Frameworx Gutter and Capping

image

Contents

1. 07 15 isior E KA ww 7 9 2 9 9 ra 1 gt 4 4 E wuosr ww 0879 ww opp 4 K 1 1 ISCH 4 Le 8 Z l zt ww 0877 ww 08pp 7 09 ww 1 DIVISION SUPPORT STRIP ASSEMBLY 1 OUTSIDE END LANE DIVISION 3 SPACER 8 X 3 7 8 X 5 8 84 860858 003 NON GUTTER JOINT POSITION OUTSIDE END LANE 4 SPACER 8 X 3 7 8 X 5 8 84 860858 003 GUTTER JOINT POSITION OUTSIDE END LANE 3 SPACER 8 X 3 7 8 X 5 8 84 860858 003 Qs NON GUTTER JOINT POSITION OUTSIDE END LANE Le 6 ADHESIVE 2 INSIDE LANE DIVISION 7 SPACER 8 X 3 7 8 X 5 8 84 860858 001 NON GUTTER JOINT 8 POSITION SPACER 8 X 3 7 8 X 5 8 84 860858 003 GUTTER JOINT POSITION INSIDE LANE DIVISION 7 SPACER 8 X 3 7 8 X 5 8 84 860858 001 NON GUTTER JOINT 5 POSITION 6 APPLY DIVISION ADHESIVE SUPPORT STRIP Figure 11 Division Support Strip 1 OUTSIDE LANE DIVISION 2 INSIDE LANE DIVISION 3 SPACER 8 X 3 7 8 X 5 8 P N 84 860858 003 NON GUTTER JOINT POSITION 4 SPACER 8 X 3 7 8 X 5 8 5 1 1 2 RING SHANK NAIL 6 DIVISION SUPPORT STRIP P N 84 860858 003 GUTTER JOINT POSITION OUTSIDE END LANE 7 SPACER 14 1 2 X 3 7 8 X
2. 3 1 1 2 RING Bs SHANK NAIL 4 NON GUTTER JOINT SPACER 22 x 3 7 8 x 5 8 PIN 84 860858 002 SS at X APPLY ADHESIVE 2 NON GUTTER JOINT SPACER 22 x 3 7 8 x 5 8 1 P N 84 860858 002 JOIST LOCATION MARKS MADE EARLIER ADHESIVE SIDE VIEW 2 Figure 8 Approach End Support Frame 1 I JOIST LOCATION MARKS 2 NON GUTTER JOINT SPACER 3 1 1 2 RING SHANK NAIL MADE EARLIER 22 X 3 7 8 X 5 8 P N 84 860858 002 4 GUTTER JOINT SPACER 5 28 X 8 3 4 711 mm 222mm 6 APPLY ADHESIVE 14 1 2 X 3 7 8 X 5 8 PLYWOOD P N 84 860858 001 Frameworx Gutters and Capping 17 Cut centering blocks to dimensions shown in Figure 9 Creating a 45 chamfer Figure 9 allows for easy removal of blocks after frames are assembled Installation of Ball Return Support Frames 2 Butt notched end of the 176 3 8 4480 mm approach end frame assembly against the foul line Refer to I JOIST 2 ROBERTSON FLAT HEAD SCREWS CENTERING BLOCKS GUTTER JOINT SUPPORT SPACER 14 1 2 X 3 7 8 X 5 8 P N 84 860588 001 NON GUTTER JOINT SUPPORT SPACER 22 X 3 7 8 X 5 8 P N 84 860588 002 8 GUTTER JOINT LOST 11 NON GUTTER JOINT 1 5 16 33 12 1 E 3 6 9 2 1 p 9 3 4 9 3 4 a 24
3. d 4 2 Mm 1 SIDE RAIL 2 2 1 2 RING SHANK NAIL 3 SPACER 1 1 2 X 3 3 4 X 5 3 4 1 1 2 X 3 3 4 X 176 3 8 146 mm 4480 mm 4 TOP VIEW 5 ROTATE SPACER 90 6 APPROXIMATELY 2 508 mm 7 I JOIST DEGREES Frameworx Gutters and Capping Install Support Spacers 1 Flip support frame upside down 2 Center the support spacers on the I Joist location marks made on the support side rails earlier 3 Apply adhesive 4 Secure long support spacers to the support frame with 1 1 2 ring shank nails D YANA van 3 4 GUTTER JOINT NU SPACER 14 1 2 3 7 8 x 5 8 P N 84 860858 001 F 2 NON GUTTER JOINT SPACER 22 x 3 7 8 x 5 8 P N 84 860858 002 Z IL 5 APPLY SS See N APPLY N ADHESIVE JOIST LOCATION MARKS MADE EARLIER NON GUTTER JOINT SPACER 22 x 3 7 8 x 5 8 P N 84 860858 002 Figure 7 Pinsetter and Common End Support Frame 1 I JOIST LOCATION MARKS 2 NON GUTTER JOINT 3 1 1 2 RING SHANK NAIL MADE EARLIER SPACER 22 X 3 7 8 X 5 8 P N 84 860858 002 4 GUTTER JOINT SPACER 5 APPLY ADHESIVE 14 1 2 X 3 7 8 X 5 8 P N 84 860858 001 5 Secure short support spacers 84 860858 000 with 1 1 2 ring shank nails where gutter joints occur 16 Frameworx Gutters and Capping 5 28 711 mm 8 3 4 222 mm PLYWOOD
4. Pq Figure 3 Ball Return Gutter and Capping Support Frames 2 SPACER 1 1 2 X 3 3 4 X 5 3 4 5 PINSETTER END FRAME QTY 1 CUT TO FINAL LENGTH 1 SIDE RAIL 1 1 2 X 3 3 4 X 176 3 8 4480 mm 146 mm PLYWOOD BOX 7 APPROACH FRAME QTY 1 Frameworx Gutters and Capping 4 12 1 Position the 1 1 2 3 3 4 x 5 3 4 146 mm spacers between the side rails and secure with four 2 1 2 ring shank nails for each spacer Refer to Figure 4 4 TOP VIEW Figure 4 PINSETTER END Support Frame 1 SIDE RAIL 2 2 1 2 RING SHANK NAILS 3 SPACER 1 1 2 X 3 3 4 X 5 3 4 1 1 2 X 3 3 4 X 176 3 8 146 mm 4 TOP VIEW i NOTE Do not install until pinsetter end support has been cut to length Frameworx Gutters and Capping 13 4 TOP VIEW Figure 5 COMMON Support Frame guantity of 2 reguired 1 SIDE RAIL 2 2 1 2 RINGSHANKNAIL 3 SPACER 1 1 2 X 3 3 4 X 5 3 4 1 1 2 X 3 3 4 X 176 3 8 146 mm 4 TOP VIEW 14 Frameworx Gutters and Capping NOTE The spacer closest to the foul line item 5 on the Approach End support frame must be installed horizontally as shown in Figure 6 3 2 2 NK 1 Figure 6 APPROACH end Support Frame
5. A WARNING Will designate a mechanical or nonelectrical alert which could potentially cause personal injury or death AN WARNING Will designate electrical alerts which could potentially cause personal injury or death k CAUTION Will designate a mechanical or nonelectrical alert which could potentially cause product damage A Will designate grounding alerts Frameworx Gutters and Capping TABLE OF CONTENTS E 6 Brunswick Gutter and Capping Faber eeng getest 1 Ball Retum and Divisi n Cap aa 10 Existing Gutters and Capping Removal amma 10 e Ee 10 imma 11 Ball Return Capping Support Prana Pre Mark Support Frame Side 8 11 WA ai mai WAS AA wana 12 Install Support Spacers AE 16 Installation of Ball Return Support Frames sss coiii E EEE RR EA 18 Division Support Strip EEN 21 Division Support Strip Installations spissere E EAEE E EEEREN EES EEE EE 22 22 Installation of Division Support Strips inside division 22 Gutter Joint Support Brace Installation jis a lt accccasesoacenazasseoagortacnsiancansiaasnasastvecesnuseasierancaants 25 EE 26 Gutter 26 02 Existing Foundation System B2000 Lane Surface With Truss Foundaton ret 26 New Found Ane cata on ne yank eke nies 27 Stand Alone Cosmetic Covers Installation 6 4 EAR eSeSAEEieg 31 Ball Return Capping New and Existing Foundations
6. l 24 h 24 24 117 2 97 m 7 2ND CAPPING SECTION 8 3RD CAPPING SECTION IC RSR Dach Sek Sek 24 24 117 4 m 6 1ST CAPPING SECTION aS 1 1 mla 215 gt 217 21 117 2 97 m EW aa 6 1ST CAPPING SECTION 2 117 RaT m Ino S Figure 25 Clip Placement 1 2 1 2 64 MM CAPPING CLIP 2 5 127MM CAPPING CLIP 3 MEASURED LENGTH DIVIDED BY 5 INSTALL AT CAPPING JOINTS EQUALS A 6TH CAPPING SECTION 4 PIN DECK 5 FOUL LINE 6 1ST CAPPING SECTION 7 2ND CAPPING SECTION 8 3RD CAPPING SECTION 9 4TH CAPPING SECTION 10 5TH CAPPING SECTION 11 6TH CAPPING SECTION 36 Frameworx Gutters and Capping Ball Return Capping 1 Install the first section of ball return capping 10 254 mm from the approach end ofthe lane a Align the capping section with the ears on the capping clip Snap the capping into place Continue this procedure toward the pin deck Refer to Figure 26 NOTE Ball return capping overhangs clip by 2 51 mm toward approach to allow for cover mounting tab 3 A II e Figure 26 Snap Capping Into Place 1 BALL RETURN CAPPING 2 CAPPING CLIP 3 CAPPING EAR 4 CLIP EAR b
7. 5 8 8 SPACER 8 X 3 7 8 X 5 8 9 APPLY ADHESIVE P N 84 860858 001 P N 84 860858 003 GUTTER NON GUTTER JOINT POSITION JOINT POSITION INSIDE LANE DIVISION Frameworx Gutters and Capping 21 Division Support Strip Installation Preparation If not previously done remove and discard existing Tel E Foul castings gutters and capping Remove any Nu Wood or other shim materials that have been installed in the foundation at the division and ball returns Installation of Division Support Strips inside division Using the same procedure that was used to install the ball return support frames described earlier in this manual install the division support Refer to Figure 12 22 Frameworx Gutters and Capping 7 GUTTER JOINT l JOIST KU 1 5 16 33 mm 11 Ge 3 12 12 FOULLINE MX__ FOULLINE 8 NON GUTTER JOINT JOIST 533 4 mm 9 3 4 9 3 4 247 65 mm gt 247 65 mm Figure 12 Install Division Support 1 DIVISION CAPPING SUPPORT 2 FOUNDATION 3 2 ROBERTSON SCREW STRIP 4 LANE 5 DIVISION CENTER LINE 6 CENTERING BLOCK 7 GUTTER JOINT I JOIST 8 NON GUTTER JOINT I JOIST 9 NON GUTTER JOINT SPACER 14 50 X 3 7 8 X 5 8 P N 84 860858 001 10 GUTTER JOINT SPACER 11 GUTTER JOINT SUPPORT 12 FOUL LINE 8 X 3 7 8 X 5 8 SPACER P N 84 860858 003 1 2 X 3 7
8. 8 X 3 7 8 13 5 32 PILOT HOLE 14 9 32 CLEARANCE HOLE 16 1 2 X 1 1 2 COUNTERBORE 17 I JOIST Frameworx Gutters and Capping 23 7 GUTTER JOINT JOIST 2 ROBERTSON SCREW NON GUTTER JOINT JOIST NON GUTTER JOINT SPACER 8 X 3 7 8 X 5 8 P N 84 860858 003 9 32 CLEARANCE HOLE JOIST NON GUTTER JOINT Installation of Division Support Strips Outside Lane Using the same procedure that was used to install the ball return support frames described earlier in this manual install the division support Refer to Figure 13 10 FOUL LINE Figure 13 Install Division Support outside division FOUNDATION 3 GUTTER JOINT SPACER 6 1 2 X 3 7 8 X 3 7 8 ROTATED GUTTER JOINT 9 SPACER 8 X 3 7 8 X 5 8 84 860858 003 5 32 PILOT HOLE 12 1 2 X 1 1 2 COUNTERBORE 15 1 DIVISION CAPPING SUPPORT 2 STRIP 4 LANE 5 7 GUTTER JOINT 8 10 FOUL LINE 11 13 14 4 ROBERTSON 14 SCREW 24 Frameworx Gutters and Capping 25 GUTTER JOINT SUPPORT BRACE INSTALLATION NOTE If a gutter joint is centered between trusses it may be necessary to install support brace s Assemble and inst
9. CONFIGURATION BRUNSWICK BOWLING amp BILLIARDS CORPORATION Drawing Number L2 600066 000 Rev No DESCRIPTION MNC DIVISION CAPPING BARRIER ECH 84 860564 000 PKG DIVISION CAPPING BARRIER WALL 8 Frameworx Gutters and Capping Page 1 of 1 MODEL NUMBER CONFIGURATION BRUNSWICK BOWLING amp BILLIARDS CORPORATION Drawing Number L2 600079 000 DESCRIPTION MNC DIVISION SUPPORT LUMBER PART NUMBER DESCRIPTION OF PACKAGE 11 081208 000 2 ROBERTSON 84 860554 001 PKG CAPPING SUPPORT LUMBER 84 860858 001 SPACER ANCHOR STRIP DIVISION 84 860858 003 SPACER ANCHOR STRIP END DIVISION 84 860858 004 SPACER GUTTER COUPLER Page 1 of 1 Drawing Number L2 600082 000 Rev No DESCRIPTION MNC RETURN CAPPING SUPPORT LUMBER PART NUMBER DESCRIPTION OF PACKAGE 11 081208 000 2 ROBERTSON SCREW 84 860554 001 PKG CAPPING SUPPORT LUMBER 84 860555 000 PKG RETURN CAPPING SUPPORT SPACER 84 860858 001 SPACER ANCHOR STRIP DIVISION 84 860858 002 SPACER ANCHOR STRIP BALL RETURN 84 860858 004 SPACER GUTTER COUPLER Page 1 of 1 Drawing Number L2 600098 XXX Rev No E DESCRIPTION MNC GUTTER GUTTER HARDWARE AND COVER FOR STAND ALONE GUTTER LANE PAIR 84 860622 XXX PKG COVER STAND ALONE GUTTER SEE TAB CHART 84 860621 000 PKG GUTTER HDWE WITH ADAPTER BLOCKS 84 860764 XXX PKG GUTTER ASS Y SEE TAB CHART 84 900032 000 J OPERATIONS AND SERVICE MANUAL PINBALL WIZARD
10. HEAD ROBERTSON SCREWS 4 FOUL LINE 5 NOTCH FOR TEL E FOUL SIGNAL NOTE Rear support is not secured to the support strip 2 Mark the location of the countersunk hole on the approach 3 Remove the cover and drill a 5 32 hole approximately 1 3 4 deep at the marked location i NOTE On laminate lanes drill a 1 4 diameter clearance hole through the laminate 4 Cuta clearance hole in the gutter to permit the Tel E Foul signal to pass from the Tel E Foul to the reflector See Item 5 Figure 29 Reposition the cover and secure it with a 14 x 3 1 2 flat head Robertson screw Refer to Figure 29 Frameworx Gutters and Capping 40 Ball Return Capping Removal 1 Atthe end ofthe ball return capping step in the middle to flatten the ball return capping Refer to Figure 30 Figure 30 Flatten Ball Return Capping 2 Lift one side of the ball return capping off the clips Once this side is loose from the clip push and lift the other side Refer to Figure 31 ier de 1 PUSH Figure 31 Lift One Side of Capping 1 PUSH 2 LIFT UP 3 Remove the ball return capping off the remaining clips by lifting one side of the ball return capping off then the other Frameworx Gutters and Capping 41
11. PER CENTER Frameworx Gutters and Capping BALL RETURN AND DIVISION CAPPING The following instructions list the necessary steps to install new gutters in new or existing centers Different lane surfaces may require variations on these instructions Make sure you refer to the text and or graphics for the specific lanes within your center BEFORE performing any necessary foundation modifications EXISTING GUTTERS AND CAPPING REMOVAL Preparation Remove and discard existing Tel E Foul castings gutters and capping Remove any Nu Wood or other shim materials that have been installed in the foundation at the division and ball returns For Brunswick gutter and capping to operate correctly the support lumber will need to be 1 5 16 mm above the lane surface and the required space for the gutter is 9 3 4 from the capping support lumber to the edge of the lane Refer to Figure 1 1 9 3 4 15 16 _ 248 mm gt 33 m7 4 Le 2 LJ 7 4 5 Figure 1 Gutter Preparation 1 DIVISION SUPPORT STRIP 2 GUTTER 3 ROUTE AREA 4 LANE SURFACE 5 JOIST 10 Frameworx Gutters and Capping BALL RETURN CAPPING SUPPORT FRAMES Pre Mark Support Frame Side Rails To aid in the installation of the gutter spacers mark the I joist locations on the side rails before assembling capping support frames 1 Mark the support frame side rails at each I Joist location b
12. i NOTE There must be a 5 127 mm capping clip P N 84 200240 000 centered at each ball return capping joint between each section of ball return capping 1 8 x 1 1 2 ROBERTSON an i 2 s H 2 3 2 1 2 64 mm CAPPING CLIP 4 FOUL LINE II 3 8 2 2 1 2 64 mm ROBERTSON SCREW CAPPING CLIP 4 FOUL LINE Figure 24 Clip Installation 1 8 1 1 2 ROBERTSON 2 SPRAYED LINE 3 2 1 2 64 MM CAPPING CLIP SCREW 4 FOUL LINE k CAUTION The use of a brad nail gun to quickly position the clips is not recommended Doing so may cause the capping clip to crack Use only the correct screws illustrated in Figure 24 Frameworx Gutters and Capping 35 11 6TH CAPPING SECTION aS 1 1 3 emm KN 10 5TH CAPPING SECTION 11 6TH CAPPING SECTION S AAA ae A MEASURED LENGTH EEN 7 2ND CAPPING SECTION aS 1 L I g 1 mi A 24 24 Sp 117 2 97 m 24 ele 24 ele 24 1 See ee MEASURED LENGTH 5 A 9 4TH CAPPING SECTION E ale 21 Weg A ICH JS ET 24 mim za EE leg m E St m 117 2 97 m 117 eee m 4TH 10 5TH CAPPING SECTION AS 1 LI L a 24
13. top of support frame APPROXIMATELY 10 254 mm from foul line and use dimension A to locate left edge of capping clip from edge of support structure 3 FOUL LINE 4 CAPPING SUPPORT A FRAME EDGE 5 CAPPING CLIP EDGE 1 ALIGN CLIP USING Si 2 DISTANCE A FROM MARK CENTER PINSETTER END OF HOLE 3 FOUL LINE Figure 22 Layout Approach End of Support Frame 1 ALIGN CLIP USING DISTANCE A 2 MARK CENTER OF HOLE 3 FOUL LINE FROM PINSETTER END 4 CAPPING SUPPORT FRAME 5 CAPPING CLIP EDGE EDGE Frameworx Gutters and Capping 33 5 Hammer a nail partially into the support frame on the marked locations at the pinsetter end and the approach end Refer to Figures 23 and 24 1 DRIVE NAIL HALFWAY IN 3 CA AT MARKED LOCATION 2 TIE STRING TO BOTH NAILS AND SPRAY PAINT THE STRING LINE OR SNAP A CHALK LINE 1 DRIVE NAIL HALFWAY IN AT MARKED LOCATION 3 FOUL LIN es Figure 23 Mark Capping Support 1 DRIVE NAIL HALFWAY AT 2 TIE STRING TO BOTH NAILS AND MARKED LOCATIONS SPRAY PAINT LINE OR SNAP CHALK LINE 6 Tie string between nails on support frame and spray paint a line or use a chalk line to snap a line Refer to Figure 23 34 Frameworx Gutters and Capping Install Capping Clips 1 Install the additional capping clips as shown in Figures 24 and 25
14. 8mm la 8 7 8 pl 248 mm 225 mm ken 723 9 mm Figures 9 and 10 13 FOUL LINE Figure 9 Secure Ball Return Frames to Foundation 2 FOUNDATION 5 BALL RETURN CENTER LINE 8 GUTTER JOINT I JOIST 11 NON GUTTER JOINT I JOIST Frameworx Gutters and Capping BALL RETURN FRAME GUTTER OPENING GUTTER JOINT 1 2 X 3 7 8 X 3 7 8 SPACER 1 4 7 10 13 3 Center the frame between the lanes 4 Secure the frame to the foundation with 10 x 1 1 2 Robertson screws NOTE Making centering blocks as shown in Figure 9 makes centering the frames easier 5 Using the same procedure as used on the approach frame install the two 176 3 8 4 48 m common frames 6 Measure the distance remaining to the kickback and cut the fourth 176 3 8 4 48 m pinsetter frame to the required length 7 Install the cut frame assembly Frameworx Gutters and Capping 19 HOVWOUddY 9 HOVOYNddVHLIMHSN14 IO b ivy aadis zZ ww 19 6 ATALVINIXOUddvV 4 saupsy 1000706 uanjay JJV 20286 01 9 Sr ww 08pp DG Biel e Q o 2 3 o 0 Se o 0 Ke o ES S ZS WW 08t 8 6 92 e S x KS K 20
15. Cut the last piece of capping to the required length and snap it into place NOTE At centers with A or A 2 pinsetters it will be necessary to cut section of capping for kickback and foul line side of dropsweep hood NOTE At AMF centers it will be necessary to cut a hole in the capping for the dropsweep Use the original capping to determine the required size and location of the clearance hole Frameworx Gutters and Capping 37 Ball Return Cover 1 Center the ball return cover on the ball return capping Refer to Figure 27 Figure 27 Ball Return Cover Installation 1 BALL RETURN COVER 2 REARCOVERMOUNTING TAB 3 14 X 3 1 2 FLAT HEAD SCREW 4 FOUL LINE 5 3 4 19 mm NOTCH FOR 6 SECURE REAR COVER TEL E FOUL SIGNAL MOUNTING TAB WITH TWO 10 X 1 1 2 ROBERTSON SCREWS 2 Mark the location of the countersunk hole on the approach 3 Remove the cover and drill a 5 32 hole approximately 1 3 4 deep at the marked location i NOTE On laminate lanes drill a 1 4 diameter clearance hole through the laminate 4 Cut notch a 3 4 19 mm clearance notch in the gutter to permit the Tel E Foul signal to pass from the Tel E Foul to the reflector 5 Reposition the cover and secure it with a 14 x 3 1 2 flat head screw 6 Remove capping and secure rear cover mounting tab with two 10 x 1 1 2 Robertson screws Frameworx Gutters and Capping 38 DIVISION CA
16. Install flat gutter spacer P N 84 200556 000 part of package number 84 860621 000 against pit end of gutter notch in wood spacer toward the lane Secure spacer with wood 2 1 2 screws Refer to Figure 6 Frameworx Gutters and Capping 29 Install transition block onto pit end of the fourth gutter section 5 6 With all four gutter sections in place and transition block installed use 10 1 1 2 Robertson screws P N 11 081201 000 to attach the THIRD and FOURTH sections ONLY Refer to Figure 19 11 END VIEW NON JOINT JOIST LOCATION EVERY OTHER I JOIST 4 END VIEW JOINT ONLY NI 11 END VIEW NON JOINT I JOIST LOCATION EVERY OTHER I JOIST Figure 19 Attach Third and Fourth Sections of Gutter SECOND GUTTER 3 THIRD GUTTER TOP VIEW 6 LANE GUTTER 9 END VIEW GUTTER JOINT ONLY END VIEW NON JOINT 12 END VIEW NON JOINT JOIST LOCATION I JOIST LOCATION DIAGONAL SCREW HORIZONTAL SCREW EVERY OTHER I JOIST EVERY OTHER I JOIST FIRST GUTTER 2 FOURTH GUTTER 5 DIAGONAL SCREW 8 HORIZONTAL SCREW 11 JOIST LOCATIONS Frameworx Gutters and Capping 30 STAND ALONE COSMETIC COVERS INSTALLATION Included in package 84 860622 700 are covers cosmetic strips which cover the opening between the gutter and the lane edge running the entire length of the lane 1 Snap the cosmetic cover 118 le
17. Installation Manual Frameworx Gutter and Capping August 2012 84 900030 000 Brunswick CUSTOMER SERVICE A tradition in excellence Frameworz Gutter and Capping Installation Manual August 2012 by the Brunswick Bowling and Billiards Corporation All rights reserved A 2 BallWall Frameworx GS Series Pinball Wizard and Tel E foul and are registered trademarks of the Brunswick Bowling and Billiards Corporation Reorder Part No 84 900030 000 Notice If available updates to this manual can be found on line at www centermaster com All information contained in this document is subject to change without notice Brunswick Bowling and Billiards Corporation 525 West Laketon Avenue P O Box 329 Muskegon MI 49443 0329 U S A 231 725 3300 2 Frameworx Gutters and Capping Safety Throughout this publication Warnings and Cautions accompanied by one of the International HAZARD Symbols are used to alert the mechanic to special instructions concerning a particular service or operation that may be hazardous if performed incorrectly or carelessly They are defined below OBSERVE AND READ THEM CAREFULLY These Safety Alerts alone cannot eliminate the hazards that they signal Strict compliance to these special instructions when performing the service plus training and Common Sense operation are major accident prevention measures NOTE or IMPORTANT Will designate significant informational notes
18. PPING AND EXISTING FOUNDATION Gutters at Division Starting at the foul line position all the gutters at each side of the division support strips using the same procedure that was used for gutters at the ball return Refer to Figure 8 NOTE Do not secure the gutter with screws at this time Division Capping Install the division capping starting at 10 1 4 260 mm from the pinsetter side of the foul line 1 Align the tabs on the division capping with the grooves in the gutter Refer to Figure 28 Figure 28 Align and Secure Capping to Support 1 LANE 2 8 1 1 4 HOLE CUTTING SCREW 3 GUTTER 4 CENTER LINE OF SUPPORT 5 CAPPING SUPPORT 6 DIVISION CAPPING 7 COLOR STRIP NOTE The division capping must be centered in the opening between the lanes and tight against the Tel E Foul cover 2 Secure the capping to the support with 8 x 1 1 4 hole cutting screws Start approximately 1 25 mm from the foul line end of capping and install the screws side by side into grooves on 12 305 mm centers Refer to Figure 28 3 Cut the last section of capping as required to fit the opening at pit end 4 Snap the color strip into the division capping Frameworx Gutters and Capping Division Cover 1 Center the division cover on the division capping Refer to Figure 29 Figure 29 Install Division Cover 1 DIVISION COVER 2 REAR SUPPORT 3 14 X 3 1 2 FLAT
19. S 6 1 8 3 mm MINIMUM 7 3 4 19 mm MAXIMUM NOTE Removing the surface area more than 3 4 19 mm deep on the top surface of the truss is not recommended Upon placing gutter into routed area the distance from the top of the gutter to the top of the lane surface should be 1 8 3 mm minimum for System B2000 2 Remove any loose wood chips or dust from routed area 26 Frameworx Gutters and Capping New Foundation Pinball Wizard gutters P N 84 860660 xxx left hand gutter P N 84 860661 xxx right hand gutter are manufactured with the numbers 1 8 placed on the end of them These numbers identify the order and position of gutters regarding installation for a single lane 1 Beginning with the L H foul line gutter place the gutter section into position starting at the foul line and working toward the pin deck and repeat steps for the R H foul line gutter Place the remaining three sections of gutter into position Check for minimum distance of 1 4 6 35 mm from top of gutter to top of lane surface Refer to Figure 6 NOTE New foundation lane requires no modification 5 6 7 8 Figure 16 Gutter Location Stickers 1 L H FOUL LINE GUTTER 2 L H COMMON GUTTER 3 L H COMMON GUTTER 4 L H PINSETTER GUTTER 5 R H FOUL LINE GUTTER 6 R H COMMON GUTTER 7 R H COMMON GUTTER 8 R H PINSETTER GUTTER 9 FOULLINE i NOTE DO NOT screw gutters
20. all gutter joint support braces for existing foundations as follows 1 Measure the distance between the bottom of the installed gutter to the concrete floor Refer to Figure 14 2 2 La 2 _ gt Figure 14 Gutter Joint Support Brace If Required 1 MEASURE DISTANCE FROM 2 BASE 2x 4 x6 152 mm LENGTH 3 LOCALLY PURCHASED 2 4 FLOOR TO BOTTOM OF INSTALLED MINIMUM GUTTER AND SUBTRACT THICKNESS OF BASE 2 x 4 2 Cuta 6 152 mm section from a locally purchased 2 x 4 board for the base 3 Subtract the thickness of the base 2 x 4 from length noted in step 1 above and cut remaining section to this measurement for vertical piece 4 Using screws or nails assemble two boards together as shown in Figure 20 5 Place assembled support brace directly centered beneath the gutter coupler Frameworx Gutters and Capping GUTTER INSTALLATION Existing Foundation System B2000 Lane Surface With Truss Foundation 1 Using a power router or equivalent tool remove a 2 1 4 57 mm x 2 3 4 70 mm maximum depth section on top surface of truss parallel with the outside edge of the lane Refer to Figure 15 9 3 4 1 5 16 N 248 mm enen YA ANE 3 5 Figure 15 Route Top of Trusses as Reguired 1 DIVISION SUPPORT STRIP 2 GUTTER 3 ROUTE AREA 4 LANE SURFACE 5 TRUS
21. anufacturer be liable for loss of profits or other direct or indirect costs expenses losses or damages arising out of defects in or failure of parts Replacement Parts Under the Warranty All service parts are F O B the installation site both during and after the warranty period The price of parts includes delivery by standard means such as United Parcel Service UPS Any expense resulting from expedited delivery such as air freight will be billed to the Customer During the one year period parts which are faulty due to material or workmanship will be replaced or repaired free of charge only if the old part is properly identified and turned in for credit Identify the defective part by attaching a tag containing the part name and part number Light bulbs are not covered by the warranty Contact the Warranty Department at 1 231 725 3433 Frameworx Gutters and Capping HARMFUL CHEMICALS k WARNING Although the gutters and capping you have just purchased are made from strong and durable PVC plastic it has been determined that some lane conditioner lane cleaner and all purpose cleaners may contain chemicals that can damage your gutters and capping Some of the chemicals are Toluene Methyl Ethyl Ketone and Chlorinated Solvents Please refer to the manufacturer s information on the products you use around your lane area to see if they are compatible with and not harmful to PVC plastics Failure to do so may damage the gutters an
22. d capping and will void your warranty Brunswick offers a full line of conditioners and cleaners for your center For information on these products contact your Brunswick distributor or Brunswick After Market Specialist 6 Frameworx Gutters and Capping 7 BRUNSWICK GUTTER AND CAPPING PACKAGING Page 10f1 MODEL NUMBER CONFIGURATION BRUNSWICK BOWLING 8 BILLIARDS CORPORATION Drawing Number 2 600061 Rev No C DESCRIPTION MNC RETURN CAPPING E 84 860740 XXX PKG RETURN CAPPING 8 HARDWARE Page 1 of 1 MODEL NUMBER CONFIGURATION BRUNSWICK BOWLING amp BILLIARDS CORPORATION Drawing Number L2 600062 XXX F DESCRIPTION MNC DIVISION CAPPING 84 860553 XXX_ PKG DIVISION CAPPING 84 860734 XXX_ PKG DIVISION CAPPING CLEAR ROHS NON GLOW 84 900030 000 MANUAL FWX CUTTER 8 CAPPING INSTALLATION PBW PER CENTER Frameworx Gutters and Capping Page 1 1 MODEL NUMBER CONFIGURATION BRUNSWICK BOWLING amp BILLIARDS CORPORATION Drawing Number L2 600063 000 Rev No A DESCRIPTION MNC RETURN TEL E FOUL COVER QTY PARTNUMBER DESCRIPTION OF PACKAGE rm seseososono PKG RETURN COVER TEL E FOUL Page 1 of 1 MODEL NUMBER CONFIGURATION BRUNSWICK BOWLING amp BILLIARDS CORPORATION Drawing Number L2 600064 000 Rev No A DESCRIPTION MNC DIVISION TEL E FOUL COVER NG 84 860602 000 PKG DIVISION COVER TEL E FOUL Page 1 of 1 MODEL NUMBER
23. into place at this time Frameworx Gutters and Capping 27 Slide a gutter coupler P N 84 200462 000 into the foul line end of the fourth gutter section and carefully insert into groove of third gutter section Make sure joint has step down toward the pindeck Refer to Figure 17 1 1 4 6 35 mm 4 MINIMUM Figure 17 Place New Gutter Into Position 1 1 4 6 35 mm MINIMUM 2 GUTTER COUPLER 3 INSTALL COUPLER WITH DOWNWARD BEND TOWARD PIT END IMPORTANT To ensure proper and consistent ball travel toward the pit end of the lane a step down higher to lower condition MUST exist at every gutter joint IMPORTANT The design of the gutter coupler assists in maintaining a step down condition however additional support at EVERY joint is needed Locally purchased material should be used to support the foul line half of the gutter couplers Supports may extend from existing trusses anchor strip etc or from the floor to the bottom of the couplers but must not interfere with ball return or automation components This is not required on new foundations Frameworx Gutters and Capping 28 3 Cut to fit the pit end of the fourth gutter section to accommodate the transition flat gutter block P N 84 200456 000 and kickback Refer to Figure 18 Figure 18 Install Flat Gutters 1 TRANSITION BLOCK 2 SPACER 3 FLAT GUTTER 4 APPROACH DIRECTION 4
24. mwema 32 Eayout Capping Chip EEN 32 Install Capping Clips ue e giegteteeeegec e Ate REENERT 35 IR ee 37 Ball Return Capping Removal 2 egene Eege 38 Ball ee 39 Division Capping and Existing FOUnGa Ot 0 40 Gutters at DIVISION ia ak oe Peet eee een Ae 40 EVEN 40 Division e 41 Framewors Gutters and Capping WARRANTY AND SERVICE POLICY If any defects in material or workmanship appear during the first three months after installation the defective part will be repaired or replaced at Brunswick s option with no charge to the Customer If any defects in material appear during the nine months following the initial three month warranty period the defective part will be repaired or replaced at Brunswick s option with no charge to the Customer for parts The Customer must assume all other costs in making the repair or replacement All service calls during the first three months of the warranty period resulting from the inability of the Customer s mechanics to perform required adjustments or maintenance will be billed directly to the Customer Brunswick reserves the right to change the design of any product but assumes no responsibility to incorporate such design changes on products already sold The warranty applies only to new products installed by Brunswick and extends only to the original purchaser Repairs or replacements made by anyone not approved by Brunswick void the warranty Under no circumstances shall the Seller or M
25. ngth P N 84 200467 xxx into place along the lane edge Each side of lane requires four covers Refer to Figure 20 3 D 1 4 END VIEW 31 Figure 20 Install Cosmetic Covers 1 GUTTER 2 LANE 3 118 LONG COVER 4 END VIEW Frameworx Gutters and Capping BALL RETURN CAPPING NEW AND EXISTING FOUNDATIONS Layout Capping Clips 1 Place 5 127 mm capping clip on top of support frame 2 51 mm from ball return kickbacks TOP VIEW OF BALL RETURN KICKBACKS i 2 NOTE DISTANCE A FOR APPROACH END 4 CAPPING SUPPORT FRAME EDGE LA 5 CAPPING CLIP EDGE 3 CENTER CLIP ON CAPPING SUPPORT FRAME AND MARK CENTER OF HOLE IN CLIP Figure 21 Ball Return Capping Clip 1 TOP VIEW OF BALL RETURN 2 NOTE DISTANCE A 3 CENTER CLIP ON CAPPING KICKBACKS FOR APPROACH END SUPPORT FRAME AND MARK CENTER OF HOLE IN CLIP 4 CAPPING SUPPORT FRAME 5 CAPPING CLIP EDGE EDGE 32 Frameworx Gutters and Capping 2 Center capping clip on capping support creating equal distance between the clip edges and the outside edges of the capping support Frame Refer to Figure 22 3 Mark center of hole closest to kickback on the left hand side and note the distance between the outside edge of the clip and the outside edge of the support frame dimension A 4 Place 2 1 2 64 mm capping clip on
26. y laying the side rails along the foundation sequentially as shown in Figure 2 Figure 2 Mark Support Frame Side Rails 1 PINSETTER SUPPORT FRAME 2 FOUNDATION 3 MARK EACH BOARD LOCATION SIDE RAIL 4 COMMON SUPPORT FRAME 5 BALL RETURN KICKBACK SIDE RAIL GS SERIES PINSETTERS Frameworx Gutters and Capping 11 8 3 4 2 222 mm 8 3 4 222 mm 8 3 4 222 mm 4 GU t gt 3 2 1 2 ROBERTSON FLAT 6 COMMON FRAME 2 1 Ea 176 3 8 4480 mm long Pinsetter End 2 Ea 176 3 8 4480 mm long Common Piece 1 Ea 176 3 8 4480 mm long Approach End Assembly Four support frames are required the length and quantities are listed below Assemble the ball return capping and gutter support frame assemblies Refer to Figures 3 34 1 2 876 mm 68 1 2 1740 mm T T 102 1 2 2604 mm HEAD SCREW PINSETTER END FRAME 176 3 8 4480 mm CUT TO LENGTH DURING INSTALLATION T b 132 3253 mm 6 COMMON FRAME 176 3 8 4480 mm Le I 1 4 132 3253 mm 7 APPROACH END FRAME 176 3 8 4480 mm 1 L2 T H 137 3480 mm 44 1118 mm 88 3 16 2240 mm 44 1118 mm 88 3 16 2240 mm 2 4 _ Ad A

Download Pdf Manuals

image

Related Search

Related Contents

Agrident APR350/380/500 Manual  Bedienungsanleitung herunterladen  Whirlpool Range GFE461LVQ1 User's Manual  Télécharger le mode d`emploi PDF.  Operating instructions  Wie alle über die Tastatur einstellbaren  KDC-461U  RTXC 3.2 TRAINING COURSE jrg.ppt      

Copyright © All rights reserved.
Failed to retrieve file