Home
        Page ZX-14 Stage I Turbo Kit WARNING: This turbo
         Contents
1.                                Using thread sealer  install the 3 8    npt to hose barb fittings  male and female  onto each end of the  gold one way valve   photo 12    Install a straight  8 to hose barb onto the oil drain of the turbo  Push the 1 2    hose onto the barb and  cut to 3      photo 11    Now install the one way valve assembly onto the 3    hose so the arrow points toward the scavenge  pump   NOTE   The ARROW on this valve must POINT TOWARD THE SCAVENGE PUMP    photo 12    Cut another 3    section of 1 2    hose and install this onto the other end of the one way valve  Install a  straight  8 hose barb onto the inlet of the pump and install the open end of the 3    hose onto it   photo  8    Install a 90    8 hose end on the other side of the pump and push the 1 2 hose onto it  Route the hose  up between the right footpeg mount and the swing arm  Continue over the top of the swing arm up  to where the oil filler plug used to go  The new billet oil filler plug has a  8 swivel screwed into it   Install another  8 90   hose end onto  8 swivel   photo 13    Trim the 1 2    hose to fit and insert it into the  8 90   hose barb   photo 13    Tighten all  8 hose ends     6  Mounting and connecting the oil system   use thread sealer on all threads           He   k GE    He    GE              Using thread sealer  install a  3 straight to 1 8   npt into each end of the small one way valve  Tighten  both ends   photo 8    Install the 1 8    npt male end of the    T    fittin
2.  ties     A heatgun    A source of compressed air    Anti seize   Safety Wire    OU O OD C E E E E EU E       2 Bike Preparation   The following items will need to be addressed in order to prepare your ZX14 for the Stage I Turbo kit   installation  Please refer to your Kawasaki service manual for further information    a Remove the following bodywork    Tank front cover   Seat   Side Fairing   Lower Fairing   Lower Rear Cowl   Q Drain and remove the fuel tank    Q Drain the cooling system into a clean container so that it can be reused   This is best done from the  drain bolt in the water pump housing  open the filler cap to vent while draining   Remember that coolant  is poisonous  Be sure to keep 1t away from pets and children and store it in a clearly marked and sealed  container    a Remove the radiator     Page I    4     a Remove the exhaust system    a Remove the air box lids and rear inlet tubes    a Drain the oil and remove the oil filter    a Remove the crankcase breather line from the frame  left hand side behind the throttle bodies  and plug   this inlet with the provided rubber cap and clamp  photo 2    a Remove the oil water trap line and install an 8 x 16mm allen bolt and washer   photo 2    a Remove the oil sender unit  on oil pan     a Remove the upper radiator shroud  attached to engine   This will be modified later to accomodate the 2     air inlet pipe    a Remove the secondary butterflies   photo 1   1  Heat the screws on each plate using a heat gun on me
3. 62910 Peerless Ct    Bend  OR 97701 Phone 541 385 0706 Fax 541 382 9406    PERFORMANCE PRODUCTS        ZX 14 Stage I Turbo Kit  WARNING  This turbo kit is for OFF ROAD RACING use ONLY     Advisement  These instructions are written to be comprehensive and detailed to make the installation of this  kit go as smoothly as possible  However  the installation of the Muzzys ZX 14 Turbo kit is an extensive and  complex task  No instructions can be a substitute for the mechanical experience necessary to properly complete  this project  Therefore  if after reviewing this document you have any doubts about your skills or experience we  strongly urge you to seek professional assistance    Note that these instructions are written in the sequence that the assembly must be done  Deviation from this  order will result in extra work from having to backtrack     1 Tools and Supplies  In addition to the normal tools required for service and maintenance you will need to have the following  items on hand to complete the Street Turbo installation in a professional manner   a High temperature gasket sealer  Permatex Ultra Grey recommended     Silicon sealer  such as Permatex Black     General purpose grease  Non moly type     Pipe thread sealer  Teflon paste type  Loctite PST 592 recommended     Spray penetrating lubricant  such as WD 40     Brake or contact cleaner  spray type    Thread locker  non permanent  such as Loctite 242     A 7 32    drill bit and drill    An assortment of cable ties  zip
4. compressor housings to help access the bolts in the following steps   Final tighten the 10mm turbo flange bolts     a Bearing Housing Adjustment                                Rotate the bearing housing forward and screw the  3AN to 1 8    NPT 90   fitting into the screened  fitting using the proper amount of pipe thread sealer  You should end with the fitting pointing back  towards the engine  Do not over tighten    Install the 3 8    NPT to  8 straight fitting into the oil outlet adapter using pipe thread sealer  The  fitting will point to the rear when installed   photo 7    Clean the oil outlet flange on the bottom of the bearing housing    Bolt the oil outlet adapter to the bottom of the bearing housing using the composite gasket and the  two M8 x 20mm bolts  The fitting should point back towards the engine  The gasket requires no  sealer but if 1t makes you feel better use a little high temperature sealer   photo 11    Rotate the bearing housing so that the inlet and outlet are roughly straight up and down  Then  tighten the pinch bolts going into the turbine housing  Don   t overdo it  the bolts tend to tighten up  with the high heat of the turbo and you may regret it someday if they   re over tightened    Leave the compressor housing free to rotate  it should now be pointing up and to the rear  until we  install the compressor pipe in a later section     5  Mounting the pipe  amp  wastegate          EC E XXX X K    The two wastegate mounting flanges form an    L     U
5. dium heat   2  Remove the screws and plates   DO NOT OPEN THE THROTTLE DURING REMOVAL     Turbo Mounting   O Exhaust Manifold  photo 4       Scrape off any carbon deposits from the exhaust port sealing surface  clean with brake cleaner and  wipe dry  Also clean any packing residue from the sealing surfaces of the turbo manifold  both the  exhaust port side and turbo mounting flange       Install new copper exhaust gaskets into the exhaust ports  Use a light coating of high temperature  sealer to hold the seals in place    2   Install the exhaust manifold onto the exhaust ports  The fit is intentionally tight to ensure the  best seal possible so make sure you have the alignment correct  Working from side to side fit the  manifold flange onto the studs  You may need a soft mallet  plastic or rubber  to get things started  but use it only on the flange  not on the manifold  The manifold ends will be guided into the ports   Be sure the gaskets have stayed in place      Once sufficient threads are through the manifold flange install the new locking exhaust nuts and use  them to pull the manifold into final position  Work gradually and side to side to ensure the manifold  is seated squarely in the ports      Working from the center out final torque the nuts  Since the process will be crushing the copper  seals you may need to go through the final torqueing more than once  For the best  most long lasting  seal you need have the manifold seated squarely and all the nuts torqued evenl
6. fittings  install a 1 8    npt 90   Pushlok fitting into the left  frame block off plate   photo 17    Next install the 1 8    npt female to female 90   fitting onto the male threads on the back of the Boost  Gauge    Thread the 1 8    npt straight pushlock into the open end of the 1 8    npt female to female 90   fitting   Mount the Boost Gauge at your chosen location   Install the 1 8    polyline between the two pushlok fittings that you just installed     10  Upper fairing shroud hole          Using provided template for general reference  cut a 2    hole for the compressor tube   photo 22    template A     11  Compressor tube installation      e   k k OG    Slip the straight 2    diameter hose over the compressor housing    Install 2 T bolt clamps over the hose    Install the stainless tube up through the fairing shroud hole with the bend toward the compressor   The 90   silicone elbow will need to be trimmed for proper fit and alignment from the compressor  tube to the inlet plate  Using photo 22 for reference install the elbow using two T bolt clamps  The  compressor tube will fit only one way  The tube will come close to the radiator but it should not  touch  Tighten all clamps     12  Final connections and checks                Trimming of the right lower fairing is required before installing the air filter over the compressor  inlet  No template has been provided for this as best results are achieved on a case by case basis due  to slight variations in fairing fitmen
7. g into the female end of the 1 8    male to female adaptor   Next install the  3 90   to 1 8    npt onto one end of the    T    fitting   Do not tighten yet   photo 14   Install the    T    fitting assembly into the port where you removed the oil pressure sending unit  When  tight  the top of this fitting assembly will be pointed slightly to the left of the bike to allow proper oil  filter clearance   photo xxx  The 90   fitting will be toward the bottom of the assembly   photo 14   Install the oil pressure sending unit in the top of the    T     photo 14    Connect the 45    end of the short  3 hose to the  3 90   fitting   photo 14    Route this line beside the oil pan and connect 1t to the small one way valve   NOTE   This line will  run oil from the engine to the turbo  The flow of oil will go toward the turbo and the ARROW on the  one way valve must POINT TOWARD THE TURBO   photo 15    Connect the 90   end of the remaining  3 line to the other end of the one way valve  Connect the 45    end to the  3 90    fitting installed earlier at the turbo oil inlet    photo 7    Make sure all lines are tight    Secure the small one way valve using the 5 8    clamp and mounting it with a locknut to the 6mm  bolt on the bottom of the scavenge pump mounting bracket   photo 8     7  Remove the Clean Air system  This includes               Remove the Clean Air system hose from the right underside of the frame    Remove the reed valve cover plates and install the Muzzys billet covers acc
8. he bracket  Secure and tighten the bolts using the  fender washers and locknuts    Next install the remaining allen bolt through the last countersunk hole  Secure with a washer and  regular nut  This bolt will mount the one way valve later    Mount the pump bracket to the rear of the oil pan using  8  6 x 30mm allen bolts   NOTE  the three  holes without raised bosses are for stock fairing mounts   photos 8  9  amp  15     5  Wiring the scavenge pump                    Remove the rubber boot from the rear of the scavenge pump  Note the polarity     of the two wire  connetors on the back of the pump    Insert each lead of the short two wire pigtail through each hole of the rubber scavenge pump boot   Install and crimp one flat female spade connector onto each lead  then connect the leads to the pump  connectors  NOTE  The black lead connects to negative     and the red to positive          Page 3       XX    Re install the rubber boot over the scavenge pump   photo 9    Mount the scavenge pump harness relay next to the battery  There is a revnut at the rear of the  battery box that may be used for mounting   photo 10    Connect the positive and negative leads to the battery   photo 9    Route the long lead down between the swing arm and frame toward the scavenge pump    Plug this lead into the scavenge pump plug  photo 9     The other lead goes toward the rear of the bike on the left hand side and plugs inline of the fuel  pump plug   photo 6     5  Plumbing the scavenge pump 
9. ording to the directions  with the kit  Note that you will not use the gaskets provided in the kit nor will you remove the OEM  reeds  On the ZX14 the gasket is part of the reed plate and the complete assembly is needed for a  proper seal     8  Installing frame block off plates    Page 4    HOGGE    Mount the inlet plate and O ring on the right side of the frame   photo 16    Mount the air filter plate  left block off plate and O rings on the left side of the frame  photo 17  amp   18    Install the billet aluminum plug where the clean air hose was removed inside the right access cover    photo 20    Install the left cover temperature probe hold down bracket by drilling a 7 32    hole and installing the  bracket using a 5mm bolt and locknut   photo 19    Reverse the three rubber plugs below the left and right access covers  Each one will need to be  removed and reinstalled in the same position from the inside of the airbox   photo 21    Insert the new O rings into the access covers then reinstall and tighten     Install the new crankcase breather tube and filter  Route the tube and filter out to the rear of the bike     9  Boost Gauge installation          HR k X    No mounting hardware is included in this kit as mounting location is a very personal choice  Muzzys  recommends mounting the gauge at the top of the triple clamp  Make sure that it does not impede  movement of the handlebars or obstruct the view of the stock instruments    Using thread sealer on all the threaded 
10. sing the two composite gaskets  four 8 x 20mm  bolts and exhaust seat  install the wastegate using antiseize on the bolts  Tighten all four bolts evenly    photo 5    Make sure the turbo flange and pipe flange are clean then apply high temperature silicon sealer to the  flange and install using the  5  8 x 20mm allen bolts and tighten completely   photo 4  amp  5    Next install the 90    4 to 1 8    npt into the main housing on the wasegate    NOT THE CAP     photo 4    Install the other 90    4 to 1 8    npt into the compressor housing   photo 3    Cut two 4    sections of fire sleeve and slide them over the 1 2    blue high pressure line    Install the 90   Push Lok hose end on one end of the 1 2    line then connect it to the wastegate fitting    photo 4    Route the hose up and over the radiator and install the straight Push Lok fitting then connect it to the  90   fitting on the compressor housing   photo 3  amp  22    Now that both ends of the hose are connected  carefully position each fire sleeve on the hose so that  it protects the areas of the hose closest to the exhaust manifold  Secure each section with safety wire    photo 4  amp  22     5  Mounting the scavenge pump                            Locate  5  6mm flathead allen bolts  Four are used to mount the pump and the other is for mounting  the one way valve    Mount the pump  photo 8  amp  9  to the bracket using four 6mm flat head allen bolts by pushing them  through the rubber grommets from the top side of t
11. t  Once satisfactory clearance has been achieved  install the filter  with the provided hose clamp    Reinstall the components removed in step 2 in the reverse order Do not install the bodywork at this  time  Be sure to refill the engine oil and coolant to OEM specifications    After running the bike at idle for a short time  stop the bike and check for oil and coolant leaks  Re   check all fluid levels    If all fluid levels are good  reinstall the bodywork  You may now start and run the bike as normal     Page 5    N      wu  0     ca    Photo 1    Photo 3       Photo 4    1 a  A UL                    Photo 8    Scavenge Pump  Bracket Fairing Mount  Bolts    Pt  a       or    Photo 9       Photo 12    Photo 14                e  i ha          ICh Scavenge Pump     Bracket Fairing Mount _        a  amp  Bolt  mem    ZI gn          E        a       e  sy  My     Photo 17             gt      o    Ws    Photo 19 Photo 20          EI      fo    Photo 21             Photo 22          Cut Hole Here    2    OD       ZX 14 Stage I Turbo  Upper Faring Shroud Cut Template       Template A       Page 14    
12. y    Q Hanging the Turbo Assembly  photo 3  amp  4     The turbo assembly is comprised of three main sections  turbine housing  bearing housing  w  oil   inlet and outlet  and the compressor housing  The three sections are joined on sliding mating surfaces   secured by lock plates and pinch bolts       Loosen the pinch bolts on both the turbine and compressor housings just enough to allow free  rotation  Rotate the housings so that the turbine inlet  oil inlet  w  screened fitting  and compressor  outlet all point roughly the same direction      Clean the mounting flange of the turbine housing of any protective coating  Gather the following  hardware and put it close at hand    0 The rectangular metal turbine gasket   0 The four MIO x 35mm mounting bolts with matching nuts and washers      Mate the turbo assembly to the manifold   Fig  4  Hopefully you have an assistant to help hold the  turbo  Be prepared for a bit of a challenge if you   re working by yourself  Note the following    O The compressor is on the right side of the bike  the turbine will exhaust to the left    0 The gasket goes in between the turbine and manifold flanges  It is coated with a dry sealer but  you may use a light coating of high temperature sealer to help hold it in place    0 The bolts go in from the top  nuts are on the bottom and there are washers used  The bolts need  only to be hand tight at first  Use anti seize on the threads  Remember you can still rotate the    Page 2          bearing and 
    
Download Pdf Manuals
 
 
    
Related Search
    
Related Contents
  Cisco 300GB 3.5" 15k SAS  Herunterladen    Copyright © All rights reserved. 
   Failed to retrieve file