Home
Electric Vehicle Charging Station Installation Marine Parking Garage
Contents
1. 120VAC 60 Hz oame as incoming Incoming Voltage Input Frequency Output Voltage Output Frequency Same as incoming Output Amperage Max Continuous 20A EATON CORPORATION www eaton com 17 Instruction Manual IMOEVOOO02E Effective April 2012 Appendix Table 10 EVSE Normal Operation User Interface Indicators Installation and Service Manual Level 2 AC Pow R Station Electric Vehicle Supply Equipment EVSE EVSE Normal Operation User Interface Indicators Unit is Ready for Use Authorization is required Steady Vehicle Connected EVSE Ready Waiting on Vehicle Steady Vehicle Connected and Vehicle Charging Vehicle Connected and Charging is Remotely Controlled by Building Management System Charging Set to INACTIVE Steady Vehicle Connected and Charging is Remotely Controlled by Building Management System Charging Set to ACTIVE but at a reduced level Vehicle Connected and Current Charge Session is Complete Vehicle Connected and Current Charge Session is Complete 18 EATON CORPORATION www eaton com Remove EV Connector from EVSE and Mate to your Electric Vehicle Plug In to Vehicle to Begin Charge Session A If the EVSE has a RFID reader please present your keyfob or other credential to activate B Otherwise proceed to process payment via Credit Card Payment System on the front of the unit After payment is rendered EVSE will activate and Power ICON None Waiting
2. gt lt Steady Very Fast Blink Unit is locked out and not operable gt t Asymmetric Double Blink Unit is locked out and not operable In all Errors Faults the Power ICON will be ON or Blinking On a few of the Errors the Charging ICON Lea will BLINK to describe the specific Error Press Manual Reset Pushbutton to Clear Error f AutoReclosure is ENABLED the EVSE will auto clear this error after 15 minutes Starting a new Plug Session will also clear the error A new Plug Session is defined as removing the EV Connector from the Vehicle Inlet and re inserting it into the Vehicle Inlet Press Manual Reset Pushbutton to Clear Error Starting a new Plug Session will also clear the error A new Plug Session is defined as removing the EV Connector from the Vehicle Inlet and re inserting it into the Vehicle Inlet Press Manual Reset Pushbutton to Clear Error Starting a new Plug Session will also clear the error A new Plug Session is defined as removing the EV Connector from the Vehicle Inlet and re inserting it into the Vehicle Inlet Press Manual Reset Pushbutton to Clear Error Starting a new Plug Session will also clear the error A new Plug Session is defined as removing the EV Connector from the Vehicle Inlet and re inserting it into the Vehicle Inlet Starting a new Plug Session will clear the error A new Plug Session is defined as removing the EV Connector from the Vehic
3. Figure 12 Typical Unistrut Mounting gt CENTER MOUNTING HOLES Figure 13 Dimensional Detail for Unistrut Mounting MOUNTING LOCATIONS Step 3 Instruction Manual IMOEVOOO02E Effective April 2012 is recommended in high wind and use area cross arms should be used to avoid twisting which can occur in a single pole installation Make sure the mounting plate is level If mounting on a single pole use the two center holes If mounting utilizing cross arms use the four outside square holes Attach mounting plate using as shown in Figure 12 Use appropriate hardware making sure it is galvanized or stain less steel for weather protection if mounting outdoors Step 4 After the mounting plate is securely attached to the mount ing structure mount the EVSE unit to the mounting plate using the washers and nuts removed in Step 1 POLE MOUNT W CROSS BRACES MOUNTING LOCATIONS MOUNTING LOCATIONS UNISTRUT WITH CROSS BRACES UNISTRUT WITH CROSS BRACES EATON CORPORATION www eaton com 9 Instruction Manual IMOEVOOO02E Effective April 2012 Installation and Service Manual Level 2 AC Pow R Station Electric Vehicle Supply Equipment EVSE FRONT of Pedestal Station 1 00 REF T 1 00 REF Figure 14 Base Detail Pedestal for EVSE Pedestal Floor Mounting Preparing the Site Once a proper site has been chosen and the electrical service has been run to the locatio
4. A L 2 La Eaton Internet Disconnected LSI Modem GRelacs LIK SecureID Disconnecked Modem Eaton Internet Intl Disconnected LSI Modem Local Area Connection Connected Ty Intel R 825771 Giga EATON CORPORATION www eaton com 15 Instruction Manual 0 00002 Effective April 2012 f Hit Ok for the two windows to close them g In the Local Area Connection Status go to the support tab and verify that an IP address has been assigned Jot down the Default Gateway address for the Wifi Troubleshooting portion Note t does not need to match exact numbers in Figure 26 l Local Area Connection Status General Suppor Connection status Ah Address Type Assigned by DHCP IP Address Subnet M ask 132 766 735 100 295 255 255 0 Default Gateway 192 168 13 31 Windows did not detect probleme with this connection IF you cannot connect click Repair Figure 26 Support tab of Local Area Connection Status Step 5 Once an IP address is assigned to the PC open an internet browser and go to a website like gridpoint com If the Ethernet service is open it should allow for any popular website to be accessed Step 6 If you are able to access a website then you have verified that the Ethernet service for the Network Manager Controller is properly functioning For more information about confirming Ethernet con nectivity contact Eaton Tech Support
5. Co This connection uses the following items El Client for Microsoft Networks m File and Printer Sharing For Microsoft Networks dal qos Packet Scheduler Internet Pretacal TCP IP Install Description You can get IP settings assigned automatically if your network supports this capability Otherwise need to ask your network administrator for the appropriate IP settings Obtain an address automatically C Use the following IP address IP address subnet mask Default gateway Uninstall Transmission Control Protocol lnternet Protocol The default wide area network protocol that provides communication across diverse interconnected networks Obtain ONS server address automatically C5 Use the following DNS server addresses SS s e Preferred DMS server 1 dT Alternate ONS server Show icon in notification area when connected Itemate DNS server Notify me when this connection has limited or na connectivity I eee Local Area Connection Status General Connection Status Duration Speed Activity Fackets Figure 25 PC setup Connected 09 45 47 100 0 Mbps Hecerved 56 306 GRelacs U5 SecurelD Disconnected LSI Modem Eaton Internet Intl Disconnected LSI Modem GRelacs LIK SecureID Disconnecked a LSI Modem 1394 Connection Connected Wireless Nekwork Connection Mok connected L
6. DIAGRAM SCALE NONE E E TO UTILITY E CT CAN NEW PLAN SCALE 1 4 1 0 Q PANEL A 4 X4 SUPPORT STRUCTURE WITH CHANNEL AS REQUIRED 2 4 8 PANEL E C 200 3 1200A 120 208V 3P 4W CAR NE A AS 6 CT E G OFCI P PANEL V B E X EST PANEL C MDP1 e 442 1486 100 3 EAE 4 2 1 8G E MAIN DISTRIBUTION PANEL MDP NEW SINGLE LINE DIAGRAM 4 SCALE NONE DESCRIPTION SPECIAL PURPOSE RECEPTACLE UTILITY METER TIME CLOCK CIRCUIT BREAKER HAND OFF AUTO SWITCH NORMALLY OPEN CONTACTS CONTACTOR COIL FUSED SWITCH BRANCH CIRCUIT PANELBOARD TRANSFORMER SERVICE OR DISTRIBUTION EQUIPMENT ABBREVIATIONS AMPERES SWITCH CONDUIT CURRENT TRANSFORMER EXISTING GROUND OWNER FURNISHED CONTRACTOR INSTALLED PHASE VOLTS REMOVE CONTROL ENCLOSURE 17 448 14106 CONTACTOR NOTES COORDINATE EXACT LOCATION WITH THE CITY AND BOROUGH OF JUNEAU PROJECT REPRESENTATIVE CONDUCTORS XHHW 2 COPPER STRANDED XHHW HANGERS AND SUPPORTS HOT DIP GALVANIZED AFTER FABRICATION STAINLESS STEEL HARDWARE RACEWAYS GALVANIZED RIGID STEEL BOXES AND ENCLOSURES GALVANIZED STEEL FINISHED WITH MANUFACTURER S STANDARD ENAMEL TIME CLOCK 365 7 DAY CONTROL WITH HOLIDAY SCHEDULE TORK DW SERIES OR EQUAL HAND OFF AUTO SWITCH TYPE HEAVY DU
7. For fleet customer with specific vehicles or for parking restricted to plug in a vehicles only the wheel stop installation distance may be different Vehicle Front Pow R Station a ENSE Pow R Station EVSE w Protective Bollard Figure 4 Parking Bay Garage w Recommended Bollard Installation Note Ihe wall mount style of Pow R Station can come with a much longer Area Reference Only cord so Parking Bays and Garages length of the cord is less of a problem for maintenance Protecting the Location For outdoor installations creative use of protective bollards and Figure 6 Protecting the Pow R Station EVSE with Bollards for wheel stops are necessary Vehicles can and will damage the units Reference Only if left unprotected Protective bollards are recommended to be installed in the area in close proximity of the Pow R Station EVSE See local jurisdiction requirements for actual specifications Pow R Station EVSE Cb db R Wheel Stop Figure 5 Protecting the Pow R Station EVSE with Wheel Stops for General Purpose Parking EATON CORPORATION www eaton com 5 Instruction Manual 0 00002 Effective April 2012 5 Installing the Electrical Service Checking the Electrical Requirements The National Electric Code Article 625 21 states Overcurrent protection for feeders and branch circuits supplying electric vehicle supply equipment shall be size
8. accessory Each optional accessory will manage user access to either connector output Note Sample catalog number configuration above shows a Level 2 dual pedestal EVSE NEMA 3R enclosure 18 foot cable 30A ChargePoint Network enabled with ChargePoint card and contactless credit card Specifications Table 2 Technical Specifications 30 70A configurations Table 3 Physical and Environmental Specifications Description Description Wallmount Pedestal Incoming voltage and connections 208 240 Vac Line 1 Line 2 and Earth ground Cable length Available up to 23 feet Input frequency 50 60 Hz Dimensions H x W x D 22 00 x 15 00 x 8 00 53 00 x 15 00 x 8 00 Outputamperage max continuous 30A Wm in inches mm 558 8 x 381 0 x 203 2 1347 0 x 381 0 x 203 2 Add 9 inches below for cable hanger Interlocked power output Yes M Weight unpackaged 65 75 Overcurrent rating Output amperage 5 Weight packaged 110 includes skid 120 includes skid Ground fault interruption 20 mA UL 2231 1 UL 2231 2 personnel protection Status indicators Six LEDs Power Charging Complete Remotely Automatic reset after DIP switch selectable Enable Disable LLL Controlled Temporary Fault and Service nuisance trip feature default Enabled Pushbuttons Fault Reset resets temporary faults Cold load pickup randomized restart on Yes Ingress pro
9. and Inspection for this Work The CBJ reserves the right to determine the acceptability of the finished Project Should the Contractor fail to meet the required specifications the Contractor shall immediately complete the Project as specified at no additional cost to the CBJ COMPENSATION The Contractor shall be paid on a lump sum basis upon satisfactory completion and acceptance of the Work by the CBJ and notification by the State Department of Labor that the Contractor has complied with its requirements Electric Vehicle Charging Station Installation Marine Parking Garage Page 2 RFQ No E15 117 LIABILITY AND INSURANCE REQUIREMENTS Liability The Contractor shall hold and save the CBJ its officers agents and employees harmless from liability of any nature This includes any costs expenses suits or damages of any kind sustained by any person s or property by any virtue of performance resulting from the Project unless arising from carelessness or negligence by the CBJ which will be apportioned on a comparative fault basis Insurance Requirements The Contractor shall provide evidence of insurance with a carrier or carriers satisfactory to the CBJ covering injury to persons and or property suffered by the CBJ or a third party as a result of operations under this contract by the Contractor or by any Subcontractor This coverage will also provide protection against injuries to all employees of the Contractor and the employees of any Su
10. below for cable hanger 6 LEDs Power Charging Complete Remotely Controlled Temporary Fault and Service Status Indicators Push Buttons 2 Buttons Override and Reset Ingress Protection IP14 Type Rating 3R Temperature Operating 30 to 50 degrees Celsius Temperature Storage 40 to 70 degrees Celsius Humidity 90 RH non condensing Table 7 Specifications Description Wall mount Pedestal J1772 Pistol Grip EV Same as Output Rating Connector Permissive Run Contact NC dry contact input Available Line Current 4 20mA analog input Control RS 485 Modbus RTU 4 wire port Memory SD Memory Slot Ethernet RJ45 IEEE 802 3 TCP IP Modbus TCP Field Diagnostics and RS 232 DB9 HyperTerminalTM Support Upgrade Port Table 8 Optional Specifications Description Wall mount Pedestal Through feed Daisy Chain Yes Compatible Enables connectivity to Pow R Station Network Manager with real time status and historical information Network controller Wireless Wi Fi WPA or WPA2 RFID basic Basic lock unlock with card or keyfob RFID User Customer provided third party database of users inte grated for authentication Cellular GPRS GSM Credit Card Processing PCI DSS Pow R Station Network Management Solution with Real time Status and Historical Information Network Management Table 9 Optional Level 1 120VAC 20A Outlet
11. technical support Step 8 Almost immediately the vehicle will engage a charge ses sion the contactor will close and power will be supplied to the vehicle See Table 10 Normal Operation User Interface Indicators in the Appendix for more details 12 EATON CORPORATION www eaton com Installation and Service Manual Level 2 AC Pow R Station Electric Vehicle Supply Equipment EVSE Step 9 When power is being supplied to the vehicle the CHARGING INDICATOR will move from a BLINK status to STEADY status signifying that current is flowing to the vehicle Step 10 You may now remove the connector from the vehicle at your leisure Authorization Needed If Authorization is needed the Power ICON will have a BLINK pat tern This signifies to the end User that either payment activation is needed or RFID authorization Ground Fault Test Figure 20 Ground Fault Test The ground fault detection feature 15 self tested every time the unit starts a plug session to charge a vehicle A User can manually test the ground fault feature at any time by pressing and holding the reset button right button for seven seconds If the test passed suc cessfully the fault light will flash once lf it detects a problem the power icon will turn off and the service light wrench icon will have a medium single blink until power is cycled to the unit See Table 11 EVSE Fault or Error User Interface Indicators in the Troubleshooting Section i
12. the unit on a solid non scratch surface and opening the unit by turning the latch on the side Remove the three nuts on the 10 32 studs that attach the mounting plate to the unit The location of these mounting studs can be seen in Figure 10 Save these nuts and washers as they will be needed to re attach the unit later in the installation Step 2 Using the mounting plate as a template mark the holes to be used for mounting Make sure the mounting plate is level If mounting on a wood stud wall use the two center holes If mounting on a solid wall such as concrete brick or concrete block use the four outside square holes Step 3 Pre drill mounting holes if mounting into a wood stud or drill appropriate sized holes in a solid wall for use with the type of anchor you will be using Step 4 Attach mounting plate to the wall as shown in Figure 11 If installing on a wood stud use 5 16 or 3 8 x 3 long Lag screws and washers These should be galvanized or stain less steel for weather protection if mounting outdoors If mounting onto a concrete block or brick wall use an appro priate anchor for the type of wall on which you are installing the unit Again these should be appropriate for weather conditions if mounting outside EVSE 10 32 MOUNTING STUDS HOLES MOUNTING LOCATION FOR WOOD STUD SINGLE POLE MOUNTING LOCATIONS FOR CONCRETE WALL CONCRETE BLOCK BRICK OR CHANNEL STRUT _ EVSE MOUNTING PLATE MOUNTING L
13. to release latch as shown in Figure 9 The door should pop open Facing the charging station locate the door latch on the right side of the unit as shown in Figure 7 4 Figure 9 Rotate Handle to Release Latch Figure 7 Door Latch Step 2 Insert key into lock and turn counterclockwise note for new instal lations the key will come already in the lock Once unlocked the latch should pop outwards as shown in Figure 8 wr EN m uS bam aim Figure 8 Unlocked Door Latch EATON CORPORATION www eaton com 7 Instruction Manual 0 00002 Effective April 2012 7 Installing to the Premise The three typical installation methods of installing Pow R Station EVSE s to the premise are found below Some installations require installing the wall mount style of Pow R Station EVSE to a wall or unistrut Mounting to a Wall Preparing the Site Once a proper site has been chosen and the electrical service has been run to the location you can begin installation A CAUTION DO NOT MOUNT UNIT TO ONLY STUCCO DRYWALL WALLBOARD DO NOT USE TOGGLE BOLTS ZIP ANCHORS NOR PLASTIC WALL ANCHORS MEANT FOR THESE MATERIALS BECAUSE THEY DO NOT HAVE THE STRENGTH NEEDED TO SUPPORT THE UNIT THE UNIT MUST BE MOUNTED TO A SOLID SUPPORT SUCH AS WOOD CONCRETE WALL CONCRETE BLOCK WALL OR EQUIVALENT Step 1 Remove the mounting plate from the back of the EVSE unit by placing
14. to support simultaneous independent charge sessions of up to 70A This range supports today s existing J1772 compatible vehicles and ensures future operability as vehicle manufacturers may upgrade their on board equipment to support faster charging Available in wallmount and pedestal types our stations will adapt to your preferred location and usage scenario The consumer interface is simple to operate and features language agnostic indicator icons and matching English text User authentication payment processing and network management are optionally available through integrated ChargePoint The stations can also optionally support a credit card swipe pay as you go platform using integrated reader and payment processing managed by USA Technologies Standard features e Dual connector simultaneous AC Level 2 charging 208 Vac or 240 Vac e NEMA exterior housing e Eaton s standard one year warranty on all electrical components and housing per Selling Policy 25 000 Standards compliance e SAE J1772 conductive charge couplers NFPAS 70 National Electrical Code Article 625 Electric Vehicle Charging System e UL 2231 personnel protection systems for EV charging circuits E I N Powering Business Worldwide e UL 2594 EV supply equipment outline of investigation e UL 1998 software in programmable components CSA C22 No 1071 FCC compliant Technical Data TD191002EN Dual AC Level 2 comme
15. www eaton com plugin call 1 855 ETN EVSE 1 855 386 3873 or call your local Eaton sales office Instruction Manual 00002 Effective April 2012 1 Important Safety Instructions Please Read WARNING ELECTRICAL THIS EQUIPMENT SHOULD BE INSTALLED ADJUSTED AND SERVICED BY QUALIFIED ELECTRICAL PERSONNEL FAMILIAR WITH THE CONSTRUC TION AND OPERATION OF THIS TYPE OF EQUIPMENT AND THE HAZARDS INVOLVED FAILURE TO OBSERVE THIS PRECAUTION COULD RESULT IN DEATH OR SEVERE INJURY READ THIS MANUAL THOROUGHLY AND MAKE SURE YOU UNDERSTAND THE PROCEDURES BEFORE YOU ATTEMPT TO OPERATE THIS EQUIPMENT THE PURPOSE OF THIS MANUAL IS TO PROVIDE YOU WITH INFORMATION NECESSARY TO SAFELY OPERATE MAINTAIN AND TROUBLESHOOT THIS EQUIPMENT KEEP THIS MANUAL FOR FUTURE REFERENCE DO NOT USE THIS PRODUCT IF THE EV CABLE IS FRAYED HAS DAMAGED INSULATION OR ANY OTHER SIGN OF DAMAGE DO NOT USE THIS PRODUCT IF THE ENCLOSURE OR THE EV CONNECTOR IS BROKEN CRACKED OPEN OR SHOW ANY OTHER INDICATION OF DAM AGE INTENDED FOR USE WITH PLUG IN ELECTRIC VEHICLES ONLY PREMISE VENTILATION NOT REQUIRED THE INFORMATION CONTAINED IN THIS MANUAL IS SUBJECT TO CHANGE WITHOUT NOTICE 2 Symbols and Definitions A WARNING ELECTRICAL THIS SYMBOL INDICATES HIGH VOLTAGE IT CALLS YOUR ATTENTION TO ITEMS OR OPERATIONS THAT COULD BE DANGEROUS TO YOU AND OTHER PERSONS OPERATING THIS EQUIPMENT READ THE MESSAGE AND FOL LOW THE INSTRUCTIONS
16. 0 for business personal property issues or Collections Division at 907 586 5268 for all other accounts RESPONSIBLE BIDDER Only responsive Bids from responsible Bidders will be considered Bid submitted by a Bidder determined to be not responsible may be rejected A responsible Bidder is one who is considered to be capable of performing the WORK NON RESPONSIVE BIDS Only responsive Bids will be considered Bids may be considered non responsive and may be rejected Some of the reasons a Bid may be rejected for being non responsive are gt Ifa Bid is received after the Deadline for Bids gt fthe Bid is ona form other than that furnished by the OWNER or legible copies thereof or if the form is altered or any part thereof is detached or if the Bid is improperly signed gt l fthere are unauthorized additions conditional or alternate Bids or irregularities of any kind which may tend to make the bid incomplete indefinite ambiguous as to its meaning or in conflict with the OWNER s Bid document gt If the Bid does not contain a Unit Price for each pay item listed except in the case of authorized alternate pay items f the Bidder has not acknowledged receipt of each Addendum f any of the Unit Prices Bid are excessively unbalanced either above or below the amount of a reasonable Bid to the potential detriment of the OWNER Electric Vehicle Charging Station Installation Marine Parking Garage Page 9 RF
17. CAL WARNING ONLY QUALIFIED PERSONNEL FAMILIAR WITH THE OPERATION AND CONSTRUCTION OF THIS EQUIPMENT SHOULD INSTALL ADJUST MODIFY AND SERVICE THIS EQUIPMENT FAILURE TO FOLLOW THE INSTRUCTIONS COULD RESULT IN SEVERE BODILY INJURY OR DEATH A IMPORTANT THE USER IS RESPONSIBLE FOR CONFORMING TO ALL LOCAL AND NATIONAL ELECTRIC CODE amp STANDARDS APPLICABLE IN THE ENVIRON MENT THAT THE POW R STATION IS BEING INSTALLED AND COMMIS SIONED Replacement Parts List Table 1 Replacement Parts List Part Part Number Protection and Control Board PCBA 9105370601 Cable Connector Assembly 91053636G02 Inlet Housing 43 276 Ribbon Cable for User Interface 91065361001 User Interface Unit 9105360601 Contactor 120V 30A 9105362G02 Contactor 70A C25FNF37B consult with your local sales office to confirm availability Instruction Manual IMOEVOOO02E Effective April 2012 ADA Standards for Accessible Design It is very important to consider all STANDARDS FOR ACCESSIBLE DESIGN for Americans with Disabilities when choosing the location and placement of all Electric Vehicle Supply Equipment The follow ing is a direct excerpt from the 2010 ADA Standards for Accessible Design http www ada gov regs2010 2010ADAStandards 2010ADAs tandards htm c3 The Department of Justice published revised regulations for Titles and 1 of the Americans with Disabilities Act of 1990 ADA in the Federal Register on September 15 2010 These reg
18. CAREFULLY A WARNING INDICATES A POTENTIALLY HAZARDOUS SITUATION WHICH IF NOT AVOIDED CAN RESULT IN SERIOUS INJURY OR DEATH A CAUTION INDICATES A POTENTIAL HAZARDOUS SITUATION WHICH IF NOT AVOID ED CAN RESULT IN MINOR TO MODERATE INJURY OR SERIOUS DAMAGE TO THE EQUIPMENT THE SITUATION DESCRIBED IN THE CAUTION MAY IF NOT AVOIDED LEAD TO SERIOUS RESULTS IMPORTANT SAFETY MEA SURES ARE DESCRIBED IN CAUTION AS WELL AS WARNING A IMPORTANT INDICATES A PARTICULAR ITEM OR INSTRUCTION THIS IS IMPORTANT TO CONSIDER SaveThese Instructions 2 EATON CORPORATION www eaton com Installation and Service Manual Level 2 AC Pow R Station Electric Vehicle Supply Equipment EVSE Definitions AC Alternating Current The type of power available in most build ings and on utility poles The Pow R Station EVSE protects Users and vehicles by allowing AC power to flow through it to the vehicle The vehicle then converts the AC to DC Direct Current to charge the traction battery ALC Available Line Current The Pow R Station EVSE tells the vehicle through the J1772 M connectors pilot pin how much current in amperes it is allowed to pull on the circuit This allows the car to not exceed the circuits maximum current rating EVSE Electric Vehicle Supply Equipment EVSE is a general term used for all of the equipment used to supply electricity to the car such as the Eaton Pow R Station EVSE Ground Fault Cur
19. CITY AND BOROUGH OF JUNEAU CBJ REQUEST for QUOTES RFQ Electric Vehicle Charging Station Installation ENGINEERING DEPARTMENT Marine Parking Garage RFQ No E15 117 QUOTES ARE DUE PRIOR TO 2 00 p m September 23 2014 RESPONDING TO THIS REQUEST FOR QUOTES Quotes may be hand delivered or faxed to the attention of Tina Brown CBJ Engineering Contracts Office 3rd Floor Marine View Center at 230 South Franklin Street The Engineering Department Contracts Division fax number is 907 586 4530 Emailed quotes will be accepted if they are emailed to contracts ci juneau ak us received and printed prior to the deadline stated above It is strongly recommended that Bidders call 907 586 0490 to confirm receipt of faxed or emailed quotes To be considered Quotes must include a Bid and Signature page and Bid Schedule SCOPE OF WORK The Contractor shall provide all labor equipment materials and perform all Work as shown on attached Drawing E100 for the Electric Vehicle Charging Station Installation Marine Parking Garage RFQ E15 117 Work shall include but is not limited to removal of existing circuit breaker transformer and primary and secondary feeders Install new circuit breaker panel control enclosure charging station and feeders The Electrical Vehicle charging station shall be the Eaton Dual AC Level 2 commercial fleet wall mounted The charging station shall be furnished by the Owner The contractor shall pick up the charg
20. OCATION TO WOOD STUD SINGLE POLE Mc RM EVSE 10 32 MOUNTING STUD HOLE Figure 10 Unit and Mounting Plate 8 EATON CORPORATION www eaton com Installation and Service Manual Level 2 AC Pow R Station Electric Vehicle Supply Equipment EVSE MOUNTING PLATE EVSE 10 32 MOUNTING STUD MOUNTING STUD RECOMMEND 3 00 STANDOFF FROM WALL USING CHANNEL OR Figure 11 Typical Wall Mounting Step 5 After the mounting plate is secure to the wall mount the EVSE unit to the mounting plate using the washers and nuts removed in Step 1 Installation and Service Manual Level 2 AC Pow R Station Electric Vehicle Supply Equipment EVSE Mounting to Uni Strut Once a proper site has been chosen and the electrical service has been run to the location you can begin installation Step 1 Step 2 Remove the mounting plate from the back of the EVSE unit by placing the unit on a solid non scratch surface and open ing the unit by turning the latch on the side for details see Section 6 Instructions for Opening Door Latch Remove the three nuts on the 10 32 studs that attach the mounting plate to the unit The location of these mounting studs can be seen in Figure 10 Save these nuts and washers as they will be needed to re attach the unit later in the installation Using the mounting plate as a template determine where the anchors should be placed to be used for mounting It SINGLE STRUT POLE P du MOUNT
21. Q No E15 117 LIST OF SUBCONTRACTORS AS 36 30 115 HFQ E15 117 Electric Vehicle Charging Station Installation Marine Parking Garage AK Contractor SUBCONTRACTOR License No 1 Contact Typeof Contract DBE ADDRESS 2 AK Business 2 Phone Number Work Amount 1 i E certify that the above listed Alaska Business License s and CONTRACTOR Registration s if applicable were valid at the time Bids were opened for this Project CONTRACTOR Authorized Signature CONTRACTOR Printed Name Electric Vehicle Charging Station Installation Marine Parking Garage Page 10 RFQ No E15 117 LEGEND SYMBOL STATION OFCI 1 a 8 CONTROL ENCLOSURE C E GATE 5 PANELBOARD DISCONNECT UTILITY METER E PANELBOARD A X XFMR A DISCONNECT DISCONNECT E UTILITY METER CT CAN PANELBOARD C MDP MDP1 DISCONNECT X 09 EUR X SECONDARY FEEDER ie TO JUNCTION BOX ON ace COLUMN APPROXIMATELY 75 FEET O EXISTING PLAN SCALE 1 4 1 0 0 2 4 PANEL B X TO JUNCTION BOX ON COLUMN X XFMR A 480 C 120 208V PANEL PANEL PANEL SM MDP1 X 50 3 200 3 DW T 9 9 ee LOAD SIDE LUGS UTILITY CT CAN MAIN DISTRIBUTION PANEL MDP 1200A 120 208V 3P 4W EXISTING SINGLE LINE
22. TY OILTIGHT PANELBOARD 100A 120 208V 3 PHASE 4 WIRE 3O0 CIRCUITS MAIN LUG ONLY BOLT ON CIRCUIT BREAKERS HINGED COVER DUAL CAR CHARGING STATION OFCI dele 217 2nd ST STE 208 JUNEAU AK 99801 PH 907 586 5900 FAX 907 586 5901 1 C 44 8 1 106 Marine View Parking Garage Car Charging Station SHEET TITLE Plans and Single Line Diagrams SCALE AS NOTED DATE AUG 2014 DRAWING NUMBER E100 Technical Data TD191002EN Effective July 2013 Dual AC Level 2 commercial fleet electric vehicle charging station For more information about Product family overview Eaton s electric vehicle solutions scan this The use of plug in electric vehicles is increasing QR Code the marketplace and this develops the need for an optimized charging infrastructure that can simultaneously charge multiple vehicles while leveraging the least amount of existing real estate The dual connector Level 2 charging station Eaton s latest addition to our family of EV charging stations is specifically designed to meet this need Ideal for commercial parking spaces multifamily dwellings and fleets Eaton s feature rich product will greatly reduce your upfront infrastructure and installation costs Product description Configuration options are available from parallel 30A to parallel 70A of power output making Eaton s dual connector charging station the only product in the marketplace
23. applicable laws and regulations Electric Vehicle Charging Station Installation Marine Parking Garage Page 1 RFQ No E15 117 QUALIFICATIONS By submitting a quote the Contractor warrants that it is qualified to perform the Work described in accordance with all applicable codes standards and regulations The Contractor shall upon request by the CBJ provide all documentation showing the Contractor s qualifications and or registrations necessary for completion of the Project QUOTES A Quote for the Work will not be accepted from a Contractor who does not hold a valid Alaska Business License and a valid Contractor s license in Alaska applicable to the type of Work bid upon at the time of opening Bids The CBJ s procurement code requires that Request for Quotes be used for projects estimated to not exceed 50 000 00 in total cost If a quote is submitted for an amount exceeding 50 000 00 it shall be considered non responsive AWARD Award of this Quote if it is awarded will be on the basis of materials and equipment described in these RFQ documents and will be made to the lowest responsive responsible Bidder whose Bid complies with all the requirements prescribed CONTRACTOR S RESPONSIBILITIES Contractor shall designate a Construction Superintendent or designee who shall serve as the Contractor s point of contact and be in full charge of the Work ensuring that construction is performed in a safe and professional manner Unless oth
24. at 1 855 ETN EVSE 386 3873 16 EATON CORPORATION www eaton com Installation and Service Manual Level 2 AC Pow R Station Electric Vehicle Supply Equipment EVSE Cellular Connectivity Step 1 Please safely energize the unit The Ethernet Port LED Lights on the Network Manager Controller should now be lit Step 2 After approximately two minutes verify that the LED indicator lights on the Cellular Modem are lit according to the following pattern Power Solid Network Solid e Signal e Solid very strong e Fast Blink strong Normal Blink good e Slow Blink weak e None no signal Figure 27 Cellular Model LED Indicator Lights Step 3 To verify connectivity call GridPoint technical support at 1 866 800 and provide them with the Network Manager controller serial num ber For more information about setting up connectivity to Network Manager see the Network Manager quick start guide document ILOEVOOO06E Wi Fi Connectivity Please refer to Instructional Leaflet ILOEVOOOO8E Level 2 AC Pow R Station electric vehicle supply equipment Wi Fi configuration quick start guide to confirm Wi Fi connectivity Installation and Service Manual Level 2 AC Pow R Station Electric Vehicle Supply Equipment EVSE 11 Specifications The Eaton Pow R Station EVSE is compliant with the following stan dards e Society of Automotive Engineers SAE J1772 2010 EV Conductive Charge Coupler and Stat
25. bcontractor engaged in Work under this contract The delivery to the CBJ of a written 30 day notice is required before cancellation of any coverage of reduction in any limits of liability Insurance carriers providing coverage shall have an A M Best rating of at least A VII The Contractor shall maintain in force at all time during the performance of Work under this contract the following policies of insurance The CBJ shall be named as additional insured for any and all work performed for the CBJ Additional insured requirements not required for Worker s Compensation coverage Proof of this insurance is required before the final bid award 1 Workers Compensation Insurance The Contractor if subject to the provisions of the Alaska Workers Compensation Act AS 23 30 will provide the CBJ and the State of Alaska with proof furnished by the insurance carrier of current coverage for workers compensation with an insurance company or association authorized to transact such business in the State of Alaska or an approved current certification of self insurance by the Alaska Workers Compensation Board The Contractor further acknowledges and agrees that in the event it fails to maintain proper Workers Compensation coverage the State will implement the provisions of AS 23 30 0458 and CBJ at its option may terminate this agreement for cause without liability a Employers Liability Bodily Injury by Accident 100 000 00 Each Accident B
26. bout the Pow R Station EV Charging Station Eaton s Pow R Station is Electric Vehicle Supply Equipment EVSE and is compatible with the Society of Automotive Engineers J1772 standard for charging plug in hybrid and all electric vehicles The Pow R Station EV Charging Station has several safety features Protects Users with interlocked power the cable and pins have no power on them until the connector is safely plugged into a vehicle Protects Users from temporary faults and automatically resets so no User interaction is needed Instructs the vehicle on how much current to draw keeps the upstream circuit protection from nuisance tripping Allows integration into authorization and management systems keeping only authorized personnel able to use units and power usage levels to predefined levels e See section Specifications for more details Automatic Reset feature must be enabled during installation see page 15 for more information Moving Transporting and Storage Instructions Store this unit indoors and in its original packaging until it is ready to be installed Storage temperature should be between 30 and 80 C When moving or lifting the unit always grasp the unit enclo sure NEVER attempt to lift move or carry the unit by the EV cable DO NOT carry the unit by the cable hook assembly Improper storage or handling may cause damage to the unit Before You Begin 4 WARNING ELECTRI
27. d for continuous duty and shall have a rating of not less than 125 percent of the maximum load of the electric vehicle supply equipment A load study of the location s electrical service may be needed to determine the availability of adequate electrical service Take the nameplate amperage rating of the Pow R Station and multiply by 12596 for the minimum upstream circuit protection needed Check your local jurisdictions for any other electrical requirements Running the Wires Once the proper electrical overcurrent device has been installed wire needs to be run from it to the Pow R Station EVSE For a typi cal installation the only field wires will be for the incoming electrical service If the EVSE has a Level 1 option additional service and wiring will be needed If the EVSE unit has a remote management option a standard CAT5 6 network cable or 3 wire shielded cable typical for a RS485 type network could also need to be run to the unit The Pow R Station operates a single phase service two hots and one ground Note Use Copper Conductors ONLY A IMPORTANT THE 30A LEVEL 2 EVSE REQUIRES A DEDICATED 208 240VAC 40A UPSTREAM BREAKER THE 70A LEVEL 2 EVSE REQUIRES A DEDICATED 208 240VAC 90A UPSTREAM BREAKER OPTIONAL LEVEL 1 OUTLET REQUIRES DEDICATED 120VAC 20A UPSTREAM BREAKER DO NOT USE BREAKERS GFCI EXISTS IN EVSE AND ON LEVEL 1 OUTLET For detail on termination of Level 1 option see pa
28. e These installation location recommendations are based upon general purpose parking trying to serve the most likely plug in vehicle drivers For specific parking such as at home or in a captive fleet scenario where the User knows where the vehicle s inlet will be locate the Pow R Station appro priately Each plug in electric vehicle manufacturer has a different location for where the charging inlet is located on the vehicle Figure 1 Vehicle Inlet Locations Differ by Manufacturer 4 EATON CORPORATION www eaton com Installation and Service Manual Level 2 AC Pow R Station Electric Vehicle Supply Equipment EVSE In North America it is recommended to install Pow R Station EVSE s with a high focus on orientating the station toward the front and driver side of parking spaces Suggestions for different types of park ing layouts are illustrated below Pow R Station EVSE Figure 2 90 Degree Parking Pow R Station EVSE Figure 3 45 Degree Parking Installation and Service Manual Instruction Manual IMOEVOOO02E Level 2 AC Pow R Station Electric Vehicle Effective April 2012 Supply Equipment EVSE Wheel stops are recommended to be installed at a minimum dis tance of four feet from the front of the Pow R Station EVSE to the vehicle side of the wheel stop for general purpose parking This distance takes into effect when larger vehicles like the backing up of a pickup truck with a trailer hitch back into such a space
29. ed TO BE CONSIDERED ALL BIDDERS MUST COMPLETE AND INCLUDE THE FOLLOWING AT THE DATE AND TIME QUOTES ARE DUE Signed Bid and Signature Page includes Addenda receipt statement gt Completed Bid Schedule Electric Vehicle Charging Station Installation Marine Parking Garage Page 6 RFQ No E15 117 BID SCHEDULE BASE BID UNIT PRICE AMOUNT BID ITEM DESCHIPTION QUANTITY DOLLARS CENTS DOLLARS CENTS Contractor shall perform all Work as shown on attached Drawing E100 for the Electric Vehicle Charging Lump Sum Req d Lump Sum otation Installation Marine Parking Garage RFQ E15 117 Total Bid Company Name Electric Vehicle Charging Station Installation Marine Parking Garage Page 7 RFQ No E15 117 Standard Terms and Conditions Examination of Quote Documents Each bidder shall thoroughly examine and be familiar with all the documents and any addenda to those documents The submission of an Quote shall constitute an acknowledgment that the bidder has thoroughly examined and is familiar with the Request For Quote RFQ documents The failure or neglect of a bidder to receive or examine any of the Quote documents shall in no way relieve that bidder from any obligations with respect to that bidder s proposal or to the contract Misinterpretation or a claimed lack of knowledge concerning the Quote will not serve as a basis for a claim for additional compensation Interpretation of Quote Documents Com
30. ed on these topics The document Guidance on the 2010 ADA Standards for Accessible Design can be downloaded from htto Awww ada gov For information about the ADA including the revised 2010 ADA regu lations please visit the Department s website www ADA gov or for answers to specific questions call the toll free ADA Information Line at 800 514 0301 Voice or 800 514 0383 TTY EATON CORPORATION www eaton com 3 Instruction Manual 0 00002 Effective April 2012 4 Installation Choosing a Location A IMPORTANT THINGS TO CONSIDER BEFORE CHOOSING A LOCATION TO MOUNT THE UNIT 1 2010 STANDARDS FOR ACCESSIBLE DESIGN 2 CONSULTATION WITH AN ARCHITECT MAY BE NEEDED IN ORDER TO CONFORM TO ALL GOVERNING STANDARDS FOR LOCATION AND PLACEMENT OF ELECTRIC VEHICLE SUPPLY EQUIPMENT 3 LOCATION OF AN AVAILABLE MOUNTING SUPPORT THE WALL MOUNT UNIT MUST BE ANCHORED INTO A MOUNTING SUPPORT SUCH AS A2 x 4 STUD OR SOLID CONCRETE WALL USING MOUNT ING HARDWARE THAT IS APPROPRIATE FOR THE SURFACE ON WHICH YOU ARE MOUNTING DO NOT MOUNT THIS UNIT TO A STUCCO DRYWALL WALLBOARD 4 LOCATION OF AN AVAILABLE ELECTRICAL SOURCE POWER WIRES MUST BE RUN THROUGH AN APPROVED CONDUIT OR JACKET FROM THE CIRCUIT PANEL TO THE UNIT 5 LOCATION OF THE VEHICLE S CHARGING INLET WHILE PARKED THE UNIT MUST BE LOCATED SO ITS RESPECTIVE CABLE LENGTH IS RIGHT SIZED TO WHERE THE VEHICLE S INLET IS FOR PLUG IN WITHOUT UNDUE MANEUVERING Not
31. eld firm for a period of ninety 90 days from the date of RFQ opening Contract Extensions Unless otherwise provided in the RFQ the CBJ and successful bidder Contractor agrees 1 that any holding over of the contract excluding any exercised renewal options will be considered as a month to month extension and all other terms and conditions shall remain in full force and effect and 2 to provide written notice to the other party of the intent to cancel such month to month extension Default In case of default by the Contractor for any reason whatsoever the CBJ may procure the goods or services from another source and hold the Contractor responsible for any resulting excess cost and may seek other remedies under law or equity Billing Instructions Except as specifically allowed under the RFQ invoices must be billed to the Engineering Department as noted on the purchase order The ordering agency will approve for payment after it receives the merchandise or service and all conditions of the RFQ have been met Equal Employment Opportunity The CBJ is an affirmative action purchaser and encourages small and disadvantaged businesses to submit bids Rejection of Quotes The CBJ reserves the right to reject any or all bids and to determine which bid if any should be accepted in the best interest of the CBJ The CBJ reserves the right to waive any Informality in a quote Electric Vehicle Charging Station Installation Mar
32. erwise approved in writing by the Owner s Project Representative the Construction superintendent shall acknowledge and accept on behalf of the Contractor all written change orders directives approval or rejection notices The Contractor shall have sole responsibility for the means methods sequences or procedures of construction and safety precautions related thereto The Contractor shall conduct all Work in such a manner as to protect CBJ resources The Contractor shall comply with all applicable laws regulations codes and ordinances addition the Contractor shall obtain applicable licenses and permits unless directed otherwise provide supervision labor tools and new materials unless directed otherwise SUBCONTRACTING If this project will have subcontractors the Contractor shall submit a list of Subcontractors who will be working on the project form attached to the end of this RFQ and to comply with Alaska Department of Labor Wage and Hour requirements and the Alaska Employment Security Act The Employment Security Tax Clearance form will be issued with the Notice to Proceed CANCELLATION The CBJ as Owner reserves the sole right to cancel this Contract in whole or in part immediately in the event of the Contractor s failure to perform the Work in conformance with these Contract Documents CONTRACT ADMINISTRATION AND ACCEPTANCE The CBJ through its authorized representative will perform the Contract Administration
33. et Technical Data TD191002EN electric vehicle charging station Effective July 2013 Installation The electric requirements and wiring installation procedure for See installation guide IMOEVOOOO2E for more details electric vehicle charging stations vary by form factor but can easily be performed by any qualified electrician Per NEC Article 625 USA and CEC Part 1 Section 86 Canada each vehicle connection requires a dedicated circuit For the dual AC Level 2 charging station a separate circuit must exist for each connector For more information visit www eaton com plugin call 855 ETN EVSE 855 386 3873 or call your local Eaton sales office Dimensions Dimensions in inches mm Shown with Level 1 Option 5 00 127 0 10 00 4 72 254 0 LH Side View Front View RH Side View Figure 1 Wallmount EATON www eaton com 3 Technical Data TD191002EN Dual AC Level 2 commercial fleet Effective July 2013 electric vehicle charging station Dimensions Dimensions in inches mm 15 37 8 35 390 4 212 1 2 38 2 Shown with Level 1 Option 50 03 1270 8 43 16 1096 3 40 88 1088 4 26 58 675 1 32 30 820 4 25 90 3 00 76 2 130 0 10 30 261 6 16 41 416 8 LH Side View Front View RH Side View Figure 2 Pedestal For
34. gainst CBJ relating to this contract The obligations of Contractor arise immediately upon actual or constructive notice of any action claim or lawsuit CBJ shall notify Contractor in a timely manner of the need for indemnification but such notice is not a condition precedent to Contractors obligations and may be waived where the Contractor has actual notice CONTRACTOR S GOOD STANDING WITH CBJ FINANCE DEPARTMENT Contractors must be in good standing with the CBJ prior to award and prior to any contract renewals and in any event no later than seven business days following notification by the CBJ of intent to award Good standing means all amounts owed to the CBJ are current and the Contractor is not delinquent with respect to any taxes fees assessment or other monies due and owed the CBJ or a Confession of Judgment has been executed and the Contractor is in compliance with the terms of any stipulation associated with the Confession of Judgment including being current as to any installment payments due and Contractor is current in all CBJ reporting obligations such as sales tax registration and reporting and business personal property declarations Failure to meet these requirements may be cause for rejection of your bid To determine if your business is in good standing or for further information contact the CBJ Finance Department s Sales Tax Division at 907 586 5265 for sales tax issues Assessor s Office at 907 586 093
35. ge 10 6 EATON CORPORATION www eaton com Installation and Service Manual Level 2 AC Pow R Station Electric Vehicle Supply Equipment EVSE WARNING ELECTRICAL WARNING LOCKOUT TAGOUT ALL ELECTRICAL SOURCE CIRCUITS FEEDING THE UNIT S IN THE OPEN POSITION BEFORE BEGINNING WIRING OR TERMINATIONS FAILURE TO FOLLOW THE INSTRUCTIONS COULD RESULT IN SEVERE BODILY INJURY OR DEATH A WARNING THIS UNIT IS RATED FOR INDOOR OR OUTDOOR INSTALLATION IF THIS UNIT IS MOUNTED OUTDOORS THE HARDWARE FOR CONNECTING THE CONDUITS TO THE UNIT MUST BE RATED FOR OUTDOOR INSTALLATION AND BE INSTALLED PROPERLY TO MAINTAIN THE PROPER NEMA 3R RAT ING ON THE UNIT A IMPORTANT CONFIRM WITH THE LOCAL ELECTRICAL REQUIREMENTS FOR THE GAUGE TEMPERATURE RATING AND TYPE OF WIRE MATERIAL USED FOR THE OVERCURRENT RATING FOUND BELOW THE CHART SHOWS A GENERAL RECOMMENDATION Table 2 Electrical Wire Chart Style Nameplate Overcurrent Suggested Suggested Suggested Rating Wire Gauge Wire Type Wire Temp Rating Wall mount SAR_B 30A 40A 8 AWG Copper 75 degrees C C 70A 90A 4 AWG Copper 75 degrees C Pedestal SBR_B 30A 40A 8 AWG Copper 75 degrees C SBR C 70A 90 4 AWG Copper 75 degrees C Installation and Service Manual Instruction Manual IMOEVOOO02E Level 2 AC Pow R Station Electric Vehicle Effective April 2012 Supply Equipment EVSE 6 Instructions for Opening Door Latch Step 3 Step 1 Rotate the handle counterclockwise
36. i d Remotely Temporary b Override Button Controlled Fault Reset Button Left Button Indicator Indicator Right Button image 2 Status Indicators Payment Authorization Needed Unit Ready for Charge Session Vehicle Connected EVSE Ready Waiting on Vehicle Vehicle Charging Vehicle Has Ended Charge May begin again at anytime Rate of Charge Contolled Remotely and Rate of Charge Controlled Remotely and Charging Set to INACTIVE Charging ACTIVE Figure 19 Status Indicators Step 5 If the Power ICON is BLINKING Authorization is needed Please consult the Authorization section of this document below If the Power ICON is STEADY please proceed to the Step 1 Ensure that the electrical service wires are landed accord ing to this manual Make sure the station access door is closed next step Step 2 Power ON the Distribution Breaker T 22 Step 6 If a SAE J1772 Compliant Electric Vehicle is available please Step 3 During initial EVSE boot up the User Interface will cycle all connect the EV Connector to the Vehicle Inlet You may also use an Eaton Vehicle Simulator Step 4 After boot up the Power ICON will be either STEADY or Step 7 The CHARGING INDICATOR will begin to blink BLINKING per above table If this is not the case please verify that all incoming service connections are landed appropriately and that the distribution breaker is in tact If the Power ICON still does not appear please call
37. icate Start on your first payroll and Final on your last payroll for this Project As part of the final payment request package CONTRACTOR must submit a NOTICE OF COMPLETION OF PUBLIC WORKS form signed by ADOL personnel Contact Information Wage and Hour Section Greg Smith Contract Administrator State of Alaska City and Borough of Juneau Department of Labor and Workforce Development 155 S Seward Street Labor Standards and Safety Division and Juneau AK 99801 Wage and Hour Administration 907 586 0873 P O Box 11149 greg smith 2ci juneau ak us Juneau AK 99811 1149 907 465 4842 http labor state ak us Iss home htm Electric Vehicle Charging Station Installation Marine Parking Garage Page 4 RFQ No E15 117 If you need additional information contact the State of Alaska Department of Labor at 465 4842 QUESTIONS CONCERNING THE WORK Contact the Contract Administrator FINAL PAYMENT Prior to final payment of the final 5 of this contract the Contractor must submit the following documents 1 Employment Security Tax Clearance for the Contractor and each Subcontractor from Alaska Department of Labor Juneau Field Tax Office form to be provided with Notice to Proceed 2 Compliance Certificate and Release Form form to be provided with Notice to Proceed 3 Approved Notice of Completion of Public Works from DOL if project exceeds 25 000 AS BUILT PLANS This request for bids may include a portion of an as bui
38. ine Parking Garage Page 8 RFQ No E15 117 Fax Email Disclaimer It is the responsibility of the bidder to respond in a timely manner Bidders use of a facsimile machine or email shall be at bidders sole risk The CBJ will attempt to keep its facsimile machine and email system in good working order but will not be responsible for bids that are late due to mechanical failure a busy facsimile machine or any other technical issue arising from bidders use of a facsimile machine or email even if bidder submits a transmission report or provides other confirmation indicating that the bidder transmitted a bid before the submittal deadline Bidders are therefore strongly encouraged to confirm receipt of their bid with the CBJ prior to submittal deadline INDEMNIFICATION The Contractor agrees to defend indemnify and hold harmless CBJ its employees volunteers consultants and insurers with respect to any action claim or lawsuit arising out of or related to the Contractor s performance of this contract without limitation as to the amount of fees and without limitation as to any damages cost or expense resulting from settlement judgment or verdict and includes the award of any attorneys fees even if in excess of Alaska Civil Rule 82 This indemnification agreement applies to the fullest extent permitted by law and is in full force and effect whenever and wherever any action claim or lawsuit is initiated filed or otherwise brought a
39. ing station at Delta Alaska Wholesale 2425 Industrial Boulevard Juneau Alaska 907 789 0301 The site of the Work is Marine Parking Garage in downtown Juneau The panel shall be installed in the electrical area on the first floor and the charging station shall be installed on the concrete wall as shown by the Owner at space number 25 Provide supports and hardware as required All Work shall be in accordance with the CBJ Standard Details 4th Edition August 2011 and the Standard Specifications for Civil Engineering Projects and Subdivision Improvements December 2003 Edition and current errata unless otherwise indicated in this RFQ document COMPLETION TIME FOR THE WORK The Contractor shall have until October 31 2014 to complete all Work as described SITE INSPECTION Bidders are encouraged to visit the Project site prior to submitting a bid for this Work Failure to visit the site shall in no way relieve the Contractor of its responsibility to perform the Work in compliance with the terms and specifications of this Contract QUALITY OF WORK The Contractor shall employ workers and craftspeople qualified in the necessary trades All Work shall conform to the drawings and specifications industry standards and practices and the manufacturer s requirements The Contractor shall be responsible for the supervision and control of all Work the safety of the workers and assurance that the quality of Work and character of workers conform to all
40. ion NFPA 70 National Electric Code Article 625 Electric Vehicle Charging System e UL 2231 Personnel Protection Systems for EV Charging Circuits e UL 2594 EV Supply Equipment Outline of Investigation e UL 1998 Software in Programmable Components FCC compliant Part 15 Table 5 Electrical and Mechanical Specifications Description 30A 70A Incoming Voltage 208 VAC 208 240 VAC 240 VAC 120 VAC Input Frequency 50 60Hz 50 60Hz Incoming Amperage 40 A 90 A Output Voltage oame as Incoming Output Frequency oame as Incoming Output Amperage Max Continuous 30A 70A Interlocked Power Output Yes Yes Overcurrent Rating Output Amperage 5 Ground Fault Interruption 20mA UL2231 1 UL2231 2 Personnel Protection DIP switch selectable Enable Disable default Enabled Randomized Restart On Power Failure Yes delay before charging resumes after a power failure Automatic Reset after Nuisance Trip Feature 10 000 cycles EV Connector replaceable 100 000 cycles Contactor replaceable Mechanical Operations Incoming Field Electrical Service 22 1 26 6 2 5 3 Terminal Block Torque in in Ib Nm Incoming Modbus Connections 4 4 5 3 5 6 Terminal Block Torque in in Ib Nm Instruction Manual IMOEVOOO02E Effective April 2012 Table 6 Physical and Environmental Specifications Description Wall mount Pedestal Dimensions H x W x D 22x10 XG 52 50 x 15 x 8 Add 9
41. its key personnel who will be assigned to this contract Specifications Unless otherwise specified in the RFQ product brand names or model numbers specified in this RFQ are examples of the type and quality of product required and are not statements of preference If the specifications describing an item conflict with a brand name or model number describing the item the specifications govern Reference to brand name or number does not preclude an offer of a comparable or better product if full specifications and descriptive literature is provided for the product Failure to provide such specifications and descriptive literature may be cause for rejection of the offer Quote Prices The bid prices shall include everything necessary for the fulfillment of the contract including but not limited to furnishing all materials equipment and labor except as may be provided otherwise in the contract documents Price bid must be in U S Funds Additional Units on RFQ Award The CBJ may from time to time request additional units above the amount stated in the RFQ realizing that additional orders constituting more than 2596 of the amount stated in the RFQ would be with the concurrence of the Contractor Extension of Prices In case of error in the extension of prices in the Quote the unit prices will govern in a lot bid the lot prices will govern Firm Offer For the purpose of award offers made in accordance with this RFQ must be h
42. lated concern Eaton defines this as a Temporary Fault or in rare occurances a Nuiscance Trip Will present itself in a Qe blink pattern or a steady icon Typically an internal EVSE Concern T SAE J1772 Concern Steady Fast Double Blink Rarely Occurs Vehicle Nuiscance Trip Continually Occurs Vehicle SAE J1772 Compatibility Concern Q SAE J1772 Concern Fast Double Blink Steady Slow Single Blink Rarely Occurs Vehicle Nuiscance Trip Continually Occurs Vehicle SAE J1772 Compatibility Concern C p Ground Fault Concern Steady Slow Single Blink Steady Rarely Occurs Vehicle Nuiscance Trip Vehicle Tried to Pull more Power the the EVSE has instructed it to pull lt Slow Single Blink Steady Slow Single Blink Rarely Occurs Vehicle Nuiscance Trip Continually Occurs Vehicle SAE J1772 Compatibility Concern Max Temporary Faults for One Plug Session T If this occurs 5 vehicle related concerns Medium Blink happened during 1 Plug Session A Plug Session is defined as the moment the user plugs the EV Connector into his her vehicle inlet and then removes it Steady J Assymetric Double Blink Steady GF Test Failure Prior to Engaging Charge Session Steady Contactor Failure Steady The occurance of Vehicle Related Errors have reached a maxium The unit is temporarily disabled so that an investigation can be done Steady Slow Single Blink
43. le Inlet and re inserting it into the Vehicle Inlet Call Technical Support 1 855 ETN EVSE Ensure that the Incoming Electrical Wires are Landed according to the Installation Manual the EVSE Requires an L1 L2 and Ground Please consult the Installation Guide for further details Call Technical Support 1 855 ETN EVSE Call Technical Support 1 855 ETN EVSE Call Technical Support 1 855 ETN EVSE EATON CORPORATION www eaton com 19 Instruction Manual IMOEVOOO02E Effective April 2012 ETN Powering Business Worldwide Eaton Corporation Electrical Sector 1111 Superior Ave Cleveland OH 44114 United States 877 ETN CARE 877 386 2273 Eaton com 2012 Eaton Corporation All Rights Reserved Printed in USA Publication No IMOEV00002E TBG000585 April 2012 Installation and Service Manual Level 2 AC Pow R Station Electric Vehicle Supply Equipment EVSE Eaton is a registered trademark of Eaton Corporation All other trademarks are property of their respective owners
44. le or 3 wire shielded cable for RS 485 Communications Electrical Service Wires Terminate the incoming electrical service wires to the Pow R Station EVSE s provided terminal block following the designations for each wire L1 L2 and G see Figure 15 Installation and Service Manual Level 2 AC Pow R Station Electric Vehicle Supply Equipment EVSE GROUND Instruction Manual IMOEVOOO002E Effective April 2012 LINE 2 INPUT LINE 1 INPUT HOT HOT Figure 15 Electrical Service Wiring Note Torque for incoming field service wiring 22 1 26 6 in Ib 2 5 3 0 Nm Use Copper Conductors Only Grounding Instructions This product must be connected to a grounded metal permanent wiring system or an equipment grounding conductor must be run with the circuit conductors and connected to the equipment ground ing terminal Optional Level 1 120VAC Outlet When the EVSE is equipped with a Level 1 120VAC Outlet perform the wiring instructions outlined below in Figure 16 Level 1 Field Connection Diagram GFCI Receptacle Screw terminal colors Green grounding terminal Silver white terminals Brass hot terminals LINE Hot terminal Brass LINE N Connection for the White termina Silver j LINE cable s black Connection for the LINE wire cable s white wire BACK VIEW Grounding Terminal Green Connection for bare A yellow sticker covers the LOAD terminals Do not remo
45. lt plan As built plans are prepared from the best available information however the plans may not reflect actual utility locations The CBJ is not responsible for costs incurred by the Contractor due to any discrepancy in the as built plans TECHNICAL SPECIFICATIONS DRAWING INDEX 1 E 100 Construction Drawing 2 Photograph of Charging Station Installation Location 3 Electric Vehicle Charging Station Specification Sheet 4 Electric Vehicle Charging Station Installation and Service Manual Electric Vehicle Charging Station Installation Marine Parking Garage Page 5 RFQ No E15 117 BID AND SIGNATURE PAGE Project RFQ E15 117 Electric Vehicle Charging Station Installation Marine Parking Garage Dated Bidder Company Name By Signature Printed Name Email Title Telephone No Address Street or P O Box Fax No City State and Zip Code The Contractor shall provide all labor equipment materials and perform all Work as described in the Scope of Work COMPLETION TIME FOR THE WORK The Contractor shall have until October 31 2014 to complete all Work as described Bidder has examined the bid documents including the following addenda receipt of all of which is hereby acknowledged by the undersigned Give number and date of each Addenda below _Failure_to acknowledge receipt of all Addenda cause the Bid to be non responsive and may cause its rejection Addenda No Date Issued Addenda No Date Issu
46. ments concerning defects questionable or objectionable material and requests for interpretation must be made in writing and received by the CBJ Engineering Department Contracts Office If required amendments to the Quote documents will be in the form of an addenda and when issued will be sent as promptly as is practical to all parties to whom the RFQ documents have been issued All such addenda shall become part of the contract Request must be sent to the CBJ Engineering Department Contracts Office 155 South Seward Street Juneau Alaska 99801 Preparation of Quote Quote must be submitted on the RFQ forms provided or copies thereof and be completed in all respects as required by the RFQ documents Each Quote shall include all information requested and be manually signed in ink Addenda Each Quote shall include acknowledgment in the space provided Item 2 in the RFQ form receipt of all addenda issued during the bidding period Failure to acknowledge all addenda may result in the proposal being rejected as not responsive It shall be the bidder s responsibility to inquire about addenda issued Qualification of Bidders Each bidder shall be skilled and regularly engaged in the general class or type of work called for under the contract If requested by the CBJ Engineering Department the low bidder shall submit resumes documentation or information explaining illustrating or demonstrating the experience of the firm and
47. more information visit www eaton com plugin call 1 855 ETN EVSE 1 855 386 3873 or call your local Eaton sales office Eaton 1000 Eaton Boulevard Cleveland OH 44122 United States Eaton com Electrical Sector Canadian Operations 5050 Mainway Burlington ON L7L 571 Canada EatonCanada ca 2013 Eaton A All Rights Reserved Eaton is a registered trademark Printed in USA m Publication No TD191002EN Z13939 All other trademarks are property Powering Business Worldwide July 2013 of their respective owners Instruction Manual IMOEV00002E Effective April 2012 Installation and Service Manual Level 2 AC Pow R Station Electric Vehicle Supply Equipment EVSE E I N Powering Business Worldwide Contents Description Page 1 2 9 10 11 12 Important Safety Instructions Please Read 2 Symbols and Definitions 2 About the Pow R Station EV Charging SIMON ew ane Ned aie een bios e eee 8 Installation llle 4 Installing the Electrical Service 6 Instructions for Opening Door Latch 7 Installing to the Premise 8 Termination and Configuration 10 Confirming Installation and First Use 12 Installation Validation for Communications GONNCCUVITY cost ah px xe sd ds 14 SPECITICATIONS i cessas xen ng aa dem 17 APPEN anne eae een ak 18 For more information visit
48. mper needs to be added between L2 and on Figure 15 of this Document SW2 2 Operating 60Hz 50Hz North America is Frequency 60Hz SW2 3 4 Reserved for Reserved for Factory Use and 5 Factory Use SW2 Auto reset Enabled Disabled Comes from the after fault factory disabled A vehicle fault must be reset manu ally the owner can easily enable this feature via this dip switch Doing so will enable an auto reclosure on a nuisance trip SW2 7 Soft Start Default in OFF Position If ON the EVSE will perform a ramp up of current to the Available Line Current ALC or Nameplate Rating over a 30 second time period This is done through the SAE J1772 handshake with the vehicle by modifying the Duty Cycle on the Pilot Signal SW2 8 Reserved for Default in OFF position Factory SW1 1 Reserved for Default in OFF position Factory SW1 2 and 3 RS485 Baud See Baud Rate Dip Switch Table Default is Rate all ON SW1 4 5 6 7 R5485 Range 0x00 to 0x1F using binary addressing and 8 Address Most Significant Bit being SW1 Position 4 Default is all OFF except Position 8 i e 0x01 Table 4 RS485 Baud Rate Dip Switch Table Baud Rate SW1 Position2 SW1 Position 9600 OFF OFF 19200 OFF ON 38400 OFF 115200 ON ON EATON CORPORATION www eaton com 13 Instruction Manual 0 00002 Effective April 2012 LL Lii C Li CI OI 2 O LL LL Lil o I 01 Figure 22 Dip Switch Se
49. n you can begin installation Step 1 Open door using the latch on the side of the unit see Section 6 Instructions for Opening Door Latch for details Step 2 Remove the bottom pan by pulling upward and then angling outward Best if performed when door is held opened Step 3 The hole pattern for the base of the pedestal mount is shown below in Figure 14 Use six 3 8 UNC Grade 5 stain less bolts torqued at 50 ft lbs for mounting base to the ground Note f using a concrete pad please be mindful of the overall height of the unit due to ADA Compliance Please reference the ADA Compliance section of this document 10 EATON CORPORATION www eaton com 5 15 8 Termination and Configuration WARNING ELECTRICAL WARNING LOCKOUT TAGOUT ALL ELECTRICAL SOURCE CIRCUITS FEEDING THE UNIT S IN THE OPEN POSITION BEFORE BEGINNING WIRING OR TERMINATIONS FAILURE TO FOLLOW THE INSTRUCTIONS COULD RESULT IN SEVERE BODILY INJURY OR DEATH WARNING ONLY QUALIFIED PERSONNEL FAMILIAR WITH THE OPERATION AND CONSTRUCTION OF THIS EQUIPMENT SHOULD INSTALL ADJUST MODIFY AND SERVICE THIS EQUIPMENT FAILURE TO FOLLOW THE INSTRUCTIONS COULD RESULT IN SEVERE BODILY INJURY OR DEATH Wire Terminations For a typical installation the only field wire terminations will be the incoming electrical service wires If the EVSE unit is configured for Pow R Station Network Manager or other remote management solu tion a standard CAT5 6 network cab
50. n the Appendix for more details Dip Switch Settings A CAUTION MODIFYING THE DIP SWITCH CONFIGURATION OF THE UNIT COULD CAUSE THE UNIT NOT TO OPERATE AS DESIRED PLEASE ONLY MODIFY DIP SWITCH SETTINGS IF YOU ABSOLUTELY UNDERSTAND THE IMPACT TO THE UNIT Automatic Reset Feature From the manufacturer the Pow R Station is set to require a manual reset after a temporary fault The User has to opt in to enable the automatic reset feature Figure 21 Enabling Disabling Automatic Reset During installation the Automatic Reset setting can be either left dis abled as it came from the factory or the User can decide to enable the feature To enable or disable this feature a Service Technician must change the position of a dip switch on the control board Instruction Manual 0 00002 Effective April 2012 o Enable Automatic Reset Dip Switch Block SW2 Position 6 must be ON o Disable Automatic Reset Dip Switch Block SW2 Position 6 must be OFF For board replacements or basic confirmation of settings Table 3 contains the explanation of the dip switch settings found in the corner of the Eaton Protection and Control Board EPCB near the RS232 Serial port labeled SW1 and SW2 Table 3 Dip Switch Settings Dip Dip Feature ON OFF Description Switch Switch Block Position SW2 1 Voltage US 120V US Voltage Configuration 208 240V Configuration of the Unit For 120V Configuration A Wire Ju
51. nstruction Manual IMOEVOOO002E Effective April 2012 Installation and Service Manual Level 2 AC Pow R Station Electric Vehicle Supply Equipment EVSE Step 3 Use an RJ45 coupler to connect the Ethernet cable that was just dis connected from the Network Manager Controller to an RJ45 cable and PC as shown Figure 24 a On test PC running Windows XP navigate to Start Control Panel Network Connections and double click on the Local Area Connection icon This will open the connection status window for that Ethernet connection Step 4 Setup your PC to obtain an IP address automatically RJ45 RJ45 Cable 45 Cable Coupler to Network Figure 24 Ethernet cable connected to RJ45 cable and PC b Note Local Area Connection may be a different name depend ing on how your Ethernet port is setup or if there are multiple Ethernet ports on the test PC Make sure the next steps are done on the Ethernet port that the modem is connected to on the test PC c Go to Properties in the General tab This will open the Connection Properties window See Figure 25 d Double click on the Internet Protocol TCP IP selection See Figure 25 e Make sure the Obtain an IP address automatically is selected See Figure 25 _ Local Area Connection Properties Ge Internet Protocol TCP IP Properties General Altemate Configuration Connect using 88 Intel R 8257 7LM Gigabit Network
52. odily Injury by Disease 100 000 00 Each Employee Bodily Injury by Disease 500 000 00 Policy Limit b The Contractor agrees to waive all rights of subrogation against the Owner for Work performed under the contract C If the Contractor directly utilizes labor outside of the State of Alaska in the prosecution of the Work Other States endorsement shall be required as a condition of the contract 2 Commercial General Liability Insurance Such insurance shall cover all operations by or on behalf of the Contractor providing insurance for bodily injury and property damage liability including coverage for premises and operations products and completed operations contractual liability broad form property damage and personal injury liability The minimum limits of liability shall be 1 000 000 each occurrence for General Liability and Products Completed Operations 1 000 000 for Personal Injury Liability Electric Vehicle Charging Station Installation Marine Parking Garage Page 3 RFQ No E15 117 2 000 000 Aggregate for Products Completed Operations 2 000 000 General Aggregate 3 Business Automobile Insurance 1 000 000 per accident combined single limit covering owned non owned and hired automobiles The City and Borough of Juneau shall be named as an Additional Insured for all coverages listed above except Workers Compensation TITLE 36 Little Davis Bacon REQUIREMENTS your quote exceeds 25 000 00 and you s
53. on Vehicle to Begin Charging If vehicle does not begin charging momentarily please check internal scheduling system or remove and re insert EV Connector Wait for Full Charge or Disconnect When you are Ready to Leave You can now walk away from the unit Charging will begin with Building Management System Allows Depending on Facility Setup Local Override may be available by pushing the Override Pushbutton You can now walk away from the unit Charging will begin when Vehicle Engages Charge Session Depending on Facility Setup Local Override may be available by pushing the Override Pushbutton This will request to charge at full capacity At anytime you may remove the EV Connector and Re Dock it to the EVSE If the vehicle wants to engage a charging again at a later time while you are away it may do so at anytime No additional activity is required by you At anytime you may remove the EV Connector and Re Dock it to the EVSE If the vehicle wants to engage charging again at a later time while you are away it may do so at anytime No additional activity is required by you Installation and Service Manual Level 2 AC Pow R Station Electric Vehicle Supply Equipment EVSE Table 11 EVSE Fault or Error User Interface Indicators EVSE Fault or Error User Interface Indicators Instruction Manual IMOEVOOO02E Effective April 2012 Will present itself in a blink pattern or a steady icon Typically is a vehicle re
54. rcial fleet Effective July 2013 electric vehicle charging station Table 1 Catalog Numbering System S DR 3 B B CR 00 00 p Product Family Optional Accessories 4 S Charging station _ Communications 00 No accessory Enclosure Cable Length X Basic hardware serial Modbus RTU CC Credit card swipe Station Type NEMA 3 18 ft B ChargePoint Network enabled CP ChargePoint card only P Custom paint 4 23 ft GSM GPRS USA CR ChargePoint card and C ChargePoint Network enabled contactless credit card C Dual wall D Dual pedestal GSM GPRS Canada E Dual wall with L1 outlet Continuous Ampere Rating 2 F Dual pedestal with L1 outlet B 30A C 48A D 70A D ChargePoint Network enabled CDMA Wallmount stations are only available with 30A dual output ratings 2 Upstream breaker shall be sized in accordance with NFPA 70 National Electrical Code NECS Article 625 14 USA or Canadian Electrical Code CEC Part 1 Section 86 Canada Each output connector will need its own dedicated upstream circuit breaker For example a dual 70A station will need two 90A breakers upstream of it Communications options are not available for wallmount stations Only one optional accessory may be configured with each station Stations configured with ChargePoint communications should also have either a CP or CR
55. rent Interrupter GFCI protects Users from faults involving leakage currents going to ground rather than the proper return path of the circuit J1772 SAE Recommended Practice for conductive charging of hybrid and electric vehicles This standard spells out the physical dimensions of the J1772 connector and the pilot communication between the plug in vehicle and EVSE Pilot The signal through the J1772 connector This signal tells both the vehicle and the EVSE when both are ready to charge and how much current it is allowed to pull This signal is a SAE standard Plug Session The time while the EVSE is plugged into a vehicle It starts by plugging in the J1772 connector and ends when unplug ging the same connector SAE Society of Automotive Engineers The group that organizes and leads committees of transportation experts to create standards such as J1772 for the transportation industry Traction Battery Ihe large battery on a plug in electric vehicle that is used to store and release energy for propulsion This is different than the 12V battery that is used to start the vehicle initially and run accessories such as the radio UI The User Interface part of the unit TB The Terminal Block is where the incoming field power will be terminated in the EVSE unit ADA Americans with Disabilities ACT Installation and Service Manual Level 2 AC Pow R Station Electric Vehicle Supply Equipment EVSE 3 A
56. tection IP14 power failure delay before charging T resumes after power failure ype rating Mechanical operations 10 000 cycles EV connector replaceable Temperature storage 730 to 80 C 100 000 cycles contactor replaceable Temperature operating 30 to 50 C De energization on breakaway Yes Humidity 90 RH noncondensing Surge withstand Up to 6 kV at 3000A D Consult factory for additional lengths Soft start No Field selectable DIP switch Upstream breaker shall be sized in accordance with NFPA 70 National Electrical Code NEC Article 625 14 USA or Canadian Electrical Code CEC Part 1 Section 86 Canada Each output connector will need its own dedicated upstream circuit breaker For example a dual 70A station will need two 90A breakers upstream of it Table 4 1 0 Specifications Table 5 Optional Specifications Description Wallmount Pedestal Description Wallmount Pedestal J1772 pistol grip EV connector Same as output rating Cellular GSM GPRS or Permissive run contact NC dry contact input Credit card processing PCI DSS Current control to vehicle 4 20 mA analog input ChargePoint Network Enables connectivity to ChargePoint Network RS 485 Modbus RTU four wire port 7 Required for ChargePoint communications Field diagnostics and upgrade port RS 232 DB9 Telnet support Requires ChargePoint communications and accessory options and a service plan 2 EATON www eaton com Dual AC Level 2 commercial fle
57. ttings for 208 240V 60Hz 30A Pow R Station with Auto reset DISABLED 14 EATON CORPORATION www eaton com Installation and Service Manual Level 2 AC Pow R Station Electric Vehicle Supply Equipment EVSE 10 Installation Validation for Communica tions Connectivity Communications to Network Manager There are several communication options to enable connectivity to Network Manager available for Pow R Station EVSE The following instructions detail the validation procedures for confirming connectiv ity for cellular Wi Fi and Ethernet communication options Please note that in order for the unit to connect to Network Manager via Wi Fi and Ethernet connections the local area network must have access to the following two web addresses Address 1 endpoint gridpoint com Address 2 ems gridpoint com Please confirm access to these sites with the facility s IT depart ment Ethernet Connectivity If the EVSE is setup to connect via hardwired Ethernet over Catb 6e cable Step 1 Verify the network providing the Ethernet service to the EVSE has DHCP enabled or if there are any firewalls on the Ethernet drop Ask facility s IT if you are not sure Ensure firewalls will not prevent the Network Manager Controller from connecting to gridpoint com Step 2 Disconnect the Ethernet Cable from the Network Manager Controller See Figure 23 EJ Figure 23 Disconnecting Ethernet cable from Network Manager Controller I
58. ubcontract or employ anyone to perform any of the Work the following will apply State of Alaska Department of Labor Laborers and Mechanics Minimum Rates of Pay AS 36 05 010 and AS 36 05 050 Wage and Hour Administration Pamphlet No 600 the latest edition published by the State of Alaska Department of Labor inclusive are made a part of this contract by reference The CONTRACTOR is responsible for contacting the Alaska Department of Labor to determine compliance with current regulations Correspondence regarding Title 36 requirements may be submitted electronically or paper copies can be submitted by mail To submit Title 36 documents electronically go to https myalaska state ak us home app If filing electronically submit certified payrolls to ADOL at the website above and email a copy of all certified payrolls to the Contract Administrator at the email address below If Contractor elects to submit paper copies they should be submitted to the physical addresses below Within 10 Days of Notice of Award Notice to Proceed make a list of all Subcontractors Include their name address phone estimated subcontract amount and estimated start and finish dates Send this list to the Wage and Hour Section contact information below Certified Payrolls must be submitted every two weeks Before the second Friday each CONTRACTOR and Subcontractor must file Certified Payrolls with Statements of Compliance for the previous two weeks Ind
59. ulations adopted revised enforceable accessibility standards called the 2010 ADA Standards for Accessible Design 2010 Standards or Standards The 2010 Standards set minimum requirements both scoping and technical for newly designed and constructed or altered State and local government facilities public accommodations and commercial facilities to be readily accessible to and usable by individuals with disabilities Adoption of the 2010 Standards also establishes a revised reference point for Title Il entities that choose to make structural changes to existing facilities to meet their program accessibility requirements and it establishes a similar reference for Title Ill entities undertaking readily achievable barrier removal The Department has assembled this online version of the official 2010 Standards to increase its ease of use This version includes 2010 Standards for State and Local Government Facilities Title 11 and 2010 Standards for Public Accommodations and Commercial Facilities Title Ill The Department has assembled into a separate publication the revised regulation guidance that applies to the Standards The Department included guidance in 115 revised ADA regulations pub lished on September 15 2010 This guidance provides detailed information about the Department s adoption of the 2010 Standards including changes to the Standards the reasoning behind those changes and responses to public comments receiv
60. ve the sticker at this time LOAD White terminal Silver Connection for the LOAD cable s white wire LOAD Hot terminal Brass Connection for the LOAD cable s black Figure 16 Optional Level 1 120VAC Outlet INCOMING ELECTRICAL SERVICE TERMINATIONS TORQUE in lbs Nm 22 1 26 6 2 5 3 Use Copper Conductor Only COUPLE po Ibf Nm 22 1 26 6 2 5 3 Conducteurs de cuivre seulement Figure 17 Receptacle Location Reference Only Control Wires RJ45 CAT5 6 network cable or a 4 wire shielded Belden cable for Modbus communication may be needed based upon the configura tion of your Pow R Station Terminate these wires before applying the electrical service wires If none present skip this step and go to the next section RJ45 CAT5 6 NETWORK CONNECTION COMMON DATA LINE B SHIELD I DATA LINEA LLL LIII 54321 4321 O RS 232 DB 9 1 1 J12 MODBUS CONNECTIONS RELAY J1 F RELAY PCB GND Figure 18 Control Wiring EATON CORPORATION www eaton com 11 Instruction Manual 0 00002 Installation and Service Manual Effective April 2012 Level 2 AC Pow R Station Electric Vehicle Supply Equipment EVSE 9 Confirming Installation and First Use Charging Indicator Power Indicator Finished Indicator Service Indicator AT
Download Pdf Manuals
Related Search
Related Contents
取扱説明書 Samsung LH55CSPLBC/EN Εγχειρίδιο χρήσης 1 Escola de Saúde Pública do Estado de Minas Gerais - ESP-MG • Installations- und Bedienungsanleitung • Apex MFC Manual - Schoonover, Inc. 取扱説明書 ma_frico_ADA Cool MoistureShield ® Installation Manual Copyright © All rights reserved.