN AFTER IT SHOULD BE CONVERTED TO REQUIRE   NPT CONNECTION  E s      9  GAS TAPPING TO VALVE ACTUATOR      10  GAS TAPPING FOR VALVE AP SWITCH      11  FOR PG        DPT DETAIL REFER MECON DRG           tM        MEC 05 E5 SD PT 001   PEE                                          PG          05   5 50   6 004  12  EXTENDED STEM VALVE                                         13  DIRECT SURFACE CONTACT              14  THIS IS TYPICAL ARRANGEMENT FOR 24    SV STATIONS   FOR 247 SV 9  SV 11  SV 12  SV 13  SV 15  SV 18  SV 19  5   2       SV 10 
102. S 4  SV 26  27  NEAR CITY  ARE CONSIDERED WITH FUTURE TAP   OFF  HOWEVER  OUT OF REST NINE No  SV s FIVE No  OF THEM ARE WITH FUTURE TAP OFF     amp  FOUR No  ARE WITHOUT FUTURE TAP OFF  TO BE DECIDED ON THE BASIS  OF GEOGRAPHICAL LOCATION OF SV STATION      FLUID    NATURAL GAS RLNG                              WORKING   01055 C  FLOW   4 99  MMSCMD             DESIGN    29 10 65    DESIGN CLASS   6008    DESIGN   92 KG Cm2 G     LINE LEGEND    PROPOSED UNE A G              PROPOSED UNE U G    24  P 13 1301   D1A      E   nnn            UNE d  PROCESS FLUID  RLNG     UNE SIZE  NOMINAL   VALVE LEGEND                    VALVE FLANGE END  pK         VALVE BW END UPTO 1 2  SW END   p      PLUG VALVE BW END UPTO 1 27 SW END   MK  PLUG VALVE FLANGE END     Jp GLOBE VALVE     u PRELIMINARY DRAWING    ex GAIL       LIMITED  177            LIMITED    OCHI KOTTANAD  BANGLORE  MANGLORE  NATURAL GAS PIPELINE PROJECT     PHASE 2     P  amp  ID FOR SV STATIONS ALONG THE  PIPELINE        BANGALORE   MANGALORE    PHASE 2 PIPELINE   SECTION II      mv    DRG  NO  MEC 23ME 05 28 M 001  0008               UNIT 18 AQ      VAL s     1  ALL VENTS SHALL BE LOCATED MIN  HEIGHT OF 3 MIR           ABOVE THE HIGHEST OPERATING LEVEL 0002002        2  SCRAPPER LAUNCHER RECEIVER SHALL HAVE SCRAPPER HANDLING    FACILITY COMPIRING OF A JIB CRANE  amp     TROLLY AND SHALL HAVE     QUICK OPPENING CLOSURE   j 25 S 3  SCRAPPER LAUNCHER RECEIVER SHALL BE SUITABLE FOR HANDLING  NOTE 1   INTELLIGENT PIGS   QOEC  
103. S OF RTU FOR CENTRALI SED SCADA SYSTEM     JOB Spec                   23       05  E5   I      5 094  RTU  Mm    xd BI D Doc No    05  51  23        GAI L  094  RTU  Arc                        to PJ S Page 1 of 1                   ANNEXURE   VIII    SOURCE OF SUPPLY  SOS  FORM             KOCHI KOTTANAD BANGALORE MANGALORE  NATURAL GAS PIPELINE PROJECT  PHASE II   PJS   RTU FOR CENTRALISED SCADA SYSTEM 487           D LTD  JOB Spec  No    MEC S 05  E5 T 23 ME  PJS  094            BID Doc No    05 51 23 ME  GAIL 094 MECON LIMITED                        to PJS Page 1 of 1             ANNEXURE VIII to PJS  RTU FOR CENTRALISED SCADA SYSTEM    SOURCE OF SUPPLY FORM  SOS  FORM    Name of Bidder  Bidder   Vendor works  amp  address  Name of Sub Vendor  as applicable     This form shall be duly filled and signed by bidder and it shall be submitted along with bid       the points  shall be unambiguously responded  if anything is kept blank by the bidder  it shall be considered as non   compliance of the tender and the bid shall be liable for rejection           SL  DESCRIPTION MAKE  MODEL Place of Name of the Company    No  No  manufacturing   Organization responsible for  and supply support and maintenance  facilities for this item   system  A RTU  1  RTU  a  Hardware  b  Software    2  Equipment Racks  3  Any other items       B Mandatory Spares GSM modem    with antenna  amp  accessories       C GSM modem with antenna  amp     D Industrial standard Tool kit for    accessories      
104. SION PROBE SHALL BE PROVIDED      8  FOR SV  amp  GOV DETAL REFER DRG  NO  MEC 23ME 05 28 M 001 0023 0030         2401 4 2403 SHALL HAVE    RANGE OF 0 1 Kg Cm2 g  WITH    GAUGE SAVER  D  DIRECT SURFACE CONTACT                                  01055     DESIGN      29 TO 65C      6004            FLOW       2 3 MMSCMD              PRESSURE   46 48          2      DESIGN   92 KG Cm2 G                 LEGEND                 PROPOSED UNE A G              PROPOSED LINE U G    24  P 24 2401 D1A  8  P 24   2401   D1A      L    MATERIAL SPEC   LINE NO   UNIT NO   PROCESS FLUID  RLNG   UNE SIZE  NOMINAL                     VALVE LEGEND                     VALVE FLANGE END    pi  BALL VALVE BW END UPTO 1 2  SW END  s           PLUG VALVE BW END UPTO 1 2    SW END               VALVE FLANGE END     xl     GLOBE VALVE       A PRELIMINARY DRAWING            GAIL  INDIA  LIMITED      Hw  27   con mam        KOCHI  KOTTANAD    BANGLORE MANGLORE  NATURAL GAS PIPELINE PROJECT       PHASE 2     P  amp  ID FOR INTERMEDIATE PIGGING STATION 4   SECTION IV                                    SCALE   NTS    DRG  NO         25     05 28    001 0011                                  1  ALL VENTS SHALL BE LOCATED MIN  HEIGHT OF 3 MIR     ABOVE THE HIGHEST OPERATING LEVEL  Be       OW SHALL BE FULL BORE ONLY   4  ALL UNMANNED STATION SHALL BE PROVIDED WITH CO2 FLOODING  SYSTEM AND ALL MANNED STATION SHALL BE WITH      200 FIRE  SUPPRESSION SYSTEM        5  ALL SV EXTENDED STEM BW  FULL BORE BALL VALVE   6
105. STRUCTION           6                          LIMITED     macs                  A             2                                    4  ALL GOV  GAS OVER  OIL OPERATED VALVES  SHALL BE FALED TO  Ge OFF    5  FOR ALL TAPPING FROM MAIN LINE  THE FIRST ISOLATION VALVE SHALL  BE WELDED END TYPE AND OTHER SECOND VALVE MAY BE FLANGED    7  INTEGRATED INTERLOCK SHOULD BE PROVIDED IN THE CAS ACTUATED          KOCHI  KOTTANAD  BANGLORE  MANGLORE  NATURAL GAS PIPELINE PROJECT    TYPICAL ARRANGEMENT FOR  24  SV 9  12    13 STATIONS       rev    DRG  NO  MEC 23ME 05 28 M 001 0027   3                                                      GAIL  INDIA  LIMITED                            ed waste  Sad    TAP OFF DETAILS AT 5   2      1  CONS OT   APOLLO          PERE       NOTE DELETED                         AL GOV  GAS OVER OL OPERATED VALVES  SHALL BE FALED TO  STAY PUT TYPE VALVE     5  FOR ALL TAPPING FROM        LINE  THE FIRST ISOLATION VALVE SHALL  PE          END          AND OTHER SECOND VALVE MAY BE FLANGED    6  ALL UNMANNED STATION SHALL BE PROVIDED WITH CO2 FLOODING  SYSTEM AND ALL MANNED STATION  SHALL BE WITH FM 200 FIRE  SUPPRESSION SYSTEM   gt            IM   7  INTEGRATED INTERLOCK SHOULD      PROVIDED IN THE GAS ACTUATED   VALVE SUCH THAT WITH HIGH      ACROSS THE VALVE   gt 3 BAR              SHOULD NOT OPEN DURING  START UP  irse as S   ALL PG  PT CONNECTION SHALL BE  TAKEN FROM 2  TWO ISOLATION    VALVES AND THEN AFTER IT SHOULD BE CONVERTED TO REQUIRE   NPT CONNECTION  
106. SUCH THAT WITH HIGH AP ACROSS THE VALVE   gt 3 BAR                     SHOULD NOT OPEN DURING START UP   L  e a   8  ALL PG  PT CONNECTION SHALL BE TAKEN FROM 2   TWD ISOLATION  VALVES AND THEN AFTER IT SHOULD BE CONVERTED TO REQUIRE  NPT CONNECTION     9  GAS TAPPING TO VALVE ACTUATOR   10  GAS  TAPPING FOR VALVE AP SWITCH     11  FOR PG               DETAIL REFER MECON DRG  NO      224  PT     MEC O5 ES SD PT 001       cu                                                  TYPICAL ARRANGEMENT FOR                 Ed    o       Pss VALVE   VALVE     OPEN CLOSED E  o          E       VALVE LEGEND    je BALL VALVE FLANGE END                  VALVE BW END UPTO 1 27 SW END       PLUG VALVE BW END UPTO 1 2  SW END          PLUG VALVE FLANGE END   pis     GLOBE VALVE               TYPICAL ARRANGEMENT FOR AV                 ISSUED FOR                  KOCHI KOTTANAD  BANGLORE    MANGLORE  NATURAL GAS PIPELINE PROJECT                  2     TYPICAL ARRANGEMENT FOR  AV  amp  GOV              DRG  NO         23     05 28    001 0023 H                                XZ vm  roa                             2 1  ALL VENT SHALL BE LOCATED MIN  HEIGHT OF 3         ABOVE THE HIGHEST     x OPERATING 1 EVEL s ou      WO ch               2  ALL BALL VALVES 2   amp  BELOW SHALL BE FULL BORE ONLY                  4  ALL GOV     STAY PUT   5  FOR ALL TAPPING FROM MAIN UNE  THE FIRST ISOLATION VALVE SHALL  BE WELDED END TYPE AND OTHER SECOND VALVE MAY BE FLANCED  CONNECTION    6  ALL UNMANNED STATION S
107. Spec                  23       05   E5  I      5 094  RTU  Mm    xd BI D Doc No    05  51  23        GAI L  094  RTU  Arc  ANNEXURE XI I to PJ S Page 1 of 1                   ANNEXURE   XII    TECHNI CAL CHECKLI ST FOR    RTU FOR CENTRALISED SCADA SYSTEM                        PI PELI NE              GAIL  INDIA  LTD  BID Doc        05 51 23 ME          094           ANNEXURE XII to PJS Page 1 of 1 MECON LIMITED    KOCHI KOTTANAD BANGALORE MANGALORE  NATURAL GAS PIPELINE PROJECT  PHASE ID  PJS of RTU FOR CENTRALISED SCADA SYSTEM   JOB Spec  No             23       05   E5   I   PJS 094                                     of Bidder    ANNEXURE XII to PJS  RTU FOR CENTRALISED SCADA SYSTEM    TECHNICAL CHECKLISTS    Bidder   Vendor works  amp  address   Name of Sub Vendor  as applicable   This Technical Check list shall be dully filled i in and submitted along with un priced sets of offers to avoid further  queries and to ensure proper evaluation of your offer in time  If this is not complied with your offer is liable to be    rejected        SI  No    Checklist point    Yes   No       Have you filled up the following formats  which form a part of technical checklist       Submit Un priced SOR with indicated    Quoted    in price part       ANNEXURE X Project Management  amp  Responsibility  PMR  Form       SOY DIMA  Fl S      ANNEXURE XI Responsive Offer Criteria  ROC  Form   ANNEXURE VIII Source Of Supply  SOS  Form   ANNEXURE   IX Power Consumption  amp  Utilities Reqmt Form 
108. TS SHALL BE LOCATED MIN  HEIGHT OF 3 MIR   ABOVE THE HIGHEST OPERATING LEVEL     2  NOTE DELETED  mec mE a As  3  ALL BALL VALVES 2     amp  BELOW SHALL BE FULL BORE ONLY       4  ALL UNMANNED STATION SHALL BE PROVIDED WITH CO2 FLOODING  SYSTEM AND ALL MANNED STATION SHALL BE WITH      200 FIRE  SUPPRESSION SYSTEM     5  ALL SV EXTENDED STEM  BW  FULL BORE BALL VALVE    6  BURRIED VALVE SHALL BE PROVIDED WITH CORROSION PROTECTION COATING    7  FOR SV  amp  GOV DETAIL REFER DRG  NO  MEC 23ME 05 28 M 001  0023 0030   8  ALL SV STATIONS  amp  TAP OFF CHAINAGES HAS TO BE CONFIRMED BY             9  FOR SV 9 SEE TYP  DRG  NO         25     05 28    001 0027      1D  ALL SV STATIONS WITHIN KERALA STATE  SV s HAVING FIXED CONSUMERS  amp   SV 26  27  NEAR         ARE CONSIDERED WITH FUTURE TAP OFF  HOWEVER    OUT OF REST NINE No  SVs FIVE No  OF THEM ARE WITH FUTURE                  amp  FOUR No  ARE WITHOUT FUTURE TAP OFF       BE DECIDED ON THE BASIS   OF GEOGRAPHICAL LOCATION OF SV STATION                                               ON                                 MEC         0005    UNIT 10     UNIT  11 UNIT  12    UNIT  08 UNIT 09           FLUID                NATURAL GAS RLNG TEMPERATURE    WORKING    0 7055     DESIGN      29 TO 65      DESIGN CLASS   600                NOTE    5 6 7             5 6 7 NOTE 5 6 7 s NOTE 5 6 7 9 NOTE 5 6 7    CH  108 545Km  CH  123 730Km            138 704        CH  157 001Km  CH  173 080Km  FLOW       10552 MMSCMD  APPX            PRESSU
109. U cubicle  typical layout and GA  RTU internal layout and interconnection drawings for each type of I O cards  PDB internal  layout  Internal layout of RTU cabinets     Construction drawings   documents      Documents such as Mounting arrangement of each cabinet  cable schedule  termination  amp  wiring diagrams   grounding schemes   diagrams has to be submitted by the vendor     Power Consumption and Utilisations Report  PUCR     Vendor shall furnish power consumption details with detailed break up for each subsystem equipments including  inrush current and its duration during detailed engineering  This document will be submitted at the earliest so that  required power availability can be ascertained by GAIL in time     Factory Acceptance Test  FAT  Plans and Procedure Documents     FAT document for RTU shall contain test sections to test all the aspects of SCADA System as covered in relevant  Purchase Requisition  PR   FDS documents     SCADA Vendor  YIL  also tests for compatibility with Centralised SCADA   Site Acceptance Test  SAT  Plans and Procedure Documents    SAT document shall contain test sections to test all the aspects of testing of data for all IEDs and integrated with  Centralised SCADA System  Test run  amp  procedure documents has to be submitted     Manuals    At least 30 days prior to the SAT  the proposed Operating and Maintenance Manuals and Final  Drawings shall be submitted for review by the Owner     Other Documentation                                
110. VE FEATURE FOR WORKING AS LAUNCHER  AS WELL AS RECEIVER ie  BI  DIRECTIONAL       5  SCRAPPER DOOR MECHANISM TO BE CONSTRUCTED SUCH THAT THE DOOR  CAN NOT BE OPENED UNLESS SCRAPPER TRAP IS FULLY DEPRESSURISED     6  SCRAPPER LAUNCHER   RECEIVER SHALL BE SUIATABLE FOR HANDLING  INTELLIGENT PIGS           7  DELETED    f           8  ONUNE RETRIVEL TYPE CORROSION MONITORING COUPON AND  CORROSION PROBE SHALL BE PROVIDED                     0004 9  FOR SV  amp  GOV DETAIL REFER ORG  NO  MEC 23ME 05 28 M 001 0023 0030         10  PG 0105 SHALL HAVE A RANGE OF 0 1 Kg Cm2 g  WITH A GAUGE SAVER   11  DIRECT SURFACE CONTACT TYPE     12  METERING SHALL BE DONE BY ULTRASONIC FLOW  METER WITH  CONTROL PANEL MOUNTED FLOW COMPUTER  INSTALLATION SHALL  BE AS PER AGAS LATEST EDITION  HOWEVER THERE SHALL BE _  THREE STREAMS OF METERING  2W 19      13  ENVIRONMENTAL ENCLOSURE REQUIRED FOR METERING INSTRUMENTS   INSULATION OF USM METER  METER RUN  amp  IMPLUSE LINES OF METERING  INSTRUMENT 15 REQUIRED        14  PROVISION SHALL      KEPT TO HOOK UP METERING PR    amp  TEMP   FLOW PARAMETERS WITH SCADA   15  THESE VALVES ACROSS THE USM SHALL BE PROVIDED WITH LIMIT SWITCHES     NOTE 1  QOEC 0101    1    0     O4A  10     DIA    FWT 0101  30  x30 x30     10  P 01 0114 D1A      30 x90 615 Km               E  B          3 4       B      B  B            HANDUNG NOTE   4 5 6 7 0               456  105       APPX  WHERE               FLOW IS CONSIDERED         17 70 MMSCMD                10    01 0111 
111. VIII          EI  Foe   asa zm JS  NO                       2      001 020 2                 ISSUED FOR    CONSTRUCTION                                                                                            oua       MEC         0022       24 x354 328 Km  APPROX   780777    API SL  Gr  X   70  U G PIPELINE       5L  Gr  X 70 80    U G PIPELINE                   98 5201  30 x24      92 Kg Cm2  9              52 8205           27    52 5208 1    24  P 52 5203 D1A    8  P 52 5204 D1A    24  P 52 5202 01A    6  A    ISSUED FOR  CONSTRUCTIQN            E    E                                    NOTES  CC             a se vd  1  ALL VENTS SHALL BE LOCATED MIN  HEIGHT OF 3                 ABOVE THE HIGHEST OPERATING LEVEL            2  SCRAPPER LAUNCHER RECEIVER SHALL  HAVE SCRAPPER HANDLING       FACILITY COMPIRING OF    JIB CRANE  amp     TROLLY AND SHALL HAVE     QUICK OPPENING CLOSURE       3  SCRAPER LAUNCHER RECENER SHALL BE SUITABLE FOR HANDLING  INTELUGENT PIGS                4  DELETED        5  SCRAPPER DOOR MECHANISM TO BE CONSTRUCTED SUCH  THAT THE DOOR   CAN NOT BE OPENED UNLESS SCRAPPER TRAP IS FULLY DEPRESSURISED     6  AL BALL VALVES 27  amp  BELOW SHALL BE FULL BORE              DH M A     7  ONLINE RETRIVEL TYPE CORROSION MONITORING COUPON AND  CORROSION PROBE SHALL BE PROVIDED     8  FOR SV  amp  GOV DETAIL REFER DRG              2       05 28    001 0023 0030             10  DIRECT SURFACE CONTACT TYPE  s    FLUID       NATURAL GAS RLNG TEMPERATURE    WORKING 
112. YSTEM     JOB Spec         MEC 23ME 05 E5 I PJS 094  RTU  V  ELECT   amp  INST  BID Doc No    05 51 23 ME  GAIL 094  RTU  2           ANNEXURE VII to PJS Page 1 of 1                      ANNEXURE   VII  TYPICAL I NTERFACI NG OF RTU WI TH    OTHER PANELS             u      T0 013 60 63 90  JIN    099840    DETECTION  SYSTEM   NOTE   1   TELEMETRY PANEL  TIC  PRIMARY      TO TELECOM  CHANNEL     NOTE   1  RTU PANEL  SECONDRY    METERING PANEL   NOTE     3     GAS      CHROMATOGRAPH       NOTE     2     SCADA  TELECOM  INSTRUMENTATION CONTROL  ROOM    ELECTRIC ROOM    HARDWIRED SIGNAL  RS 232 RS 485 SERIAL LINK  POWER CABLE    CATHODIC PROTECTIO POWER DISTRIBUTION  R PAN  E 5 FIRE PANEL CABINET              ADDITION TO SERIAL DATA  FLOW RATE  PRESSERE  amp  TEMPERATURE               HARDWIRED SIGNAL FROM FLOW                                PSP VALUE  IMPRESSED VOLTAGE  amp  IMPRESSED CURRENT SHALL BE HARDWIRED SIGNAL FROM CATHODIC PROTECTION PANEL TO RTU     SEPERATE METERING PANELS SHALL BE PROVIDED BY METERING VENDOR       WHICH FLOW COMPUTER  GC CONTROLLER SHALL BE INSTALLED     HADWIRED SIGNALS FROM FIRE  amp  GAS DETECTION PANEL  METERING PANEL  SOLAR PANEL  PDC  amp  CATHODIC PROTECTION PANEL SHALL BE TERMINATED INSIDE TIC CABINET FROM WHERE THESE SIGNALS  UL BE TAKEN TO RTU THROUGH HARDWIRED LINK    SEPERATE HARDWIRED CABLES SHALL BE USED FOR Al  AO  DI  DO SIGNALS  MIXING OF DIFFERENT TYPES OF SIGNALS SHALL NOT BE ACCEPTABLE  TYPICAL INTERFACING OF    SCOPE CF INTERFACIN
113. ace cabinet to RTU     The Ethernet cable from RTU to Telecom rack shall be 50 feet long at each station  complete  with connectors at each end  However distances shall be firmed up during detail engineering  or prior to FAT     RTU  SCADA vendor shall be responsible for proper selection of the RS 232 C or any other  cable for ensuring good communication with telecommunications          the erection work shall be carried out as per the established recommended practices and  best workmanship     Bidder shall bring all installation aids  test equipments and qualified and experienced  personnel  in order to carry out the job successfully  A list of the same shall be submitted to  the Client   Consultant for the review     On completion of erection and installation of all equipment and software  and before start up   each item of the system shall be jointly inspected by the Client   Consultant and Bidder for                     LIMITED    DELHI    KOCHI KOTTANAD BANGALORE MANGALORE NATURAL  GAS PIPELINE PROJECT  PHASE ID  PJS OF RTU FOR CENTRALISED SCADA SYSTEM          ELECT   amp  INST   SECTION    JOB Spec  No    MEC   23ME   05   ES I PJS  094           BID Doc No    05 51 23 ME  GAIL 094             ANNEXURE IV to PJS Page 2 of 3                      correctness  amp  completeness of the installation and acceptability of start up leading of  commissioning tests at site     The list of commissioning test to be performed shall be mutually agreed upon and included in  the Bidde
114. aking goods and finishing such masonry work     ELECTRICAL WORKS     Electrical work associated at all the stations shall be consisting of  but not limited to     1       the cable work including earthing up to the panel from the dedicated Earthing point  Earthing pit   system grounding for the supplied equipments    2  Any temporary electrical works associated with the erection  amp  commissioning of the system   3  Testing and certification of all the electrical works within the scope    4  All power cabling  including supply of cables  glanding  cable tray  ferruling  termination etc   from the  power distribution cabinet to the RTU shall be carried out by vendor     SPARES     The vendor shall cover the various categories of spares included corresponding activity   services as listed  below as part of Lump sum price     a  Commissioning spares including consumables as part of commissioning activities     b  Vendor must ensure availability of following commissioning spares as a minimum at site   2 nos of CPU  2 nos  of each I O s cards  AL  AO  DI  and DO  of RTU  one no  of each type of  communication card  Power cables  converter and connectors         The mandatory spares       per SOR  shall be supplied as        the contract  These spares can t be used  during commissioning  Any mandatory spares utilized by the RTU vendor during Warranty period  shall be replenished within 45 days                                                           KOCHI KOTTANAD BANGALORE MANGA
115. along with offer   B 3   For Intermediate Pigging  IP  Station Nos  07  Bidder shall provide the price Break up for services  amp  site work as per the enclosed format    1 along with offer   BA Training  as define in specifications  before the final acceptance of the SCADA system by   Lump 1          Client   sum   All inclusive per month rates for maintaining the store at site  for the supplied material    Mont 12      during the extended period as required  payable if site is not ready even after 6 months of hs  actual date of completion  i e  22 months from FOI  as per terms  amp  condition of contracts  and as define in the tender scope of work   Refer Note 8    NOTES    1  Bidder shall quote for all the items    2  Bid offer will be evaluated package wise  All the items of part A  amp  B will be considered for evaluation  purpose  Completion of total work as a TURNKEY work is Bidder s responsibility    3  Detail list of the commissioning spares shall be furnished along with the offer    4  Details of Mandatory spares with part no   make etc  shall be given separately with the offer  amp  price part    5  The quantity and the location of the stations may change  bidder shall take prior approval for procurement  and erection    6  Bidder shall submit the price break up of  sub items  activities  parts  inclusive in the quoted Unit rate for  RTU specified above in enclosed format   I along with offer  amp  price part  It shall be used for any addition  or deletion of sub i
116. arranty  amp  Extended Warranty  Mandatory  amp  commissioning spares  Documentation etc  as  specified in various documents attached with tender  The complete requirement as contained in the Bid  Document shall be executed on turnkey indivisible works contract basis     In case bidder is a subsidiary or authorized representative of the OEM of offered RTUs  then OEM shall assume  the complete responsibility for the following as a minimum      a  Approval of QA   QC programs conforming to their own standards for carrying out the activities being  proposed to be carried out by the bidder    b  Provide logistic technical support to the bidder during interfacing with Telecom system  IEDs  amp   Centralised SCADA system    c  Provide performance guarantee for offered RTUs     Bidder shall provide the storage charges of extended period as per the SOR MR  The storage charges shall be  applicable  amp  payable only if the work will not be completed in 22 months  16 months from FOI   additional 6  months of period        the work has to be completed as define in the completion schedule  As evaluation will be  on package wise basis hence this will be considered in the evaluation as per the terms  amp  condition of the  contract     Bidder shall provide the rates for the extended warranty  This will be applicable  amp  payable as define in  respective clause elsewhere in the document  As evaluation will be on package wise basis hence this will be  considered in the evaluation as per the
117. as awarded MECON Limited as project management  amp  consultancy services for  laying 307x90 615 Km  Appx   amp  247x794 Km  Appx  long pipeline in Phase II in the state of Kerala  Tamilnadu   amp  Karnataka for transportation and distribution of re gasified LNG from tap off cum dispatch facility at IP 1 of  Phase I pipeline     The network will connect Kerala  Tamilnadu  amp  Karnataka state  This Phase II pipeline will be laid up to  Bangalore  amp  Mangalore  M s Petronet LNG Ltd  is constructing the LNG re gasification terminal at Puthuvypeen   Regasified LNG R LNG  from M s PLL at Puthuvypeen has been considered as source for KKBMPL pipeline  Phase I  amp  II     The phase II pipeline is designed to carry 10 0 mmscmd  appx  R LNG   PROJECT SCOPE    1  Laying of Pipeline in Phase II      Size 307x90 615 KM Trunk pipeline from dispatch at IP 1 of Phase I to Kottanad   e Size 247  439 085 KM trunk pipeline from IP 1 of Phase II to receiving terminal at Bangalore   e Size 24 x354 328 KM spur pipeline from IP 1 of Phase II to receiving terminal at Mangalore   2  Sectionlizing Valve  SV  Stations above three lines   3  Intermediate Pigging  IP Stations above three lines   4  Dispatch  receiving facilities terminals above three lines     To facilitate the operation  monitoring  control and maintenance of the pipeline  dedicated OFC   SDH  telecommunication system  network is proposed to be installed along the above mentioned new pipeline   Optical Fibre Cable 24 Fibre   6 fibre
118. ase may be  If after this one replacement the unit of sub system still fails to meet the  specifications  the Bidder shall replace the complete unit or sub system with one that meets the  requirements and restarts the test all over again     Bidder shall depute one experienced software  amp  one hardware engineer fully conversant with the  system at MS  EMS during the test run  and they will coordinator for APPS system integration with  APPS sub vendor engineer during the test run                    KOCHI KOTTANAD BANGALORE MANGALORE NATURAL  um GAS PIPELINE PROJECT  PHASE II   PJS OF RTU FOR CENTRALISED SCADA SYSTEM  JOB Spec  No             23       05   E5   I   PJS 094           ELECT   amp  INST  BID Doc No    05 51 23 ME  GAIL 094  RTU   SECTION  ANNEXURE III to PJS Page 5 of 6                      All the tests will be necessary in connection with the execution of works as per approved document  shall be carried out at the Bidder s premise  testing laboratory and work site of the Client    Consultant at Bidder s cost  The Bidder shall provide assistance  instruments  labour and materials  as are normally required for the examining  measuring and testing any workmanship as may be  selected and required     Factory Acceptance Test shall be carried out at Bidder s factory  These tests will encompass all the  material and equipment delivered and software pertaining to RTU  SCADA system including the  equipment and software supplied by Bidder and sub vendor  Pre FAT report 
119. at any stage of system implementation  without any implication of cost and schedule to the  OWNER     It is RTU vendors responsibility to incorporate all the comments of the OWNER S OWNER S  REPRESENTATIVE in one revision itself  RTU vendor shall be responsible for incorporation of comments   comments not incorporated in the revised document without prior bringing to the notice of the  OWNER S OWNER S REPRESENTATIVE for acceptance  in the RTU system at any stage of the system  implementation  without any implication of cost and schedule to the Owner     RTU Vendor shall take care of the complete requirements of designing  generation and implementation of RTU  displays for monitoring  amp  control  RTU reports  RTU alarms  events  RTU trending taking care of P amp IDs and list of  electrical parameters and covering the requirements outlined in this specification for RTU implementation     The review code will be furnished by OWNER S OWNER S REPRESENTATIVE only when the complete  document is furnished by RTU vendor     RTU vendor shall furnish the point wise response to OWNER S OWNER S REPRESENTATIVE comments  indicating the document section clause page no  reference where the same has been included in the revised  document  The body of the document and corresponding pages will show the revision bars only at the places where  the revision has been carried out  OWNER   S OWNER   S REPRESENTATIVE will be required to check the revised  document w r t  these changes only  while con
120. ation   RWS  The MS  RWS  BMS shall have dual redundant Ethernet LAN   distributed open system architecture having redundant processor  power supply and storage devices     The system will be based on the concept of Open system Interconnect  OSI  architecture maximising the use of  international standard interfaces  The SCADA system shall communicate to individually IP addressed RTU    Device on dedicated OFC network and some of the RTU   device may be on GSM   leased line network   Backup communication link between MS and BMS  RWS will be provided by Independent leased line  provided by the independent service provider  arranged by the client      The material to be delivered shall meet the technical specifications and other requirements and performed at site  as defined in the tender     One RTU shall be provided with redundant GSM  Hot standby 1 1 configuration  Modem having capability for  polling  read and write  to Flow Computer through either dialup   GPRS  The dial up RTU  any one from the  supplied RTU  to be hooked up with the GSM Modem shall be conveyed during detailed engineering  All the  necessary software hardware and program for getting data through dial up has to be supplied by the bidder   Also the bidder has to demonstrate the dialup functionality for one FC through redundant GSM GPRS modem  during FAT SAT     The RTUs shall be provided at all SVs  IPs  Despatch and Receiving Terminals for remote monitoring and  control as per the requirements  The each RTU
121. base upon  power failure for at least one month  Upon restoration on the power  RTU shall resume the  normal operation automatically     11 17 The failed RTU once put online shall initiate service requirement to MS EMS FEP for re   initialization                             MECON LI MI TED TECHNI CAL SPECI FI CATI ON  REGD  OFF  RANCHI  834002 ELECTRI CAL  amp  INSTRUMENTATI ON    OIL  amp  GAS SBU  DELHI       DOCUMENT NO  Page 12 of 22  REMOTE TERMI NAL UNI TS         S  05  E5  099 REVISION   1    EDITION   1       11 18 RTU shall operate power supply  230 V AC or 24 V DC as define elsewhere  as per power  availability at site  Separate on off power supply switch and fuse shall be supplied with  each RTU  SCADA Vendor shall indicate power consumption for all the RTUs  Adequate  isolation of input  output and power supply circuits shall be provided along with over  voltage and short circuit protection     Wherever 230V AC supply is provided for RTU  SCADA vendor shall carry out necessary  conversion to covert the AC voltages to 24V DC for supply to field instrumentations and to  RTU  The power to the field instrumentations is to be provided through barriers and all the  digital output has to be driven through 3 5 A interposing relays  The necessary converter to  covert the AC voltages to 24V DC  the barriers and the imposing relays shall form the  integral part of the RTU     Terminations for connections of power supply should be of standard industrial type     11 19      t
122. both locally and remotely to manage SCADA system  Provision for local  accessibility at each equipment shall be provided along with all hardware  cable etc available at each station     The PDU shall be provided as per the following minimum specification  For any discrepancy   conflict with  specification  higher specification will prevail     Make  Processor  Chipset  RAM  Keyboard  Display   Mouse  Port    Slots  Display    HDD  Smart LAN  modem    DVD   CD RW Drive   Swappable with FDD   Weight   Operating System    Manageability    Anti virus    Accessories  Battery      HP  LENOVO DELL     Intel core 15   Min 2 3 Ghz integrated cache     Intel 845MP Chipset     4       DDR SD RAM  266 MHz     87 key or higher     15    LED active screen or higher Active color monitor    Touch point Touch pad   Pin typet     3 USB  1 parallel 1 serial   S Video out   Integrated wireless Blue  Tooth  External speaker  External     mic  Line in  External monitor   RJ 11 amp  RJ 45     One type II     AGP 4 x with min 16MB RAM  Dedicated Video card   with 512 MB RAM     Minimum 500 GB    10 100Mbps Ethernet and 56 6Kbps Modem   wireless LAN  820 11  b wireless Connection 10          T 100BASE  TX Ethernet with RJ   45 interface      8 x min with auto disc cleaner and lens cleaning Cartridge     less than 2 9 KG     Latest Window OS with Documentation  amp  recovery mechanism   Office XP CD with license and media       DMI  PC 2001 WI   FI certified state of art Management features      Lates
123. c Test Unit    RTU shall have feature of connecting a pluggable Programmable configuration and  maintenance terminal along with all hardware and software necessary to interface to the  RTU  This unit will function as a diagnostic and programming aid to trouble shoot and  configure RTU and input output boards  It shall be possible to exercise all the functions  of RTU s without disconnecting the RTU from process  This unit shall be a note book PC  with proper enclosure with key board and VDU  It shall operate on integral rechargeable  battery which shall be able to supply power for a minimum of 12 hours before recharge     The PDT along with Servers at FEP Locations   MS to be installed with licensed RTU  configurator software along with all the cables  amp  connectors required for configuration of                            MECON LI MI TED TECHNI CAL SPECI FI CATI ON  REGD  OFF  RANCHI  834002 ELECTRI CAL  amp  INSTRUMENTATI ON    OIL  amp  GAS SBU  DELHI       DOCUMENT NO  Page 18 of 22  REMOTE TERMI NAL UNI TS         S  05  E5  099 REVISION   1    EDITION   1               Also any additional software required for programming RTUS for dialup operation   making logics etc needs to be provided by the vendor     The PDT as diagnostic aid to RTU shall be a notebook  laptop  with proper enclosure and  shall operate on integral battery which shall be rechargeable type  The battery shall be  able to supply power as a minimum for 12 hours before requiring recharging operation   Al
124. cope of work    RTU configurator software licenses shall be preferred in software  software key  form in  instead of hardware  dongle   The PDT along with RTU configurator software shall be handed  over to client before start of RTU commissioning activities and are not to be used by RTU  vendor for commissioning activities     bb  RTU configurator   diagnostic software shall have the following provision     a  DNP index of     I O along with hardware details and present value in single  table window     b  All RTU cards  serial ports and communications channels health points are to be  configured in        and DNP index of same are to be reflected in I O list and all serial  ports should be independently configurable         Error detection control feature to ensure data integrity   cc  RTU should have the utility for configuration and diagnostics through remote and local     dd  RTU should have diagnostic provision without uploading   downloading RTU configuration to  PC laptop     ee  The        should have diagnostic feature for hardwired 105  DNP  DNP and IED  communication     ff  It should be possible to reload the RTU configurator software by GAIL engineers in case of  any OS related problem or PDT failure     gg  RTU should be completely configured for all the points available in the RTU irrespective of  field termination     hh  The        should be able to provide 1    card and serial port level health points to SCADA   11 37 Portable RTU Configuration and Diagnosti
125. dder     Trench will be provided by client  erection of foundation channel as per base requirement on trench  has to be done by the contractor  All necessary channel  welding  grouting etc has to be done     a  All supply and interconnection of cabling and accessories including cable routing between the  following cabinets equipments are also included in Bidder   s scope  and to be carried out by  the Bidder  The activities of signal identification at site  cable termination  ferruling  glanding   dressing at TIC end  RTU end  telecom rack end etc  are in Bidders scope for all sites     Between RTUs  amp  Telemetry interface cabinets    Between RTUs  amp  Telecommunication equipments    Between SCADA  CCUs  WAN routers   amp  Telecommunication equipments   Between Remote workstations  amp  Telecommunication equipments    Between RTUs and flow computers serial interfacing as required     All cables between TICs and RTUs shall be PVC insulated  single pair  1 5 mm2   multi pair   0 5 mm2   twisted in pair individually  individual pair shielded and overall shielded with  aluminium mylar tape  Separate cables for analog and digital cables to be used  The distance  between TIC and RTU for each SV  and IP station shall be approx  15 meters  The cables  have to be included accordingly     Each cable pair shall be identifiable by pair core no of colour code  The cable shall have multi  strand copper conductor  20  spare pairs shall be provided in all the cables from Telemetry  interf
126. dor to note that there could be minor database changes  graphics  report  logic changes during site commissioning phase as required by the client   consultant  The  same shall be treated as part of the scope of SCADA vendor  This activity will be carried out  by other vendor                    KOCHI KOTTANAD BANGALORE MANGALORE NATURAL           GAS PIPELINE PROJ         PHASE I1   PJS OF RTU FOR CENTRALISED SCADA SYSTEM     JOB Spec         MEC 23ME 05 E5 I PJS 094  RTU  V  ELECT   amp  INST  BID Doc No    05 51 23 ME  GAIL 094  RTU  2                               to PJS Page 1 of 1                      ANNEXURE   V  P amp ID DRAWINGS FOR ALL STATI ONS   KKBMPL PH 11                               XLRI D      CONTINIUOUS ACTION VALVE    4     p    coos       a e          f                 YMBOLS   2       SHUT OFF VALVE  G    PEE       SAFETY SHUT OFF  VALVE           _RIGHT ANGLE SHUT OFF VALVE  GENERAL  92                    VALVE  GENERAL      FOUR WAY VALVE  GENERAL  NEEDLE VALVE    PUSHBUTTON VALVE    CHECK VALVE  SPRING TYPE   NON RETURN VALVE  SWING TYPE   BUTTERFLY VALVE      CONTINUOUSLY VARIABLE BORE      BUTTERFLY VALVE    LOUVRE         SEPERATOR GENERAL      2 STAGE SEPERATOR      CYCLONE SEPERATOR   CONDENSATE TRAP   FLOWMETER GENERAL    METER GENERAL   TURBINE METER   VORTEX SHEDDING FLOWMETER  DIAPHRAGM METER EE  MANUALLY OPERATED ACTUATOR  GENERAL    DIAPHRAGM ACTUATOR f  PISTON ACTUATOR       ELECTROMAGNETIC ACTUATOR    HYDRAULIC OR PNEUMATIC ACTUATOR     G
127. duly witnessed and  accepted by the SCADA vendor shall be available for reference during FAT     Various observations and test results obtained during the various test shall be documented and  produced in the form of a report by the Bidder  Each report shall contain     a  Purpose   b  Method         Deviation from procedures described in previously submitted test plans  if any   with cause for the same     d  Result of test compared with expected results as per the test plan   e  Exceptions and action plan     If a unit or sub system has failed during the test and is not repaired and made successfully  operational or not replaced within four hours of active repair time after the failure  the test shall be  suspended and restarted all over again only after the Bidder has placed the device back in to  acceptable operation  The Client   Consultant  s approval shall be obtained for any allowable logistic  time required to replace the failed component system shall be to Bidder   s account     The Client   Consultant shall be free to request any specific test on any equipment and the system  considered necessary by him  although not listed in the testing documents to verify the compliance  with the specifications     Any statutory test inspection certificate  as may be required  under any law or directive issued by  Govt  or any competent authority  shall be furnished to the Client   Consultant     For operational software tests  the plans shall include summery of the method  a li
128. e w r t RTU system have been successfully tested   with regard to correctness of complete database using plant simulator  remote diagnostics   proper representation of all RTUs data on graphics  alarms  trending  reports etc   checking  of operation of various control commands i e  valves open close  pipeline shutdown and  permissive etc   complete checking and testing of signals from Inst panels to RTU  amp  RTU to  Inst panel checking of field values  field device status  controls of field devices commands  and set points from MS   EMS  Complete checking and testing of signals and RTU I o   s  database points from Inst panel cabinets to RTUS  testing of serial interfaces with Inst panel   amp  Solar panel shall be included in the on line testing of RTUs     2 2 4 2 Prior to SAT  the activities of installation  RTUs on line testing and commissioning shall be  performed by RTU vendor by following their Company standard  amp  established practices   amp  procedures to ensure that good techniques and best engineering practices had been  followed  while ensuring correctness  amp  completeness of the same     2 2 4 3 SAT shall be conducted by the RTU vendor after successful integration  amp  commissioning  of the complete system and after all actual field signals have been interfaced with the  RTU system including the successful completion of on line testing of all the RTUs     SITE ACCEPTANCE TESTING  SAT     The Bidder shall prepare SAT test plans and procedures document for in
129. ed for site works as per tender     Page 4 of 4                                  1  Price                    for Centralised SCADA system  GAIL  KKBMPL Phase   II                                                          SOR DESCRIPTION Unit SV type RTU IP type RTU Receiving  RT  type RTU  Item Unit   Qty Unit Total   Qty Unit   Total   Qty Unit   Total  No  Rate Rate Rate  1 2 3 4 5 6 7 8 9 10 11 12  Supply of Hardware  1    RTU cabinet consisting of Lot 01 01 01  Size   2100 x 800 x 800 plus 100 mm base channel with front door  2 nos  of tube lights  front  with door switch   2 nos  of fans  Earthing bus bar for signal   instrumentation earth  Earthing bus bar for panel earth  copper thickness 25 x 4 mm   Drawing pocket  front   DIN Rails  Cable Ducts  Glanding plates  2    Terminal Blocks in RTU Cabinet Panel  Two termination for each signal  input   consisting of       Terminal Blocks for DI  16 Inputs  Nos  01 01 02  D   Terminal Blocks for DO  8 Outputs  Nos  01 01 01       Terminal Blocks for Al  8 Inputs  Nos  03 03 04  d   Terminal Blocks for AO  4 Outputs  Nos  00 01 01  3   Internal wiring between terminal blocks and IO Module in RTU Chasis       Entire DI module  min 16 inputs  Nos  01 01 02  b Entire DO module  min 8 Outputs including wiring for external relays  Nos  01 01 01       Entire Al module  min 8 Inputs  Nos  03 03 04  d   Entire AO module  min 4 Outputs  Nos  00 01 01  4 RTU Rack   Chassis  s    Back Plane with necessary mounted units  required as a mini
130. enance purpose is  essential  The I O point wires shall not be terminated directly on the I O boards   Termination panel is to be provided for this     The RTU equipment cabinet  Rittal or equivalent  to be supplied shall be constructed to  allow free airflow to dissipate heat generated  Construction shall be such that ventilation  grills will not be obstructed when equipment is mounted in its installed position  In order  to effectively remove dissipated heat from the cabinets  vent louvers backed by wire fly  screen shall be provided  RTU vendor shall calculate the heat dissipation and where the  calculations prove the necessity  then air flow ventilation shall be assisted by integral low                            MECON LI MI TED TECHNI CAL SPECI FI CATI ON  REGD  OFF  RANCHI  834002 ELECTRI CAL  amp  INSTRUMENTATI ON    OIL  amp  GAS SBU  DELHI       DOCUMENT NO  Page 15 of 22  REMOTE TERMI NAL UNI TS         S  05  E5  099 REVISION   1    EDITION   1       power silent running air extraction fans and same shall be included             vendor s  scope  In let ventilation grills shall be filled with dust filters     The Vendor shall guarantee satisfactory functioning of the system hardware mounted in  the panels even in the event of failure of air conditioning unit     Each panel shall have provision for fully wired 2596  of IO requirement mentioned in  Annexure     spare additional 1 0 terminals for each type of 1 05  Al  DI  DO  AO  to  take care of any additions in futu
131. ents  software  installation materials  spares etc  required  to execute the complete system in all respects  However  if any additional items are required to meet the  functionality of the system as per this tender  vendor shall supply the same without any cost and time implication     Vendor shall provide all the RTU configuration details  communication Protocol details  amp  assistance required for  KKBMPL PH II SCADA vendor  M s YIL  during interfacing  amp  commissioning     The system shall meet the requirements of interoperability  portability and scalability as per the international  standards  latest version      RTU shall be interfaced with existing SCADA via telecom system on dual channel terminology and should support    compatible to DNP 3 0  TCP IP  protocol     RTU Vendor shall provide all the required configuration data and necessary support  assistance during interfacing  with Telecom system  amp  SCADA system     Vendor to note that though DNP 3 00  TCP IP  is a standard protocol  in case any further details are required for  configuration  integration or during design of RTUs with the existing SCADA system the same has to be obtained  from the original supplier M s Yokogawa India limited  Bangalore by the vendor as required     For telecom system vendor shall design the RTU which can support the IP base telecom system and provide IP port   two numbers    RTU will poll through both the ports from two FEP servers simultaneously     It is the prime responsibil
132. er specification   Bangalore  amp  Mangalore  Nos  02      Protocol Analyser as per the specification defines in      Job specification PJS No           Nos 02     23       05   E5   I   PJS 094  RTU  Rev 0   Bangalore  amp  Noida   RTU test unit  test jig  with each type of RTU cards  power supply  CPU  communication    d  serial  ALDLAO DO cards for simulating RTU test environment  to be mounted in 19    Nos  02  rack    Bangalore  amp  Noida    e  RTU configurator software No  01  Extended post Warranty per month from the date of actual expiry of main warranty   i e  Mont 24  period of 24 months  two years  from the date of    provisional    acceptance of the system by hs               owner or 28 months from the actual delivery of material at site after FAT and issue of  IC which ever is earlier  as per the terms  amp  condition of contract and as define in clause no   24 0 of PJS    Refer Note 7   SERVICE AND SITE WORK   B Installation  Testing  amp  commissioning  Interfacing with Instrumentation   Telecommunication  Electrical  CP system  any other work for the completion  hook up of  RTU to Centralised SCADA system complete in all respect    B 1 For Sectionalising Valve  SV  Stations  Nos  43  Bidder shall provide the price Break up for services  amp  site work as per the enclosed format    1 along with offer   B 2   For Receiving Stations   Despatch stations Nos  03  Bidder shall provide the price Break up for services  amp  site work as per the enclosed format    1 
133. er technical data as required at the various  stages of the project indicated in tender     AII the drawings and documents shall be verified by the vendor before presenting the same for Client review        these documentation shall be furnished in hard cover loose ring folders in A4 size  210mm x 297 mm           documents shall also be supplied in  SOFT COPY  form  However document submission date will be  considered the date of actual hard copy received from vendor at PMC GAIL office          the drawings and documents shall be verified by the SCADA vendor before presenting the same for Client  review  For initial submission 3 set hard  amp  soft shall be submit till the approval  6 sets of CD  amp  prints of          BUILT FINAL    documents shall be submitted     RTU engineering documents  FAT  engineering manual  user s manual  engineering will be submitted for  review approval records     The contract document would be the Purchase order  after award of contract  and the same shall have higher  precedence than all approved project documents                                         KOCHI KOTTANAD BANGALORE MANGALORE     NATURAL GAS PIPELINE PROJECT  PHASE II   PJS OF RTU FOR CENTRALISED SCADA SYSTEM  Job Spec  No    MEC   23ME   05   E5  1  PJS 094           z            BID Doc No    05 51 23 ME  GAIL 094  RTU   Rev  0 Page 20 of 24                         22 0    All the PO  FDS  FAT cum Inspection Certificates  SAT and Warranty  Guarantee   warrantee etc documents  wi
134. eration  maintenance  system  internals and  expansion modification of the installed RTU system shall be provided     RTU vendor shall prepare and submit final terminal details along with final IO list as per the FORMAT  to be  provided by GAIL  and to be approved by PMC GAIL before pre commissioning     The RTU vendor shall inform GAIL about product discontinuation one year in advance so that GAIL can procure  the spares of the RTUs to maintain it for its remaining useful life  If bidder is not RTU manufacturer then the RTU  manufacturer should give a letter that they intimate GAIL about discontinuation of product one year in advance  along with the bidder s commitment     SPARES     Supply of Mandatory spares and Commissioning Spares of all supplied RTU shall be provided as per the  following     a  MANDATORY SPARES       Supply of loose Mandatory spare shall include 10  of all type of Installed cards  convertors  power  supply converters  termination boards  OEM cables between cards and termination boards  backplanes  relays etc  accounted  amp  calculated considering total quantities of RTU  53 nos   In case total installed cards items are 1 or  2 then only one spare card item shall be provided  Bill of material of fully wired RTU  with spare  calculation  must be furnished along with offer   Bill of Material has to be provided along with offer  any  fraction quantity should be round off to nearest number in higher side      Unit rate for Mandatory spares with cards detai
135. ernal wiring  mounting arrangement etc  shall be carried out  in detailed engineering  Proper illumination shall be provided inside the RTU cabinet     2 0 Environmental  The equipment selected will operate in the following conditions       Ambient Temperature 55         Humidity 05 95  RH     Non air conditioned environments    3 0 Power Supply    RTU shall operate at 24 V DC power supply  The power supply available will be 24 V DC or  230 V AC   10   50 Hz   3  as indicated in the Tender elsewhere  The Vendor shall select  the power supply module accordingly and furnish the power consumption of equipment in  format enclosed with tender     4 0 RTU SUBSYSTEMS  4 1 The RTUs shall comprise the following subsystems     Central processor with system software    Analog input   Digital  contact  input   Digital  contact  output   Analog Output   2 Ethernet port for polling for simultaneous polling from FEPs through DNP 3 0  TCP IP   Serial ports Ethernet port to connect Portable Diagnostic Test Unit  PDT                                        LIMITED TECHNICAL SPECI FI CATI       REGD  OFF  RANCHI  834002 ELECTRI CAL  amp  INSTRUMENTATI ON Nu    OIL  amp  GAS SBU  DELHI              DOCUMENT NO  Page 5 of 22    REMOTE TERMINAL UNITS         S  05    5  099 REVISION   1    EDITION   1       Serial ports for connecting IEDs e g  Flow computers  Gas chromatograph   Battery backed power supply  SMPS     Diagnostic tools  Online from MS BM and off line diagnostics    2 Ethernet port fo
136. for compatibility testing  GAIL will arrange testing at GAIL Noida  Following has to be  done for compatibility testing certificate     a  RTU Vendor  if bidder is not OEM then bidder along with OEM has to apply  shall apply to GAIL  Project   SCADA Group  Delhi requesting for the testing of         with Centralised SCADA at MMS  at GAIL Noida  The date for testing will be fixed one week prior to the testing     b  The RTU vendor has to arrange their RTU along with required cables  connectors and other necessary  equipments for testing at MMS  GAIL Noida         The tests shall be demonstrated by RTU vendor as        enclosed test procedure  Refer annexure XIV                                                           5 3    6 0    6 1    6 2    6 3    6 4    6 5    6 6    6 7    KOCHI KOTTANAD BANGALORE MANGALORE  MEE en NATURAL GAS PIPELINE PROJECT                  PJS OF RTU FOR CENTRALISED SCADA SYSTEM  Job Spec  No    MEC   23ME   05   E5   I   PJS 094           2  BID             05 51 23       GAIL 094                   0 Page 6 of 24  d  After successful testing  certificate shall be issued by GAIL  Noida     This compatibility testing certificate with test reports must be enclosed with bid documents     During RTU FAT  RTU vendor bidder shall call and involve Yokogawa engineer for witnessing the RTU FAT  with Yokagawa Fast Tools SCADA system at their cost  The testing will be done by YOKOGAWA India limited  at RTU manufacturer s works  RTU vendor shall extend all the 
137. g data for high low limit violations as per stored limit tables and  communicate the same to MS along with time stamping    b  Linear conversion to engineering units and input filtering  in case engineering unit  conversion is being done at RTU level  conversion of raw data to normalized values  e g  0 to  1 0  for communication shall also be acceptable     C  To support remote reconfiguration and downloading of parameters i e  addition  deletion   modification and reassignment with different range  limits etc  from workstations to avoid  local engineering at RTU level  The following requirements of RTU configuration form MS    EMS shall be fulfilled      i  The remote configuration wrt following parameters for the points defined in the RTUs  shall be remotely done from active SCADA Server at FEP Servers   MS   EMS  in case the                                       LIMITED            OFF                 TECHNICAL 5                                 834002                    ELECTRI CAL  amp  INSTRUMENTATI       OIL  amp  GAS SBU  DELHI  DOCUMENT NO     TERMINAL UNITS         S  05  E5  099    Page 10 of 22  REVISION   1  EDITION   1       features of Alarm generation  association of the alarm priority and engineering unit  conversion are implemented at the RTU level     e Analog alarm limits    e Analog scaling factor for engineering unit conversion    e Threshold value    e Filter time constant etc     These shall be automatically updated to the standby SCADA Server also      
138. gration of I Os  IEDs  integration with SCADA software  d  Generation  amp  modification Point database   e  Programming        to built logic  make program to poll IEDS with propriety protocol etc    f  Precaution and safety aspect for RTU     RTU vendor to note that all programming languages  commands  display languages etc  system shall be in  ENGLISH language only     WARRANTY   EXTENDED WARRANTY    The system shall be guaranteed to give specified performance of 99 99  for a period of 24 months  two years   from the date of    provisional    acceptance of the system by the owner or 28 months from the actual delivery of  material at site after FAT and issue of IC  whichever is earlier  as per the terms  amp  condition of contract  This  warranty shall survive inspection of goods and acceptance of the system     Bidder shall quote extended post warranty per month from the date of actual expiry of main warranty  i e   period of 24 months  two years  from the date of  provisional  acceptance of the system by the owner or 28  months from the actual delivery of material at site after FAT and issue of IC  whichever is earlier  as per the  terms  amp  conditions of contract  After 28 months Client   EIC ordered extended warranty in writing for additional  period  The additional period will be decided at the time of order placement  Period for extension will be finalized  by the client as per the requirements  amp  accordingly payments will be made as per SOR rate     Contractor s
139. h GAIL   s Centralised  SCADA system including all the related activities for interfacing with existing Centralised SCADA system   The proposed RTU by the bidder should be compatible to GAIL   s Centralised SCADA system  However the  interfacing work at existing MS  amp  BMS will be executed by other contractor GAIL  Any assistance required  for hookup of RTU with existing Centralised SCADA System and commissioning of KKBMPL Phase  II RTU  will be in bidder s scope  The RTU will be multidropped and interconnected to the Front End Processor  FEP   SCADA Server  provided  amp  installed by other contractor   Approx  53 Nos  of Remote Telemetry Units   RTU s  for                      Pipeline has been envisaged     The Scope of work for bidder shall be to supply and commission RTUs for KKBMPL PH II pipeline with  Centralised SCADA system which includes Project Management  Design  Engineering  Procurement of  Materials  fabrications  manufacturing  Inspection  amp  Factory Acceptance Testing at works  Supply  Packaging   Shipping  Insurance  Port Handling  Custom Clearance  Inland Transportation to store  amp  site  Storage  amp  Safety   Installation along with necessary accessories  cables  connectors  RTU panels  erection of foundation support  channel on trench for panel erection  cable trays  test instruments  equipments  Site Acceptance testing and  integration with Centralised SCADA system  Test Run  Commissioning  Integration Telecom System  amp  local  IEDs   Training  W
140. he RTU shall be equipped with the RS 232 ports  amp  RS 485 ports for polling the IEDs  as specified in the document elsewhere  Additionally one more RS 232C or TCP IP  port shall be provided for connecting PDT for configuration of the RTU     v  RTU vendor shall develop  configure and establish the communication for reading    writing of data from   to the flow computers   CP Panel   Gas Chromatograph or other  IEDs         vendor to configure RTUs for writing of GC data installed in one  terminal and connected one         to flow computers kept at other terminal and  connected to a different RTU  along the same pipeline  The client shall furnish to RTU  vendor the make  amp  model no   protocol details of these IEDs during detailed  engineering or prior to FAT  RTU vendor shall simulate the above devices using  protocol analyzers   PC  other means to demonstrate during FAT     w  RTU vendor shall provide all the software tools and programs  source code  used to  interface RTUs with Flow computer  PLCs  any other IEDs  It shall be possible for  client to integrate other IEDs with the RTU in future  To achieve the same the RTUs  shall have provision for integrating IEDs and all necessary software  compilers  tools  etc  shall be supplied by the SCADA vendor  The alarms for power supply  serial link  failure  flow computer  amp  other IEDs malfunction through serial link shall be  implemented  The integration of IED s  of any protocol not just modbus  with the  RTUS shall be t
141. he field instrument connections for RTUs shall be terminated in      TIP  Telemetry  interface panel   The 1    point wires shall not be directly terminated on the        1 0  boards  Terminal blocks panels are to be provided in the        cabinet  1 0 termination  blocks shall have both male and female portions so that to isolate the field wiring at RTU  level  male female termination block attached to be field wiring can be pulled out instead  of removing the wiring  Printed tube type Cross ferruling shall be done     11 20 The electronics in the RTU cabinet shall consist of plug in PCB s or units with Gold plated  edge connectors that utilize a wiping action for connection for PCB s to the back frame  wiring  SCADA Vender shall detail the shelf and inter shelf wiring and the termination of  the wiring harness between the RTU and the terminal block area  Easy access cabinet  wiring  for maintenance purposes is essential  The PCBs and RTU components shall be  designed for high temp rating and low power consumption so that air exchange with the  ambient environment will not be required     11 21 The RTU shall be Immune to radio frequency interference generated by any nearby source  meeting the latest international standards in this regard  MIL  VDE etc      11 22 The RTU equipment shall function continuously without requiring any preventive  maintenance     11 23  RTUS shall be multidropped on a pair of communication channels  Each RTUs will be polled  from both the communica
142. ii  RTU vender shall include in scope of supply at MS   EMS  various stations  PDT  configuration unit  Monitor  amp  Keyboard  hardware  amp  software with cables  amp  connectors   to create configuration file involving definition of            modules attached to the RTUs       Type of each 1 0 modules and time stamping requirements for points in each    module     e The mapping of RTUs data base to the DNP Protocol address space    e Software logic in RTUs    e Physical and software interfaces connected to the RTUs     iii  The configuration file shall be able to be transferred online from MS   EMS   various  stations using the existing data channels to the corresponding RTU      d  Time stamping of all exception reports      However  the SCADA vendor has the option to implement the features of Alarm generation   association of the alarm priority and engineering unit conversion at the RTU level or SCADA    server level      11 6 RTU shall comply the following     a  RTU shall be capable of updating process parameters data and configuration data in its own  built in memory  Time stamping of all field values at RTU end shall be required  In the event  of failure or break of communication link  the RTU shall continue to scan all parameters and  update its database  RTU shall retain in its database the complete analog and digital  information of the field till it is completely and correctly read by MS   EMS   various stations  in order to take care of no loss of data in case 
143. inalized during detail  engineering     11 25 Non availability of any one of the two communication channels should not hamper the  functioning of the other RTUs multidropped on the pair of channels     11 26 RTU vender to ensure that the open close status of valves  open state first wired and  thereafter close state  be wired consecutively in the RTUs     Interlocking Logic    The means to minimize the risk of incorrect operation or incorrect sequence of operations can  be included within the RTU as a logical interlocking function     All the data shall be available in the engineering units in the RTU database  The RTU vendor  has the option to implement the feature of engineering unit conversion at the RTU level     11 27  t shall have feature of connecting a pluggable Programmable Diagnostic Test unit  PDT   with keyboard  amp  monitors diagnostic and programming aid to trouble shoot and  configuration tool for RTU and 1 0 boards  It shall be possible to exercise all the functions  of the RTU without disconnecting the RTU from process     11 28 RTU Vendor shall detail the shelf and inter shelf wiring and the termination of the wiring  harness between the RTU  the terminal block area and the field instrumentation  Easy  access to cabinet wiring  for maintenance purposes is essential  The RTU components shall  be designed for high temperature rating and low power consumption so that air exchange  with the ambient environment will not be required     11 29 Identification label
144. ing upon the severity of the issue  engineer  shall be sent by vendor to the site       the costs for this support are in the scope of vendor     A   QC REQUIREMENTS    The Bidder shall operate a Quality System meeting the requirements of the relevant part of ISO 9002 If bidder is  not the OEM of RTU then he should follow QA QC of OEM also                                      KOCHI KOTTANAD BANGALORE MANGALORE     NATURAL GAS PIPELINE PROJECT  PHASE II   PJS OF RTU FOR CENTRALISED SCADA SYSTEM  Job Spec  No    MEC   23ME   05   E5  1  PJS 094           2  BID Doc No    05 51 23 ME  GAIL 094  RTU   Rev  0 Page 23 of 24                         26    27    28    Bidder shall provide documents such as plans  procedures  instructions  etc  for the accomplishment of all works  covered in this specification to provide the required quality     Specific adherence to the guidelines set down in ISO 9002 series documentation shall be detailed out by the  bidder and shall be subject to review and approval by the Company     Vendor shall submit the quality management system meeting the requirements of ISO 9001     2000 which he  proposes to operate while executing the job     The system documents shall cover Quality Plan for this job  procedures  work instructions  inspection and test  plans  ITP  and test results reporting format to provide an approach for achieving the required quality job  The  quality system shall be reviewed and approved by the company     Owner reserves the right to 
145. irely with the requirements of IS 3043  The bar shall incorporate a removable  section to facilitate earth continuity testing     On intrinsically safe circuits the following shall be considered     e Unused cores of the multicare cables nominated as spares shall be terminated to earth via dummy  barriers  All other unused cores shall be taken directly to the I S  earth bar    e The earth connection via dual shake proof screws or clamps    e Brass studs shall be incorporated on the I S  earth bar for connection of dual LS  earth cables    e The LS  earthing system shall be labeled    Safety earth Do not disconnect      Similarly unused cores of Non  1 5  field cables and system cables shall be terminated and connected to the  instrumentation    clean    earth  A minimum of 30   spare capacity shall be provided within system cables  and ELCO connectors                                              LIMITED    KOCHI KOTTANAD BANGALORE MANGALORE  NATURAL GAS PIPELINE PROJECT  PHASE II     DELHI PJS OF RTU FOR CENTRALISED SCADA SYSTEM          ELECT   amp  INST  BID Doc No    05 51 23 ME  GAIL 094  RTU     Job Spec  No    MEC   23ME   05   E5  1  PJS 094                   SECTION             Rev  0 Page 16 of 24          11 5    SAFETY REQUIREMENTS  It is the intent of the Client that operational hazards be reduced to a minimum  The bidder shall use sound  engineering judgment to complete      installation that will perform the required function without compromising this    aim    
146. ities and the nature of the documents to be submitted by the Vendor to the Client    Consultant for Approval   Record     Any document  even when preliminary  shall be binding and therefore duly identified and signed by the Vendor  It shall bear  the Project reference  the PO no  and the document identification number     THE DOCUMENTS ARE FULLY PART OF THE SUPPLY WHICH SHALL BE COMPLETE ONLY IF AND WHEN  THE DOCUMENTS COMPLYING FULLY WITH THE MATERIAL REQUISITION REQUIREMENTS ARE  RECEIVED BY THE CLIENT   CONSULTANT        Certified information required after Purchase Order    Documents and Data    Functional design Specification for RTU       Soft Copy    4    Printed  Matter    4    Date  needed    12 weeks    Date  Promised            Assignment    RTU Cabinet Wiring diagram    4    4    12 weeks    16 weeks       SST  SOS  amp  PCUR From  attached with the  tender  duly filled and siened by the bidder       Bill of Material    12 weeks       List of Mandatory Spares    12 weeks       List of Commissioning Spares    12 weeks       Suggestive Control Room Layout for each  station    12 weeks       Equipment Interconnection diagram including  details of various interfaces  signal protocols  etc     16 weeks       RTU Specification  internal Layout including  mounting arrangement  interconnection    12 weeks       Internal layout of SCADA cabinets  consoles   desks etc  including mounting arrangement   interconnection etc        LAN interconnection diagram       I O point da
147. ity of RTU vendor to establish communication between RTU  Telecom and SCADA   During interfacing stage if any extra item would require from RTU end which was not ascertained by RTU vendor  during bidding stage shall make available with out any implication of extra cost to client   RTU panels testing shall be carried out as per the following stages   A  Real data testing of all the serial interface signals from respective panel to RTU with Centralised  SCADA   B  Real data testing of hardwired signals from respective panel to RTU with Centralised SCADA     The person deputed for erection and testing shall be competent to execute the work independently                                      KOCHI KOTTANAD BANGALORE MANGALORE  a NATURAL GAS PIPELINE PROJECT  PHASE ID  PJS OF RTU FOR CENTRALISED SCADA SYSTEM  Job Spec  No    MEC   23ME   05   E5  1    5 094           2  BID Doc        05 51 23 ME  GAIL 094  RTU   Rev  0 Page 10 of 24                         6 36    6 37  6 38  6 39    6 40    6 41    6 42    6 43    6 44    6 45    6 46    6 47    Portable Programmable Diagnostic Unit  PDT   shall be provided as per the specification   with Latest  configuration with minimum 1 USB  amp  1 RS232 port  amp  as define in the specifications     Test equipments as per specification with Latest configuration as per the SOR  MR   Vendor shall provide Mandatory spares as per the SOR     The test jigs RTUs  two     one for Noida  amp  one for Bangalore  of same make and model as proposed   
148. l testing to ensure correct  proper  good and neat  workmanship     b  Demonstration of the complete system functionalities  hardware  amp  software  compliances wit all the equipments including RTUs     c  Checking of complete database definitions for the proper system configuration     d  Testing of system passwords and security features                    KOCHI KOTTANAD BANGALORE MANGALORE NATURAL  um GAS PIPELINE PROJECT                  PJS OF RTU FOR CENTRALISED SCADA SYSTEM  JOB Spec  No    MEC   23ME   05   E5   I   PJS 094                        amp  INST  BID Doc        05 51 23       GAIL 094           SECTION  ANNEXURE III to PJS Page 3 of 6                      Testing the synchronization of clock between      nodes of each MS and the RTUs  as per the specification     Checking of various Tog formats  reports  archiving functions   Checking of system loading w r t CPU  memory  disk  as per the requirements     Checking of system diagnostics for all the equipments as per the requirements   power failure and system restarts     Redundancy check for dual communication channel   10  amp  Serial communication checking by simulation  System building procedures and verifications     Pipeline shutdown and various sequences and interlocks as per pipeline Operation  and Control Philosophy     2 24 Online testing  Commissioning    2 2 4 1 Prior to SAT  all RTUs shall be tested online by        vendor when all the dispatched  SV   IP  receiving station hardware  amp  softwar
149. ll be part of the    Final Documents        FUNCTIONAL DESIGN SPECIFICATIONS  FDS     Vendor has to note that this tender completely covers the operational and functional requirements of the R TU for  Centralised SCADA system for GAIL s KKBMPL PH II pipeline and associated network  The requirement of  FDS shall be to focus on the implementation aspects of requirements specified elsewhere    FDS shall be custom defined for this project and include the implementation aspects of tender requirements in the  following sections     FDS shall cover operational and functional requirements of SCADA implementation aspects within the scope of  this tender  Complete details of systems configuration  control philosophy  Redundancy and backup aspects   system failovers  amp  fail backs   alarms management covering implementation aspects of tender requirements   Interfacing  Integration and communication aspects between various subsystems including with Telecom system   communication protocol interfacing with Flow computers  GC  CP Panel and other IEDs  description of SCADA   third party software interface  system resource sizing basis and performance parameters covering CPU  Hard disk  and main memory utilisation  memory mapping  system timeouts  computers switchover timings  Display updates   Display Call ups  poll time calculations etc      DRAWINGS     Engineering drawings   documents        This document shall cover the drawings   documents such as interconnection diagrams  supplied RT
150. llowing an  instruction from the Master Station  Compliance with CCITT recommendations  42 Physical interface                   Item Description Particulars  ANALOG INPUT MODULE          Module designation   Microcontroller microprocessor type   No  of inputs per module   Type of ADC   Scanning resolution bits   Whether AI module of self calibrating type and event reporting  to Master Station if out of calibration  yes no   Accuracy     Conversion time ms   Type of Analog multiplexer   Method of isolation                   S P P                  SoN                                                    MECON LI MI TED TECHNI CAL SPECI FI CATI ON  REGD  OFF  RANCHI  834002 ELECTRI CAL  amp  INSTRUMENTATI ON    OIL  amp  GAS SBU  DELHI       DOCUMENT NO  Page 21 of 22  REMOTE TERMI NAL UNI TS         S  05  E5  099 REVISION   1    EDITION   1          11  Surge withstand capability  as        IEEE Standards                    12  MTBF h   13  Equipment availability     14  Power requirement W   15  Signal support  4 20 mA and 0 5 V Yes No   DIGITAL INPUT MODULE       15  Module designation             16  Microcontroller microprocessor type  17  No  of inputs per module  18  Is input module type configurable as    a  Status and alarms   b  Sequence of events   c  Parallel input   d  Pulse accumulator   e  Any combination of these                                           19  Contact bounce protection yes no   20  Optical isolation yes no   21  Scan time ms   22  Noise rejection ye
151. ls  part no   make etc  shall be given separately with the offer  amp   price part     Vendor has to note that mandatory spares  supplied to GAIL  shall not be available to them as part of  commissioning spares                                      KOCHI KOTTANAD BANGALORE MANGALORE     NATURAL GAS PIPELINE PROJECT  PHASE II   PJS OF RTU FOR CENTRALISED SCADA SYSTEM  Job Spec  No    MEC   23ME   05   E5  1  PJS 094           z            BID Doc No    05 51 23       GAIL 094           Rev  0 Page 11 of 24                         6 48    7 0    7 1    For spares Vendor shall provide the address  contact person  fax and telephone numbers of the manufacturer  for spare parts  The vendor shall warrant that spare part for the system would be available for minimum of 10  years after warranty period from the date of system commissioning  After this period if the vendor  discontinues the production of the spare parts  then he shall give at least 12 months notice prior to such  discontinuation so that Owner may order the requirements of spares in one lot     The Vendor shall provide unit price of each Spare Module card  which shall be valid for the procurement of  the spares for operation and maintenance in subsequent years as  amp  when requested or during detailed  engineering     b  COMMISSIONING SPARES   The commissioning spares shall be arranged by the vendor to cater to the needs requirement during  installation  commissioning  site acceptance testing  trial run and warranty peri
152. m avallability and reliability and shall not be dependent upon established failure of third party  supplied items  Client   Consultant shall have      right to reject the complete system or part there of  in the event of two successive failures of test run     The    Test           will be carried out after the commissioning of complete pipeline duly witnessed by  Client   Consultant  After the successful completion of Test run  Warranty phase will start and    system taking over certificate will be issued by the Client   Consultant     TEST REPORTS    The observations  exceptions and test result obtained during the various test shall be documented  and produced in the form of a report by the Bidder within 15 days of completion of Test Run which  shall be subsequently reviewed   approved by Client  Consultant within 10 days of submission of  repost  The warranty phase will start only after the approval of documents   acceptance of the  system     FAILURE OF COMPONENTS    A log of all failed hardware and software modules shall be maintained which shall give date and  time of failure  description of the failed components  amp  cards software along with designation  effect  of failure on the system  cause of failure and number of hours of operation of the part before it  failed     Upon failure of the components cards modules  the same shall be replaced by better graded  components cards  And the test shall be restarted from the beginning or the previous logical points  as the c
153. mum       RTU Rack   Chassis   Back plane having minimum 10 slots with Nos  01 01 01       mounting arrangements                                     Page 1 of 4                      1  Price                    for Centralised SCADA system  GAIL  KKBMPL Phase   II                                                          D   RTU Rack   Chassis   Back Plane Power Supply Unit Nos  01 01 01  CPU card   32 bit with 64 MB Flash  Nos  01 01 01  Shall include following communications ports as a minimum  to be  indicated if not included in CPU Card     e For polling from MS  BMS  Lot 01 01 01  1   Ethernet   2 nos    2   RS 232  2 nos    f For diagnostics  1 nos  for connecting PDU for diagnostic and local Nos  01 01 01  configuration of RTU either on Ethernet or Serial   5 Input   Output Modules        48V to 24V DC Converter along with Surge Arrester along with terminal Nos  00 00 00  blocks for power cable termination and MCBs   b  24  to 24V DC Converter along with Surge Arrester along with terminal Nos  01 01 01  blocks for power cable termination        MCBs        230V AC to 24V DC Converter along with Surge Arrester along with Nos  00 00 00  terminal blocks for power cable termination and MCBs   d   DI Card s   16 Inputs  Nos  01 01 02        DO Card s    8 output including external relays  Nos  01 01 01   f   Al Card s   8 Inputs  Nos  03 03 04   9        Card s   4 Outputs  Nos  00 01 01   h Module   Card for 2 nos of RS 232   RS485  software   selectable  Serial Nos  02 02 0
154. necessary testing facilities to YIL and do the  necessary modification   programming as required     The Modbus        data format details to be provided by the RTU vendor is enclosed as ANNEXURE  XV   The  Modbus details of the IEDs will be provided during detailed engineering to successful bidder  Functionality will  be tested during          testing      PROJECT REQUIREMENTS AND DETAIL SCOPE OF WORK     The Bidder shall undertake full responsibility for supply and commissioning of RTU for Centralised SCADA  system in KKBMPL PH II  meeting the objectives  functional and specific requirements describe in the  specification     The material to be delivered and works performed shall be to meet the technical specifications and the  requirements detailed in the Bid package     GENERAL CONTROL AND FAILOVER PHILOSOPHY     AII the pipeline facility as define elsewhere for KKBMPL PH II shall be supervised and controlled by the  Centralised SCADA operators of Master Control station  MS  at Noida and backup at Emergency Master  Control Station  BMS  at Jaipur  amp  also monitored at Remote Work Station located at all FEP locations  tentatively at Mangalore  Bangalore  amp  Kochi  All the despatch and Receiving station will be manned and all the  SVs stations  amp  IP Stations are unmanned  Local control system at these locations for various facilities  communicated with SCADA system to allow remote monitoring and control from the Master Control Station  and Emergency Master Control St
155. netic Compatibility  130 System Availability Requirement    14 0 Installation Material    15 0 Finish    16 0 Calibration  17 0 Minor civil area  18 0 Electrical Work    19 0 Spares    20 0 Test Equipments  21 0 Documentation    22 0 Functional Design Specifications  FDS     23 0 Training    24 0 Warranty   Extended Warranty  25 0  QA  QC Requirements   26 0 Certificate Of Logistic Support  27 0 Supply  amp  Storage Of Equipment    28 0 Site Preparation  29 0 Annexure    ANNEXURE I  ANNEXURE II  ANNEXURE III  ANNEXURE IV  ANNEXURE V  ANNEXURE VI  ANNEXURE VII    A   ANNEXURE IX  ANNEXURE X  ANNEXURE XI  ANNEXURE XII  A  A  A  A    NNEXURE XV       NNEXURE VIII    NNEXURE XIII  NNEXURE XIV    NNEXURE XVI    SPECIFICATION OF REMOTE TELEMETRY UNIT  RTU   I O COUNT FOR NEW RTUS  INSPECTION  amp  TESTING  INSTALLATION  amp  COMMISSIONING  P  amp  ID FOR ALL STATIONS KKBMPL PH II  PIPELINE SCHEMATIC ROUTE DIAGRAM  KKBMPL PH I  amp  IT   TYPICAL INTERFACING OF RTU WITH OTHER PANELS  SOURCE OF SUPPLY FORM  SOS  FORM  POWER CONSUMPTION  amp  UTILITIES REQMT FORM  PUCR Form   PROJECT MANAGEMENT  amp  RESPONSIBILITY  PMR  FORM  RESPONSIVE OFFER CRITERIA  ROC  FORM  TECHNICAL CHECKLIST  LOGISTIC SUPPORT  PROCEDURE TEST SCHEDULE FORMAT FOR THE TEST OF  DNP 3 0 MAPPING   PROTOCOL   INTEROPERABILITY DETAILS  MODBUS RTU DATA FORMAT DETAILS TO BE PROVIDED BY RTU  VENDOR  DEVIATION FORM                                             LIMITED    KOCHI KOTTANAD BANGALORE MANGALORE  NATURAL GAS PIPEL
156. ng for proper  integration     The electrical works associated with the installation and commissioning  define elsewhere  and earthing of RTU  equipments at all sites  from Earth pit to RTU   powering of equipments at all sites  termination of cables as  required  Separate earth pits if required shall be provided by Client  other contractor     At the RTU locations  UPS power at single point shall be provided by Client  Further lying of power cables  PDB  and distribution to individual equipments is in the scope of bidder     Supply and laying of cables  amp  connectors from TIC  Instrumentation panel to RTU  amp  interconnection between  RTU with Telecom system     Glanding  ferruling  termination of instrumentation signal cabling at RTU end and respective end at TIC  Inst  Panel end  The cabling from field devices up to TIC panel  including supply of panel  amp  cables  will be carried out  by Client  other contractor     IEDs communication protocol details will be provided by Client during detail engineering     The type of telecom connectivity shall be Ethernet based TCP IP for each remote location  if any change  it will  be communicated during engineering by Client     Scope regarding cables  glands and interconnection of cabling and accessories including cable routing between the  following cabinets  equipments are as follows                 Type of   Location   From To RTU vendor  Cabling  l    Serial RTU RTUs  IEDs  FC  GC  CP  Complete interfacing requirements  Inte
157. ng with bid         RTUs DC Load Requirements    Complete RTUs  DC power  requirements   watts                                communication   memory  power  supply unit  Any item s not  7 included above    NOTE        a       RTU cards  including CPU  communication cards  AI        DI  DO  Serial cards along with power supply  unit  are included for power consumption     b  The digital output cards power consumption  watts  shall also include the power requirements for interposing  relays     c  The above table shall be filled for all the RTUs being supplied                                  LIMITED KOCHI  KOTTANAD BANGALORE MANGALORE NATURAL GAS  DELHI PI PELI NE PROJ               5   11   PJ S OF RTU FOR CENTRALI SED SCADA SYSTEM     JOB Spec                  23       05   E5  I     5 094          HK                   id BI D Doc No    05  51  23 ME   GAIL  094  RTU  S       ANNEXURE X to PJS Page 1 of 1                   ANNEXURE   X    PROJ ECT MANAGEMENT AND    RESPONSI BI LI TY  PMR  FORM                   KOCHI KOTTANAD BANGALORE MANGALORE  NATURAL GAS PIPELINE PROJECT  PHASE II   PJS of RTU FOR CENTRALISED SCADA SYSTEM  JOB Spec  No            23       05   E5   I   PJS 094  RTU            INDIA  LTD  BID Doc No    05 51 23 ME  GAIL 094  RTU     ANNEXURE X to PJS Page 1 of 1                   PROJECT MANAGEMENT AND RESPONSIBILITY  PMR  FORM    Name of RTU Bidder   RTU Vendor works  amp  address   Name of the sub vendor Service Associates  Sub vendor works  amp  Addres
158. nts   port  The DO card should have minimum 8 points  ports     C  All the field   IED Parameters should be configurable at the RTU end on Modbus ascii and  Binary protocol     d  Each RTU should have 25  spare 1 0 points and additional 25  spare slots of total installed  serial and 1 0 cards slots  The spare slots to be covered with appropriate enclosure to avoid  any dust particle entering the RTU    e  RTU should be internally wired for all the cards available IO points in the RTU     f  RTU vendor should provide the final indexing of all 1 0 points for each        to enable SCADA  vendor to configure the SCADA database     g         vendor to provide Field 1 0 details  list of I O points along with engineering units  range   alarm limits  status corresponding to open close contacts  indexing details in the RTU etc    for configuring in SCADA as        GAIL standard 1 0 list format to be provided by GAIL     h  RTU should have calculation features in it for defining         resident calculation points                                        LIMITED TECHNICAL SPECI FI CATI       REGD  OFF  RANCHI  834002 ELECTRI CAL  amp  INSTRUMENTATI ON Nu    OIL  amp  GAS SBU  DELHI ir       DOCUMENT NO  Page 6 of 22    REMOTE TERMI NAL UNI TS         S  05  E5  099 REVISION   1    EDITION   1    i         RTU should have diagnostic feature for hardwired 105  DNP and IED communication   Modbus  from remote as well as from local        5 0 DIGITAL INPUTS    Typical specification of Digital
159. od  These spares will be the  part of the tender  These spares shall be readily available with the vendor  If the spares not used they may be  retained by the vendor for maintenance   These commissioning spares are different from Mandatory spares and vendor shall not use mandatory spares  as commissioning spares  Vendor shall provide a list of commissioning spares  with Serial  amp  Part number for  each system  sub system  at the time of offer and it will be part of main offer    EXCLUSIONS    Work such as civil work related to building  Electrical panel  Instrumentation panel  supply and erection of these  panels in control room  Trench in control room  Preparation of buried cable trenches and laying of multi cables  which is outside the vendor s scope  However vendor shall be responsible for Erection of foundation channel on  trench for RTU supply and laying of cables from TIC  instrumentation panel   other respective equipments to  RTU  Cable tray  complete loop checking related to RTU SCADA and final documents  The work for MS  amp  BMS  will be in other contractor scope  However any assistance required at KKBMPL PH II pipeline site will be in  bidder s scope for interfacing work     GENERAL TECHNICAL REQUIREMENTS     REFERENCES    Codes and Standards    The following standards shall be considered part of this specification insofar as they give definitions  describe  requirements and provide tests that the equipment supplied shall meet  The Standards used shall be the la
160. odic Protection System  CP     8       Count for RTU IPS 1 are inclusive of Despatch facilities for both Bangalore  amp  Mangalore pipeline    9  The         marked              are the tentative CP station locations  Location may change and it will be finalised during detailed engineering            10  If during detail engineering any additional card has to be added  then same will be paid as per rates available in the SOR  however wiring  erection etc   will be in bidder s scope                                 KOCHI  KOTTANAD BANGALORE MANGALORE NATURAL GAS    DELHI PI PELI NE PROJ ECT  PHASE 11   PJS   RTU FOR CENTRALI SED SCADA SYSTEM WS  JOB Spec         MEC   23ME  05   E5  I      5 094           lt        or            ELECT   amp  INST  BI D Doc No    05  51  23               094           SECTI ON                      ANNEXURE 111 to      5 Page 1 of 1       ANNEXURE   III    I NSPECTI      AND TESTI                        KOCHI KOTTANAD BANGALORE MANGALORE NATURAL  um GAS PIPELINE PROJECT  PHASE II   PJS OF RTU FOR CENTRALISED SCADA SYSTEM  JOB Spec  No    MEC   23ME   05   E5   I   PJS 094           ELECT   amp  INST  BID Doc No    05 51 23 ME  GAIL 094  RTU   SECTION  ANNEXURE III to PJS Page 1 of 6                                          to PJS  RTU FOR CENTRALISED SCADA SYSTEM    INSPECTION AND TESTING  INSPECTION    All equipment and components of the system shall be subjected to inspection and testing both  during and upon completion of manufacturing and at 
161. of failure of MS   EMS  various stations  The  RTU shall scan the field and the memory buffer is to be sized to store all the changing data   i e  new exception report for the data every poll time  and MS EMS FEP various stations  receive the same without any loss of data and alarms in the SCADA system to take care of  channels SCADA server switchover times                                        LIMITED TECHNICAL SPECI FI CATI       REGD  OFF  RANCHI  834002 ELECTRI CAL  amp  INSTRUMENTATI ON    OI L  amp  GAS SBU  DELHI       DOCUMENT NO  Page 11 of 22  REMOTE TERMI NAL UNI TS         S  05  E5  099 REVISION   1    EDITION   1       b  Further to take care of long term communication outage with MS EMS FEP the RTUs shall be  designated to also scan the field and store in the memory up to 1000 field s exception reports  during the period of communication outage for retrieval by MS subsequently         The RTU system shall have the facility to attach to each digital event signal a time tag  generated by the RTU local clock to enable the occurrence to be recorded and transferred  with the resolution of 100 ms     11 7 It shall be possible to have highest priority of alarms  in order for the same to be sent to  MS EMS FEP  The SCADA vendor has the option to implement the feature of association of the  alarm priority at the RTU level or SCADA server level     11 8  Itshall provide  Check before Execute  feature before execution of command     11 9 Every control associated with the
162. oftware  Instruments and Equipments   A log shall also be maintained by the Bidder during the time the system remains at Bidder s works    from the time of purchase putting the system for the purpose until system is cleared to dispatch to  India  This log shall be sent along with the system to the Client   Consultant                      LIMITED KOCHI  KOTTANAD BANGALORE MANGALORE NATURAL GAS    DELHI PI PELI NE PROJ ECT  PHASE 11   PJS OF RTU FOR CENTRALI SED SCADA SYSTEM                 Spec  No    MEC  23ME  05   E5  I      5 094          hg 2  ores            ELECT   amp  INST  BI D Doc No    05  51  23 ME   GAI L  094           SECTI ON                      ANNEXURE IV to PJ 5 Page 1 of 1       ANNEXURE   IV    INSTALLATI ON  amp  COMMI SSI ONI NG                                                                                    NATURAL  kas       oe GAS PIPELINE PROJECT  PHASE II   PJS OF RTU FOR CENTRALISED SCADA SYSTEM  JOB Spec  No            23ME 05 E5 1 PJS  094           ELECT   amp  INST  BID Doc No    05 51 23 ME  GAIL 094           SECTION  ANNEXURE IV to PJS Page 1 of 3                      ANNEXURE IV to PJS  RTU FOR CENTRALISED SCADA SYSTEM    INSTALLATION  amp  COMMISSIONING    The installation and commissioning of all the equipment at various sites including the activities of  instrumentation signal interconnections  electrical and civil works with power supply distribution and  grounding works and other necessary facilities is the responsibility of the Bi
163. olled through Ethernet port from MS EMS FEP                             MECON LI MI TED TECHNI CAL SPECI FI CATI ON  REGD  OFF  RANCHI  834002 ELECTRI CAL  amp  INSTRUMENTATI ON Nu    OIL  amp  GAS SBU  DELHI ir       DOCUMENT NO  Page 8 of 22    REMOTE TERMI NAL UNI TS         S  05  E5  099 REVISION   1    EDITION   1       10 0 Guide line for Communication      a  RTU shall have dual Ethernet ports  configurable independently  for TCP IP  communication with FEP on multi dropped environment    b  The        should support DNP 3 0 protocols for communication with FEP    c  Serial ports for communicating with IEDs shall be in a separate card and should not be  in the same card having Ethernet communication ports for SCADA communication    d  The RTU communication card shall be user configurable for various communication  settings  e g  hardware controls  Pre Transmission Mark settings etc        Serial ports available at serial card should be independently and individually  configurable at all respect    f  It shall be possible to do configure   write IED interface through modbus protocol in  RTU for which necessary software tools shall be supplied  RTU shall support all the  fucntion code of modbus protocol to interface      5    9  For communication with IEDs through serial and Ethernet ports  the         shall support  16 bit  32 bit  signed  unsigned  integer and floating point data type of Modbus protocol    h  The hardwired cabling from RTU to Telemetry Interface Cabine
164. on System    All the instruments connections for RTU s shall be terminated in the Marshalling rack   Control Cabinets  TIC panel    Instrumentation panel to be supplied by other  The vendor  shall include in the offer all necessary cables  materials and services required to install  the RTU s and interconnect the 1 05 with the Marshalling rack  Inst Control Cabinet   interface cabinets and RTU s along with interfacing with telecommunication system     a  The hardwired cabling of from RTU to Telemetry Interface cabinet  TIC  panel  the  cables should have pair number marked on each pair  For analog signal  individual  amp   overall shielded cables are to be used    b  Communication from RTU to Telecom panel for SCADA   CAT 6 cable shall be used        RTU vendor should provide the final indexing of all I O points for each        to enable  SCADA vendor to configure the SCADA database                             MECON LI MI TED TECHNI CAL SPECI FI CATI ON  REGD  OFF  RANCHI  834002 ELECTRI CAL  amp  INSTRUMENTATI ON    OI L  amp  GAS SBU  DELHI       DOCUMENT NO  Page 16 of 22  REMOTE TERMI NAL UNI TS         S  05  E5  099 REVISION   1    EDITION   1       d  RTU vendor to provide Field 1 0 details  list of 1 0 points along with engineering units   range  alarm limits  status corresponding to open close contacts  indexing details in the         etc   for configuring in SCADA as per GAIL standard 1    list format to be provided  by GAIL     11 35 SERIAL LINK REQUIREMENT    u  T
165. or  FIFO First In First Out  FMC Field Marshalling Cabinet  GIS Geographical Information System  GMS        Management System  GOV Gas Operated Valve  GPS Global Positioning System  IS Intrinsically Safe  LAN Local Area Network  LDS Leak Detection System  MS Master Control Station  MIS Management Information System  HMI Human Machine Interface  MOV Motor Operated Valve  MTBF Mean Time between Failures  MTTR Mean Time To Power  OPC OLE for Process Control  P amp ID Piping and Instrument Diagram  PLC Programmable logic Controller  RAID Redundant Array of Independent Disks  RTU Remote Terminal  Telemetry Unit  RWS Remote Work station    SCADA Supervisory Control and Data Acquisition Unit                                     KOCHI KOTTANAD BANGALORE MANGALORE     NATURAL GAS PIPELINE PROJECT  PHASE II   PJS OF RTU FOR CENTRALISED SCADA SYSTEM  Job Spec  No    MEC   23ME   05   E5   1  PJS 094           2  BID Doc        05 51 23       GAIL 094                   0 Page 14 of 24                         72    7 3    7 4  8 0    9 0    9 1    SCSI Small Computer System Interface  EMS Emergency Master Control Station  TSS Training Simulation System  UPS Uninterruptible Power Supply  WAN Wide Area Network   GENERAL SITE INFORMATION          the equipment supplied under this contract shall be suitable for continuous operation under the environmental  conditions prevailing at site  It shall be suitable for operation under the following site conditions     Sand  amp  Dust    With a built u
166. otally end user configurable     X  The alarms for power supply   serial link failure   flow computer  CP panel  amp  gas  chromatograph malfunction through serial link shall be implemented     y  The RTU memory sizing sizing shall be adequate for required nos   as application  of  flow computers   gas chromatographs serially connected with the RTU     z  The Flow computer   Gas Chromatograph data shall be scanned by the RTU much  faster than RTU poll time by MS   EMS     aa  All the RTU shall be user programmable for interfacing with any kind of IEDs FC  GC        panel   Solar panel  UPS panel   PLC etc     11 36 Input Output Points and serial ports for polling   EDs   The        vendor shall supply the RTUs equipped with I O cards  IP port  amp  serial ports     for IED interfacing  as per the 1    count and serial ports requirement define elsewhere   The RTUs shall be user programmable for interfacings with any kind of IED    11 36 Aspects related to RTU configuration and diagnostics                                       LIMITED TECHNICAL 5                                      OFF               834002 ELECTRI CAL  amp  INSTRUMENTATI         OIL  amp  GAS SBU  DELHI       DOCUMENT NO  Page 17 of 22  REMOTE TERMINAL UNITS         S  05  E5  099 REVISION   1    EDITION   1       One licensed        configuration software  along with software CD  loaded on PDT shall be  provided for every 10 RTUs  300 KM trunk pipeline in general or otherwise as indicated in the  respective s
167. ovide logistic to purchaser in  the format furnished along with   1 2 In case of bought out items  this certificate must be furnished for each of the Sub  vendors clearly indicating type  model no  etc   1 3 The Certificates must be furnished from each manufacturer in case more than one  manufacturer is proposed for an item  However it is expected that the vendor proposes  Only one approved manufacturer for an item   1 4 1 The Certificate must be signed with seal by the official signatory on the company s    letterhead              PJS of        FOR CENTRALISED SCADA SYSTEM  JOB Spec  No    MEC   23ME   05   E5   I   PJJS 094  RTU   BID Doc No    05 51 23 ME  GAIL 094  RTU    ANNEXURE XIII to PJS Page 2 of 2    i KOCHI KOTTANAD BANGALORE MANGALORE  NATURAL GAS PIPELINE PROJECT                    GAIL  INDIA  LTD                 CERTIFICATE FOR LOGISTICS SUPPORT     To be signed by Manufacturer s corporate level signatory on company s letterhead     I  on behalf of M s confirm that the Item  Model No  for quoted by M s for  M s GAIL against Bid Doc No  05 51 23 ME   GAIL   094  RTU   respective Particular Job  Specification for RTU for Centralised SCADA system No           23        05   E5   I  PJS   094  RTU  shall continue to be supported by us for a period of minimum 05 years  The quoted  system shall not be withdrawn from Indian market as a matter of our corporate policy                 I further confirm that in case of placement of order by GAIL on us  we shall continue 
168. p  local IEDs  Training  Warranty  Extended Warranty   Mandatory  amp  commissioning spares  Documentation etc and shall be executed on turnkey  indivisible works contract basis as per details scope of work  Technical Specification of           Annexure I to PJS   amp  Job specification PJS No  MEC   23ME   05   E5   I   PJS   094  RTU  Rev 0 provided in the tender documents                                      accessories as required        A Supply  Supply  amp  all the work define above of Remote terminal units  RTU  with accessories as  per the Technical Specification of RTU   Annexure I to PJS   amp  Job specification PJS No   MEC   23       05   E5   I   PJS 094  RTU  Rev 0      1 For Sectionalising Valve  SV  Stations  Nos  43  Bidder shall provide the price Break up for supply as per the enclosed format   1 along  with offer     2   For Receiving Stations   Despatch stations Nos  03  Bidder shall provide the price Break up for supply as per the enclosed format   1 along  with offer         For Intermediate Pigging  IP  Station Nos  07  Bidder shall provide the price Break up for supply as per the enclosed format   1 along  with offer    4   Mandatory Spares    a  Supply of loose Mandatory Spares  1096 of all type of Installed cards  convertors  power  supply converters  termination boards  OEM cables between cards and termination boards   backplanes  relays etc accounted  amp  calculated considering for total quantities of RTU   53nos  during calculation of mandatory 
169. p of dust on operational surface to a level such as may occur because of imperfections in the sealing of  equipment  housing and conditions prevailing in sub tropical dust conditions     Tropicalisation  The equipment shall be fully tropicalised  Shock  amp  vibration    The equipment shall withstand transportation and handling by air  sea and road under packed condition confirming  to standards  confirming to MIL 810 B specification or commercial equivalent     The equipment shall also be resistant to termite  fungus  rodents and salty environments     ENVIRONMENTAL SPECIFICATION OF EQUIPMENT TO BE SUPPLIED         the other RTUs at unmanned stations  at remote locations  shall be designed for storage and operation under  the non air conditioned environment with the limits given below     FOR TEMPERATURE HUMIDITY  Operation 0 to 55 C 10 to 95   RH  Storage  amp  transportation 0 to  60      50 95   RH         equipment to be supplied shall withstand international standards of vibration for industrial application     AREA AND ZONE CLASSIFICATION    The RTU installation and other Telemetering panel located in control room are specified as safe area     POWER SUPPLY    Electrical power supply shall be provided at one point inside the battery limit as per the details provided below  If  any other voltage levels are required  then all necessary conversions shall be in the scope of Vendor     Vendor has to provide Station wise power consumption for the RTU along with the bid      
170. pter   cards termination  connectors  interconnecting signal and power cables and connectors with carrying  case  Calibration certificates shall be included    41  Digit Multi meters     4 15 Digit Multimeter with built in signal level meters and with carrying case  to measure accurately and  serve the function of measurements of DC voltage  AC voltage  True     RMS   resistance  conductance   frequency Test leads  probe holder  alligator clips  batteries  user manual and calibration certificate shall be  included   Preferred Make shall be Tektronix  Fluke  Agilent Technologies  Falcon     Protocol analyser     Protocol analyser shall be supplied with necessary software to diagnose and troubleshooting in networks   The analyser should be able to monitor  line and buffer   simulate different industry related protocol and shall  provide detailed timing  raw data and messaging information for serial  and ethernet networks  The analyser  shall have provision to monitor  diagnose and simulate minimum modbus  serial ip    dnp  serial   ip   protocols  Communication setting in the analyser shall be user defined and can be set by the user  The  analyser shall be provision to be configured both as master or slave     DOCUMENTATION  Vendor shall furnish all the documents as per VENDOR DATA REQUIREMENT   The language used in all correspondence  documentation  literature  drawings  markings etc   shall be English     Vendor shall furnish all relevant technical manuals  literature and oth
171. r  IS  697  or as per RAL 7035     The finished of the equipments shall be of the finest quality and capable of long and unattended service  The inside  of the cabinets shall be painted pale cream color  IS 352  or RAL 7035  Vendor shall take approval of the shade or  other different shade during detailed engineering  Shade of the plinth shall be as per RAL 7022          the        cabinets shall have  Nameplates  correlating with the type and location of the cabinet at both front  amp   back side     CALIBRATION    The calibration procedure along with periodicity required for ensuring the accuracy of test instruments supplied  under this contract shall be taken care by the vendor  The vendor shall supply calibration charts from independent  test laboratory for all input output subsystems  during the warranty period     MINOR CIVIL WORKS  For RTU locations  civil work shall consist of     a  Civil works required for interconnecting cabling at control rooms between various systems  amp  equipments   RTUs  with telecommunication system and the power supply unit along with cable routing and dressing    b  The cable trenching work will be done by other Contractor  Erection of foundation channel to suit the RTU  base frame requirement shall be done    C  Associated grouting and fixing of equipment    d  Providing and laying perforated trays etc  for point a  above if required   e  Any masonry work associated with entry and ingress of equipment inside the control rooms including  m
172. r  MECON Vendor Data    ofs ission by  E   Print  P   Date of Retum  Rew  by MECON  Review Status  Code     RTU Date of       1 APPROVED   No Comments                       Govt  of India Undertaking   A Navratna Company  NEW DELHI  INDIA    KOCHI KOTTANAD BANGALORE MANGALORE  NATURAL GAS PIPELINE PROJECT  PHASE ID    PARTICULAR  JOB SPECIFICATION    RTU FOR CENTRALISED SCADA SYSTEM    PJS No   MEC   23       05     5      PJS 094           BID Doc No    05 51 23       GAIL 094             Prepared  amp  Issued            ELECTRICAL  amp   INSTRUMENTATION SECTION  MECON LIMITED  DELHI   110 092    0 31 05 2012 ISSUED FOR BID Harsha Rakesh Pankaj          Revision Date Description Prepared by Checked by Approved by                                                                        LIMITED    DELHI    KOCHI KOTTANAD BANGALORE MANGALORE  NATURAL GAS PIPELINE PROJECT  PHASE ID  PJS OF RTU FOR CENTRALISED SCADA SYSTEM          ELECT   amp  INST     SECTION    Job Spec  No    MEC   23ME   05   E5   I     75 094             BID Doc No    05 51 23 ME  GAIL 094  RTU                 Rev  0 Page 2 of 24                1 0 Introduction  20 Brief Project Details    Table of Contents    3 0 Brief scope of works    4 0   Completion Period    5 0 Bidders Qualification Criteria   6 0 Projection Requirements  amp  Detail Scope of Work  7 0 General Technical Requirements   8 0   Area  amp  Zone Classification    9 0   Power Supply  10 0  Barthing    11 0 Safety Requirements  12 0 Electromag
173. r Data Requirements enclosed     A blank space measuring 75mm W x 40mm H shall be provided on all vendor  drawings for marking review codes etc  by MECON LIMITED     The review of vendor drawings shall be done as applicable under the following  review codes      a  Review Code Approved   Approved    b  Review Code Approved As Noted  Proceed with manufacture  fabrication as  per commented drawings  Revised drawing required     Review Code Not Approved  Document does not conform to basic  requirements as marked  Resubmit it for review     Review of the vendor drawings by MECON would be only to check compatibility with  basic design and concepts and would in no way absolve the manufacturer   fabricator of his responsibility to meet applicable codes  specification and statutory  rules  regulations     For drawings  documents indicated as FOR INFORMATION in the Vendor Data  Requirement  Vendor must mark FOR INFORMATION ONLY on the submitted  drawings  documents          MECON Linited Vendor Deming Document Submission Schedule    Clierw  Project  GAIL   Kochi   Koottanad Vendors Name    Contact Person  Nane  Tel                       Bangalore   Mangalore  Phasel   Review Status Code     2  APPROVED AS NOTED   Proceed with manufacture  fabrication as        contrented    rae    E            hue          NOT APPROVED Docurrert  does not conform to basic requirerrents as marked              Drawings   Docurrerts      per Schedule Date  Anticipated  Ant  Date of subrrission      vendo
174. r cable from PDB to RTU cabinet  glanding  ferruling  Per Mtr   25 25 25  lugging and termination at both ends   k Laying of earthing cable for signal earth and panel earth from earth pit   Per Mtr   25 25 25  bus bar to RTU cabinet  glanding  ferruling  lugging and termination at  both ends     Laying of cable tray Per Mtr   00 00 05  m   Laying of Cable conduit PerMtr   01 01 01  n Laying of serial cables between RTU Serial port and IED Per Mtr   40 40 80       Laying of Ethernet cable between RTU and Telecom rack        Mtr   25 25 25  p Laying of individual signal  DI DO AI AO  cables from other panel to Per Mtr   25 25 25  RTU  glanding  ferruling  lugging and termination at both ends   15   Online testing of field IO signal from SCADA System Lot 01 01 01  16 Integration  Trial Run  commissioning Lot 01 01 01  17   Mis Items not covered above  mention details  Nos 01 01 01  18 on     Lot 01 01 01  Documentation  As built  all documents  amp  drawings as per spec 6 sets   Total for the Services  amp  Site work as per SOR item  Must be same SOR B 1  Sum of SOR B 2 SOR B 3  as unit rate of RTU     services  amp  site work indicated in main SOR Column 6   Sum of Column 9  Bum of Column 12   against sub items of    B      Note    1  The above erection quantities indicated at sl no 14 is tentative and for estimation purpose  bidder has to provide the erection    material as per the actual site requirements              4 of 4                         INDIA  LTD     KOCHI KOTTAN
175. r future polling of IEDs through TCP IP   Interposing Relays for Digital Output    The RTU s shall be configured such that interdependence of function is minimized and failure  of any part of a RTU Module subsystem except the common logic subsystem shall not directly  affect the integrity of the unit  as a whole     The RTU should be able to store alarm  events in case of communication failure till the time  of communication restoration     4 2 The RTU system software shall provide the overall management of the supervision   monitoring and control function within the RTU and also manage communications   comprehensive diagnostic facilities and RTU start up procedures  RTU shall be accessible  from Master station for configuration and diagnostic same as from local     4 3 The RTU shall be programmable and shall have facilities for developing logic for interface  with the IEDs as and when required  To this effect  all necessary tools  softwares and  documentation shall be part of supply of the RTUs within the scope of this document     4 4 Guide line for     O points  amp         cards   a  The Digital Output should be configured for pulse duration  No separate program or logic will  be acceptable at RTU end  On RTU restart  power failure  RTU shall not reset the output    circuit  shall not generate false control signal and cancel all pending control signal     b        DI cards of the        should have minimum 16 IO points  The AO and serial card should  have minimum 4 IO poi
176. r s Quality assurance programmes  Bidder s commissioning engineers shall carry  out these tests  After the commissioning tests are over  the system shall be put for SAT          technical personnel assigned to the site by Bidder must be fully conversant with the  specific system and its software packages  The Bidder s field personnel shall have both  hardware  amp  software capability to bring the system online quickly and efficiently and with the  minimum of interference with other concurrent construction and commissioning activity     The commissioning spares for all the items equipments shall be included along with  commissioning services as required to commission the complete system  The consumable  required during commissioning of system shall be included      part of commissioning  spares     Commissioning spares including consumables as part of commissioning activities  Vendor  must ensure availability of following commissioning spares as a minimum at site     a  2 nos  of CPU and 2 nos  of each type of I O card  AI  AO  DI  DO  Serial cards  of RTU  b  One no  Router  Mandatory spares as per MR    RTU  SCADA Vendor to note that the mandatory spares are the inventory of the spares to be  kept by the Client and the same shall not be utilised by the RTU SCADA Vendor at any stage  of the project till completion of warranty  without Client s prior concurrence  Any  mandatory spares utilized by the RTU SCADA vendor during Warranty period shall be  replenished within 45 days
177. re  All the 1 05 present in each cards installed in the  RTUs  including spares  has to be wired till termination board  For DO card provision of  relay has to be made for all the 1 05 available in the DO cards installed     Hardware mounted and wired panels of all systems included in the scope of the Vendor  shall be subjected to burn in operation for minimum 15 days before dispatch to site     A typical panel Rack drawing is enclosed with this document for reference purpose   Vendor has to select the Rack as per dimension refer in enclosed drawing     The RTU s cabinet shall be made of CRCA sheet enclosures frame minimum thickness  shall be 1 5 mm and the cabinet size 2000 mm height x 800 mm width and 800 mm  depth and 100 mm base frame  Gland plate thickness shall be 3 0 mm    Vendor shall supply necessary hardware s like DI  DO  A1 and AO cards  complete with  interning wiring upto the terminal blocks including spares 1 05     The RTU cabinet shall be provided with 24V dc Power supply unit     Non UPS power supply for Cooling fans  panel door switches  space heater  maintenance  socket and Tube lights front  amp  rear end     Finish    i  All frame and steel work of the RTU cabinets shall be degreased  then phosphate treated  or coated with primer  followed by at least two undercoats   ii  All the        cabinets shall have    Nameplates    correlating with the type and location qf the  cabinet     11 34 Connection to Marshalling  Instrument Control Panel  Telecommunicati
178. rface locations LEL etc  at Remote including supply of cables with  cables  RS locations connectors at IED end  modem end   232 RS 485  and RS 232C   RS 485 intrinsically  safe box  ISB  ends   2    Power cables RWS     Power RTU Supply of cable including  RTU Distribution glanding  termination  ferruling   locations cabinet dressing etc  at RTU   RWS end                                                                   LIMITED  DELHI    KOCHI KOTTANAD BANGALORE MANGALORE  NATURAL GAS PIPELINE PROJECT  PHASE ID  PJS OF RTU FOR CENTRALISED SCADA SYSTEM          ELECT   amp  INST     Job Spec  No       BID Doc No    05 51 23 ME  GAIL 094  RTU              23ME   05   E5   I   PJS 094  RTU                                            SECTION Rev  0 Page 8 of 24  3    Telecom RWS     Telecom panel   Ethernet port of   Supply  Laying  routing   Interface RTU   router              RWS   Lease   glanding termination both end   Cable locations switch line modem  4    Instrumn  RTU TIC Panel RTU Glanding  ferruling  termination  Cables Locations of instrumentation signal from    TIC to RTU  both ends  The  cabling from field devices up to  TIC  Inst panel to TIC will be  carried out by Client   Other  Contractor           6 21    Vendor shall consider separate cable for each type of digital and analog signals  Over all  amp  individually shielding    cable for analog signals and over all shielded for digital signals  Necessary tray  Glands  other erection accessories  as required has to
179. roperly secured to the electrical earthing bus          the system ground of various cards and equipments  shields of instrument cables shall be connected to  system ground bus which is electrically isolated from the AC mains earthing bus  The equipment shall provide  separate earthing strip for the same  The system ground bus shall be connected to independent ground buses  through insulated wires     Bidder shall note that for RTUs  separate earthing shall be provided by the Client for    a  System grounding  Earth resistance less than 2 ohm   b  Frame and AC mains grounding  Earth resistance less than 5 ohm     Accordingly the RTUS shall provide separate earthing strips as mentioned above and vendor shall also take  care of onwards earthing connections from equipment to earthing strips provided separately in the respective  rooms     Following guideline shall be considered while doing the earthing work     a  Panel metalwork  electrical AC mains supply earth     2 off M10 brass studs per panel section  These  brass studs shall be fitted with vibration proof nuts and washers     b  Instrument    Clean    earth     electrically insulated copper bus bar 75 mm2 minimum separated from the  panel metalwork by 25mm minimum  2 off M10 brass earth studs to be provided at each end of the  bars with associated shake proof nuts and washers              intrinsically earth        similar in construction to the instrumentation clean        shall      installed   This bar shall comply ent
180. s    ANNEXURE X to PJS  RTU FOR CENTRALISED SCADA SYSTEM       Activity project  Responsibility    Performed by  Bidder   yes no     Performed by  Sub vendor    Service associate    Manufacturing  facilities  location       Single source responsibility with performance  guarantee for the successful execution of the project       Project management       Project basic engineering activities including design       Supply of RTU       Development  amp  implementation SCADA DATA       Detailed System Engineering       Logistic Support       Integration of RTU and SCADA software  SCADA  Supplied by other        Documentation  1  For RTU  2  Detailed engineering  drawing and documents  3  For FAT  4  For Construction drawings  amp  documents  5  For SAT                         Factory Acceptance Testing  1 For MS  BMS with RTUs  2 For integrated SCADA system       Installation and commissioning of RTU  at various location       Site acceptance testing and test run       Warranty       Training                Signature of the authorized signatory  Name of the authorized signatory  Stamp and Date    Note  If the activity is performed by the Bidder  and sub vendor  same shall be differentiated  by letter    P    against the party who is primarily responsible for the same activity                       MECON LIMITED   KOCHI KOTTANAD BANGALORE MANGALORE NATURAL GAS  DELHI PIPELINE PROJ ECT  PHASE I1   PJ S OF RTU FOR CENTRALI SED SCADA SYSTEM      ELECT   amp  INST  JOB Spec  No    MEC 
181. s for RTUs         card files  power distribution boards  terminations etc  complete in all respects properly correlating with the drawings is to be ensured by the  RTU vendor     11 30 SCAN RATES    The local scan rate for the individual 1 0 modules shall be such that the time tagging  resolution and system performance requirements are achieved     Vendor to provide minimum  amp  maximum SCAN time    The consideration of scan times shall include the acquisition of data  processing and  updating of the RTU database  The overall RTU local scan shall be defined as the time  required to acquire field data and update the RTU database and the same shall be much  faster                poll time by MS   EMS  It is expected that scan rate shall not exceed  100 msec for direct 1 05                            MECON LI MI TED TECHNI CAL SPECI FI CATI ON  REGD  OFF  RANCHI  834002 ELECTRI CAL  amp  INSTRUMENTATI ON    OIL  amp  GAS SBU  DELHI       DOCUMENT NO  Page 14 of 22  REMOTE TERMI NAL UNI TS         S  05  E5  099 REVISION   1    EDITION   1       11 31 DIGITAL OUTPUT  CONTACT  SUBSYSTEM    The contact output subsystem shall provide momentary closure of potential free contact  relay output for the operation of valves  The subsystem shall fully support the functional  requirement of control    The relay contact configuration shall be provided up to the RTU terminal block     The DO command contact closure duration shall be configurable  It shall be possible to  configure DO contac
182. s no   23  Surge withstand capability  as per IEEE standard    24  MTBF h   25  Equipment availability     26  Power requirement W  DIGITAL OUTPUT MODULE    27  Module designation                            28  Microcontroller microprocessor type   29  No  of outputs per module   30  Maximum output current mA   31  Maximum switched output voltage V   32  MTBF h   33  Equipment availability     34  Power requirement W  ANALOG OUTPUT MODULE       35  Module designation  36  Microcontroller microprocessor type  37  No  of outputs per module       Max  no  of voltage outputs   Max  no  of current outputs   38  Type of output interface  DAC    39  DAC resolution bits                                                            LIMITED TECHNICAL 5                                      OFF               834002 ELECTRI CAL  amp  INSTRUMENTATI ON    OIL  amp  GAS SBU  DELHI       DOCUMENT NO  Page 22 of 22  REMOTE TERMI NAL UNI TS MEC S 05 E5 099   REVISION   1    EDITION   1          40  Overall accuracy  41           of isolation  42  Whether module of self calibrating type and event reporting to                Master Station if out of calibration  yes no   43  MTBF h   44  Equipment availability     45  Power requirement W          COMMUNICATION MODULE       46  Module designation                                                                            AT  Microcontroller microprocessor type   48  No  of communication channels   49  Type of communications interfaces supported   50  
183. shed documents supporting BEC       Tender MR requirements and scope as per Job Specification       Payment Terms as per Tender       Training as per Tender       Warranty as per Tender specifications       Quoted for Extended Warranty per month  for 24 months  as per Tender specifications                          Quoted for Extended Storage per month  for 12 months  payable  after 22 months  as         Tender specifications          Signature of the Bidder authorized signatory  Name of the Bidder authorized signatory  Stamp and Date                   MECON LIMITED   KOCHI KOTTANAD BANGALORE MANGALORE NATURAL GAS  DELHI PIPELINE PROJ ECT  PHASE I1   PJ S OF RTU FOR CENTRALI SED SCADA SYSTEM      ELECT   amp  INST  JOB Spec  No    MEC  23ME  05  E5  1   PJS 094  RTU  4 2  no BI D Doc No    05 51 23        GAIL  094                ANNEXURE XIII to PJ S Page 1 of 1                   ANNEXURE   XIII    LOGI STI CS SUPPORT             KOCHI KOTTANAD BANGALORE MANGALORE  NATURAL GAS PIPELINE PROJECT  PHASE ID    PJS of RTU FOR CENTRALISED SCADA SYSTEM  JOB Spec  No            23       05  E5   I   PJS 094                         NDIA EED  BID Doc No    05 51 23 ME  GAIL 094  RTU   ANNEXURE XIII to PJS Page 1 of 2  ANNEXURE  XIII to PJS  RTU FOR CENTRALISED SCADA SYSTEM  CERTIFICATE FOR LOGISTICS SUPPORT  1 0   LOGISTIC SUPPORT CERTIFICATE  1 1 Vendor must furnish Certificate        providing necessary support services in favour of  the Owner  M s GAIL  for RTU committing them to pr
184. sidering that rest of the document has remained unchanged     TRAINING    Vendor shall provide training to technical  operator  amp  maintenance personnel of the company in India  Company  will bear the expenditure pertaining to air ticket  daily allowance  hotel expenditure and local conveyance for  company s personnel for attending the training     Training has to be provided at vendor s works having full training facilities for all the training specified in  various clauses  Training documents contains all the details as specified have to be provided to all the trainee  as per the schedule     Training to be done at the integration centre where all the types of equipments supplied are simulated for practical  training as defined elsewhere in the tender document  Each trainee to be given dedicated demo RTU system for  hands on practice during training     RTU vendor shall train 4 man weeks for OWNER s RTU engineers on internals and maintenance of the supplied  system  The training shall include the following                                      KOCHI KOTTANAD BANGALORE MANGALORE     NATURAL GAS PIPELINE PROJECT  PHASE II   PJS OF RTU FOR CENTRALISED SCADA SYSTEM  Job Spec  No    MEC   23ME   05   E5  1  PJS 094           2  BID Doc        05 51 23       GAIL 094           Rev  0 Page 22 of 24                         24    24 1    24 2    24 3    24 4    24 5    25        System internals    b  Operate  amp  maintain the system   c  Configuration  programming of RTU for inte
185. site  Bidder shall provide full details of all  type tests carried out on boards and modules and tests normally carried out in their works including  to what standards these are carried out  These test preferably in accordance with International    National Standards          factory tests will be witnessed by Client   Consultant     Client   Consultant shall have free entry and access at all phases of the project to all parts of  Bidder s facilities associated with manufacturing and testing of system     Bidder shall invite Client   Consultant well in advance with minimum 2 months notice of the date at  which the system is ready for testing     The equipment will not be shipped before they have been officially released in the form of release  notes by Client   Consultant     Bidder shall provide Client   Consultant with all reasonable facilities necessary to determine  compliance to the system specification     Bidder to note that acceptance of the equipments and the system of inspection and testing shall in  no way absolve the bidder of his responsibility to deliver the equipment meeting all the  requirements specified in the specification  Bidder shall be responsible till the completion of the  warranty  for any corrections modifications including supply and implementation of hardware  amp   software to fulfil the requirements of the contract  If after acceptance of the system certain changes  are required such as debugging of the software supplied or any other related iss
186. so the PDT shall operate on 230 V AC power supply  Vendor shall provide all the  necessary converter adaptor along with PDT     11 38 PACKAGING     The RTU shall be packaged to withstand rough handling during ocean shipment and in   land journey  It shall be vendor s responsibility to make good any deterioration that  occurs during shipment  Sling points shall be clearly indicated on crates     11 39 DATA AND DRAWING DETAIL    Vendor shall furnish all the documents as per    Vendor Data Requirements    enclosed with  Material Requisition  Job Specifications  All the other documents as per Technical  specification and the documents required for better understanding and execution of the  job to be supplied by the Vendor     A certificate from statutory authorities confirming suitability of design   construction of all  electrical and electronic items for use in hazardous area classification has to be furnished     11 40 RTU SPARE SUPPORT    Vendor to provide a certificate to client from OEM of RTU for RTU spare support for 10 years  from completion of warranty     11 41 RTU shall support compete DNP3 0 protocol with minimum object and variation as         following     DNP 3 Objects   30 32 01 02 03 04 40 41 42 43 10 11 13 80 and  object 12  amp  variation 01    11 43 RTU shall support Report by exception and On demand scan polling   11 44 Annexure        Enclosed                                        LIMITED TECHNICAL SPECI FI CATI       REGD  OFF  RANCHI  834002 ELECTRI CAL 
187. spares as defines in Job specification PJS No   MEC   23       05   ES   I   PJS 094          Rev 0  Clause no 6 47  a     Bill of Material has   Lump 01  to be provided along with offer  any fraction quantity should be round off to nearest number in    sum  higher side    Unit rate for Mandatory spares with cards details  part no   make etc  shall be given separately  with the offer  amp  price part   b    GSM modem with antenna  amp  accessories Nos  02  c   Industrial standard Tool kit for equipments with leather bag  Nos  04  d  Spare fully wired RTU similar to SV Stations I O configuration type with necessary   Nos  04  accessories as required   e  Spare fully wired RTU similar to Receiving Stations I O configuration type with necessary   Nos  04                Page 2 of 4                               KOCHI KOTTANAD BANGALORE MANGALORE NATURAL  GAS PIPELINE PROJECT  PHASE II                                                                       MATERIAL REQUISITION          i RTU FOR CENTRALISED SCADA SYSTEM     BID Doc NO 05 51  23                  094  RTU      Page3of 4   MECON LIMITED    5 PDT with all accessories including all cables  amp  connectors             the Technical Nos 02    specifications of RTU  one each for Bangalore  amp  Mangalore  i         Test equipments as        specification  Portable Power Source cum Calibrator  Current  amp  Voltage   as per specification   a  Nos  02    one each for Bangalore  amp  Mangalore    b  4 V5 Digit Multi meter as p
188. st of typical test  cases  the sequence of execution and expected results     For hardware tests  the plans shall include purpose of the test  definition of test inputs   specifications of test procedures and definition of results to be obtained     It shall be Bidder s responsibility to modify the operational and diagnostics software in case of any  mal operation is revealed during online operation of the system after commissioning with in the  guarantee period                    KOCHI KOTTANAD BANGALORE MANGALORE NATURAL  um GAS PIPELINE PROJECT                  PJS OF RTU FOR CENTRALISED SCADA SYSTEM  JOB Spec  No    MEC   23ME   05   E5   I   PJS 094           ELECT   amp  INST  BID Doc No    05 51 23 ME  GAIL 094           SECTION  ANNEXURE III to PJS Page 6 of 6                      QUALITY ASSURANCE QUALITY CONTROL  QA QC  PROGRAM RECORDS    The Bidder shall ensure the quality of all equipment and software delivered  installed and  commissioning and all works performed under this Contract according to a Quality Policy and a  Quality Assurance Programme submitted along with his Bid     The Bidder shall submit   a  Quality Control Plans showing the activities to be examined by Quality Control group of  Bidder along with the documentation which shall be maintained and submitted to the Client      Consultant     b  Quality Control  amp  Quality Assurance organisation set up proposed to be deployed by the  Bidder         Procedure        Tests  Calibration  Maintenance of s
189. t  TIC  panel  the cables  should have pair number marked on each pair  For analog signal  individual  amp  overall  shielded cables are to be used    i  Communication from RTU to Telecom panel for SCADA  CAT 6 cable shall be used     11 0 RTU FEATURES    11 1 The RTU sub system shall support the following     a  Scanning of Input and Output   b  Fast scanning of selected 1 05 points    C  Field input initiated discrete control action    d  Discrete control action corresponding to Remote Control Command reception    e  Operator initiated discrete control action with check before execute and time out feature   f  Operator initiated discrete control action with sequencing and interlocking       Derivation of calculated digital points based on logical functions AND OR NOT etc from  Digital and Analog input points    h  Derivation of calculated analog points based on arithmetic functions             sq  root  etc  and driving external hardware  Calculation shall be performed in RTU in engineering  units with 16 bit or higher floating point accuracy in case engineering conversion is being  done at RTU level   Calculations shall be performed in the SCADA server in case  engineering conversion is being implemented in the SCADA server     i  Deviation of counter values using Integration of hardware and software generated analog  points   j IED  Flow computers  Gas Chromatographs   CP Panel  Solar system  UPS panel  interfacing through RS232  RS 485 ports for serial data    k  Rate of
190. t Antivirus with license for virus definition free update till 3  years     Latest MS Office suite    Leather carrying case  AC adaptor 240V AC 50Hz     Battery backup for M 3 Hours  Min  with additional battery pack    RTU configurator diagnostic software shall have the following provision                                      KOCHI KOTTANAD BANGALORE MANGALORE     NATURAL GAS PIPELINE PROJECT  PHASE II   PJS OF RTU FOR CENTRALISED SCADA SYSTEM  Job Spec  No    MEC   23ME   05   E5  1  PJS 094           2  BID Doc        05 51 23       GAIL 094                   0 Page 19 of 24                      20 4    20 5    20 6    21 0    i  DNP index of all I O along with hardware details and present value in single table window    ii  All RTU cards  serial ports and communications channels health points are to be configured in  RTU and DNP index of same are to be reflected in I O list and all serial ports should be  independently configurable    iii  Error detection control feature to ensure data integrity     Portable Power Source cum Calibrator  Voltage  amp  Current      Portable Power Source cum Calibrator  Voltage  amp  Current  for simulating signal source and measurements  function for current  min 4 20 m Amp   amp  voltage  1 5 Volt  make YOKOGAWA          or equivalent     The calibrator shall be operable on RTU power supply Voltage level  Both 24 V and 230 V AC   The  calibrator shall be self contained and complete in all respects with power supply  230V AC chargeable  ada
191. t duration open or close for a long duration and all contacts shall be  voltage free     It shall not be possible for the RTU to energize an output that has not been selected for  control     A RTU restart  following an RTU power failure  shall not reset the output circuits  shall  not generate false control signal and shall cancel any pending control selection     Set point controls     All analog output control functions shall utilize the select check operate control  sequence associated with set point control    11 32 Each 1 0 shall be protected against the reverse polarity of the power voltage to  1 0     11 33 RTU Panels    RTU Panels shall be free standing and conform to NEMA 4  IP55  requirement  The  panels shall have lockable front and rear doors and bottom cable entry and provided with  gasket and fitting to keep out moisture  salt  dust  greases and corrosives  The panel  shall be naturally cooled     All doors  drawers  trays and other weight supporting parts shall be fabricated of metal  and adequately reinforced to limit vibrations  All components and devices inside the  panel shall be well highly and the panel shall have a tidy look     The Vendor shall furnish details of the shelf and inter shelf wiring and the termination of  the wiring harness between the RTU and the terminal block area  the connections from  PCB s to back frame wiring shall preferably be with gold plated edge connectors which  utilize a wiping action  Easy access to cabinet wiring for maint
192. tabase    12 weeks       HMI Graphics  Colour document        Standard SCADA Manual for operation  amp   maintenance       User guides  maintenance  amp  configuration  manuals for all supplied equipments   Test  instruments  Spares  subsystems              Complier manuals including user guide   language reference  library reference etc                                   KOCHI KOTTANAD BANGALORE MANGALORE NATURAL  GAS PIPELINE PROJECT  PHASE II        RTU FOR CENTRALISED SCADA SYSTEM              BID Doc        05 51 23       GAIL 094          a       GAIL  INDIA  LTD  Page 2 of 2      pa PEN                      API manuals including user guide  library  reference manuals etc    RTU Specification  operation  maintenance  and configuration manual   RTU IED interface manuals including  manuals of special tools used for interfacing  IEDs    Oracle interface manuals                  Quality Assurance Plan 12 weeks       FAT Procedure 40 weeks       SAT Procedure 48 weeks       Test Run Procedure 48 weeks       IP address  amp  protocol structure at each station 12 weeks       Datasheet of HMI Monitors  Laser jet printers   Color jet monitors  one routers etc   Station wise power consumption calculations  of RTU    List of special Tools  amp  Tackles         12 weeks          Project execution schedule 6 weeks       AS BUILT IO DETAILS AS PER GAIL s  FORMAT    Centralised SCADA Interfacing 48 weeks    48 weeks          RTU Compatibility Test Certificate                           
193. te  and direct from SCADA with DNP3 0 Object and Variations  40  41 42 43       Result   Remarks   2 6 Digital Output Data    Action  Add Digital Output Items and check the values at RTU  Trip  Close  Pulse type with ON  time duration  Single Bit  Select  Execute and Direct with DNP3 0 Object and Variations 10    11 13  object 12and variation 01      Result     Remarks     SCADA RTU Testing Over DNP3 0       2 7 MODBUS Data with Third party system through Serial Interface    Action  Add Items at RTU and check the data   Holding Register  Input Register  Coil Register  and Input Status Register  from Third Party System Modbus Simulator  This data should  transfer over DNP3 0 protocol with quality flag for SCADA system     Result   Remarks   2 8 Network Redundancy Check    Action  Check Data transfer over DNP3 0 using Redundant Communication Ports by  disconnecting one port at a time and successful data transfer over other port     Result   Remarks   2 9 Time Synchronization Check    Action  Check Time Synchronization over DNP3 0 using Communication Ports by changing RTU  time and successful update of RTU time as per SCADA Server time     Result   Remarks   2 10 Communication Statistics    Action   RTU should support Object 80 for internal indication as per DNP3 0 protocol for making  healthiness of RTU at Master SCADA level     Result    Remarks    2 11 Report by exception for     and DI based on Class 1  Class 2 and Class 3 request  Action   RTU should be able to exchange the
194. tegrated system  amp  submit  it 1 month in advance of Client   Consultant review and approval     SAT shall involve integrated testing of complete RTU   SCADA system  Site Acceptance Testing  will be done based on the stipulations in the approved SAT document  Once the test is successfully  performed  then the system would be ready for commencement of test run                    KOCHI KOTTANAD BANGALORE MANGALORE NATURAL  um GAS PIPELINE PROJECT                  PJS OF RTU FOR CENTRALISED SCADA SYSTEM  JOB Spec  No    MEC   23       05   E5   I   PJS 094                        amp  INST  BID Doc        05 51 23       GAIL 094           SECTION  ANNEXURE III to PJS Page 4 of 6                      SAT shall be done inline with FAT  wherein simulated signals shall be replaced by actual field  signal and integration with Telecom system has been carried out     SAT shall be conducted by the experienced system engineering group of the vendor  having  experience and involved in system design  engineering  integration  amp  FAT      TEST RUN    Test for continuous functional operation of the system with the required system reliability and  availability  This test aims at keeping the complete integrated system operation for a period of 30  days for all the 24 hours a day     In case of failure  the test will be restarted till the system operates without failure of any system  functionality for 30 days  Failure of test shall be limited to such system failures which will affect  syste
195. tems if required    7  Bidder shall quote extended post Warranty per month from the date of actual expiry of main warranty   i e     period of 24 months  two years  from the date of    provisional    acceptance of the system by the owner or 28  months from the actual delivery of material at site after FAT and issue of IC which ever is earlier  as per    Page 3 of 4                               KOCHI KOTTANAD BANGALORE MANGALORE NATURAL  GAS PIPELINE PROJECT  PHASE II   MATERIAL REQUISITION  GAIL  India  Ltd RTU FOR CENTRALISED SCADA SYSTEM  BID Doc       05 51 23                  094           Page4of 4       2               LIMITED                        terms  amp  condition of contracts  Period for extension will      finalised by the client             the  requirements and accordingly payments will be made as per SOR rate  Refer Clause no  24 0 of Particular  Job specification of the tender    8  Bidder has to complete the work as per the schedule  if the site is not ready even after 6 months of the  completion schedule as define in the contract then bidder may compensate the expenditure of store  as per  all inclusive rate per month available in the tender  till the readiness of the site  The payment will be made  from seventh month  No payment upto six months from date of completion  onward from actual date of  completion as per the certifications by EIC  Client  In this situation  after intimation from GAIL  the site  work has to be completed within the time stipulat
196. test  revision in force  including any addenda  supplements or revisions thereto     International Standards    API     API 1113 Developing a Pipeline Supervisory Control Centre     API 1130 Computational Pipeline Monitoring  ANSI     ANSI NFPA 75 Standard for the Protection of Electronic Computer Data  Processing Equipment  NEMA       NEMA ICS General Standards for Industrial Control and Systems                                                          KOCHI KOTTANAD BANGALORE MANGALORE  MU      NATURAL GAS PIPELINE PROJECT  PHASE II   PJS OF RTU FOR CENTRALISED SCADA SYSTEM  Job Spec  No    MEC   23ME   05   E5   I   PJS 094                      SS BID Doc No    05 51 23 ME  GAIL 094  RTU   SECTION Rev  0 Page 12 of 24     NEMA ICS 2 230 Components for Solid state Logic Systems     NEMA ICS 3 304 Programmable Controllers     NEEMA ICS 6 Enclosures for Industrial Controls and Systems  IEC     IEC 61131 Programmable Controllers  ALL PARTS     IEC 60870 5 101 Telecontrol equipment and systems     Part 5     101  Transmission  Protocols   Companion standard for basic telecontrol tasks  ISA     ISA S5 1 Instrumentation symbols and identification     ISA S5 2 Binary Logic Diagrams for Process operation     ISA  5 3     1983 Graphic symbols for Distributed Control  Shared Display  Instrumentation  Logic  and Computer systems     ISA 55 4 Instrument loop Diagrams     ISA 5 5 1985 Graphic Symbols for Process Displays     ISA S18 1 Alarm annunciation sequence and specification     ISA
197. tion ports of RTU simultaneously from SCADA FEP Servers  to be  kept at two end of the pipeline section   RTU should reply to both the FEP Servers  simultaneously in realtime  without any loss of data  amp  operation  System shall provide  status on the availability of each of the channels     11 24  t shall be possible to output any AI  Including serial data from IEDs   amp  DI point value  available in real time database at MS   EMS  as       Including serial data from      5   amp  DO  to any RTU respectively  The relay contact configuration shall be provided up to the RTU  terminal block  The DO command contact closure duration shall be configurable  It shall be  possible to configure DO contact duration open or close for a long duration as per the DI  status  This provision should be available in the SCADA system  however separate card  AO    DO  is not required                                        LIMITED TECHNICAL 5                                      OFF               834002 ELECTRI CAL  amp  INSTRUMENTATI         OI L  amp  GAS SBU  DELHI       DOCUMENT NO  Page 13 of 22  REMOTE TERMI NAL UNI TS         5  05  E5  099 REVISION   1    EDITION   1       Within the scope of this document  SCADA vender shall down load Gas Chromatograph  value to those Flow Computers  in those locations where Gas Chromatograph is not  available  through the same serial link which is used for reading the Flow Computer values   Source Gas Chromatograph and target Flow Computers will be f
198. to  Support GAIL by spare part support for a period of 10 years from the date of placement of  order     Signature of the Bidder authorized signatory  Name of the Bidder authorized signatory    Stamp and Date          KOCHI  KOTTANAD BANGALORE MANGALORE NATURAL GAS    MECON LI MI TED PI PELI NE PROJ ECT  PHASE 11                       DELHI PJ      RTU FOR CENTRALISED SCADA SYSTEM  JOB Spec  No    MEC   23ME  05   E5  I   PJ S 094  RTU         BID Doc No    05 51 23        GAIL  094  RTU        ANNEXURE XIV to PJ   Page 1 of 1       ANNEXURE   XIV    PROCEDURE  TEST SCHEDULE  FORMAT    FOR THE TEST OF DNP 3 0 MAPPI NG   PROTOCOL  INTEROPERABI LI TY DETAILS             Venue of Testing      Test Period     RTU Vendor Details      Address   Contact Person   Phone   Fax   Mobile   Email    Site     RTU test engineers  Engineer     Contact Number         SCADA RTU COMPATIBILITY OVER DNP3 0     This document covers the minimum interfaces test procedure for DNP3 0 based testing over TCP IP  protocols which is as per Yokogawa India Limited Standards for their SCADA system only     SCADA RTU Testing Over DNP3 0       1  System Information   1 1 SCADA System   Yokogawa     FASTTOOLS SCADA System R 9 04  1 2 RTU System    1  Make  2  Brand Model  3  Communication Details  a  Protocol  DNP 3 0  b  Connection Type  Serial Ethernet      Type of Connector  d  IP Address Settings  d 1  IP Address for LAN A  SCADA with 2 unique domain  d 2  IP Address for LAN B  SCADA with 2 unique domain   
199. ues which cannot be  ascertained during the final handover of the system  these changes shall be carried out by the  vendor at their cost    Bidder personnel shall be actively involved during factory acceptance and site acceptance testing     TESTING    Testing shall concern SCADA equipments at all stations including RTUs and application software  system  The test shall consist of     a  Pre Factory Acceptance Test                  b  Factory Acceptance Testing  FAT        Pre Site Acceptance Test  Pre SAT    d  Site Acceptance Test  SAT                    KOCHI KOTTANAD BANGALORE MANGALORE NATURAL  um GAS PIPELINE PROJECT  PHASE II   PJS OF RTU FOR CENTRALISED SCADA SYSTEM  JOB Spec  No             23       05   E5   I   PJS 094           ELECT   amp  INST  BID Doc No    05 51 23 ME  GAIL 094  RTU   SECTION  ANNEXURE III to PJS Page 2 of 6                      e  Test Run    Bidder shall submit to Client   Consultant detailed test plans and procedures  three months prior to  all actual testing for factory and site acceptance test and run over review     PRE FAT    During the PRE FAT testing phase  the Bidder is to ensure that system performs in compliance to  specifications of the tender  FDS prior to offering the system for FAT by Client   Consultant     PRE FAT shall be conducted based on the approved FAT documentation signed by system  engineering group of the bidder and On successful clearance of PRE FAT  the Bidder shall make  available to the Client   Consultant  the P
200. undertake such audit as deemed necessary to assess the effectiveness of the Bidder s  quality system     CERTIFICATE FOR LOGISTICS SUPPORT    Vendor shall provide backup engineering  maintenance support and spare part supports for a period of ten  10  years  for the RTU being supplied  Logistic support certificates as per format attached with the bid document     SUPPLY AND STORAGE OF EQUIPMENT    This shall include but not limited to supply and storage of equipment and all other items required for installation  and commissioning of the network including the following     e Transportation of equipment and all other components from locations of manufacturing to Site or Site store  and then to locations of installation    e Storage during transit  amp  storage after installation till the handing over to owner    e Statutory clearances including clearances of Customs  Excise  Octroi and others  as required for all the  supplied items     Bidder has to deliver the material at site after FAT and store at site till the readiness of the control room at  respective locations  When the site is ready then shift the RTU at respective locations     Bidder has to complete the work as per the schedule  if the site is not ready even after 6 months of the completion  schedule  i e  upto 22 months  as define in the contract then bidder may compensate the expenditure of store  as  per the all inclusive rate per month available in the tender  till the readiness of the site  The payment will be 
201. upply indicated in main SOR against  Sum of Column 6   Sum 2                sub items of            Sil  servic  s f  r stations Unit SV type RTU IP type RTU Receiving  RT  type RTU  Unit   Qty Unit Total Unit Qty   Unit   Total Unit   Qty  Rate Rate  12   Transportation  Loading  amp  Unloading  Insurance of RTU Panel  IO Lot 01 01 01  Modules  cables  amp  accessories from main site office   godown to  individual RTU sites of KKBMPL Ph 2   13   Erection   Erection of RTU Panel Nos  01 01 01  14   Erection accessories  supply  amp  laying of Cables  Trays  conduits etc         Power cable  per meter  Per Mtr   25 25 25  b   Earthing cable  per meter  Per Mtr   25 25 25  C   Ethernet Cable  per meter  Per Mtr   25 25 25  d   Serial Cable  per meter  Per Mtr   40 40 80                                        Page 3 of 4                      1    Price                    for Centralised SCADA system    GAIL  KKBMPL Phase   II                                                                                                36 core   18 pair  0 5 sqmm   armoured DI   DO signal cables  per meter    Per Mtr   25 25 50  f 12 core   24 pair  0 5           shielded 8 armoured        AO signal cables   Per Mtr 25 25 75   per meter   g Cable trays   per meter  Per Mtr 00 00 05  h   Conduits  per meter                01 01 01  i Laying of individual signal  DI DO AI AO  cables from TIC      RTU  Per Mtr   25 25 100  glanding  ferruling  lugging and termination at both ends   j Laying of powe
202. ware Quality Assurance Plan  Software Requirement Specification  Standard CSMA CD Media Access Control  Ethernet   Software Test Documentation  Recommended Practice Hardware Testing of Digital Process computers  Modern VF Interference  DCE DTE Interface    BS 5345  Part 4 1977 UK Code of Practice for Intrinsic Safety    Intrinsic Safety                                                   LIMITED  DELHI    KOCHI KOTTANAD BANGALORE MANGALORE  NATURAL GAS PIPELINE PROJECT  PHASE II   PJS OF RTU FOR CENTRALISED SCADA SYSTEM       ELECT   amp  INST        Job Spec  No    MEC   23ME   05   E5  1    75 094                BID Doc No    05 51 23 ME  GAIL 094  RTU                       SECTION Rev  0 Page 13 of 24     BS 1259  1958 Intrinsic Safety Standard     EIA 232 Interface between Data terminal equipment and data  communication equipment employing serial binary data interchange     EIA 422 Electrical characteristics of balanced voltage digital interface circuits     EIA 485 Electrical Characteristic of generators and Receivers for use in  Balanced Digital Multipoint Systems     150 9001 02 03 Quality system        Design Production and Installations  Final Inspection  and testing     MIL STD 461B Radio Frequency and Electro magnetic Interference   7 1 2 Abbreviations  AMS Alarm Management System  CP Cathodic Protection  DCS Distributed Control System  DHCP Dynamic Host Configuration Protocol  EPAX Electronic Private Automatic Exchange  ESD Emergency Shut Down  FEP Front End Process
    
Download Pdf Manuals
 
 
    
Related Search
    
Related Contents
Technical Publications LOGIQtα200 Service Manual  BSC HAMMER フロントフェイス  Alma Pumps Guarantee  Mesure in situ du dégagement de gaz carbonique des sols à l`aide  Chief PCS2306 flat panel wall mount  DEPRO SOLFIX PRIM 14  Melancholy Abstract      Copyright © All rights reserved. 
   Failed to retrieve file