Home
        HAAS CHT 800 O&M Manual
         Contents
1.   Before attaching vertical track angle or brackets to jambs it must be plumb and parallel to door and raised to match leveling of  bottom door section    Attach vertical track angles to jambs by welding or by using 1 4    self drilling screws on steel jambs or 5 16  x 1 1  2  hex  head lag screws on wood jambs  If mounting directly to masonry  anchors are not supplied    Repeat above step for right hand track   Note  Both tracks must be parallel for proper operation     Insert rollers into end hinges    Hook rollers into vertical track and swing end  hinges onto door section as shown at left   Secure with fasteners provided        Correctly Installed    Figure 5  STEP 5    Place  2 section on top of bottom section  Note  if door is supplied with cylinder lock  use section with lock holes punched  or drilled in it  See Step 19 on page 8     Attach hinges and rollers as shown in Figure 5  See hinge schedule Figure 6 on page 4 for correct placement of numbered  hinges  If inside lock is supplied  see Figure 7     Rev  5 12    2012 Haas Door Company 3    Haas Door Commercial Instruction Manual    STEP 6    Complete the remainder of the sections at this time  Top  door section should only be installed after horizontal track or  full vertical track has been installed    Note  if door is supplied with full view aluminum section s    attach hinges with 1 4  self drilling screws provided     STEP 7 SLIDE BOLT LOCK    The inside lock is installed on the end stile of the second  sectio
2.   Stucco Aluminum    24 GA Flush  Stucco Aluminum    800 Series   3    thick   R 25 8                    Haas Installation  amp  Maintenance      Door Service Manual For  A Nofziger Company Commercial Steel Doors    320 Sycamore Street Wauseon  OH 43567  www haasdoor com Read Instructions Thoroughly Before Starting Installation             Horizontal Track Support i      1  f  B  s   Center  i             Horizontal Track Support                     Jam Preparation X     SA      RRS  E ET       Y          i     d   L                            lt  lt          Top Fixture    Counterbalance      i    Vertical Track                E                                    3  T 8    End Hinge    Bottom Bracket       Center Hinge    Lock Assembly    Figure 1    Rev  5 12  02012 Haas Door Company 1    Haas Door Commercial Instruction Manual    OPENING PREPARATION    Note   All framing materials must be provided    by building contractor or installer   Some large doors    may require additional  oad or pads located off    center to accommodate All vertical jambs  auxiliary bearings  and pads regardless  Fig ure     W 5 of type  must extend   gt  to top of headroom  D requirement                                 gt           5    Steel  2   Channel    5 5 5  Cc      Q  O  Opening Width         3 pa Min   Wood  mod Steel Jambs  Section  W  Interior Elevation Section    S          STEP 1 INSTALLATION OF DOOR    Check the size of door to be sure it is the same size as opening  Inspect the tra
3.  Hinge  9    v     7 Section    A         Hinge  5   Hinge  8    v     6 Section    m Hinge  5   Hinge Ff           5 Section                  Hinge  4   Hinge  6     w            4 Section          Hinge  3   Hinge  5     3 Section    a Hinge  2   Hinge  4    wi        Lock  2 Section  9            Hinge  1   Hinge  3    Bottom  1 Section  jus Bottom Bracket         Center Stile    Section 2 5 n    L6                Figure 8  Plumb ine    Note  Small doors may         use a bracket without Bearing  fO    a wall mounting leg   Bracket                 if   Horizontal wen  Track        297 7    Rope Z   A        D        7 M                      We      j t    l   d   gua spice           2           Bracket  Si Completion of Track  Figure 9  Rev  5 12    Haas Door Commercial Instruction Manual    STEP 9a HI LIFT TRACK    Connect vertical hi lift track to top of existing vertical track  with 1 4   x 5 8  truss head machine screws  Set track plumb  and fasten to jamb in the same manner as the vertical track  previously installed in Step 4  Attach bearing brackets to the  horizontal angles with 3 8  x 3 4  bolts  amp  nuts  Form rope  loops to a convenient overhead structural member and insert  horizontal tracks through them  then attach bottom of the  curved portions of track to the top of the vertical tracks at the  splice brackets with 1 4  x 5 8  truss head machine screws  and nuts  Head of machine srews should be to inside of the  track  see Figure 9a   Using a level  strike 
4.  as shown Sprin  Figur 21 One spring mounted on a 1  torque tube ng  Left hand              Bearing Bracket  cable drum  rec  3 n                                    10 11 JA      Qu   AUI   R W  iu   Hed Cone     Jm TAA       Black Cone                                                                      Center Support Bracket Right  i See Figure  17     Cable Wound  Figure 13 Two springs mounted on a 1    torque tube Spring  eth    Black   i iiit     Shaft Coupling T Bearing Bracket  RUM                mmm URL                        ok LW  W   Red Cone   Black Cone    llo  u Center Support Bracket n  Figur 5 14 Two springs mounted on a 1  keyed solid shaft   Cable  Left hand            cable drum  red    fa Shaft Coupling   I  pcc  Lu   o      Tr  IT 1      lh Hmmm           in HTT n  11171 mm HIE        R W  lo _ RW  61  15 L W        Hed Cone     Hed Cone  E Black Cone  EE  Black E    T          Center Sonn Bracket EM         Fig ure 19 Four springs mounted on a 1  keyed solid shaft RES  STEP 13    Place the center support bracket and the bearing on the axles as shown in Figure 16  bearing sits inside spring fitting   Bolt  spring fitting s  to center support bracket  see Figure 16 or 17  using 3 8  dia  x 1 1 2  hex head bolts  Slide a cable drum  on both ends of shaft  Be sure correct hand drum is used  see Figures 12 thru 15   Slide bearing on each shaft end if not             Support       Axle       Bracket  Bracket     1   Centerline Spring    Fitting  Spring    Fitt
5.  in front of winding cones or winding bars  With one hand  insert one winding rod all  the way into the hole of the winding cone and wind the spring up one quarter turn  With your other hand  insert the second  winding bar into the next hole  remove the upper winding bar and then take another one quarter turn  Proceed in this man   ner until you have made all the required number of turns  The number of turns are indicated on the spring tag attached to   the spring assembly  For example  if the tag says  wind spring 7 turns    x 4   28 one quarter turns are required to balance   Note  each complete turn will cause the chalk line to make one spiral  After the requred number of 1 4 turns have been made   tighten both set screws in the winding cone to secure it to the shaft before removing the winding bars  Repeat this procedure  for each spring  then locking pliers can be removed  Attach one red warning label to spring     Rev  5 12    2012 Haas Door Company         Haas Door Commercial Instruction Manual    STEP 19 CYLINDER LOCK INSTALLATION    If lock cylinder is supplied  install in lock section as shown in the exploded view  see Figure 22      Qutside  Handle         spring  q Lock Bar w  Cam    Cyliner    Lock            Q    Figure 22    Handle       Botto  enl Night Latch    Qutside Drill 2    5 16  holes    Figure 23  STEP  20 LIFT HANDLES    Install lift handle s  on bottom section with 1 4    20 nuts and Bottom  bolts supplied  as shown in fig    23   Section    MAINTE
6. COMMERCIAL  800 SEHIES    COMMERCIAL  SERIES                816 in white       COMMERCIAL  800 SERIES    3    Thick _R 25 8    814 816 832   833   832 20  833 20   850   851    TITTLE TTT RR AME       E 816 in sandstone                          833 in white       6        Bom   z     CO          6            3        IT  T                                        OPTIONS    800 QUICK GUIDE    86191     Thickness  R Value     816    832    833    832 20    833 20    850    851    Ra   76 2MM     e   76 2mm     eu   76 2mm     3      76 2mm     3    76 2mm     3      76 2mm     3      76 2mm     ae   76 2mm        calculated R Value    For detailed information about the construction of this series  see pages 28 29    25 8    205    20 8    25 8    Zoe    25 8    20 8    38   Oy    38 2    DEDE    Dieu    A    2507    38 2    OO       S208    COE    eur    22220    22    S204    522    5220    ENEEAE 7 EN  heim   1 Stile  Type   Inside   Outside      Steel    Steel    Steel    Steel    Steel    Steel    Steel    Steel    26 GA V Groove  Woodgrain Steel    26 GA V Groove  Woodgrain Steel    26 GA V Groove  Woodgrain Steel    26 GA V Groove  Woodgrain Steel    20 GA V Groove  Smooth Steel    20 GA V Groove  Smooth Steel    24 GA V Groove  Stucco Aluminum    24 GA V Groove  Stucco Aluminum       26 GA Flush  Woodgrain Steel    26 GA V Groove  Woodgrain Steel    20 GA  Smooth Steel    20 GA V Groove  Smooth Steel    20 GA  Smooth Steel    20 GA V Groove  Smooth Steel    24 GA V Groove
7. NANCE  amp  CAUTIONS    Recommended Service  lubricate rollers with a light oil as required  Check and tighten all nuts  bolts and screws annually    This may be required more frequently for high usage doors      Haas Door recommends servicing any part of the counterbalance system including springs  drums cables  bearing brackets   and bottom corner brackets where cable is attached be performed by qualified door service personnel only  see notice below      Important Safety Notice  Operate door only when properly adjusted and free of obstructions  Door is under extreme spring  tension  Repairs and adjustments  especially to cables and spring assembly  can be hazardous and should be performed by  qualifled door service personnel only     Do not permit children to play with garage door or electric controls    If door is now  or later becomes  electrically operated  pull down rope must be removed    Avoid standing in open doorway or walking thru doorway while electrically operated door is moving    Should door become hard to operate or completely inoperative  it is recommended that a qualified door agency be contacted     The notice above has been approved and recommended by the National Association of Garage Door Manufacturers  NAGDM      6    2012 Haas Door Company Rev  5 12    MIT    M LN CHT CMT Series    MODEL 600  700  2000  800  STEEL COMMERCIAL  GARAGE DOORS       Haas Door Company warrants its commercial CMT 600  CHT 700  CHT 2000  and  CHT 800 series steel garage door 
8. a plumb line from  the inside ot the splice bracket to the inside of the horizontal  angle on each side  Place outside edges of bearing brackets  against the plumb lines and attach          brackets securely to the wall Bearing   see Figure 98   Bracket          e  Hornzontal  Track  L  Rope  1  1          PR              Hi Lif p  Vertical        Track     Sp ce      Bracket Ex L  M                 Vertical SE   Figure 9a  rs    Track           STEP 10 1  HORIZONTAL TRACK SUPPORT    Replace temporary support hangers with steel support angle   not supplied   Install sway braces only after checking the  horizontal track with a tape measure or spacing bar to verify  that they are parallel  Important  steel support or other means  must be strong enough to support full door weight and must  be attached to a structurally sound member   Note  a center horizontal track support is required for doors  larger than 12  1  in height  see Figure 1 Item A on page 1    Ceiling           Angle A     Note  Hanging  Horizontal track Angle          d i      slopes upward POT    AN      per foot toward    the rear of door          Sway   Brace    Figure 10    Hev  5 12     y     2 Plumb Line       2012 Haas Door Company    STEP 9b VERTICAL LIFT TRACK    Place upper vertical track on top of lower vertical track   Plumb track and attach to wall in same manner as lower  vertical tracks  Heads of machine screws should be to inside  of the tracks as shown in Figure 9b   Jamb fasteners must  be instal
9. ck and determine if you have reverse angle or  bracket mount tracks  Note  bracket mount has individual j brackets to attach track to jamb  reverse angle has a continuous  angle to attach track to jamb  Note  if door is supplied with reverse angle  The door should be 2  wider than opening                       G   N         oection End Hinge           see Figure 6  on page 4    for correct  hinge numbers      Weatherstrip         Figure 3   V XB AR Paw      Bottom Bracket                         gt                Drill a 3  16    diameter   lt  GB 3      hole for this screw              9   STEP 2 i    Attach hardware to bottom section with 1 4  x 3 4  hex head sheet metal screws  see Figure 3   If door requires struts  u   bars  see Figure 8 on page 4     2  3 2012 Haas Door Company Rev  5 12       Haas Door Commercial Instruction Manual    INSTALLATION OF VERTICAL TRACKS    Opening Width          Top of both tracks must       J   level to each other    Reverse Angle Mounting WT F            vertical Track  Note       Opening Width        plumbo  amp  be parallel to each other        ui    Both Vertical Tracks must be     stop Mould  f  i  1    Hide     Level  qi     Bottom Section must    be level  Shim as req d       Breacket Mounting    Figure 4    STEP 3    Position bottom section in center of the opening  allowing equal distance from each side of the opening     STEP 4    Position left hand track over rollers as shown in Figure 4  Space track 1 2    from door as shown  
10. en the two set screws securing the drum to the shaft   Clamp a set of locking pliers with the jaws locked onto the shaft and the other end against the wall so that cable tension On  the drum is taut  no slack  and the shaft locked  Secure the remaining drum making sure both cables have equal tension and  are taut  see Figure 20   If axle is a solid shaft use a 1 4  key for both drums     Cable        Hight side shaft             Locking        Winding    Bracket                            Axle          Te    Winding          Bar    STEP 7 Figure 20 Figure 21  Before going to Step 18  Be sure door is in locked position  If no lock is supplied  place a clamp in both tracks of door directly  above a roller to make sure door can not be raised at this tlme     STEP   18 WINDING SPRING  see Figure 21     Note  garage door springs can cause serious injury if not handled properly  Before winding the springs  make sure the lock is  engaged in the  locked  position  This will prevent the door from raising up by itself in the event the springs are over wound  or are too strong   Use two cold rolled steel rods approximately 18  long and the same diameter as the holes in the winding  cones  winding rods not furnished  1 2  dia  for 1 3 4     amp  2 5 8  springs and 5 8  dia  for larger springs  Do not use undersized  rods or other tools to wind springs  For your safety  position yourself on a sturdy ladder so that winding cone is either to your  right or to your left  Never stand directly
11. ing Spring        Bearing    Axle      j Bearing  Centerin S 3 Notch to  po Bottom         Fittir  Centerline J    Figure 16      Figure 17  6    2012 Haas Door Company Rev  5 12    Haas Door Commercial Instruction Manual    STEP 14    Raise the shaft assembly over the door  If 2 piece shaft with coupling is supplied  raise half the total shaft at a time  Rest the  end s  of shaft on the horizontal track angle   See Figure 19 For coupling installation  5 Left side shaft    Rotating bearing hub         faces the cable drum           Coupling                   Coupling  4        STEP 15 Figure 18 Figure 19    Locate and attach spring bearing plates center support bracket to mountlng pads  not supplied   See Figure 2 for wood or  steel frame  jambs    Mount spring brackets to structural member of building of sufficient size to withstand spring s  torque   When mounting springs on pads  keep in mind that springs grow in length when wound  Allow at least 5  space between  spring fitting and cable drum  If mounting the center support bracket to wood  use  2  5 16  x 1 5 8  long hex head lags for  each bracket  For steel jambs use  2  3 8  x 1 1 2  hex head bolts  If mounting directly to concrete use  2  5 16  dia thru  bolts or threaded rods  not supplied      STEP 16 ATTACHING THE CABLES    Thread each cable between the axle and wall  Then insert each cable into the entry slot of each drum  Wind the excess cable  on the drum  then slide the drum against the bearing plate and tight
12. ive  Upon  verification of a manufacturing defect  Haas Door Company will provide repair or replacement part s  at its  option     THE MANUFACTURER SHALL NOT BE RESPONSIBLE FOR ANY INCIDENTAL OR CONSEQUENTIAL  DAMAGES ARISING OUT OF ANY BREACH OF THIS EXPRESS LIMITED WARRANTY  including but not limited  to any damage to buildings  other property or for any injuries or damages sustained by any person whomsoever  or  the recovery of any direct or indirect costs such as shipping  travel  lost time  installation labor charges  paint or  painting  cleaning  repair  or other building materials     This warranty gives you specific legal rights and you may also have other rights that may vary from state to state  Haas Door  Company does not authorize anyone to change or modify the above warranties in any respect  ANY IMPLIED WARRANTY OR  MERCHANTABILITY OR FITNESS FOR A PARTICULAR PURPOSE APPLICABLE TO THE COMMERCIAL MODEL  S  OF  INSULATED STEEL OVERHEAD GARAGE DOORS IS LIMITED IN DURATION TO THE DURATION OF THE HAAS DOOR  COMPANY WRITTEN WARRANTY SET FORTH ABOVE AND NEITHER HAAS DOOR COMPANY NOR ANY AUTHORIZED  SELLING DEALER SHALL BE LIABLE FOR LOSS OF TIME  INCONVENIENCE  COMMERCIAL LOSS  OR OTHER  CONSEQUENTIAL OR INCIDENTAL DAMAGES  Some states do not allow limitations on how long an implied warranty will last or  the exclusion or limitation of incidental or consequential damages  particularly in consumer transactions  so the above limitations or  exclusions may not apply to yo
13. led with no more than 48    between each fastener    Now set bearing brackets against the plumb lines and attach  brackets securely to the track and wall     Plumb Line      1    Bearing      Bracket                Splice   je    m m    Hracket   Tin     Lower      Vertical Track         Figure 9b    STEP 11 TOP BRACKETS    Place top section in position  With rollers inserted in the  sleeves of top roller brackets  bolt brackets to section  through holes provided  utilizing self tapping screws  Adjust  bracket slide so top section is perfectly vertical and tighten  adjusting bolt securely  Attach top leaves of hinges from the  preceding section  Check tracks for proper clearance and  permanently secure all fasteners     Section    Top  Fixture          ie        1     pee    Figure 17    ME rA    Haas Door Commercial Instruction Manual    WARNING     Installing torsion springs can be a dangerous procedure and should only be performed by qualified door service personnel   Do not attempt installation without proper tools and until reading and understanding the following instructions     STEP 12 COUNTERBALANCE INSTALLATION    Determine what type of spring assembly you have as shown in figures 12  13  14 or 15                          Left hand   5    cable drum  red  2 Bearing Bracket      eh  i                 NBN E              I     R W      Center Support    9 spring Bracket  Black    Red Cone             See Figure  16 Wound      If supplied with  black cone  mount opposite
14. n so the slide bolt rests against the top of one of the  rectangular engaging slots in the vertical track  see Figure 7    If door is supplied with cylinder lock  see page 8     Track       H H  Lock Shown  L H  Opposite    Figure f    STEP 8 U BAR INSTALLATION    All trusses  u bars  except top section truss are attached with  tech screws below hinges as shown in Figure 8  Top section  truss is located directly above the top roller brackets  secured  at the ends with tech screws  Secure all trusses to center  stiles through existing holes utilizing tech screws    Note  Doors over 14  2  wide require one truss per section     STEP 9 STANDARD LIFT TRACK    Attach bearing brackets to the horizontal angles with 3 8  x  3 4    bolts  amp  nuts  Form rope loops to a convenient overhead  structural member  amp  insert horizontal tracks through them   then attach bottom of the curved portions of track to the top  of the vertical tracks at the splice brackets with 1 4  x 5 8   truss head machine screws  amp  nuts  Head of machine screws  should be to inside of the track  see Figure 9   Using a level   strike a plumb line from the inside of the splice bracket to  the inside of the horizontal angle on each side  Place outside  edges of bearing brackets against the plumb lines and attach  brackets securely to the wall  see Figure 9      4    2012 Haas Door Company    HINGE SCHEDULE                i For For  Figure 6 2  Track   3    Track  E  Top Brackel  l Top  8 Section      Hinge     
15. sections to be free from delamination or rust   through for a period of 10 years to the original purchaser of the building where  the door sections are installed  All other components are warranted to be free  from defects in workmanship and material for a period of one  1  year from date  of installation     This ten year Warranty applies only to steel garage door sections manufactured by Haas Door  Company and components manufactured or supplied by Haas Door Company  The warranty  excludes   1  Sections and or component parts which have been damaged due to misuse   2   Sections and or components which have been improperly installed  maintained or operated   3   Sections and or components that have been damaged due to accident   4  Sections and or  components that have been damaged due to exposure to salt environments including coastal  areas  corrosive fumes chemicals  alkaline cleaning agents  condensation or fire   5  Repair  and or replacement labor charges  including travel cost   6  Cool Black color   7  Damages  resulting from other causes beyond the manufacturers control     In the event any defect is claimed during the warranty periods  a claim in writing must be submitted to  Haas Door Company  directed through an authorized Haas Door Company dealer or installer  This claim  must be submitted within fifteen  15  days of the discovery of the suspected defect  The door and all  components must be available for inspection by an authorized Haas Door Company representat
16. u     TECE THIS WARRANTY IS NOT TRANSFERABLE             Haas       2012 Haas Door Company Door Effective  June 4  2012    Revised  July 12  2012  A ziger Company evised  July 0       
    
Download Pdf Manuals
 
 
    