1. cor paresi och creia ct esz scone ric 805 asi ecise bei zozer sere lt 1 NOE u NRL su NOTE 0 2 _ 009 00 Uy 062 304 U0 paseq suone oz 0 3uet tg oo 4309 G5 Nyy 34 0 58 6 ipuojs uno2 Suiuayyby pezipueouers SIVvIBIL Pumping solutions ASSEMBLY AND MAINTENANCE INSTRUCTIONS MULTI ROTOR PUMP SECTIONAL DRAWING MULTI ROTOR 50 15 Si sai NO SEY sawi 2 AN E i L E 4 f 2 5 OHM T ye Vb Pumping Solutions ASSEMBLY AND MAINTENANCE INSTRUCTIONS MULTI ROTOR PUMP LIST OF PARTS MULTI ROTOR 50 MULTI ROTOR 50 PUMP ITEM DESCRIPTION QTY UNIT 1 CENTRIFUGE RING 2 PC 2 PRESSURE HOUSING 1 PC 3 SUCTION HOUSING 1 PC 4 SUCTION ROTOR 1 PC 5 SERIES ROTOR 9 PC 6 END STAGE DIFFUSER 1 PC 7 BALANCING BUSHING 1 PC 8 BALANCING SLEEVE 1 PC 9 BEARING BLOCK DRIVE 1 PC 10 OPPOSITE SIDE BEARIN
2. Pumping Solutions ASSEMBLY AND MAINTENANCE INSTRUCTIONS MULTI ROTOR PUMP The mechanical seal only leaks slightly or invisibly vapor during operation It does not require maintenance The gasket should leak slightly dripping Any reserve pumps must be switched on and off immediately once a week to keep in operation Pay attention to the correct operation of the auxiliary connections BEARING BLOCKS AND LUBRICATIONS To re lubricate the bearing blocks of the pump with grease Multi rotor pumps 30 to 200 require the use of grease pins available and for the outer rolling of the coupling side bearing block in sizes 50 65 100 125 150 and 200 the lid of the bearing block must be removed and it must be filled with grease Depending on the version of the pump the bearing blocks are lubricated with grease or oil Quality of grease Changing grease The bearing blocks are assembled with high quality lithium soap based grease Depending on the size of the pump operation time hours the bearings should be lubricated or the inside the bearing block support greased and the bearing replaced Size Rotation RPM lt 1800 2950 3550 32 50 65 10 000 h 7 200 h 5 700 h 100 125 9 000 h 5 700 h 3 900 h 150 8 300 h 4 000 h 3 100 h If the lubrication interval is lt 4 000 h it recommended to change the grease completely once a year If this is not the case the complete grease chan
3. MULTI ROTOR PUMP STORAGE SHORT TERM When it is necessary to store the pump for a short period less than six months before its installation place it on a pallet dry place away from vibrations Protect it completely from moisture sand gravel or other contaminants Do not remove the protective lids supplied with the suction and discharge flanges and with the pipe connections Turn the pump rotating the shaft in the direction of rotation 2 turns every week to avoid seizure of the bearings and to prevent the seal faces sticking To store the engine follow the instructions of its manufacturer When the pump is stored for more than six months The pump must be covered or stored a closed environment Before storage remove the plug from the oil passage and fill the bearing casing with a quarter of vapor emitting oil Replace the passage plug Perform the procedure at 3 month intervals Cover all external machined and unpainted surfaces generously with a light petroleum grease equivalent anticorrosive oil Remove the passage of the bearing block casing and drain plugs and drain the oil Replace the plug and fill the bearing block casing again with a quarter of vapor emitting oil Replace the passage plug Turn the shaft of the pump 3 turns to remain at 180 from the original position Remove the protective lids of the suction and discharge flanges Remove any visible rust from the inner s
4. 2 PC 48 33 274 RETAINER R 5 FPM VITON VEDABRAS 29 5 43 8 1 PC 49 PULL ROD M20X1 5 8 PC SIMIBIL Pumping Solutions ASSEMBLY AND MAINTENANCE INSTRUCTIONS MULTI ROTOR PUMP 50 FLAT HEAD INTERNAL SOCKET SCREW 6 20 4 PC 51 HEAVY HEX NUT 20 1 5 16 PC 52 SPECIAL KEY 8X7X61 TYPE 1 PC 53 SPECIAL KEY 10X8X20 TYPE B 1 PC 54 SPECIAL KEY 10X8X35 TYPE B 10 PC 55 438 FLAT JOIN 160X102X0 80 2 PC 56 JOIN CONNECTOR TUBE X TUBE X TUBE 3 8 D E DOUBLE WASHER 2 PC 57 5 CONNECTOR TUBE X TUBE X TUBE 3 8 D E DOUBLE WASHER 1 PC 58 MALE CONNECTOR TUBE 3 8 D E X MALE THREAD 1 4 NPT DOUBLE WASHER 9 PC 59 NEEDLE VALVE CL3000 LBS 1 4 NPT X 1 4 NPT 2 PC 60 FITTING 1 4 BSP 2 PC 61 FIXING NUT KM 7 LEFT THREAD 35 1 5 1 PC Pumping Solutions ASSEMBLY AND MAINTENANCE INSTRUCTIONS MULTI ROTOR PUMP SECTIONAL DRAWING MULTI ROTOR 100 K N SIMIBIL Pumping Solutions ASSEMBLY AND MAINTENANCE INSTRUCTIONS MULTI ROTOR PUMP MULTI ROTOR 100 PUMP ITEM DESCRIPTION QTY UNIT 1 CENTRIFUGE RING 2 PC 2 PRESSURE HOUSING 1 PC 3 SUCTION HOUSING 1 PC 4 SUCTION ROTOR 1 PC 5 SERIES ROTOR 1 PC 6 END STAGE DIFFUSER 1 PC 7 BALANCING BUSHING 1 PC 8 BALANCING SLEEVE 1 PC 9 BEARING BLOCK DRIVE 1 PC 10 OPPOSITE SIDE BEARING BLOCK 1 PC 11 DRIVE BEARING BLOCK LID 1 PC 12 LOCKED BEARING BLOCK LID 1 PC 13
5. KEY 22X14X80 TYPE B 4 PC 59 SPECIAL KEY 10X8X30 TYPE B 3 PC 60 SPECIAL KEY 10X8X25 TYPE B 1 PC 61 SPECIAL KEY 10X8X95 TYPE B 1 62 438 FLAT JOINT 349x201x0 8 NA 1002 2 PC 63 5 CONNECTOR TUBE X TUBE X TUBE 5 8 D E DOUBLE WASHER 1 PC 64 MALE CONNECTOR TUBE 5 8 X MALE THREAD 1 2 NPT DOUBLE WASHER 9 PC 65 NEEDLE VALVE CL3000 LBS 1 2 NPT X 1 2 NPT 2 PC 66 M48X3 0 PULL ROD 8 PC 67 CAP SCREW TOTAL THREAD NBR 11207 10 1 5 95 4 PC 68 BREATHER WITH AIR FILTER 1 4 NPT 2 PC 69 EYE DIN 580 42 4 5 FORGED STEEL 1 PC 70 FITTING 45 DEGREES 1 4 BSP 2 PC 71 8 PLUG NPT WITHOUT HEAD WITH SOCKET CLASS 3000 LBS 1 PC 72 DIN 580 EYE M16X2 FORGED STEEL SAE 1020 ZINC 1 PC 73 12 279 O RING FPM VITON VEDABRAS 5 00 371 00 1 PC 74 12 477 O RING FPM VITON VEDABRAS 6 00X600 00 4 PC
6. SUCTION WEAR RING 1 PC 14 OPPOSITE SIDE SPACER BUSHING 1 PC 15 OPPOSITE SIDE PROTECTIVE BUSHING 1 PC 16 SHAFT 1 PC 17 END STAGE ROTOR 1 PC 18 DRIVING SIDE BEARING BUSHING 1 PC 19 LOCKED SIDE BEARING BUSHING 1 PC 20 LOCK RING 2 PC 21 THRUST RING 2 PC 22 KEY NBR 6375 14X9X30 TYPE B 1 PC 23 STAGE BODY 2 PC 24 DIFFUSER 2 PC 25 WEAR RING 2 PC 26 DRIVE GUARD BUSHING 1 PC 27 11 038 O RING FPM VITON VEDABRAS 3 00X50 00 4 PC 28 PRESSURE WASHER M10 8 PC 29 PRESSURE WASHER M12 8 PC 30 MILIMETRIC SERIES FLAT WASHER M27 8 PC 31 SQUARE HEAD PLUG 1 2 4 PC 32 11 828 O RING VEDEBRAS REFERENCE 0336 X 6 3 PC 33 KEYNBR 6375 14X9X20 TYPE B 5 PC 34 HEX CAP SCREW TOTAL THREAD NBR 11207 M10X1 5X30 A 8 PC 35 HEX CAP SCREW TOTAL THREAD NBR 11207 M12X1 75X40 8 PC 36 DIN 934 HEX NUT M12x1 75 8 PC 37 LOCKING WASHER AW 10 WITH INNER CURVE TAB 2 PC 38 STUD BOLT NBR 13251 DIN 938 12 1 75 45 8 PC 39 STRAIGHT FITTING 1 4 BSP 2 PC 40 KM 10 FIXING NUT M50X1 5 1 PC 41 DIN 934 HEX NUT 27 1 5 8 PC 42 SCH PIPE 160 21 2 WITH THREADED 820 mm 43 PACKING GLAND 1 PC 44 BWG BEARING 7312 2 PC 45 6312 BEARING C3 1 PC 46 GASKET 1 2 2202 TEADIT 138 CM 47 FEMALE FEMALE TE 1 2 NPT 1 PC 48 MINI BALL VALVE M F 1 2 NPT 2 PC 49 KM 10 FIXING NUT M50X1 5 LEFT THREAD 1 PC 50 HEX CAP SCREW TOTAL THREAD NBR 11207 M6X1 0X45 2 PC 51 DIN 934 HEX NUT M6X1 4 PC 52 30 502 RETAINER R 5 FPM VITON VEDABRAS 60 X 74X 10 2 PC 53 29 148 RETAINER R 5 FPM VITON VEDABRAS 4
7. all safety and protection equipment must be readjusted and reactivated before starting the pump MAINTENANCE AND GENERAL INSTRUCTIONS The operator is responsible for ensuring that all maintenance inspection and installation is made by an authorized and properly qualified team that is completely familiar with the operating instructions The preparation of a maintenance plan will allow with minimal cost the avoidance of expensive repairs and will ensure a safe malfunction free operation The work to the unit must only be made with the electrical connections disconnected Check that the pump set cannot be switched on accidentally Harmful fluids to be pumped which may cause damage to health must be decontaminated When the product is drained check that there are no risks to people or the environment All relevant laws must be considered MAINTENANCE INSPECTION Operation Supervision The pump must operate silently and free of vibrations at all times The pump must never be operated when dry Maximum room temperature 40 C The temperature of the bearing block may exceed the room temperature up to 50 C but may never exceed 90 C measured on the outside of the bearing block support Prolonged operation against the blocking valve of the closed delivery pipe is not permitted Caution Minimum flow required The locking element in the suction line must not be closed during pump operation
8. boxes or packaging with accessories or spare parts that may be attached to the crate TRANSPORTATION Lift the entire unit using appropriate lifting techniques Fig A Properly trained staff should perform the lifting in accordance with local regulations The driver and pump weights are given in the General Arrangement design of the purchased equipment The complete pump unit may not be swung when raised Always introduce a support so that the pump does not turn Ensure that the equipment used for lifting is able to support the weights found and that the parts are completely secure before lifting Remove the coupling and the spacer before lifting the complete unit Always raise using the 4 lifting supports supplied at the base for lifting the unit Do not lift the pump engine and base from the pump and wing screw on the engine To lift the driver follow the manufacturer s instructions To lift units assembled at the base with or without drivers Attach the lifting straps through the lifting brackets provided at the base Figure A with a suitable lifting device for lifting the unit uniformly without turning to one side or the other To lift the pump only Attach the lifting straps to the bearing blocks of the pump passing through the cooling pipe Raise the pump uniformly without turning with adequate lifting equipment Fig b Pumping Solutions ASSEMBLY AND MAINTENANCE INSTRUCTIONS
9. connected the alignment should be checked once again while tightening the connection screws NOTE The direction of the driver s rotation should be checked to make sure that it matches that of the pump The coupling halves may then be re connected With the pump properly primed the unit must then be operated under normal operating conditions until the temperatures have stabilized The unit should then be switched off and immediately checked again in relation to the coupling alignment It must be emphasized that attempts to correct the alignment in one direction may alter the alignment in the other direction As such it is necessary to check in all directions having made the adjustments Pumps must have a level of 0 127mm per foot at the operating temperature when measured at the extension of the shaft SHIMS Shafts must be clean and dry Water dust and rust may affect the height of the shim after a certain time The shims must be large enough to support the weight of the equipment on its assembly foot Use a combination of thick and thin shims set of maximum of 5 on the foot to compensate the misalignment instead of using several thin shims which may result in spongy assembly The equipment must be moved vertically to add or Remove shims Torque of screws consult page 28 NOTE Shims added at the factory may be stacked up to a minimum of 1 8 3 mm and a maximum of 1 4 454 Pumping Solutio
10. of impurities into the pump The total transversal section of the holes in the sieve should be 3 times bigger than the transversal section of the pipe to avoid the excessive loss of pressure transversally to the sieve due to blockage Tapered sieves with wire mesh 2mm in width and with a mesh diameter of 0 5 mm with a rust resistant material are recommended 1 Sieve housing 2 Screen 3 Perforated plate 4 Suction flange of pump 5 Differential pressure gage Vacuum compensation When it is necessary to pump the liquid from the tank in vacuum conditions it is advisable to install a compensating line This line should have a minimum nominal diameter of 25 mm and should be positioned above the highest permitted level in the tank An additional pipe assembled with a closing valve starting at the discharge nozzle of the pump up to the balance line facilitates the ventilation of the pump before start up Pi aD Main closing valve Vacuum balance line Closing valve E Vacuum tight closing valve Check valve V Vacuum tank 2 Intermediary flange Pumping Solutions ASSEMBLY AND MAINTENANCE INSTRUCTIONS MULTI ROTOR PUMP The nominal diameter of the suction pipe should be greater than or equal to the nominal size of the pump suction The suction pipe should be as short and straight as possible Straight pipes of equal size five 5 t
11. the equipment or when ordering spare parts indicate the part s code pump line and also the series no found on the identification plate and recorded in low relief at the pump suction flange NOTE IMBIL asks that the customer straight after receiving the GUARANTEE DOCUMENT for his her equipment fills in the data and sends the stub to IMBIL facilitating the exchange of information between IMBIL and the CUSTOMER SIVvIBIL Pumping Solutions ASSEMBLY AND MAINTENANCE INSTRUCTIONS MULTI ROTOR PUMP RECEIPT INSPECTION Upon receipt of the pump inspect it carefully for damage and check it against the issue receipt Report any damage or faults immediately to the local representative of the transporter and send a copy to IMBIL which should be received in writing within one month from the receipt of the equipment Inspect the protective layer of the various parts and if necessary apply further protection to the areas where it has already been torn Inspect all painted surfaces If necessary retouch the areas where the paint may have chipped or scratched Inspect all the lids on the discharge flanges and pipe connections for damage or clearance If necessary remove the lids and inspect the accessible inner areas visually for the accumulation of foreign materials or water If necessary clean and conserve the inner parts as mentioned above and replace the lids and tighten securely NOTE When unpacking take care not to drop any
12. the system must be avoided at all costs FIRST START UP Before starting the operation of the pump confirm whether the following requirements have been met correctly The quality of the concrete foundation is accordance with the Regulation in force The fixing of the set to the foundation shims and alignment corresponds to the stipulated margins The pipes have been connected without distortion to the flanges of the pump The electrical connection and adjustment of the timer correspond to the power of the engine and applicable regulations The equipment is equipped with all hydraulic electrical and mechanical protections The pump has been totally primed with the product to be pumped The rotation direction of the unit corresponds to that indicated by the arrow All connections have been tightened In the case of installations with no foundation for example anti vibratory it must be ensured that all movements of the set may be balanced e g through the installation of compensatory elements in the suction line as in the holding pressure line LUBRICATING AGENT Grease lubricated bearings Grease lubricated bearings are filled at the factory Oil lubricated bearings The lids of the bearing block supports are filled with HD20 quality oil ISO VG46 SIMIBIL Pumping Solutions ASSEMBLY AND MAINTENANCE INSTRUCTIONS MULTI ROTOR PUMP PUMP PRIMING AND CHECKS Before each start up the
13. to a drip approximately 7 h Coupling The flexible elements of the coupling must be replaced in a timely fashion when they display signs of wear and alignment of the engine pump must be checked Disassembly Should you require further information or instructions contact the IMBIL customer services department GENERAL INSTRUCTIONS Drainage Washing If the pump was used for pumping liquids that pose a health risk ensure that there is no risk to people and to the environment when draining the product All relevant laws must be adhered to If required use safety clothing and protection masks The washing liquid used and any liquid residue in the pump must be collected appropriately eliminated without any risk to people and to the environment PREPARATION FOR PUMP DISASSEMBLY Use the disassembly sequence as described in this manual Before disassembling measure the distance from the tip of the shaft opposite side to the bearing locking nut Leaving at the same dimension when assembly Check that the pump set has been switched off before beginning any disassembly activity Ensure that the pump cannot be switched on accidentally The blocking elements in the suction line elevation and discharge line must be closed and inadvertent opening must be prevented The body of the pump must be cooled to room temperature It must be drained and its pressure must be Pumping Solution
14. to use them give preference to commercially available products Chemical adhesives must be applied at selected points and in thin layers Do not use quick sticking chemical adhesives Re assembly of the Hydraulic Set Re assembly of the pump begins on the discharge side starting with the mounting of the thrust ring onto the shaft and then assembly must be followed in reverse order to disassembly Tightening torques for pull rods and nuts are found in the table on page Sealing of Gasket Shaft Before assembly completely clean the gasket box j Pumping Solutions ASSEMBLY AND MAINTENANCE INSTRUCTIONS MULTI ROTOR PUMP and the packing gland The gland rings must be inserted so that the join of the two ends is placed out of phase by 90 to 120 relative to the former Place the gasket ring already preformed on the protective sleeve of the shaft with the aid of the packing gland Each ring must be pushed on to the gasket box individually using the packing gland In the case of packing with a lock ring pumping in vacuum this ring must be assembled in place of the penultimate gasket the last gasket ring is within the sealing box next to the pump The gasket must be tightened manually Use a gage to control the correct position of the packing gland It must be easy to turn the rotating set by hand Leakage is normal during initial operation and may be reduced after
15. 5 X 68 X 10 1 PC 54 PULL ROD 27 1 5 4 PC 55 KEYNBR 6375 14X9X100 TYPE C 1 PC 56 FLAT HEAD HEX SOCKET SCREW 8 X 50 4 PC Pumping Solutions ASSEMBLY AND MAINTENANCE INSTRUCTIONS MULTI ROTOR PUMP SECTIONAL DRAWING MULTI ROTOR 200 WAR 4 N gt KSN S 9 aN SIVIBIL Pumping Solutions LIST OF PARTS MULTI ROTOR 200 BEW PUMP 200 ASSEMBLY AND MAINTENANCE INSTRUCTIONS MULTI ROTOR PUMP ITEM DESCRIPTION QTY UNIT 1 CENTRIFUGE RING 2 PC 2 BALANCING BUSHING 1 PC 3 BALANCING SLEEVE 1 4 BEARING BLOCK DRIVE 1 PC 5 OPPOSITE SIDE BEARING BLOCK 1 PC 6 DRIVE BEARING BLOCK LID 1 PC 7 OPPOSITE SIDE BEARING BLOCK LID 1 PC 8 SUCTION WEAR RING 1 PC 9 OPPOSITE SIDE SPACER BUSHING 1 10 DRIVING SIDE BEARING BUSHING 1 PC 11 OPPOSITE SIDE BEARING BUSHING 1 PC 12 THRUST RING 1 PC 13 BEARING WASHER 1 PC 14 PRESSURE HOUSING 1 15 SUCTION HOUSING 1 16 PACKING GLAND 2 PC 17 LOCK RING 2 PC 18 SUCTION ROTOR 1 PC 19 SERIES ROTOR 2 PC 20 END STAGE ROTOR 1 PC 21 SHAFT 1 PC 22 OPPOSITE SIDE PROTECTIVE SLEEVE 1 23 DRIVE PROTECTIVE SLEEVE 1 24 STAGE BODY 3 PC 25 WEAR RING 3 PC 26 SERIES DIFFUSER 3 PC 27 END STAGE DIFFUSER 1 PC 28 OPPOSITE SIDE ROTOR OF SPACER BUSHING 1 29 DRIVING SIDE SPACER BUS
16. 5 minutes of operation The leakage amount may be reduced constantly by using the two nuts of the packing gland turning them 1 6 of a turn each time Then observe the leakage and monitor the water temperature The definitive positioning only occurs after a few hours of operation In this time there must be a greater leakage Repeat this procedure at 5 minute intervals to obtain a minimal leakage Mechanical seals are precision components The stationary ring and the rotating ring should always be replaced together that is always replace the complete mechanical seal Extreme care and cleaning during assembly are of the utmost importance with operations without mechanical seal problems The faces of the seal must only be cleaned immediately after the set has been assembled They must not be dirty grease fingerprints or damaged Pump Size box L 50 45 70 6 65 100 60 85 5 85 200 100 138 2 120 Pump Size Measurements in mm 50 100 200 Section of the gasket 1 2 1 2 3 4 Gasket cut length 181 mm 228 mm 373 mm Gasket Amount 4 4 5 Sealing box The basic dimensions of the sealing boxes of Multi rotor pumps are given in the table Mechanical Seals The individual components of the seal such as the O ring made of EPDM must never enter into contact with oil or grease The mechanical seal must be reassembled in the reverse order of disassembly Once the rotating ring is assemble
17. CTION TO POWER SUPPLY If the pump is equipped with an electric engine the connection to the power supply must only be made by a trained electrician The voltage available on the network must be compared with the indications on the plate of the engine and the type of start up chosen Check that the three phase motors with star delta starting will be started from star to delta at short intervals Extended intervals may result in damage to the pump Adjustment of timer relay for star delta starting Power of Time Y to be Engine Adjusted lt 30 kW 3 seconds 30 gt 30 kW 5 seconds 30 START UP Start up procedure The blocking valve on the discharge side must be closed start up must proceed without abnormal vibrations or noise When the operating speed has been reached an automatic check valve needs to open without abnormal noise vibrations or increase in power consumption Open the blocking valve on the discharge side Once the operating point has been reached check the absorbed power of the engine and the bearing block temperature Once the operating temperature has been reached switch off the unit and tighten the screws of the flanges the event of abnormal noise vibrations temperatures or leakage switch off the unit immediately and only restart once the cause of the problem has been eliminated SIMIBIL Pumping Solutions ASSEMBLY AND MAINTENANCE INSTRUCTIONS MULTI ROTOR P
18. E TABLE IVIBIL Pumping Solutions A p san 9 wea Byswoys 100087 ebi oporo 80 52 zoez 80 00 0001 1320181 26001 901 9268011 earar 0907 soszeze seco ceosozz 0982 oseore carozo zoza 10061 sozaori 548 torr 9 esser 208276 ozaiz 016200 ater escor 9 OF peser Lome ie sen ino om omes sors 2063 ae escoi an cock izo eooo gt coa cesc osr ace cee ceras lt Soapce 006 oca penze sco esa 0136 Sib ooz zoz 99 zez cz ig saeeci oos zar cor cerat poe ecese eoz eccer et ez
19. G BLOCK 1 PC 11 DRIVE BEARING BLOCK LID 1 PC 12 OPPOSITE BEARING BLOCK LID 1 PC 13 SUCTION WEAR RING 1 PC 14 OPPOSITE SIDE SPACER BUSHING 1 PC 15 DRIVE GUARD BUSHING 1 PC 16 OPPOSITE SIDE PROTECTIVE BUSHING 1 PC 17 SHAFT 1 PC 18 END STAGE ROTOR 1 PC 19 DRIVING SIDE BEARING BUSHING 1 PC 20 OPPOSITE SIDE BEARING BUSHING 1 PC 21 THRUST RING 1 PC 22 STAGE BODY 8 PC 23 DIFFUSER 9 24 WEAR RING 9 25 BODY OF LAST STAGE 1 PC 26 AXIAL BEARING WASHER 1 PC 27 PRESSURE WASHER M10 8 PC 28 PRESSURE WASHER M12 8 PC 29 LOCKING WASHER WITH INNER CURVE TAB MB 7 35MM 2 PC 30 HEX CAP SCREW TOTAL THREAD NBR 11207 M10X1 5X30 8 PC 31 HEX CAP SCREW TOTAL THREAD NBR 11207 12 1 75 40 8 PC 32 DIN934 HEX NUT 10 1 5 8 PC 33 63091 BEARING 1 PC 34 3 8 PIPE D E X 1 24MM WALL 3 mm 35 SQUARE HEAD PLUG 1 8 NPT 3 PC 36 M10 MILIMETRIC SERIES FLAT WASHER 16 PC 37 7 FIXING NUT 35 1 5 1 PC 38 NBR 6925 SQUARE HEAD PLUG 1 4 NPT 5 PC 39 MILIMETRIC SERIES FLAT WASHER M12 8 PC 40 SPECIAL STUD BOLT 10 1 5 65 10 40 8 PC 41 NBR 6943 SQUARE HEAD PLUG 3 8 BSP 3 PC 42 11 106 O RING FPM VITON VEDABRAS 2 60X35 00 3 PC 43 7309B BEARING FOR ASSEMBLY OF PAIRS REF NSK 2 PC 44 11 585 O RING FPM VITON VEDABRAS 3 53X228 19 9 45 11 597 O RING FPM VITON VEDABRAS 3 53X253 59 1 PC 46 PULL ROD WASHER 8 PC 47 131 832 RETAINER R 5 VEDABRAS 45 65 8
20. HING 1 PC 30 SLEEVE PLUG 4 PC 31 PRESSURE WASHER M24 8 PC 32 MILIMETRIC FLAT WASHER M24 8 PC 33 MB 15 LOCKING WASHER 75 MM 2 PC 34 3 4 GASKET 500 cm 35 HEX CAP SCREW TOTAL THREAD CLASS 8 8 M24X3 0X95 8 PC 36 DIN 933 20 2 5 50 HEX CAP SCREW TOTAL THREAD CLASS 5 8 16 PC 37 DIN 934 HEX NUT 20 2 5 4 PC 38 DIN 934 HEX NUT 10 1 5 4 PC 39 6319 BEARING C3 1 40 5 8 PIPE D E X 1 24MM THICKNESS 4 000 mm 41 SERIES FLAT WASHER M10 8 PC 42 SERIES FLAT WASHER M20 4 PC Pumping Solutions ASSEMBLY AND MAINTENANCE INSTRUCTIONS MULTI ROTOR PUMP 43 MILIMETRIC SERIES FLAT WASHER M20 16 PC 44 KM 15 FIXING NUT M75X2 LEFT THREAD 1 PC 45 KM 15 FIXING NUT 75 2 1 PC 46 ANSI SQUARE HEX HEAD PLUG B16 11 1 2 NPT CLASS 3000 LBS 9 PC 47 SPECIAL STUD BOLT 20 2 5 115 30 60 4 PC 48 10 777 O RING FPM VITON VEDABRAS 3 50 77 00 1 PC 49 7319B BEARING 2 PC 50 11 877 O RING FPM VITON VEDABRAS 3 00 78 00 1 PC 51 10 234 O RING FPM VITON VEDABRAS 4 00X79 00 2 PC 52 PULL ROD WASHER 8 PC 53 29 591 RETAINER R 2 FPM VITON VEDABRAS 95 00 120 00 12 00 2 PC 54 30 992 RETAINER R 2 FPM VITON VEDABRAS 71 44 95 05 6 99 1 PC 55 ALLEN CYLINDRICAL SOCKET SCREW DIN 912 10 1 5 80 4 PC 56 DIN 934 HEX NUT M48X3 0 16 PC 57 SPECIAL KEY 20X12X100 TYPE 1 PC 58 SPECIAL
21. OUTI Before grouting check that the leveling of the base and the alignment of the shaft coupling is complete Once the alignment is correct the foundation screws should be tightened uniformly but not very tightly The unit should then be cemented to the foundation The base should be completely filled with water oil and shrink proof mortar The following suggestions are not compulsory but should be followed modified or rejected by the engineer or builder as these and not IMBIL are responsible for the planning and execution procedures for the work Build a wooden barrier around the foundation and saturate the upper surface of the foundation with water for at least six 6 hours before grouting Remove the remaining water with a hose or cloths before placing the mortar Remove the water from the anchor bolts with cloths or a siphon The formation method depends on the selection by the builder of a mortar placement procedure that allows the rapid and complete filling of the spaces to be cemented and which keeps the mortar in total contact with the under part of the base until it has hardened The vibration of machines operating in the surrounding area is frequently transmitted to the foundation of the machine to be cemented Such machines should be switched off until the mortar has reached its initial configuration otherwise the drying may be affected Observing the surface of the water in a basin placed on the base will indic
22. Pumping Solutions ASSEMBLY AND MAINTENANCE INSTRUCTIONS MULTI ROTOR PUMP INSTALLATION OPERATION AND MAINTENANCE MANUAL ie 22 150 9001 8 BUREAU VERITAS i Certification 782 ISO 9001 2008 Quality Management System Pumping Solutions SIMBIL Pumping Solutions Dear Owner Congratulations You have just acquired a simple piece of construction equipment designed and manufactured with the most advanced technology with excellent performance and easy maintenance ASSEMBLY AND MAINTENANCE INSTRUCTIONS MULTI ROTOR PUMP The purpose of this Manual is to provide the user with the equipment s details and the correct Installation Operation and Maintenance techniques IMBIL recommends that the equipment is installed and cared for as recommended by the correct technique and in accordance with the instructions contained in this Manual and that it is used in accordance with the service conditions for which it was selected flow Total Dynamic Head speed voltage frequency and temperature IMBIL is not liable for defects arising from the breach of these service prescriptions and recommends that this Manual is used by the personnel responsible for installation operation and maintenance Pumping Solutions ROTATION DIRECTION Se 53 283 g EE 254 22 95 SEs 55 wor 9 lt 255 lt 22 In the event of query about
23. RUCTIONS MULTI ROTOR PUMP Ensure that the engine is switched off and locked before removing or installing the coupling or coupling guard Remove coupling guard and the coupling spacer if required for your tooling Check that the radial variation of the coupling measured between the edges of the flange is within the total radial variation of 0 005 inches 0 127 mm Check that the faces of the coupling flange are parallel within the range of 0 003 inches 0 076 mm NOTE f the pump must operate above 300 F 150 C it is important to align the pump at operation temperature Consult your local IMBIL Service Center for support DRIVER FIELD MOUNTING When the driver must be assembled on the base in field it is necessary to please the base with the pump in the foundation level the shaft of the pump check the coupling faces including parallelism and angular misalignment adjustments and the suction and discharge flanges in relation to the vertical and horizontal positions and to make any necessary corrective adjustments The pads of the driver at the base can now be with chalk to facilitate the marking of the holes of the fixing screws Position the driver on the base so that the distance between the two halves of the coupling is equal to that indicated in the diagram Adjust the height of the driver placing shims under the feet of the driver Once the alignment of the coupling halves is correct including pa
24. UMP High bearing temperatures after first start up are attributable to initial reactions The definitive temperature of the bearings is only established after a certain operating time depending on the conditions in up to 48 hours STOPPING Close the blocking valve on the discharge line If the discharge line is equipped with a check valve the blocking valve may remain open provided that there is sufficient contra pressure in the line Switch off the driver checking that the pump is stopping smoothly In the event of prolonged switching off the blocking valve of the suction line must be closed Also close any blocking element in the auxiliary lines The pump sealing system in which the liquid flows in vacuum must be supplied with sealing fluid throughout the stopping period In the event of extended stopping the pump must be drained or protected against freezing If the pump must remain operational throughout stopping periods it must be switched on regularly for at least 5 minutes Fire extinguishing pumps at least once a month e Pump for drinking water at least once every 48 hours e Reserve pump at least once a week The best option is to alternate daily with the pump in operation The function and tightness of auxiliary lines should be checked during these pump stops FINAL CHECK Once the pump has been prepared it should be easy to turn the coupling by hand Leaks in the sealing s
25. ady to operate and to prevent the formation of deposits within the pump and pump inlet area switch the pump set on regularly once a month or once every three months for a short period approximately 5 minutes To do this follow the instructions for the first start up For pumps manufactured in cast iron prolonged stopping times must be avoided especially for aggressive water pumps high oxygen content In this case the pump must remain filled and it must be made to operate for at least 2 days every 1 to 3 months In the event of freezing and or extended stopping the pump needs to be drained and protected against freezing and rust To empty the pump open the plug A complete emptying of the stages with horizontal pumps is only possible when opening the plugs in stages special design When this is not possible it is recommended to decouple the pump from the engine and to proceed in accordance with chapter 6 3 2 THE PUMP IS REMOVED FROM THE INSTALLATION Pumping Solutions ASSEMBLY AND MAINTENANCE INSTRUCTIONS MULTI ROTOR PUMP AND STORED Before storing the pump a review and maintenance must be made Then the pump must be preserved as follows If possible empty the pump completely This may be carried out with vertical pumps via the opening of the emptying plugs in the suction body In horizontal pumps with plugs in the stages special design they may be emptied almost completely by opening th
26. ate whether the vibrations are present Mix the mortar continually while it is poured to remove the air and completely fill the cavities under the base up to the level of the holes for mortar Check whether the mortar flows under the edges of the base uniformly Pumping Solutions ASSEMBLY AND MAINTENANCE INSTRUCTIONS MULTI ROTOR PUMP After 48 hours shims wedges and extender screws used for leveling the base should be removed and the remaining cavities should be filled with mortar Only once the mortar is hard 72 hours or more later should the foundation screws be tightened and the pump and driver aligned PIPING Never use the pump as a support for piping Never force piping to remain in the place of the suction and discharge flanges Ensure that the piping for hazardous liquids has the possibility of a pump discharge before its removal Support and anchor the suction and discharge pipes independently close to the pump so that when the flange screws are tightened the tension is not transmitted to the pump housing The piping should be aligned with the flanges of the pump to prevent excessive loads to the nozzles and to avoid vibrations induced by the piping If an expansion joint or non rigid coupling is used install an anchor between the fitting and the pump The correct installation of the anchor will prevent excessive loads to the nozzles of the pump It is good practice to increase t
27. avoid abnormal temperature increases to the engine and excessive load to the coupling pump seals and bearing blocks the frequency of start ups must not exceed the following number of start ups per hour Engine Power Max no of start ups h up to 3 kW 4 Hp 20 to 11 kW 4 to 15 Hp 15 11 to 45 kW 15 to 60 Hp 10 above 45 kW 60 Hp 5 MINIMUM FLOWS If the type of operation allows the operation of the pump against a blocking valve on the closed discharge side the following minimum flows are required throughout this time t 10 100 C 15 of BEP t gt 100 to 140 C 20 of BEP t gt 140 to 200 C 25 of BEP In isolated incidents that require a precise calculation contact IMBIL The minimum flows cited above are valid for the operation of an independent pump and prevent an excessive thermal or mechanical stress In the case of operation of a pump in parallel with identical pumps or other pumps greater minimum flows may be partially necessary to ensure a secure behavior and operation DENSITY OF PUMPED PRODUCT The power consumed by the pump will increase in proportion to the density of the pumped product To avoid the overloading of the engine and the pump the density of the pumped product must comply with the data specified in the purchase order STOPPING STOCKING PRESERVATION The Pump Unit Remains Installed Periodic Operation Check To confirm that the pump is already re
28. d the shaft sleeve may be moistened with clean pumped material to reduce friction forces The stationary ring and the rotating ring must always be assembled manually ensuring that the pressure is applied uniformly without binding Static sealing elements Sealing elements made of EPDM must never into contact with oil and grease Faulty O rings that have undergone mechanical damage such as cuts cracks and deformations as well as changes due to layering or becoming brittle must be replaced New flat joints must be used when the pump is reformed If possible sealing elements must be assembled without the use of assembly protectives such as grease or adhesives unless authorized protectives are being used Leakage in mechanical seal Check the axial alignment of the seal Check the flat joint Remove the gland and position the stationary ring on the grand Check the O ring of the shaft sleeve Pumping Solutions ASSEMBLY AND MAINTENANCE INSTRUCTIONS MULTI ROTOR PUMP BEARING BLOCKS Bearing blocks Bearing blocks are always mounted on a sleeve of the shaft and tightened with the shaft nut Re assembly is carried out in reverse order of disassembly Both in grease lubrication and oil lubrication the Bearing Block Casings are the same Important aim to keep the bearing nut opposite side free bearing block as it was before disassembly To do this leave the same distance found be
29. e entire surface of the foundation leaving it rough but level The surface should be free of oil grease and loose particles and material residue close to the foundation should be removed Pumping Solutions ASSEMBLY AND MAINTENANCE INSTRUCTIONS MULTI ROTOR PUMP PIPE SLEEVE Clean the screws and the under part of the base removing oil grease dust and other coverings that may affect the grounding or react with the cement Check the base and the proposed mortar placement method to avoid the trapping of air on the base ventilation holes are placed on the platform of the base to help fill in any gaps Place the unit on the foundation with the coupling halves disconnected The coupling must not be reconnected until the leveling operations are complete Follow the appropriate alignment procedure for your equipment after leveling The base must be supported by rectangular metal blocks and shims or on metal wedges with a small reduction in thickness These support pieces should be placed close to the foundation screws Adjust the supports or metal wedges until the shafts of the pump and the driver are leveled Check the leveling faces and the discharge and suction flanges of the pump to check the horizontal vertical position using a level Correct the positions if necessary adjusting the supports on the base as indicated See section on field installation of the Engine and coupling alignment R
30. e plugs It is also possible to empty the pump via lifting to a vertical position with the suction flange downwards turning the rotating set manually In spite of this the sealing box must me drained by opening the respective closing plug Using lifting equipment ensure that the pump cannot slip from the suspension to avoid material damage and injury to persons If complete emptying is not possible it is recommended to disassemble the pump and dry the loose parts Then fill the pump with a water resistant conservation substance such as Rustilo DW 301 supplied by Castrol or an equivalent preservative Turn the shaft of the pump by hand several times to ensure an equal distribution of the preservative Then drain the pump and close the nozzles Polished metal parts exposed to the environment must be treated with a suitable preservative When the pump is preserved with a glycol based preservative or another substance for extended storage the substance used cannot be removed from the pump In this case the pump must be stored completely full of this substances Before re entry into service the preservative must be drained and may be used again Before the next use ensure that the water content in the preservation substance does not exceed 20 RETURNING TO SERVICE AFTER STORAGE Before returning the pump to service follow all instructions of the First start up and Operating Limits sections Once the work is complete
31. fore disassembly The shaft nuts must be tightened in accordance with the torque table on page If an appropriate wrench is not available for applying torque to the shaft nut proceed as follows Self locking nut on driving side and opposite side V Tighten the nut firmly Loosen the nut again v Apply safety agent to the thread of the screw for example Loctite Tighten the nut slightly Locking ring nut on driving side and opposite side Tighten the first nut firmly Loosen the nut again Tighten the nut slightly Fold the tab of the locking ring Self locking nut on driving side and opposite side Tighten the nut firmly Loosen the nut again Tighten the nut slightly Lock this nut with a suitable tool and tighten the lock nut firmly ARAA Fixed bearing block The fixed bearing block is on the driving side It is fitted with angular contact ball bearings to support the axial load The bearings are the same both in grease lubrication and in oil lubrication Free bearing block The free bearing block is on the side opposite the driving side It is fitted with hard ball bearings These bearings must have axial clearances Bearing sizes The size of the bearings are provided in the following table Pump Size Fixed Free Bearing Bearing Block Block 50 2 x 7309 B 6309 C3 100 2x7312 B 6312 C3 200 2x7319 B 6319 C3 TEMPERATURE OF BEARING BLOCKS The temperatu
32. ft in all directions during service SIMIBIL Pumping Solutions ASSEMBLY AND MAINTENANCE INSTRUCTIONS MULTI ROTOR PUMP Coupling Misalignment REGULAR ANGULAR ANGULAR FLUCTUATION PARALLEL AND PARALLEL MISALIGNMEN OF EXTREMITIES MISALIGNMENT T MISALIGNMEN AERIAL VIEW P He FRONT VIEW NOTE Any coupling that is highly subjected to stress by torque will have a small reserve for stresses due to misalignment Conversely if the coupling receives a slight torque it will have greater reserve for misalignment conditions NOTA t must also be advised that any coupling rotating at low speeds as used in conjunction with the low speed side of a gear reducer may lead to relatively large misalignments in the long term On the other hand any coupling rotating at high speeds must be aligned with great care so as to ensure that a continuous and problem free service will be provided ALIGNMENT OF SPACER COUPLING Before alignment check that the driver does not have overly soft feet to ensure that there is no undue stress to the screws that secure the driver due to the base being non aligned or rotated To check remove all shims and tighten the driver at the base Begin to loosen a screw and measure the deviation of that foot with a dial gage or using depth indicators If the devi ation is greater than 0 05mm place a shim on the foot to the size of the deviation For example if the deviation obse
33. ge must be made at least twice a year at which time the bearings are disassembled cleaned and lubricated with new grease In the event of unfavorable operating conditions that is environments with high temperature high atmospheric humidity air polluted with dust aggressive industrial atmosphere etc the bearings must be controlled earlier and if necessary cleaned and lubricated with new grease Use a high quality lithium soap based grease free of resin and acid and not subject to disintegration and with good rust preventing characteristics The grease must have a penetration number between 2 and 3 corresponding to the work penetration between 220 and 295 mm 10 Its dropping point cannot be below 175 If required the bearing blocks must be lubricated with greases of other bases As greases with different bases must not be mixed the bearing blocks must be totally cleaned before re lubrication The lubrication interval required must then be adjusted to the greases used Oil Quality Changing Oil Quality HD20 The first oil change must be made after 300 hours of operation and all subsequent oil changes at every 3 000 hours of operation Unscrew the drainage plug Remove the filler plug Once the body of the bearing block has been completely drained close the drain hole again Tilt the constant oil level reservoir Flow the oil through the hole until the oil appears at the vertical position of the connectio
34. he size of the suction and discharge pipes that lead to the nozzles of the pump Arrange the piping with the lowest number of bends and fittings as possible Use longer radius elbows when possible see the Piping Diagram All this results in a reduction in the load loss due to friction Wash all piping carefully to remove any foreign material before connecting it to the pump The thermal expansion of the piping should be compensated by appropriate devices so that no additional load is imposed on the pump exceeding forces and moments An excessive increase in the piping forces may cause leakage in the pump where the pumped product may escape into the atmosphere To avoid greater problems expansion joints must be used Danger to life when hot product is handled FORCES AND MOMENTS IN PIPES Direction of forces X horizontal parallel to pump shaft Y vertical to pump shaft Z horizontal at a right angle to the pump shaft Direction of moments Mx around the horizontal axis parallel to the pump shaft My around the shaft of the vertical nozzle Mz around the horizontal axis at a right angle to the pump shaft Pumping Solutions ASSEMBLY AND MAINTENANCE INSTRUCTIONS MULTI ROTOR PUMP Suction and discharge nozzles are considered separately Maximum allowable piping force Housing at A48 CL 30 DN FLANGES 32 50 65 80 100 125 150 200 250 Vertical no
35. ide Important Using a caliper measure the distance from the tip of the shaft to the side of the bearing nut This is necessary to ensure the same positioning of the rotating set axial adjustment Loosen the Nut with the safety ring Remove the Bearing block casing It should come off together with the bearing bearing bushing centrifuge ring and retainer Disassemble the centrifuge ring and the bearing bushing Remove the retainer SEAL SYSTEM DISASSEMBLY Mechanical Seal Loosen the nuts and remove the stud bolts of the gland Remove the mechanical seal Gasket Loosen the nuts and remove the stud bolts from the packing gland Remove the gaskets and the centrifuge ring DISASSEMBLY OF HYDRAULIC ELEMENTS Following disassembly of the sealing system proceed with the following steps Remove the protective sleeve from the opposite side Remove the nuts and the washers from the pull rods Remove the Suction Housing Remove the key from the protective sleeve Remove the spacing bushing Disassemble the other components in the following sequence Pumping Solutions ASSEMBLY AND MAINTENANCE INSTRUCTIONS MULTI ROTOR PUMP Remove the pull rods Remove Rotor Remove Stage body with Diffuser Remove key from Rotor to release the removal of the next Rotor Disassemble all stages When removing the Body of the last stage it must come out together with the Balancing bushing Remove key f
36. imes the diameter of the pipe should be connected to the suction flange of the pump to obtain a uniform flow at entry Ensure that the suction lines are sealed and ventilated to avoid leakage and air bubbles Reducers if used should be eccentric and installed with sloping side downwards to prevent the trapping of air Reducers should have a maximum divergence angle of 15 A reducer or elbow of the section pipe should be positioned at a distance of at least 5 five times the diameter of the pipe from the suction flange of the pump For start up suction filters of the tapered type should be used and there must be a net flow area of at least 3 three times the section area of the suction pipe The suction reducer must be installed at a distance of 5 to 20 times the diameter of the pipe against the current from the suction flange A cylindrical piece must be installed in the suction line to facilitate the installation and removal of the suction filter Pressure gages must be installed on both sides of the filter to measure the pressure drop An increase in differential pressure indicates that the filter screen is getting clogged At this point the pump should be turned off and the screen should be cleaned and replaced When working under suction head or flooded suction install a sectioning valve in the suction line to allow the closure of the line for inspection and maintenance of the pump Never accelerate the pump wi
37. ing member diametrical distance in clearance distance mm mm inches lt 50 0 25 lt 2 000 0 010 50 to 0 28 2 000 to 2 499 0 011 65 to 0 30 2 500 to 2 999 0 012 80 to 0 33 3 000 to 3 499 0 013 90 to 0 35 3 500 to 3 999 0 014 100 to 114 99 0 38 4 000 to 4 499 0 012 115 to 124 99 0 40 4 500 to 4 999 0 016 125 to 149 99 0 43 5 000 to 5 999 0 017 150 to 174 99 0 45 6 000 to 6 999 0 018 175 to 199 99 0 48 7 000 to 7 999 0 019 200 to 224 99 0 50 8 000 to 8 999 0 020 225 to 249 99 0 53 9 000 to 9 999 0 021 250 to 274 99 0 55 10 000 to 10 999 0 022 275 to 299 99 0 58 11 000 to 11 999 0 023 300 to 324 99 0 60 12 000 to 12 999 0 024 325 to 349 99 0 63 13 000 to 13 999 0 025 350 to 374 99 0 65 14 000 to 14 999 0 026 375 to 399 99 0 68 15 000 to 15 999 0 027 400 to 424 99 0 70 16 000 to 16 999 0 028 425 to 449 99 0 73 17 000 to 17 999 0 029 450 to 474 99 0 75 18 000 to 18 999 0 030 475 to 499 99 0 78 19 000 to 19 999 0 031 500 to 524 99 0 80 20 000 to 20 999 0 032 525 to 549 99 0 83 21 000 to 21 999 0 033 550 to 574 99 0 85 22 000 to 22 999 0 034 575 to 599 99 0 88 23 000 to 23 999 0 035 600 to 624 99 0 90 24 000 to 24 999 0 036 625 to 649 99 0 95 25 000 to 25 999 0 037 For diameters greater than 649 99 mm 25 99 inches the minimum diametrical distances will be 0 95 millimeters 0 037 inches plus 1 for every additional 1 mm of diameter or fraction 0 001 in addition for every Inch ASSEMBLY AND MAINTENANCE INSTRUCTIONS MULTI ROTOR PUMP TORQU
38. n elbow Then fill the constant oil level reservoir and return it to operation position After a short time check if the oil level in the reservoir has decreased It is important to keep the reservoir 2 3 full with oil at all times Pumping Solutions ASSEMBLY AND MAINTENANCE INSTRUCTIONS MULTI ROTOR PUMP LUBRICANT AMOUNTS Grease Amount Pump Size Amount per bearing block g driving side opposite side 50 80 100 100 220 220 200 900 900 Oil Amount considering 2 3 of reservoir full Pump Size Amount per bearing block ml driving side opposite side 50 300 300 100 300 300 200 365 380 Engine Engines without lubrication points The bearing block has been lubricated by the manufacturer for an operation period of 15 000 or for 2 years under normal operating conditions Engines with lubrication points The bearing block needs to be re lubricated at intervals indicated on the engine plate approximately every 500 hours SHAFT SEAL SYSTEM Mechanical Seal Maintenance is not required Gasket The nuts of the packing gland must only be tightened slightly The packing gland must be perpendicular to the shaft once the pump has been prepared and before starting operation check whether the gasket was placed allowing a greater leakage quantity After approximately one hour of operation tighten the gasket gradually until the leakage is reduced
39. nd installed at the factory It does not require maintenance Check the seal for leakage occasionally During the initial start up an increase in leakage may occur for a short period of time If the leakage continues to be great stop the unit immediately and check the cause of the leakage for example contaminated pumped product or previous start up dry due to incomplete purging of air Refrigerated Mechanical Seal If the pump is equipped with a refrigerated mechanical seal ventilate the sealing chamber as described Pumping Solutions ASSEMBLY AND MAINTENANCE INSTRUCTIONS MULTI ROTOR PUMP OPERATING LIMITS The pump is suitable for working with pure or slightly contaminated fluids max solid content of 20 ppm It is essential to ensure that the operating limits indicated when confirming the request maintained TEMPERATURE OF PUMPED PRODUCT Do not operate the pump at temperatures above those specified on the identification plate or in the technical data START UP FREQUENCY The number of start ups allowed in a given period of time depends upon the installation circumstances and operation conditions The overloading of the engine may result in Abnormal increase in temperature exceeding the limit values of the bearings and the grease of the bearing blocks Premature wear of the coupling Reduced working life of the pump components v Irregularities or damage in installation To
40. ns ASSEMBLY AND MAINTENANCE INSTRUCTIONS MULTI ROTOR PUMP FIXING WITH PINS Once the unit has been operating for around one week the coupling halves must undergo a final check for misalignment caused by tensions in pipes or tensions caused by temperatures If the alignment is correct the pump and the driver must be fixed at the base with pins FACTORS THAT MAY AFFECT ALIGNMENT The unit must be checked periodically in terms of alignment If the unit does not remain aligned once it has been properly installed the following factors may be causes Settlement adjustment or removal of the foundation Tensions in the pipes that distort or change the machine Wear to bearings Raising of base due to heat or adjacent steam pipe etc Chance to constructed structure due to variable loads or other causes For a new unit and foundation it may be necessary to readjust the alignment slightly from time to time INITIAL OPERATION SHUTDOWN Additional information for operation with the boiler supply pump Limit values for boiler and condensed supply water when using pump parts in cast iron pH gt 9 0 suitable value gt 9 3 0 content lt 0 02 ppm The values must be ensured for any operating conditions before entering into the pump The fresh water part must be 25 at most Water treatments must be in accordance with national regulations for boiler supply water in steam plants up to 64 bar The penetration of air into
41. ouplings of the gearing type are aligned in the same way as shown in Figure 7 However the coupling lids must be moved backwards away from the path and the measurements made at the central shaft of the coupling It is impossible to align any equipment perfectly We therefore recommend that in the event of vertical misalignment you assemble the equipment with the greatest dimension between the base of the assembly foot and the central line of its shaft before mounting it on shims for alignment Example The shaft of an engine or gear mounted on one foot would be below the shaft of pump mounted on the central line When a turbine driver is used to drive the pump this variation in the elevation of the shaft must be checked again once the driver has reached operation temperature An approximate cold environment may be obtained from the manufacturer of the driver FINAL ALIGNMENT CHECK Once the mortar has settled and the pressure mortar for filling in the gaps has also settled and the foundation screws have been tightened properly the unit should be checked for parallel and angular alignment and if necessary corrective measures must be taken The machinery must be free from tensions or distortions Loosen and then tighten the fixing screws of the pump and the engine sequentially using a dial gage in the coupling in order to monitor and ensure that the units are supported uniformly Once the piping of the unit has been
42. pump and suction line must be completely primed with the liquid to be pumped The pump has several plugs made for the elimination of air Similar air elimination devices may be used in pipes The blocking elements in the suction line and supply line must be completely open Open all auxiliary connections completely and check the flow Open the closure valve on the vacuum compensating line if there is one close the valve vacuum tight Dry operation will cause increased wear to the unit and may damage the pump If the discharge line is equipped with an automatic check valve open the minimum flow valve and ensure against unforeseen closure Exceptions If there is no contra pressure before start up the lock valve of the pressure line must be closed In pumps assembled with a mechanical seal the mechanical seal will have negligible or invisible leaks in vapor form during operation The seal is maintenance free If the pump is equipped with a gasket the leakage during start up is normal If the pump is equipped with a refrigerated mechanical seal ventilate the sealing chamber by unscrewing the ventilation plug by a quarter of a turn and re tighten CONTACT PROTECTION In agreement with the accident prevention regulation the pump must not be operated without a coupling guard If the customer specifically requests the non inclusion of a coupling guard in its order then the customer is liable CONNE
43. rallelism angular misalignment adjustments perforate at the center with a transfer tool or mark the circumference of the screw holes at the base of the driver feet Remove the driver determine the size of the fixing screws and drill at the base Replace the driver at the base insert the screws and align the driver before tightening them The following procedures are the same for the factory aligned units FLEXIBLE COUPLING The primary functions of all flexible couplings are To transmit power from one shaft to another efficiently and effectively To accommodate small misalignments of the shaft that arise during activity e The secondary functions of flexible couplings are V To observe shock loads and pulsations V minimize vibrations To accommodate load reversions To minimize initial setback y ensure ease of installation and maintenance V reduce wear in shaft bearings and equipment The shafts become misaligned during operation due to the foundation due to the effects of heat vibration worn bearings etc These misalignments occur in the form of angular misalignment parallel misalignment or axial movement of the shafts fluctuation of extremities Thus to achieve the complete working life of any flexible coupling it is necessary to a ensure the correct alignment of the shaft during initial installation and b to check and correct occasionally the misalignments of the sha
44. re of the bearing blocks which operate at 3 000 RPM or more can easily reach 90 C Manual temperature checks are not enough The bearing blocks only reach their regular temperature after a few hours of operation When a new pump is actioned the temperature of the bearing block can exceed 95 C After 2 or 3 hours of operation it will slowly decrease and will return to normal after approximately one week An increase in temperature may occur following activities replacement of bearing blocks or disassembly of hydraulic system If the temperature exceeds 100 C at the beginning of the pump s operation switch it off and make the following checks Check that the set is correctly aligned Remove the bearing blocks check the quantity of grease An excessive quantity of grease will cause excessive temperatures Check the type of bearing block and arrangements Restart the pump Make sure that the bearing block lid is tightening the outer rings of the thrust bearings fixed bearing block Standard clearances for diameter of wear rings are as per the appendix Pumping Solutions ASSEMBLY AND MAINTENANCE INSTRUCTIONS MULTI ROTOR PUMP Pumping Solutions ASSEMBLY AND MAINTENANCE INSTRUCTIONS MULTI ROTOR PUMP STANDARD MINIMUM CLEARANCES FOR WEAR RINGS Diameter of rotating Minimum Diameter of Minimum member in clearance diametrical rotat
45. rom the last stage DISASSEMBLY OF BEARING BLOCK ON DRIVING SIDE Remove coupling from the tip of the shaft Remove key Loosen the screws and remove the Lid from the bearing block Remove the locking nut together with the locking washer Remove the Washer from the bearing Unfix the screws from the Bearing block Remove the bearings from the bearing block and the bushing from the bearings Remove the retainer DISASSEMBLY FINALIZATION Disassemble the sealing system as described above Remove the centrifuge ring Remove the protective sleeve Remove the Shaft outside the delivery casing Disassemble the balancing sleeve the key and the thrust ring PUMP RE ASSEMBLY The pump must be re assembled in accordance with suitable engineering criteria as follows Do not force under any circumstances Due to their weight some components of the pump must be supported during re assembly Before re assembly the local surfaces of the individual components must be re covered with a protective oil in accordance with hygiene health and safety standards The properties of the new components must not be changed without consulting our technical department in advance The parts must be clean and free of chips and dirt reassembly is made in the reverse order of assembly The tightening torques indicated must be in accordance with the table Avoid the use of chemical adhesives as far as possible If it is really necessary
46. rved is 0 25mm then this is the size of the shim to be placed on the foot Tighten and repeat the procedure for all other feet Spacer type coupling is used between the pump and the driver To align it remove the spacer between the pump and the driver Produce a support as shown in Figure 7 which may be connected to one of the halves of the coupling and which is long enough to reach the other half Connect this support to one half of the coupling and a dial gage to the support arm so that the gage comes into contact with the bar of the coupling half as shown in A Figure 7 Rotate one half of the coupling manually so that the gage moves around the other half Once the alignment of the coupling bar has been achieved change the gage so that it leans against the face of the same half and make any necessary adjustments If the shafts have end play it is advisable to carry out this face alignment check in micrometers as shown DIAL GAGE Coupling Alignment The Maximum radial variation in A should follow the manufacturer s recommendation and must exceed the total radial variation of 0 127mm The maximum variation in the parallelism in B should follow the coupling manufacturer s recommendation and must not exceed 0 0762mm The recommended spacing up to the central shaft must be maintained IIVIBIL Pumping Solutions ASSEMBLY AND MAINTENANCE INSTRUCTIONS MULTI ROTOR PUMP NOTE C
47. s ASSEMBLY AND MAINTENANCE INSTRUCTIONS MULTI ROTOR PUMP released Harmful explosive and hot elements and other hazardous elements must be drained without posing risk to people or the environment Drying and cleaning the pump are an absolute necessity before sending the pump to the workshop After extended period of operation some components may present a difficulty in removal We recommend the use of a quality anti grip agent or an appropriate extraction device Do not force under any circumstances Disassembly must always be executed observing the sectional drawings at the end of this service manual Heavy components must be sufficiently supported during disassembly Components must be marked with their disassembly sequence to ensure that they will be removed in the correct sequence Completely clean the disassembled components and inspect their conditions A careful check may help to find the cause of the pump fault if there is one If in doubt replace the components Always replace the parts subject to wear gasket O ring wear ring bearing DISCONNECTING AUXILIARY PIPES Disconnect auxiliary cooling pipe from the sealing system Disconnect balancing pipe from the axial thrust DISASSEMBLY OF BEARING BLOCK ON OPPOSITE SIDE If the pump is lubricated with oil drain the reservoir of oil before disassembling the bearing blocks Remove the screws and remove the Bearing block lid from the opposite s
48. th the suction valve closed and never place the valve directly against the entry nozzle of the pump y Where stents used the discharge they must be positioned between the check valve and the pump they should have a maximum divergence angle of 15 and if located horizontally must be installed with the sloping side down to prevent the trapping of air SHAFT ALIGNMENT COUPLING When the pumps and drivers are received from the factory with both machines assembled on a common base they were carefully aligned before shipping All bases are flexible to a certain extent and therefore it should not be expected that they maintain factory alignment Realignment is necessary once the complete unit has been leveled at the foundation and again when the mortar has rested when any final pressure grouting has been made and once the foundation screws have been tightened The final alignment of the pump with the engine should be checked once the unit has been connected to the piping and checked again periodically as described facilitate precise alignment in the field IMBIL does not secure bases and drivers to the bases before shipment NOTE The shafts must be aligned in all directions for successful operation The above misalignment of the limits specified in this section may cause noise vibration excessive wear and damage to the equipment Pumping Solutions ASSEMBLY AND MAINTENANCE INST
49. urfaces and cover with an anti corrosive oil Replace the protective flange lids NOTE Accumulation of condensation in the pump should be avoided Store the equipment away from climactic extremes Do not store the pump in areas with high environmental temperature variation as this may cause damage to the bearing blocks When auxiliary equipment such as drivers mechanical seals and instrumentation are provided additional preparative measures may be necessary for long term storage See the manufacturers literature for specific instructions FOUNDATION A proper foundation and grouting can make the difference between a unit that generates many years of trouble free service or one that requires constant realignment It should therefore be the concern of all to ensure that only the best materials as well as an adequate design are used when performing this important function NOTE The foundation 4 to 6 longer and wider than the base must be sufficiently rigid and substantial to absorb any vibration and to provide permanent support to the base This is important for keeping the units aligned A mortar foundation on a solid base should be satisfactory The foundation screws must be installed as shown in Figure 1 and should be placed in accordance with the certified design sent previously LEVELLING THE UNIT Before the pump is placed on the foundation wrench the leftover parts from the mortar leveling th
50. ystem are unacceptable during the pump s operation Packing The gasket is assembled at the factory Its ideal compression may only be adjusted after hours of the pump s operation Throughout this operation period the leakage will be greater than during the normal operation period of the pump Check the temperature of the fluid in the leak The final adjustment of the gasket is made gradually after a sufficient operation period so that the leakage is reduced to a drip around 20 drops per minute Tightening the gasket very early or too strongly without allowing a sufficient operation period will lead to an increase in the local temperature and insufficient lubrication resulting in the destruction of the gasket premature wear of the protective sleeve of the shaft and uncontrollable leakage It is not recommended to use a gasket for pumps with adjustable rotation or with variable inflow pressure Variable pressures make adjustment to a uniform and controllable drip difficult Once these conditions confirmed the increased dripping cannot be prevented With the suction pressure increased and or the rotation RPM increased the increase in the leakage of the gasket occurs forcibly It cannot be reduced by tightening the gasket tightening screws Regulation to a minimal drip can only be made with the pump in rotation and or with a lower suction pressure MECHANICAL SEAL The mechanical seal set is adjusted a
51. zzle at right angle to the sha ft N Fx 245 510 640 700 1015 1470 1780 2700 Fy 410 635 800 970 1270 1850 2220 3490 Fz 265 415 520 625 830 1220 1465 2220 Horizontal nozzle at right angle to the shaft N Fx 245 510 640 800 1015 1470 1780 2700 Fy 265 415 520 625 830 1220 1465 2220 Fz 410 635 800 970 1270 1850 2220 3490 Axial nozzle parallel to the shaft N Fx 800 1270 1850 2220 3490 4760 Fy 520 830 1220 1465 2220 3180 Fz 640 1015 1470 1780 2700 3810 Moment for all nozzl les Nm Mx 260 330 460 380 950 1235 1640 2520 3580 My 160 250 350 520 715 930 1260 1840 2710 Mz 190 170 240 340 490 660 840 1260 1740 Maximum allowable piping force Housing at A216 WCB The table values should be multiplied by 1 4 SUCTION PIPE Protection against foreign bodies Before the initial operation of new facilities clean level and apply compressed air through all vessels pipes and connections Often welding slag scale and other impurities only escape after a short period of operation Fit a sieve to the suction to line to prevent the entry
Download Pdf Manuals
Related Search
Related Contents
G DATA InternetSecurity 2010 for Netbooks EN DOMItech F 24 - TECHNO IMPIANTI Srl Settings - School of Electrical and Computer Engineering 「マウスノロウイルスの状況と研究」 「遺伝子改変 2013 Tacoma - Capitale Chrysler Bass Metaphors - Instructions - Electro ficha datos técnicos limpiador caja de cambio automatica Manual de Usuario Copyright © All rights reserved.