Home
BSR0621/2012 - Department of Justice
Contents
1. Pa yeg ese else y k k obs i TTOOSE SZN SV YUM ldujoo ol uonisod yaju ME j oon P pe T l l II r 9yeg N s N F l L l L6 co A c eju N j I s l I L gt BEEN ense I 0050 N x a Pa A 8 co B w m 0090 t o sgt Lo 009 i 005 009 0s or7 1 0s F 22 o POPEIGIA 9 1569 3299 9 SIGE OSL SZN SV YM Ajduioo oj sseuxotui jem unu KT eyjeq woy ABAE xew LuLUQ9 0 ejjeq ye uu Woy seseaul Sseuyxolul IEM S ON T CA Page 14 of 16 Department of Justice Certificate of Accreditation BSR062 1 2012 Appendix C Component list and specifications No Description Material Specification _ erin ot Seer freon sor 100 Sewer junction 90 to m tto Sener jnction sor 000 100 Sewer junction 90 a a 100 Sewer junction 90 4 Circulationpipe CP 82 Pressurepipe 5 Circulationweir BZ End cap 6 Anaerobic filter P 45m m surface area 11 mm 8 Filterbafle JFRPorPP az20mm 9 Diffuser 2 9J J RPE m 10 Aerobicfilter PP S F surface area 15 Weir PVC 0100 Sewer pipe 100 Sewer junction 90
2. 100 End cap 20 Backwash diffuser PE BOM 0 00000 000 24 wngationfiter PE 25mm _ 25 jUVfiter 0 0 SS 1 Bm 26 UV outflow pipe PVC mm pressure 27 Air blower j Arpump ji00itlmn 0 28 Electrical panel RigidPVC See wiring diagram model 10NR DUNT O EO IPS O o Primary Sedimentation Chamber AF Anaerobic FiltrationChamber sss 4 4 4 4 4 4 4 i i CA Contact Aeration Chamber gt gt s Secondary Sedimentation Chamber PU Pump Chamber TE virocycle Model TDANR SPECIFICATION Primary Anaerobic 3 3004m Aeration 2 0430m Sedimentation 0 6642m Pump Chamber 0 3876m Total 6 3876m 75kg m minimum fibre reinforcement as specified within AS NZS 1546 1 2008 clause 6 4 1 1 Minimum coverage for fabric to comply with table 6 4 wall s AS NZS 1546 1 2008 Minimum Concrete Cover STEEL FIBRE 75kg m minimum 600MPa tensile strength as specified within table 6 1 AS NZS 1546 1 2008 and clause 6 2 4 2 Steel fibre shall be tested to achieve the requirements specified within clause 6 3 3 The final mix for casting must meet the requirement of AS NZS 1546 1 2008 clause 6 4 Steel fibre shall be of a non corrosive nature as specified within clause 6 7 2 Date of issue 17 May 2012 Director Building Control Cc
3. by manufacturer 0 25 kWh Controller amp remote alarm Matelec Note The irrigation pump hours of operation may vary depending on influent flow volume Also a pump with different specifications to the Zenox ZHS040 may have to be installed where the head and flow performance is not adequate for the site conditions Therefore this will result in an adjustment to the estimated annual energy costs Date of issue 17 May 2012 Director Building Control Cy delegate of Minister for Workplace Relations Page 2 of 16 Department of Justice Certificate of Accreditation BSR0621 2012 Description of Treatment Processes Wastewater enters the primary anaerobic septic chamber where the bulk of the organic and inorganic solids are retained by either settling to the bottom of the chamber or floating to the surface The clarified sewage flows into a second anaerobic settling filtration chamber before passing into the aeration chamber Organic material in the wastewater is consumed by anaerobic microbes in the first two chambers and by aerobic microbes in the aeration chamber see Figure and Appendix A The 80 litre per minute air blower forces air through micro diffusers located in the aeration chamber This supplies oxygen to aerobic microbes in the biomass suspended within the water column and attached to the fixed media Electrical Jumction Box Irrigation Anaerobic Amaerobic Filtration septic Chamber
4. delegate of Minister for Workplace Relations Page 15 of 16 Department of Justice Certificate of Accreditation BSR062 1 2012 Side elevation ie 13 14 28 25 26 23 18 22 15 15 SS PU 14 21 7 i j AF 20 7 9 7 Plan ft AF 9 8 10 gt 11 TJ j SS PON s 13 a M 4 15 j 16 j 17 B IE zm j B a PU uc x E ans 12 M Ww 5 XI ire PS 11 x ane 11 l E f T E CA Date of issue 17 May 2012 Director Building Control Cc delegate of Minister for Workplace Relations Page 16 of 16
5. Chamber Figure General View The Blower is pre set to operate on a pre determined on off cycle throughout a 24 hour period in order to provide aeration which matches the design organic loading and achieves the design nitrogen nutrient reduction The biologically treated water flows from the aeration chamber into the clarification sedimentation chamber to allow settling of suspended particles to occur A sludge return pipe located in the clarification sedimentation chamber transfers accumulated settled sludge back to the primary chamber for further treatment The clarified effluent is then disinfected as it flows over chlorine tablets into the effluent storage chamber pump well A float switch attached to the pump controls it to periodically discharge the effluent to the irrigation field A high level alarm located in the pump well detects high water levels Emergency storage capacity of not less than 1000 litres without cross contamination in accordance with clause 2 4 8 of AS NZS 1546 3 2008 is provided within the primary treatment chambers of the system The primary tank is de sludged every five years or less as deemed necessary by the service contractor The system is fitted with a control panel containing a programmable logic controller PLC The system is designed to treat all household wastewater from the kitchen bathroom toilet and laundry Date of issue 17 May 2012 Director Building Control Cc delegate of Minister for Work
6. Engineering drawings refer to Appendix B For treatment system components list including concrete tank specifications refer to Appendix C System Components The system consists of one 6388L vertical axis pre cast reinforced concrete cylinder containing A 1478L primary sedimentation anaerobic chamber A 1698L anerobic filtration chamber A 2065L contact aeration chamber A timer controlled Air Blower which operates at 80 L minute when timed on A 407L secondary sedimentation chamber A 336L pump out disinfection chamber housing a chlorine dispenser and a submersible irrigation pump High level float switches e A sludge return system in the secondary sedimentation chamber constructed of UPVC pipe and operated by the Air Blower e A Control module and programmable logic controller PLC air blower timer and e An audio visual alarm system Certification to AS NZS 1546 3 for systems manufactured at 91 Lampton Ave Derwent Park Tasmania has been given by Geo Environmental Solutions Hobart The system is designed to treat a maximum Hydraulic Load of 2500 Litres of domestic wastewater per day from residential premises The Raw Influent used in the testing of the system met the requirements of AS NZS 1546 3 2008 Appendix A4 l Energy consumption The estimated Electricity Usage is based on a 4 person household with average wastewater flows and loads Electrical Equipment Daily operation kWh year Estimated hours specified Annual Cost
7. IOANR Inflow Outflow Sedimentation Disinfection Pump Out Date of issue 17 May 2012 Director Building Control Cy _ delegate of Minister for Workplace Relations E Page 12 of 16 BSR0621 2012 Department of Justice Certificate of Accreditation Drawings Appendix B Eng M6uKdoD 33 5 UoSIIM 1 4 3wos vv A3 ONOMG 30002 39v9 3zis uonoeg ssoJ2 anu YNVOL I pON 9 9A90JIAUu3 ineering 8002 L 9vSL SZN SV Z 9 L esnep YM peuyep se JAdN uuoo Ayeoid A si yowedid ondes 8002 1 SPSL SZN SV LO xipueddy O eiqe uj jduioo jjeus jueuoduuoo Ajoedeo ondes NOILVOIJIO3dS SLMV s ep gz 18 Bd S 9Jqi4 99 S 800Z 1 97S SZN SV JO L S 3198 ULM pejejs Se HLON3 1S WNWINIIN cvv esnep uti payroeds se eJnjeu 9AISOJJOO UOU E JO q Eus eJqy 199S L S 8192 8002 9S1 SZN SV Jo 1ueuieJinba y Joow jsnui Bunseo Joy xiu jeu eu p cvs esnep uym payloads sjueuieuinbai eu 9 eluoe oj pajsej aq jeus eJqy 29S Zv Z S esnep g00Z l 9pSL SZN SV ulum payloads se uj amp ueais ejsuej edIW009 tunuuluttu Lu YGZ 3H8l4 1331S sesodund jueuieoJ0juraJ JO pesn eq jou jsnui 9uqej 8002 19S SZN SV S IIEM S ejqej uium peyroeds se Iuqey soz jueuieJinbeJ uinuiruru y uey sse Bureq ss uyolu em o eng 9 oN 19 02 BJasNUOD uinuiuiw 8002 L 9vSL SZN SV S IIEM E S eige uy Iduuoo 0 2uqej 304 ebeeAo0 WNW s esnep 9002 1 9PSL SZN SV Ulum payloads se jue
8. ZS 1547 c the location of the land application system satisfies the relevant requirements of the State Policy on Water Quality Management 1997 and d the discharge is capable of satisfying the relevant water quality limits see 5 7 Installation and Commissioning The installation and operation of the system must comply with the conditions of accreditation and the manufacturer s instructions All plumbing work carried out in connection with the system installation must satisfy the requirements of the Building Act 2000 TPC and the Tasmanian Plumbing Regulations and be carried out by a registered plumber with appropriate training and qualifications All installations of the system must satisfy the installation requirements set out in Appendix Al On site Waste Water Management Systems of the TPC All electrical work must be carried out by a licensed electrician and in accordance with relevant provisions of AS NZS 3000 The system requires a 240V AC power supply A weather proof isolating switch must be provided at the power outlet The power supply must have its own clearly marked designated circuit breaker in the electricity supply fuse box Each system installation must be inspected and checked by the designer or the designer s agent The designer on completion is to certify that the system has been constructed installed and commissioned in accordance with its design the conditions of accreditation and any additional requiremen
9. Ze wT Tasmanian Government Certificate of Accreditation On Site Waste Water Management System This Certificate of Accreditation is hereby issued by the Minister for Justice and Workplace Relations pursuant to Section 59 2 of the Building Act 2000 and Part G2 of the Tasmanian Plumbing Code 2006 System Envirocycle Tas lOANR Manufacturer Professional Plumbing Pty Ltd Supplier ACN 009 580 705 Of 91 Lampton Ave Derwent Park TAS 7009 This is to certify that the Envirocycle Tas IOANR Aerated Wastewater Treatment System the system as described in Schedule has been accredited for use as an on site waste water management system in single dwellings within plumbing installations in Tasmania This accreditation is subject to the conditions and permitted uses specified in Schedule 2 and in accordance with the Tasmanian Plumbing Code W oud Kerrie Crowder Director of Building Control delegate of the Minister for Justice and Workplace Relations Date of Issue 17 May 2012 Certificate No BSR0621 2012 This Certificate of Accreditation is in force until 16 May 2017 Department of Justice Certificate of Accreditation BSR0621 2012 SCHEDULE l Specification Envirocycle Tas I0ANR Aerated Wastewater Treatment System General Description The Envirocycle Tas IOANR the system collects and treats domestic wastewater For treatment system schematic drawings and flow path refer to Appendix A For
10. atment systems AS NZS 3000 means the Joint Australian New Zealand Standard AS NZS 3000 2000 Wiring rules AS NZS 5667 means the Joint Australian New Zealand Standard AS NZS 5667 1 1998 Water quality Sampling Part Guidance on the design of sampling programs sampling techniques and preservation and handling of samples BOD means 5 day Biochemical Oxygen Demand cfu means colony forming unit Council means the Municipal Council having jurisdiction Commissioned means when the test results from a NATA Certified Laboratory show that the water quality requirements for the AWTS have been met and all pre commissioning tests have been carried out in accordance with AS NZS 1547 on all associated equipment and land application system Designer means a person who is accredited under the Building Act 2000 or a Plumber who has a specialty in the area of designing on site waste water management system installations Director means the Director of Building Control EC means electrical conductivity E coli means Escherichia coli of the family Enterobacteriaceae which is a bacterium used in public health as an indicator of faecal pollution g m means grams per cubic metre Manufacturer means Professional Plumbing Pty Ltd NATA means National Association of Testing Authorities PCA means Vol 3 of the National Construction Code Plumbing Code of Australia Permit means a Permit i
11. e EdW SE 93 4 1891S 1 E 8002 1 9S SZN SV JO VG 9498 LIN papers se HIONSYLS MINI S ypoyeg N we ru Z YvSosnep uui poyrmeds se enjeu AIS01U09 u0u JO Gq JJeus eJqy Jess f A o VS 8198 8002 L 9vS I SZN SV JO Jueueumba ej jeeui jsnur Bunseo sop xiui eui eu oO pa Z y Z S esnep uy paypads sjueuainba eu eere 0 perse eq ILYS equ Jess a4 k O co Z YZS SNe BOOT L SPSL SZN SV uui peyroeds se ulBuens ellsue edIW009 uunusuluu LU BYG g 3X814 1331S ow Z lt 51 ssew nun 09000 euinjoA Hun T L RUPEM J A09 SS8099 gt m o Byzz ssew wun IH amp 600 0 9UnioA WU 2 J AOO uonoedsu O On SH3AO9 NOLLO3dSNI SS329V N o 3 sesodund jueujeoJ0jureJ JOJ pesn eq you snw 2uqej aA oO 8002 l SPSL SZN SV SNEM S 8 98 uiu payloads se dugez oj JUeLWavINbey unuulu eu uey sse Bureq ssauxoruj JEM o end 90N enog eyaouo wnuru 800Z L 9vSt SZN SV shiem gg eren ui Adwo oj Suge 304 eDexe oo unu NOLLVHTYOIJNOO 3133V8 TIVNH3LNI S asnep g00Z L 9vS SZN SV uri payloads se jueujsaJojure eJqy UNUU eul Bx 7 xU 1U9UJJE9J JN3W3ONOJNI3M 8uuoj pE SSey pun r UO L 9unioA HUN 7 IN JI NV Xue juouJjeoJ j NOLLVOI4IO3dS A l 1 5 l l l l r 4 YSCINOHS GINOW i di euyeg 00 L a p l N3AOO NOILO3dSNI HJAOO SS3OO0V l K A 4 i I Jepinous pinoy
12. ids Reuse Guidelines and the conditions of permit Only persons with a waste transport business Environment Protection Notice are to be engaged for the removal transporting and disposal of accumulated sludge removed from the system Any waste material removed from the system must be collected and disposed of or utilised by an approved facility or agency Measures are to be put in place so that during servicing activities all persons and the environment will be protected from the results of the servicing activities Permitted uses The effluent is suitable for land application by any of the following methods a sub surface by i subsurface drip irrigation ii trenches beds mounds evapo transpiration systems b above ground by i spray irrigation ii surface drip irrigation Note Each of the above forms of Land Application is subject to consent from the permit authority and must be in accordance with the relevant provisions of AS NZS 1547 Where it is not practicable for effluent from the system to be applied in accordance with AS NZS 547 the method of discharge must satisfy contemporary relevant regulatory requirements to the satisfaction of the permit authority Date of issue 17 May 2012 Director Building Control ne delegate of Minister for Workplace Relations Page 11 of 16 Department of Justice Certificate of Accreditation BSR0621 2012 Appendix Schematic drawings Process Flow Envirocycle Tas
13. lt the system has been found not to operate satisfactorily during its service life and as a result requires modification to achieve the required water quality limits all installed systems are to be modified accordingly When granting a permit the permit authority is to satisfy itself that the designer s choice of the system configuration is optimal for the proposed use and site conditions The system must not be deployed to areas where seasonal climatic conditions will negatively affect its proper operation refer to manufacturer s specifications Prior to the granting of a permit to install a system the following reports must be submitted with an application to the permit authority Site and soil evaluation report The site and soil evaluation report is to detail results of an assessment of the individual lot s for the public health environmental legal and economic factors which are likely to impinge on the location and design of a land application system Refer to AS NZS 1547 Clause 4 1 5 and associated appendices to 4 1 Design report The Design Report is to include the following a Relevant aspects of the Site and soil Evaluation Report D A report on the selection of the land application system Refer to AS NZS 1547 Clause 4 2 4 and associated appendices to Clause 4 2 for further information c A report on the selection of the wastewater treatment unit Refer to AS NZS 1547 Clause 4 3 6 and associated appendices
14. nd Schedules This Certificate of Accreditation is valid for five 5 years from the date of issue or until withdrawn by the Director and is not transferable Any application for variation or renewal must be accompanied by Product Certification that has been issued by a JAS ANZ accredited Conformity Assessment Body CAB and other required documentation in accordance with the latest Application for Accreditation Form At each anniversary of the accreditation date the supplier must submit to the Director a list of all systems installed in Tasmania during the previous 12 months The Director may randomly select up to 10 of the installed systems from each year of installation The Director will notify the supplier s nominated NATA accredited laboratory which systems are to be sampled and tested for BOD and Date of issue 17 May 2012 Director Building Control Cc delegate of Minister for Workplace Relations Page 6 of 16 Department of Justice Certificate of Accreditation BSR0621 2012 2 10 2 11 2 12 2 13 TSS and Chlorine residual The sampling and testing of the selected systems is to be done at the subplier s expense The following results must be reported to the Director Address of premises Date inspected and sampled Sample identification number Chlorine Residual e BOD TSS Total nitrogen concentrations Total phosphorous concentrations and Service history Where due to a design fau
15. ollowing information The brand and model name or designation of the system The manufacturer s name or registered trademark Top load limitations and The month and year of manufacture The supplier must supply the owner and occupier of each installation with a user manual setting out the following a the treatment process b procedures to be followed in the event of a system failure c emergency contact number d care operation monitoring and maintenance requirements and e inspection and sampling procedures to be followed as part of the on going monitoring and program required by the permit authority Any proposed modifications to the system s specified processes equipment materials fittings or manuals must have prior authorisation in writing from the Director and may be subject to additional verification or testing Each application to a permit authority to install a system must be accompanied by a site and soil evaluation report and design report in accordance with AS NZS 1547 as appropriate The supplier must provide the following information to each permit authority where it is intended to install a system in their jurisdiction e Statement of warranty e Statement of service life e Quality Assurance Certification e Installation Manual e Service Manual e Owner s Manual e Service Report Form e Engineering Drawings on A3 format e Detailed Specifications e Certificate of Accreditation a
16. p d Check and test air blower fan or air venturi and clean replace air filters e Check and test alarm system f Check slime growth on membranes and report the on condition of membranes gx Check and report operation of sludge return sludge level and de sludging h Check and record water meter reading if fitted i Check and record operation of irrigation area irrigation fittings j Check and clean replace irrigation filters k Check and report on water quality testing for pH Turbidity EC and dissolved oxygen l Check and replenish chlorine disinfection system m Cleaning of the following items at above the waterline l clarifier l pipework Il valves IV walls of chambers Performance Hydraulic and Organic Loading The system is accredited for treatment of domestic wastewater from residential and commercial premises with the following MAXIMUM hydraulic and organic loads Max Hydraulic load L day Biochemical Oxygen Demand g day Treated effluent from the system must not exceed the following limits 9076 of samples Free Residual Chlorine concentrations Date of issue 17 May 2012 Director Building Control Cy delegate of Minister for Workplace Relations Page 10 of 16 Department of Justice Certificate of Accreditation BSR0621 2012 6 0 6 6 2 6 3 6 4 6 5 6 6 6 7 6 8 6 9 7 0 7 7 2 On going management The mandatory servicing and monito
17. place Relations Page 3 of 16 Department of Justice Certificate of Accreditation BSRO062 1 201 2 Hydraulic and organic loading and effluent quality influent Design flow as specified by the manufacturer e Daily flow maximum hydraulic load 250 litres per person OEP 2500 litres Organic loading as specified by the manufacturer e Daily BOD 70 grams per person OEP 700 grams per day e Daily TSS 70 grams per person OEP 700 grams per day e Daily Nitrogen 5 grams per person I0EP 150 grams per day e Daily Phosphorus 2 5 grams per person OEP 25 grams per day Effluent The effluent test results for 90 of samples tested showed BOD less than or equal to 20 0 mg L TSS less than or equal to 30 0 mg L E coli less than or equal to Ocfu 00mL Total nitrogen concentrations less than or equal to 50 mg L Total phosphorous concentrations less than or equal to 5 mg L Date of issue 17 May 2012 Director Building Control Cc delegate of Minister for Workplace Relations Page 4 of 16 Department of Justice Certificate of Accreditation BSR0621 2012 Schedule 2 Conditions of Accreditation I 0 Definitions In this schedule AS NZS 1547 means the Joint Australian New Zealand Standard AS NZS 1547 2000 On site domestic wastewater management AS NZS 1546 3 means the Joint Australian New Zealand Standard AS NZS 1546 3 2008 On site domestic wastewater treatment units Part 3 Aerated wastewater tre
18. ring is to commence 3 months after the plant is commissioned The servicing and monitoring is to coincide with the supplier s required on going routine scheduled maintenance program Where a system installed at a site has been found not to operate satisfactorily during its service life and as a result requires modification to achieve the required performance requirements in particular water quality limits the installed system is to be modified accordingly Any modifications must be recorded on the service report In the event of failure to comply with the water quality limits set out in these conditions fortnightly sampling and testing for BODs TSS and Free Residual Chlorine must be carried out until the plant is re commissioned The method of preserving and the handling of samples taken from the plant must satisfy the relevant requirements of AS NZS 5667 Copies of the following reports and certificates must be submitted to the permit authority and the owner as soon as practicable after the commissioning of the system and after each scheduled or unscheduled service for the period specified in the permit a the initial plant installation and commissioning report b all laboratory analytical test reports and c all inspection and maintenance reports The system is to be de sludged every five years strictly in accordance with the manufacturer s recommendations and the sludge is to be disposed of in accordance with the Tasmanian Biosol
19. ssued by the council pursuant to section 82 of the Building Act 2000 Permit authority means a person or body authorised for that purpose by the council of the municipal area in which the on site waste water management system is installed Plumber means a person who holds an appropriate class of licence under the Occupational Licensing Act 2005 as a Plumber Practitioner Certifier Supplier means the party that is responsible for ensuring that products meet and if applicable continue to meet the requirements on which the certification is based The supplier for the Envirocycle Tas IOANR is Professional Plumbing Pty Ltd System means Envirocycle Tas I0ANR TPC means the Tasmanian Plumbing Code TSS means Total Suspended Solids Date of issue 17 May 2012 Director Building Control ne delegate of Minister for Workplace Relations Page 5 of 16 Department of Justice Certificate of Accreditation BSR0621 2012 2 0 2 2 2 2 3 2 4 2 5 2 6 2 7 2 8 2 9 General The system must be supplied constructed and installed in accordance with the design submitted and accredited by the Director The system must not be installed or used in a plumbing installation other than in accordance with the conditions of the permit issued by the Permit Authority Each system must be permanently and legibly marked on a non corrosive metal plaque or equivalent attached to the lid with the f
20. system installation together with the results of commissioning tests to demonstrate correct construction and installation and is to be provided to the owner and permit authority on completion of the work Refer to and AS NZS 1547 Clause 4 5 6 3 and associated appendices to Clause 4 5 e Inspection and Maintenance Report Maintenance reports cover ongoing inspection and maintenance operations in order to monitor the operation of the installation Refer to AS NZS 1547 Clause 3 7 4 and associated Appendix 3A Where the supplied pump is not suitably rated for the proposed land application area it must be replaced with a pump which has a rated capacity that matches the hydraulic characteristics of the irrigation system and be capable of discharging at least 5076 more than the 30 minute flow rate For drip irrigation systems ensure that drip emitter flow rates do not vary more than 10 from the design rate over the whole of the system when installed on a sloping site Note The pump selection is to be based on flow head loss and pressure requirements Effluent distribution by sub surface application may be permitted where the Permit Authority is satisfied that the application for a permit to install the system has demonstrated that the a effluent can be retained within the authorised land application area b where applicable the land application system has been designed and is capable of being installed and maintained in accordance with AS N
21. t or certificate required by the conditions of accreditation must be made available to the Director on request The designer is to provide a statement warning the user of which items and products that must not be placed in the system To verify that the plant is commissioned sampling must be carried out by a council approved person for BOD TSS and Free Residual Chlorine The samples are to be tested and reported on by a NATA certified laboratory Maintenance and monitoring Each installation must be serviced and monitored at not less than 3 monthly intervals in accordance with the conditions of accreditation the conditions of permit and manufacturer s requirements Notes Only a plumber can carry out the maintenance and required monitoring of the system other than electrical work unless licensed to do so The plumber may need to complete training by the supplier before carrying out any maintenance on the system The maintenance and monitoring intervals may be combined provided the monitoring frequency remains at 3 month intervals The owner of the system must enter into and maintain a maintenance contract with the council the supplier of the system or other council approved plumbing contractor The owner must enter into an agreement with the council to maintain the maintenance contract where that contract is with the supplier of the system or other council approved plumbing contractor The system must be operated and main
22. tained to ensure it performs continuously and without any intervention between inspections carried out by the council approved plumbing contractor A service report is to be prepared by the plumbing contractor who carried out the work detailing the inspection of the installation and the results of all servicing tests and conditions at the completion of all scheduled or unscheduled services or inspections The service report is to be accompanied by a signed document certifying that the system is operating and performing adequately A copy of the service report and certifying document is to be provided to the occupant and council Each service report is to contain a statement reminding the user about items and products that must not be placed in the system Date of issue 17 May 2012 Director Building Control Cy delegate of Minister for Workplace Relations Page 9 of 16 Department of Justice Certificate of Accreditation BSR0621 2012 4 8 4 9 4 10 5 0 5 Each service must include monitoring the operation of the system and associated land application system Maintenance must be carried out on all mechanical electrical and functioning components of the system as appropriate The monitoring servicing and reporting of the installation must include but not be restricted to the following matters as appropriate a Reporting on weather conditions ambient temperature effluent temperature b Odour c Check and test pum
23. to Clause 4 3 for further information d Sufficient information to show that the relevant performance requirements set out in the PCA have been met e A loading certificate which sets out the design criteria and the limitations associated with use of the system and incorporates such matters as i System capacity number of persons and daily flow ii Summary of design criteria iii The location of and use of reserve areas iv Use of water efficient fittings fixtures or appliances vy Allowable variation from design flows peak loading events vi Consequences of changes in loading due to varying wastewater characteristics vii Consequences of overloading the system viii Consequences of underloading the system Date of issue 17 May 2012 Director Building Control Cc delegate of Minister for Workplace Relations Page 7 of 16 Department of Justice Certificate of Accreditation BSR0621 2012 2 14 2 15 2 16 3 0 3 3 2 3 3 3 4 3 5 3 6 ix Consequences of lack of operation maintenance and monitoring attention and x Any other relevant considerations related to the use of the system The following reports must be submitted to the permit authority and owner and be made available to the Director upon request after commissioning of the system e Installation and commissioning report The Installation and Commissioning Report is to cover the as constructed records of the
24. ts set out in the permit Note Where the designer is not available to supervise the installation the designer should obtain signed certification from the installing plumber stating that the installation has been constructed installed and commissioned in accordance with its design the conditions of permit Date of issue 17 May 2012 Director Building Control Cc delegate of Minister for Workplace Relations Page 8 of 16 Department of Justice Certificate of Accreditation BSR0621 2012 3 7 3 8 3 9 3 10 3 11 3 12 4 0 4 1 4 2 4 3 44 4 5 4 6 4 7 Where discharging wastewater to a land application system by irrigation a lockable sampling tap or gate valve is to be provided on the outlet pipe to the irrigation system A report is to be prepared by the council approved plumbing contractor detailing the inspection of the installation and the results of the commissioning tests and be accompanied by a certificate certifying that the system is operating and performing adequately Copies of the following reports certificates must be submitted to the council and the owner as soon as practicable after the commissioning of the system and after each scheduled or unscheduled service or inspection for the period specified in the permit a The initial plant installation and commissioning report b All required laboratory analytical test reports and c All inspection and maintenance reports Copies of any repor
25. ureoJojurei equ WNWIUIW ui Bxs 7 yue jueugneeJ LN3A3OHOJNI3H euuo p sseyy Yun eul O euinjoA HUN Xue juaugeaJ p NOILVOIJIO3dS V 7 NOLLO3S SSOMNHO SLE SLLL ost o i Otol OvOL AMG 9NS 2Adn tutuu00 INS 0j IIPA YUE ojur jseo Jejoo DAN Ajuo sesodund Ajuo sesodund 6uny 10 9jou pasede eipsg o eIPOS 001 uny 40 lou peJedej eIpGg oj eipoc 0 0022 OL 00S2 09SZ Director Building Control N co c N gt m co D gt c n uc e 9 a delegate of Minister for Workplace Relations Page 13 of 16 BSR0621 2012 ing Drawings ineering Appendix B Eng Department of Justice Certificate of Accreditation Bu do uos 1uDi o 133HS IM 1 LL 3Tvos a vw K A33 ON 9M 3GO9 39v2 3ZIS C S G 9 s jypeg 4 JILL INV0 I polA 9 9 90JlAU3 4 n 4 9eyeg Sl e1 p J0 Buiweup SIU Jepjnous pino 0 J9j93J 3 2 N Loyeg 2 N o K ac I I wA L 8002 L 9rSL SZN SV Z 9 L 9snej uj pauyap se 2Agn WWD AgeoidA si xpowadid ondes l L g800Z 1 SPSL SZN SV LO xipueddy O 9198 UNA Ajduioo peys jueuoduoo Ayoedeo andes o NOILVOIJIO3dS S LMV x lt VM o s ep gz 1
Download Pdf Manuals
Related Search
Related Contents
Características de TanGO Aicleaner Guía del Usuario de Línea-2 de CapTel® Samsung GT-E1360C 用户手册 Unified Brands HYPERSTEAM HY-6G(CE) User's Manual Parallel Reversible Auto Switch (2 position) ONE SHOT - PurOdor English Contents Environmental protection CLUB3D CGNX-G942LI graphics card Applica Citrus Juicer Copyright © All rights reserved.
Failed to retrieve file