Home

Institute of Nano Science and Technology

image

Contents

1. S No Description Technical Details 1 Monochromator Double beam double monochromator UV VIS NIR Spectrophotometer must be capable of analyzing in following modes and all the desired accessories needed for the same to be included in the offer 2 Modes Absolute Reflectance at Variable Angles Transmission at Variable Angles Direct Transmission Angular Transmission Absorbance Scattering Glossy Diffuse Transmission and Partial Scattered Transmission If all the above Measurement can be performed without removing the sample from the compartment such system will be preferred 3 Wavelength Range 175 3300 nm With N2 purging below 185 nm 4 Wavelength Better than or equal to 0 08 UV VIS and 0 40 for NIR Accuracy range 5 Wavelength Better than or equal to 0 008 nm for UV VIS range and Reproducibility better than or equal to 0 05 nm for NIR range 6 Source Lamps Tungsten halogen and Deuterium 7 Stray Light Better than or equal to 0 00007 T at 220 nm 10 g l Nal ASTM method and better than or equal to 0 0002 T at 1420 nm with water 8 Resolution Better than or equal to 0 05 nm for UV VIS range Better than or equal to 0 2 nm for NIR range 9 Photometric range Better than or equal to 8A 10 Photometric Better than or equal to 0 00025 A or 0 05 T at 2A with Accuracy NIST filter 930D 11 Optical system Suitable reflecting optical system with high end coating preferably SiO2
2. S No Description Technical Details 1 Measurement type 1 Measurement type Particle size and molecular size 2 Measurement range 0 3 nm 10 0 um diameter 3 Measurement principle Dynamic Light Scattering 4 Minimum sample 12 uL volume 5 Accuracy Better than 2 on NIST traceable latex standards 6 Precision Repeatability Better than 2 on NIST traceable latex standards 7 Sensitivity O 1mg mL Lysozyme 8 Measurement type 2 Measurement type Zeta potential and Protein Mobility 9 Measurement range 3 8 nm 100 um diameter 10 Measurement principle Electrophoretic Light Scattering 11 Minimum sample 150 uL 20 uL using diffusion barrier method volume 12 Accuracy 0 12 um cm V for aqueous systems using NIST SRM1980 standard reference material 13 Sensitivity l1mg mL Lysozyme 14 Measurement type 3 Measurement type Molecular weight 15 Measurement range 980Da 20M Da 16 Measurement principle Static Light Scattering using Debye plot 17 Minimum sample 12 uL 3 5 sample concentrations required volume 18 Accuracy 10 typical 19 Measurement type 4 Measurement type Microrheology optional 20 Measurement principle Dynamic Light Scattering 21 Minimum sample 12 uL DLS measurement only maximum range volume sample dependent 22 Temperature control 0 C 90 C 0 1 C range 23 Light source He Ne laser 633 nm Max 10 mW 24 Laser safety Class 1 25 Software Should be compatible with Windows 7 or higher
3. version with both 32 amp 64 bit operating systems Shifting After 3 4 years instrument should be shifted and reinstallation in main campus free of cost 32 Ref No INST Equip 2013 14 M 09 Technical Specifications for Surface Profiler contact mode S No Description Technical Details 1 Scan length upto 55 mm or higher 2 Sample X Y Stage motion 150 mm or more motorized 3 Theta 360 continuous 4 Step height repeatability 0 6 nm or lower 5 Vertical range 800 um or higher 6 Sample stage Area 200 mm dia or more T Stylus force 1 15 mg or 0 03 mg 15 mg optional 8 Scan speed 10 um sec or better 9 Stylus 2 um Rad or other options 2 Nos as spares 10 Sample viewing Camera with selectable magnification 1 to 4 mm FOV 11 Database software Capable of analysing step height roughness waviness and stress analysis Stitching 3D mode 12 Computer System Branded desktop PC HP Compaq IBM or equivalent with following configurations Processor Core i5 3470 or higher 3 4GB RAM 4GB DDDR3 HDD 1 TB Disks R W DVD OS Windows 7 or higher whichever is compatible Input Devices Keyboard amp Mouse 6 USB ports Minimum Display 21 or larger Screen Graphics NVIDIA 1GB 512MB Dedicated Graphics Optional Warranty 3 Years Onsite 13 Calibration standard Step height standards with calibration certificate by national metrology institu
4. A separate version should be made available for offline processing and analysis of the images on a separate computer along with a standard PC and printer Separate license for analysis of EDS data should be provided for a stand alone PC 15 Accessories required for SEM 1 IR CCD camera for specimen chamber inspection to avoid accident and easy stage navigation 2 Hard panel for adjusting various functions by knob 3 Vibration isolation Active vibration damping system for SEM with pneumatically isolated legs 4 Sputtering Evaporation unit Sputter coater with carbon platinum gold coating facility along with the required target materials 2 each of C Au and Pt targets International branded product 5 Specimen cutting tool precise cutting machine preferably about 4 inch diameter OD low high speed diamond saw for SEM specimen international branded product 6 Specimen grinder lapping system A lapping system for the surface thinning polishing of SEM specimen with auto controlled specimen holder international branded product 7 Electro polishing unit For optical finish flat surface SEM specimen international branded product 42 8 Standard samples for Imaging Au C Sn balls and standard sample for EDS stubs and tweezers and essential tool box 16 Desirable 1 Model details quoted should be available on vendor s website 2 Model should hav
5. Airport Seaport Hence the price should not include the above charges 16 Notices For the purpose of all notices the following shall be the address of the Purchaser and Supplier Any notice given by one party to the other pursuant to this contract order shall be sent to the other party in writing or by cable telex FAX email and confirmed in writing to the other party s address A notice shall be effective when delivered or on the notice s effective date whichever is later Purchaser The Director Institute of Nano Science and Technology Habitat Centre Sector 64 Phase X Mohali 160062 Punjab India Supplier To be filled in by the supplier 17 Resolution of Disputes The dispute resolution mechanism to be applied pursuant shall be as follows i In case of Dispute or difference arising between the Purchaser and a domestic supplier relating to any matter arising out of or connected with this agreement such disputes or difference shall be settled in accordance with the Indian Arbitration amp Conciliation Act 1996 the rules there under and any statutory modifications or re enactments thereof shall apply to the arbitration proceedings The dispute shall be referred to the Director Institute of Nano Science and Technology INST Mohali and if he is unable or unwilling to act to some other person appointed by him willing to act as such Arbitrator The award of the arbitrator so appointed shall be final conclusive and
6. 2 Magnification Range Continuous range from 11x to 179x through eyepieces to be achieved with no alteration in eyepieces or objective lens during operation 3 Motorized Zoom range 20 1 4 Motorized focus range 340 mm step size 0 35 um or better 5 Other motorized Variable speed motorized zoom and motorized focus control with controller units with real time on screen display of all essential working parameters such as total magnification object field Z position depth of field resolution etc 6 Objectives Plan APO 1X 7 High N A 0 25 or higher for maximum brightness and resolution 8 Working Distance 60 mm or higher 9 Eyepiece pair 16x and Field No 16 10 Trinocular details Observation tube Trinocular with inclination 15 degree Light distribution 100 through eyepieces or 100 through camera port 11 Transmitted light stand base with light guide and 2 shiftable and tiltable reflectors for bright field darkfield and variable oblique light 12 Light source 1 Transmitted light source Cold light source up to 9001m light flux or more with minimum 50 000 operating hours until intensity drop to 70 with Day light filter and Halogen light filters 2 Slit ring Epi scopic illuminator with light guide 2000 mm long 13 Episcopic light source Cold light source up to 9001m light flux or more with minimum 50 000 operating hours until intensity drop to 70 with Day light filter and Halogen light filters 14 Reflected and Simul
7. 3 00 000 17 INST equip 2013 14 M 17 Digital DC 21 11 13 21 11 13 Rs 10 000 Source Meter 1200 hrs 1500 hrs Note The Institute shall not be responsible for any postal delay about non receipt non delivery of the bids or due to wrong addressee TERMS AND CONDITIONS Important Conditions of the tender to be abide by the tenderer 1 Due date The tender has to be submitted before the due date The offers received after the due date and time will not be considered 2 Preparation Bids The offer bid should be submitted in two bid systems i e Technical bid and Financial bid The technical bid should consist of all technical details along with commercial terms and conditions Financial bid should indicate item wise price for the items mentioned in the technical bid The Technical bid and the financial bid should be put in separate covers and sealed Both the sealed covers should be put into a bigger cover along with letter of EMD and to be sealed The tender number and details should be superscripted on the left side of the outer cover The Quotations should be valid for 120 days from the due date The Quotations duly sealed and super scribed on the envelope with the reference No and due date should be addressed to The Director Institute of Nano Science and Technology Habitat Centre Sector 64 Phase X Mohali 160062 Punjab India so as to reach on or before the due date 3 Delivery of the tender Th
8. to the Supplier terminate the Contract in whole or part i If the Supplier fails to deliver any or all of the Goods within the period s specified in the order or within any extension thereof granted by the Purchaser or ii Ifthe Supplier fails to perform any other obligation s under the Contract iii If the Supplier in the judgment of the Purchaser has engaged in corrupt or fraudulent practices in competing for or in executing the Contract For the purpose of this Clause a Corrupt practice means the offering giving receiving or soliciting of anything of value to influence the action of a public official in the procurement process or in contract execution b Fraudulent practice means a misrepresentation of facts in order to influence a procurement process or the execution of a contract to the detriment of the Purchaser and includes collusive practice among Bidders prior to or after bid submission designed to establish bid prices at artificial non competitive levels and to deprive the Purchaser of the benefits of free and open competition In the event the Purchaser terminates the Contract in whole or in part the Purchaser may procure upon such terms and in such manner as it deems appropriate Goods or Services similar to those undelivered and the Supplier shall be liable to the Purchaser for any excess costs for such similar Goods or Services However the Supplier shall continue the performance of t
9. binding on all parties to this order ii In the case of a dispute between the purchaser and a Foreign Supplier the dispute shall be settled by arbitration in accordance with provision of sub clause a above But if this is not acceptable to the supplier then the dispute shall be settled in accordance with provisions of UNCITRAL United Nations Commission on International Trade Law Arbitration Rules iii The venue of the arbitration shall be the place from where the order is issued 18 Jurisdiction amp Applicable Law Any legal disputes arising out of any breach of contract pertaining to this tender shall be settled in the court of competent jurisdiction located within Mohali The Contract shall be interpreted in accordance with the laws of the Union of India and all disputes shall be subject to place of jurisdiction i e Mohali Punjab INDIA 19 Defective Equipment If any of the equipment supplied by the Tenderer is found to be substandard refurbished un merchantable or not in accordance with the description specification or otherwise faulty the Director will have the right to reject the equipment or its part The prices of such equipment shall be refunded by the Tenderer with 18 interest if such payments for such equipment have already 7 been made All damaged or unapproved goods shall be returned at suppliers cost and risk and the incidental expenses incurred thereon shall be recovered from the supplier Defective part in eq
10. length approx 300 mm chamber volume approx 2 61 5 Standard electrode Aluminium stainless steel outside the chamber 6 Control PCCE control PC integrated 7 Generator 40 kHz 0 100 W 8 Pressure sensor Pirani pressure sensor incl power supply 9 Optional Tray Sodium lime glass Vacuum pump Suction power 1 3 m3 h Quartz glass chamber Ref No INST Equip 2013 14 M 02d Technical Specifications for syringe pump system S No Technical Description Qty 1 Base module V2 power supply 120 W power amp USB cables 1 documentation in English 2 User Interface operating software for syringe pumps software amp 1 documentation in English 3 Low pressure module V2 with valve and 14 1 gear without 3 trigger interface documentation in English 4 High precision glass syringe 2 5ml with Tubing Connector 1 4 4 28 UNF thread 60 mm scale length 5 High precision glass syringe 5 ml with Tubing Connector 1 4 28 4 UNF thread 60 mm scale length 6 High precision glass syringe 10 ml with Tubing Connector 1 4 4 28 UNF thread 60 mm scale length 7 Connection kit for glass syringes with tubing connector 1 4 28 16 UNF thread 4 nuts washers ETFE tubing ID 0 8 mm OD 1 6 mm Shifting After 3 4 years instrument should be shifted and reinstallation in main campus free of cost 20 Ref No INST Equip 2013 14 M 03 Technical Specifications for UV VIS NIR Spectrometer
11. need for any manual measurements or manual mirror adjustments Polarizer and Depolarizer drive Accessory to measure the s and p polarized light 24 Optional Quote should also be submitted separately for Lamps 22 accessories Tungsten halogen and Deuterium lamps 2 Nos each 25 Manuals Mainten ance The following manuals in English should be supplied free of cost along with the system Detailed user instruction manual operation instruction manual troubleshooting manual CDROM tutorials for Spectrophotometer Automated reflectance accessory and integrating sphere attachment Detailed circuit and fault diagnostic software detailed circuit diagram of the equipment Spectrophotometer maintenance and service manual The supplier shall provide uninterrupted supply of spares and accessories for a period of 03 years after warranty 26 Up gradation The supplier shall supply any software for spectrophotometer and automatic reflectance accessory whenever they are upgraded at free of cost 27 Application Note The supplier shall provide detailed application notes of spectrophotometer and notes Various Transmission and reflectance accessory in hard and soft copies Shifting After 3 4 years instrument should be shifted and reinstallation in main campus free of cost 23 Ref No INST Equip 2013 14 M 04 Technical Specifications for Double Beam UV Visible Spectrop
12. stand with faraday cage computer controlled stirring amp purging Optional techniques In situ spectroscopy Transmission mode and Reflection mode RDE control 0 10V output w Compliance Voltage 13 V or better Maximum current 250 mA or better 34 5 Output Voltage 10 V or better Range 6 Smallest Current 25 A or better in more than seven ranges Range 7 Resolution of applied 0 0015 or better of potential range potential 8 Resolution of 0 0015 or better of measured range measured potential 9 Accuracy of applied 0 2 or better of the current range current 10 Measured current 0 30 fA minimum resolution 11 Potentiostat Rise fall lt lus Time 12 Gain bandwidth 1 MHz range of amplifier 13 Bandwidth of gt 4 MHz electrometer 14 Input bias current lt 20 pA 15 Computer System Branded desktop PC HP Compaq IBM or equivalent with following configurations Processor Core i5 3470 or higher 3 4GB RAM 4GB DDDR3 HDD 1 TB Disks R W DVD OS Windows 7 or higher whichever is compatible Input Devices Keyboard amp Mouse 6 USB ports Minimum Display 21 or larger Screen Graphics NVIDIA 1GB 512MB Dedicated Graphics Optional Warranty 3 Years Onsite Shifting After 3 4 years instrument should be shifted and reinstallation in main campus free of cost 35 Ref No INST Equip 2013 14 M 11 Techni
13. 254 302 365 mm illuminator 6 Image capture gt 4 mb 16 bit 7 USB Port and CD Drive for DATA transfer 8 Set of Extra UV Visible Lamps 9 UV protective window 10 Amter filter for applications of ethidium bromide SYBR Green SYBR gold and rhodamine etc 11 Branded state of art Desktop PC from a reputed make with a latest processor at least Core i5 or above LED monitor 19 or bigger size 4 GB RAM and 500 GB hard disk and preloaded with latest operating system software 12 Software for densitometry of 1 D 2 D gets blot colony counting and other applications Software compatibility Windows 7 or higher and other recent compatible common programmes 13 List of required spares consumables may be quoted separately Shifting After 3 4 years instrument should be shifted and reinstallation in main campus free of cost 38 Ref No INST Equip 2013 14 M 14 Technical Specifications for Glove Box S No Description Technical details 1 Inner Dimensions 900 mm x 1200 mm x 780 mm H x L x D 2 Material of Stainless Steel construction 3 Windows Polycarbonate thickness of 10 mm Special coating for chemical and scratch resistance 4 Dust filter 0 3 Micron Class H 13 One Inlets outlets filter 5 Shelves Stainless Steel 1000 mm length 220 mm depth 03 6 Gloves Two Glove ports 220 mm diameter polymer type solvent and rust resistance Gloves of Butyl Type thickness 0 4 mm or bett
14. Institute of Nano Science and Technology Habitat Centre Sector 64 Phase X Mohali 160062 Punjab India Ph 91 172 2210073 75 Fax 91 172 2211074 E mail ID purchase inst ac in NOTICE INVITING TENDER INST invites tender from the reputed manufacturers or their authorized dealers so as to reach this office on or before scheduled date and time for the instrument as per specifications given in the Annexure attached to the Tender form All offers should be made in English and should be written in both figures and words Tender forms can be downloaded from the website www inst ac in of the Institute The bidders are requested to read the tender document carefully and ensure compliance with all specifications instructions herein Non compliance with specifications instructions in this document may disqualify the bidders from the tender exercise The Director reserves the right to select the item in single or multiple units or to reject any or all quotation s without assigning any reason Incomplete tenders amendments and additions to tender after opening or late tenders are liable to be ignored and rejected S No Ref No Instrument Tender Tender EMD submission opening 1 INST equip 2013 14 M 01 Fluorimeter 18 11 13 18 11 13 Rs 20 000 1200 hrs 1500 hrs 2 INST equip 2013 14 M Microfluidics 18 11 13 18 11 13 Rs 50 000 02a Optical 1200 hrs 1500 hrs M
15. ate the bidder on a regular basis with technology product updates and extend support for the warranty as well iii OEM should be internationally reputed Branded Company iv Non compliance of tender terms non submission of required documents lack of clarity of the specifications contradiction between bidder specification and supporting documents etc may lead to rejection of the bid v Either the Indian agent on behalf of the Principal OEM or Principal OEM itself can bid but both cannot bid simultaneously for the same item product in the same tender If an agent submits bid on behalf of the Principal OEM the same agent shall not submit a bid on behalf of another Principal OEM in the same tender for the same item product 7 EMD The tenderer should submit an EMD amount along with the tender by way of Demand Draft BG Banker s Pay Order drawn in favour of Institute of Nano Science and Technology Mohali and payable at Chandigarh Mohali from any nationalized bank valid for six months The Technical Bid without EMD would be considered as UNRESPONSIVE and will not be accepted The EMD will be returned without any interest to the unsuccessful bidders immediately after the award of contract 8 Refund of EMD The EMD will be returned to unsuccessful Tenderer only after the Tenders are finalized In case of successful Tenderer it will be retained till the successful and complete installation of the equipment 9 Performance Sec
16. c to the instrument attached Does the instrument comply with all the specifications detailed Attach a separate sheet showing compliance with the specifications and explanations thereto if the equipment varies from the requested specifications Whether free Installation Commissioning and Application Training offered 10 Whether Three years comprehensive onsite extended warranty offered 11 Whether Annual maintenance after expiry of comprehensive onsite warranty quoted separately 12 Whether free of cost shifting of instrument from transit campus to main campus offered 15 ANNEXURE Ref No INST Equip 2013 14 M 01 Technical Specifications for Fluorescence Spectrophotometer S No Description Technical Specification 1 Source Xenon steady state lamp 450 W 2 Monochromator Czerny Turner or equivalent and double monochromator on the excitation side 3 Grating Excitation 1200 lines mm blazed at 340 nm Emission 1200 lines mm blazed at 500 nm 4 Detectors High performance PMT preferably thermoelectric cooled to minimize dark current The spectrometer should be equipped with a reference photodiode to monitor excitation lamp intensity fluctuations 5 Spectral 1 5 to 10 nm continuously variable and computer bandwidth controlled 6 Wavelength 240 to 900 nm or better Xe lamp has no output near 200 range nm T Waveleng
17. cal Specifications for Bio Safety cabinet S No Technical Description 1 Cabinet should be class II type A2 suitable for work with microorganisms assigned to biological safety levels I II or II Should be complete with a germicidal UV lamp fluorescent lamp one electrical outlet and a support stand with leveling feet or castors 2 Microprocessor controller with LCD display efficient air velocity control facilities with UV and fluorescent lamps and timer and filter replacement warning lamp 3 With standard facilities including air and gas cock vacuum tap and power console 4 Main body should be made of SS 304 grade Heavy gauge 16 G Table top and working zone should be made of SS 304 grade Heavy gauge 14 G amp 16 G 5 Table top should be in two parts a Front perforated portion 4 in size b Non perforated working zone Table sunken type trough type for spillage management that can be lifted easily for cleaning below the table 6 Sliding tempering safe glass door ensuring silent noise free operation lt 63 5 dBA according to NSF amp according to EN 12469 lt 60 5 dBA and vibration free 7 Work Area should be approximately 1200 x 600 x 600 mm 4 feet in size with shutter opening of 489 mm 8 Overall Size of the cabinet should be approximately 1300 x 825 x 2450 mm 9 Air Flow should be vertical down flow with 100 exhaust 10 Cleanliness level should be less t
18. cate issued by the nominated inspection agency if any and the vii Supplier s factory inspection report and viii Certificate of Origin ix Two copies of the packing list identifying the contents of each package x The above documents should be received by the Purchaser before arrival of the Goods except where the Goods have been delivered directly to the Consignee with all documents and if not received the Supplier will be responsible for any consequent expenses 14 Delayed delivery If the delivery is not made within the due date for any reason the Director will have the right to impose penalty 1 per week and the maximum deduction would be 10 of the contract value price 15 Prices The price should be quoted in net per unit after breakup and must include all packing and delivery charges The offer bid should be exclusive of taxes and duties which will be paid by the purchaser as applicable However the percentage of taxes amp duties shall be clearly indicated The price should be quoted without custom duty and excise duty since INST is exempted from payment of Excise Duty and is eligible for concessional rate of custom duty Necessary certificate will be issued on demand In case of import supply the price should be quoted on FOB Basis Also please indicate CIF charges separately upto New Delhi indicating the mode of shipment INST will make necessary arrangements for the clearance of imported goods at the
19. coated with holographic grating monochromator with not less than 1200 lines mm blazed at UV VIS and 300 lines mm_ blazed in NIR regions System should come with lit row mounting with pre aligned tungsten halogen and deuterium sources 12 Sample type Suitable for measuring the reflectance transmittance and absorbance of bulk samples thin films liquid samples 13 Sample Large enough to accommodate accessories required for compartment analysis 14 Modes Scan Time Drive Wavelength program Concentration Calibration Concentration 15 Detectors Photomultiplier R928 and Peltier cooled PbS detectors for UV VIS and NIR range respectively or better detectors 21 16 Baseline Flatness Better than or equal to 0 00007A from 200 3000 nm 2 nm slit 17 Noise Level UV VIS Better than or equal to 0 000050 A RMS at 500 nm OA better than or equal to 0 001 A RMS at 500nm 4A better than or equal to 0 0001 A RMS at 190 nm OA 18 Noise Level NIR Better than or equal to 0 00004 A RMS at 1500 nm OA better than or equal to 0 001 A RMS at 1500nm 2A better than or equal to 0 007 A RMS at 1500 nm 3A 19 Computer System Branded desktop PC HP Compaq IBM or equivalent with following configurations Processor Core i5 3470 or higher 3 4GB RAM 4GB DDDR3 HDD 1 TB Disks R W DVD OS Windows 7 or higher whichever is compatible Input Devices Keyboard amp Mouse 6 USB ports Mini
20. d Ref No INST Equip 2013 14 M 02b Technical Specifications for High speed camera S No Technical Description 1 The camera should be portable and should have mobile use 2 At full resolution recording time up to 55 mins at 250 fps at 280 x 1024 should be possible 3 It should be capable of capturing high frame rate upto 35000 fps at reduced resolution 4 Maximum photo sensitivity in the range of 2 500 ASA monochrome 2 000 ASA RGB 5 Stepless adjustable frame rate up to 35 000 frames per second at reduced resolution should be possible 6 Lossless recording without compression T Windows 7 or higher version based Director2 operator software 8 Image storage in various formats such as BMP JPG TIFF AVI DNG and PNG should be provided 9 Quad Mode 4 x speed or recording time should be possible 10 It should be capable of performing motion analysis and flow behaviour of liquids and gases in microfluidics research 11 One inch C mount adapter for integration with the optical microscope 19 Ref No INST Equip 2013 14 M 02c Technical Specifications for Plasma system S No Description Technical Details 1 Basic unit W 425 mm D 450 mm H 185 mm 2 Gas supply Gas 2 pcs MFCs channel 3 Connections 230 V 16 A tube 4 mm inside and 6 mm outside 4 Vacuum chamber Round borosilicate glass cap approx 105 mm Recipient
21. dge Filament 2 Objective Aperture 5 position click stop objective aperture 3 Detectors Chamber mounted Everhart Thornley Secondary electron Back scattered electron retractable Specimen current monitor 4 Analytical Position WD 10 mm 9 Image display Standard Dual live image Digital Zoom Dual magnification 10 Image format BMP JPG amp TIFF 11 Operation Control Should have capability for control through wireless mode LAN dedicated PC IPad Total control panel should be touch panel supported 12 Desired features Model should have standby mode safety mode Safety measures custom recipe Image regeneration beam blanking auto contrast auto stigma auto gun alignment amp biasing single switch for Low Vacuum High Vacuum switch over 13 EDS Optional 1 LNo2 free SSD Si drift detector 2 Detector range From Be U 41 3 Detector resolution 123 eV or better 4 30 mm detector 5 Software for quantitative and qualitative elemental analysis X ray mapping capability for spectrum analysis Digital control for the beam for composition profile Phase mapping Peak deconvolution Element to phase map and phase map to element map Drift correction facility 14 Microscope controlling software Electron microscope should be completely digital controlled with capability of controlling basic microscope operation as well as EDS from separate platforms
22. e capability for upgradability with EBSD 3 Upgrade of software has to be supplied free of cost as and when it is upgraded for 10 years after the SEM supply 17 Installation and commissioning The manufacturer should undertake to install and commission the equipment and all attachments accessories and also demonstrate the performance guaranteed as per specifications at site The main system as well as other accessories should run on 220 V 50 Hz single phase AC power supply Only ordinary electrical points will be provided and rest of the connections cables has to be provided by the supplier Vendor has to provide pre installation requirements before supply 18 Spare parts Recommended set of spares and consumables for five years of operation may be quoted as optional items Those spares consumables which are not recommended will be considered as the spares consumables within the warranty period even after the expiry of warranty 19 Computer System Branded desktop PC HP Compaq IBM or equivalent with following configurations Processor Core i5 3470 or higher 3 4GB RAM 4GB DDDR3 HDD 1 TB Disks R W DVD OS Windows 7 or higher whichever is compatible Input Devices Keyboard amp Mouse 6 USB ports Minimum Display 21 or larger Screen Graphics NVIDIA 1GB 512MB Dedicated Graphics Optional Warranty 3 Years Onsite 20 Guarantee warranty The entire equipment must hav
23. e is lower than 30 SO 6 Easy storage gt 500 and transfer protocols among cyclers using a USB storage device Temperature range 4 C to 99 C Block uniformity 0 5 C Heated lid temperature 100 C to 110 C 10 Temperature accuracy 0 5 C 11 Ramp rate Maximum heating rate upto 4 C sec and Max cooling rate upto lt 3 C sec 12 Maximum gradient 30 C 13 Gradient range 20 C to gt 70 C 14 Alphanumeric LCD Display with touch screen 15 Option of using instrument through PC 16 Auto restart facility with user defined time interval if power fails and resumes 17 System should be CE and ISO certified 18 Should have PCR license and authorization for usage in research and diagnostics applications 19 List of required spares consumables may be quoted separately Shifting After 3 4 years instrument should be shifted and reinstallation in main campus free of cost 37 Ref No INST Equip 2013 14 M 13 Technical Specifications for Gel Documentation System S No Technical Description 1 Gel documentation system simple to operate user friendly and ultra high sensitivity for chemiluminiscence Fluorescence 2 With high resolution CCD Camera lt 4 megapixels amp pixel size HxV 4 65 x 4 65 pm 3 Motorized Zoom Lens with F 1 2 12 5 75 mm lens with broad range amber filter 4 Ultrathin white light transilluminator 5 UV white light epillumination with
24. e tender shall be sent to the addressee mentioned in the para 2 above either by post or by courier so as to reach our office before the due date specified in our Schedule The offer bid can also be dropped in the tender box on or before the due date specified in the schedule The tender box is kept in Foyer area of INST The institute will not take any responsibility for any postal delay 4 Opening of the tender The offer bid will be opened by a committee duly constituted for this purpose The technical bid will be opened first and it will be examined by a technical committee which will decide the suitability as per our specification and requirement The financial offer bid will be opened only for the offer bid which technically meets all our requirements as per the specification The bidders if interested may participate on the tender opening Date and Time The bidder should produce authorization letter from their company to participate in the tender opening Only one representative will be allowed to participate in the tender opening 5 Acceptance Rejection of bids The Director reserves the right to reject any or all offers without assigning any reason 6 Pre qualification criteria i Bidders should be the manufacturer authorized dealer Letter of Authorization from original equipment manufacturer OEM on the same and specific to the tender should be enclosed ii An undertaking from the OEM is required stating that they would facilit
25. e warranty for free repairs and replacement for a period of 36 months from the date of installation and commissioning 21 Training Onsite training to the researchers by the company person in for two weeks immediately after commissioning of the equipment 43 22 Annual maintenance AMC for a period of four years beyond warranty contract The quote should specify the response time for call and spare parts Spare should be available for ten years Please also quote optionally AMC covering replacement of parts 23 Uninterrupted power Online UPS 7 5 KVA for the power back up of supply UPS the system for at least one hour compatible with the SEM and the peripherals branded products Shifting After 3 4 years instrument should be shifted and reinstallation in main campus free of cost 44 Ref No INST Equip 2013 14 M 16 Technical Specifications for Confocal Raman Microscope S No Feature Details 1 Raman Spectral Imaging Acquisition of complete Raman spectra at every pixel mapping Acquisition of Raman spectra at selected area Micro Raman Raman Microscopy imaging at fixed wave numbers at least 1024 x 1024 pixels Resolution 0 5 cm Confocal microscopy in reflection on backscattering mode and if possible coupling to an inverted geometry Confocal fluorescence imaging Optical resolution diffraction limited lateral type 25 nm amp 532 n
26. er 7 Sensors Automatic pressure sensors adjustable range 15 mbar to 15 mbar near transfer chamber 8 Components amp Foot pedal water proof for under and over Controls pressure adjustment stand castor wheels and levelling feet Box light with fluorescent lamp top mounted 9 Antechamber Material Stainless steel thickness 2 5 mm With Cylindrical 390 sliding stainless steel tray Doors of SS thickness mm diameter 10 mm 4 flat Inside surface brushed finish Length 600 mm Outside surface coated grey 10 Door lock Spindle lock type fitted with pressure gauge manometer display Antechamber 150mmx400mm sliding tray hinged doors 1 3r4 inside and 2 3 4 outside Vacuum and pressure gauge fitted 11 Automatic Single filter purifier re generable regeneration Capacity oxygen removal 36 litres Moisture removal 1300 grams of H20 Attainable purity lt 1 ppm H20 and lt 1 ppm O2 Fully automated regeneration programme Inbuilt heat exchanger with suitable re circulator Integrated blower vacuum tight oil free flow rate 88m3 h at A 60mbar 60Hz Rotary vane pump oil mist filter Oil recirculation Automatic gas ballast control 12m3 h dual stage Valves should be electro pneumatic Solid state oxygen sensor 0 1000 ppm Solid state moisture sensors 0 500 ppm Solvent adsorption system with activated charcoal 5 kg Optional refrigerator with three tray 35 C 39 Micro controller system control with co
27. h resolution FTIR system should be fully PC software controlled The system should be having at least two external ports for coupling to auxiliary units or other instruments System should have facilities to upgrade with GC Raman microscope attachment for FTIR imaging 2 Spectral range 8000 350 cm upgradable to FIR amp NIR quote separately 3 Wavenumber At least 0 02 cm at 2000 cm accuracy 4 Wavenumber At least 0 009 cm at 2000 cm precision 5 Resolution 0 5 cm or better 6 Beam splitter KBr beam splitter Upgradeable with beam splitter change covering range from FIR to NIR point 2 above 7 Signal to noise 50 000 1 peak to peak 4 cm resolution 1 minute ratio accumulation or more 8 Interferometer Michelson interferometer with advanced dynamic alignment system for fast scanning self compensating 9 Spectrometer Enclosure sealed and desiccated 10 Detector High sensitive temperature stabilized DLATGS DTGS detector 11 Optics Optics Gold coated silver coated quote separately 12 Atmospheric System should have minimized effect of atmospheric water compensation and carbon dioxide etc on the sample spectra without the need for reference or calibration spectra should be purgeable with dry nitrogen gas in different compartments especially the sample compartment and the detector compartment 13 Accessories a Demountable cell with should be CaF2 or ZnSe windows windows for liquid samples also the pathlength
28. han 3 5 particles ltr of 0 5 um and larger ISO 14644 1 11 High capacity centrifugal fans for impulsion and exhaust 12 Cabinet should have light Intensity gt 1400 Lux 13 Cabinet controls Microprocessor based touch pad controls 14 UV interlock system to protect the operator in case of accidental raising of front sliding window 15 Should have Ergonomically Sloped front 16 Downflow and Exhaust Filters HEPA ULPA filters with integral metal guards and filter frame gaskets 17 The manufacturer must undertake to supply of spares and consumables for at least 03 years from the date of supply Shifting After 3 4 years instrument should be shifted and reinstallation in main campus free of cost 36 Ref No INST Equip 2013 14 M 12 Technical Specifications for Polymerase Chain Reactor PCR S No Technical Description 1 System should have Universal block for 96 wells x 0 2 ml tube strips or 96 well plate with interchangeable block design 2 x 48 well and 384 well block for variable reaction volumes 2 Accuracy and uniformity of 0 2 C for non gradient protocols and 0 3 C for gradient protocols Should be capable to produce high temperature ramp rates to shorten the time to reach target temperature Heating and cooling via peltier technology 4 Oil free heated lid with adjustable pressure Lid heating should automatically turn off if block temperatur
29. he Contract to the extent not terminated 12 37 Compliancy certificate This certificate must be provided indicating conformity to the technical specifications 38 Acknowledgement It is hereby acknowledged that we have gone through all the conditions mentioned above and we agree to abide by them SIGNATURE OF TENDERER ALONG WITH SEAL OF THE COMPANY WITH DATE 13 BID PARTICULARS Name of the Supplier Address of the Supplier Availability of demonstration of equipment Yes No EMD enclosed Yes No If Yes D D No Bank Amount Name and address of the Officer contact person to whom all references shall be made regarding this tender enquiry Name Address Phone Fax Mobile Email Web 14 Compliance statement for the tender specifications Ref No S No Check list of documents Undertakings Yes No Remarks give explanation if the answer is No Is EMD attached if applicable Is the bidder original equipment manufacturer OEM authorised dealer If authorised dealer recent dated certificate to this effect from OEM attached or not Undertaking from OEM regarding technical support amp extended warranty period Validity of 120 days or not Undertaking from bidder regarding acceptance of tender terms amp conditions Whether list of reputed users along with telephone numbers of contact persons for the past three years specifi
30. hotometer S No Description Technical specifications 1 Photometric System Double beam optics 2 Photometric Accuracy 0 003 Abs at 1 0 Abs 0 002 Abs at 0 5 Abs 3 Photometric 0 001 Abs at 1 0 Abs 0 001 Abs at 0 5 Abs Repeatability 4 Wavelength Range 190 to 900 nm or better 5 Wavelength Accuracy 0 1 nm or better 6 Wavelength 0 1 nm or better Repeatability 7 Photometric range Up to 5 Abs or better Transmittance Reflectance O to 999 or better 8 Spectral Bandwidth Variable from 0 1 to 5 nm or better 9 Resolution 0 1 nm 10 Wavelength Scan Up to 4000 nm min or better Speed 11 Noise level 0 00003 Abs RMS 500 nm or better 12 Stray light 0 005 at 220 nm 340 nm amp 370 nm or lesser 13 Monochromator Single Double with Czerny Turner mounting Blazed Holographic grating 14 Detector Photomultiplier 15 Light source Tungsten and Deuterium lamp with automatic switching 16 Baseline stability 0 0002 Abs h or lesser 17 Baseline flatness 0 0003Abs or lesser 18 Quartz Cuvette 1 ml and 0 5 mL capacity 10 mm path length 02 pairs each 19 Automatic Linear Cell At least Six Samples and one reference cell holder Changer 20 Software Original licensed Windows based Operating software in the form of CD ROM should have built in features like real time concentration display Time scan Photometric mode Single multi wavelength Enzyme Kinetics ca
31. icroscope INST equip 2013 14 M Camera Rs 10 000 02b INST equip 2013 14 M Plasma Cleaner Rs 15 000 02c INST equip 2013 14 M Syringe pump Rs 15 000 02d 3 INST equip 2013 14 M 03 UV VIS NIR 18 11 13 18 11 13 Rs 70 000 1200 hrs 1500 hrs 4 INST equip 2013 14 M 04 UV VIS 18 11 13 18 11 13 Rs 20 000 1200 hrs 1500 hrs 5 INST equip 2013 14 M 05 FTIR 19 11 13 19 11 13 Rs 75 000 1200 hrs 1500 hrs 6 INST equip 2013 14 M 06 TG DTA 19 11 13 19 11 13 Rs 40 000 1200 hrs 1500 hrs 7 INST equip 2013 14 M 07 DSC 19 11 13 19 11 13 Rs 40 000 1200 hrs 1500 hrs 8 INST equip 2013 14 M 08 Particle size 19 11 13 19 11 13 Rs 80 000 Analyser 1200 hrs 1500 hrs 9 INST equip 2013 14 M 09 Surface profiler 19 11 13 19 11 13 Rs 50 000 1200 hrs 1500 hrs 10 INST equip 2013 14 M 10 Electrochemical 20 11 13 20 11 13 Rs 50 000 workstation 1200 hrs 1500 hrs 11 INST equip 2013 14 M 11 Biosafety cabinet 20 11 13 20 11 13 Rs 15 000 1200 hrs 1500 hrs 12 I PCR 20 11 13 20 11 13 Rs 20 000 NST equip 2013 14 M 12 1200 hrs 1500 hrs 13 INST equip 2013 14 M 13 Gel doc 20 11 13 20 11 13 Rs 10 000 1200 hrs 1500 hrs 14 INST equip 2013 14 M 14 Glove box 20 11 13 20 11 13 Rs 25 000 1200 hrs 1500 hrs 15 INST equip 2013 14 M 15 SEM 21 11 13 21 11 13 Rs 1200 hrs 1500 hrs 2 00 000 16 INST equip 2013 14 M 16 Confocal Raman 21 11 13 21 11 13 Rs 1200 hrs 1500 hrs
32. ification to the Purchaser of the pending termination in sufficient time to permit the Purchaser to procure needed requirements and 9 iv Following such termination furnishing at no cost to the Purchaser the blueprints drawings and specifications of the spare parts if requested Supplier shall carry sufficient inventories to assure ex stock supply of consumable spares for the Goods such as gaskets plugs washers belts etc Other spare parts and components shall be supplied as promptly as possible but in any case within six months of placement of order 29 30 31 32 Application Specialist The Tenderer should mention in the Techno Commercial bid the availability and names of Application Specialist and Service Engineers in the nearest regional office Shifting After 3 4 years once our new building is ready the supplier has to shift and reinstall the instrument free of cost Insurance For delivery of goods at the purchaser s premises the insurance shall be obtained by the Supplier in an amount equal to 110 of the value of the goods from warehouse to warehouse final destinations on All Risks basis including War Risks and Strikes The insurance shall be valid for a period of not less than 3 months after installation and commissioning In case of orders placed on FOB FCA basis the purchaser shall arrange Insurance Warranty i The tender must be quoted with 36 months on site comprehensive
33. ing After 3 4 years instrument should be shifted and reinstallation in main campus free of cost 29 Ref No INST Equip 2013 14 M 07 Technical Specifications for the Differential Scanning Calorimeter DSC S No Description Technical details 1 DSC Type Modulated Differential Scanning Calorimeter 2 Measurement Technology Heat Flux Technology Power compensated 3 Software Suitable to run MDSC and analyze the samples 4 DCS cell position Fixed 5 Temperature range 85 C to 700 C or higher with software controlled cooling accessories 6 Cooling system Suitable cooling system electronic liquid N2 cooling should be quoted as optional 7 Cooling options Cooling time 100 C to O C lt 4 minutes 8 Measurement atmosphere Inert Gas or Oxidative 9 Gas flow connections Purge dry and cleaning gas Mass flow controller range 5 ml min to 200 ml min for gas switching 10 Sample pan types Al Pt 11 Time constant Less than 2 seconds 12 Temperature Accuracy 0 2 C or better 13 Temperature precision 0 03 C or better 14 Heating Cooling rates 0 1 to 100 C min or higher 15 Calorimetric Sensitivity 0 2 uW or better 16 Calorimetric reproducibility 1 17 Calorimetric precision 0 1 18 Baseline reproducibility lt 10uW 19 Dynamic range 350 mW 20 DSC Software Capability Software for evaluation of glass transition phenomen
34. jeure event 11 Risk Purchase Clause In event of failure of supply of the item equipment within the stipulated delivery schedule the purchaser has all the right to purchase the item equipment from the other source on the total risk of the supplier under risk purchase clause 12 Packing Instructions Each package will be marked on three sides with proper paint indelible ink the following i Item Nomenclature ii Order Contract No iii Country of Origin of Goods iv Supplier s Name and Address v Consignee details vi Packing list reference number Delivery and Documents Delivery of the goods should be made within a maximum of 08 to 12 weeks from the date of placement of purchase order and the opening of LC Within 24 hours of shipment the supplier shall notify the purchaser and the insurance company by cable telex fax email the full details of the shipment including contract number railway receipt number AAP etc and date description of goods quantity name of the consignee invoice etc The supplier shall mail the following documents to the purchaser with a copy to the insurance company i 4 Copies of the Supplier invoice showing contract number goods description quantity ii unit price total amount iii Acknowledgment of receipt of goods from the consignee s by the transporter 5 iv Insurance Certificate if applicable v Manufacturer s Supplier s warranty certificate vi Inspection Certifi
35. lculation event recording such as Addition of reagents during measurement DNA protein quantification etc 24 21 Accessories a Peltier based temperature controller for sample as well as reference position with temperature range 10 to 60 C or better b Integrating sphere with inner diameter of 60 mm or better for diffuse reflectance of direct powder sample analysis Wavelength range up to 1400 nm or better with built in PMT and InGaAs Detectors Should be able to record spectra in reflectance as well as Transmittance mode c Micro cell 50 uL and 400 uL one pair each with micro cell holder if any d Free Additional Deuterium and Tungsten Lamp 22 Computer System Branded desktop PC HP Compaq IBM or equivalent with following configurations Processor Core i5 3470 or higher 3 4GB RAM 4GB DDDR3 HDD 1 TB Disks R W DVD OS Windows 7 or higher whichever is compatible Input Devices Keyboard amp Mouse 6 USB ports Minimum Display 21 or larger Screen Graphics NVIDIA 1GB 512MB Dedicated Graphics Optional Warranty 3 Years Onsite Shifting After 3 4 years instrument should be shifted and reinstallation in main campus free of cost 25 Ref No INST Equip 2013 14 M 05 Technical Specifications for FTIR spectrometer S No Description Technical Details 1 Basic System Basic system high performance hig
36. lour touch screen monitor 12 Power saving features In built power saving features Auto switch off of vacuum pump when antechamber not in use Automatically reduce increase blower speed based on oxygen and moisture levels Automatic fluorescent light switch off when not in use Shifting After 3 4 years instrument should be shifted and reinstallation in main campus free of cost 40 Ref No INST Equip 2013 14 M 15 Technical Specifications for Low High Vacuum Scanning Electron Microscope S No Description Technical details 1 Resolution 3 0 nm or better in High Vacuum mode at 30 kV and 4 0 nm or better in low vacuum mode 2 Accelerating Voltage 300 V to 30 kV 3 Probe Current Range 1pA to 1 uA or more continuously adjustable for tungsten filament 4 Magnification Minimum 10X to 3 00 000X or better continuous in both high and low vacuum 5 Electron Source Pre centered Tungsten hairpin filament 6 Vacuum System Should give ultra clean dry fast vacuum using air cooled Turbo Molecular Pump Safety measures for electron column against any vacuum failure Variable pressure range for chamber must be at least 270 Pa or more in low vacuum mode 7 Sample stage Stage should accommodate 200 mm size sample X and Y stage motion 100 mm or better Z 40 mm or higher Tilt 10 to 90 Rotation 360 continuous 8 Electron Optics 1 Electron Gun Pre centered Cartri
37. m excitation wavelength Sample Size 120 mm in X and Y direction 25 mm in Height Measurable wavelength range excitation 442 785 nm detecting 150 4000 cm t Optical microscope with 6X turret piezo driven scan platform for sample scanning continuous scan range 150 um or better in X and Y direction with high accuracy Details about accuracy should be provided clearly as application desires high accuracy Video System Eyepiece color video camera Motorized stage open type i e the base is removable for larger samples 2 Stage system for automated approach 30 mm travel single step of 10 nm resolution Manual sampling Position in X and Y direction 20 mm travel gradation 10 um resolution lt 1 um Illumination and control LED white light source for Kohler illumination Digital controller for scanning confocal Raman microscopy System on programmable clip controller with the following feature or better 80 MHz FPGA 32 MB or more SDRAM High speed USB 2 0 Connection Triple D A connecters for scanning in XYZ 1 25 MHz driving frequency FROM 16 Bit 200 KHz A D Convertors for SVM signal at the X Y Z position of the scan stage Three digital outputs for MS applications Two face FPGA slots for future extensions XYZ scan stage with closed loop controlled piezo and capacitive sensors 45 Microscope Z axis control Computer system for control and data acquisition Rama
38. mum Display 21 or larger Screen Graphics NVIDIA 1GB 512MB Dedicated Graphics Optional Warranty 3 Years Onsite 20 Software Original licensed software for the comprehensive operation of the spectrophotometer computer Software for acquiring the optical constants of thin films bulk and liquid samples The software should be embedded in the spectrophotometer control software Latest version of Microsoft Office utility 21 Calibration Accessories standards for calibration of reflectance transmittance and absorbance 22 Support kit Tungsten halogen and deuterium spare lamps 2 Nos each Quartz Cuvette 10 mm path length 3 pairs and solid sample holders for transmittance measurements 23 Accessories Mandatory accessories should be capable of handling following sizes of the samples Sample sizing e Min 5mm x5 mm e Max 20 cm x 20 cm e t max optical 5 mm e t max physical gt 20 mm Variable Angle Transmission Analysis Accessory and accessory for Diffuse Glossy Scattering Automated Absolute Reflectance Accessory For absolute variable angle reflectance measurements of high and low reflectance coatings anti reflection coatings and band pass filters This accessory should have fully automated software controlled provision to select required measurement angles from 8 80 or better covering the measurement in the range of 250 2500 nm or better with Polariser and eliminating the
39. n laser coupler 532 nm and 633 nm spectrometer f 4 300 mm focal length imaging spectrometer with standard SMA FC optical fibre entrance and dual grating turret including 2 gratings with 1800 and 600 lines mm or 5000 650 nm Thermoelectrically cooled CCD camera with Peltier cooling Control Software for the whole system and data analysis with standard features Spectrum to image correlation Cluster analysis Principal component analysis PCA Advance FITTING TOOL Data Binning and reduction Graph De mixture Weighted spectrum substitution Image correlation 2DFFT and advanced filters etc Objective 10 X and 20 X Objective 50 X numerical aperture NA 0 7 working distance mD 1 1 mm Objective 100X numerical aperture NA 0 9 working distance mD 0 31 mm for application from 360 nm to NIR with excellent flatness of field Four additional Analog to Digital convertors Operating Voltage 220 V Warranty Three years from the date of the installation 10 Annual maintenance contract AMC for a period of four years beyond warranty The quote should specify the response time for call and spare parts Spare should be available for ten years Please also quote optionally AMC covering replacement of parts 11 Training Indicate the level of training for local service capability in India and indicate the typical response time for service Shifting After 3 4 years instrument should be shif
40. nd all the other infrastructural requirements needed for the equipment which the Institute should arrange before the arrival of the equipment to ensure its timely installation and smooth operation thereafter The supplier shall visit the Institute and see the site where the equipment is to be installed and may offer his advice and render assistance to the Institute in the preparation of the site and other pre installation requirements 24 Installation amp Demonstration The equipment or machinery has to be installed or commissioned by the successful bidder within 30 days from the date of receipt of the item at INST In case of any mishappening damage to equipment and supplies 8 during the carriage of supplies from the origin of equipment to the installation site the supplier has to replace it with new equipment supplies immediately at his own risk Supplier will settle his claim with the insurance company as per his convenience INST will not be liable to any type of losses in any form The supplier is also required to do the demonstration of the equipment within one month of the arrival at the INST site of installation otherwise the penalty clause will be the same as per the supply of materials 25 Training of Personnel The supplier shall be required to undertake to provide the technical training to the personnel involved in the use of the equipment at the Institute premises immediately after completing the installation of the eq
41. on heats of fusion and reaction melting point and boiling points and specific heat Peak detection and analysis online data acquisition and display of running measurements and calibration storage of both raw DSC data as well as deconvoluted data in the standard DSC curves as well as in the tabular form options for baseline correction data smoothening plot overlay and calculation of results in the real time and view results trends in graphs and tables Temperature modulated software for effective separation of thermodynamic and kinetic processes excellent thermokinetics software for DSC Temperature modulation software to be provided to get reversing and non reversing signals along with automation and Iso step mode 30 21 Computer System Branded desktop PC HP Compaq IBM or equivalent with following configurations Processor Core i5 3470 or higher 3 4GB RAM 4GB DDDR3 HDD 1 TB Disks R W DVD OS Windows 7 or higher whichever is compatible Input Devices Keyboard amp Mouse 6 USB ports Minimum Display 21 or larger Screen Graphics NVIDIA 1GB 512MB Dedicated Graphics Optional Warranty 3 Years Onsite Shifting After 3 4 years instrument should be shifted and reinstallation in main campus free of cost 31 Ref No INST Equip 2013 14 M 08 Technical Specifications for Particle Size Analyzer
42. or higher whichever is compatible Input Devices Keyboard amp Mouse 6 USB ports Minimum Display 21 or larger Screen Graphics NVIDIA 1GB 512MB Dedicated Graphics Optional Warranty 3 Years Onsite Shifting After 3 4 years instrument should be shifted and reinstallation in main campus free of cost 27 Ref No INST Equip 2013 14 M 06 Technical Specifications for Simultaneous TG DTA Unit S No Description Technical Details 1 TG DTA System Simultaneous Thermogravimetry Differential thermal analysis TG DTA measurements High sensitive balance and quick response corrosion resistant alumina furnace 2 Temperature Range Ambient to 1500 C or better 3 Temperature Accuracy 0 5 C or better 4 Heating Rate 0 1 C to 200 C min or better 5 Cooling Rate 0 2 C to 50 C min or 1000 C to 50 C in 20 to 30 min or better 6 Balance Measurement Up to 500 mg or more Range 7 Balance Digital 0 1 pg or better Resolution 8 Balance Sensitivity 1 pg or better 9 Sample Quantity 1 g maximum as gross weight max 20 g 10 DTA Range 1000 uV or better 11 DTA Resolution 0 01 pV or better 12 DTA Noise 1 pV or better 13 Calibration Suitable standards for Temperature calibration to be quoted 14 Sample pans Pt Pans of 60 and 120 uL 06 Nos each Alumina Pans 20 Nos 15 Purge Gases High Purity N2 gas with dual stage gas regulator for Ine
43. r scan application kinetics life time measurements concentration 17 Accessories e Solid liquid sample holder e Peltier controlled cell holder with temp precision of 0 05 deg C min e Micro Plate Reader Accessory coupled to the spectrometer through fiber optics e LC Flow Cell Accessory e Autosampler e Fiber Optic Accessory e Front Face Accessory e Fast Filter accessory e Automated Polarizer Glan Thompson Polarisers both on the excitation and emission sides should be easy to move into and out of the excitation and emission paths Automated anisotropy measurements and G factor correction e Should be upgradable to a time resolved spectrometer 18 Computer Branded desktop PC HP Compaq IBM or equivalent with System following configurations Processor Core i5 3470 or higher 3 4GB RAM 4GB DDDR3 HDD 1 TB Disks R W DVD OS Windows 7 or higher whichever is compatible Input Devices Keyboard amp Mouse 6 USB ports Minimum Display 21 or larger Screen Graphics NVIDIA 1GB 512MB Dedicated Graphics Optional Warranty 3 Years Onsite Shifting After 3 4 years instrument should be shifted and reinstallation in main campus free of cost 17 Ref No INST Equip 2013 14 M 02a Technical Specifications for Motorized High NA On Axis Zoom Microscope S No Description Technical details 1 Zoom design Apochromatic On axis
44. rt Atmosphere and Zero Air with dual stage gas regulator for active atmosphere 16 Gas Flow Control System must be quoted with flow controller for accurate gas control and switching from one gas to another during analysis 17 Computer System Branded desktop PC HP Compaq IBM or equivalent with following configurations Processor Core i5 3470 or higher 3 4GB RAM 4GB DDDR3 HDD 1 TB Disks R W DVD OS Windows 7 or higher whichever is compatible Input Devices Keyboard amp Mouse 6 USB ports Minimum Display 21 or larger Screen Graphics NVIDIA 1GB 512MB Dedicated Graphics Optional Warranty 3 Years Onsite 18 Software Any other software hardware required for safe and auto operation of equipment a Window based software with multitasking capability b Hardware required for safe and auto operation equipment c Software to be provided for thermal analysis e g reaction kinetics Data files can be imported and 28 exported in user friendly format like Excel ASCII d It should have appropriate measurement and analysis software for automatic sample mass detection detection of peak temperature peak areas etc and enthalpy values for weight changes during the sample run 19 Warranty and Annual Maintenance Cost A minimum of three years comprehensive onsite warranty should be provided Annual Maintenance Cost AMC after warranty period should be quoted for 5 years Shift
45. shment i For Indigenous supplies 100 payment shall be made by the Purchaser against delivery inspection successful installation commissioning and acceptance of the equipment at INST in good condition and to the entire satisfaction of the Purchaser and on production of unconditional performance bank guarantee as specified in Clause 9 of tender terms and conditions ii For Imports LC will be opened for 100 FOB CIF value 80 of the LC amount shall be released on presentation of complete and clear shipping documents and 20 of the LC amount shall be released after the installation and demonstration of the equipment at the INST site of installation in faultless working condition for period of 11 60 days from the date of the satisfactory installation and subject to the production of unconditional performance bank guarantee as specified in Clause 9 of tender terms and conditions iii Indian Agency commission IAC if any shall be paid after satisfactory installation amp commissioning of the goods at the destination at the exchange rate prevailing on the date of negotiation of LC documents subject to DGS amp D registration for restricted items iv All the bank charges within India will be borne by the Institute and outside India will be borne by the Supplier 36 Termination for Default Risk Purchase Clause The Purchaser may without prejudice to any other remedy for breach of contract by written notice of default sent
46. should be variable with an assortment of spacers Temperature of the cell should be controllable and should be least be varied from 5 to 95 C preferably using a TE cooled or heating system temperature ramping should be done automatically using the instrument software b Sealed fixed thickness cell of 0 1 mm with windows C Diffuse reflectance accessory for direct powder sample analysis along with powder sample holder quote separately d Multi reflection ATR accessory for aqueous based sample polymer sample etc quote separately 26 Hydraulic press Agate mortar and pestle KBr dice set 15 Tm Pellet holder Polystyrene film with traceable certificate j Automatic component recognition system should have features like automatic accessory recognition once accessory like DRS ATR is mounted in sample compartment and controlled via PC 14 Software Software should have built in spectral search function with different algorithms and should support commercial FTIR database Software should have to be supplied with inbuilt organic inorganic compounds spectra Quote separately for 4000 inorganic and 400 organic samples spectra along with the system Software should have built in validation program 15 Computer System Branded desktop PC HP Compaq IBM or equivalent with following configurations Processor Core i5 3470 or higher 3 4GB RAM 4GB DDDR3 HDD 1 TB Disks R W DVD OS Windows 7
47. t the time of their replacement No claim whatsoever shall lie on the Purchaser for the replaced parts goods thereafter The period for correction of defects in the warranty period is 02 days If the supplier having been notified fails to remedy the defects within 02 days the purchaser may proceed to take such remedial action as may be necessary at the supplier s risk and expenses and without prejudice to any other rights which the purchaser may have against the supplier under the contract 33 Governing Language The contract shall be written in English language English language version of the Contract shall govern its interpretation All correspondence and other documents pertaining to the Contract which are exchanged by the parties shall be written in the same language 34 Agency Commission Agency commission if any will be paid to the Indian agent in Rupees on receipt of the equipment and after satisfactory installation Agency Commission will not be paid in foreign currency under any circumstances The details should be explicitly shown in Tender even in case of Nil commission The tenderer should indicate the percentage of agency commission to be paid to the Indian agent 35 Payment Payment will be made through irrevocable Letter of Credit LC LC will be established in the favour of foreign Supplier after the submission of performance security LC will be established on the exchange rates as applicable on the date of establi
48. taneous usage of both is must Transmitted illumination 15 Camera mounting C mount adapter suitable for 1 Chip option Stage 3 Plates Mechanical Stage with minimum travel 6 x 4 to be used for reflected light or transmitted light application with horizontal coaxial drive 16 Calibration standard Standards with calibration certificate to be provided 18 Others 1 Adequate safety mechanism for protection against collision between lens and sample 2 Preferably single control and display unit for all settings such as illuminations intensity control for reflected light and transmitted light focusing zooming along with the display for all vital parameters like total magnification resolution Depth of field field of view zoom and focus positions light levels etc and provision for data transfer to PC 3 Preferably with 2 objective coded nosepiece for further up gradation 17 Computer System Branded desktop PC HP Compaq IBM or equivalent with following configurations Processor Core i5 3470 or higher 3 4GB RAM 4GB DDDR3 HDD 1 TB Disks R W DVD OS Windows 7 or higher whichever is compatible Input Devices Keyboard amp Mouse 6 USB ports Minimum Display 21 or larger Screen Graphics NVIDIA 1GB 512MB Dedicated Graphics Optional Warranty 3 Years Onsite 18 Software Necessary software for operation and data acquisition analysis and upgradation should be provide
49. te Shifting After 3 4 years instrument should be shifted and reinstallation in main campus free of cost 33 Ref No INST Equip 2013 14 M 10 Technical Specifications for Electrochemical Analyzer Workstation Potentiostat Galvanostat with Windows Based Acquisition Software S No Description Technical Details 1 Techniques Cyclic Voltammetry CV Linear Sweep Voltammetry LSV Staircase Voltammetry SCV Tafel plot TAFEL Chrono Amperometry CA Chrono Coulometry CC Differential Pulse Voltammetry DPV Normal Pulse Voltamemtry NPV Differential Normal pulse Voltamemtry DPNV Square Wave Voltammetry SWV AC Voltammetry ACV Second Harmonic AC Voltammetry SHACV Amperometric i t Curve i t Differential Pulse Amperometry DPA Double Differential Pulse Amperometry DDPA Triple Pulse Amperometry TPA Integrated Pulse Amperometry Detection IAPD Bulk Electrolysis with Coulometry BE Hydrodynamic Modulation Voltammetry HMV Sweep Step Functions SSF Multi Potential Steps STEP AC Impedance IMP 10u Hz 1M Hz Impedance Time IMPT Impedance Potential IMPE Chrono Potentiometry CP Multi Current Steps ISTEP Chronopotentiometry with Current Ramp CPCR Potentiometric Stripping Analysis PSA Open Circuit Potential Time OCPT Galvanostat Full version of CV simulator Impedance Simulator IR Compensation External Potential Input Cell including cell
50. ted and reinstallation in main campus free of cost 46 Ref No INST Equip 2013 14 M 17 Technical Specifications for Digital DC Source Meter S No Description Technical details 1 Current Accuracy a Current Source 1 5fA to 100mA b Current Measure 10aA to 100mA Voltage accuracy a Voltage Source 5 uV to 210 V b Voltage Measure 0 2 uV to 210 V c Minimum compliance value 0 1 of range Pulse mode a Maximum Pulse Width 5ms from 90 rising to 90 falling edge 2 5ms 10A range b Minimum Pulse Width 150 us Sweeps a Standard Linear Staircase and Logarithmic Staircase Sweep b Custom sweep custom point by point user defined sweep c For I V I R V I and V R characterization d Source readback i e when programmed to sweep voltage report back actual measured voltage values instead of programmed Digital I O Interface The digital I O interface to link SMU instrument to many popular component handlers along with trigger link 6 Low noise Triax cables Qty 03 To connect from the source unit to measuring unit with alligator clips 7 Software Relevant software for data analysis Shifting After 3 4 years instrument should be shifted and reinstallation in main campus free of cost 47
51. th 1nm accuracy 8 Wavelength 0 1nm Repeatability 9 Sensitivity greater than 5000 1 based on 5 nm slits excitation and emission and excitation at 350 nm for water Raman at 397 nm 10 Resolution 0 1 nm 11 Wavelength Up to 9000 nm min or better scan speed 12 Standard A single position water thermostatted holder for 10 mm Sample holder cuvettes instead go for a Peltier based cell holder water thermostatted ones can become messy sometimes temperature range of 5 to 105 C Should be equipped with magnetic stirring facility 13 Automatic cell At least 4 position changer 14 Quartz Cuvette Cuvettes 10 sets of 1 mL and 500 uL volume with Teflon tight screw capped 15 Measurements e Fluorescence phosphorescence and bio and chemi mode luminescence measurement modes e Excitation emission constant wavelength synchronous and constant energy synchronous spectral scanning e 3D excitation emission scans 3D synchronous and kinetic scans e Microplate measurements with fixed wavelength wavelength program or automated spectral data collection 16 e TLC plate electrophoresis gel or other flat sample types can be analyzed with our Plate Reader accessory e Single and multiple wavelength kinetics e Simultaneous kinetics for multiple samples 16 Software Software should be User friendly original licensed Windows based operating software in the form of CD ROM it should have built in features like have facility fo
52. uipment for a minimum period of one week at the supplier s cost 26 Manuals and Drawings i Before the goods and equipment are taken over by the Purchaser the Supplier shall supply operation and maintenance manuals These shall be in such details as will enable the Purchaser to operate maintain adjust and repair all parts of the equipment as stated in the specifications ii The Manuals shall be in the ruling language English in such form and numbers as stated in the contract iii Unless and otherwise agreed the goods equipment shall not be considered to be completed for the purposes of taking over until such manuals and drawing have been supplied to the Purchaser 27 Downtime During the warranty period not more than 5 downtime will be permissible For every day exceeding permissible downtime penalty of 1 365 of the 5 FOB value will be imposed Downtime will be counted from the date and time of the filing of complaint with in the business hours 28 Spare Parts The Supplier may be required to provide any or all of the following materials notifications and information pertaining to spare parts manufactured or distributed by the Supplier i Such spare parts as the Purchaser may elect to purchase from the Supplier providing that this election shall not relieve the Supplier of any warranty obligations under the Contract and ii In the event of termination of production of the spare parts iii Advance not
53. uipment if found before installation and or during warranty period shall be replaced within 45 days on receipt of the intimation from this office at the cost and risk of supplier including all other charges In extreme cases black listing of firm can be done on the recommendations of the Director 20 Right to Use Defective Goods If after delivery acceptance and installation and 21 within the guarantee and warranty period the operation or use of the goods proves to be unsatisfactory the Purchaser shall have the right to continue to operate or use such goods until rectifications of defects errors or omissions by repair or by partial or complete replacement is made without interfering with the Purchaser s operation Supplier Integrity The Supplier is responsible for and obliged to conduct all contracted activities in accordance with the Contract using state of the art methods and economic principles and exercising all means available to achieve the performance specified in the contract 22 User list Brochure detailing technical specifications and performance list of industrial and educational establishments where the items enquired have been supplied must be provided 23 Site Preparation The supplier shall inform to the Institute about the site preparation if any needed for the installation of equipment immediately after the receipt of the purchase order The supplier must provide complete details regarding space a
54. urity The supplier shall be required to submit the performance security in the form of irrevocable bank guarantee issued by any Indian Nationalized Bank for an amount of which is equal to the 10 of FOB value within 21 days from the date of receipt of the purchase order and should be kept valid for a period of 60 days beyond the date of completion of warranty period 10 Force Majeure The Supplier shall not be liable for forfeiture of its performance security liquidated damages or termination for default if and to the extent that it s delay in performance or other failure to perform its obligations under the Contract is the result of an event of Force Majeure 13 i For purposes of this Clause Force Majeure means an event beyond the control of the Supplier and not involving the Supplier s fault or negligence and not foreseeable Such events may include but are not limited to acts of the Purchaser either in its sovereign or contractual capacity wars or revolutions fires floods epidemics quarantine restrictions and freight embargoes ii Ifa Force Majeure situation arises the Supplier shall promptly notify the Purchaser in writing of such conditions and the cause thereof Unless otherwise directed by the Purchaser in writing the Supplier shall continue to perform its obligations under the Contract as far as is reasonably practical and shall seek all reasonable alternative means for performance not prevented by the Force Ma
55. warranty guarantee which will commence from the date of the satisfactory installation commissioning of the equipment at the INST against the defect of any manufacturing workmanship and poor quality of the components The Supplier shall in addition comply with the performance and or consumption guarantees specified under the contract If for reasons attributable to the Supplier these guarantees are not attained in whole or in part the Supplier shall at its discretion make such changes modifications and or additions to the Goods or any part thereof as may be necessary in order to attain the contractual guarantees specified in the Contract at its own cost and expense and to carry out further performance tests After the warranty period is over Annual Maintenance Contract AMC Comprehensive Maintenance Contract CMC up to next two years should be started The AMC CMC charges will be included in computing the total cost of the equipment Note If a different period of warranty has been specified in the Technical Specifications then the period mentioned above shall stand modified to that extent 10 ii The Purchaser shall promptly notify the Supplier in writing of any claims arising under this warranty Upon receipt of such notice the Supplier shall immediately within 02 days arrange to repair or replace the defective goods or parts thereof free of cost at the ultimate destination The Supplier shall take over the replaced parts goods a

Download Pdf Manuals

image

Related Search

Related Contents

MODE D`EMPLOI - FO Grand Est  GV-CMS Serie  ABSTRACT RAMACHANDRAN, VINAY. Bryce: An  FluidSIM® 5 Handbuch 11/13  LC-Power 7011B - ATX Classic  ACS v 3.3.0 Release Notes  Azionamento di prova TAPMOTION® TD  1 - Alpine Europe  担当課名 大 分類 中 分類 小 分類 フォルダー名 文書番号 件名  救命艇離脱フック機構の安全性向上に関する調査研究  

Copyright © All rights reserved.
Failed to retrieve file