1. 2510 AlO Supplemental Insert Overview The AlO valve is designed for use when water containing contaminates subjected to oxidation is encountered The water passes through the AIO valve then passes through the tank containing oxygen enriched filter media The oxygen reduces all contaminates in the water to an oxide or in the case of hydrogen sulfide gas it is reduced to a molecule of acid Regeneration as follows Backwash BW The backwash cycle washes oxidized contaminates to drain and Cycle Step 1 reclassifies the media bed Air Draw BD Air Draw empties water from tank and replenishes oxygen to filter Cycle Step 2 media Rapid Rinse RR Rapid Rinse purges excess atmosphere from the media tank and Cycle Step 3 distributor NOTE Due to the oxygen in the media tank maximum 80 PSI for operation SXT Programming Abbreviation Definition Abbreviation a Day Override Days Between Regeneration In conditions of high water usage and or high levels of contaminants the AlO may need to regenerate more frequently than once every three days DO NOT set the regeneration day override for a longer period than three days as the filter media can become fouled with contaminates rendering the AIO ineffective Regeneration 12 30 AM Regeneration Time If there is a need to Time change the factory default then make sure the time of regeneration is not the same with any other water treatment equipment in the system ap A
2. Installation Put a thin layer of silicone lube around inside diameter of the deflector Slowly slide the deflector over the distribu tor tube down about 1 When threading the AIO valve to the tank the bottom of the threads will slide the deflector down As shown in diagram Reference the 2510 service manual for information on the following Trouble shooting Parts list P N 42157 Rev B 06 10
3. rDrew o seeno Overview Above ek Rapare 4 SeeAl0 Overview Above Factory Defaults Reference SXT service manual for programming information Page 1 2510 AlO Supplemental Insert Installation Overview Install the AlO valve after the supply lines to the outside faucets unless outside faucets need to be free of contaminates in water The AlO valve is generally installed before a water softener or any taste odor cartridges if applicable Insure the inlet check valve is connected as shown to the inlet side of the AlO valve The drain should be installed in accordance with plumbing codes Due to the release of air during regeneration the drain line should be anchored through out the run and secured at the end of the drain line The drain line should be sized for the backwash rate and friction loss The drain line flow control should accommodate the size tank and backwash rate for the filter media being used The injector size slow rinse rate based on pressure should be sized the same as the service flow rate of the filter media being used AIO Specific Parts ltem Part Description 1 61662 PISTON ASSY 2510AIO 2 12777 01 CAM AIR DRAW 3 41861 CHECK VALVE AIR DRAW 3 13147 1 5 TUBE DRAW 1 1 2 PVC 4 43154 SCREEN AIR CHECK ADPTR 5 43152 CHECK VALVE 2510AIO BRASS 6 43153 SCREW 8 32 SS 2510AIO 7 42188 KIT PARTS IRON FILTER Part not shown but illustration showing location Deflector
Download Pdf Manuals
Related Search
Related Contents
Installation Instructions 取扱説明書 - 日本パルスモーター Copyright © All rights reserved.
Failed to retrieve file