Home
        TECHNICAL MANUAL - Exhibitor Online Services
         Contents
1.         stands and working higher than    Muries or dea Visitors 3  Ensure only experienced staff are permitted to vorkat height   2m from the hall floor   4  Restrict access to stand by cordoning off areas where there is  overhead working  amp  erect warning signs   The car engine exhibit must be   Crane collapse  sling High 1  Ensure only the official lifters lift items   craned into position  failure resulting in   Contractors  Exhibitors  Visitors 2  Ensure they know correct weight of item to be lifted   crushing  death  3  Cordon off area whilst positioning  erect warning signage and use  damage to property banksman   4  Check condition of slings  equipment  operators license and  inspection certificates   High 1  Fit Lexan or polycarbonate guard     Moving engine demo on stand        Nips and trapped  fingers due to poorly  fitted guard       Children  Visitors          2  Ensure 2mm gap maximum around all moving parts     3  Fit warning sign           5 0    5 1    5 2    5 3    5 4    Standfitting Information    Shell Scheme    Shell Scheme Contractor   Eastern Exhibition Services Limited is the Official Shell Scheme Contractor for CABSAT 2013    They are responsible for stand servicing and maintenance of Shell Scheme stands throughout the whole period of the  exhibition  Please find below their contact details     Eastern Exhibition Services Limited    PO Box 9279   Dubai   United Arab Emirates   Contact  Paul Machin   Telephone   971 4 3809918   Fax   971 4 3809912 
2.    4  The number of exits shall not be less than the number shown in the second column of Table A in this regulation and    the minimum width of exit shall be not less than the width shown in the third column of that table in each case  having regard to the number of persons shown in the first column of that Table  provided that each exit shall be  remote from any other    5  Each exit shall deliver to a Gangway terminating at one or both ends at an exit door on the perimeter of a Hall and  the Gangway shall not be less width than the combined minimum widths of each exit discharging to that Gangway    6  Any notices regarding means of escape shall   a  Be sited in a conspicuous position above or adjacent to all exits   b  Where necessary be positioned to indicate the route of escape  c  Have no other markings except means of escape in Arabic and English  d  Have all lettering and markings in Arabic and English   i  Clearly distinctive against their background   ii  At least 125mm in size   iii  Clearly visible when either normal or emergency lighting is in use    7  Where a stage is provided   a  Not less than half the exits for the audience shall be sited remote from the stage     5 18     9      10     b  Two exits one of which must be other than by way of any stage  shall be provided from each dressing  room in either of the following cases     i  Where the travel distance from any point in such room to the exit doorway there from exceeds  7 5m    ii  Where there is direct
3.   E mail  eastern2  emirates net ae    Shell Scheme Electrics  The cost for providing single phase mains supply and connection  including energy consumed to Shell Scheme stands is  covered by the stand rental charges     Shell Scheme Name Board  Fascia    Those Exhibitors taking a Shell Scheme stand have a Name Board provided  It is 300mm wide set at 2 2mtrs to the underside   to each open elevation comprising aluminium frame with infill panel fitted between dividing walls with additional supports at  corners and where fascias exceed 4m in length    The Exhibitors Name and Stand Number will be in standard 50mm white Helvetica Medium Capital lettering and fixed directly  to fascia panel  The fascia panels will be blue with white lettering  The Exhibitor must complete and return FORM 2 before 10  February 2013 to ensure that the Name Board is installed before the show opens     Shell Scheme Services  amp  Regulations   For complete details and specifications on Shell Scheme stands  please refer to the Eastern Exhibition Service Manual    All additional standfitting and display must be contained within the Shell Scheme structure and may not exceed 2 4 mtrs in  height  No projections into gangways will be permitted  neither may additional display materials be fitted to the Shell  Scheme Fascia     Those Exhibitors who booked Shell Scheme stands and then get their own contractor to build a special stand  kindly  ensure that you advise the contractor that the total height of the st
4.  Duct covers   The crossing of Gangways with mains electrical supplies via fascias and floors is prohibited   Note  Persons responsible for designing the layout of Stands should acquaint themselves with the location of the under floor  Service Ducts in the Halls used for installing Stand services to ensure that Stand layouts can  or are designed to  permit the  termination of main cables over the Service Duct   Alterations to Orders   a  Termination Position  Where the termination position of a mains supply is altered after the deadline date for placing orders  this will be  treated by DWTC as a late order and will be subject to a 50  surcharge    b  Rating  Where the rating of a mains supply is changed after the deadline date for placing orders  the new mains supply will  be treated as a late order and will be subject to a 50  surcharge     Power Supply    See Electricity Supply     Electrical Information    Protection of Wiring   Platform floors must be provided in cases of the extraordinary amount of cabling that an exhibition of this type  necessitates    However  any cable laid across the floor of a Stand shall be effectively protected and fixed to such floor in such a manner as  to prevent risk of injury and where liable to mechanical damage or interference  shall be tough overall sheathed or armoured  or enclosed in protective conduit  trunking or cladding  Conductive materials used to provide mechanical protection should  be efficiently bonded to earth  Where tough ov
5.  access to a stage or platform or stage basement     Seats and Gangways in the auditorium shall be so arranged that     e Free and ready access is direct to each exit    e No portion of any Gangway shall be more than 18m from an exit from the auditorium measured along the line  of the Gangway    e The seating area assigned to each person shall not be less than        i  750mm in depth where backs are provided or 600mm in any other case    ii  500mm in width where arms are provided or 450mm in any other case    e A clear seatway of at least 300mm measured perpendicularly from the back of one unit to the front of the unit  immediately behind shall be provided    e The number of seats in a row shall not exceed twelve if there is a Gangway at one end of the row and twenty   four  where there is a Gangway at each row end    e All chairs or other single seats shall be secured together in lengths of not fewer than four seats    e Provision shall be made for fixing to the floor the rows of seating flanking the front  back and cross Gangways  and seats near exits  but if all the seats in each row or length are secured together  only the end seats of such  row or length shall be fixed to the floor    Not withstanding the provisions of paragraph  8   g  of this Regulation where it is impracticable to fix such seating   and the seating is not of a permanent nature  floor bars may be used  Such bars shall have a cambered top surface   and shall extend from the row to be fixed to at least 
6.  and position of any fire or emergency exit and escape routes within the Stand  and  viii  the provision made in the structure of the Stand for protection against fire and spread of flame    ix  copies of the Method Statement and Risk Assessment  See Health  amp  Safety Information     5 16    5 17    Failure to meet any of the deadlines stipulated could result in the stand not being approved and therefore not built  Hereto  no vvorkis to commence in the Halls until vvritten approval is obtained from the Senior Operations Manager    Dubai VVorld Trade Centre  L L C     VValling Regulations  Perimeter VValling  Where a stand edge faces directly or in part onto another stand  all construction must be arranged so that    a  no more than 20  of the stand edge is enclosed with walling   b  walling in excess of 6 linear metres in length must be broken up with transparent glazing  openings or other such  features so as to create an open feel to the stand  c  all external walling must be finished in a decorative and attractive manner and may utilise the side back walls for  branding purposes  Where stand edges face directly onto a DWTC wall  or officially designated catering seating area  no walling restrictions apply  other than Clause c  above  See Restricted Access to Stands     Space only     Standfitting Information   Other walling Rooms on stand  Solid running walls on stands should be confined to the central area of the stand  The total length of walling should not be  more th
7.  be possible to use an electric compressor  provided the following  requirements are met    e The compressor is super silence and not a noise nuisance   e The equipment was tested  amp  inspected during the previous year  or the equipment is less than a year old and in   good working order and condition    Exhibitors requiring Gas should contact the Organiser for assistance and complete the Gas Connection Form  The form must  be returned to the DWTC at least 2 weeks prior to the start of the tenancy for approval by DWTC Venue Health  amp  Safety  Division     IT  amp  Communication Services   Telephone and facsimile services are provided by Dubai World Trade  L L C    The telecommunication facility will flow from  state of the art technology provided by a highly sophisticated PABX system  Any network connections  to any hosts within or  outside UAE or Internet  made using the PABX extension is entirely your decision    e The system can provide telephone and facsimile connections at local  national  UAE  and international levels as  required  Please indicate your choice on the order form  Each telephone can be code locked to prevent un   authorized use    e Orders through PABX   Charges are payable 100  in advance and cover installation  connection  line rental   equipment rental and purchase of units against line usage  Should your line usage exceed your deposit during the  exhibition  the option to purchase additional units is available   A statement  including a printout of
8.  line usage and  any refund will be sent to you following the exhibition   Service will not be provided without payment    e Orders received 14 days or less before the start of the exhibition will be subject to a 100  surcharge and may not  be processed    e Devices attached to an Etisalat line require to be  type approved    by Etisalat  Devices which are not  type approved   cannot be guaranteed to operate  Installation of Exhibitor provided equipment is entirely at the Exhibitor s risk and  DWTC is unable to take any responsibility for malfunction or failure to operate    e    If at any time during the exhibition a virus has infected one or more of the Exhibitors    computers  the DWTC will not  be held responsible    e WTC will only provide telecommunication lines to Exhibitor stands  DWTC is unable to provide any modem or set   up support  An ISDN Modem is must for ISDN Line    e All line and equipment usage during the period of hire is the responsibility of the person company applying on  relevant Form Numbers  Once handed over  the equipment becomes the responsibility of the hirer and must be  returned to the organizers office within 1 hour of the close of the last day of the show    e Itis advisable that the Exhibitor insures the equipment hired    t    Remember to order a power point for the fax machine    e Tell your stand Contractor that you have ordered telecommunications     6 11    e     Missing or lost telecommunication instruments will be charged for as follow
9.  provided the following is observed      6 3    6 4    6 5    6 6    All speakers are to be positioned within the boundaries of the stand and angled so that they face inwards towards the centre  point of the stand    Video equipment must be placed so as not to blatantly face other stands  or so as to cause restrictions in the flow of visitors  down any gangways  Sufficient space must be allocated within the boundaries of the stand for the viewing of any such video  features    The use of super high intensity bass systems  strobe lighting or any other such type of audio visual equipment  is prohibited  without the written permission of the Senior Operations Manager   All lights  projectors and reflectors etc  must be positioned to ensure that the beam projected is contained within the  boundaries of an Exhibitor   s allotted stand area at all times    All such equipment must be clearly indicated on the submitted stand design     Dilapidations   The Exhibitor is responsible for any damage to the fabric of the Premises caused by it  its agents or its Contractors  This  includes incorrect use of carpet tape on the hall floor  we recommend Euro tape  Eurocel and Advance tape    See Adhesive Tapes     Technical Information    e On arrival at the Venue  the Exhibitor or its appointed Contractor is required to report to the Organiser who will  inspect the stand area for dilapidations    e During breakdown  and once the stand area has been cleared of all standfittings  exhibits and wa
10. 7    6 8    6 9    6 10    e Sufficient time is available during the tenancy to install and remove     Fixings to Floors  Fixings to the surface of the hall floor to secure margin boards  cable clips and similar items of Stand fittings will not be  permitted  Any damage to the floor will be repaired by DWTC and charged to the Exhibitor accordingly     Floor Loadings   The Hall floors  not including trench covers  can withstand a loading of 1500kg per square meter  except for The Pavilion  which is 1000 kg per square meter  Shk Rashid  amp  Shk Maktoum Halls have a maximum loading of 500kgs    See Base Plates     Complex Stands     Standfitting Information    Gas and Compressed Air  Exhibitors requiring compressed air should contact the Organiser for assistance and complete the Air Compressor Schedule  Form  The form must be returned to DWTC at least 2 weeks prior to the start of the build up for approval by DWTC Venue  Health  amp  Safety Division   All compressor pipe installation will be inside the floor trenches   Organisers or Exhibitors requiring compressed air at higher bar ratings than can be provided through technical services  Contractors must locate their compressor outside the building and request technical services assistance in the provision of  the supply though the utility ducts in the venues   If there is a genuine reason why the compressor must be located within the halls  and not because the location of the  compressor was overlooked by the Exhibitor  It may
11. Annual Contractor Badges   Annual contractor badges can be issued for regular contractors working at DWTC  The validity of these badges is 12 months  from the time of purchase    The price of each badge depends on the total number of badges issued for the same company    As of 1 September 2011  the prices are as follows     e 0 99 badges AED 500 00 per badge   e 100     149 badges AED 450 00 per badge   e 150     199 badges AED 400 00 per badge   e 200     249 badges AED 350 00 per badge   e 250 and above AED 300 00 per badge   In order to apply for annual contractor badges  the contractor   s company should provide a soft copy of the following  documents    e A request letter on company letterhead    e A copy of the company trade licence    2 2    e A copy of the valid visa and passport  on one page  of each applicant   e A photo  JPEG format  of each applicant   e A staff list using the format shown below   A company representative should submit all the applications to the FM Protocol and Security Department located on level 1  of DWTC Management Offices  Once the badges are issued  the representative should make the payment in advance to  DWTC Finance Department Cashier   s Office located at Al VVasl Building  level 1 and collect the badges    The company is responsible for returning the badge to DWTC when the applicant is no longer under their sponsorship  The  individual or the company will have to pay a fee of AED 500 00 against a lost badge     Collection Points  DWTC 
12. Any stairway to a Multi storey Stand shall discharge directly to a Gangway or to the ground floor of a stand  which  provides unobstructed access to a Gangway   4  Any ramp having a total rise of more than 600mm shall comply with the following requirements   a  the requirements of paragraphs  1   a    b  and  h  above   b  the slope of the ramp shall not exceed 1 12 gradient     Stand Area  The Organiser will issue full details of the space to be allocated to an Exhibitor indicating the stand size  area and boundaries   see Fig 1        Co co co co co Cd  STAND NUMBER    COMPANY NAME  ca             GROSS STAND AREA        M        a    a        Service Ducts                      5 15    Fig 1    An Exhibitor must keep its design and construction of any standfittings  features  exhibits or lighting rigs within the  boundaries of its allocated stand area  Under no circumstances may any element  at any height  infringe the gangways or  adjacent stands or obscure any fire or exit signs  or be suspended from the roof or facility structure    Every effort will be made to ensure that all details contained within the floor plan are accurate  The Exhibitor  however  is  responsible for inspecting the hall for restrictions prior to designing any stand    Exhibitors must not use any area behind rear walls for storage under any circumstances    An Exhibitor is not allowed to paste or otherwise to affix or exhibit advertisements anywhere in the exhibition Halls except on  his own stand  
13. Organisers must be informed by at least by 10 February 2013  to give their written approval  where any of the following  is proposed   e     Any material  exhibit or substances that are of a hazardous  dangerous  noxious  explosive or objectionable nature   e Exhibits that produce fumes  exhaust and smoke  e Operating machinery and apparatus  e Use or display of radioactive materials  e Use or display of pyrotechnics and lasers  e Use or display of firearms  weapons and ammunition whether replica or fully functional  e Use or display of flammable liquids  oils and gases  e Welding or similar processes where acetylene or compressed gas is being used  e Any use of compressed air  e Any recording  broadcasting or use of radios  two way or for microphones   film sound  music or video or any other  presentation likely to generate excessive noise   e The use of balloons  e Public entertainment including fairground  amusements  displays and live performances  All Contractors to note   All work must be carried out in accordance with the Rules and Regulations  which form part of the Operating Manual issued  by DWTC as part of the Exhibition Licence Agreement and are shown in short form below   All Contractors carrying out work shall observe the    Safe Working Practices    as follows   Licensee   s staff and Contractors shall be vigilant regarding health and safety of themselves and others in the Halls  and they  shall observe the following practices  which will be monitored and enfor
14. P if ENA  et  The Middle East  amp  1 5      1 e BA  Africa s Largest           ri  AA    PA  p  rp    Ci  K   V    AL                MACAC CUM       2 0    2 1  2 2  2 3  2 4    3 0    3 1  3 2  3 3  3 4  3 5  3 6  3 7  3 8  3 9  3 10  3 11  3 12  3 13  3 14  3 15  3 16  3 17  3 18  3 19  3 20  3 21  3 22  3 23  3 24  3 25  3 26    4 0    CONTENTS    TECHNICAL MANUAL    Contractor Information    Badges   Contractor  Contractor Information  Letter of Undertaking  Performance Bond    Letter of Undertaking   Document  Performance Bond   Document    Electrical Information    Batteries   Chokes and Capacitors   Electric Cookers Kettles Irons etc  Electric Discharge Lamp Installations  Electric Motors   Electrical Contractor   Electrical VViring   Electricity Supply   Electro Magnetic Compatibility  Guarding of Electrical Equipment  Harmonic Distortion   Lighting  amp  Machinery Mains  Lighting of Showcases   Lighting of Signs   Load Limitation  Electrical    Local Switches  amp  Socket Outlets  Location of Boards   Mains Supply Cables  amp  Distribution  Ordering of Electrical Supplies  Power Supply   Protection of Wiring   Space for Working   Supply  amp  Use of Electricity   Testing of Stand Installations   Time of Operation of Electrical Supplies  Transformers and Frequency Converters    Health  amp  Safety Section  DWTC H amp S Rules  amp  Regulations  Exhibitor s Health  amp  Safety Check List  Method Statement   Example   Risk Assessment     Example   Catering Disclaimer Fo
15. The Exhibitor may not distribute handbills  advertisements  photographs or other printed matter from the  gangways and outside areas of the exhibition  They must remain within the stand area allocated to the Exhibitor only as must  stand personnel including demonstrators hostesses     Stand Design Submission  amp  Approval   It is a strict condition of exhibiting that each    Space Only    Exhibitor submits FORM 3  Notice to Erect an Exhibition Stand   This must be accompanied by details of work to be carried out including dimensional drawings showing the front  side and  back perspectives  elevation and floor layout of the stand  This is not only essential to ascertain compliance with the  Organisers and Venue regulations  but also ensure that no errors have been made in the interpretation of stand area  size  and position  This form is to be submitted with all required information by 10 February 2013     FORM 3 and all stand designs and drawings must be sent to the Rahul Thomas  rahul thomas dwtc com       All drawings must be in English and clearly state    e Exhibiting Company Name  e Stand Number  e  Designers details and contact name  e The scale used   at least 1 200  All Stands  Non Complex    Space Only    Stands       e Three copies of a plan view  clearly showing the overall dimensions of the stand  position of major exhibits  all  walling and audio visual equipment   e Three copies of each open elevation  clearly showing the dimensions of all heights  graphics  lo
16. al conduit  metal casing of apparatus  frames of motors  etc   shall be efficiently bonded to earth using the earthing  system provided within DWTC s permanent electrical distribution system  This Regulation shall apply to all matters covered  by BS 7671  Where separate special Regulations and codes of practice have been prepared and approved by the Authorities   i e  electrical installations and electro medical equipment   all insulated  apparatus  and appliances  which conform to the  Standards of double insulation   the current edition of these special Regulations shall apply   Lighting Fittings  At every lighting point an earth terminal shall be provided and connected to the earth continuity conductor of the final sub   circuit   Metal Framework  etc   Where the electrical bonding to earth of metal framed Stands  metal water pipes  sinks and other items is necessary  this  shall be to an earth conductor  which terminates at DWTC s electrical supply  The bonding conductor shall have a minimum  cross section area of 6mm2  Under no circumstances shall any of these items be used as the sole means of earthing an  electrical installation  Where block mains are employed on metal framed Stands  the Stand framework shall be bonded at the  incoming main position and also at the termination point of every submain  The bonding conductor shall have a minimum  cross section area of 6mm2   Insulation Sleeving  Every earth continuity conductor shall  wherever exposed  including within al
17. all be adequately protected from the Public    b  Installation    1  Signs    The fascia or stand fitting material behind luminous signs of this nature shall be incombustible material  and protected as required by BS 7671  IEC364      2  High Voltage Gear  High voltage gear shall be mounted on incombustible material and protected as required by BS7671   IEC364    c  Fireman s Switch    A separate electric circuit must be used to supply such signs or lamp exhibits and shall be controlled by an  approved pattern Fireman s emergency switch located in an accessible and visible position and labelled  Fireman s  Switch  in accordance with the Authority s requirements     d  Approval  DWTC shall be advised by persons responsible for installing this type of apparatus of their proposals prior to  installation on site  No installation of this type will be permitted unless approved by DWTC s Engineering in writing     Electric Motors    a  Isolators  Every motor shall be provided with an effective means of isolation on all poles and such isolators shall be adjacent  to the motor which they control     b  Starting  Motors in excess of 7 5 kW  10 hp  shall be fitted with current limiting devices for starting  i e  shall not be started   direct on line   Where  however  the  direct on line  starting of a motor is essential to the satisfactory operation  of the machine  details of such requirements shall be submitted in advance to DWTC for dispensation     c  Overload and No Volt Release  E
18. an 20  of the corresponding side  width or depth  of the stand  Any meeting   store rooms should be confined to the  central area of the back   side walls and should in no way  obstruct the view of the immediate neighbouring stands        Complex Stands    This section is ONLY for Exhibitors who intend to construct a    Complex    stand which is defined as one that falls into one or       more of the following categories    e any item that requires cross bracing  e  standfitting over 4m in height   e staging or platforms over 600mm and viewing service platforms  e tiered seating   e a double storey or multi level stand   e purpose built or fixed step stairs of any height  e any stand over 100 m   e  Soundilighting towers  e Provide for a  Closely Seated Audience  of 15 or more chairs  theatre style   e The travel distance from any part of a Stand to an open side or exit or to a Gangway is greater than 10m    Auditoria  amp  Seminar Areas    Requirements where Provision is made for a Closely Seated Audience     1  This Regulation shall apply where provision is made for a Closely Seated Audience of more than fifteen persons   theatre style within a Stand     2  The maximum number of persons  which may be accommodated  shall be displayed and calculated in relation to  the area  utilised by such audience at the rate of 0 5m  per person  this number should be prominently displayed     3  Emergency lighting from a source other than that supplying the normal lighting in the Centre  
19. an so as to not obstruct the view  in any  way  of the neighbouring stands     Double storey stands must be constructed of materials as specified in Materials     Technical Information and arranged as  follows     e Ceilings  other than to the topmost storey  must be of solid construction or of inherently non flammable fabric   Treated fabric may be permitted to single storey portions of stands if not exposed to the risk of fire from lighted  articles dropped from above    e Cupboards  enclosed offices  storerooms  etc  formed beneath the upper floor of a two storey stand must be lined  throughout with non combustible fire resisting material    e The maximum distance to the nearest exit from the upper area or to a point from which escape is available in  separate directions to alternative exits must not exceed 12m  Include 50 person rule  More than 50 people will not  occupy the level served by the staircase at any one time public  performers and staff inclusive    e Each level must have minimum headroom of at least 2 3m    e All enclosed areas must incorporate suitable  independently powered emergency lighting and exit signage    e Exhibitors must make arrangements for a fire extinguisher to be prominently positioned on each floor     Rigging  The DWTC Events Services Department is the sole provider of all top and primary rigging at the venue     All rigging operations at the venues are subject to approval by the engineering team responsible for technical services   Any stee
20. and must not be more than 2 5 meters  Proposed  stand designs must be submitted to the r Operations Manager   Exhibitions for approval 10 February 2013     All such special stands will be treated as Space Only and bare floor space will be provided    No Shell Scheme options will be made available and power supply will have to be ordered separately        5 5    5 6    5 7    5 8    5 9    Space Only  Adjoining VValls    Any Exhibitor whose stand area joins another on any side may agree with any such adjoining Exhibitor not to build a dividing  wall  or agree to share the cost of any division required  Failure to agree will result in both Exhibitors being responsible for  erecting  within the boundaries of their stands  a form of division    Exhibitors are responsible for erecting and decorating side and back walls facing onto their stand areas to a height of 2 5m   Any such division that exceeds the height of the wall of an adjoining stand must be decorated in a plain  single  neutral colour  finish with no branding or graphics  All walls on a stand must be of one level only    Graphics  branding and logos are not to be placed on towers or other structures at the rear of the stand so as to blatantly  overshadow an adjoining stand and must be shown on all drawings submitted for approval  The Senior Operations Manager  reserves the right to arbitrate in any dispute and their decision is final     In the interest of the Exhibition as a whole  it may be necessary to remove or alt
21. art of a manufactured  system  and then fully in accordance with Special Lighting Systems Section below    b  Construction  Flexible cords shall be of circular section  fully insulated and sheathed  and the only form of jointing shall be  purpose made non reversible flex connectors  being shrouded and having an earth terminal    c  Length  For static appliances  flexible cords shall not exceed 2m in length    d  Position  They shall be installed remote from textile fabrics   Lamp holders  Lamp holders in lighting systems must have screw clamp or screw terminal connections between the conductors and the  plungers of the lamp holders  Lamp holders using spikes for connections shall not be used   Special Lighting Systems  Must comply with all Regulations and are subject to testing and spot checks    a  Track Lighting Systems  These may be used provided the track and all the accessories are of the same make  and also provided the loading  on the system is compatible with the rating of the sub circuit wiring and fuse  and complies with the requirements  of Earthing section and Protection of Wiring section    b  Other Lighting Systems  Only systems designed and manufactured to suit their intended use shall be permitted and these must comply with  all other relevant aspects of these Regulations    c  Client s Own Equipment  Where  client s own  equipment is used this must comply with all Regulations and is subject to testing and spot  checks     3 8    3 9    3 10    Safety Extra Lo
22. be advised of the cost before the work is put in hand    If any Exhibitor intends the have a water feature on its stand  full details must be included when submitting a stand design   An outbreak of Legionella is a risk associated with water features and an Exhibitor   s Risk Assessment should also cover all the  reasonable measures that will be taken to prevent an outbreak    See Water Butts  Water Systems and Legionellosis   Health  amp  Safety Information     Working in the Venue  Any grinding  cutting  welding machines are not allowed to be used in the exhibition halls   Any electrically operated wood cutting machines are not allowed to be used in the exhibition halls   Any type of spray paint  compressed paint  is not allowed to be used in the exhibition halls   Any type of air conditioning units are not allowed to be installed on stands inside the exhibition halls   Any erecting of scaffolding should be inspected by a Third Party inspector  appointed by DWTC Engineering   Any access equipment  used inside the exhibition halls  has to be electrically operated only   e No boom lifts or scissor lifts are allowed to be used within the DWTC premises without approval   All Contractors must advise the Organiser well in advance on the use of any Boom lift   Cranes etc  in the halls  Without prior    approval access will be denied  Please advise on the type  duration and contact mobile no  of the responsible person     
23. ced  as necessary by the Company   e The understanding of the Fire  Emergency and Accidents Procedures   e The need to maintain emergency gangways  through the Centre and the Halls in build up and breakdown situation     2 3    2 4    e The use of hard hats when working beneath or near overhead working or if this be impracticable  restricting access  in such areas    e The need of operatives to wear suitable protective clothing relevant to their job which includes eye  hearing  foot  and hand protection    e The safe use and storage of flammable liquids and substances and segregation from waste and other risk areas    e Ensuring that portable power equipment is used for the purpose for which it was designed and those safety guards  are correctly fitted and used    e Ensuring that portable electric tools are used with the minimum length of trailing leads and that such equipment is  not left unattended with a live power supply to it    e That stacker trucks are not used by other than fully trained personnel    e That chemicals and flammable liquids are  after use  removed from the Exhibition Halls by the user for safe and  proper disposal  Such products must not be placed in general rubbish bins or skips    e That any work area is maintained free from general waste materials which could hazard operatives    e That proper scaffolding is used during the construction of any building within the Halls  safety features of the  scaffolding are provided  in acceptance with established 
24. contractor badges can be collected at     e Cashier   s cabin at the Za   abeel service yard for temporary and international contractor badges  e Al VVasl reception for international contractor badges  this facility vvill be in operation upon prior approval   e Loading docks of Sheikh Maktoum  Sheikh Rashid and Sheikh Saeed Halls for pick up drivers delivering goods  this    facility will be in operation upon prior approval     Notes   e DWTC contractor badge is the property of DWTC and must be used in accordance with the agreed terms and  conditions   e Under no circumstances can a contractor be admitted into the halls without showing a valid DWTC contractor  badge   e DWTC contractor badge bearers enter the complex at their own risk and DWTC holds no responsibility for any  injury to persons or damage to a vehicle or property   e Access by contractors will be restricted to the specific halls wherein build up and tear down are required    e Contractor Badges are valid for build up and tear down period only     Special Contractor Badges     Valid For the Open Period of the Show   Special Contractor Badges are available to Contractors by paying AED 125 per badge and can be ordered on site  However   these badges will be issued at the discretion of the Organiser and are only for the purpose of essential services to be carried  out on the stands  Access will be permitted for one hour prior to the show open  amp  one hour after the show has closed     CONTRACTOR INFORMATION  The 
25. e continuity of supply is required this should be indicated by ordering a 24 hour supply  The continuous supply will be  from the opening morning until the close of the Exhibition  During the build up period the supply will normally be switched  on and off as for Standard supplies  All 24 hour supplies must be clearly identified and a drawing provided showing the  routing of cabling and wiring     Electro Magnetic Compatibility   Any electrical equipment radiating a magnetic field could cause problems for DWTC and other Exhibitors in the halls  This  equipment may only be used if adequate precautions and suitable screens are provided  Any extra costs involved to  overcome the magnetic problems will be the responsibility of the installer and liability for any costs damage DWTC   s  electrical supply and or others equipment lies with the installer  DWTC reserves the right to refuse to connect up any  suspect equipment and disconnect any equipment known to cause a problem     Guarding of Electrical Equipment    a  Electrical Equipment and Exhibits  Electrical equipment and exhibits shall be guarded as necessary to prevent accidental contact with live metal   moving parts  live terminals  etc   and accidental short circuiting     b  Conditions of Operation  Proper consideration shall be given to the conditions under which the equipment is being demonstrated  which  may well differ from the conditions under which it is normally installed and for which the normal safeguards may  no
26. ect and test all installations  The person responsible for  the installation  only when it is complete and ready for inspection and testing  must complete and hand Form   Request for Connection and Energising of Utility Supply to Stand   Wherefound to be satisfactory  power will be  supplied  Where the installation is found to be unsatisfactory the power will not be supplied and the person  responsible must rectify any faults and advise when the installation is ready for re inspecting and re testing by re   submission of the test form  It is the responsibility of the person undertaking an installation to carry out the  appropriate testing to ensure compliance with Regulations prior to the submission of Form  Request for  Connection and Energising of Utility Supply to Stand    Modification or Addition to Stand Installations  If  after initial inspection and supplying of mains utility supplies  modifications or additions are made to the Stand  installations  these must be notified to DWTC s Engineering for inspection or re testing   Appliances  A competent person must have tested any electrical appliance connected to a socket before it is plugged in and  energised  The responsibility for ensuring this testing is carried out is that of the person  or persons  responsible for  bringing the equipment into the Hall   Responsibility  DWTC will not accept responsibility for    1  Delays  Delays in supplying power to installations found to be unsatisfactory or where insufficient time 
27. ed to the  Senior Operations Manager     DWTC Exhibitions  along with the required Managers Cheque or Bank Guarantee and the Letter  of Understanding    See Letter of Understanding     Contractor Information    LETTER OF UNDERTAKING  The Contractor hereby undertakes to the Organiser that it shall     1  Carry out all work in accordance with the Rules and Regulations as laid down in the Exhibitor  and Technical  amp  Standfitting Manuals and in accordance with professional standards of care  and diligence     2  Strictly adhere to the attached published Exhibition Time Table for the CABSAT 2013    3  Ensure all the stand building will be ready by the deadline communicated by the Organiser if  not earlier     4  Ensure all standfitting materials including scaffolding  lifting equipment  waste materials  etc   will be cleared from the halls venue by the given deadline  before the show opens and after  the show closes     5  Ensure proper conduct of their work force     6  Ensure no damage or loss is caused to other stands  the venue property which includes  floor tarmac  ceiling truss  walls lighting fixtures cables or any other fitment such as  pontoons  corporate decks or any premises  facilities or to any person or property     7  Ensure that all manpower is adequately trained and legally authorized and licensed to carry  out the works     8  Ensure compliance with all Governmental Health  amp  Safety Standards in relation to any  potential hazard or danger to visitors Exhibi
28. ed with  a detailed drawing specifying the amount  dimension  load  proposed suspension  points and positioning of the banks which require to be suspended  This drawing along with the stand design needs to be  submitted to us by 10 February 2013  for checking prior to issuing final approval     The proper installation and removal of these lighting systems will be the Exhibitors responsibility  However  it would be  done under the supervision of the concerned Dubai World Trade Centre personnel  Any cost  if incurred  for the  installation of these systems will be borne by the Exhibitor           Lighting Adjustment Focusing  Adjustment focusing of lighting fittings in situ is permitted  provided that     e The persons involved on the operation are experienced and competent to do so    e All appropriate health and safety equipment required for the safe execution of the operation is not only available  and in good working order BUT IT IS ALSO USED  this includes PPE such as safety harnesses  bump caps  stabilising  legs for access towers and hoists  etc     e The area underneath and in the immediate vicinity is kept free of personnel by appropriate barriers  warning tape  or stewarding     Suspended Lighting Equipment   Suspended lighting fittings  other than single lamp pendants  shall be provided with adequate means of suspension  independent of the electrical conductors  Heavy lighting fittings shall be provided with a secondary means of suspension    All equipment attached t
29. egulator which cuts off the mains  supply to the rectifier when the battery is fully charged and is otherwise of an approved type    2  Times for Charging  The battery may only be charged on the Stand at times when the Public is not in the Hall    3  Charger Isolation  The circuit to the charger unit shall be directly connected to DWTC s supply with its own isolator   separate from all other circuits  to permit the isolation of these other circuits without affecting the  charging circuit    4  Enclosure  The equipment and its charger must stand in a free and enclosed space  the battery box cover shall be  removed and the gas vents of the cells shall be cleared and inspected daily    5  No Smoking Signs   No Smoking  signs shall be displayed in the vicinity of the charging operation   Batteries Not in Use  Charged batteries on exhibit vehicle or other exhibits shall be disconnected at both terminals     Chokes and Capacitors     a      b     Location   Choke and capacitor for fluorescent lighting shall be fixed in accessible and well ventilated positions away from  combustible material and shall be spaced at least 10mm there from by an air gap or by non combustible material   Connecting Wiring   Where choke and capacitor equipment for fluorescent lighting is not contained within the lighting fitting  any  connecting wiring exceeding 1m in length shall be of PVC sheathed  PVC insulated flexible construction  placed well  away from readily flammable articles and shall not be ins
30. el and Advance tape   e Areas of stands on the perimeter that are not sufficiently covered will be carpeted in the gangway carpet and this  area will be charged to the Exhibitor     e Exhibitors wishing to incorporate flooring with a metal finish must arrange with the appointed electrical Contractor  to have the area adequately bonded to earth if necessary     5 10    5 11    5 12    5 13    5 14    Height Regulations  The maximum height for Space Only stands is as follows  including name sign or trademark  All Space Only Exhibitors must  follovv the height grading system   e Halls 1  2  3 4 5 6  7 88  The maximum height allovved is 6 metres  e Between Halls 2 and 3  under bulkhead   The maximum height allowed is 3 metres    Notice to Erect an Exhibition Stand   All Space Only Exhibitors shall submit FORM 3    Notice to Erect an Exhibition Stand   Details of work to be carried out  including dimensional drawings showing the front  side and back perspectives  elevation and floor layout of the stand must  accompany this form  This form is to be submitted with all required information by 10 February 2013    See Stand Design Submission  amp  Approval     Space Only     Standfitting Information     Ramps  See Stairways and Ramps to Stands     Space Only     Standfitting Information    Stairways  amp  Ramps to Stands  1  Any stairway having a total rise of more than 600mm shall comply with the following requirements   a  there shall be clear headroom of not less than 2m over the wh
31. er part of a stand  If we feel this action must  be taken  this will be at the expense of the Exhibitor concerned   See Height Regulations     Space Only     Standfitting Information     Columns Light Poles Pillars Totems  These are allowed to be positioned on stands   e The dimensions of any one side of such structures should not exceed 1 5 mtrs in width   e Multiple structures should have a minimum distance of five linear meters between them     Emergency Access Gangways  Clear access is required through each hall during build up and breakdown to ensure that in the event of an emergency  fire  and ambulance service personnel are not restricted in any way  This is achieved with the allocation of emergency access  gangways which will be clearly defined on all floor plans  Exhibitors must therefore ensure that all gangways adjoining the  stand are not blocked during build up and break down to an extent which inhibits the movement of other Exhibitors and  freight  The Exhibitor is also responsible for ensuring that no obstruction is placed in the aisle adjacent to his stand  throughout the open hours of the exhibition   It is the Exhibitor   s responsibility to ensure that all Contractors  delivery drivers and other staff involved in the build up and  breakdown of its stand     e are aware of the existence and importance of the emergency gangways  and   e ensure that they do not obstruct the gangways in any way whatsoever   DWTC reserves the right to enforce these gangways in s
32. erall sheathed cables are used without further protection  i e  without armour  or protective conduit trunking or cladding  such cables shall have stranded conductors and shall have a degree of flexibility  In  circumstances where full mechanical protection is impracticable a supply will only be provided if the circuit has a 100mA  RCD ELCB installed    Cables should not be placed under carpets     Space for Working  Electrical apparatus  other than exhibits and portable equipment  shall be fixed in position with adequate space for  operation and maintenance     3 23    3 24    3 25    Supply 8 Use of Electricity  Electrical supply    DWTC will not supply electricity to any Stand  feature  display or exhibit  which does not comply with these Regulations or its    reasonable requirements     Electrical installations    The electrical installation including any temporary installations in connection with the provision of electricity to Stands and  other parts of the Centre shall be of such a nature as to ensure safety in the utilisation of electricity  Installations within    Stands shall be carried out in a competent manner and any installation found to be unsatisfactory would not be connected to  the mains supply until DWTC is satisfied  Where a connection is made and a fault becomes apparent the equipment shall not  be used until the fault has been rectified     Testing of Stand Installations     a      b      d     To verify compliance  DWTC and its representatives will insp
33. ere the electrical installation on all   Stands within the block is the responsibility of a single Contractor    Note  The crossing of Gangways with mains cables via fascias and floors is prohibited    Termination   Mains cables supplied to stands will not be terminated  A distribution board  fused isolator or circuit breaker shall be   supplied by the Contractor building the Stand and shall be situated in an accessible position on the Stand and be clearly   labelled    Isolation    a  Each of the Stands on a block fed from a single supply shall have its own means of isolation situated in an accessible  position on the Stand and be clearly labelled     b  Where a Stand is to be sub divided into sections then this shall constitute a block of Stands and shall have a  separate means of isolation for each individual section    Minimum Cable Size  Sub Mains    The minimum acceptable cable size should be sufficient for the proposed loading  where sub mains are required on a block   of Stands    Proliferation of Mains supplies   Where installation of a number of small supplies would  in the opinion of DWTC  lead to an unacceptable proliferation of   supplies  then DWTC may  at its discretion  either itself install a larger supply and provide the supply ordered by sub     3 19    3 20    3 21    3 22    distribution vvithin the block  or instruct the nominated Contractor that only a single main vvill be installed to the group of  Stands    Access for Installation   The mains supply t
34. f Mortar   Persons proposing to erect brick  stone or block walls  etc   shall lay heavy duty building paper or similar material on the  floors under the walls  etc   to protect the floor surfaces from mortar damage  The cost of repairing any damage caused to  floors by the erection or dismantling of this work will be re charged     Water  amp  Waste    All exhibits and ancillary equipment containing water shall be carefully drained down at the end of an exhibition  in such a  way that water is not discharged onto the floor of the Halls  Any costs involved in dealing with water discharge onto the  floors of the Halls  or into the service ducts  or any damage caused to mains services in the service ducts or tunnels under the  Halls by the discharge of water  will be charged to the Licensee    All pipework used in the installations shall be suitable for the operating pressure of the mains service for which it is to be  used    No paint  oils  fats  waste food  spirits  chemicals or other noxious substances shall be discharged into the drainage system   These materials shall be discharged into closed containers manufactured of material suitable for this purpose  Full details of  wastes of these types are to be submitted to the Company who will make arrangements for their disposal at the cost of the  Exhibitor    The cost of clearing or repairing the drainage system or making good any other damage caused by the stand effluent shall be  the responsibility of the Exhibitor    The O
35. fficial Water  amp  Waste Contractor for the event is as follows    Dubai World Trade Centre   P O  Box 9292   Dubai   United Arab Emirates   Customer Contact Centre   Telephone   971 43086333    6 26    6 27    Fax   971 4 3188741  E mail  C3 dwtc com  This service is only available for    Space Only    Exhibitors  Please refer to FORM 13 to place your Water  amp  Waste Order     Water Features   Full details of all vessels containing 250 litres or more of water or other liquids are to be submitted to DWTC for approval at  least six weeks before the first day of the Licence Period    All vessels of this type containing water are to be fitted with either a connection in the base to a waste pipe ordered from  DWTC Event Services or a suitable connection incorporating a pump connected to a waste pipe ordered from DWTC Event  Services  This is to ensure that means are always available to easily drain down the vessel in case of emergency and at the  end of the exhibition    DWTC Event Services will undertake to fill and empty vessels by means other than piped water supply and drain where the  construction of the vessels will not permit the fitting of pipework  The cost of such work will be charged to the Exhibitor   Enquiries regarding the supply of water and draining down of vessels of any type must be made to DWTC Event Services at  least six weeks before the start of the Licence Period  DWTC Event Services will charge the applicant for the provision of this  service  who will 
36. formation  Space Only     Standfitting Information  Space Only     Standfitting Information  Space Only     Standfitting Information  Space Only     Standfitting Information  Space Only     Standfitting Information  Space Only     Standfitting Information  Space Only     Standfitting Information  Space Only     Standfitting Information  Space Only     Standfitting Information  Space Only     Standfitting Information  Space Only     Standfitting Information    Complex Stands     Standfitting Information  Complex Stands     Standfitting Information  Complex Stands     Standfitting Information  Complex Stands     Standfitting Information    Rigging     Standfitting Information  Rigging     Standfitting Information  Rigging     Standfitting Information  Rigging     Standfitting Information  Rigging     Standfitting Information  Rigging     Standfitting Information  Rigging     Standfitting Information  Rigging     Standfitting Information    Technical Information  Technical Information  Technical Information  Technical Information  Technical Information  Technical Information  Technical Information  Technical Information  Technical Information  Technical Information  Technical Information  Technical Information  Technical Information  Technical Information  Technical Information  Technical Information  Technical Information  Technical Information  Technical Information  Technical Information  Technical Information  Technical Information  Technical Information  Technical Informati
37. ght to the top of a second lower handrail from the  pitch line of the surface of a ramp  or a flight of steps  is 600mm  where provided    Handrails shall be non climbable  i e  with solid infills or vertical guardrails  which should be no more than 100mm  apart and without horizontal members between verticals        5 19    5 20    5 21    e Handrails must extend at least 300mm horizontally beyond the top and bottom of a ramped access  or the top and  bottom nosing of a flight or flights of steps  while not projecting into an access route   e Handrails should contrast visually with the background against which it is seen  without being highly reflective   e The surface of a handrail should be slip resistant and not cold to touch  e A handrail must terminate in a way that reduces the risk of clothing being caught   e Ifthe profile is circular its diameter must be between 40 and 45mm  If it is oval the width should preferably be  50mm   e There must be a clearance of between 60 and 75mm between the handrail and any adjacent wall surface   e There must be a clearance of at least 50mm between a cranked support and the underside of the handrail   e The inner rail of a handrail must be located no more than 50mm beyond the surface width of the width of the  ramped or stepped access   Barriers  Balustrades   Barriers shall be provided to protect exposed edges of landings  balconies and any other changes of levels exceeding 320mm   Barriers shall be non climbable  i e  with solid inf
38. gos  etc   Complex    Space Only    Stands  Inspection and approval of this type of stand is a long and involved process  With the need for each design and element of       the stand to be inspected by the Organiser  as well as copies lodged with DWTC  structural engineers and if required the  Local Authorities  it is essential that the following is adhered to    e Three copies of the initial design showing the basic principles of the stand and any feature elements should be  submitted as soon as available   e THREE FULL SETS of the proposed stand design as detailed below should be submitted no later than 10 February  2013    i  dimensional plan views of each floor  clearly showing planned construction  the position of major exhibits and  audio visual equipment   ii  detailed elevation drawings taken from each open side and any appropriate sections   iii  plan and elevation drawings of each stairwell  ramp  balustrade and infill showing compliance to rules and  regulations   iv  copies of a simple plan view of the upper deck showing dimensional walkways  public access areas and means  of escape  all with less than 15m travel distance to the top of any stairwells   v  structural drawings and calculations  in English  including any design certificates  load tests to comply with  good design practice and will only be accepted where provided by competent  qualified experienced structural    engineers   vi  the materials to be used in the construction of the Stand   vii  the width
39. has been  allowed for testing    2  Faults  Any faults discovered in installations after testing by DWTC  No approval  after testing or otherwise  shall  absolve the Exhibitor of its obligation to comply in all respects with these Regulations     Time of Operation of Electrical Supplies     a      b      c     During Build Up   During the build up period for the Exhibition  supplies which have been tested and connected will normally be  switched on within half an hour after the official opening times of the Hall and off within half an hour before the  official closing time of the Hall each day  Additionally  there may be interruptions to the supply to allow DWTC to  make extra connections    During Exhibition Open Days   Electrical supplies to Stands will normally be switched on  one hour before opening and off half an hour after the  close of the Exhibition each day  All Stands not requiring continuous supplies should be switched off using the  Stand isolator as soon as possible after the close of each Exhibition open period    During Breakdown   All electrical supplies will be switched off 30 minutes after the closing time of the Exhibition on the last day  Where  an Exhibitor requires a supply after the close of the Exhibition  a request for such supply should be made through  the organiser 24 hours before the final closing of the Exhibition  The supply may be reinstated after the close of the  Exhibition once essential safety work has been completed     For details on 24 
40. hour Electrical Supply  see Electricity Supply     Electrical Information    3 26    4 0    Transformers and Frequency Converters     a      b      c      d      e     Step Up Transformers   Step up transformers shall not be installed without the written permission of DWTC s Engineering  Where such  permission is required  drawings and full details shall be submitted at the time of application  Where  however   step up transformers are used as an integral part of any electronic or similar apparatus  appliance or equipment   and providing the use of such step up transformers conforms to the customary practice within a particular  industry  no such permission will be required    Step Down Transformers   Step down transformers shall have separately wound primary and secondary windings  The iron core and frame  shall be connected to earth  In addition to the normal fuse protection on the phase line s  of the primary circuit   the secondary circuit shall be fitted with fuse protection in the phase line s  and with three phase transformers  the  neutral connected to earth    Auto Transformers   Auto transformers shall not be used  except as an integral part of motor starters  unless the written permission of  DWTC has been obtained    Location   Transformers shall be placed in positions out of reach of the Public and shall be adequately ventilated    Oil Filled Transformers   Oil filled transformers containing more than 20 litres of oil shall be mounted in a suitable catch pit or t
41. hout the prior approval of DWTC H amp S Dept    Details of the type of smoke generator to be used must be submitted to the Organiser along with the stand design for  submission to DWTC H amp S Dept  Measures must also be taken to ensure that CO  levels do not adversely affect public safety   This must be accompanied by a risk assessment     Specialised Lighting  amp  Laser Displays   Specialised Lighting   All forms of Specialised Lighting  such as neons  to include visible fireman   s switch  rotographics  interactive and laser  imaging  must be produced in such a way as to be contained within the boundaries of the Exhibitor   s allotted stand area at all  times    The bouncing of any projected images off or on to the fabric of the Premises or other adjoining stands is strictly prohibited     6 22    6 23    6 24    6 25    Any use of specialist graphic equipment must be done in accordance with the Organisers Regulations    Laserlight Shows   See Pyrotechnics  Smoke Machines and Specialist Equipment     Health  amp  Safety Information   It is the Exhibitor   s responsibility to ensure that all laser installations are fully inspected and approved by a competent person  on site prior to the first open day  The Organisers are authorised to suspend any such installations regarded as dangerous or  not complying with the Regulations    Final approval will be given by the Organiser and DWTC Venue Health  amp  Safety Division subject to the above regulations     Standards   Each Exh
42. ibitor must undertake to erect a stand that is in keeping with the high reputation of the Show  Upon inspection   should an Exhibitor   s stand  in the opinion of the Organiser  whose decision is final  fail to be of a quality that reflects the  event as a whole  the Organiser has the authority to carry out any actions applicable  of which any costs or expenses are to  be borne by the Exhibitor     Structural Stability   Interpretation    Dead load  means the force due to the static mass of all walls  partitions  floors  roofs and finishes and  imposed load   means the load assumed to be produced by the intended occupancy or use  including distributed  concentrated  impact   dynamic and inertia loads    Calculation of Loading   In determining for the purpose of this part the loads to which any Stand will be subjected    e    dead loads    shall be calculated from the actual known weights of the materials used  Any beams and or flooring  that are for the purpose of lateral distribution shall be designed to carry a uniformly distributed load per square  metre of not less than 1 kN m    e  imposed loads  shall be calculated as being equivalent to a uniformly distributed load per square metre of area  measured on plan of not less than 5 kN m    Structure of Stands  The structure of a Stand shall safely sustain and transmit to the floor of the Hall the combined  dead load  and  imposed  load  without any deflection or deformation as will impair the stability of the Stand     Use o
43. ight to refuse to connect up any suspect equipment and disconnect any equipment known to cause a  problem     Lighting  amp  Machinery Mains   Separate mains will be supplied for Exhibitors    machinery and equipment from those used for the provision of lighting     a  Connection of machinery to lighting mains  Connection of machinery to lighting mains will NOT be permitted     b  Connection of lighting or small power to machinery mains  Connection of lighting or small power to machinery mains is prohibited  If any such connections are made  then the  party responsible for placing the order for electrical supplies to that Stand will be required to order and have  installed an appropriate lighting main  Where this is not practical the Stand will be subject to a surcharge  equivalent to the late order cost of the lighting main which would otherwise have been installed   Mains will not be connected until this is rectified    Lighting of Showcases    a  Externally  Unless the exhibits are of an incombustible nature  showcases shall be illuminated from the outside only     b  Internally  Internally illuminated showcases shall be constructed of approved materials and wired in approved type cables  not  flexible cords  and adequately ventilated     Lighting of Signs    a  Fixing  Electrically operated or illuminated signs shall not be fixed on woodwork or cloth unless effectively protected by  non combustible material     b  Construction and Wiring  Internally illuminated signs shal
44. ills or vertical guardrails  which should be no more than 100mm apart and  without horizontal members between verticals     Base Plates   The floor loading capacity is 1500kgs per sq m on all main floor areas in the Halls  except The Pavilion where the capacity is  1000kgs per sq m and Shk Rashid  amp  Shk Maktoum where the capacity is 500kgs per sq m  Exhibitors with heavier exhibits  should provide the Organisers with details of the exhibits together with their exact position so that they can ascertain  whether special weight spreading facilities are necessary    Any structures in DWTC that are lying over the Service Ducts must have base plates of a minimum area of 1m   i e  must have  a length of 1m and a width of 1m x 12mm thick Grade 43a steel   See Service Ducts     Technical Information   Building paper must be provided between the base plate and the floor    The position of all base plates must be clearly shown on all drawings  No fixings whatsoever may be made to the Hall Floors     Double Storey Stands    The minimum size for all double storey stands is 36 sq m and subject to design approval by the Organisers  No double  storey stands are allowed in the Concourse    Double decker stand designs will only be accepted if there is a valid double decker stand booking made by the Exhibitor   Stand approval and or construction will be stopped immediately should there be no valid booking    Exhibitors building double storey stands will have to ensure an open ground floor pl
45. ing unattended exhibits    e Proper consideration should be given to the conditions under which the equipment is being demonstrated which  may well differ considerably from the conditions under which it is normally installed and for which the normal  safeguards will no longer be appropriate    e     Any exhibit or process that generates noxious or toxic fumes  exhausts or smoke of any kind is not permitted    e The use of compressors  sprayers and similar plant powered by internal combustion engines is prohibited    e All supplies of fuel are to be kept outside the Show in a controlled store for flammable items    e The Organiser reserves the right to terminate an equipment demonstration at any time     Service Ducts   e Exclusion   Access to and use of the Service Ducts  floor trenches  is limited to employees of DWTC  or Contractors  employed by DWTC  for the purpose of installing main supply cables  piped services and telephone equipment    e Limited Use   DWTC will consider limited use of the Service Ducts  for purposes other than those specified above  provided that the installation in the duct is carried out by or under the supervision of DWTC and that such use has been  agreed in writing prior to the commencement of tenancy  See also Floor Loadings     Technical Information    Smoke Alarms  All enclosed rooms beneath multi storey stand and any other rooms with solid ceilings must have smoke alarms  incorporated     Smoke Machines   Smoke machines should not be used wit
46. jacent Exhibitor s on adjustments to be  made to the height of the platform   e Provision for a special ramp for handicapped visitors on stands with platform is a MUST  with sides clearly defined  at not more than 1 12 gradient as described in Disabled Access     Technical Information  e Platforms in excess of 600mm must conform to  See Structural Stability     Technical Information  e Platforms and stages for public use over 320mm high shall require a suitable handrail  See Balustrades  amp  Handrails      Complex Stands     Standfitting Information  Exhibitors occupying two or more stands as part of their corporate group strategy are allowed to platform the gangways  between their stands subject to the following    e Written permission must be granted from the Organiser   e The stands must be adjacent to each other  or  e The gangway must be clearly highlighted with studs or other means of identification     Restricted Access to Stands    6 17    6 18    6 19    6 20    6 21    An Exhibitor may barrier the whole or part of its stand to control access to visitors provided it is constructed in compliance  with the following     a  Any barrier exceeding 1500mm in height must conform to See Balustrades  amp  Handrails     Complex Stands      Standfitting Information    b  Any barrier must be designed for a horizontal load of 1 5kN calculated at a height of 1 1m from floor level unless  prior dispensation has been given by the Technical Consultants    c  Barriers must be positio
47. l be constructed of approved materials and wired in approved type cables  not  flexible cords  which are related to the expected internal ambient temperature and adequately ventilated     c  Location  Illuminated signs  which in any way resemble exit notices and similar mandatory signs shall not be positioned in  such a way as to cause confusion to the Public     Load Limitation  Electrical     DWTC at its own discretion will limit the electrical supply or supplies where  in its opinion  the load or combination of loads  requested may have an adverse effect on the supplies to Exhibitors     3 16    3 17    3 18    Local Switches  amp  Socket Outlets   a  Local Switches  Local switches shall be fixed out of reach of the Public and shall be mounted and protected in a similar way to  distribution fuse boards    b  Socket Outlets   It is recommended that double socket outlets be installed    1  Construction  Socket outlets shall be to BS 1363  1984  industrial type for mechanical protection and be suitable so that  in normal use their performance is reliable and without danger    2  Location  Socket outlet enclosures shall be securely fixed to Stand floors  walls or partitioning in such a way that  they shall not be subject to mechanical damage and shall be located not less than 2m  measured  horizontally  from any sink unit  unless where this is unavoidable  100 mA RCD protection is installed   Wall sockets shall be a minimum of 300mm above floor or work surface level      3  Wa
48. l termination enclosures  be totally insulated  using green and yellow PVC sleeving   Residual Current Devices  ELCB  Where a residual current device ELCB is installed this shall only be considered a secondary means of protection   Wiring  Material Specification  Stand wiring may be PVC  elastomeric or other plastic sheathed cable  not less than 1 5mm2 cross sectional area and  300 500 volt grade   Joints  Joints shall not be made in cables except where necessary as a connection into the circuit  In such cases insulated screwed  connectors shall be used  and shall be totally enclosed in insulated enclosures   Excess Current Protection  All circuits must be separately protected for excess current with fuses or other means of excess current protection   Lighting Circuits   a  Maximum Capacity  Lighting circuits  serving more than one fitting  shall not carry more than 1200 VA and all sections of the wiring  system shall be capable of carrying its circuit full load current  Where discharge lighting is connected then the  appropriate reduction shall be made  normally to 800 VA   All apparatus over 1000 VA shall be individually fused    b  Main Load  Where the lighting load of any Stand or feature is in excess of 14000 VA  the circuit shall be arrange to be suitable  for connection to a 3 phase supply with neutral and phase conductors being of equal size   Flexible Cords   a  Limitations  The use of flexible cords for Stand wiring is generally prohibited other than where forming p
49. l wires  shackles  web slings  chains or lifting appliances are classed as rigging accessories     Adjustment to Permanent Hall Lighting    5 22    5 23    5 24    5 25    5 26    5 27    Where adjustment to the permanent hall lighting is required by means of the removal or isolation of house lighting  this may  only be undertaken at the sole discretion of DWTC  Such adjustment may only be considered for areas within the allocated  stand area boundaries and must be notified to the Senior Operations Manager at the time of placing confirmation orders for  rigging services at least two week prior to build    Wherever such adjustment is made to the hall lighting  temporary measures must be made to provide adequate temporary  lighting for build up and breakdown periods     Area Boundaries  All suspended systems must be totally self contained within the boundaries of the allocated stand area to which they relate  and must either be totally suspended or totally ground supported     Enquiries and Orders  Any Contractor intending to carry out installation of suspended fittings must contact   Customer Contact Centre    Telephone   971 43086333  Fax   971 4 3188741  E mail  C3 dwtc com    And adhere to the implemented Rigging Form  see FORM 12  to place their orders and a review of the guidelines     General Rigging Regulations   Installation of overhead suspended lighting rigs  are subject to limitations on weight loading  To ensure complete safety  it is  imperative that we are provid
50. le to Shell Scheme Exhibitors    RISK ASSESSMENT FORM   EXAMPLE  PLEASE NOTE THAT THIS FORM IS AN EXAMPLE ONLY  DO NOT RETURN THIS FORM AS YOUR RISK ASSESSMENT FORM          RISK ASSESSMENT    For show period  Y   BU OPEN BD    Date this RA Undertaken   aa   ua     aaa aaa aaa aaa o anen usnncene cen zezore veeenen       Shovv        Venue 8 Hall    RA undertaken by      signed  FOR CONTRACTOR     RA undertaken by      signed  FOR EXHIBITOR                    Task  Hazard  Who   s at risk  NAME   Risk level   Precautions  Control Measures    NB  Samples only     use your   List ALL here     but only   Exhibitors   Contractors   Sub    Frequency x NB  If the existing control measures are adequate  set them out  12 If I   the maj Contract Visit Y i   NT  own pages abe norma Tor asma j E Bers ones ontrac ors   1S ors   Young  Severity x If more precautions need to be taken then prioritise the    High Very  stand  complex stands may require 20      None is usually   New or inexperienced staff     Max loss x i preh PR  P   i fi  or more  insufficient  General Public   Disabled   Lone Probability High Risk  hazards and implement their control measures first   Workers   Children   Other  name   Medium 1  Hard hats  amp  harnesses to be worn in appropriate areas   Working at height  ie  Falls of men and 2  Ensure temporary guardrails are fitted when constructing the  constructing and dismantling   equipment causing   Contractors  Exhibitors  New staff  upper deck   injuri death isi  
51. lways available    Application for this facility must be made to the Senior Operations Manager at least 6 weeks prior to the show  If Early Access  is available the Senior Operations Manager will notify the Exhibitor Contractor of the dates available and the associated cost   If any electrical power is required then this will have to be ordered from the Electrical Contractor  Charges may be made for  this extra facility and will be invoiced directly by the Electrical Contractor     Fixing to Building Structures  It is strictly prohibited to affix nails  hooks  tacks  screws  adhesives  paint or similar items to the floor  walls  ceilings or other  parts of the premises  This shall include the fixing of holding down bolts  attachments to the structural steel work  and the  anchorage of guy ropes  wires  cramps or tackle for any purpose to any part of the building fabric and structure  whether to  the interior or exterior  See Rigging     Standfitting Information  Suspended stand fittings will not be permitted  However the Company may permit suspension from the Hall roof of banners  or other decorative materials provided that    e They form part of an overall scheme of decoration approved by the organiser   Application is made to the Senior Manager     Exhibitions Operations by 10 February 2013  The proposed suspended units do not overstress the roof structure   Full details are submitted at the time of application   Work is carried out by the Exhibitor   s Contractor        6 
52. ned at a minimum height of 500mm to ensure that they are not a trip hazard to visitors    d  Emergency exits must be incorporated at intervals at no less than every 20m of the perimeter of the barriered area   with a minimum of 2 such exits on any enclosed area irrespective of size    e  Clear and specified access and exit points  including provision for disabled visitors  must be incorporated  They  must be a minimum of 1000mm wide and must be able to be opened immediately in an emergency    f    Unless an Exhibitor wishes to restrict access to invited guests only and not allow the general public access to the  stand  then 5  or 10m   whichever is the greater  of the available enclosed area must be incorporated within the  stand area for the queuing of visitors    g  If access is to be limited to invited guests as detailed in Clause  f  this must be clearly indicated on the stand design       submitted for approval   h  All exits including gates must not open into the gangway     Safety of Working Exhibits  In order to offer some guidance to those Exhibitors planning to demonstrate equipment  the following should be noted      e All running machinery and other working apparatus must be efficiently guarded to the satisfaction of the relevant  Authorities to prevent injury to persons    e Exhibits must be positioned so that  at no time  do they intrude into the gangway or cause a hazard to visitors    e Starting devices on machines should be isolated to prevent visitors operat
53. ng Walls   Columns Light Poles Pillars Totems  Emergency Access Gangways  Emergency Lighting   Floor Coverings   Height Regulations   Notice to Erect an Exhibition Stand  Ramps   Stairways  amp  Ramps to Stands   Stand Area   Stand Design Submission  amp  Approval  Walling Regulations    Complex Stands  Auditoria  amp  Seminar Areas  Balustrades  amp  Handrails  Base Plates   Double Storey Stands    Rigging   Adjustment to Permanent Hall Lighting  Area Boundaries   Enquiries and Orders   General Rigging Regulations   Lighting Adjustment Focusing  Suspended Lighting Equipment  Lighting Trusses   Truss Infills    Technical Information    Adhesive tapes   Audio Visual Equipment  Dilapidations   Disabled Access   Early Access for Suspended Lighting and or steelwork Erection and Power  Fixing to Building Structures   Fixings to Floors   Floor Loadings   Gas and Compressed Air   IT  amp  Communication Services  Lifting  Handling  amp  Transportation of Goods  Materials   Means of Escape   Minimum Standfittings   Platforms   Restricted Access to Stands   Safety of Working Exhibits   Service Ducts   Smoke Alarms   Smoke Machines   Specialised Lighting  amp  Laser Displays  Standards   Structural Stability   Use of Mortar   Water  amp  Waste   Water Features   Working in the Venue    Shell Scheme     Standfitting Information  Shell Scheme     Standfitting Information  Shell Scheme     Standfitting Information  Shell Scheme     Standfitting Information    Space Only     Standfitting In
54. o Stands or exhibits vvill be installed on 11 December  2009  provided that the supply has been ordered  before the deadline  Before occupying the Stand  Exhibitors and their Contractors must check that the supply has been  installed and  if not  shall only occupy areas of the Stand site permitted by DWTC until such time as the supply is installed     Ordering of Electrical Supplies  Placing of Orders  Orders will only be accepted when made in writing using the Electrical Mains order FORM 13 in the Exhibitor Service Forms  Section   Supply will be a cable only to the stand  The position of the cable on the stand will depend on the position of the Service Duct  serving the stand  Any other termination required should be ordered   Deadline for Orders  Orders for mains electrical supplies shall be placed not later than 10 FEBRUARY 2013   Orders for mains electrical supplies received after 10 FEBRUARY 2013 will incur a 20  surcharge   Payment  The Official Standfitting and Electrical Contractor reserve the right to refuse to connect a supply until payment has been  received   Routing and Termination Positions  The mains electrical supply shall be brought onto the Stand from the Service Duct within the area of the Stand  Connections  from a Duct on an adjacent Stand shall not be permitted unless there is no trench on the Stand  or the organisers and  adjacent Stand holder have given their prior permission   Only authorised personnel are allowed to enter the Service Ducts or remove
55. o trusses is subject to the conditions of the Electrical Regulations Section  The electrical mains  supply for suspended lighting systems shall be separate from the stand mains supply  but must be located within the  allocated stand area to which it relates    If the suspended system is to be raised and or lowered by the use of electric motors a separate electrical mains supply must  be used  This supply will be connected to raise the rig  disconnected once the rig is installed  and then re connected at the  close of the Show to allow for lowering of the rig   NOTE  the use of the lighting or stand mains power supply for this  purpose is NOT permitted     Lights  lasers and reflectors must be directed in such a manner as to ensure that the light beam projected is contained within  the allocated stand area boundaries to which they relate    See Specialised Lighting  amp  Laser Displays  Technical Information     Lighting Trusses    Lighting trusses are to be of a tubular metal construction  finished in a single neutral colour or natural metal finish     5 28    6 0    6 1    6 2    A structural report  certified by a competent  independent structural engineer  must be available for inspection for all  suspended truss systems   At all times  all suspended truss systems must be used vvithin the confines of the structural report relevant to such systems     Truss Infills   Truss infills are permitted  Full proposals  taking into consideration information below  must be submitted 
56. oints in the exhibition  halls  concourse areas  meeting rooms or offices are strictly prohibited  DWTC reserves its right to sanction non compliance   DWTC is responsible for maintaining a secure network and will deploy adequate security mechanisms to support wireless  networking in the venues    DWTC deployed a wireless network to cover all its venues  based on the 802 11 standards  DWTC will work with other  entities to accommodate special needs  where technically feasible    DWTC will collaborate with organisers and tenants where devices used for specific business reasons may require specific    solutions     Wireless Service Considerations   Wireless networking has bandwidth limitations compared to the wired network  The wireless network should be viewed as  augmenting the wired network  to provide more flexible network use  Applications that require large amounts of bandwidth   or are sensitive to changes in signal quality and strength may not be appropriate for wireless access     Standards supported  IEEE 802 112 is the preferred wireless networking standard  Security standards may be applied as needed     Lifting  Handling  amp  Transportation of Goods   The Official Freight Forwarder and On site Handling Agents are Airlink International UAE  Agility Logistics and they will take  care of the shipping and transportation requests of our Exhibitors  They have total responsibility for the movement of all  exhibits on the exhibition site  Their contact details are as foll
57. ole width of the stairway   b  the width shall be not less than 1m   c  there shall not be fewer than three nor more than sixteen risers per flight   d  the height of the riser shall be not be less than 75mm nor more than 180mm   e  the going shall be not less than 280mm and the aggregate of the going and twice the riser shall be not less  than 550mm nor more than 700mm   f  the going of the landing shall be not less than the width of the stairway   g  where tapered steps are constructed  the angle formed by the nosing of the tread and the nosing of the tread  or landing immediately above it shall be not more than 15 degrees   h  a handrail shall be    i  provided on each side of a flight of the stairway and where the stairway exceeds 1 9m in width  ii  a handrail shall be provided so as to divide the flight equally  iii  designed as to afford adequate means of support to persons using the flight  continuous for the  length of the flight  and  iv  securely fixed at a height of not less than 840mm or more than 1m  measured vertically above the  line of pitch of the flight    i  the treads and landings shall not be constructed of slats or perforated material   j  each tread shall be level and the nosing of each tread shall overlap the back edge of the tread below it by not  less than 15mm   k  consecutive tapered treads shall each have the same going and rate of taper   2  Cupboards formed beneath stairways and ramps shall be lined throughout with non combustible material   3  
58. on  Technical Information  Technical Information  Technical Information       2 0 Contractor Information    2 1    Contractors are advised to read the whole of the Exhibitor Manual and the   V      that they are full conversant with all elements of working at the Venue  From a Contractor    erspective please pay particular attention to Contractor Information  Electrical Information    Stanantting information  Heath  amp  Safety Information as well as the Technical Information     e        nl             Badges     Contractor  The following regulation has been introduced by DWTC Protocol and Security Department as required by the Dubai  Naturalisation and Residency Department     Temporary Contractor Badges   Local Contractors  UAE Based    Individual Application   All contractor staff must report to the cashier   s cabin at the Za   abeel service yard to avail of a temporary contractor badge in  exchange of a valid proof of identity which can be either a UAE labour card or a UAE national ID card or a UAE driving licence  or a UAE government organisation ID card    This proof of identity will be kept at the cashier   s cabin at the Za   abeel service yard until the contractor badge is returned  As  of 1 September 2011  each of these contractor badges will be charged AED 20 00 and is valid for a day  from 00 01 to 24 00    A fee of AED 100 00 will be payable at the cashier   s cabin at the Za   abeel service yard for any lost contractor badge     Group Application   A contracto
59. or which they are designed     Means of Escape  Each and all stands must be designed in such a way as to ensure that the maximum travel distance from any part of the stand   offices  hospitality  auditoria  etc  to a gangway or unobstructed access to a gangway does not exceed 15m    Minimum Standfittings   All Space Only stands MUST  at the Exhibitor   s expense  have a minimum standfitting requirement of floor covering to occupy  the whole of the stand area and suitable dividing walls between stands including back walls  both to be a minimum height  that relates to the height regulations    All Space Only stands on the perimeter of the hall MUST have back walls and suitable dividing walls between stands to a  minimum height that relates to the height regulations    See Height Limits     Standfitting Information     Platforms  It is the responsibility of Exhibitors taking Space Only to make their own arrangements for the provision of platform for their  stand area  which would facilitate the passage of cables   An Exhibitor may incorporate platforms as part of its overall stand design provided they are constructed in such a way as to  conform to the following    e Sharp metal edging must not be used  The platform should have timber finished edging and all corners should be  rounded  e Corners of stand platforms must be fixed securely and flush with the floor  where practical  to prevent a trip  hazard   e Ifa Platform abuts an adjoining stand Exhibitors must agree with the ad
60. ore than one socket per circuit  maximum rating of  overcurrent protective device shall be 15 amps  Total load shall not exceed 3000 watts and not more than 3 sockets shall be  permitted on that circuit   Coils Reels of Flexible Cord Cable  Coils of flexible cord or cable loose or on reels and forming part of the circuit shall not be permitted     Electricity Supply   A separate mains cable will be supplied to each stand and each stand should have separate circuits for lighting and mains  It  is the responsibility of the stand electrical Contractor to supply a distribution board  fused isolator or circuit breaker  fitted  with an earth leakage protector of not more than 30mA for power and 100mA for lighting  suitably positioned in an  accessible position and clearly labelled     Single Phase 240V    50 cycles per second AC supply  earthed neutral between 2 and 30 amps with 100 mA RCD ELCB protection any one supply   Three Phase 380V    50 cycles per second AC supply  earthed neutral between 10 and 60 amps with 100 mA RCD ELCB protection any one supply    a  Neutrals are earthed by DWTC    b  DWTC s standard supplies are normally acceptable as  clean  and suitable for use for computers and data  processing equipment  However  it is recommended that the Exhibitor arranges a suitable UPS or line conditioner  as protection for all electrical systems requiring clean supplies  DWTC  LLC  will not be held responsible for any  damage to Exhibitors equipment    24 Hour Supplies   Wher
61. ows    Airlink International UAE   P  O  Box 10466   Dubai  United Arab Emirates    Telephone   971 4 3325334   Fax   971 4 3325155   E mail  j khoury airlink ae   exhibitions  airlink ae  Contact  Jihad Khoury    Agility Logistics  P  O  Box 52378  Dubai  United Arab Emirates    6 12    6 13    6 14    6 15    6 16    Telephone   971 4 3312003    Fax   971 4 3310007  E mail  gjacob  agilitylogistics com  Contact  George Jacob    We recommend that Exhibitors use the services of Airlink International UAE  Agility Logistics as they have experience in  handling exhibition shipments and will supply comprehensive pre exhibition  site and post exhibition services    Video Tapes  CD  amp  DVD   Please note that the import of videocassettes  CD  amp  DVD is subject to censorship by the Ministry of Information  Exhibitors  proposing to use videotapes at Exhibition are recommended to obtain necessary clearance through Airlink International UAE   Agility Logistics     Materials  Fitness of Materials  All materials used in the construction of stands  features and displays  including signs and fascias  shall be   e Non combustible  inherently non flammable or durably flameproofed  Advice can be obtained from the Venue   s  Health and Safety department   e Ofa suitable nature and quality in relation to the purposes for and conditions in which they are used  e Adequately mixed or prepared before being brought to the Centre  e Applied  used or fixed so are adequate to perform the functions f
62. r may also apply for DWTC contractor badges for the company   s entire team any time before the build up starts   A representative of the company should submit the application at the cashier   s cabin at the Za   abeel service yard along with  each staff s original proof of identity  a UAE labour card or a UAE national ID card or a UAE driving licence or a UAE  government organisation ID card  that will be kept at the cashier   s cabin at the Za   abeel service yard until the contractor  badges are returned    As of 1 September 2011  each of these contractor badges will be charged AED 20 00 and is valid for a day  from 00 01 to  24 00   A fee of AED 100 00 will be payable at the cashier   s cabin at the Za   abeel service yard for any lost contractor badge     Temporary Contractor Badges   International Contractor Badges  non UAE based    All contractor staff must report to either the cashier   s cabin at the Za   abeel service yard or at Al Wasl reception to avail of a  temporary contractor badge in exchange of a passport copy  The badge will be valid for a maximum of 15 days  AED 200 00  will be charged per badge  this AED 200 00 represents an entrance fee of AED100 00 and a refundable deposit of AED100 00   The refundable deposit can be claimed upon returning the badge within 15 days from the date of payment  In the event of  the badge not being returned to the cashier   s cabin at the Za   abeel service yard or at Al VVasl reception  the deposit will not  be refunded     
63. ray capable  of containing the entire quantity of oil plus a margin of 10     Frequency Converters   DWTC shall be notified in advance of the intention to provide apparatus to convert the frequency of the electrical  supply to any machine or exhibit     Health  amp  Safety Rules and Regulations    The following information is available to download from the Exhibitor Zone on show website     DWTC Health  amp  Safety Rules and Regulations    DWTC Health  amp  Safety Checklist    Catering Disclaimer Form    Method Statement   Example  PLEASE NOTE THAT THIS FORM IS FOR EXAMPLE ONLY   PLEASE DO NOT RETURN THIS FORM AS YOUR METHOD STATEMENT    Submitted by Managing Director Senior Manager     in block capitals please     Signed by Managing Director Senior Manager    Exhibitor  in block capitals please     ITEM       RESPONSE REQUIRED       Responsible Person s      Details of the Stand     Name of person s  who will be responsible for the construction and breakdown of your stand     Hall m     any unusual stand features              Access  Estimate the number of vehicles making deliveries and whether there will be any abnormal  deliveries    Erection  The sequence and schedule in which all the stand elements will be built  including alignment   electrical connections  etc    Scheduling  Estimate the number of hours and personnel needed within the time allowed to safely  complete the stand    Stability  Methods of ensuring adequate structural support of any stand element that requi
64. res cross  bracing  with calculations and inspection certificate from an independent structural engineer    Lifting  If a forklift truck is required for erection  what lifting capacity needs to be provided locally    Scaffolding  Include details of temporary and mobile scaffolds  access towers and other work at height  which you intend to carry out    COSHH  Advise of any proposed use of hazardous and toxic substances to the venue  outline the    protection provided for employees and workers on adjacent stands           Environment     Consider any abnormal noise level that may be present  or work which may create dust or  fumes  what ventilation and other control measures will be provided           Services  Note where electrical work will be carried out and where welding gases  compressed air   water or waste services will be brought onto site    Safety features  Identify the safety equipment and precautions that you will be providing on site  including  protective measures that you will be implementing for all of the above and areas of risk as  highlighted from your Risk Assessment    Exhibits  Provide DWTC with any all details on exhibits which may present a risk to the public and or    the operator  how will this exhibit be delivered onto your stand   what guarding or any other    special requirements are there   what hazardous waste will be produced and what measures  will be employed to dispose of that waste        NB  This Method Statement Form is not usually applicab
65. rm    Contractor Information Section  Contractor Information Section  Contractor Information Section  Contractor Information Section    Contractor Information Section  Contractor Information Section    Electrical Information  Electrical Information  Electrical Information  Electrical Information  Electrical Information  Electrical Information  Electrical Information  Electrical Information  Electrical Information  Electrical Information  Electrical Information  Electrical Information  Electrical Information  Electrical Information  Electrical Information  Electrical Information  Electrical Information  Electrical Information  Electrical Information  Electrical Information  Electrical Information  Electrical Information  Electrical Information  Electrical Information  Electrical Information  Electrical Information    Health  amp  Safety Section  Health  amp  Safety Section  Health  amp  Safety Section  Health  amp  Safety Section  Health  amp  Safety Section    5 0    5 1  5 2  5 3  5 4    5 5  5 6  5 7  5 8  5 9  5 10  5 11  5 12  5 13  5 14  5 15  5 16    5 17  5 18  5 19  5 20    5 21  5 22  5 23  5 24  5 25  5 26  5 27  5 28    6 0    6 1  6 2  6 3  6 4  6 5  6 6  6 7  6 8  6 9  6 10  6 11  6 12  6 13  6 14  6 15  6 16  6 17  6 18  6 19  6 20  6 21  6 22  6 23  6 24  6 25  6 26  6 27    Standfitting Information    Shell Scheme   Shell Scheme Contractor   Shell Scheme Electrics   Shell Scheme Name Board  Fascia   Shell Scheme Services  amp  Regulations  Space Only   Adjoini
66. ry 2013     Performance Bond Refundable subject to conditions    Exhibition Name     Company Name   Address   City Country   Email  ___    Contact Person with designation     Date  Official Company Stamp     Stand Numbers  ___  Total number of stands   Manager s Cheque No   Bank Guarantee No       For Official Use only     Signature     Fax     Mobile        Managers Cheque   Bank Guarantee Received On    Amount to be refunded        Penalties  if any     Date of Refund           Date of return       Name  amp  Signature       This document must be returned together with the Letter of Undertaking       3 0 Electrical Information    3 1    3 2    3 3    Batteries     a      b      c      d      e     General  Charged batteries may only be exhibited as part of electric lighting  small demonstration  house lighting  plants or  other small working devices  No Stand lighting shall be connected thereto  The use of approved purpose made self   contained secondary lighting fittings both of a maintained and non maintained pattern will be permitted provided  they are connected to a 24 hour supply   Terminals  All terminals of charged batteries  whether in use or not  shall be fitted with a cover of non conducting  incombustible material   Switches and Fuses  A double pole metal clad switch with suitable fuses shall be fitted and shall control all connections serving such  appliances   Charging  1  Current Regulation  The battery charging unit shall be fitted with an automatic current r
67. s   Telephone sets   AED 120 00 each  Fax machines   AED 1 100 00 each  Please refer to the following forms for more information and to place your order   e FORM 14   Data  amp  Telecomm Services  e FORM 15   Audio Visual inc Satellite Services    Wi Fi Clean Air Policy    Purpose   As the Wi Fi wireless networking uses the shared resource of the unlicensed radio frequencies  it is necessary to regulate the  usage of such devices within the Dubai World Trade Centre  DWTC  venues    By applying this policy  reliable and secure Wi Fi based services can be provided at DWTC    This policy applies to all wireless networking devices and users on DWTC premises     Policy   Ownership and Management of Radio Airspace   DWTC is the owner of the unlicensed radio frequencies on its property  These include the FCC 2 4 GHz Industrial Scientific   Medical  ISM  and the 5 GHz Unlicensed National Information Infrastructure  UNII  bands used in wireless networking  DWTC  is responsible for managing these radio frequencies for the benefit of DWTC users  DWTC may restrict use of any devices that  can cause interference in the unlicensed radio frequencies ranges  These include cordless phones  microwave ovens  high  voltage audio speakers or any radio transmission devices    DWTC is solely responsible for providing wireless networking services within its venues and offices  No other entity may  deploy wireless network access points or other wireless service in its space  Private wireless access p
68. standards and that any tower scaffold in use is properly  established and propped    e Use of 3 pin adaptors with earth clips to connect European sockets to British sockets and never to use a 2 pin plug  in a 3 pin socket or vice versa    Unforeseen Occurrences   In the event of any occurrences not foreseen in these Rules and Regulations  the decision of the Organiser shall be final     Letter of Undertaking Performance Bond   The Letter of Undertaking is a compulsory document that is required from the Contractor  It is required before any work may  start at the build of the show  It is also important that the Contractor fully understands and reads all sections of the Exhibitor  Manual before completing the letter    A copy of the Letter of Understanding is on the following pages  Once completed the Letter of Understanding is to be  returned to the Senior Operations Manager     DWTC Exhibitions  along with the Performance Bond    See Performance Bond     Contractor Information    Performance Bond Letter of Undertaking    In our constant efforts to improve our service delivery to our clients  we have implemented a Performance Bond requirement  for all stand Contractors  working on all shows organised by Dubai World Trade Centre    This is compulsory for all stand Contractors working in the exhibition halls or any off site venues to complete the  Performance document    A copy of the Performance Bond is on the following pages  Once completed the Performance Bond is to be return
69. ste materials  the  Exhibitor or its appointed Contractor vvill be required to sign a clearance form  confirming any dilapidations  issued  by the Organiser    e Failure to obtain a clearance form will result in the loss of right of appeal against any dilapidation charges made   Before the end of the tenancy  the Premises will be inspected by DWTC and  in accordance with the Licence  any damage to  the building structure occasioned by an Exhibitor or its Contractor will be notified to the Organiser who will invoice the  Exhibitor for the cost of any repairs     Disabled Access  Exhibitors should ensure that they have considered all features that may make it unreasonably difficult for a disabled person  to access their stand   Any Exhibitor incorporating a platform that exceeds 38mm in height or a part platform that exceeds 20m  AND 38mm in  height  MUST ensure that it is accessible to the disabled visitor and should contain clear and specified access and constructed  in such a way as to conform to the following     e bevelled with a ramp of no more than 5    1 12 gradient     e aminimum of 1000mm wide  and   e fitted with a handrail on each side or other such division to avoid any trip hazard resulting from the change of floor   levels    See Balustrades  amp  Handrails  Complex Stands     Standfitting Information    Early Access for Suspended Lighting and or steelwork Erection and Power    Early entry for suspended lighting rigging purposes and or steelwork erection is not a
70. t be appropriate     3 11    3 12    3 13    3 14    3 15     c  Lighting Fittings  Lighting fittings mounted below 2m from floor level or otherwise accessible to accidental contact shall be firmly  and adequately fixed and so sited or guarded as to prevent risk of injury to persons or materials      d  Heat Generation  Incandescent lamps and other apparatus or appliances with high temperature surfaces shall  in addition to being  suitably guarded  be arranged well away from combustible exhibits and in such a manner as would prevent contact  therewith  Stands containing a concentration of electrical apparatus  lighting fittings or lamps liable to generate  abnormal heat shall be well ventilated     Harmonic Distortion   DWTC electrical mains normally provide an acceptably    clean    supply  No protection is incorporated in the mains to  counteract interference produced by other Exhibitor   s equipment connected to the same source of supply  All  sensitive vulnerable equipment should be protected by filters  etc    Electrical equipment which produces harmonic distortion can cause problems for the local area supply board  DWTC and  other Exhibitors in the halls  This equipment may only be used if adequate precautions and harmonic filters are used  Any  costs involved to overcome the harmonic problems will be the responsibility of the installer and liability for any  costs damage to DWTC   s supply equipment and or others equipment lies with the installer    DWTC reserves the r
71. talled under flooring or in spaces enclosed by Stand  construction     Electric Cookers Kettles Irons etc     a      b      c     General   The use of exhibits with exposed elements is not permitted  Any apparatus which has a hot surface and all  electrical appliances such as electric kettles  irons etc   shall be guarded where necessary and stood or mounted on  incombustible material  All appliances under this heading which are liable to exceed a surface temperature of 70   C  shall be supplied from a socket outlet having a pilot lamp indicating whether the appliance is switched on or not   Kettles  irons and similar appliances shall not be connected to the lighting circuit  they shall be separately  connected to the electrical supply    Electric Kettles   Electric kettles shall be fitted with an automatic safety device whereby in the event of boiling dry  the kettle will be  automatically disconnected    Adjacent Construction   Walls adjacent to all electrical cookers  irons  kettles  hot plates  etc   shall be protected with non combustible  material  Shelves are not allowed immediately above any of the appliances and adequate ventilation shall be  provided     3 4    3 5    3 6    3 7    Electric Discharge Lamp Installations  Installations of any type of high voltage luminous tube sign or lamp as an illuminated unit on a Stand  or as an exhibit  shall  confirm to the follovving conditions      a  Location   The sign or lamp exhibit shall be installed out of reach of or sh
72. ter Heaters  Water heaters shall be connected via fused spur outlets   not socket outlets    4  Floor Sockets    Where a floor mounted socket outlet is essential it shall be securely fixed  not in a gangway and shall be  adequately protected from the accidental ingress of water  and be of surface mounted pattern    c  Plugs    1  Multiple Connections  Not more than one flexible cord shall be connected to one plug     2  Fuses  The rating of fuses in fused plugs shall be appropriate for both the equipment and flexible cord  connected thereto  Non flexible cords shall not be connected into plugs      d  Adaptors   1  Multi way plug in type and bayonet adaptors shall not be used    2  The use of Trailing Block type  4 way fused sockets shall not be used    3  Extension cables shall not be used     Location of Boards    Distribution boards and similar equipment shall be installed adjacent to the fused isolators  Switch and fuse gear  motor  controls  starters  etc   shall be readily accessible  suitably connected and out of reach of Public Gangways  The electrical  Contractor responsible for the Stand installation shall supply suitable service mains to connect his her installation to the  main supply cables supplied by DWTC     Mains Supply Cables  amp  Distribution   Every Stand shall be supplied by a separate mains cable except where  by approval of DWTC  a single mains cable may be   installed to supply a block of up to six adjoining Stands  This approval will only be given wh
73. to the Organiser  by 10 February 2013   The following should be noted     e  Infills must be of a single thickness muslin  casement or other such material that will allow egress of water from the  permanent sprinkler system installed throughout the Premises    e All materials used for infills must be flame retardant treated to BS5867 Part 2 minimum and a certificate of flame  retardant treatment must be available for inspection    e Installation of infills is subject to any restrictions from CCTV  ventilation systems or other applicable restrictions  from any permanent services within the Premises and must  in all circumstances  be clearly indicated on any design  plans    The colour of the truss infill must be white neutral    Technical Information    Adhesive tapes   Adhesive tapes used to fix carpets or other materials to floor areas must be removed after use without damage to the floor   Plastic packing tape  gaffer tape  masking tape or drafting tape  which are the most difficult tapes to remove from floors  is  not to be used  DWTC recommend that the following tapes are used     Euro tape  Eurocel and Advance tape    DWTC will examine the hall floors after the removal of tapes and if the floor surface is found to be damaged a charge will be  made for repairs  Any tapes not removed by the Contractor will be removed by DWTC and a charge of AED 50 00 per metre  will be made     Audio Visual Equipment    The use of PA systems  video monitors and walls etc  is ONLY permitted
74. tors     9  Assume responsibility for any and all Sub Contractors it subcontracts     The Organiser reserves the right  at its sole discretion to apply penalties  in the event of any breach by  the Contractor  of any of the above undertakings     Exhibition Name     Company Name     Address  Tel    City Country  Fax  2    Email  Mobile  sd   Contact Person with designation  Signature    Date  Official Company Stamp     This document must be returned together with the Performance Bond    PERFORMANCE BOND    All Contractors are required to issue a Performance Bond in favour of Dubai VVorld Trade Centre  LLC      Only vvhen this Performance Bond is placed and the Letter of Undertaking signed and returned to the Organiser   will the Contractor be allowed to commence work in the exhibition halls or any off site venues     The Performance Bond must be paid either as a Manager s Cheque or Bank Guarantee  in favour of Dubai       World Trade Centre  LLC  as follows        AED 10 000  per Stand   Pavilion contracted   AED 20 000  per Double Decker stand contracted     The Performance Bond will be refunded to the Contractor  3 weeks after the end of the Exhibition  subject to the  application of penalties for any breach of the conditions stipulated in the Letter of Undertaking     The Contractor is required to provide the Organiser with full bank details for refund purposes  so that this refund    can be processed accordingly     The deadline to submit the Performance Bond is 10 Februa
75. two adjacent rows but shall not extend across Gangways    No area beneath a stage  tiered seating  or a stairway to such stage or tiered seating shall be used for storage   purposes     TABLE A TO REGULATION  4                       Number of persons Minimum number of exits Minimum width of exits  m   Up to 200 2 1 0   200  300 2 1 2   300     400 2 1 4   400  500 2 1 6   Over 500 2                Plus 1 additional exit of minimum width 1 6m for every additional 250 persons or part of 250 persons        Balustrades  amp  Handrails  Handrails  Design Considerations  People who have physical difficulty in negotiating changes of level need the help of a handrail that can be gripped easily  is    comfortable to touch and  preferably  provides good forearm support   Handrails should be spaced away from the wall and rigidly supported in a way that avoids impeding finger grip     Handrails should be set at heights that are convenient for all users and should extend safely beyond the top and bottom of  flights of steps  or a ramp  to give both stability and warning of presence of a change of level     A continuous handrail must be provided across the flights and landings of ramped or stepped access    The vertical height to the top of the upper handrail from the pitch line of the surface of a ramp  or a flight of steps   must be between 900 and 1000mm  From the surface of a landing it must be between 900 and 1100mm    Where there is a full height structural guarding  the vertical hei
76. uch ways as it sees fit  including the right to restrict the area of  scaffolding or plant and limit the times during which it shall remain in the Halls or on the stand     Emergency Lighting  The illumination provided by normal lighting and by the emergency lighting should each be sufficient to enable the public   performers and staff to see their way out of the premises  stands  seminar rooms and theatres at all times  The horizontal  luminance at floor level provided from either source along the centre line of defined escape routes should nowhere be less  than 1 lux  This need not apply to seatways leading directly to gangways   e Care should be exercised so that the failure of a single lamp on either supply will not cause a hazard   e Any battery used for emergency lighting should be capable of maintaining the full load connected to it for a  minimum of three hours after the failure of the normal supply   e All rooms beneath multi storey stands and any other rooms with solid ceilings must have emergency lighting  incorporated   e Rooms with fabric or muslin type ceilings must allow adequate light through should the hall lights dim in the event  of an emergency and all exits must have a battery operated emergency exit sign     Floor Coverings  e The entire space of all allocated Space Only stands must be covered with a suitable floor covering   e Floor coverings may only be fixed to the floor using an industry recommended type of carpet tape  we recommend  Euro tape  Euroc
77. very motor in excess of 0 375 kW  1 2 hp  shall be fitted with a starter having an overload release in each phase  line    Every motor shall be provided with means to prevent automatic restarting after a stoppage  to a drop in voltage or a failure   of supply  where the unexpected restarting of the motor might cause danger     Electrical Contractor   The Official Electrical Contractor for the event is as follows   Admin Office   Event Services   Dubai World Trade Centre   P O  Box 9292   Dubai   United Arab Emirates   Customer Contact Centre    Telephone   971 43086333  Fax   971 4 3188741  E mail  C3 dwtc com    Orders for electrical installations should be returned to the Official Electrical Contractor by no later than 10 February 2013   see FORM 13 Utilities Order Form     Exhibitor Service Forms Section   ORDERS PLACED AFTER 10 February 2013 WILL BE  SUBJECT TO A SURCHARGE OF 20   It is essential that this date is strictly adhered to  not only for the stand installation  but  to enable the necessary mains to be ordered from DWTC in sufficient time for them to be laid in the hall before general  construction commences     Earthing   Earth Leakage   Each Exhibitor shall provide exact details of earth leakage to prevent tripping and shall have provided by the Contractors   earth leakage  RCD ELCB  protection  30 mA for lighting and 100mA for exhibit power  suitably positioned beyond the  termination point of the supplied mains cable     Regulations and Codes of Practice  Met
78. w Voltage Lighting Systems   a  Transformers    Multiple connections Safety Extra Lovv Voltage  SELV  Transformers shall be of an isolating type providing a high  degree of safety and having a fused primary connection  Every secondary connection shall be individually fused to  its appropriate rating or shall be fitted with a manual re set protective device approved by DWTC s Engineering   Transformers shall be clearly labelled indicating the precise details of any integral secondary circuit protective  device  that they are manual re set and shall include the rated transformer power output in VA     b  Positioning  Care shall be taken when installing SELV transformers  which shall be fixed at high level  allowing adequate  ventilation and access for testing fuse replacement     c  Cable Sizing  Selection of cabling for SELV circuits shall take into consideration both volt drop and current carrying restraints  subject to a maximum volt drop on 12v supplies of 0 6 volts  Cabling from a SELV transformer supplying extra low  voltage track shall be of sufficient size for the full current rating of the transformer      d  Catenary Uninsulated Pole Low Voltage Systems  The use of uninsulated catenary or uninsulated pole low voltage systems is prohibited    e  Earthing of SELV Equipment    Secondary windings of SELV transformers  fittings and lighting track connected to it shall not be earthed   Power Circuits  Circuits feeding 13 amp socket outlets shall be radials  Where there is m
    
Download Pdf Manuals
 
 
    
Related Search
    
Related Contents
Bild 1 - Olink Bioscience  Valueline VLEB11040B20 power cable  il est interdit de fumer ! il est interdit de boire de I`alcool et bien sûr  ZAXIS 120-3 - Distribuidora Nissan SA  ManUal - General Tools And Instruments    筑波大学附属病院再開発に係る施設整備等事業 に関する質問回答書  Appendix 7 Alecsis Library Manager -  取扱説明書 - 株式会社チヒロ  marking system    Copyright © All rights reserved. 
   Failed to retrieve file