Home
LM_ComChecklist_English_June_2012(webready)
Contents
1. BOART LONGYEAR LM DRILLS PA d A Commissioning Procedure Ensure you have a copy of the sales order with you to review content with the customer no pricing to be listed on your copy prior to starting the commissioning process COMMISSIONING PROCESS Drilling Safety Refer to the Drilling Safety guide in front of the parts book Train drill crew in safe drilling procedures and practices Ensure that all safety guards are left installed on the equipment the site is keep clean with no tripping hazards train in rod handling fuel storage etc O Drill Inspection Upon receipt of the drill the first thing to do is visually inspect the rig for any obvious damage or oil leaks that may have occurred during shipping With the customer present inspect all items received Using the packing lists check off all items and quantities received Note any shipping errors O Drill Introduction Discuss drill depth capacities power unit HP KW rating torque ratings etc Describe the drill components weights etc Cover all tech data information with the customer and drill crew Operation Engine Maintenance Hydraulic System Maintenance etc Using the table of contents as a guide read and discuss all sections of this manual with the drill crew Ordering Parts Review the parts book with the customer discuss drill warranty part numbering system how to locate items in the parts book p
2. NVGYOr HLNOS 009 ALINS 3 1 4 13 1 1 1085 14044 5 1 2 0 01 8
3. Copyright 6 2012 Boart Longyear All rights reserved IM DRILLS CHECK LIST OPT Selector PT1 Main Pump Discharge Pressure PT2 Rotation Circuit Pressure PT3 Rod Holder Pressure PT4 Load Sensing PT5 Chuck Pressure PT6 Pressure Pilot Pressure PT7 Charge Pressure O Hydraulic System The Hydraulic System comprises a low pressure control circuit and a high pressure load sensing function circuit The low pressure control circuit allows for the use of small diameter low pressure hoses between the Control Panel and the Power Pack which increases the manoeuvrability of the Control Panel The high pressure system is controlled by pilot operated valves in the Hydraulic Module in the Power Pack and directs oil from the Main Pump to the Drill Head as required The hydraulic system is pre set in the factory and tested on a dynamometer to ensure that all settings are correct No attempt should be made to alter them in the field The maximum oil flows and pressures are set to ensure the full load current of the electric motor is not exceded O Module Valve Identification Gauge PT6 PT7 Selector M4 Valve V20 va underneath 0 DRAIN d MANIFOLD ols SV40 60 we V10 6 FEED CV5 5 3 31 00 6 9 0 0 ROT V13 3 WL 1 CV4 V9 V7 V11 SV2 oo V12 L WARRANTY REGISTRATION CHECK LIST Once the drill commissioning has been completed fill out
4. enance It is a good idea to leave a copy of the coring catalogue with the customer Train in core barrel options such as landing indicator water retention types of bits and casing shoes etc O Service Tools Required for Commissioning Basic mechanics hand tool kit hydraulic test gauges with connecting hoses hydraulic flow meter digital tachometer infrared temperature sensor Also an assortment of JIC test fittings tees etc Supplied with optional tool kit Train customer in use of these tools NOTE Explain to the customer that the drill has been fully tested at the factory using calibrated tools and instruments before shipping The testing documents are available on request Drill Head Review the separate drill head and chuck assembly instructions in the operation and service manual the customer s mechanic and drill crew Demonstrate how to change the chuck jaws and bushings and how to identify proper jaw and bushing sizes by part number Refer to the hydraulic schematic and the hydraulic adjustment procedures to train the customer on the hydraulic system explaining the flow path from pumps valves etc O Primary Hydraulic System Explanation Pressure Settings The primary pump sends oil thru the high pressure filter to the load sensing main valve bank The pump compensator is set at 310 BAR 4500 PSI LM90 or 285 BAR 4130 PSI LM45 55 75 load sensing standby pressure is 300 PSI The main valve controls
5. ning provided Commissioning Date Technician Signature Customer Name Customer Signature TECHNICAL SUPPORT GROUP BOART LONGYEAR GENUINE PARTS Each Boart Longyear drill rig is a highly engineered system rugged and reliable with every part designed and built to precise specifications To maintain quality and maximize efficiency it is critical to use only genuine Boart Longyear parts Parts repair and rebuild services are offered as a more efficient replacement parts option for major components Australia Kazakhstan United Kingdom Adelaide 61 08 8375 8375 Almaty 7 727 244 51 03 Mansfield 44 1623 747 898 infoAP G boartlongyear com n OAP G boartlongyear com infoEU boartlongyear com Brazil Peru United States Rio de Janeiro 55 21 2506 2300 Lima 511 203 4200 Salt Lake City 1 801 952 0 infochile 0 infochile boartlongyear com info boartlongyear com Canada Russia Zambia North Bay 1 800 461 7333 Moscow 7 495 748 51 68 Ndola 260 21 2651530 boartlongyear com Khabarovsk 7 4212 78 97 6 5 0 Chile infoAP boartlongyear com Santiago 56 2 361 6300 South Africa infochile boartlongyear com Johannesburg 27 11 767 0 infoSA boartlongyear com BOART LONGYEAR 0 0 www boartlongyear com 9 0 Services available vary from region to region Please contact your local office for more information Copyright 2012 Boart Longyear All Rights Reserved vsn S6078 LN
6. oil to the rotation circuit fast feed circuit main hoist and wire line hoist circuit The main relief valve in the main valve bank is set at 330 BAR 4790 PSI This relief adjustment is factory set and should not be tampered with The load sense relief valve for the fast feed is fixed at 280 BAR 4060 PSI for A amp B ports The wire line winch relief is fixed 165 BAR 2400 PSI for A amp B ports These valves are internal in the work sections and factory set Oil returns from the main valve to the return manifold then to the oil cooler then to the main return filter to the reservoir O Chuck All grease fittings on the chuck should be lubricated daily Demonstrate how to change the chuck jaws and bushings and how to identify proper jaw and bushing sizes by part number Drill Maintenance Follow recommended service intervals and oil specifications in the operation and service manual For information on the power unit servicing refer to the power unit maintenance manual O Complete and Submit Warranty Registration Check List Fill out the form on page 10 and send to Boart Longyear for warranty consideration OLM Valve Pressures V1 Wireline Circuit 105 Bar 2400 PSI V7 Rod Holder Circuit 140 Bar 2030 PSI V9 Pllot Control Circuit 35 45 Bar 510 650 PSI V11 Chuck Circuit 70 80 Bar 1015 1160 PSI SIU6u 89 607 beog 2102 61000 continued on following page
7. rocedure for ordering parts etc p m s su 89 6 07 peog 2106 01 9 Copyright 2012 Boart Longyear All rights reserved IM DRILLS CHECK LIST O Drill Setup amp Anchoring Ensure that the drill is properly anchored before the drilling operation begins Refer to the anchoring procedure in the operation and service manual if published Drill Startup Grease rig completely before use Turn on water and adjust flow to 20 30 LPM Check the hydraulic reservoir oil level Check electric motor direction Fans should turn clockwise when viewed from end Shut down if charge pressure PT 7 does not reach 1 1 5 bar within 10 seconds Ensure emergency stop is working correctly Check the oil level in the fluid pump Check the oil level in the rotation unit Check all the fastening hardware on the feed frame base frame power unit etc to ensure that they have not become loose in shipment O Drilling Operations Before the drilling starts allow the driller to operate the drill to become familiar with the directional controls speeds of functions etc Train driller in chuck jaw installation foot clamp jaw installation etc Explain how to determine the bit weight pressure review chart in Operations Manual O Corebarrel and Diamond Products Training Refer to the coring catalogue to train the drill crevv in core barrel and diamond product selection use and maint
8. the warranty registration check list below Fold in half seal add correct postage and mail to Boart Longyear fax to 385 234 3095 or scan and email to warranty boartlongyear com Warranty registration must be completed and on file to obtain warranty consideration Customer Name Company Customer Address Rig Model Rig Serial Number Drill Site Date In Service O Drilling Safety O Drill Inspection O Drill Introduction O Operation Hydraulic System Maintenance etc O Ordering Parts O Drill Setup amp Anchoring O Drill Startup Check the hydraulic reservoir oil level O Check the oil level in the fluid pump O Check the oil level in the rotation unit O Check all the fastening hardware on the feed frame base frame power unit etc to ensure that they have not become loose in shipment Drilling Operations Corebarrel and Diamond Products Training Drill Head LM Valve Pressures PT Selector Hydraulic System 0 0 Module Valve Identification SIU6u 8 6 07 peog 2102 1U6uAdoD COMMISSIONING SIGN OFF The commissioning technician is responsible for checking off all boxes beside headings as training progresses Also signing off that the customer has been fully trained on the safe operation and maintenance of the drill rig The customer is responsible for signing off that he fully understands and is satisfied with all aspects of the trai
Download Pdf Manuals
Related Search
Related Contents
Samsung PS43E450A1W Priručnik za korisnike 2N VoiceBlue Next - 2N WIKI EDGER User Manual - National Optronics resources center Manual de Informação e Lazer Manual del Usuario Copyright © All rights reserved.
Failed to retrieve file