Home
KODAK 8000C Digital Panoramic and
Contents
1. E RJ45 d K8000C r6 64 ie d d 2 ONE O oO O o o A I 1 General mains 7bis X ray warning lamp connecting terminal 2 Differential circuit breaker 8 Column connecting terminals 3 Red color actuator emergency stop push button 9 Xray remote control 4 Red color actuator emergency stop push button 10 Door safety switch 5 Red warning lamp power ON indicator 11 Mains outlet for electric tools 6 Unit mains connecting terminal 12 Ethernet outlet RJ45 1 7 Green warning lamp ready state indicator 13 Contactor 4 4 SITE PREPARATION BEFORE INSTALLATION Electrical Requirements A single phase alternating current power supply is required The electrical installation specifications should be as follows Table 4 2 Electrical Installation Specifications Supply Voltage 100V 110V 230V 240V 130V Frequency 50 60 Hz 50 60 Hz Electrical supply 6 kW 6 kW Line current 16A 20A required Cable cross section For 30 m For 10 m according to length 2 5 mm2 2 5 mm2 Max line 0 5 0 12 impedance Differential circuit breaker 2 SOUS SORA Maximum current to 16A 20A Protect the power supply line with a trip circuit breaker differential circuit breaker that trips at maximum current Specifications of 2 250V 6A 250V6A Install these stop push buttons to red color actuator UL listed UL listed simult
2. 60 Hz e P5 230 240 V 50 Hz e U6 230 240 V 60 Hz IMPORTANT AN If you cannot use the above manufacturer devices use an equivalent emergency switch and contactor in the UL list with the same specifications For more information see UL 2601 1 clause 22 7 4 6 SITE PREPARATION BEFORE INSTALLATION X Ray Room Requirement X Ray Room Requirement IMPORTANT N Use an appropriate wall fixing system suitable for the type of wall construction See the examples below The following illustrations provide examples of wall types and fixations Da ia Som A pee Table 4 3 X Ray Room Requirements Room Components Minimum Requirement Comments Width of the door 75 cm 30 Height of the ceiling 240 cm 95 If needed a shorter column is possible by special order Strength of the wall Withstanding an extraction force of 150 kPa at It is the responsibility of the installer to each point of attachment choose an appropriate fixing system that withstands the extraction force Load bearing capacity of the floor 500 kg m2 The floor must be solid and flat Required space for the KODAK 8000 2350 L x 1950 D x 2400 H mm and K8000C units IMPORTANT AN Install the unit where a minimum amount of space is provided to allow easy access for the patient or the maintenance technician see Figure 4 2 KODAK 8000C Digital Panoramic and Cephalometric Extraoral
3. 7 Inthe Imaging Window on the acquired image zoom on the value grid B of the image quality phantom A The resulting value clearly visible must be minimum 2 5 right left center and bottom Check that there is no splitting lines of the grid of the image quality phantom 5 18 INSTALLING THE CEPHALOSTAT Post Installation Control 8 Save the image Use this image as reference for a later image quality verification KODAK 8000C Digital Panoramic and Cephalometric Extraoral Imaging System Installation Guide SM736 Ed 02 5 19 Fitting the Covers Fitting the Covers WARNING N Before fitting the covers you MUST switch off the unit Before fitting the covers check that e All the screws in the wall and the floor have been tightened e All the screws attaching the head and the fixed arm to the column have been tightened 2x E usx20 SZ c M5x50 Y 2x E usxi5 zZ 2x M5x50 OmO Qe Om OmO BS 2x SL M5x12 3mm To fit the covers follow these steps 1 Fit the upper cover A on the column Fit the cover on the wall bracket B Fit the cover on the column connecting terminal C and tighten the fixing screws 5 20 INSTALLING THE CEPHALOSTAT Fitting the Covers Fit the head cover D of the unit to the head chassis and tighten the f
4. A when you have reached the desired adjustment mL e O88 KODAK 8000C Digital Panoramic and Cephalometric Extraoral Imaging System Installation Guide SM736 _Ed 02 5 11 Post Installation Control Adjusting the Height of the Cephalostat Head To adjust the height of the cephalostat head follow these steps 1 Position the head clamps in a lateral position 2 Access the Cephalometric Acquisition Window In the Program pane click 3 Launch an x ray using the x ray remote control 4 In the Imaging Window on the drawing toolbar click On the acquired image draw a line from the bottom of the image to the center of the ball ear cone The resulting value must be e Height 30mm 5mm e Length 110mm 5mm 30 mm 5 mm 110 mm 5 mm 5 12 INSTALLING THE CEPHALOSTAT Post Installation Control 5 If needed adjust the height using the cephalostat arm screws A Untighten slightly the screws A and lift the cephalostat head to the correct height Tighten the cephalostat arm screws A KODAK 8000C Digital Panoramic and Cephalometric Extraoral Imaging System Installation Guide SM736 Ed 02 5 13 Post Installation Control Adjusting the Ear Cones Alignment To adjust the ear cones alignment follow these steps 1 Position the head clamps in a lateral position 2 Access the Ceph
5. 5 12 Adjusting the Ear Cones AGH usada aka va pd oc ER RR ERE AR KOSS ENS RAE FF CR a don 5 14 Adjusting the Nasion UPON eis rer tirer EE N eabes 5 15 Adjusting the Cephalometric Frankfurt Positioning Laser 0 0 0 cee eee eee tees 5 17 Cs Ce We is a 8p 08k ree a eRe Eee RTE SES 09 eed EEE EEE es 5 18 FIINSIUR e E AT AEE ATTAT EET EEEE TAEAE FEITA ESTIT TTET 5 20 KODAK 8000C Digital Panoramic and Cephalometric Extraoral Imaging System Installation Guide SM736 _Ed 02 iii Contents Fil the Cephalbostal AiG c 4sLiRRZASARAR RARRRPR RARAd P REAdRRARPACRSD eases ERAAE RE RA 5 22 6 Maintenance Annual Maintenance Chapter 1 About This Guide Conventions in this Guide The following special messages emphasize information or indicate potential risk to personnel or equipment oobb b WARNING Warns you to avoid injury to yourself or others by following the safety instructions precisely CAUTION Alerts you to a condition that might cause serious damage IMPORTANT Alerts you to a condition that might cause problems NOTE Emphasizes important information TIP Provides extra information and hints KODAK 8000C Digital Panoramic and Cephalometric Extraoral Imaging System Installation Guide SM736 Ed 02 Conventions in this Guide 1 2 About This Guide Chapter 2 KODAK 8000C UNIT OVERVIEW The KODAK 8000C digital panoramic and cephalometric unit is desig
6. If the results of any of these inspections are unsatisfactory refer to the Service Manual in order to rectify any problems If there is any doubt do not operate the unit KODAK 8000C Digital Panoramic and Cephalometric Extraoral Imaging System Installation Guide SM736 _Ed 02 6 1 Annual Maintenance 6 2 Maintenance
7. Imaging System Installation Guide SM736 Ed 02 4 7 X Ray Room Requirement Figure 4 2 Nn Oo Oo Q 7bis MINI 2350 mm Minimum X Ray Room Space Configuration for K8000 and K8000C 92 52 MINI 500 mm 19 68 7bis 11 JE CCE SC SIERO RRR 909090 0 4 0 05 RENATA HETITILITIT ITI RRR KORR ROI RORIS 78 73 MINI 2000 mm Red color actuator emergency stop push button Red color actuator emergency stop push button Red warning lamp power ON indicator Unit mains connecting terminal Green warning lamp ready state indicator X Ray warning lamp connecting terminal A WARNING wori SRR BKK ROY comes R RSS s Xe Me ZXXXXXXXXXXXXX RESAS ESS SKK QREK KKK KS RRR XX ne o X900 XX S S LL x SKS lt SSS SO s 2E x Z ue sates exo XXXXXXXXY RSIS SRO KS RLR s zm eo RLR ZXY S eee L K tot SOS RS XSEX SSS SSS RRR BSS POX posco RS 9 10 11 12 13 X ray remote control Door safety switch Mains outlet for electrical tools Ethernet outlet RJ45 1 Local Area Network LAN RJ45 2 You MUST prepare the appropriate electrical re
8. Panoramic and Cephalometric System S te iis Te Jes Buc NE RR 1 2 3 4 1 X Ray emission LED Yellow indicates the x rays are being emitted 2 Display Screen Displays the current acquisition parameters and the error messages 3 Reset button Resets the unit arm to the initial position to enable the patient to enter and exit the unit 4 Laser beam button Activates the laser positioning beams to correctly position the patient KODAK 8000C Digital Panoramic and Cephalometric Extraoral Imaging System Installation Guide SM736 Ed 02 2 7 X Ray Remote Control Overview X Ray Remote Control Overview The x ray remote control enables you to launch a radiological image acquisition via the exposure button from outside the x ray room You must press and hold the exposure button until the end of acquisition Premature release of the exposure button interrupts the acquisition Figure 2 6 X Ray Remote Control WEE e 1 Exposure button launches image acquisition 2 8 KODAK 8000C UNIT OVERVIEW Positioning Accessories and Replacement Parts Positioning Accessories and Replacement Parts The following accessories are used when positioning a patient They are delivered with the KODAK 8000 digital panoramic and KODAK 8000C digital panoramic and cephalometric unit Table 2 1 and Table 2 2 list the panoramic and cephalometric positioning accessories Table 2 1 Panoramic Positioning Accessories and Repla
9. SS IS ha aac feet end elt tC EMER VE e CEU beree i beeen eee 4 1 ii DINNING ados datus qut Romer rated actwgedne by dads b addu is ietdestheainakngataa 4 2 Elactneal Require 24233 3d C XOCEREEN GERCEOROE ICE OR CE don Eo e DEES RR E CAR CR RE olo ic RR E LR AR E CR EON OO 4 3 Aena Room PORUIFGRIATIE erreia ss dade nee ees Weed ORE ERNE eed OR UOCE GUCCI ERS ORES Oke Bee Coke ek 4 7 Computer System esl S rrniaadacak amp a RERRERUREXARDRR REN XR kaidi uada ks bKRAA RE REA dE cd 4 9 5 INSTALLING THE CEPHALOSTAT Top POSEUUIFBETRSTILE cac cbr dob RE a RE aed ee 49a GRRE SARTRE ERE ep de EC RR ER A Cd d ROPA A 5 1 Technical Stati Fe errei urriki keri EUE ERE CEU wks C ees AERE RC E Re Feline eee bl 5 1 SSMS BOS SWNCTEEITITITT S 100 1 0 lio 2I TOT E A E EE 5 2 installing the Cephalostat Uril uiudas n khac kd okpREEERR ert rn Ete nE are ERCR ER RR RE Re nan ca 5 3 Jie seg ES sr ce NEM 5 3 installing the Cephalostat Head uad xe ais Cae ivnn das c EO Ea pU boc c e bc rro 5 5 Winna the eS ec bn eek Foe ER RR Qe oe ree a AE EEE f R En 5 8 Wiring the Cephalostat to he Unit Head 24 ade 19d dolor Ro ooo decor eee Fede scr dde bd 5 9 uci tupEFog o VEPRHETTTT Torrrrrrnem 5 10 Adjusting the Cephal stat Head isaauxad R s amp zeddoiRke dd spsi4Rn x Ed Rar duets en RARE RA des 5 10 Adjusting the Cephalostat Head Inclination 0000 cece eese 5 10 Adjusting the Height of the Cephalostat Head i 2sooseoe eoe hanh rmm m
10. 53 J10 B Ethernet Pano Ethernet Pano C Ethernet Workstation Ethernet Workstation D CJ664 J21 CJ664 J21 adapter board CJ664 v4 E R 39 CJ699 J9 amp 40 CJ699 J9 CJ699 JO for right side ceph E L 39 CJ699 J9 amp 40 CJ699 J9 CJ699 Jo for left side ceph KODAK 8000C Digital Panoramic and Cephalometric Extraoral Imaging System Installation Guide SM736 Ed 02 5 9 Post Installation Control Post Installation Control Before the post installation control check that e The installation of the unit is complete e The installation of the KODAK dental imaging software is complete e You have the test tool e You have raised the digital sensor to ceph mode e The unitis on Adjusting the Cephalostat Head Adjusting the Cephalostat Head Inclination To adjust the cephalostat head inclination follow these steps 1 Position the head clamps in a frontal AP position 2 Access the Cephalometric Acquisition Window In the Program pane click 3 Launch an x ray using the x ray remote control The head clamps must be correctly and vertically positioned on the acquired x ray image 5 10 INSTALLING THE CEPHALOSTAT Post Installation Control 4 f needed adjust the cephalostat head mechanically using the elbow tube for horizontal inclination of the cepahlostat head Untighten the fixing screws A slightly Use the fixing screws B to adjust the horizontal inclination Tighten the fixing screws
11. DAK 8000C Units Mobile Components 2 2 KODAK 8000C UNIT OVERVIEW General Overview General Functional Components Figure 2 2 illustrates the general functional components of the KODAK 8000C digital panoramic and cephalometric units Figure 2 2 KODAK 8000 and KODAK 8000C Units Functional Components 1 Height adjustment buttons 14 2 Control panel 15 3 Hand Grip 16 3a Temple supports control knob 17 4 Chin rest base 18 4a Chin rest and bite block 19 Temple supports 20 5 6 Unit mains connecting terminal 21 7 Green warning lamp ready state indicator 22 8 Column connecting terminal 23 KD X Ray source assembly Unit rotative arm Panoramic sensor Component to raise for Cephalometric mode ON OFF button Wall mounting brackets cover Wall mounting brackets Column upper cover Panoramic head cover Cephalostat arm KODAK 8000C Digital Panoramic and Cephalometric Extraoral Imaging System Installation Guide SM736 Ed 02 2 3 General Overview 10 11 12 13 X Ray remote control 24 Door safety switch 25 PC hosting the imaging and the acquisition 26 software Ethernet outlet RJ45 1 27 LAN RJ45 2 28 29 Cephalometric end of the arm cover Cephalostat head and head top cover Cephalostat head side cover Carbon fiber screen Head clamps and ear cones Nasion support 2 4 KODAK 8000C UNIT OVERVIEW General Overv
12. If needed adjust the nasion support using the nasion support fixing screws A 2mm 5 16 INSTALLING THE CEPHALOSTAT Post Installation Control Adjusting the Cephalometric Frankfurt Positioning Laser To adjust the cephalometric Frankfurt positioning laser follow these steps 1 Remove the generator front cover 2 Turn on the unit On the control panel press to turn on the positioning laser beams 3 Make sure that the cephalometric Frankfurt positioning laser beam is projected in the middle of the ear cone 4 f needed adjust the laser using the fixing screw of the laser socket 5 Replace the generator front cover KODAK 8000C Digital Panoramic and Cephalometric Extraoral Imaging System Installation Guide SM736 Ed 02 5 17 Post Installation Control Checking the Image Quality To check the image quality follow these steps 1 Raise the nasion support 2 Open the head clamps 3 Position the image quality phantom A at the center of the digital sensor gt O gt 2 4 Access the Cephalometric Acquisition Window In the Program pane click 5 In the Parameter pane select e 64Kv e 15mA e 045 6 Launch an x ray to acquire an image
13. KODAK 8000C Digital Panoramic and Cephalometric Extraoral Imaging System Installation Guide Notice Congratulations on your purchase of the KO DAK 8000C Digital Panoramic and C ephalometric Extraoral Imaging S ystem Thank you for your confidence in our products and we will do all in our power to ensure your complete satisfaction The Installation G uide for the KODAK 8000C Digital Panoramic and Cephalometric Extraoral Imaging S ystem includes information on the cephalometric features For the panoramic features see the KO DAK 8000 Extraoral Imaging S ystem S M721 Installation G uide W e recommend that you thoroughly familiarize yourself with this Guide in order to make the most effective use of your system WARNING We recommend that you consult the Safety Regulatory and the Technical Specification User Guide before using the KODAK 8000C Extraoral Imaging Systems The information contained in this G uide may be subject to modification without notice justification or notification to the persons concerned No part of this G uide may be reproduced without the express permission of C arestream Health Inc The US Federal law restricts this device to sale by or on the order of a physician This document is originally written in English Manual Name KODAK 8000C Digital Panoramic and C ephalometric Extraoral Imaging System Installation G uide Part Number SM736 Revision Number 02 Print Date 03 2010 The brand names and logos repr
14. KODAK 8000C Digital Panoramic and Cephalometric Extraoral Imaging System Installation Guide SM736 Ed 02 5 7 Installing the Cephalostat Unit Wiring the Cephalostat Head 9 Pull the cables out of the elbow tube A Remove the adhesive tape Connect the following wiring in the following order Cable On the To B 967 Alim Lambda CN1 Power supply board CN1 C Green and yellow cable Next to power supply box Ground screw D Ethernet Pano with ferrite Control box Pano E Ethernet Workstation with ferrite Control box Workstation F A14 CJ802 5 with ferrite Control box Synchro 5 8 INSTALLING THE CEPHALOSTAT Installing the Cephalostat Unit Wiring the Cephalostat to the Unit Head 10 Pull the cables out of the cephalostat arm Pass the cables through the opening in the column and attach them with a cable tie to avoid cable wear due to usage as shown in the figure below Connect the wiring in the following order Cable On the To A 967 CJ653 J10 CJ6
15. alometric Acquisition Window In the Program pane click 3 Launch an x ray using the x ray remote control The ear cone ball A must be at the center of the head clamps circle B 4 In the Imaging Window on the drawing toolbar click On the acquired image draw a line from the center of the ball A to the center of the circle B The resulting value must be 1 5mm 1 5mm 5 14 INSTALLING THE CEPHALOSTAT Post Installation Control 5 If needed adjust the cephalostat head mechanically e Fora vertical adjustment use the cephalostat arm screws A e Fora horizontal adjustment use the elbow tube clamps screws B Adjusting the Nasion Support To adjust the nasion support follow these steps 1 Lower the nasion support to a vertical position 2 Access the Cephalometric Acquisition Window In the Program pane click 3 Launch an x ray using the x ray remote control The nasion support must be perpendicular to the ear cones KODAK 8000C Digital Panoramic and Cephalometric Extraoral Imaging System Installation Guide SM736 Ed 02 5 15 Post Installation Control 4 n the Imaging Window on the drawing toolbar click Ee On the acquired image draw a perpendicular line between the center of the ear cones and the nasion support holes to check that the nasion support is positioned vertically The resulting value must be A B 3mm i m aa i 5
16. aneously switch off the emergency stop push button 3 and 4 current to the active conductors of the radiological installation and exclude any other electric equipment Locate 3 inside the x ray room near the unit for the operator to quickly cut the power supply if necessary Locate 4 outside the x ray room near the x ray remote control for the operator to quickly cut the power supply if necessary Maintain them in OFF open position until a deliberate action is performed KODAK 8000C Digital Panoramic and Cephalometric Extraoral Imaging System Installation Guide SM736 _Ed 02 4 5 Electrical Requirements Table 4 2 Electrical Installation Specifications Continued Specifications of 60W 60 W Locate the red warning lamp 5 the warning lamps outside the x ray room to indicate 5 and 7 the unit is active 1 lamp at each access point e Locate the green warning lamp 7 outside the x ray room to indicate the ready state of the unit for acquisition Contactor 13 16A 250V 20A 250V UL listed UL listed Door Safety Switch 1A 250V 1A 130V Optionally connect the door safety 9 switch 9 that deactivates the x ray remote control if the door remains open Use the following switches Emergency Stop Switch Manufacturer Cutler Hammer Ref e E22AT111 e E22AT112 Contactor Manufacturer Telemecanique Ref LC1 D4011 e F6 110 130 V
17. cement Parts Accessory Description Panoramic chin rest and TMJ x2 Maxillary sinus chin rest TMJ x2 and TMJ x4 nose rest Standard bite block Bite block for edentulous patients A set of right and left temple supports Single use sheaths for bite blocks 500 pcs box KODAK 8000C Digital Panoramic and Cephalometric Extraoral Imaging System Installation Guide SM736 Ed 02 2 9 Positioning Accessories and Replacement Parts Accessory Description Head clamps with ear cones Nasion support 2 10 KODAK 8000C UNIT OVERVIEW Chapter 3 KODAK 8000C PACKAGING Standard Packaging R Us SEI FI R f Ee EN S J j Table 3 1 Cephalometric Assembly Components Box Components Dimension mm Weight e Cephalostat head e Cephalostat arm e Cephalostat covers 1200mm L x 800mm D x 1180mm H 80 kg e Documentation User Guide and Installation Guide Table 3 2 Components Product Description Quantity Cephalostat head 1 KODAK 8000C Digital Panoramic and Cephalometric Extraoral Imaging System Installation Guide SM736 _Ed 02 3 1 Standard Packaging Table 3 2 Components Continued Product Description Ouantity Cephalostat arm 1 Arm elbow tube End of the arm cove
18. iew Digital Sensor Locations Figure 2 3 illustrates the locations of the digital panoramic and digital cephalometric sensors of the KODAK 8000C digital panoramic and cephalometric units Figure 2 3 KODAK 8000 and KODAK 8000C Units Digital Sensor Locations LXK OU IS lt gt 3 xo XXX Xo Ox e lt gt COS XX LRS OOOO 3833S d X L tt L m 5 SxS ones 28 lt gt x KR KR KR KR CO OU Owe x 3S lt 5 n ne 5S setae x ee case eo So e X da t4 QOS 2 o OS C005 b SKK RKO RRR KODAK 8000C Digital Panoramic and Cephalometric Extraoral Imaging System Installation Guide SM736 Ed 02 2 5 General Overview Laser Locations Figure 2 4 illustrates the location of the lasers of the KODAK 8000C digital panoramic and cephalometric units Figure 2 4 KODAK 8000 and KODAK 8000C Units Laser Beam Locations Mid sagittal plane positioning laser beam Frankfort plane positioning laser beam Canine plane positioning laser beam A OO N a Cephalometric Frankfort plane positioning laser beam 2 6 KODAK 8000C UNIT OVERVIEW Control Panel Control Panel The control panel is an alphanumeric digital soft touch console It allows the operator to control certain unit functions It also displays the operating parameters and error messages Figure 2 5 Unit Control Panel Kodak 8000C Digital
19. ixing screws Fit under the head cover E and tighten the fixing screws Fit the inside column cover F and position and attach securely the ON OFF button to the cover with the fixing screws Screw and tighten the fixing screws of the column cover You can fit the cephalometric covers now KODAK 8000C Digital Panoramic and Cephalometric Extraoral Imaging System Installation Guide SM736 Ed 02 5 21 Fitting the Covers Fitting the Cephalostat Covers To fit the cephalostat covers follow these steps 1 Fitthe cephalostat end of the arm cover A and screw the fixing screws 2 Fit the cephalostat head side covers B and screw the fixing screws 3 Fit the cephalostat head top cover C and screw the fixing screws Ed M5x12 4x S 0 q 2x EJ M5x16 5 22 INSTALLING THE CEPHALOSTAT Chapter 6 Maintenance Annual Maintenance W e recommend that a general inspection of the unit should be carried out every year by an approved dental systems technician The inspection should cover the following points C heck the attachment points to the floor and the wall Check all the mobile components of the unit Check the x ray generator Check the alignment of the x ray Make an image acquisition with the test tools and check the image Check the focal trough and the symmetry Check the degree of legibility of the labels Check for damage to cables covers oil leaks etc
20. ned to carry out the following radiological examinations e Panoramic e Maxillary Sinus e Temporomandibular Joints TMJ e Lateral cephalometric e Frontal PA or AP cephalometric e Oblique cephalometric e Submento vertex cephalometric e Carpus cephalometric General Overview The KODAK 8000C digital panoramic and cephalometric unit is composed of the following functional components The unit head that contains all the electronic control The rotative arm The fixed arm with a control panel The panoramic digital sensor The x ray source assembly The x ray remote control The chin rest and bite block The chin rest base The panoramic chin rest and bite block The temple supports The hand grips The cephalostat arm The cephalostat head The head clamps and ear cones The nasion support The acquisition software see Imaging Software Overview The following figures illustrate the general overview of the KODAK 8000C digital panoramic and cephalometric units KODAK 8000C Digital Panoramic and Cephalometric Extraoral Imaging System Installation Guide SM736 _Ed 02 2 1 General Overview IMPORTANT N The Cephalostat can be positioned either on the right or the left side of the KODAK 8000 unit Mobile Components Figure 2 1 illustrates the up and down movement of the KODAK 8000C digital panoramic and cephalometric units mobile component and the rotation of the rotative arm Figure 2 1 KODAK 8000 and KO
21. o add a base plate you must add 15mm to the height of the unit 500 91 13 4 2 SITE PREPARATION BEFORE INSTALLATION Electrical Requirements Electrical Requirements WARNING You MUST select the operating voltage when placing an order The operating voltage CANNOT be modified on site The unit can operate at e 100 110 130 V 50 60 Hz e 230 240 V 50 60 Hz Table 4 1 Optional Operating Voltages of the Unit Nominal voltage e 2 Maximum line Minimum Maximum no load current 100V 130V 90 V 143 V 20A 230V 240V 207 V 264 V 10A CAUTION LS The power supply line must be equipped with a connection box that ensures a constant connection It must not be possible to connect the unit to the power supply without using a tool The unit must be protected against any accidental disconnection If other units are installed on the same line interference and voltage fluctuations can cause the radiological unit to operate abnormally We strongly recommend that a separate electrical line be dedicated to supply power to the KODAK 8000C unit This line should be protected by a circuit breaker with a maximum current of e 16 A at 230 240 V e 20Aat110 130 V e A differential circuit breaker of 30 mA KODAK 8000C Digital Panoramic and Cephalometric Extraoral Imaging System Installation Guide SM736 Ed 02 4 3 Electrical Requirements Figure 4 1 Electrical Diagram of the X ray Room and Connections
22. oduced in this Guide are copyright KO DAK is a trademark of KO DAK used under License KO DAK 8000C Digital Panoramic and Cephalometric Extraoral Imaging S ystem complies with Directive 93 42 CEE relating to medical equipment 0086 Manufacturer Carestream Health Inc m 150 Verona Street Rochester NY 14 608 Authorized Representative in the European Community EC REP TROPHY 4 Rue F Pelloutier C roissy B eaubourg 77435 Marne la Vall e C edex 2 France Contents 1 About This Guide Conventions Minhs OSEE Lear dark Raf ede d HEC Sk el e eer RET ep ae tei ue ta NR bed Ur eR 1 1 2 KODAK 8000C UNIT OVERVIEW ea R4 Se ee eee ee eee rmm 2 1 Mobile L Omponenis ada ee ee ee ee ee ee ey ee eer o dr ba do Te ee 2 2 General Functional DOMI rr riri oe vena vaca CHEER d dg RICE VR Ea PR C Ke o POR ERR ER rac 2 3 Digital Sensor Lors resia ee ee DERE RE FRA C ere ere 2 5 Er Ecol on MTM 2 6 CeO Pel aad ERAT AREsPRTARAPARARARRASARARRRAAR RER Cd RPRRE ARE PRRrddRAP EPA EAE pAdaE 2 7 X Ray Remote Control OUIIVIBW ee ee ee Ira at eee ee ee er er ee RO a a 2 8 Positioning Accessories and Replacement Parla iiissasus euh ens een eke eens HERR AE RA V EAR TELET IA 2 89 3 KODAK 8000C PACKAGING Sandal FEIERN es aaduns aq qai ER Fair ria bark CE RR a rica Redi imc A Exi a RR RO M Ra Bde Cm d Rr den 3 1 4 SITE PREPARATION BEFORE INSTALLATION s neE ejn li WETIEMCTITD UTTTTMUPUTSUTTT 4 1 ECCS LT
23. position 7mm B e Right side ceph position 22mm C 6mm 4 Screw the fixing screws but do not tighten them KODAK 8000C Digital Panoramic and Cephalometric Extraoral Imaging System Installation Guide SM736 Ed 02 5 5 Installing the Cephalostat Unit 5 Correctly position the cephalostat head using a spirit level C placed as shown in the figure Tighten the fixing screws B to adjust with the spirit level C 6 Correctly position the cephalostat head using a spirit level D placed as shown in the figure Tighten the fixing screws C to adjust with to the spirit level D 5 6 INSTALLING THE CEPHALOSTAT Installing the Cephalostat Unit 7 Toadjust the height of the Cephalostat head using a measurement tape measure the height from the floor to the middle of the collimator outlet A Measure the height from the floor to the center of the ear cone ball B The measurements must be the same A B To adjust the height use the tube fixing nut C see step 2 of the procedure 8 Insert the cables B inside the elbow tube A tube
24. quirements and configurations of the x ray room before installing the unit You MUST locate separately the following low voltage and high voltage connections Low Voltage 12 9 10 High Voltage 6 5 7bis 4 8 SITE PREPARATION BEFORE INSTALLATION Computer System Requirements Computer System Requirements To keep you always updated on the latest evolution of the minimum computer system requirements for KODAK 8000C system software this section is posted on site MyTrophytec http www mytrophytec com as a separate document with edition number Before any intervention on the client s site check first the MyTrophytec site for the latest edition IMPORTANT AN It is MANDATORY to check that the computer system configuration is compatible with the computer system requirements for the KODAK 8000C software If necessary you MUST update your computer system configuration KODAK 8000C MUST be connected to the computer via a point to point Ethernet link and not via a LAN DO NOT place the computer and the peripheral equipment connected to it in the immediate vicinity of the patient in the unit Leave at least 1 5 m distance from the unit The computer and the peripheral equipment must conform to the IEC 60950 standard KODAK 8000C Digital Panoramic and Cephalometric Extraoral Imaging System Installation Guide SM736 Ed 02 4 9 Computer System Requirements 4 10 SITE PREPARATION BEFORE INSTALLATION Chapte
25. r Head top cover Head side cover 3 2 KODAK 8000C PACKAGING Chapter 4 SITE PREPARATION BEFORE INSTALLATION IMPORTANT Prior to placing the order and before installation carefully check the following requirements for the x ray room Standard Compliance Install the unit in an x ray room compliant with all official regulations applicable to protection against radiation This room must reduce the frequency interferences of the 30MHz to 1GHz band to at least 12db Environmental Requirements Check the following ambient operating condition requirements of the x ray room before installing the unit e Temperatures 5 35 C e Relative humidity 30 85 e Atmospheric pressure 700 1060 hpa KODAK 8000C Digital Panoramic and Cephalometric Extraoral Imaging System Installation Guide SM736 Ed 02 4 1 Unit Dimensions Unit Dimensions 1261 mm 49 63 E E Be E ala ER 2 oO eo m sm Els as x N Mc x cis eiu q lt gt 6 0 S Ele ze EJE EIE ajy Fle RIS ol Tle tom me Es pe s gt a 2 Z x z Eq 2 2 i z NS 1810 mm 440 mm 71 3 17 3 The unit dimensions illustrated in the above figure are as follows e Maximum height of the unit 2315mm e Minimum 1687mm and maximum 997mm height of the chin rest e Minimum 1022mm and maximum 1712mm height of the ear cones e Width 2250mm and depth 1261mm of the unit WARNING AN If you need t
26. r 5 INSTALLING THE CEPHALOSTAT Tool Requirements The installer must supply the following tools Power drill Screws and heavy duty fixings Spirit level Measuring tape Cutter Metric Allen keys Metric spanners IMPORTANT AN The tool references mentioned in this manual are ISO tool references Technical Staff Requirements The installation requires the following number of technicians Unit Component Technicians Arm 2 Head 2 KODAK 8000C Digital Panoramic and Cephalometric Extraoral Imaging System Installation Guide SM736 _Ed 02 5 1 Opening the Box Opening the Box 9 Before opening the cephalostat assembly box make sure that you have the required tool To open the cephalostat assembly box follow these steps 1 Qr e O Remove the upper cardboard from the packaging DO NOT cut through the cardboard Remove the cephalostat arm Remove gently and set aside the cephalostat head cover Remove the protection elements Lift off the packaging carton Remove gently the cephalostat head from the transport support and place it on the ground Remove the other accessories 5 2 INSTALLING THE CEPHALOSTAT Installing the Cephalostat Unit Installing the Cephalostat Unit Before installing the cephalostat unit make sure that e The unit is switched off e The head and generator cover
27. s are removed e You have the required tools Installing the Cephalostat Arm To install the cephalostat unit follow these steps IMPORTANT AN Make sure that the wall mounting bracket s hole A is the furthest from the wall before installing the cephalostat unit 1 With the help of 1 person position the cephalostat arm on the rear of the mobile component of the column To attach the arm insert the screws on the column on the lower holes A Insert and then tighten the fixing screws C KODAK 8000C Digital Panoramic and Cephalometric Extraoral Imaging System Installation Guide SM736 Ed 02 5 3 Installing the Cephalostat Unit 2 Make sure that the tube A is for the appropriate side by default it is for the right side position of the ceph if not unscrew the fixing screws and reposition it for the appropriate side Insert all the way tube A inside the tube clamps B and screw in the fixing nut Tigten the fixing screws of the tube clamps B LORRI FS JEREEREK KNORR HNO FRR RRR KR KI KY TERRE RK KR IO KY PLL RSSRSS SLRS x LZ M m 5 4 INSTALLING THE CEPHALOSTAT Installing the Cephalostat Unit Installing the Cephalostat Head 3 With the help of 1 person lift the cephalostat head and insert the elbow tube A inside the elbow tube clamps Insert the elbow tube A as far as e Left side ceph
Download Pdf Manuals
Related Search
Related Contents
capitolato speciale d`appalto-vittorio-grassi - Bandi on-line LDL Instruction Manual - HiTECH Technologies, Inc. Taski R2 Concentrado AGREEMENT Copyright © All rights reserved.
Failed to retrieve file