Home
        Aegis Drum Scale Aegis Drum Scale with Backstop
         Contents
1.              Am  7    E              FAIRBANKS                                  2  CAL     5 5  38 X 38 MILDSTEELPARTS LIST  P N 28723     Section 5 Parts    PARTS LIST      3   1168   8   SCREW CAP 1 220X175         2  4  5        10  11  1  1    17546 CONNECTOR  LIQUID TIGHT    14278 NUT  GLAND               1   BOT 20                   28896 1 LABEL  FAIRBANKS          11175    A               2           LOAD CELL TABLE    PART NO  MODEL NO  CAPACITY LOAD CELL  28746 3200 202 2000 LB 83634    28725 3200 203 2500 LB 83634    28724 3200 201 1000 LB 83634  28723 3200 200 500 LB 63893       SCALE ASSY  DRUM    MILD STEEL   38 x 38  51190 5    08 14 2  51190  Rev 3       Section 5  Parts    bs    5 6  38 X 38 MILDSTEELPARTS DIAGRAM  P N 28723         2   5  w1 00   E1  8   6                              1 zal                    43 62  REF    49 25         GEO CORNER  CORNER       dot NO  2 35 50 REF      BOTTOM VIEW    CENTER ON RAIL       TOP VIEW    DRUM SCALE ASSY  MILD STEEL 38 x 38  51190 6    08 14 28    51190  Rev 3             Am  7    E              FAIRBANKS                       amp             A L P    5 7  38 X38 MILDSTEELPARTS LIST  P N28726     PARTS LIST    ITEM PART NO  DESCRIPTION    WELDMENT  PLATFORM  SEE TABLE BELOW LOAD CELL LC1 LC4  SCREW          1 2 20 X 1 75    Section 5  Parts                8   x 4 69899  4           25   WIRE NUT  CRIMP ON STYLE          WIRE         CRIMP      STYLE    1  1      8   11099 NUT HEX 10 24 55  9  28599    CONNECTOR  L
2.             hua   FAIRBANKS Installation Manual  Wye    Aegis Drum Scale  Aegis Drum Scale with Backstop       5 1190       2008 2014 by Fairbanks Scales  Inc  Revision 3 08 14  All rights reserved                    Revision 1  Revision 2    Revision 3    08 14    07 08  07 08  04 10  08 14    Amendment Record  AEGIS DRUM SCALE    Document 51190    Manufactured by Fairbanks Scales Inc   821 Locust St   Kansas City  Missouri 64106    Created Document    Preliminary Release    Corrected part number on page 29     Added Backstop model    Aegis Stainless Steel Drum Scale  shown  with optional Ramp and Integral Pillar    51190       Rev  3    Disclaimer    Every effort has been made to provide complete and accurate information in this manual  However   although this manual may include a specifically identified warranty notice for the product  Fairbanks  Scales makes no representations or warranties with respect to the contents of this manual  and reserves  the right to make changes to this manual without notice when and as improvements are made     Fairbanks Scales shall not be liable for any loss  damage  cost of repairs  incidental or consequential  damages of any kind  whether or not based on express or implied warranty  contract  negligence  or  strict liability arising in connection with the design  development  installation  or use of the scale        Copyright 2008 2014    This document contains proprietary information protected by copyright  All rights are reserved  no pa
3.   30 x 30 Mild Steel Parts Diagram  p n 28374                                                           24  5 3  30 x 30 Stainless Steel Parts List  p n 28379                                                           25  5 4  30 x 30 Parts Diagram  p n 28379                 26  5 5  38 x 38 Mild Steel Parts List  p n 28723    27  5 6  38 x 38 Mild Steel Parts DIAGRAM  p n 28723     20  5 6  38 x 38 Mild Steel Parts Diagram  p n 28723                                                            29  5 7  38 x 38 Stainless Steel Parts List  p n 28726                                                           30  9 9  Accessory Part              U U Uu U UU LLULLU                                       31    08 14 5 51190  Rev 3    Section 1  General Information    1 1  INTRODUCTION    The Aegis Drum Scale has                     a half inch  1 1      low profile for easy on    and off loading       Threaded half inch  2   holes for  inserting Eyebolts  to make the Platform    easy 10 move  Ultra low profile for easy on  and off loading      Available in Mild Steel and Stainless     Shown with optional Ramp   Steel        Stainless Steel Load Cells        used on all models       However on the Stainless Steel Platform Models  the Load Cells have a   true  hermetically sealed  IP69K  rating  optional on Mild Steel Models       The Aegis Drum Scale is used with either analog or digital weight indicators   e Three inch  3   high Side Rails for pallet weighing        The Platform is sup
4.  Instrument     DO NOT SHOCKLOAD  THE SCALE      True  Hermetically Sealed Load  Cells used on both the Stainless and  Mild Steel models          Prevents problems with accidental  Example of Load Cell from a Mild Steel Scale spills and washdown        08 14 8 51190  Rev 3     lt  Am                Section 1  General Information  TV     12  GEN ERAL SERVICE POLI CY    Prior to installation  always verify  that the equipment satisfies the  customer s requirements as  supplied  and as described in this  manual     If the equipment cannot satisfy  the application and the  application cannot be modified to  meet the design parameters of the  equipment  the installation  should NOT be attempted        Itis the customer operator s responsibility to ensure the  equipment provided by Fairbanks is operated within the parameters  of the equipment s specifications and protected from accidental or  malicious damage           Absolutely NO physical  electrical or program modifications other than    selection of standard options and accessories can be made by     customers to this equipment      Repairs are performed by Fairbanks Scales Service Technicians and  6  Authorized Distributor Personnel ONLY           Failure to comply with this policy voids all implied and or written     warranties     08 14 9 51190  Rev 3     lt  k                 Section 1  General Information  FAIRBANKS           wawas  Le    d ayz           13           CONFERRING WITH OUR CLIENT    The technician must be pr
5.  SHOWN                 sO     i                                                          CORNER          1         CORNER    1 NO  4         35 62    41 25  REF  O S Z CORNER  NO  3  DL CORNER      a              2 27 50              30 24            BOTTOM VIEW CENTER ON RAIL                         TOP VIEW    DRUM SCALE ASSY  MS 30 x 30  51190 2       08 14 24 51190                lt      i             Section 5  Parts  FAIKI ANKS           CAL     5 3  30 X 30 STAINLESS STEELPARTS LIST  P N 28379     PARTIS LIST    ITEM PART NO  DESCRIPTION  28389 WELDMENT  PLATFORM    SEE TABLE BELOW LOAD CELL LC1 LC4    11088 SCREW  CAP  1 2 20 X 1 75    4     6389   4  40000 2  SEALING SCREW 1 4 20 X  50           A              E  EN                       LOAD CELL TABLE    PART NO  MODEL NO  CAPACITY LOAD CELL  28743 3200 106 2000 LB 63895    28381 3200 107 2500 LB 63895  28380 3200 105 1000 LB 63895  28379 3200 104 500 LB 63898       SCALE ASSY  DRUM  ST  ST  30 x 30    51190 3    08 14 25 51190  Rev 3             Am  7    E              FAIRBANKS    Section 5  Parts                    A L P    5 4  30 X30 PARTS DIAGRAM  P N 28379              N                                          Mon           LOCATE APPROX   AS SHOWN ON INSIDE  OF COVER PLATE       LOCATE APPROX   AS SHOWN     2   5          e  E1  8    14   5     CORNER    41 25 35 62  REF    NO 2 27 50 REF  boo 30 24          BOTTOM VIEW       TOP VIEW    SCALE ASSY  DRUM  ST  ST  30 x 30    51190 4    08 14 26 51190  Rev 3
6.  Scale Platform                                                                                       14  2 2 2  Wheel Kit Assembly Sl OS     2  122  cccccccccosenseececcssiecsseseneeccscsdedssessneccnccedasesensescsscaciadesetesenstes 15  2 2 2  Wheel Kit Assembly Steps  Continued                                                                                16  2 2 3  Installing the Ramp Ss                                                                       r                17  2 2 4  Installing Ramp s  With Integral Pillar                                                                                 17  SECTION 3  USER OPERATIONS iu uuu uuu unas  18  3 1  Moving the Scale with a Wheel         18  3 2  Changing Position of Top Plate                                                                                18  SECTION 4  SERVICE  amp  MAINTENANGCGE                                                             19  4 1  General                                                  19  4 2  Scale Platform                                              20  LUN                     aus                               20  2 22  Load Cell              au Em 20  4 2 3  Load Cell Replacement Steps                        000 0000000000000000000005550000000 nnns sanas aaa nnn nnns 21  4 2 3  Load Cell Replacement Steps                                         1  2 2220              22  SECTIONS  PARTS uu          E                23  5 1  30 x 30 Mild Steel Parts List  P N 28374    23  5 2
7.  be adjusted to performance specifications may be charged to  warranly        No physical alterations  mounting holes  etc   are permitted during installation     The installing technician is responsible that all personnel are fully  trained and familiar with the equipment s capabilities and  limitations before the installation is considered complete     e All electrical assemblies must be replaced as assemblies or units         Replacement of individual components is not permitted         These components must be returned intact for replacement credit using the  standard procedures     e Atthe time of installation  all  electronic and mechanical  adjustments are considered to be  part of the installation  and are  included in the installation               5                     receptacle outlet shall be  located near the Indicator and  easily accessible        Electrical connections other than  those specified may not be  performed     Aegis Drum Scale shown with FB 2200 Indicator  and optional Wheel Kit        08 14 11 51190        3    s Section 2 Scale Installation  FAIRBANKS                                                                         wawa     amp  SM E     CAL     2 1 2  Pre Installation Checklist    The following points should be checked and discussed with  the Area Sales Manager and or customer  if necessary   before the technician goes to the site and installs the  equipment     Y Check the customer s application to make certain it is  within the capabili
8.  the foot from the loading    pin        6  Wire the scale cable to the proper type WIRE COLOR    indicator  as shown in the chart    Red    Signal    7  Calibrate the unit according to the                     Excitation  appropriate inaicator service manual     Ex  ilatlon       08 14 14 51190 Rev 3      Am 1       wa Section 2  Scale Installation  L  d    2 2 2  Wheel Kit Assembly Steps    1  Unpack the Wheel Kit         Inspect it thoroughly for any obvious shipping or  handling damages     2  Stand the Instrument Pillar onto the Wheel Kit  Assembly     3  Fasten the Pillar to the Platform with the three     184  5 16    bolts        lock washers     4  Place the Instrument Stand on the Pillar         5  Rotate the Instrument Stand to its desired position     6  Screw in  but do not tighten completely  the three  3  4     Allen Screws       the collar of the Instrument Stand     7  Place the Aegis Drum Scale into the Wheel Kit Assembly       Use Eye Bolts for ease of installation       The area in the Drum Scale where the Interface Cable exits should face the       pillar   plu P P UU                                      EE EEE ELE                                                              ru                               Z WATCH YOUR FINGERS  2     Fingers        be pinched when placing the Scale into the     y Wheel Kit Assembly  especially in the corners  4          8  Route the Platform Interface Cable up  through the pillar to a second hole  just  under the Indicato
9. 0 51190  Rev 3    A  1    1 i                 Section 4  Service  amp  Maintenance  TTE     4 2 3  Load Cell Replacement Steps    NOTE  Torque the two  2  Load Cell Fastening Bolts to 90 ft Ibs when replacing  them       IMPORTANT PRECAUTION  DO NOT CUT OR SHORTEN ANY                                      LOAD CELL CABLES                         the scale on its           Unscrew the two  2  7 16    bolts and open the Load Cell Wiring Panel   Locate and cut the defective Load Cell Interfacing Cable connection   Remove the two bolts securing the damaged Load Cell to its mounting block   Remove the Load Cell from the Platform    Make a note of the cable routing design and the wiring connections     St aS S           cas   E So      1        08 14 21 51190  Rev 3    sanum  Section 4  Service  amp  Maintenance  FAIRBANKS        CCCL  k d    4 S       CAL       4 2 3  Load Cell Replacement Steps  Continued    7  Carefully remove the new replacement Load Cell from its packing   8  Inspect it thoroughly for any obvious shipping or handling damages     9  Remove the Load Cell Foot Assembly from the defective Load Cell  then place it  onto the new replacement Load Cell     10  Replace the new Load Cell onto its Mounting Block  then secure it with the  Mounting Bolts     11  Torque each Mounting Bolt to 90 ft Ibs     12  Secure the Load Cell Cable into place  WIRE COLOR    13  Strip away the insulation from the four  4               Signal 00  Load Cell to a minimum of 94    14 Using Cr
10. Backstop    INSTALLATION MANUAL  DOCUMENT 51190    
11. IQUID TIGHT  NUT  GLAND    BOOT    28896 LABEL  FAIRBANKS    LOAD CELL TABLE  PART NO  MODEL NO  CAPACITY   LOAD CELL  28747 3200 206 2000 LB 63895    28728 3200 207 25001   63895  28727 3200 205 1000 LB 63895  28726 3200 204 500 LB 63898       DRUM SCALE ASSY  ST  ST  38 x 38    91190 7A    08 14 29 51190  Rev 3    TALAT  FAIRBANKS    TA    5 0  38 X 38 STAINLESS STEELPARTS DIAGRAM  P N 28726     G SectionsParts       LOCATE APPROX   AS SHOWN ON INSIDE  OF COVER PLATE        2        W140   E1  8  04  Ce i213  CORNER 2   NO  1               A   A NO 4    49 25 43 62  REF              1  CORNER    CORNER                2   35  ne  vid      BOTTOM VIEW                     TOP VIEW    CENTER ON RAIL       DRUM SCALE ASSY    ST  ST  38 x 38  51190 8    08 14 30 51190  Rev 3                  Section 5  Parts  FAIRBANKS                 gt o         gt x   gt             T       D s  J o     F P gt          gt                                         W   t9XTS    gt S           hv sa      gt A     s wv  CAL      2 9  ACCESSORY PART NUMBERS    Part Part   Description  Number    27779 Ramp Assembly  27791 Ramp Assembly with Pillar  28549   Wheel Base Assembly    16291   Quad multilexerBoard SSCS     26591   Ramp Assembly with       38 x38  22119 2802 intrinsically Safe Controler l  15291   Quad multiplexer Board       08 14 31 51190  Rev 3    Manufactured by Fairbanks Scales  Inc     821 Locust St   Kansas City  MO 64106    www fairbanks com    Aegis Drum Scale  amp   Drum Scale with 
12. IRBANKS                                                                                                                                          TQ    4 2  SCALEPLATFORM TROUBLESHOOTING    Except for severe structural damages  most Platform Assembly problems can be  traced to the following causes         Material under or around the Platform       Broken Load Cell Feet    e Faulty Load Cells       Incorrect  loose or damaged Load Cells     4 2 1  Scale Platform Testing    1  Inspect the Interface Cable from the Platform to the Instrument for visible breaks  or cracks    2  ZERO the Instrument Display    3  Apply a test load of 2596 of the Load Cell capacity to one corner                Instrument should display a weight reading within 0 1  of the applied  weight  or One Instrument Division  whichever is greater     4  Repeat Step 3 for all the corners  placing the same Test Load on each corner     4 2 2  Load Cell Testing    When corners do not match the correct tolerances  unsolder each Load Cell Cable   then test each Load Cell for the settings on the following chart     TEST READING REMARKS    Green to Black  Input  1106 Ohms   5  2 Ohms    Input Resistance    Red to White  Output    1000 Ohms   5  2 Ohms    Output   Bridge Resistance  Yellow  Shield  to Load Cell Case    Input and Output Leads to Shield More than 1 000 megohms   Insulation Resistance  Input and Output Leads to Case    If any Load Cell fails  it should be replaced according to Subsection 4 4        08 14 2
13. en the three  3   4    Allen  Screws on the collar of the Top Plate  Assembly     2  Rotate the Top Plate Assembly to the  best position     3  Re tighten the set screws     08 14 18    51190          Rev  3    Section 4 5              amp  Maintenance    4 1  GENERAL TROUBLESHOOTING    From the following chart  identify the symptom s  and cause s  of each malfunction   solving each issue with an appropriate solution     SYMPTOM    Displays stay at zero    Erratic Weights    Inaccurate Weights    08 14    Load Cell connections faulty   Instrument faulty   Faulty bad Load          Foreign object around load cells   ramps  or under platform     Excessive vibration near platform     Instrument faulty     Platform not level within 4     3 09      Surface not smooth enough   within 1 8       Faulty bad Load Cell     Instrument out of span     Instrument not properly adjusted  to zero     Faulty bad Load Cell     19    SOLUTION    Cable replacement   Service Instrument   Test and replace according to  Subsection 4 3 2 and 4 3 3     Clear the area     Remove the vibration source   Service Instrument   Level the platform surface     Find a smoother surface for the  platform     Test and replace according to  Subsection 4 3 2 and 4 3 3     Check and alter per the Instrument  Service Manual     Zero the instrument according to  normal operation procedures     Test and replace according to  Subsection 4 3 2 and 4 3 3        51190  Rev 3    sanum  Section 4  Service  amp  Maintenance  FA
14. epared to recommend the arrangement of components  which provide the most efficient layout  using the equipment to the best possible  advantage     The warranty policy must be explained and reviewed with the customer     Refer to Instrument Manual for power requirements     1 3 1  Service technician    s Responsibilies    All electronic and mechanical calibrations and or adjustments required for making  this equipment perform to accuracy and operational specifications are considered  to be part of the installation         They are included in the installation charge         Only those charges which are incurred as a result of the equipment s inability  to be adjusted or calibrated to performance specifications may be charged to  warranty     If the equipment consists of printed circuit assemblies  they must be handled  using ESD handling procedures  and must be replaced as units         Replacement of individual components is not permitted                assemblies must be properly packaged in ESD protective material and  returned intact for replacement credit per normal procedures     1 3 2  Users     Responsibility    Absolutely no physical  electrical  Or program modifications other  than selection of standard  options and accessories are to  be made to this equipment        08 14 10 51190  Rev 3    Section 2  5        Installation    2 1  OVERVIEW    2 1 1  Physical Installation Notes       Only those charges which are incurred as a result of the equipment s  inability to
15. fect the weight accuracy     Platform vibrations may also affect the weighing accuracy  Wherever possible   locate the platform as far away from heavy  low frequency vibrations as much as  possible     Do not load the platform if there is any evidence of damage to the platform or  supporting structure     Ease of access is very important  Allow plenty of room for maneuvering a box  truck     Heading the Indicator is also important to workers  so place it in a very visible  position     When installing the Scales and Indicator in an outdoor location  set it up so the  Snow  ice accumulation  rain and other conditions do not affect the platform  operations        08 14 13 51190                lt  A A                 Section 2  Scale Installation  FAIRBANKS           2 2  INSTALLATION STEPS    2 2 1  Assembling the Scale Platform    Remove the top of the crate and all packing material   ocrew the two  2  eyebolts  optional  into the threaded adapters in the platform top     It is recommended that two  2  adults remove the scale from the crate bottom     p p          oet the scale so the interface cable exits in a direction where it can be protected         If possible  use a cable protector to reduce          hazards and to protect the  interface cable from being  damaged               thirty foot  30    cable  can be shortened as  needed     5  Level the scale         Turn the Load Cell Foot  clockwise or counter   clockwise to level the scale        Be careful not to unthread 
16. imp Connectors  fasten all five   5  green wires together  all five  5  black  wires together  all five  5  white wires    together  all five  5  red wires together  and all  five  5  yellow wires together        15  Replace the Wiring Panel Cover  then screw in the two  2  7 16    bolts   16 Level the scale         Turn the Load Cell Foot  clockwise or counter clockwise to  level the scale         Be careful not to unthread the foot  from the loading pin  taa     17 Reapply power to the Instrument     18  Recalibrate the scale with the  Instrument Service Manual     19  Test the Platform for proper  operations        08 14 22 51190  Rev 3    Section 5  Parts    5 1  30 X30 MILD STEEL PARTS LIST  P N 28374     PARTS LIST    2    12            NEN    PART NO     28388    SEE TABLE BELO    11168  63899    24988  28384  10105  28599  12838  17546  14278  11175    11039    28896    W       4                                              LOAD CELL TABLE    28742 3200 102 2000 LB 83634    28376 3200 103 2500 LB 83634    28375  28374    7 08    3200 101  3200 100       1000 LB  500 LB    83634  63893          SCALE ASSY  DRUM  MILD STEEL 30 x 30    51190 1    23 51190 Rev  1                  H              Section 5  Parts  ARENS                   CAL     5 2  30 X30 MILD STEELPARTS DIAGRAM  P N 28374                       27   lt  lt                                             lt  lt  BREST eS    LOCATE APPROX   AS SHOWN ON INSIDE  OF COVER PLATE                   LOCATE APPROX   AS
17. late Holes     2 2 4  Installing Ramp s  With  Integral Pillar    Each Ramp With the Pillar Accessory comes  with Integral Bolt down Plates and four  4  Anchors     1  Place the Ramp in position     2  Drill Four  4  7 16    holes         Use a standard drill      a wood floor  anda  hammer drill on cement     3  Screw the ramp with the pillar into the floor  using  the appropriate fastener     4  Tighten the bolts securely     5  Lift and set the Platform Feet into the bolt down  plate holes        IMPORTANT TIPS       f two ramps are installed  then no other bolt down plates are needed     e Only two ramps  total  may be installed per platform  and each is placed on  opposite sides     08 14 17 51190               Section 3  User Operations    3 1 MOVING THE SCALE WI TH A WHEEL KIT    1  Remove all objects from the Platform     2  Remove the AC Power from the  Instrument  if applicable     3  Pull down each of the three  3  pivoting  Wheel Cam Levers  lowering and locking  each wheel onto the floor     v Please work carefully   Y Possible Pinch Point   4  Using the T handle  move the scale to the    desired location     5  Once the scale is repositioned  raise the  wheels by lifting each of the Wheel Cam  Levers         The wheels will be raised approximately  1 16    above the floor line     6  Reapply AC Power to the Instrument  if  applicable     3 2  CHANGING POSITION OF TOP PLATE    The Top Plate Assembly can rotate the  Indicator to any viewing angle  3609     1  Loos
18. ported by four  4  17 4ph Stainless Steel Shear Beam Load  Cells     e Bubble Level for platform leveling confirmation        1 1 1  Specifications    Feature Description  Platform Sizes 30  x 30  x 1 12    and 38    x 38  x 1 12     Overall Dimensions 41    x 30    x 3  and 49    x 38  x 3     Temperatures Operating   10  C to 40  C  14  F to 104  F     Storage   20  C to 70      14  F to 158   F     Humidity 10 to 100   Wash down  Stainless Steel models only   Accuracy Platform Accuracy up to 0 02     Power Cable Thirty cable feet  30    of four  4  conductor interface cable  PVC jacketed     Adjustment Limits e Scale must be level within three degrees  3         Height adjustment allows for up to one quarter inch  1  per foot     Construction Mild steel with black enamel finish  Type 304 PH stainless steel  brushed     Approvals Both Stainless Steel and Mild Steel have FM Approved Load Cells   NTEP and CWM approvals PENDING     08 14 7 51190  Rev 3                   Section                  Information  FAIRBANKS        TP      v    1 1 2  Applications        Manufacturing     Food  amp  Beverage      Chemical     Textile      Scrap or Recycling     Pharmaceutical    1 1 3  Accessories    Available modifications and accessories include the following         Loading Ramp     Stand alone Pillar      Ramp with Pillar     intrinsically Safe Controller      Wheel Kit     Quad multiplexer Board        Factory Calibration and Quick Disconnect  not available for Intrinsically Safe
19. r Stand     9  Feed the cable through the final bushing   leaving enough cable to connect it to the  Instrument     10  Tighten the three set screws to secure the  top plate to the pillar        08 14 15 51190  Rev 3       NN     lt  A     sS Section 2  Scale Installation    FAIRBANKS  wawa            2 2 2  Wheel Kit Assembly Steps  Continued    11 Place the Indicator and Stand on the Plate  lining up their holes together     12 Secure the Indicator  Stand and Plate into place using the fastening bolts supplied  with the Wheel Kit     13  Connect the cable to the Instrument according to the appropriate Instrument  service Manual     Always raise the Wheels off the floor  before calibrating or using the Scale   Weighing or storing the Scale with the Wheels down can  damage the Scale or can cause personal injury     14  Calibrate the Platform to the Instrument according to the Instrument Service  Manual     08 14 16 51190  Rev 3    lU UU UR UR                       Section 2 Scale Installation  FAIRBANKS            n   as                           Cs   O O     2 2 3  Installing the Ramp s     Each Ramp Accessory comes with Integral Bolt down Plates and two  2   Anchors     1  Place the Ramp in position     2  Drill Two  2  7 16    holes         Use a standard drill      a wood floor  and     hammer drill on cement     3  Screw the Ramp into the floor  using the appropriate  fastener        4  Tighten the bolts securely     5  Lift and set the platform feet into the Bolt down P
20. rt  of this manual may be reproduced  copied  translated or transmitted in any form or by any means  without prior written permission of the manufacturer     08 14 4 51190  Rev 3    Table of Contents    TABLE OF CONTENTS                                                                                             5  SECTION 1  GENERAL INFORMATION                                                                   7     Ji d                                  7            CCMA NOVI mHE                         7            POONA T                                8  15  ACCES SIOS                                               8   1 2  General Service Polley U LLL LLL                                 9  1 3  Conferring with ODrOIenm                 10  1 3 1  Service technician    s Responsibilies                                                                                   10     Users           4 9      uuu u u                                                EE                     10  SECTION 2  SCALE INSTALLATION   ss u                                                                                   uuu  11  ANNE TUI          11  2 1 1  Physical Installation                                                       11  2 1 2  Pre Installation                                                         12  TID e                               A      12                           mM 13   2 2  Installation                                                                14  2 2 1  Assembling the
21. ties and design parameters of the  equipment        Y      sure that the equipment operator s  are available for training     2 1 3  Unpacking    Follow these guidelines when unpacking all equipment   Y Check in all components and accessories according to the customer s order   Y Remove all components from their packing material  checking against the invoice  that they are accounted for and not damaged     Advise the shipper immediately  if damage has occurred     Order any parts necessary to replace those which have been damaged     Keep the shipping container and packing material for future use     Check the packing list     Y Collect all necessary installation manuals for the equipment  and accessories     NOTE  It is the owner s responsibility to document  notify  and  follow up regarding shipping damage with the carrier           08 14 12 51190  Rev 3     lt  A    z i  wa Section 2  Scale Installation  L  d    2 1 4  Positioning the Equipment    Position the equipment with these points in mind     yx    yx    The scale is to be placed on    flat  solid  level surface         that fully supports the  weight of the platform plus a full capacity load     The smooth surface must be within 1 8          on a level plane  within 7 4    across  both the length and width of the platform     The four corners of the Platform must rest solidly on the surface  and not rock   Irregular bumps and foreign material under the Platform can cause an  out of   level  condition  which will af
    
Download Pdf Manuals
 
 
    
Related Search
    
Related Contents
Manual dos binóculos com gravação digital DEV  RI2162 - philipsconsumerlifestyle.com  Samsung H1245A User Manual  COMPASS Bacillus cereus Agar  Release notes for Version 3.6 - Civil & Environmental Engineering  Philips Halogen lustre bulb 871829121978100  Inyector PoE IEEE 802.3af/at de 1 Puerto 10/100 Mbps.  USER MANUAL - Kramer Electronics  Philips CEM5000  Livret Accueil Villa du Fauquié FR    Copyright © All rights reserved. 
   Failed to retrieve file