Home

ICBA, ICBB,ICBC, ICB-DV, ICB Twin Infusion Series - Expert-CM

image

Contents

1. e This appliance must not be cleaned by water jet This appliance is not intended for use by persons including children with reduced physical sensory or mental capabilities or lack of experience and knowledge unless they have been given instructions concerning use of this appliance by a person responsible for its safety e Children should be supervised to ensure they do not play with the appliance e f the power cord is ever damaged it must be replaced by the manufacturer or authorized service personnel with a special cord available from the manufacturer or its authorized service personnel in order to avoid a hazard Machine must not be immersed for cleaning PLUMBING REQUIREMENTS These brewers must be connected to a cold water system with operating pressure between 20 and 90 psi 138 and 620 kPa from a 1 2 or larger supply line A shut off valve should be installed in the line before the brewer Install a regulator in the line when pressure is greater than 90 psi 620 kPa to reduce it to 50 psi 345 kPa The water inlet fitting is 75 11 5 NH HOSE THREAD For convenience an elbow adaptor is provided to convert to 1 4 flare fitting Bunn O Matic does not recommend the use of a reverse osmosis or deionized water supply to this equipment REQUIRED 1 0 gpm 3 78 Ipm flow rate from water supply line NOTE Bunn O Matic recommends 3 8 copper tubing for all installations from the 1 2 water supply line A tight coil of tubing in th
2. ir bii o om udo t ceto 5 Plumbing Requirements TR EET 6 Tank Drain ee e 6 Operating 7 A 8 Viewing Assigned Recipes Asset amp Serial 8 Coffee BrEWIMO MEN RR NS 9 B rnnMe 10 GOSSA oer HEU Mm Dr C uM M LONE MEM M FEE CLE 10 her ee ua Rud 12 le a Dual Voltage Machine n 230 Volt Machine pl HR 200 Volt Machine 120 208 240V 23301 3 41581 120408 USER NOTICES Carefully read and follow all notices in this manual and on the equipment All labels on the equipment should be kept in good condition Replace any unreadable or damaged labels As directed in the International Plumbing Code of the International Code Council and the Food Code Manual of the Food and Drug Administration FDA this equipment must be installed with adequate backflow prevention to comply with federal state and local codes For models installed outside the ing Sanitation Code for your area U S A you must comply with the applicable Plumb 00656 0001 FOR USE AN INDIVIDUAL BRANCH CIRCUIT RATED 20 AMPS 00985 0000 NEA waanine ee
3. BrewWISE Brew WIZARD BUNN Espress BUNN Family Gourmet BUNN Gourmet BUNN Pour O Matic BUNN BUNN with the stylized red line BUNNlink Bunn OMatic Bunn O Matic BUNNserve BUNNSERVE with the stylized wrench design Cool Froth DBC Dr Brew stylized Dr design Dual Easy Pour EasyClear EasyGard FlavorGard Gourmet Ice Gourmet Juice High Intensity iMIX Infusion Series Intellisteam My Caf Phase Brew PowerLogic Quality Beverage Equipment Worldwide Respect Earth Respect Earth with the stylized leaf and coffee cherry design Safety Fresh savemycoffee com Scale Pro Silver Series Single Smart Funnel Smart Hopper SmartWAVE Soft Heat SplashGard The Mark of Quality in Beverage Equipment Worldwide ThermoFresh Titan trifecta Velocity Brew Air Brew Air Infusion Beverage Bar Creator Bever age Profit Calculator Brew better not bitter BUNNSource Coffee At Its Best Cyclonic Heating System Daypart Digital Brewer Control Element Nothing Brews Like a BUNN Pouring Profits Signature Series Tea At Its Best The Horizontal Red Line Ultra are either trademarks or registered trademarks of Bunn O Matic Corporation The commercial trifecta brewer housing configuration is a trademark of Bunn O Matic Corporation Page 2 41581 080612 INTRODUCTION This equipment will brew coffee into an awaiting server or airpot The brewer may have an auxillary hot water faucet It is only for indoor use on a sturdy and level counter or shelf
4. grinder 2 Insert a BUNN filter into the funnel 3 Grind the selected amount of fresh coffee into the Smart Funnel using the G9 2T DBC or MHG with Smart Funnel operation and level the grounds by gently shaking 4 Slide the funnel into the funnel rails of the selected side The brewer will read the coffee name and size ground through the chip in the funnel handle NOTE The brewer will automatically match the brew batch size to the grinder batch size GRINDER BREWER Small Half Batch Medium Full Batch Large Full Batch f BREW is pressed with a large grinder batch the display will read INCORRECT GRIND BATCH SIZE WRONG and then PRESS BREW BREW ANYWAY 5 Place an empty server under the funnel 6 The ENABLE BREW ON OFF switch for the selected side must be ON 7 Momentarily press and release the assigned BREW button There may be certain situations in which the brew cycle will not begin when BREW is pressed a SWITCH NOT ON ENABLE BREW ON OFF switch must be ON b BREW TEMPERATURE TOO LOW wait until heated or cancel BREW LOCKOUT option c CHECK FUNNEL remove funnel empty previously brewed grounds and replace with fresh d INCORRECT GRIND Indicates a large batch was ground using the grinder Check batch size 8 If none of the above messages are displayed the display will read NOW BREWING and show the time remain ing in the brew cycle Arrows will point to the side that is brewing If both sides are brewin
5. 6 41581 051012 OPERATING CONTROLS r D BREW e Dza Brewer Conna A ENABLE BREW ON OFF SWITCH NOTE For Singles refer to left side of Twins Pressing the ENABLE BREW ON OFF switch indicator on enables the brew circuit on that side of Twins and energizes the tank refill circuit Pressing the switch again indicator off stops tank refilling and brewing Stop ping a brew cycle after it has been started will not stop the flow of water into the server until the funnel is empty Pressing this switch during programming of the brewer will exit the setup and return to the main screen NOTE Hot water will be available at the faucet in a limited amount when the ENABLE BREW ON OFF switch is in the OFF position because the tank will not refill B PROGRAMMING left This hidden switch can be used to scroll backwards through the function list while in programming mode C BREW A B C When the ENABLE BREW ON OFF switch is ON and the main screen is visible momentarily pressing and releasing this switch will begin a brew cycle on the selected side D PROGRAMMING right Pressing and holding this switch allows entry into the programming menus Pressing and releasing the switch steps through each function screen while in the programming mode E BATCH SELECTOR SWITCHES Pressing the switch corresponding to the Half or Full batch selects the amount of product to be brewed on the selected side Pressing a different switch af
6. All Models CAUTION Improper electrical installation will damage electronic components Damage caused by incor 009 c OO UTD rect electrical connections is not covered by warranty An electrician must provide electrical service Determine the available on site electrical service DV models only Select the desired unit voltage based on the available on site electrical service Using a voltmeter check the voltage and color coding of each conductor at the electrical source Remove the front access panel to gain access to the terminal block Feed the power cord through the strain relief and connect it to the terminal block s Connect the power cord to the terminal block as shown Before proceeding verify the voltage at the field wiring terminal block DV models only Set voltage switch to the appropriate position and replace the access panel If plumbing is to be hooked up later be sure the brewer is disconnected from the power source If plumbing has been hooked up the brewer is ready for Initial Set Up Page 5 41581 120312 CE Requirements This appliance must be installed in locations where it can be overseen by trained personnel For proper operation this appliance must be installed where the temperature is between 5 C to 35 C Appliance shall not be tilted more than 10 for safe operation An electrician must provide electrical service as specified in conformance with all local and national codes
7. ICBA ICBB ICBC ICB DV ICB Twin Infusion Series with Smart Funnel Supercedes Operating Manuals 37077 0000 38112 0001 INSTALLATION amp OPERATING GUIDE BUNN O MATIC CORPORATION POST OFFICE BOX 3227 SPRINGFIELD ILLINOIS 62708 3227 PHONE 217 529 6601 FAX 217 529 6644 WWW bunn com To ensure you have the latest revision of the Operating Manual or to view the Illustrated Parts Catalog Programming Manual or Service Manual please visit the Bunn O Matic website at www bunn com This is absolutely FREE and the quickest way to obtain the latest catalog and manual updates For Technical Service contact Bunn O Matic Corporation at 1 800 286 6070 X 41581 0000D 12 12 2008 Bunn O Matic Corporation 0 COMMERCIAL PRODUCT WARRANTY Bunn O Matic Corp BUNN warrants equipment manufactured by it as follows 1 Airpots thermal carafes decanters GPR servers iced tea coffee dispensers MCP MCA pod brewers thermal servers and Thermofresh servers mechanical and digital 1 year parts and 1 year labor 2 All other equipment 2 years parts and 1 year labor plus added warranties as specified below Electronic circuit and or control boards parts and labor for 3 years b Compressors on refrigeration equipment 5 years parts and 1 year labor c Grinding burrs on coffee grinding equipment to grind coffee to meet original factory screen sieve analysis par
8. NK FILLING until tank is filled with water Wait approximately twenty five minutes for the water in the tank to heat to the proper temperature Display will show READY TO BREW WATER TEMP 200 when tank is at operating temperature Some water may drip from the funnels during this time this is due to expan sion and should not occur thereafter Place a small vessel beneath the faucet and open the faucet handle Release it when you hear the tank refill ing Water volumes and flow settings have been preset at the factory Refer to programming manual should the volume need to be increased or decreased The brewer is now ready for use in accordance with the instructions for Coffee Brewing VIEWING ASSIGNED RECIPES ASSET amp SERIAL NUMBER Make sure the ENABLE BREW ON OFF switch is OFF LED will not be lit Press and hold BREW switch The display will show the name of the recipe assigned to Brew A along with SWITCH NOT ON This is to indicate that a brew cannot be initiated while the ENABLE BREW OFF switch is OFF on this side Repeat for BREW B and BREW C Twins only Repeat steps 1 3 for other side Make sure the ENABLE BREW ON OFF switch is OFF To view the asset number of the machine press and hold the left hidden button until the display reads ANXXXXXX ASSET NUMBER Release the left hidden button After a 5 second delay the display will read ICBXXXXX
9. Please install in an area where there are no water jet devices The Infusion Series similar to the DBC BrewWISE incorporates a wireless interface system that allows the MHG or DBC Grinders to load certain information into the programming chip located inside the handle of the funnel This information includes what flavor of coffee is being ground and what batch size will be brewed half or full Once the correct flavor name and amount of coffee is ground the funnel is loaded into the brewer The information from the funnel handle is then transferred into the brewer The brewer then takes this information and dispenses the amount of water preset in the brewer for that particular flavor of coffee and batch size The brewer can also be programmed to adjust different functions of the brewing process such as brew temperature brew volumes bypass percentages pulse brew etc This allows the operator to program a certain recipe for each coffee flavor to be brewed The Infusion Series Coffee Brewer is able to brew both hot tea and coffee with recipe settings and has the fol lowing features By Pass Pre Infusion and Pulse Brew BrewWISE and LCD for digital readout and programming along with the Smart Funnel options for coffee Other features are Energy Savings mode BUNNLink compatible Smart Reader compatible Freshness Timer and Sanitation Alert CONTENTS MN 2 DL DRO OQ 3 User Notices mE T TP 4 Electrical Requirements cuiu teu
10. R A PARTICULAR PURPOSE The agents dealers or employees of BUNN are not authorized to make modifications to this warranty or to make additional warranties that are binding on BUNN Accordingly statements by such individuals whether oral or written do not constitute warranties and should not be relied upon If BUNN determines in its sole discretion that the equipment does not conform to the warranty BUNN at its exclusive op tion while the equipment is under warranty shall either 1 provide at no charge replacement parts and or labor during the applicable parts and labor warranty periods specified above to repair the defective components provided that this repair is done by a BUNN Authorized Service Representative or 2 shall replace the equipment or refund the purchase price for the equipment THE BUYER S REMEDY AGAINST BUNN FOR THE BREACH OF ANY OBLIGATION ARISING OUT OF THE SALE OF THIS EQUIPMENT WHETHER DERIVED FROM WARRANTY OR OTHERWISE SHALL BE LIMITED AT BUNN S SOLE OPTION AS SPECIFIED HEREIN TO REPAIR REPLACEMENT OR REFUND In no event shall BUNN be liable for any other damage or loss including but not limited to lost profits lost sales loss of use of equipment claims of Buyer s customers cost of capital cost of down time cost of substitute equipment facilities or services or any other special incidental or consequential damages 392 A Partner You Can Count On AutoPOD AXIOM BrewLOGIC BrewMETER Brew Better Not Bitter
11. XX This is the serial number of the machine Page 8 41581 120408 COFFEE BREWING WITHOUT A SMART FUNNEL AND MHG or DBC GRINDER Begin each brew cycle with a clean empty brew funnel Insert a BUNN filter into the funnel Pour the fresh coffee into the filter and level the bed of grounds by gently shaking Slide the funnel into the funnel rails of the selected side until it stops Place an empty server under the funnel The ENABLE BREW ON OFF switch for the selected side must be ON Select the desired batch size Momentarily press and release the assigned BREW button There may be certain situations in which the brew cycle will not begin when BREW is pressed a SWITCH NOT ON BREW ON OFF switch must be ON b BREW TEMPERATURE TOO LOW wait until heated or cancel BREW LOCKOUT option c CHECK FUNNEL remove funnel empty previously brewed grounds and replace with fresh d DISABLED select different brew button or batch size 8 If none of the above messages are displayed the display will read NOW BREWING and show the time remain ing in the brew cycle 9 Following the brew will be a countdown of drip time DRIPPING which shows the time remaining until the coffee no longer drips from the funnel tip 10 Carefully remove the brew funnel and discard the grounds and filter only after visible dripping stops TALES Psp T3 ct WITH A SMART FUNNEL AND G9 2T DBC or MHG GRINDER 1 Select the small batch size on the
12. ayhead only needs to be hand tightened Refer to programming manual for calibration routine to verify sprayhead flow rate matches programmed flow rate Machine may need to be re calibrated due to lime build up If machine is cleaned and build up removed machine must be re calibrated to achieve desired volumes Page 10 41581 120408 PROGRAMMING The programming of the brewer is divided into two levels There is one function in Level 1 All other functions are accessed in Level 2 The following function screens are in order of appearance Each screen will have instructions on how to access and the procedures for programming the various functions of the brewer IMPORTANT PROGRAMMING NOTES READ CAREFULLY To exit the programming mode at any time press and release either ON OFF pad located on the front switch panel The display will return to the MAIN SCREEN If none of the five programming switches are pressed within one minute during the setup of the brewer the programming of the function screen that is being set will be exited and the display will return to the MAIN SCREEN Always remember to place a container and funnel under the sprayhead when operating the brewer during the set up of CALIBRATE FLOW and testing the brew and bypass valves in SERVICE TOOLS TEST OUTPUTS AY vote For additional information you can download the programming manual at www bunn com Dese Brewer Control 2426 This screen will be shown when t
13. bunn com Doha Brewer M is aa M Brewer 12 41581 120408
14. e water line will facilitate moving the brewer to clean the countertop Bunn O Matic does not recommend the use of a saddle valve to install the brewer The size and shape of the hole made in the supply line by this type of device may restrict water flow As directed in the International Plumbing Code of the International Code Council and the Food Code Manual of the Food and Drug Administration FDA this equipment must be installed with adequate backflow pre vention to comply with federal state and local codes For models installed outside the U S A you must comply with the applicable Plumbing Sanitation Code for your area Plumbing Hook Up 1 Hush the water line 2 Securely attach the adaptor elbow assembly to the water supply line 3 Securely attach adaptor elbow assembly to the the 75 11 5 NH HOSE THREAD fitting at the rear of the brewer 4 on the water supply TANK DRAIN 1 Loosen screws that secure the front access panel Remove the panel 2 Tighten the white shutoff clamp on the long hose between tank and inlet solenoid 2 Disconnect the hose clamp and hose from inlet solenoid 3 the end of the drain hose in a container that has a minimum capacity of 3 5 gallons 13 25 L Singles 6 0 gallons 22 7 L Twins Release the white clamp to drain water from the tank 5 When tank is empty replace the hose onto solenoid and tighten the clamp 6 Replace the front panel and tighten screws e Page
15. g simultaneously the arrows will alternate from left to right on the display 9 Following the brew will be a countdown of drip time DRIPPING which shows the time remaining until the coffee no longer drips from the funnel tip 10 Carefully remove the brew funnel and discard the grounds and filter only after visible dripping stops Page 9 41581 120408 7 CLEANING The use of a damp cloth rinsed in any mild nonabrasive liquid detergent is recommended for cleaning all surfaces Bunn O Matic equipment Do NOT clean this equipment with a water jet device Check and clean each sprayhead The sprayhead holes must always remain open NOTE Any buildup on the sprayhead may restrict water flow and impact your coffee brewing For consis tently great coffee clean sprayheads weekly Upon visual inspection it may appear that light passes through all holes in the sprayhead plate but a thin film of residue can pass light and still impede water flow Remove sprayhead from brewer Disassemble by removing the seal Use the pointed end of sprayhead cleaning tool to remove any mineral deposits from the sprayhead holes Insert the long end of sprayhead cleaning tool into the sprayhead fitting and rotate several times to remove any mineral deposits from the fitting Insert the short end of sprayhead cleaning tool into the bypass fittings and rotate several times to remove any mineral deposits from the fitting Reassemble sprayhead and reattach Spr
16. he brewer is ready for use The screen displays the water temperature in the tank When the water in the tank reaches the correct set temperature the display will change from HEATING to READY TO BREW MAIN SCREEN MEMORY PROGRAMMING LOCKOUT SWITCH located on the memory module board prior to S N ICB001330 located on the main circuit board S N ICB001330 LOCK UNLOCK and after This switch can be set to prevent access to the PROGRAMMING programming settings of the brewer Once all the cor LOCKOUT SWITCH rect brew settings are programmed the operator can set the switch to the ON position to prohibit anyone from changing the settings With the switch in the P3048 ON position the programming menus can still be accessed to view the current settings However no BM 11 41581 120408 PROGRAMMING cont PROGRAMMING FUNCTIONS FLOW CHART PROGRAMMING FUNCTIONS LEVEL as yy ay p Brewer PROGRAMMING FUNCTIONS LEVEL 2 p euer 9 p Beewer Brewer n Biewer Beewer M f e EIC 4 on A p Beu vr 0 77 A p Kewer 9 077 od Dhu Brewer p euer neo Carro xx M yy pm Brewer 0 7 Doha Brewer Beewer ym y Canto Brewer more advanced PROGRAMMING information refer to programming manual 41581 0001 at www
17. ptional Field Wiring 120 208 240 V 13 8 16 8 A 2900 4050 W 1PH 3 Wire GND 60HZ 29710 0011 Risk of Fire Use a UL listed grounding type attachment plug rated 125 208 Vac 30 A 1 phase 4 conductor Plug to be selected and installed only by qualified service personnel 38125 0001 04 05 2005 Bunn O Matic Corporation 38125 0001 Incorrect programming could result in accidental dispens ing of HOT LIQUID Trained personnel are to follow instructions provided for software programming Use of additional graphic layer requires disabling of appropriate switches Read all instructions for additional graphic layer prior to installing and programming 391 75 0000 41581 051012 ELECTRICAL REQUIREMENTS Refer to Data Plate on the Brewer and local national electrical codes to determine circuit requirements WARNING The brewer must be disconnected from the power source until specified WARNING The power cord must be UL Listed Flexible Cord Type SO SJO SJTO HSJO or SJOW Rated 90 C and the attachment plug cap must be UL Listed in order to avoid a hazard The Power Supply Cord must be at least 3 feet long and maximum 6 feet long measured from Strain Relief to end of the Attachment Plug Cap POWER CORD POWER CORD WHITE POWER CORD DUAL VOLT 22 TOGGLE SWITCH 220 240V 2 WIRE GROUND ELECTRICAL HOOK UP
18. s REMOVE FUNNEL SLOWLY 03408 0000 ged ili WARNING enor 03409 0000 To reduce the risk of electric shock do not remove or open cover No user serviceable parts inside Authorized service personnel only Disconnect power before servicing 37881 0000 Risk of Fire Use a UL listed grounding type attachment plug rated 125 250 Vac 30 A 1 phase 4 conductor Plug to be selected and installed only by qualified service personnel 38125 0000 04 05 2005 Bunn O Matic Corporation 38125 0000 DISCARD DECANTER IF CRACKED les ili Wa HEATED WHEN EMPTY USED ON HIGH FLAME FUNNEL CONTENTS on EXPOSED ELECTRIC ARE HOT ELEMENTS READ THE ENTIRE OPERATING MANUAL BEFORE USING THIS PRODUCT pr 00658 0000 06064 0000 m 120 240V 34056 0001 00824 0002 i 00824 0001 4 DO NOT OVERLOAD CIRCUIT ALWAYS ELECTRICALLY GROUND THE CHASSIS DO NOT DEFORM PLUG OR CORD FOLLOW NATIONAL AND LOCAL ELECTRICAL CODES KEEP COMBUSTIBLES AWAY FAILURE TO COMPLY RISKS EQUIPMENT DAMAGE FIRE OR SHOCK HAZARD READ THE ENTIRE OPERATING MANUAL BEFORE USING THIS PRODUCT 00986 0000F 10 07 1994 Bunn O Matic Corporation 00986 0000 A CAUTION For 120 208V or 120 240 volt operation replace Power Supply Cord only with Bunn O Matic part number 01699 0000 34072 0000 O
19. ter a brew cycle has been initiated does not change the brew batch in progress Light indicates the selected batch to brew Also used in programming to adjust settings on both batch sizes F FUNCTION SCREEN This is the display which shows the various functions of the brewer and allows the programming to be ac complished G FUNNEL SENSING COIL These are used to receive information from the Smart Funnel handle recipe cards and ad cards H FUNCTION SCREEN SWITCHES Digital This is used to select options NO that appear on the display during programming Brewer This is used to select options DONE that appear on the display during programming Control This is used to select options YES that appear on the display during programming Page 7 41581 120408 INITIAL SET UP Insert an empty funnel into the funnel rails of the brew Brew water temperature is factory set at 200 F 93 3 C station s Areas of high altitude will require lowering this tempera Place an empty server s under the funnel s ture to prevent boiling This chart should be used as a Connect the brewer to the power source Make sure the corresponding ENABLE BREW ON OFF switch is ON Altitude Boiling point Recommended LED will be lit of water water temperature Feet F ep F eg guide when readjusting the brew water temperature Water will flow into the tank and stop when the tank is filled to its capacity Display will show PLEASE WAIT TA
20. ts and labor for 4 years or 40 000 pounds of coffee whichever comes first These warranty periods run from the date of installation BUNN warrants that the equipment manufactured by it will be commercially free of defects in material and workmanship existing at the time of manufacture and appearing within the applicable warranty period This warranty does not apply to any equipment component or part that was not manufactured by BUNN or that in BUNN s judgment has been affected by misuse neglect alteration improper installation or operation improper maintenance or repair non periodic cleaning and descaling equipment failures related to poor water quality damage or casualty In addition the warranty does not apply to replacement of items subject to normal use including but not limited to user replaceable parts such as seals and gaskets This warranty is conditioned on the Buyer 1 giving BUNN prompt notice of any claim to be made under this warranty by telephone at 217 529 6601 or by writing to Post Office Box 3227 Springfield Illinois 62708 3227 2 if requested by BUNN shipping the defective equipment prepaid to an authorized BUNN service location and 3 receiving prior authorization from BUNN that the defective equipment is under warranty THE FOREGOING WARRANTY IS EXCLUSIVE AND IS IN LIEU OF ANY OTHER WARRANTY WRITTEN OR ORAL EX PRESS OR IMPLIED INCLUDING BUT NOT LIMITED TO ANY IMPLIED WARRANTY OF EITHER MERCHANTABILITY OR FITNESS FO

Download Pdf Manuals

image

Related Search

Related Contents

A Matlab GUI for use with ISOLA Fortran codes User's Guide by  User's Guide to the PGF Package, Version 0.65  VIBROPORT 41 VIBROTEST 42 VIBROBALANCER 42  Installing the Printer Station  VARIABLE SHADE AUTO-DARKENING WELDING HELMET User  Gigabyte GA-880GMA-UD2H motherboard  PCUSBVC - Velleman  

Copyright © All rights reserved.
Failed to retrieve file