1. tue Pellet Max Silo Nominal Output P chamber wood Weight Boiler type length consumption length volume 9 kcal h kW bar mm kg h mm lit kg MCL BIO 20 20 000 23 3 450 2 0 3 0 400 370 380 MCL BIO 28 28 000 32 3 550 3 0 4 0 500 370 420 MCL BIO 36 36 000 41 3 650 4 0 5 0 600 370 460 MCL BIO 45 45 000 52 3 750 5 0 6 5 700 370 500 MCL BIO 53 53 000 61 3 850 6 0 7 0 800 370 550 MCL BIO 60 60 000 69 3 950 7 0 8 5 900 370 600 MCL BIO 70 70 000 81 3 700 7 5 9 5 650 600 750 MCL BIO 80 80 000 93 3 820 7 5 9 5 750 600 880 MCL BIO 90 90 000 104 3 920 8 5 10 0 850 600 930 MCL BIO 100 100 000 116 3 1080 10 0 11 8 950 600 1000 MCL BIO 120 120 000 139 3 1200 11 5 14 0 1100 600 1070 MCL BIO 140 140 000 162 3 1450 12 5 16 0 1350 600 1220 MCL BIO 160 160 000 186 3 1650 14 0 19 0 1550 600 1470 MCL BIO 180 180 000 209 3 1650 14 0 19 0 1550 600 1680 MCL BIO 200 200 000 232 3 1200 20 0 28 0 1100 950 1790 MCL BIO 250 250 000 291 3 1450 24 0 33 0 1350 950 2010 MCL BIO 300 300 000 348 3 1700 28 0 39 0 1600 950 2230 MCL BIO 350 350 000 406 3 1700 33 0 45 0 1600 950 2230 MCL BIO 400 400 000 464 3 1950 38 0 50 0 1850 950 2750 MCL BIO 450 450 000 522 3 1950 43 0 55 0 1850 950 2980 MCL BIO 500 500 000 580 3 1450 85 0 110 0 1350 2000 3500 MCL BIO 550 550 000 638 3 1450 85 0 110 0 1350 2000 3800 MCL BIO 600 600 000 696 3 1700 110 0 140 0 1600 2000 4200 MCL BIO 650 650 000 754 3 1700 110 0 140 0 1600 2000 4700 MCL BIO 700
2. Check the doors and the sealing cord Make sure the contact with the boiler is air tight If ash has accumulated on the sealing cord clean it Check the fan and make sure it functions properly Clean from dust and check that the air passage is clear of obstacles and dust Remove the turbinators from the heat exchanger and check their condition It is recommended that you clean the chimney box of the boiler and the chimney pipes at least every 3 4 months in order to assure efficient and safe function of the boiler 24 7 3 Basic service procedures 7 3 1 Service after overheating If overheating occurs the safety valves of the boiler must open If the boiler is equipped with an overheating protection cold water will enter the coil to protect the boiler Make sure the boiler pump is working In case of blackout open all the valves of the system to let hot water out of the boiler In any case a blackout protection UPS is recommended to be installed on the boiler pump If the chimney damper is not fully opened put it in fully open position All safety devices must lead to drainage After overheating make sure that all the water from the safety devices has drained and the system has filled with cold water Check the pressure and the temperature of the boiler At overheating the safety thermostat will activate and cut electrical supply to the fan In that case you need to manually reset the safety thermostat and put the s
3. Fan switch TR Room thermostat PE Grounding Unscrew the control panel back plate to have access to the connection terminals in the interior Connect the main electrical supply to the terminals 1 2 3 as indicated The fan is connected to the terminals 10 11 12 and the pump to the terminals 4 5 6 The motor phase is connected to the terminal 9 while neutral and grounding together with the fan s at terminals 12 and 11 respectively Between the terminals 7 8 there is a jumper If you want to connect a room thermostat remove the jumper and connect it to these two terminals Attention The room thermostat must be a simple contact interruptor It is not allowed to connect a digital thermostat with an electrical signal output 19 6 BOILER START UP 6 1 Initial lighting checks Before you start the boiler make the following checks Check that all the hydraulic connections and make sure they are tight Make sure there is no leakage or moisture on the pipes or other equipment Make sure that the connection with the chimney is air tight and the chimney installation is properly made Check that the controller bulbs well inserted and secured in the boiler s case Make sure that the pressure in the network is correct Check that the boiler pump and the central heating pumps function properly Make sure that the connection with the expansion vessel is correct and the expansion volume is sufficient for the boiler No valve
4. and increase the stop time These two timers must be set together and with not too big difference the ratio between TIME ON TIME OFF must be between 0 5 0 9 This way you achieve a stable feeding and fire in the furnace After regulating the feeding observe the flame shape and color through the flange provided on the middle door The flame will have to occupy about two thirds of the fire chamber and quietly lick the cylindrical heat exchanger Its shape must be fully developed and with not too many detachments at the flame end Its color must be vivid orange yellow not too transparent The combustion quality is regulated through the air delivery By positioning the fan damper you regulate the air pressure and by the control panel speed regulator you regulate the fan 21 speed The combination of these two will result to the optimum air delivery in order to accomplish perfect combustion GENERAL SUGGESTIONS The flame needs to have reasonable dimensions and fill up the fire chamber as told The flame must not be too red too low air supply The flame must not have big detachments and sparkles too high air supply The flame must not be too small If it is slow easily influenced by air currents and the chimney draught it means that the air supply is too low The smoke at the chimney must be clear grey Black smoke means lack of air supply f too much ash and big coal pieces fall down to the ash box reduce the air suppl
5. eon e oT RN heden tate 29 8 TROUBLESHOOTING 30 9 WARRANTY EEEEEE Ranina siian 31 1 GENERAL INFORMATION 1 1 Proper use of the appliance Before you make use of this appliance make sure you have read and fully understood the instructions included in this manual The installation and use of the appliance must be performed according to the instructions indicated in this manual in combination with the current national safety regulations The appliance is designed for use in pumped hot water central heating systems Any other use is considered improper and is prohibited THERMOSTAHL declines any responsibility for damages or injuries caused by improper use in this case the risk is completely at the user s responsibility To ensure an efficient and flawless function of the appliance it is strongly recommended that you have performed an annual service by a qualified technician 1 2 Safety warnings All installation and maintenance procedures must be carried out by professional and authorized personnel in compliance with the indications in the present manual and national regulations Any failure to correctly install this appliance could cause damage or injuries Do not make modifications to parts of the appliance
6. function The fan does not function or it makes a lot of noise set temperature reached disconnected by safety thermostat capacitor motor defect bad electrical connection of the fan correct boiler function reset manually check replace the fan check the electrical connection of the fan The feeder does not function fuel not fed to the furnace feeder blocked from obstacle feeder is burnt or damaged no electricity to motor damaged motor reducer connection pin broken remove the axes and the obstacle bad combustion regulation bad chimney draught replace feeder check the electrical connections replace the motoreducer replace the connection pin 30 9 1 10 WARRANTY Warranty duration is 3 years for all boiler parts under pressure 1 year for other electro mechanical equipment The warranty period starts from the date of installation but no longer than 120 days from the day of purchase The warranty covers costs of replacing parts that have been proved to be defect and any work that is connected with replacing these parts Costs related to removing defect parts or products transportation etc are not covered by the producer s warranty The producer will not accept to cover warranty terms in case of the following Maltreating the product bad conditions of transportation and loading unloading Wrong installation failing to apply the directions given in the man
7. ia dae sep RE nerede oeradel AA dal Re nan FE 24 7 2 1 nr resta residenten eraan bis nere dera AE RE 24 7 2 2 Weekly tarde terree rer rre euge eu nope Y be ded a ce eda ea dees 24 7 2 3 Monthly maintenances ue eie ie ttd ene eio aa etheen riad prb ea Aaa derden telende ore 24 7 3 Basic Service procedures ores aine e seil pa ira cond Sea teas vea aser dba saas E da 25 7 3 1 Service after overheatihg ense inta tene ER an AR ERR peas Ka haa tenes 25 7 3 2 Service after feeder blockage 2 2 eise hike E ER Ya da vaders aande 25 7 3 3 Service after motor bolt breakage 2 4 4 4 44 44 nennen eee ene 27 7 3 4 Service lt lt eenen ensen AE neen a hn semens edere eend ens ande 27 7 3 5 Replacement of the ignition 4 444 2 2 2 4 4 104 enen 27 7 4 Maintenance after long SEOpP 4 avensis reddend gu aad E na nadoen 28 7 4 1 Maintenance of the boiler i iicet er tens Onda rex a Sede ewa eae Tea edad 28 7 4 2 ett er ke
8. unless you have contacted the company and an authorized service contractor Only original accessories and spare parts must be used to ensure correct and safe function Make sure you respect the cleaning and maintenance procedures on the corresponding intervals Failure to do so can cause malfunction to the appliance and possible damages The boiler is design to function on the fuels indicated in the corresponding paragraph Any other fuel is prohibited Do not use explosive or flammable substances Do not store such substances inside the boiler room The working pressure varies according to the model Make sure you use the appropriate water pressure Working in a pressure higher than the one indicated in this manual is strictly prohibited and dangerous 1 3 Data label The data label of the appliance is placed on the boiler s side cover on the external part Make sure that it is properly placed and readable On the label it is indicated the serial number and the manufacturing year of the appliance 1 4 Document information This document is an integral and indispensable part of the product and must be retained in good condition by the user Keep it in a safe place for future reference If the appliance is sold or transferred to another person this manual has to always follow the appliance and handed to the new user or installer 2 TECHNICAL FEATURES AND DIMENSIONS 2 1 Technical features BIOPLEX boiler is a steel solid fuel
9. 0 345 3 2 2x34 MCL BIO 250 500x810 1100 1000 2050 1600 2000 2160 1500 2200 345 3 2 2x4 MCL BIO 300 500x810 1100 1000 2050 1850 2000 2160 1500 2450 395 4 2 2x34 MCL BIO 350 500x810 1100 1000 2050 1850 2000 2160 1500 2450 395 4 2 2x34 MCL BIO 400 500x810 1100 1000 2050 2100 2000 2160 1500 2650 395 4 2 2x34 MCL BIO 450 500x810 1100 1000 2050 2100 2000 2160 1500 2650 395 4 2 2x34 MCL BIO 500 1230x520 1540 1440 2400 1600 2400 2650 1750 2300 445 5 2w 2x34 MCL BIO 550 1230x520 1540 1440 2400 1600 2400 2650 1750 2300 445 5 2 2x34 MCL BIO 600 1230x520 1540 1440 2400 1800 2400 2650 1750 25700 445 5 2 2x34 MCL BIO 650 1230x520 1540 1440 2400 1800 2400 2650 1750 25700 445 5 2 2x34 MCL BIO 700 1230x520 1540 1440 2400 2150 2400 2650 1750 2820 495 6 2 2x34 MCL BIO 800 1230x520 1540 1440 2400 2400 2400 2650 1750 3070 495 6 3 2x4 MCL BIO 900 1230x520 1640 1540 2400 2600 2870 2650 1750 3350 495 6 3 2x34 BOILER TECHNICAL DATA
10. 1 EE y T DIMENSIONS Lo ae A ai 2 B H H1 E c T3 DR T5 T6 EE Tm MCL BIO 20 350x480 630 670 1470 560 1280 1380 960 195 1 1 7 MCL BIO 28 350x480 630 670 1470 660 1280 1380 960 960 195 iw 1 7 MCL BIO 36 350x480 630 670 1470 760 1280 1380 960 1060 195 1 1 7 MCL BIO 45 350x480 630 670 1470 860 1280 1380 960 1160 195 iw 1 7 MCL BIO 53 350x480 630 670 1470 960 1280 1380 960 1260 245 2 1 7 MCL BIO 60 350x480 630 670 1470 1060 1280 1380 960 1360 245 2 1 7 MCL BIO 70 600x360 910 810 1700 860 1600 1720 1240 1280 245 2 1w w MCL BIO 80 600x360 910 810 1700 980 1600 1720 1240 1380 245 2 1w w MCL BIO 90 600x360 910 810 1700 1100 1600 1720 1240 1480 245 2 110 w MCL BIO 100 600x360 910 810 1700 1200 1600 1720 1240 1580 295 2 amp 1 w MCL BIO 120 600x360 910 810 1700 1330 1600 1720 1240 1680 295 2 1 MCL BIO 140 600x360 910 810 1700 1580 1600 1720 1240 1750 295 2 1 MCL BIO 160 600x360 910 810 1700 1830 1600 1720 1240 2000 295 2 1 w MCL BIO 180 600x360 910 810 1700 1830 1600 1720 1240 2300 295 2 1 w MCL BIO 200 500x810 1100 1000 2050 1350 2000 2160 1500 195
11. 700 000 812 3 1935 130 0 165 0 1800 3000 5200 MCL BIO 800 800 000 928 3 2000 145 0 180 0 1900 3000 5650 MCL BIO 900 900 000 1 044 3 2300 160 0 210 0 2200 3000 6150 Nominal output is obtained with good quality wood pellet Pellet consumption is calculated as average based on pellet with calorific power 4 800 kcal kg and external temperature 0 C FURNACE TECHNICAL DATA Furnace type BIOFIRE I BIOFIRE II BIOFIRE III BIOFIRE IV Boiler range MCL BIO 20 60 MCL BIO 70 90 MCL BIO 100 200 MCL BIO 250 500 MCL BIO 550 900 Type RV 12RK RV 06 RV 05 RV 25 RK RV 21 RK Power W 80 80 85 230 250 3 Air debit mh 240 350 400 580 900 5 Pressure Pa 310 300 300 520 550 Voltage V Hz 230 50 230 50 230 50 230 50 Noise level dB lt 60 lt 60 lt 60 lt 60 Protection IP 20 IP 20 IP 20 IP 20 X Type EWM 30 50 300 EWM 30 50 300 MAF 071 AR2 0 MAF 071 AR2 0 9 Power W 180 180 370 370 Voltage V Hz 230 50 230 50 380 50 380 50 Protection IP 54 IP 54 IP 54 IP 54 Silo volume lit 370 600 950 1 500 Weight kg 200 250 320 450 2 4 Fuel The BIOPLEX series is designed for automatic function with solid fuel of biogenic or fossil nature with granulation up to 30 mm and humidity up to 20 The boiler is also able to be used on wood or other solid fuels with manual feeding without any modification This means different types of biomass fuels such as pellet agropellet olive husks fruit kernels cereals granulated carbon When the fuel used has characterist
12. MICE S R L DRUMUL OSIEI 57 59 sector 6 Bucharest 062395 Romania www thermostahl ro
13. NON thermostahl group ot companies BIOMASS SOLID FUEL RETORT BOILER BIOPLEX MCL BIO INSTALLATION AND SERVICE MANUAL VERSION 2 1 UPDATE 10 10 2013 Contents 1 GENERAL INFORMATION nsnsssssnsnnrnenenensnennseenenenenenensnenenensnennnananansenenenenenenennsnenenenenensn 3 1 1 Proper us of the pplianc arrangeren ee nieteens wok aa added 3 1 2 Safety warnings saar se A gran va vlan DRAK an 3 1 3 Data label sedan renee ketan teren OT EEEE Ra 3 1 4 Document information stim seer deretur pos ee varden daa state etd mgee vanden T SLE E SURE 3 2 TECHNICAL FEATURES AND DIMENSIONS 4 2 1 Technical verre ten venen en teha et arran ana da PU 4 2 2 Function principle rr re tie m needs rnb nea eed in a Dea paa aka eden dees en ae 5 2 2 1 BOI m EE 5 2 2 2 40 ane ane eener enden a dean wed ave den 5 2 3 Palace 6 2 4 A E PR nerede Cre Pre ERE T dermee rende nnn daden M RE RR EAE KE 8 3 BOILER MOUNTING 9 9 1 Transportation and delivery mr bedded er hdd e
14. al RETE 18 5 2 Control Panel f nctions 18 5 3 Wiring CIA GKAM deedeetee daens RAV RT esta dn 19 6 BOILER START UP 20 6 1 Initial lighting checkSziiue ce Leo rp der hdd tanga entes cepe qus ideeen c poe y Ae de mu 20 6 2 Startspot dns dnek eten eeen terne DNE EC Eh 20 6 3 Checks to carry after initial start up 2 11 2 6 i eenen enen 20 6 4 Fuel loading iier mn rennende redeneren we kN EYE i AE I EAEE dean EAR RRRIGE RE 21 6 5 Combustion regulatiOnhzs c erre a terre hern prr Eua mider verdi Eu eda erde ene nike POE RUNS 21 6 6 Chimney damper adjustment ae oe ud re RE eap eee deren eerd hei teta dx du e RE OR cba 22 7 SERVICE AND MAINTENANCE sss snnrsonnnennsnnnrnenenenenenenenenenensnenananansenenenenenenenssnenenenenenen 23 Zele Cleaning 23 7 1 1 Cleaning the Boiler EE 23 7 1 2 Cleaning the chimney DOX san rre er eet Rh sand seen nen Ey RR ERR ERR RARE 24 7 1 3 Cleaning the f rnace uer roti eter bednet Dope ete seer ep XE en 24 7 2 Mainteriance intervals
15. boiler with cylindrical heat exchanger consisted of fire tubes The furnace system BIOFIRE made of steel plates The furnace plate and grates that come in contact with fire are made of special refractory cast iron The boiler body is made of cold rolled steel St 37 2 STAS 500 2 80 S235 JR SR EN 10025 90 according to DIN 17100 The boiler is designed so that all the parts in contact with exhaust gases are water cooled The boiler body parts are assembled by welding Weldings are performed according to standards 288 1 and 288 3 according to DIN 50120 50121 50145 SR EN 1011 1 2001 by means of electric arc welding MIG MAG DESCIPTION OF BOILER COMPONENTS Steel boiler body with cylindrical heat exchanger Removable rear smoke box with inspection cleaning door Upper door for cleaning the heat exchanger Middle door for ignition and fuel loading equipped with an inspection flange which can also be used for a burner mounting Lower door for ash removal Ash box positioned on the lower part of the fire chamber Cast iron catalyst positioned above the furnace Rockwool body insulation of 50 mm thickness Electrostatically painted external covers Control panel for electromechanical operation Safety heat exchanger optional DESCIPTION OF FURNACE COMPONENTS Steel furnace body Feeding auger welded to solid axis Combustion air fan Feeding motoreducer Transmission system with chain wheels Transmission system protection cover Cast iron combus
16. ce If they are blocked use a sharp tool to clean them Put together all the pieces in the reverse order Check all the sealing material between the connections Make sure they are in good shape and provide an air tight sealing Tighten well the screws to ensure an air tight connection After putting together the axes and the chain wheels make the chain has a good grip on the wheels and the rotation is performed freely Grease carefully the chain and the wheels A Attention All the connections boiler furnace furnace silo inspection doors etc must be air tight If not there is high danger of backfire to the silo 29 8 TROUBLESHOOTING Problem Cause Solution The lamps of the control panel do not no electrical supply to the lamp the control panel is not connected to electricity check replace the lamp connect to electricity light lamp defect check replace the cables electric cable defect fam blocked check replace the fan check the The boiler does not reach set temperature air passages are blocked boiler is not cleaned incorrect boiler start up insufficient water in the system too big pump debit boiler under dimensioned bad quality fuel used insufficient chimney draught function of the fan regulator and thermostat clean the air passages clean the boiler start the boiler correctly fill the system regulate the pump speed change the fuel used check cl
17. e combustion will be highly imperfect causing problems to the furnace and the feeder For proper and efficient function and a long lifespan it is strictly recommended that only dry wood is used with a humidity content of 20 Practically this means at least one year dry wood An order for the feeding and combustion system to function properly the maximum allowed humidity of the fuel is 20 A It is prohibited the use of explosive inflammable materials plastic domestic residues etc The boiler is provided with a flange for mounting a burner for use with oil or gas as an alternative fuel However this option is an emergency alternative and it is not recommended that boiler is on stable function on oil or gas The efficiency will be very low on such fuels If a burner is mounted remove it before you use solid fuel again A It is prohibited to manually feed solid fuel in the boiler simultaneously with the burner function 3 BOILER MOUNTING 3 1 Transportation and delivery The boiler is delivered on wood pallet well positioned with metal plates Remove them carefully by unscrewinf the screws holding them in place The loading and unloading of the boiler must be performed with a forklift or a crane A special hook is provided on the upper part of the boiler for lifting LN me boiler is very heavy Do not try to lift by hands or other unsuitable equipment Danger of injury Perform all moves with extreme attention and care R
18. e from all the sides f following dimensions are recommended see Fig 2 min 400 mm Distance from the front wall N For boilers up to 100 kW minimum 1 5 de min 100 mm For boilers bigger than 100 kW minimum 2 m xS Distance from the rear wall L Appropriate distance for maintenance access Minimum 0 6 m Distance from side walls M For boiler up to 300 KW minimum 0 6 m For boilers bigger than 300 kW minimum 1 m Boiler room height H For boilers up to 70 kW minimum 2 m For boilers 70 to 230 kW minimum 2 4 m For boiler 230 to 400 kW minimum 3 m For boiler bigger than 400 kW minimum 3 5 m Distance between two boilers P must be at least 1m Fig 2 Boiler room dimensions 10 3 3 Chimney The chimney installation must supply sufficient draught air tightness and protection against condensation A The appropriate chimney installation is very important for the boiler s efficient and safe function The chimney must be positioned if possible in the interior of the building It must be vertical with no changes in the direction The cross section of the chimney can be round or rectangular If the chimney is installed in the exterior it must be insulated The horizontal part connecting the boiler s chimney pipe with the vertical chimney must have maximum length 2 m If this distance is bigger it is recommended to have 15 30 inclination up
19. ean the chimney High temperature in the boiler but low temperature at the radiators too high hydraulic resistance in the heating network thermostatic mixing valve is connected wrong increase the pump speed check replace the mixing valve Condensation formation in the fire chamber too big boiler power too low return temperature in the boiler fuel with excessive humidity load less fuel in the chamber install a return protection system thermostatic valve change the fuel used Smoke coming out of the doors boiler doors not regulated defect sealing cord of the door insufficient chimney draught too high air supply by the fan regulate the doors so that the sealing cord stays tight check replace the sealing cord check clean the chimney reduce the air speed Smoke coming back to the silo chimney not cleaned blocked fire tubes blocked boiler not cleaned furnace air holes blocked insufficient air supply and ventilation of the boiler room too low flame and fuel level bad air regulation wrong fuel ignition bad chimney connection insufficient chimney draught damaged sealing check the chimney clean it clean the boiler and the tubes clean the furnace and the air holes check the air supply and ventilation regulate correctly the fuel feeding check the ignition procedure check the chimney connection and draught check all the connections sealing do not leave the silo lid open while in
20. ected within plastic channel The main electrical supply of the boiler must be connected to an independent safety of max 16A The boiler room lighting must be on a separate circuit A THERMOSTAHL is not responsible for accidents or malfunctions caused by wrong or bad electrical connections 5 2 Control panel functions Legend Thermometer Furnace thermostat Safety thermostat Pump thermostat General ON OFF switch Motor timer Fan speed regulator Pump indication lamp Motor switch 0 Fan switch THERMOSTAHL SAFET A Y MOTOR REGUL THERMOSTAT PUMP REGUL FEEDING GENERAL SWITCH IL SUPERVISION THERMOMETER VENTILATOR SWITCH a OUT FE a Fig 7 Control panel The general switch ON OFF interrupts the electrical supply to all the devices The furnace thermostat interrupts the fan and motor function when the preset boiler temperature has been reached It is recommended that this temperature is set between 70 90 C This temperature should never be set below 60 C The fan speed regulator regulates the fan rotating speed by means of a dimmer rheostat The pump thermostat starts the circulation pump function at the preset temperature It is recommended that this temperature is set around 45 55 C The pump indication lamp follows the function of pump The safety thermostat will interrupt the fan function if the boiler temperature reaches above 95 C If so it needs to be reset manual
21. ed with an exhaust temperature sensor This must be installed on the chimney at a distance maximum 1m from the boiler A If the boiler comes with the automatic ignition system refer to the controller s manual for electrical connections and settings 15 4 7 Connection diagrams 4 7 1 Open expansion vessel connection Robinet Legend 1 9 Separation valves 10 11 Radiator valves 12 Radiators 13 15 Safety valves 16 Filling valve 17 Drainage valve 18 Cold water valve 19 24 One way valves B Hot water boiler VED Open expansion vessel PCI Central heating pump PRC Recirculation pump RP Pressure reducer F Filter A Air relief valve FD Water softener 16 INSTALLATION 4 7 2 Closed expansion vessel connection Legenda 1 9 10 11 Separation valves Radiator valves Radiators Safety valves Filling valve Drainage valve Cold water valve One way valves Hot water boiler Closed expansion vessel Central heating pump Recirculation pump Pressure reducer Filter Air relief valve Water softener 17 5 ELECTRICAL CONNECTIONS 5 1 General instructions All electrical connection must be performed by an authorized professional in conformity with the local regulations and the indications of this manual Connections must be done according to norms EN 60529 and EN 60335 1 and protection norms IP 40 and IP 44 All wiring must be waterproof insulated Exposed cables should be prot
22. emove the boiler packaging with attention Keep the packaging material away from chidren since it can be dangerous After having unpacked everything make sure that the appliacne is intact and undamaged In case of doubt do not use the appliance and inform the supplier The BIOPLEX boiler is delivered with the following equipment already fitted and mounted Boiler steel body Rockwool insulation mounted on the boiler body and tightened with plastic tapes Metal covers mounted on the boiler body Turbinators positioned inside the fire tubes Castiron catalyst for the biomass combustion Cast iron grates for wood combustion Control panel and electrical connections The furnace system BIOFIRE is already preassembled and mounted on the boiler side flange It consists of BIOFIRE furnace steel body Fuel silo with lid shutter inspection window Feeder with screw Fan Motoreducer Transmission system with chain wheels Protection cover of the mechanism Cast iron combustion plate The following accessories are positioned inside the boiler body Remove them carefully by opening the middle door Cleaning tools Safety kit Drainage valve In the documentation folder you will find Technical manual Warranty leaflet Declaration of conformity 3 2 Boiler room 3 2 1 General requirements The boiler must be installed in a special and separate room This room must be chosen so that it offers ea
23. ensure it is not blocked 28 7 4 2 Maintenance of the furnace It is necessary to perform a general maintenance and cleaning of the furnace after the heating season The maintenance of the furnace should only be done when the boiler is stopped cool and the power deactivated For easier maintenance it is recommended to leave all the fuel in the silo be consumed before you proceed to works The maintenance procedure includes the following steps A Do not attempt to do any maintenance or service to the furnace while working There is serious danger of burning Wait until the boiler is cool and deactivate from the electricity Make sure the silo is empty If not empty manually the silo before proceeding to any works Open the silo cleaning door if necessary to remove any remaining fuel Remove the silo from the furnace body by unscrewing the bolts Remove the motoreducer which is mounted on the lower axis See instruction in chapter 7 3 2 Check the motoreducer Check the oil level in the reducer and add oil if necessary Remove the two feeders Check them and make sure they are in good shape and not deformed Clean the tubes where the feeders are inserted Remove any fuel or ash remains Remove the cast iron plate of the furnace Clean thoroughly the elbow underneath the plate form where the fuel is provided It is very important to be clean of any obstacles that could block the feeding Clean very well all the holes on the plate surfa
24. ety in order of explosion of exhaust gases in the chimney box Fig 14 Cleaning the chimney box 7 1 3 Cleaning the furnace The furnace should be regularly cleaned according to the ash deposits but not less than once a week To clean the furnace follow the next steps Stop the furnace function by the control panel and leave it to cool down completely Clean the surface of the cast iron plate from ashes and other deposits Make sure the air holes are clean and free from obstacles Clean the ashes and deposits at the perimeter around the plate After you turn on again the furnace ensure the fuel feeding is performed freely and the fuel is evenly distributed at the plate surface Check the function of the motoreducer and the fan Clean from dust if needed 7 2 Maintenance intervals 7 2 1 Daily maintenance The pressure of the network must be daily verified to be within the allowed limits Make sure that all the safety devices and pumps function properly 7 2 2 Weekly maintenance The boiler must be cleaned every 3 4 days or at least once a week depending on the ash quantity accumulated on the boiler walls and in the heat exchanger Cleaning procedure must be performed according to the instruction given in the corresponding paragraph Check the quantity of ash accumulated in the ash box The ash disposal can be performed every 1 2 weeks depending on the ash quantity formed 7 2 3 Monthly maintenance
25. h closed expansion vessel if it is equipped with an overheating serpentine optional The boiler is intended for maximum working temperature 90 C and maximum pressure 3 bar for boilers up to 500 kW and 4 bar for bigger boilers When connected with a closed expansion vessel its volume must be chosen double to a similar installation on liquid or gas fuel N If a connection pipe is not used it must be sealed before water fill T6 15 Legend T1 Outlet T2 Return T3 Chimney pipe T4 Discharge valve connection T5 Safety kit connection T6 Additional safety connection 4 2 Safety features The boiler equipment includes a safety kit which shall be connected to the corresponding connection pipe T5 The kit consists of a safety valve an air relief valve and a thermomanometer Bigger boilers are equipped with two or more safety valves Additional safety equipment can be mounted at the connection pipe T6 This can be a dual safety valve pressure and temperature or a cooling valve Alternatively this pipe can be used for connection with the expansion vessel Fig 5 Boiler safety kit 13 4 3 Overheating serpentine As an optional the boiler can be equipped with an overheating protection serpentine This is incorporated in the boiler body surrounding the fire chamber For the function of the safety serpentine a discharge valve must be installed The bulb of the valve must be mounted on the boilers ho
26. he boiler after the heating season Clean thoroughly all the surfaces of the boiler as described in the corresponding paragraph Also clean the chimney box and all the chimney parts where ash might be deposited After cleaning all the ash empty the ash box and leave the boiler clean for the next winter season After long stop of the boiler before you put in function you need to perform the following checks Check the condition of the electric cables and the sensors Make sure they are not damaged Check that the thermometer indicates the correct temperature and all the thermostats function properly Make sure the bulbs are properly positioned in the case Make a general check of the chimney and make sure it is clean and free of obstacles Verify the pressure in the heating network and the boiler A Do not empty the water of the boiler and the heating installation after the heating season It will corrupt all the installation and especially the boiler Check that all the valves are working properly Replace them if necessary Pay special attention so that all the safety equipment of the boiler functions properly Make sure all the ball valves of the boiler and other relative equipment are open Check the function of the pumps They might be blocked after long stop Check that there have been no modifications to the installation and the boiler room ventilation openings chimney doors Check the fan and clean from dust Turn it manually to
27. ics that significantly vary from nominal i e carbon cereals agricultural residues it is recommended that they are used in combination with pellet or agropellet at a 50 50 ratio If you want to use solely carbon as fuel please contact the manufacturer The fuel with the best quality concidering calorific power ash content humidity and standartization is wood pellet The less quality of the fuel the more fuel supply must be provided to achieve the nominal power and of course the most the consumption and the ash remains Ame nominal characteristics of the boiler are calculated for use on wood pellet Calorific Max Max Ash Fuel type power diameter humidity content kWh kg mm Pellet 4 8 6 8 lt 10 lt 1 Agropellet 4 4 2 6 10 lt 10 lt 5 Coal 5 3 6 5 3 25 15 4 8 Lignite 1 6 3 8 3 25 20 10 Cereals oat 4 2 3 6 10 13 0 6 Wood chips 4 3 5 25 20 4 6 Barks 2 6 5 25 20 8 10 Wood 4 4 3 lt 20 4 8 Wood briquette 5 2 10 4 Table 1 Characteristics of different types of fuels Every type of biomass fuel contains a significant amount of humidity which highly affects its combustion behaviour and calorific value Boiler output efficiency and autonomy will significantly diminish as the humidity increases The nominal data presented in this manual are calculated for humidity content 10 Maximum allowable humidity content is 20 If the fuel has bigger humidity th
28. ion cover of the transmission system Remove the two gears from the axes by unscrewing the headless inserted screws keeping them in place You do not need to unmake the chain Remove them all together with the chain Unscrew the four nuts keeping the motor in place and remove it see Fig 17 Fig 17 Removing the lower axis Remove the support disk and the feeder When putting back together it is absolutely necessary to put the rubber gasket at its position 26 7 3 3 Service after motor bolt breakage 7 connection between the motoreducer the EON lower axis is realized through a protection bolt This is Ree designed in such a way so that it breaks in case of ribi 2 feeder blockage to protect the motor from burning i E If this bolt breaks follow these steps to replace it Remove the two gears from the axes by i unscrewing the headless inserted screws keeping them place You do not need to the A S st chain Remove them all together with the chain Unscrew the nut and remove the broken bolt PALL Introduce a new bolt M6x50 and tighten with the Y D Vl Gl nut from the other side CD WEZ Verify the causes of the breakage If there is an mf obstacle in the feeding pipe remove it 7 ol Fig 18 Motor protection bolt replacement 7 3 4 Service after power blackout In case there is a power blac
29. kout it is absolutely necessary to perform some checks and take some safety measures to avoid overheating The solid fuel has all the time a certain amount of fuel in the fire chamber which will not stop burning immediately For safety reasons it is recommended you have installed a UPS with a battery which assures function of the boiler pump at least for 30 minutes Remove the amount of fuel that is still burning in the furnace Due to power blackout there is risk of backfire to the silo Turn the control panel to OFF When the power is restored turn on the control panel and make sure all the devices function properly 7 3 5 Replacement of the ignition element In case you need to replace the ignition element follow the instructions Turn OFF the control panel and disconnect from electricity Disconnect the connection wires of the ignition element and loosen the plastic tap holding them in place Remove the fan by unscrewing the four screws keeping it in place Remove the furnace plate The ignition element is positioned inside the INOX tube casing Remove the ignition element from the tube and insert in position the new one When you position back the furnace plate be careful to fix it correctly with the fixing tooth as shown on Fig 19 27 Fig 19 Removing the ignition element 7 4 Maintenance after long stop 7 4 1 Maintenance of the boiler It is necessary to perform a general maintenance and cleaning of t
30. ly by unscrewing the plastic cover The ventilator and motor switches are used to activate or deactivate the corresponding devices The switch has an incorporated indication lamp that follows the function of the devices The motor timer controls the motor function by means of ON OFF time intervals The first timer T1 controls the TIME OFF interval while the T2 the TIME ON interval If a burner is connected to the control panel it can be connected in the place of the fan and regulated by the fan thermostat 18 The control panel offers the possibility to connect with a room thermostat When the room thermostat contact opens the furnace function stops 5 3 Wiring diagram TIMER 2 EI 1 n NE 2 1 1 GS TS TP SM VT 3 2 1 7 P i b S 3 2 1 REOSTAT 1 NLL TL SV T 4 EI LE Ld ol Jol Jel Je el el jol el Jel el ol je 1020 30 4c 8 5 g 4 a o 1 R c PE of lof lof lef lof lef lef lof lof lof lel Ie PE N Fo PE 4 F F PE N 230V PUMP B 28 x FAN TR z Fig 8 Control panel wiring diagram Legend GS General ON OFF switch TS Safety thermostat TM Furnace thermostat TP Pump thermostat VT Fan speed regulator LP Pump indication lamp SM Motor switch SV
31. ol Afterwards clean the exterior surface of the cylindrical heat exchanger with the exchanger cleaning tool as shown in Fig 12 With the same tool scrape the ash and any other remains from the side walls of the boiler N SS Ter in d SSS E 75 OC He Sr i aide s oS OC 4 Ne ei 6005 4 san 10 00 XE O e e e 81 OC V n oo Ife ll E M Open the lower door of the boiler and remove the ash box Empty all the containing ash With the ash cleaning tool you can scrape the lower surface of the boiler for any residues of ash A The ash must be disposed in an appropriate container Do not throw the ash together with the domestic garbage Be careful since ash might contain hot particles even long time after stop Fig 13 Removing the ash 23 7 1 2 Cleaning the chimney box To ensure efficient and safe function of the boiler you must clean the chimney box from ash residues at least every 3 months The ash box is equipped with a cleaning door for this purpose as shown in Fig 14 In order to open the door unscrew the wing nuts remove the washers and springs that keep it in place Clean the interior of the chimney box and remove all the ash and residues Put back the door the same way as removed springs must not omitted They act as saf
32. rri ed E dede wak dn 9 3 2 Boiler n iiri E A E TALET 10 3 2 1 General requirements xerit RR AX EORR RA TE d X enean deden and anatek ge wed 10 3 2 2 Boiler room 10 3 3 MCHIMMCY En 11 4 INSTALLATION nsnsnensnensnnnsnsnansnsenenenenenenenssnensnenenenensnenenensnsnananannenenenenenensnennenenenenenen 13 4 1 Hydraulic connections eee rate reo nantes nete ae denn a ea sta ned hen tarde 13 A MNEEECT o EIpIGM 13 4 3 Overheating serpentine oen 14 4 4 Return temperature protection detiris na dra aau a aa aAa ehe enhn enne nennen nen nnn 14 4 5 Filling thie System de Ex Rr e nende veter nende Pa daa eld 15 4 6 Automatic ignition SySEeITI isses e eee ERR YRSRMIRY eR Y UA neer der eed ce PUR weren eek een de wiede 15 4 7 Connection diagrams tx pend chee Xara pex Tea eerden bead va KATAR AR TRY vaan menne 16 4 7 1 Open expansion vessel 1 1 1 44 44 4 4 enne eee 16 4 7 2 Closed expansion vessel 4 nennen eee 17 5 ELECTRICAL CONNECTIONS sassen nnannenenenenenenssennsnenenenenenensnenenensnenanannnnenenenenenens 18 5 1 Gener
33. s should be installed between the boiler and the expansion vessel Make sure the boiler s separation valves are open Make sure that there is sufficient air supply and natural ventilation in the boiler room A Do not store inflammable materials or fuel close to the boiler Before you light the boiler make sure the boiler room is clear and safe 6 2 Start up To correctly start up the BIOPLEX boiler follow the next steps Make sure the silo is full with fuel Make sure the chimney damper is positioned in horizontal position completely open Open the middle door feeding door to have visual supervision of the feeding procedure Turn the control panel on from the general switch and activate only the motor from the corresponding switch Keep the fan deactivated during this step Set the first timer T1 to maximum and the second T2 to zero in order to fill the furnace with fuel Fill it until the fuel level reaches the cast iron plate and covers a small part of it Stop the motor function from the motor switch Using sheets of thin paper or other ignition material light the fuel placed the furnace Wait several minutes until the flame stabilizes and covers the entire plate surface Close the middle door of the boiler Turn on the fan by the corresponding switch During this step the motor must remain deactivated When the flame is fully developed activate both the motor and the fan Set the furnace thermostat to
34. sufficient amount of fuel Each loading should be regulated according to the boiler output and the heat demand Never load too much to fuel to fill all the fire chamber volume Maximum fuel should be 70 80 of the fire chamber volume Close the door and secure with the handle Start again the fan function by putting the thermostat to the preset temperature A When loading fuel in the boiler do not throw them but position them carefully 6 5 Combustion regulation After completing the start up procedure and closing the door set the required temperature to the furnace thermostat noted Motor Regul After the fan and motor are activated have a look at the quantity of fuel fed to the furnace and the shape of it on the cast iron plate The timer must be set in such a way so that the quantity of fuel fed is stable to a level where it makes a small hill over the plate covering almost half of its surface middle picture If the fuel accumulates covering all the plate surface left picture it means the feeding is too big and must be reduced If the level of the fuel is below the plate right picture it means the feeding is too small and must be increased Fig 9 Fuel feeding regulation The feeding depends on two parameters the feeding time timer T1 and the stop time time T2 When you want to increase the feeding increase the feeding time and reduce the stop time When you want to reduce the feeding reduce the feeding time
35. sy access for fuel transport air supply and exhaust gas evacuation The doors of the boiler room must be metallic open outwards and have at least 0 9 m width N The boiler installation is prohibited in rooms with extensive dust dangerous gases and moist spaces For the correct boiler function it is necessary that the boiler room has openings for natural ventilation and combustion air supply It is recommended that two different openings are used for this purpose positioned on opposite walls and diagonally to ensure good air circulation The total surface of the openings must be at least 1 12 of the boiler room surface Forced ventilation is prohibited in the boiler room The boiler room must be provided with a drainage channel All safety devices must be connected to this channel The boiler room must have an appropriate fire extinguishing system according to the regulations in force In case that the building is designed with a fire alarm system a smoke detector must be positioned on top of every boiler The fuel storage is prohibited in the boiler room If so the storage must be separated from the boiler with a non flammable wall and proper distanced from the boiler 3 2 2 Boiler room dimensions The boiler must be placed on a horizontal plane with adequate mechanical resistance to support the boiler s LEMMA weight The boiler must be positioned in the room in such so that it is easily accessibl
36. t water delivery at maximum distance im from the boiler 4 DRAINAGE Fig 6 Overheating serpentine connection The valve can be connected on either side of the serpentine Attention should be given to the flow direction of the valve The valve can be fitted on the cold water inlet or hot water outlet However we recommend that the valve is fitted on the cold water inlet For the protection of the valve a filter is recommended to be installed on the water line before the valve On the opposite side of the serpentine drainage must be connected A The correct function of the discharge valve is crucial for the boiler s safety Verify its function often and replace if defect 4 4 Return temperature protection For the correct function of the boiler and for protection against corrosion it is very important to ensure steady temperature at the return of the boiler of at least 55 C This can be ensured by installing a recirculation pump between the boiler outlet and return see connection diagrams An alternative variation is by installing at the return of the boiler a three way thermostatic valve 14 4 5 Filling the system After completing all the hydraulic connections the circuit may be filled with water After filling the system open the radiators air valves to get rid of the air in the installation Verify that the installation pressure is according to the technical feature of the boiler The press
37. the required temperature Follow the instructions given in the chapter Combustion Regulation to correctly regulate the combustion A It is prohibited to light the boiler with inflammable or explosive liquids 6 3 Checks to carry after initial start up During the first start up you need to carefully check the air tightness of all the connections especially the doors and the connection with the chimney Check that the thermostats function properly and devices operate accordingly Wait for the boiler to reach the preset temperature and make sure the fan stops properly and the flame falls down Check the temperature and pressure rise in the network Make sure it is according to the indications Check if there is any water leakage in the network After burning of the fuel is completed check the situation inside the boiler If the walls are too black it means that there is insufficient air supply If there is condensation forming on the 20 boiler walls it means that the pump operation starts at a low temperature or the fuel has too big humidity content Make sure you set the pump according to the indications and you install a return temperature protection system as indicated 6 4 Fuel loading In order to correct add fuel to the boiler follow the next steps Stop the fan function by turning the fan thermostat to zero Wait 30 seconds for the fume to exit the boiler Open the middle door slowly to avoid leakage of smoke Load a
38. tion plate Cast iron grates for manual wood feeding Ignition element optional Fuel silo with protection frame and shuttering lid 2 2 Function principle 2 2 1 Boiler Fig 1 4 Hot water outlet Furnace Boiler function H HH KO Water return The function of the BIOPLEX boiler is based on natural gas evacuation through the chimney The fuel is positioned on the grate The combustion takes place in the fire chamber During the combustion the flame comes in contact with the side walls of the fire chamber which are surrounded by water The fire chamber is of big volume in order to receive big dimension logs and to ensure a long autonomy The combustion air is supplied by the fan and distributed through an air distributor positioned below the fuel grate The combustion is regulated through the fan controlled by the control panel The exhaust gases are guided through the heat exchanger to the smoke box and afterwards evacuated to the chimney The smoke box is equipped with an inspection and cleaning door which also actions as an explosion relief The doors have an insulation cord to ensure air tight closing Each door is equipped with a screwed handle which must always be well tightened during the combustion The flange on the middle door has a rotating clamp for secondary air adjustment and flame inspection If necessary this flange can be removed and a burner can be placed in i
39. ts position 2 2 2 Furnace The BIOPLEX boiler is equipped with the innovative biomass furnace BIOFIRE The system is consisted of two axes BI AX The lower axis is the main one feeding fuel to the furnace while the upper is the secondary transporting the fuel from the silo to the main axis Between the two axes there is a safety DROPBOX device This device has a metal flap that automatically closes with a spring when the feeding stops This way the danger of blockage and backfire is eliminated The motoreducer is mounted on the lower axis and the transmission is realized through chain wheels A metal protection cover is places around the transmission system The combustion air is supplied by the fan mounted on the furnace In case the optional ignition system is installed there is a 500W ignition element mounted in the air pipe close to the furnace plate 11 13 12 Legend 1 Silo flange Fuel box 3 Upper feeding axis 4 Transmission chain 5 Motor 6 Reducer 7 Support leg 8 Fan 9 Boiler flange 10 Lowe feeding axis 11 Mixing chamber 12 Fuel DROPBOX 13 Castiron plate 14 Lower feeding axis 2 3 Dimensions T T5 A2 T on 1 i 4 4 FT z 5 T3 4 A 1 um a m H 1 i ge E _ eS 9 We m 57 2 i OE L P
40. ual Improper use of the product Damages that have been cause by using improper fuels with dimensions or characteristics different from those described in the manual Damages from freezing if not necessary measures are taken against anti freezing Incident of explosion due to use of impropriate chemical substances Electrical shocks that may harm electrical parts of the appliance Warranty is only valid if the installation is performed by a professional installer authorized by the producer according to the local legislation and the instructions of this manual Warranty does not cover function problems or damages that are caused by bad chimney installation failing to respect the instruction of this manual and local legislation Warranty is not valid if the boiler cleaning maintenance and service intervals are not respected and the directions given are not followed Warranty is not valid if the maintenance is not performed by an authorized professional according the instructions given and at the time intervals given Warranty does not cover costs related to emergency incidents like earthquake fire electrical blackout robbery Warranty is not valid if the hardness of the water is over the allowed limits and no water softening protection is installed The warranty is not transferable in case of reselling or replacing the product A new warranty should be accorded to the new user 31 THERMOSTAHL ROMANIA SISTEME TER
41. ure must be verified through the boiler s manometer An additional manometer should be installed on the cold water inlet to verify the cold pressure at the lowest point of the installation at a point close to the boiler The whole installation must remain under nominal pressure for at least 10 minutes During this period check that all the connections are tight and there are no water leakages Make sure that during this period no pressure drop appears After firing the boiler make sure the network functions properly at working temperature and pressure A The hardness of the mains water supply affects the boiler s life span It is recommended to use a water softener if water hardness exceeds 15 f A Do not fill the system at the working pressure When the boiler will be heated the water pressure will raise Filling pressure must be at least 1 bar lower than working pressure 4 6 Automatic ignition system As an optional the furnace can be provided with an automatic ignition system This consists of the following Ignition element 500W 2 pieces in bigger boilers Control panel Ecomax 800P technical manual given with the control panel Exhaust temperature sensor The ignition element is installed in a special inox tube casing positioned under the furnace cast iron plate The cables are protected with a silicon layer resistant to temperature up to 300 C All the electrical connections are prewired The controller is equipp
42. wards The connection with the boiler s chimney pipe must be air tight The chimney must be equipped with a cleaning door at its base Also cleaning doors are recommended where there are changes in direction and ash can be accumulated Tactical cleaning is recommended every 3 months for efficient boiler function A chimney terminal must be installed at the end of the chimney for protection against weather effects and foreign objects entrance In areas with strong winds a special anti downdraught terminal is recommended The chimney height must exceed the roofline by at least 1 m If there are other obstacles positioned on the roof the chimney height must exceed them by at least 1 m If there are multiple chimneys minimum distance between them is 0 3m Each boiler should be connected to an independent chimney Connection of multiple boilers to the same chimney is not recommended E at least 203m 4 0 6m NAA e dd dd at least 1 5m Fig 3 Chimney distances DRAUGHT au REGULATOR 57 15 309 T T L lt 2m a A cti a 2 CLEANING CLEANING DOOR DOOR m 11 BOILER MOUNTING Fig 4 Chimney connection 12 4 INSTALLATION 4 1 Hydraulic connections The boiler is intended for connection with an open expansion vessel network The boiler can be connected also wit
43. y The flame is too fast dry and might make a noise 6 6 Chimney damper adjustment Fig 10 Chimney damper The boiler chimney pipe is equipped with a damper This can be set in various positions to throttle the exhaust gases At nominal function of the boiler this damper should be normally open Also it should always be at open position at boiler start up If the chimney draught is too big and the gases are evacuated too fast set this damper at a side position by inserting the positioner at a different hole If a burner is installed it is recommended that the damper is in completely closed position 22 7 SERVICE AND MAINTENANCE 7 1 Cleaning 7 1 1 Cleaning the boiler Solid fuel boiler require regular cleaning in order to function properly and efficient Cleaning must be effected at least once a week The boiler is equipped with three cleaning tools appropriate for the cleaning procedure of the boiler as shown in Fig 11 1 Legend 1 Tubes cleaning tool 2 2 Heat cleaning tool 3 Ash cleaning tool N N Qu 2 2 ZZ 2 Fig 11 Boiler cleaning tools The boiler function must be stopped before cleaning Make sure all the devices are stopped and the boiler has cooled down It is strictly prohibited to clean the boiler while in function Open the upper door to have access to the heat exchanger Remove the turbinators from the tubes and clean the tubes with the appropriate to
44. ystem back in function Unscrew the plastic cover of the safety thermostat and press the switch Put the plastic cover back A Verify the causes of the overheating If it happens again check the installation and function of the pumps and safety devices 7 3 2 Service after feeder blockage If a blockage occurs to one of the feeders you will have to remove the axes in order to clean the feeding tubes The same procedure is applicable at the annual maintenance procedure A Before proceeding to any of the following steps make sure the boiler function is stopped the boiler is cool and it is disconnected from the electricity Do not try to do any works while the motor is working and the control panel is activated Risk of injury REMOVING THE UPPER AXIS Remove the protection cover of the transmission system Remove the two gears from the axes by unscrewing the headless inserted screws keeping them in place You do not need to unmake the chain Remove them all together with the chain Unscrew the four nuts from the back side of the flange see Fig 15 M em Fig 15 Removing the upper axis flange 25 Remove the whole feeder together with the bearings and supporting disk see Fig 16 FX E FAA L di Fig 16 Removing the upper axis When putting back together it is absolutely necessary to put the rubber gasket at its position REMOVING THE LOWER AXIS Remove the protect

Download Pdf Manuals

image

Related Search

Related Contents

Controller  BERNINA L220_DFINL.indd  WinBatch User`s Manual - WinBatch Tech Database  MANUAL DEL USUARIO  BioAxxis® ThumbLock™ PCMU User Manual  Kenwood B60-5632-00 User's Manual  MSSIAH Drummer User Manual  取扱説明書  Diamondback 500 Home Gym User Manual  

Copyright © All rights reserved.
Failed to retrieve file