Home
Ducati Monster Installation Instructions
Contents
1. This will ensure that the wire will not touch the exhaust pipes and header Do NOT allow the harness to directly contact the motor or exhaust STEP 6 Replace tank amp seat Enjoy PATENTS PENDING August 28 2009 WEB SITE www powerlet net
2. Ducati Monster Installation Instructions PKT 023 Introduction Made in USA This easy to install high quality Powerlet kit provides a convenient way to access the battery on Ducati Monster motorcycles The operator can supply power to the battery i e battery charger draw power from the battery i e heated vest or monitor the state of charge on the battery using the Powerlet socket Parts List e 1 Wiring harness w 15A fuse e 1 Mounting bracket w socket e 1 1 8 spacer e Ty wrap s Please read all of the instructions carefully before attempting the installation of this product Please have a trained professional install this kit if you are not familiar with these procedures Quick Start Instruction STEP 1 Lift gas tank STEP 2 Route wires starting at the battery and finishing at the bracket STEP 3 Attach the wires to the socket and test STEP 4 Mount the bracket STEP 5 Look over your work STEP 6 Put everything you took off back on Detailed Instruction STEP 1 Rotate gas tank to expose the battery See the Ducati service manual STEP 2 Stretch out the wiring harness Grab the socket end of the harness and start routing the harness by looping the wires up through the gap between the frame members just behind the battery B The wires will exit in the underside of the seat area D Attach the ground black wire under the hinge mounting bolt C Tie wrap the harness under the cross memb
3. er Go back to the battery area and tuck the fuse holder under the rubber strap in front of the plus terminal of the battery E Connect the fuse to the battery holder by a ty wrap on the lower part of the hook where the battery holder plastic is connected This hook is at the back part of the battery close to the rider E Connect the red wire to the battery posts as follows RED WIRE BATTERY POSITIVE Copyright 2006 2009 Coliant Corporation PHONE 877 752 7835 FAX 586 276 0907 powerict EQUIPPED STEP 3 Install the fuse in the fuse holder Attach the wires to the socket The center terminal is plus and the outer ring is negative see dwg below Apply either dielectric grease or Vaseline to the terminals Use a voltmeter to check if the polarity is correct POSITIVE FRONT GATIVE POWERLET POSITIVE CONNECTOR REAR EGATIVE STEP 4 Remove the left driver foot peg bolts The Powerlet bracket and the 1 8 spacer are mounted between the footpeg bracket and the frame Attach the bracket to the back mounting lug A the 1 8 spacer is used on the front hole The above picture is for a high mount pipe the installation is the same for a stock exhaust except high pipes require some modification of the spacers Reuse the stock bolts and torque them down to the specification in the Ducati service manual STEP 5 Apply the remaining ty wraps in useful locations It is important to have two ty wraps close to the sockets
Download Pdf Manuals
Related Search
Related Contents
ATweigh WEV300 Manual (950X500X45mm) Alice AIR2000 manual - fra www.interstage.dk Global Direct 21926 Installation Guide User's Guide DSS-1300 37.0°C 37.0°C 37.0°C 37.0°C 37.0°C 37.0°C International® MaxxForce® 11 and 13 Diesel Engines Engine Brother XL-5510 User's Manual Copyright © All rights reserved.
Failed to retrieve file