Home
        INSTALLATION - Carrier Transicold Dealer Extranet
         Contents
1.       Installation Roof preparation Front supports   Snaplocks       2  Install the 3 fixing front supports of the skin     A RECOMMENDATIONS    Put grease on each fixation screw before  installation to avoid rust        3  Install the 2 rear snaplocks     A RECOMMENDATIONS    Put grease on each fixation screw before  installation to avoid rust        Carrier Transicold Europe 01 02 07 Neos 100   Installation RevA  13 33    Operation  amp  Service Manual          Installation Roof preparation Rear support    4  Install the safety rear support     Ay RECOMMENDATIONS    Put grease on each fixation screw before  installation to avoid rust        Carrier Transicold Europe 01 02 07 Neos 100   Installation RevA  14 33       Operation  amp  Service Manual NeEOS    Installation Unit Preparation    1  To be done first  Remove the cable bushing fixing screw        2  Place the lifting tool inside the vehicle  P N  07 60109 00     RECOMMENDATIONS    A 2 technicians are recommended to place the  lifting tool in the vehicle        Carrier Transicold Europe 01 02 07 Neos 100   Installation RevA  15 33       Operation  amp  Service Manual    Installation Unit Handling       1  Using a forklift  place the condenser section onto the lifting  tool inside the vehicle body     2  Run the electrical harness up through the upper hole        Carrier Transicold Europe 01 02 07 Neos 100   Installation RevA  16 33    Operation  amp  Service Manual       Installation Unit Handling        RECOMMENDATION
2.  to the corresponding mounting kit instruction to  connect the  12Vdc ignition live     Carrier Transicold Europe 01 02 07 Neos 100   Installation RevA  24 33       Operation  amp  Service Manual       Installation Battery harness fitting    MANDATORY BEFORE ANY ELECTRICAL OPERATION        DISCONNECT THE VEHICLE BATTERY  Remove the battery ground      the positive battery      and lock out     1  Route the battery harness to the vehicle battery     2  Secure the harness to the vehicle chassis using plastic tie   wraps     Ay RECOMMENDATIONS    Protect or move the harness away from    metallic corners of the chassis        m Avoid connecting the harness to or in contact  with heating source     m Avoid connecting the harness to parts that  may cause vibrations         Do not secure the unit harness to the vehicle  harness or piping       m Avoid drilling the vehicle frame     Carrier Transicold Europe 01 02 07 Neos 100   Installation RevA  25 33    Operation  amp  Service Manual       Installation Battery harness fitting       3  Cut the battery harness coming from the unit or standby  module  if equipped  to the required length     4  Strip the   battery  35mm     red  and the fuse holder for the    microprocessor positive     5  Using a crimping tool  install the  125A  fuse supplied with  the mounting kit     NOTE   Soft solder is recommended        Carrier Transicold Europe 01 02 07 Neos 100   Installation RevA  26 33       Operation  amp  Service Manual    Installation Ba
3. 0 mm for hole length  m Cut 2 bands at 206 mm for the hole width    m With remnants  4 bands for the internal edges     Ay RECOMMENDATIONS  m Gasket installation  ALWAYS start with the    roof by putting the gasket in place        a Overlap minimum 5 mm    01 02 07 Neos 100   Installation RevA  10 33       Operation  amp  Service Manual       Installation Box preparation Waterproof gasket Condenser fan opening    B     Condenser fan opening  m Cut 4 bands at 315 mm    a With remnants  complete the internal edges insulation      Ay RECOMMENDATIONS  gw Gasket installation  ALWAYS start with the    ceiling by putting the gasket in place          Overlap minimum 5 mm       Carrier Transicold Europe 01 02 07 Neos 100   Installation RevA  11 33       Operation  amp  Service Manual    Installation Roof preparation Rivnuts       1  To install the rivnuts  10    m Put silicone in the holes    m Insert the rivnuts using the adapted tool  manual or  pneumatic      m Remove excess of silicone with adapted cleaning  solution        NOTE   To remove the rivnut       Drill the rivnut head with a drill   10 5 mm to  remove it       After rivnut head removal  put a drift punch in  replacement of the head          Using a hammer punch the rivnut back side       Check the drilling hole to be sure the hexagonal  punching is not damaged in order to be able to put  in place a new rivnut        Carrier Transicold Europe 01 02 07 Neos 100   Installation RevA  12 33    Operation  amp  Service Manual 
4. Box preparation Drilling inside          Check that the body builder has installed the front  panel with an integrated channel     If not  follow steps 5  amp  6     5  Drill the electrical harness hole  upper position    DU       350 mm from the right front fixing point of the  condenser      30 mm from the roof insulation  6  Drill the drain water hose hole  lower position    50 with  an angle of 45         360 mm from the right front fixing point of the  condenser         350 mm from the roof insulation    Carrier Transicold Europe 01 02 07 Neos 100   Installation RevA  8 33       Operation  amp  Service Manual    Installation Box preparation Drilling outside       ETONLONHE VENICE 7  Mark the 10 fixing holes for the roof skin brackets with the    E drilling jig  delivered in set P N  07 60108 00      D O The right position of jig is done with regard to condenser  opening  The part number 07 60108 00 must be readable     8  Drill the roof at    9 5 mm     9  Clean the roof before following next steps     07 60108 00 DE  l    Rear of the vehicle       Carrier Transicold Europe 01 02 07 Neos 100   Installation RevA  9 33    Operation  amp  Service Manual          Installation Box preparation Waterproof gasket       Example for van with reinforcement    Carrier Transicold Europe    Condenser opening    1  Install the waterproof gasket between the insulation and  the roof opening     NOTE   Gasket installation MUST be done as follow   A   Condenser opening  m Cut 2 bands at 59
5. FACTORY CHARGED AND SET   A   MANDATORY BEFORE ANY ELECTRICAL OPERATION     m DISCONNECT THE VEHICLE BATTERY     Firstremove the battery ground             then remove the positive battery      PERSONAL PROTECTIVE EQUIPMENT    m Always use adequate personal protective equipment before doing anything on this refrigerant unit     BODYBUILDER RECOMMENDATIONS    m Roof insulation should be MINIMUM 60 mm thickness   m Roof insulation should be FLAT        m Unit reinforcement should be INSIDE the insulation     ms DO NOT cut van reinforcement     Carrier Transicold Europe 01 02 07 Neos 100   Installation RevA  4 33       Operation  amp  Service Manual    Installation Preparation before installation       1  Unpack the box contents in your warehouse        Ay KEEP THE DOCUMENT DELIVERED WITH THE  UNIT      a    ie     SR ZA  ei vk RS Lei p Weg    T A wi     a    em     _        2  Unpack the box       Remove the cover       Remove the carton belt     m  he condenser is ready to be moved directly with a  forklift from the box     3  Check if the box content corresponds to the bill of material  on the packaging       Mounting kit    In the event of any abnormality  missing  damaged part or  part number etc   fill in the form  Advance Warning  DOA   Claim        Carrier Transicold Europe 01 02 07 Neos 100   Installation RevA  5 33    Operation  amp  Service Manual          Installation Preparation before installation       Carrier Transicold Europe    Vehicle partition    m  ake care 
6. Operation  amp  Service Manual NeEOS    INSTALLATION       Carrier Transicold Europe 01 02 07 Neos 100   Installation RevA  1 33       Operation  amp  Service Manual    INSTALLATION Table of content        6  010  0011  0  q EEN 4  Preparation befor   INSIaliaHONi     icil RENEE ocaseonsemeeenessuposieecsunecanctsameaenecsncesucoossacusn  5  VO  E EE CETO 6  BOX PrEP Le E D  Billie lte 7  DDG feig Ce ea 9  MV SMF OOM OAS CU aee caren tase E EEEE AL REATO A SE DN tessa IALIA IRANIANA re 10  conden oron NN ME 10  KEE EIERE 11  ROOT POC AE AOI EE 12  PIU nana 12   FV OMI SUS OS SIA OG IS nn 13  PAOD Dee Le EE 14  JI 15  Preparation                      iii 15  FRI  16  Bel RUE d UE  d Le 1 EN 20  HOOFSKIN NST UE ee E 21  Driver cap OS an ANION ME 22  le command TAPAS TUNG scares eee ete coerce ATE TE IR 23  Battery Narness  HG ninni cce secs ENR E Ea rE arae So EE aerea epicentro 25    Carrier Transicold Europe 01 02 07 Neos 100   Installation RevA  2 33    NEeo gt s       Operation  amp  Service Manual       Ell lee d une e TER TE ON E 29  Standby module connection             iaia ie 30  Slandpy Pug MVS et AUN ON rs at acc essere coe nce ea etre ssi a tues eee eee oes eee E E 32   33    Standby plug connection    Carrier Transicold Europe 01 02 07 Neos 100   Installation RevA  3 33       Operation  amp  Service Manual    Installation Introduction       This document gives the correct rules to follow in order to correctly install the NEOS 100 unit     SAFETY FIRST  THE UNIT IS 
7. S    While lifting up the unit  take care of the  condenser introduction to not damage the  gasket insulation    4  Fix the unit with the 6 screws  BIR 10x50     Carrier Transicold Europe 01 02 07 Neos 100   Installation RevA  1 7 33    Operation  amp  Service Manual    Installation Unit Installation          SEN  i    ANAN       Carrier Transicold Europe 01 02 07    1  Replace the cable bushing screw     Remove the 3 mounting screws of the electrical motor     Swing out the electric motor and remove the belt to gain  access to the cable bushing screw     Re install the cable bushing screw     Re install the electric motor belt and the motor to its  original position     Check the belt alignment and tension  refer to belt  alignment section     NOTE  Belt tension is done automatically when the  electrical motor bracket is re installed     Neos 100   Installation RevA  18 33    Operation  amp  Service Manual NeEOS    Installation Unit Installation    2  Insulate the harness hole  silicone  polyurethane   mastic               3  Run the drain water hose through the lower hole        Carrier Transicold Europe 01 02 07 Neos 100   Installation RevA  19 33       Operation  amp  Service Manual NeEOS    Installation Pod installation    4  Install the isotherm pod   5 locking screws       5  Connect the water drain hose on the pod water drain plug     6  Insulate the drain water hose hole  silicone  polyurethane   mastic        7  Install the Serial Number sticker on the pod  delivere
8. at the heat shrink tube     Install the connector and tighten the nut     Enger  i    x A7   4  Secure the standby cable onto the standby module with  wp plastic tie wraps          5  Secure all wires together with plastic tie wraps             LAENA  aa aa Sap E  qo i n   il   mF    6  Continue the installation  refer to  Driver cab preparation       step 4   p22    Carrier Transicold Europe 01 02 07 Neos 100   Installation RevA  33 33    
9. d in  mounting kit     Qty 2         Carrier Transicold Europe 01 02 07 Neos 100   Installation RevA  20 33       Operation  amp  Service Manual NeEOS    Installation Roof skin installation    Ay RECOMMENDATIONS  Before installing the roof top cover  make sure    that the distance between the middle hook and  each side hook is 425 mm             gt   1  Install a LUBRICANT onto the 3 front hooks to allow the  7 Loi   fitting of the top cover without moving or damaging the  i 425 mm 425 mm   rubber bushes        2  Connect the condenser fan   3  Slide the skin onto the 3 front hooks     4  Press on the rear of the cover to engage the snaplocks     5  Install the rear safety screw  adding the plastic spacer if  required     Carrier Transicold Europe 01 02 07 Neos 100   Installation RevA  21 33       Operation  amp  Service Manual    Installation Driver cab preparation          Ay RECOMMENDATIONS  Before drilling the floor  check the location of    fuel tank  harness and or tubes        1  Drill a hole in the cab floor  behind driver or passenger  seat     depends on battery location      RECOMMENDATIONS    Se   eh  AY Protect the hole  ex  armoured hose  to avoid    harness damage   2  Run water drain hose through the floor     3  Run battery cable through the floor  keep a wire loop for a  potential standby module installation      4  Run the cab command and ignition cable to the dashboard   keep a wire loop for a potential standby module  installation       5  Install the sta
10. dby module    m Strip the wire       ee D  0 00 SE  OO  EE  000 30   90 9970 00  ro 0      Crimp the terminals with the adapted crimping tool           a  ooo    m Connect the wire into the  Ignition key in  port     Carrier Transicold Europe 01 02 07 Neos 100   Installation RevA  31 33       Operation  amp  Service Manual       Installation Standby plug installation    A RECOMMANDATIONS      Make sure there is a room at the rear for the    cable and enough room for the fastening nut       Before drilling the bumper  check the location  of harness  components and or tubes     m Protect the hole  ex  armoured hose  to avoid  harness damage          Protect or move the harness away from  metallic corners of the chassis     m Avoid connecting the harness to or in contact  with heating source     m Avoid connecting the harness to parts that  may cause vibrations     1  To Install the standby plug    m Drill the front bumper    25 mm        a Install the plug with the fastened nut     Carrier Transicold Europe 01 02 07 Neos 100   Installation RevA  32 33       Operation  amp  Service Manual    Installation Standby plug connection    2  Run the cable to the standby module into the driver cab       EY LL 3  Connect the standby module               Gur       m Strip the phase  brown  and neutral  black  wires    Crimp the terminals with adapted crimping tool   Heat the heat shrink tube     Strip the ground  yellow green      Crimp the ring terminal with the adapted crimping tool   He
11. ndby module for unit so equipped     refer  to  Standby module installation      p29     6  Install a capping  not supplied  to cover the hoses and  harness     7  Insulate the water drain hose     Carrier Transicold Europe 01 02 07 Neos 100   Installation RevA  22 33       Operation  amp  Service Manual    Installation Cab command harness fitting       NOTE  For cab command harness fitting  refer to the  vehicle mounting kit instructions     1  Route the cab command harness to the vehicle  dashboard     Ay RECOMMENDATIONS    Protect or move the harness away from    metallic corners of the chassis        m Avoid connecting the harness to or in contact  with heating source     m Avoid connecting the harness to parts that  may cause vibrations        01 02 07 Neos 100   Installation RevA  23 33    Carrier Transicold Europe       Operation  amp  Service Manual    Installation Cab command harness fitting       2  Fit the cab command  in specified location      Ay RECOMMENDATIONS  m  ake care not to pierce any harness or hoses    within the dashboard        a If the cab command is built into the  dashboard  fit it as far as possible from the  heating ducts        m Maximum temperature of exposure  70  C   158   F     a  he cab command MUST NOT be located  behind the screen  T   too high and  obstruction of windscreen      3  Route the ignition cable  white  to the vehicle fuse box        4  Connect the white wire onto the fuse holder supplied in the  mounting kit  2A      5  Refer
12. not to obstruct the air intakes on the  evaporator section and the ventilation ducts       For any mobile partition installation  contact our  Technical Department or refer to the following chart     m Insulation and roof opening has to be done by the  bodybuilder according to the bodybuilder drawing       Reinforcement fixations have to be inside the insulation   if not  noise transmission through the vehicle body may  be experienced     m Insulation between the roof and box insulation can be  done       with bodybuilder preparation    using gasket supplied with the unit     01 02 07 Neos 100   Installation RevA  6 33    Operation  amp  Service Manual       Installation Box preparation Drilling inside       RECOMMENDATIONS         Before box preparation and unit installation commences  protect the vehicle roof and the refrigeration  box floor  cover  cardboard         Front of the vehicle I D    NOTE  The two drilling jigs for internal and external drillings  are available in the same kit with the reference 07 60108 00     E mm E   1  Using the drilling jig  mark out the fixing holes     The jig is in the right position if you can read the part  number 07 60108 00     2  Drill   8 5 mm  D 3  Female thread   10 mm   150  D    4  Use the fixing material adapted to the reinforcement done  by the bodybuilder        04 80408 00    O    Rear of the vehicle    Carrier Transicold Europe 01 02 07 Neos 100   Installation RevA  7 33    Operation  amp  Service Manual       Installation 
13. rivnuts        4  Fix the module        Carrier Transicold Europe 01 02 07 Neos 100   Installation RevA  29 33    Operation  amp  Service Manual    Installation Standby module connection             an    E An  e DO   8 GE rn           0700 Ae 09    a 09020  95902070005   me    00 DODO   057  Ge Gei in ao       IER k    E pali        Nn  Meg sla        Carrier Transicold Europe    1  Cut to the required length  the   battery  red 35mm2   the      battery  black 35mm2  and the ignition cable  white 1 5  mm2  coming from the unit     2  Battery cable from unit  m Strip the   and     battery     a Crimp the ring terminals with the adapted crimping tool     battery   6 mm and     battery    8mm      a Tighten the   battery at 4 Nm and     battery at 10 Nm     m Cover screws and ring terminals with heat shrink tube     3  Ignition cable from unit  m Strip the wire     Crimp the terminals with the adapted crimping tool     m Connect the wire into the  Ignition key out  port     01 02 07 Neos 100   Installation RevA  30 33       Operation  amp  Service Manual    Installation Standby module connection       4  Battery cable from standby module to the battery       m Strip the   and     battery          OO  we 0 0 SEN  ei A L    AH          pe  PT kb    AA      a Crimp the ring terminals with the adapted crimping tool     gt  e ee a E 8mm    e a Tighten the 2 wires at 10 Nm                          m Cover screws and ring terminals with heat shrink tube     5  Ignition key to the stan
14. ttery harness fitting       6  Heat the retractable sleeve to insulate the connector   7  Connect the   battery to the battery     8  Strip the battery ground      35mm     black      crimp the  terminal with the adapted crimping tool     NOTE   Soft solder is recommended     9  Connect the   microprocessor  1 5mm   red  to the fuse  holder  2A      crimp the terminal with the adapted crimping  tool     10  Heat the retractable connection        Carrier Transicold Europe 01 02 07 Neos 100   Installation RevA  27 33    Operation  amp  Service Manual       Installation Battery harness fitting       11  Put the fuse in place  2 amps      12  Connect unit ground     to the battery   13  Re connect the ground     of the vehicle battery     14  Start the vehicle and press the cab command ON key to  Start the unit     REMINDER   This unit is factory charged and set     Are tf ES Tn KZ     rh        i i o i    F r  F      x Ur      LI r A di  d i f p  v  irat EL we ADI t     Tue amm Le INI  Wor   FI pe   t  LBIFI   TOMER ar i  A  di  par H x  3  geg    Carrier Transicold Europe 01 02 07 Neos 100   Installation RevA  28 33    Operation  amp  Service Manual       Installation Standby module installation          m The standby module can be fit under or    behind the seat       Before drilling the floor  check the  location of fuel tank  harness and or  tubes     1  Putin place the module and mark the 4 fixing holes for the  standby module     2  Drill at    9 5 mm     3  Install the 4 
    
Download Pdf Manuals
 
 
    
Related Search
    
Related Contents
iiyama ProLite E2202WSV-B1  LST ENM2-1 User's Manual  取扱説明書はこちら  ProScan TV User's Manual  Untitled - Domaines Skiables de France  Comment utiliser le manuel d`utilisation    Copyright © All rights reserved. 
   Failed to retrieve file