Home
        Negative Pressure Isolator
         Contents
1.   The second pipe line must be a S S pipe  of 160mm diameter and will be supplied  and installed by the successful tenderer  and according to the written instructions  of the manufacturer of the isolator     The Tenderer must verify that the  offered extract fans can be located on  the roof of the BOCOC without any  problems  Tenderers are invited to visit  the areas of the Center after  arrangement of a meeting  so that all  installation works will be according to  the needs of the BOCOC      To be completed by    Weight  Factor  30        Reference to  Product Evaluation  Literature Points   Page  amp   Paragraph     Statement of  Conformity    Tenderer                 Extract Fans for Negative Pressure isolators   cont d      Statement of Reference to     Er AMET Conformity Product  Specification  To be completed by   Literature    Requirements Tenderer   Page  amp   Paragraph    The Tenderer must verify that the fan  motors of the offered Extract Fan are  supplied with  sealed for life bearings  and that no routine maintenance will be  required for the bearings     a  The Tenderer must verify that the  extract fans offered will function with  a 3 Phase motor designed for range  of rated voltage 380 420 V   5      50Hz  IE1 Standard Efficiency  Motors      b  The Tenderer must verify that each of  the extract fans offered will function  with an Inverter    C  The Inverter must be a high quality  one  with 3 phased inlet and outlet    d  The Inverter must be CE marked   pre
2.  access  to all potentially contaminated areas and  all other equipment areas  to facilitate  easy cleaning  sanitization and  ergonomy of all operator movements     For each of the three working chambers   specify what the value of the air  exchange rate is separately  and  characterize the form of air flow        Weight  Negative Pressure Isolator  cont d   Factor    cont d   60       Statement of Reference to Evaluation  Conformity Product Points  Tenderer   Page  amp   Paragraph              Indicate if and how  nursing or other  personnel can continuously monitor  important working parameters  like   a  pressure   b  condition of HEPA filters   C  air flow  in all three working chambers     17 1 Indicate if service engineers and   users will be allowed to perform   automated or semi automated QA tests    like    a  Automated pressure decay seal leak  tests     b  glove leak test in an easy and quick  way    17 2 List and shortly describe allavailable  QA tests     Indicate availability of service mode  password protection for use by service  engineers     19 1 Verify the availability of sealed  fluorescent lighting inside the isolator  cabinets  giving safe view at the whole  work surface  State the resulting  luminance in SI units  lux     19 2 Indicate if Lighting systems have  at least IP64 degree of protection  against ingress of particles           Weight  Negative Pressure Isolator  cont d    Factor  cont d   60                Statement of Reference to Evaluation  
3.  and recording  system     The Tenderer must provide two sets of  manuals in English  one Operation and  one Service Manual     The Tenderers must verify that the  Isolator offered will comply with the  following standards     BS EN ISO 14644   EU GMP Grade A  equivalent to ISO  Class 5  air environment quality CE  BS EN 1822  HEPA filters    IEC 61010 1 2001  Electric wiring    Pharmaceutical Isolators   pharmaceutical  Press 2004   AS 4273 1999  when optional  activated carbon filter is fitted      Compliance to additional relevant  standards to be indicated          Weight  Negative Pressure Isolator  cont d    Factor  cont d   60               Statement of Reference to Evaluation  Conformity Product Points   To be completed by Literature  Tenderer     Specification Requirements    The manufacturer must be established in  the international market and be officially  represented in Cyprus  At least two  service engineers trained by the factory  for servicing the offered isolator and  extract fan are needed  If there are no  factory trained engineers employed by  the Tenderer  then two of the engineers  employed by the Tenderer must be  trained within three months from the  date of signing a contract with the  succesful Tenderer  In addition to  technical problems  the service engineers  will also be responsible for any periodical  operation and technical training needed  for the staff of the Oncology Center  The  tenderers must provide Curriculum Vitae  of the service engine
4.  purchase contract  is signed    If the Tenderer  Representative of  the manufacturer in Cyprus  becomes  unable to continue offering  maintenance for the equipment  purchased by the Bank of Cyprus  Oncology Center  then the  Manuafacturers themselves  undertake to send engineers for both  the annual and the quarterly  maintenance of the isolator and the  extract fans    The manufacturer undertakes in  addition  if the above unavailability  becomes a reality  to train an in   house engineer for the maintenance  of the isolator and the extract fan    The successful Tenderer must provide  basic training on the extract fan of an in   house engineer for emergencies              Warranty  Spare parts  Maintenance Contract     Weight    manufacturer support and Training of Service Factor  Engineers for the Negative Pressure Isolator and the cons d  extract fans offered  10       Specification Requirements    1 1 Verify that the Isolator and the  extract fans offered will have a two year  full warranty  including service and all  spare parts    1 2 Verify that the Tenderer is willing to  undertake and provide an eight year  service contract following the two year  warranty for the isolator and the extract  fans offered  This service contract must  cover all spare parts  It must also include  an annual Preventive Maintenance and  Quality Assurance session performed by  a Service Engineer from the factory  as  well as quarterly maintenance service  provided by the local engineers trai
5.  separately     9 1 The offered isolator must allow  performance of all operations in an easy   reliable and safe way    9 2 Verify that the isolator offered has  adjustable height and ergonomic design  for all chambers  especially the  Processing Chamber   Wide clear  openings of all doors for easy loading   inside surfaces easily reachable from the  glove ports etc     9 3 Indicate the Dimensions of all doors  and of the two sleeve ports     The offered isolator must have  ergonomically positioned DOP particle  counter test   ports in all chambers        Weight  Negative Pressure Isolator  cont d    Factor  cont d   60                Statement of Reference to Evaluation  Conformity Product Points   To be completed by Literature  Tenderer     Specification Requirements    11 1 The isolator design must allow easy  maintenance    11 2 The unit offered must allow service  from a lockable front panel  which  is preferable     Indicate the overall dimensions of the  unit offered  The isolator approximate  dimensions are given below     Length  1800 2500 mm  Depth  750 mm  Height  2800 mm  maximum     13 1 Verify that the isolator has  adjustable height as required for this  tender  for easier and more ergonomic  use by the operators and for easier  cleaning of all the external surfaces of  the isolator    13 2 Indicate if the base frame has    a  Lockable castors   b  Adjustable height of the footrest   c  At least 350mm unobstructed knee  room     The offered unit must have good
6. BANK OF CYPRUS ONCOLOGY CENTER  BOCOC     ENTYTIO 8    Technical Specifications for the Purchase of a  Negative Pressure Isolator and two Extract Fans  for reconstitution of Cytotoxic drugs in the Clean Room of the  Bank of Cyprus Oncology Center    Npoogopa yia Ayop     v  g KouBoukAiou AogaAgias kai 600    Gagpio Tpuv yia Avac  craor KUTTAPOOTATIKWV  Mapyakwyv cro Ka8ap   Aupg  rio Tou OykoAoyiKoU  K  vrpou Tpdtregac K  rrpovu     r1 20011   008    TECHNICAL SPECIFICATIONS AND  STATEMENT OF CONFORMITY WITH SPECIFICATIONS    December 2011       BANK OF CYPRUS ONCOLOGY CENTRE  32 Acropoleos Ave  2006 Strovolos  Nicosia   Cyprus  Tel   357 22841300  Fax   357 22511870  e mail  oncology  bococ org cy  http   www bococ org cy    I  Negative Pressure Isolator    Maintenance   Inspection Tasks    Frequency  Quarterly   every 4 months  Location  BOCOC    Task Description     Supply  Installation  Commitioning  Inspection and Planned Maintenance of a  new Negative Pressure Isolator and two new extract fans  Provide the cost of  the above in Entypo 11  The second new extract fan must be connected by  the successful tenderer to the existing isolator  supply and installation   The  cost of all optional items must be given in Entypo 11A     Safety requirements     According to the Standards EU cGMP  BS EN ISO 14644  IEC 61010   1 2001  Electric wiring   Pharmaceutical Isolators  Pharmaceutical  Press 2004 and BS EN 1822 1 1998  HEPA filters      Safe working methods     All works perfor
7. Conformity Product Points   To be completed by Literature  Tenderer     Specification Requirements    ALARMS    20 1 Verify that the following are  available    Latched audible and visible alarm for  internal pressure  Alarm for failure of downflow air  exchange rate  Alarm for transfer chamber door not  closed     20 2 Verify that Alarm mute option is  available   20 3 Verify that battery back up for  alarms is available   20 4 Any additional visual and audible  alarms available to be indicated    Verify that Electrical supply is designed  for 230VAC 50Hz  1PH    Verify that the Isolator is supported by  Programmable Logic Controller  PLC   technology     The isolator offered must be supplied  with UPS back up to support the  operation of key isolator functions  for at  least 20 minutes  Specify   what  operations are possible with UPS back up  and indicate how this affects the safety of  personnel and cytotoxics           Weight  Negative Pressure Isolator  cont d   Factor  60               Statement of Reference to Evaluation  Conformity Product   To be completed by Literature  Tenderer   Page  amp     Specification Requirements    The Tenderer must provide a price list  with all accessories and consumables of  the isolator  sleeves  gownlets  powder   free gloves suitable for cytotoxics  etc       The following must be quoted separately  as additional options in Entypo 11A     i  13 amp single splash proof socket  Cable gland for computer connection   iii  CCTV monitoring
8. el was launched to the market          Weight  Negative Pressure Isolator Factor    60               Statement of Reference to Evaluation  Conformity Product Points   To be completed by Literature  Tenderer     Specification Requirements    Tenderers must verify that the Isolator  offered is appropriate for the safe aseptic  reconstitution and dispensing of  cytotoxics     2 1 Verify that the Isolator offered  functions with Negative Pressure and can  be connected to an external Negative  Pressure Extract Fan  externally ducted  system      2 2 Verify that all potentially  contaminated airways and plenums are  under negative pressure     Tenderers must provide description of  the function of the whole unit with  emphasis on the airflow and filtration  parts and components              Negative Pressure Isolator  cont d      Specification Requirements    Conformity   To be completed by  Tenderer     a  Verify that the HEPA filtered air will  be exhausted to the atmosphere via  a dedicated ducting system and an  extract fan located on the roof of  the hospital    The manufacturer must provide  confirmation that the Extract Fan  offered is suitable for proper  operation when connected with the  isolator offered  based on the  required pipe lengths and pipe  sizes    Note  Technical specifications of the  Extract Fan must be provided  separately  see relevant section on  the extract fans below      a  Verify that all HEPA filters and  lighting systems can be safely  removed and r
9. eplaced from the  upper site of the offered isolator    dirty site      b  Verify that the service engineer  can seal the primary and all other  HEPA filters into a plastic bag  before removing it for safe  disposal     a  The Tenderers must verify that the  isolator offered provides an EC GMP  Grade A  class 100  air environment  in the Processing Chamber    b  Verify that the isolator is a three  module one with a process chamber  and two fully interlocked class E  Transfer Chambers  Left and Right      Weight  Factor  Cont   d   60          Statement of Reference to Evaluation    Product  Literature             Weight       Negative Pressure Isolator  cont d      Statement of Reference to Evaluation  Conformity Product Points   To be completed by Literature  Tenderer     Specification Requirements    Verify that both transfer chambers  operate with timed interlocks and high air  change rates  Indicate the air change  rates available     8 1 The Tenderers must verify that the  isolator is manufactured with high quality  materials  and indicate what these  materials are  More specifically  they  must verify that all external and internal  surfaces are durable  not rusting and  allow easy cleaning and disinfecting   8 2 Indicate what materials are used  for the surfaces mentioned below   a  Interior surfaces of Processing  Chamber  Interior surfaces of Transfer  Chambers  left  amp  right   Doors  Stand  External panels   For any coated surfaces  indicate  the type of coating
10. ers including  experience related to the offered items     The Tenderers must provide a list of  other public or private institutions in  Cyprus where they have installed the  same or similar equipment to that offered  for this tender     The Tenderers must describe any  additional advantages of the offered  items that are not included above     The successful Tenderer must provide  basic training on the isolator of an in   house engineer for emergencies           Extract Fans for Negative Pressure isolators    Specification  Requirements    1 1 The Tenderer must provide a  declaration from the manufacturer of the  Negative Pressure Isolator  that the  Extract Fans offered  are suitable for  proper operation in connection with the  offered isolator as well as the existing  isolator of the Clean Room of the  Oncology Center  Amercare Negative  Pressure isolator  model A2     1 2 The Tenderer must provide a  declaration that the following will be  performed    a  The new isolator will be connected via  the existing pipe system of the present  clean room to one of the new extract  fans installed on the roof  present  arrangement    V  connection of two  isolators in the clean room and  V    connection of two extract fans  duty  amp   stand by  on the roof     b  When the new clean room is  commithioned  the second new extract  fan must be separately connected via a  new additional pipe to the existing  Amercare A2 isolator  so that each  isolator is functioning with its own fan 
11. ferable made by a known  european manufacturer    e  The tender must provide the name of  the inverters    manufacturer    f  The tender must provide the model of  the two inverters together with all  technical data sheets and a copy of  user and installation instructions     The Tenderer must verify that the duct  connection of the Extract Fan offered is  made with a flexible mount  in order to  enable an easy visual check whenever  needed        Weight  Factor  30 96    Evaluation  Points                Extract Fans for Negative Pressure isolators Weight   cont d   Factor  30     Statement of Reference to    Specification Conformity Product Evaluation    Requirements  To be completed by   Literature Points  Tenderer     The Tenderer must verify that the  offered Extract Fans have the following  technical characteristics     Type  Negative Pressure Extract Fan    Housing Material  Corrosion Resinstant   Moulded Polypropylene  in order to   handle corrosive substances that may be   hazardous to health    Inlet Exhaust Spigot  160mm Diameter   Impeller Type  Forward curved  Centrifugal   Impeller Drive  Direct   Volume  approx  1000 m  per hour   Maximum Static Pressure  approx  1300  Pa     Motor Type  Squirrel Cage Induction   Motor Speed  approx  3000 r m     Motor Electrical Voltage  415VAC 3PH   50Hz   Motor Rated Output  approx  0 75 kW   Starting method  Variable Frequency  Drive     Waterproofing Classification  At least   IP55     The Tenderer must verify that the  of
12. fered Extract Fans have the following  additional characteristics     Fans to be complete with anti vibration  mountings   Fans to have flexible connections with  Quick Release Clips connected to the S S  pipe   The S S pipe to have an individual  Manual Damper near each Fan for  manual flow regulation whenever  necessary    Fans appropriate for functioning without  any problems under extreme high  weather temperatures  over 60  C     The fan environmental conditions given  by the fan manufacturer to be submitted  with the tender    Shadow rain  cover protection to be  provided for both extract fans  The  cover protection must not complicate  the accessibility to the Fans for any  maintenance or visual check           Weight    Extract Fans for Negative Pressure isolators Factor   cont d   cont d   30                Statement of Reference to Evaluation  Conformity Product Points   To be completed by Literature  Tenderer     Specification Requirements    The Tenderer must provide with the  tender a detailed technical description of  the Extract Fan offered with all  accessories  including data sheets and  diagrams showing basic dimensions of  the unit that are important for the  installation and for the connection with  the Negative Pressure isolators     The Tenderer must provide a letter from  the manufacturers of the isolator and  the extract Fans guaranteeing the  following     a  The manufacturer guarantees the  availability of spare parts for at least  10 years after the
13. med on the Negative Pressure Isolator must comply with the  method and risk assessments described in relevant international standards for  safe and proper working in a Clean Room    A written report detailing the tasks performed  must be provided by the  contracting company on completion of any Planned Preventive Maintenance   PPM  or any other Service visit  or when any work is undertaken in the Clean  Room     Planned Preventive Maintenance  PPM      The tenderers must submit a table with detailed check lists  which will include    all Maintenance Tasks they are proposing to perform during PPM according to  the instructions of the manufacturer           The tenderers must also submit a list of at least two Service Engineers who will  be the responsible persons to perform this PPM  Certificates regarding their  qualifications must also be submitted  as indicated in Entypo 6 of this tender           II  Outline Specifications    All installation works  acceptance testing  commissioning and quality control tests of all installed  systems must be performed according to the Standards EU cGMP  BS EN ISO 14644  IEC 61010   1 2001  Electric wiring   Pharmaceutical Isolators    Pharmaceutical   Press 2004 and BS EN 1822 1 1998  HEPA filters      1  The successful tenderer must submit the following     a  The names of at least two institutions in Cyprus where the tenderer has done similar  installations   b  Provide documentation to verify the above  e g  either copies of the contrac
14. ned at  the factory  The cost of this service  contract must be indicated in Entypo 11     The Tenderers must provide a list of the  most important  electronic mechanic   pneumatic and other spare parts that the  manufacturer suggests having in stock  and be available at the premises of their  representative in Cyprus  Additionally  the Tenderers must provide with their  tender  an estimated delivery time for  the other spare parts that may be  needed one day  but are not available in  the stock kept in Cyprus     The Tenderers must indicate the ability of  the system to accept upgrades of the  system s software  All upgrades and  hardware releases during the warranty  and service contract periods to be  included and installed without any  additional costs for the BOCOC  for at  least ten years        Statement of Reference to Evaluation  Conformity Product Points   To be completed by Literature  Tenderer   Page  amp   Paragraph           
15. ng both the new isolator and the pre existing isolator with their new extract fans in  the new Clean Room  In case that the new isolator of the successful tenderer will not be made  by the same manufacturer as the existing one  Amercare   then the successful tender will be  responsible for the installation and commitioning of the isolator of its manufacturer only  In this  case  Amercare s representative has to declare separately the costs just to re install and  commition the present Amercare A2 isolator in the new Clean Room after connecting it to the  new extract fan  In any case  each isolator in the new Clean Room will be connected to one  exctract fan installed on the roof of the building via a ductpipe  The time period to arrange  above will be defined to the tenderer by BOCOC and must not in any way affect the scheduled  program of other works in process of the BOCOC extension  All tenderers are invited to arrange  a meeting either with Dr  Chris Constantinou  Head of Medical Physic Departmetn or Mr   Nestoras Georgiou  Biomedical Engineer  to clarify any questions regarding the above     3  All Items offered  i e  the Negative Pressure Isolator  the Extract Fans and all  related accessories controls etc  must be of the latest state of the Art and  compatible with each other  They must satisfy the needs of a modern medical  oncology department           III  Negative Pressure Isolator    Essential Information  To be completed by Tenderer     Model    Year on which mod
16. ts for    relevant installations or Service Contracts for Maintenance or reference persons with  telephone numbers from the relevant departments of the hospitals and or the consulting  engineers of the hospitals      2  Installation and Commissioning of the Negative Pressure Isolator     After completion of installation  including connection of both new negative pressure exract fans  to the new isolator and the existing A2 Amercare isolator  the systems will be subjected to  inspection and Quality Control under supervision of a manufacturer engineer  specialized in such installations  A file containing all measurements and results must be  submitted to the Medical Physics Department of the BOCOC  The new isolator will be initially  installed in the existing Clean Room of the Center  At some point during the planned  construction of the new Clean Room  the existing clean room will have to be remodeled  and  the successful tenderer will be responsible for de installing all the isolators new and already  existing  storing the already existing one  Amercare A2 isolator  and re installing only the new  isolator with its extract fan in a temporary room  which will be used for the intermiddent period  until the new clean room is completed  The timetable to start the above works may last from  one to three years from the date of the tender submission  When the new clean room is  commitioned  the successful tender will be responsible for de installing and re installing and  commitioni
    
Download Pdf Manuals
 
 
    
Related Search
    
Related Contents
当院における輸液ポンプ・シリンジポンプの安全管理の取り組み  Sciences humaines, maternelle, programme d`immersion française  THCAM-IR518B User Manual  Step    Este produto não possui conexão à Internet nem  MANUAL DE INSTRUÇÕES  Print H4011-12-13-14 Manual  hier de onderhoudstips voor Saeco  ISTRUZIONI PER L`USO DELLA VENTOSA A VUOTO    Copyright © All rights reserved. 
   Failed to retrieve file