Home
BSR0599/2012
Contents
1. Department of Justice Certificate of Accreditation BSR0599 2012 Energy consumption Estimated Electricity Usage for a 4 person household with average wastewater flows and loads Electrical Equipment Watts Daily operation kWhlyear Estimated hours specified Annual Cost by manufacturer 0 25 kWh Claytech Blue Diver 30 irrigation 750 0 8 219 55 pump Fuji MAC80N Blower 54 24 473 118 Alarm system 3 24 26 7 Description of Treatment Processes Sedimentation Chamber Wastewater enters the Sedimentation Chamber which is designed to physically separate the gross solids and fat and grease from the incoming wastewater Anaerobic Filtration Chamber This chamber contains a spherical skeleton type of filter media Anaerobic bacterial growth on the surface of the filter media captures and decomposes suspended solids The bacteria in this chamber convert nitrates in the recirculated water returning from the aerobic chamber to gaseous nitrogen Aerobic Contact Filtration Chamber The aeration chamber consists of an upper section with plastic lattice board media plates and hollow net media in the lower section An air diffuser continuously supplies the micro organisms with oxygen In the upper section the lattice board media adjusts inflow from the anaerobic filtration chamber and organic matter is decomposed by micro organisms bacteria on the contact media surface Also organic matter is decompose
2. lt 1 Upper shell 0 2 Lower shell Materials FRP 2510 2500 INI N g D OQ px 0 6 Storage Chamber Unit D a y 440 1 F ncm a 3 eo D DO a S Manhole Center 1570 P g D X Alf a ANIMA 0 4 Partition B CE 1500EX Unit Body Ji Dnipwi te Design Check Wander Scale Name May 2011 Ohtsubo Fuji Clean Co Ltd Date of issue 13 January 2012 Director Building Control Ce delegate of Minister for Workplace Relations Page 15 of 17 Department of Justice Certificate of Accreditation BSR0599 2012 lt 1 Anaerobic Chamber Support Frame gt 520 lt 2 Anaerobic Chamber Suppress Frame gt lt 4 Board Medi Securing P i o r lt a late gt Materials FRP lt 7 FRP Riser gt ago 59 V Z7 Ni 4 LL f AL 20 L lt 9 Blower Box Cover lt 10 Blower Box Stand B gt lt 8 FRP bracket 300 CEI1500EX Parts 2 Fuji Clean Co Ltd 9 1 Materials PP 500K
3. Invigorates aerobic bacteria Schematic diagram of treatment process Influent Effluent Date of issue 1 3 January 2012 Director Building Control Oc delegate of Minister for Workplace Relations Page 13 of 17 Department of Justice Certificate of Accreditation BSRO599 2012 System Components and dimensions Volume L Dimensions mm Sedimentation Chamber 1 114 Max Width 1 440 Anaerobic Filtration Chamber 982 Max Length 2 510 Aerobic Contact Filtration Chamber 580 Max Height Standard 1 870 Clarification Chamber 281 Max Height with 300mmH risers 2 170 Pump Chamber 803 Inlet Invert Standard 460 Total Volume 3 265 Inlet Invert with 300mmH risers 760 Weight kg 430 Inlet Pipe Nominal Size Dia 100 Outlet Pipe Nominal Size Dia 25 Influent Baffle Baffles Aeration Pipes Sedimentation Chamber Pump Chamber Chlorinator Irrigation Pump Anaerobic Filtration Chamber Horizontal Sectional View ve Inlet Recirculation Pipe Blower Box Pd Access Covers High Water Level HWL Low Water Level LWL Clarification Chamber Sedimentation Chamber Pump H Chamber Aerobic Contact Filtration Chamber Anaerobic Filtration Chamber Anaerobic Media Vertical Sectional View Date of issue 13 January 2012 Director Building Control Oc delegate of Minister for
4. tank containing e II4L sedimentation chamber primary treatment e 982L anaerobic filtration chamber primary treatment e 580L aerobic contact filtration chamber containing contact and filter media e 281L Storage chamber e 308L Chlorine disinfection irrigation chamber containing the chlorinator unit and irrigation pump The chamber has further emergency capacity of 1094L e 80L minute Air Blower e High and low level float switch and e Alarm panel monitoring power high water and air pressure faults This is connected to a remote audio and visual alarm to alert the householder The system requires a 240V AC power supply The system has been certified by SAI Global to AS NZS 1546 3 The system is designed to treat a Hydraulic Load of 1500 litres of domestic wastewater per day from a residential premises The Raw Influent used in the testing of the system met the requirements AS NZS 1546 3 2008 Appendix A4 l The effluent test results for 10076 of samples showed e BOD less than or equal to lOmg L e TSS less than or equal to lOmg L e E coli less than or equal to lOcfu 100mL For system cutaway drawings flow path schematic sectional diagram and components diagram refer to Appendix A For Engineering drawings refer to Appendix B For treatment system components list refer to Appendix C Date of issue 13 January 2012 Director Building Control Cc delegate of Minister for Workplace Relations Page 2 of 17
5. to install a system must be accompanied by a site and soil evaluation report and design report in accordance with AS NZS 1547 as appropriate 2 8 The supplier must provide the following information to each permit authority where it is intended to install a system in their jurisdiction e Statement of warranty e Statement of service life e Quality Assurance Certification e Installation Manual e Service Manual e Owner s Manual e Service Report Form e Engineering Drawings on A3 format e Detailed system Specifications e Copy of Certificate of Accreditation and Schedules 2 9 This Certificate of Accreditation is valid for five 5 years from the date of issue or until withdrawn by the Director and is not transferable Date of issue 13 January 2012 Director Building Control Ce y delegate of Minister for Workplace Relations Page 6 of 17 Department of Justice Certificate of Accreditation BSRO599 2012 2 10 At each anniversary of the accreditation date the supplier must submit to the Director a list of all systems installed in Tasmania during the previous 12 months The Director may randomly select up to 10 of the installed systems from each year of installation The Director will notify the supplier s nominated NATA accredited laboratory which systems are to be sampled and tested for BODs and TSS and Chlorine residual The sampling and testing of the selected systems is to be done at the supplier s expense The fo
6. 5kg 80L min 15kPa 54W 240V 50Hz 6 Pumps Claytech BlueDiver 30 Height Diameter Weight Flow rate Motor Power Power Source 375mm 149mm 8kg 68L at Om Head 750W 240V 50Hz BSR0599 2012 Date of issue 13 January 2012 Director Building Control delegate of Minister for Workplace Relations Oc Page 17 of 17
7. Color Grey Materials PP 500K Color Grey x 6450 497 4600 650 y z 532 450 698 600 0 8 Blower Piping Parts Elbow Cr Air Tube Connector eu Connector ti Manhole Lid 6 2 Manhole Ring lt 3 Alarm Panel Connector Box gt 6 5 Bracket gt 40 Abration Sensor TorFiadt Gt TRR O dre ken for Blower Power for Pump Power Alarm Panel lt 6 Flange Socket lt 4 Power Box eh lt 130 5 fo 1 C s l e a0 S 0 7 Ventilation rerne piate O 100 LL ko J CE1500EX Parts 4 cd Fuji Clean Co Ltd Date of issue 13 January 2012 Director Building Control delegate of Minister for Workplace Relations Page 16 of 17 Department of Justice Certificate of Accreditation Appendix C Component list and specifications I Tank Material Height Width Length Total Volume Fibreglass Reinforced Plastic FRP 1870mm 1400mm 2510mm 4359L 2 Influent effluent pipes Material Diameter 3 Other pipes Material Diameter Rigid PVC 100mm Rigid PVC various 4 Filter or contact media Material Diameter PVC PP PE various 5 Air Blower MAC80N Weight Air flow volume Pressure Power consumption Power Source
8. Control Oc delegate of Minister for Workplace Relations Page II of 17 Department of Justice Certificate of Accreditation BSRO599 2012 7 0 Permitted uses 7 1 The effluent is suitable for land application by any of the following methods a sub surface by i subsurface drip irrigation ii trenches beds mounds evapo transpiration systems b above ground by i spray irrigation ii surface drip irrigation Note Each of the above forms of Land Application is subject to consent from the permit authority and must be in accordance with the relevant provisions of AS NZS 1547 7 2 Where it is not practicable for effluent from the system to be applied in accordance with AS NZS 1547 the method of discharge must satisfy contemporary relevant regulatory requirements to the satisfaction of the permit authority Date of issue 13 January 2012 Director Building Control Oe delegate of Minister for Workplace Relations s Page 12 of 17 Department of Justice Certificate of Accreditation BSRO599 20 12 Appendix A Cutaway drawings schematic and sectional view Fuji Clean CE 1500EX Cutaway view of the tank e Clarification Chamber aren ab Outlet Pipe fem Pump Chamber oO Sedimentation Chamber Separates bulk solid and grease waste e Aerobic Contact Filtration Chamber e Anaerobic Filtration Chamber Organisms adhere to fixed film media and digest waste
9. Tasmanian Government Certificate of Accreditation On Site Waste Water Management System This Certificate of Accreditation is hereby issued by the Minister for Justice and Workplace Relations pursuant to Section 59 2 of the Building Act 2000 and Part G2 of the Tasmanian Plumbing Code 2006 System Fuji Clean CEI500EX Manufacturer Fuji Clean Australia Pty Ltd ACN 129 181 137 Supplier Of 16 Waterway Drive Coomera QLD 4210 This is to certify that the Fuji Clean CEI500EX Aerated Wastewater Treatment System the system as described in Schedule has been accredited for use as an on site waste water management system in single dwellings within plumbing installations in Tasmania This accreditation is subject to the conditions and permitted uses specified in Schedule 2 and in accordance with the Tasmanian Plumbing Code W TEN Kerrie Crowder Director of Building Control Delegate of the Minister for Justice and Workplace Relations Date of Issue 13 January 2012 Certificate No BSR0599 2012 Address amended October 2013 This Certificate of Accreditation is in force until 12 January 2017 Department of Justice Certificate of Accreditation BSRO599 2012 SCHEDULE Specification Fuji Clean CEI500EX Aerated Waste Water Treatment System General Description The Fuji Clean CE 500EX the system collects and treats domestic wastewater The system comprises One 4359 litre Fibreglass Reinforced Plastic FRP moulded
10. Workplace Relations Page 14 of 17 Department of Justice Certificate of Accreditation BSR0599 2012 Appendix B Engineering Drawings Sedimentation Chamber Upper Shell Anaerobic Filtration Chamber Lower Shell Aerobic Contact Partition A Filtration Chamber Partition B Storage Chamber Partition C Disindection Chamber Storage Chamber Unit Inflow Baffle Outflow Baffle Scum Baffle Air lift Control Unit Anaerobic Chamber Support Frame Anaerobic Chamber Suppress Frame Aerobic Chamber Support Frame Board Media Securing Plate Chlorinate Clylinder Stand Pump Stand PRP Riser FRP Bracket Blower Box Cover Blower Box Stand B Air Supply Pipe Kit Recirculation Air lift Pump Aeration Pipe Arm 48 Slanted Screw amp socket 100mm dia Condult Pipe Pipe Kit for Blower Pipe Kit for Pump Biostar for Anaerobic Chamber Cylindical Media Board Media Chlorinate Cylinder Manhole Lid Manhole Ring Alarm Panel and Connector Box Power Box Bracket Flange Socket Ventilation Blower Piping Parts CE 1500EX Overall view Designed date Design Check Nunber May 2011 Ohtsubo Fuji Clean Co Ltd A A Section View B B Section View
11. and application system Refer to AS NZS 1547 Clause 4 2 4 and associated appendices to Clause 4 2 for further information c Areport on the selection of the wastewater treatment unit Refer to AS NZS 1547 Clause 4 3 6 and associated appendices to Clause 4 3 for further information d Sufficient information to show that the relevant performance requirements set out in the PCA have been met d A loading certificate which sets out the design criteria and the limitations associated with use of the system and incorporates such matters as i System capacity number of persons and daily flow ii Summary of design criteria iii The location of and use of reserve areas iv Use of water efficient fittings fixtures or appliances v Allowable variation from design flows peak loading events Date of issue 13 January 2012 Director Building Control Oc delegate of Minister for Workplace Relations Page 7 of 17 Department of Justice Certificate of Accreditation BSRO599 2012 2 15 2 16 2 17 3 0 3 1 3 2 3 3 3 4 3 5 vi Consequences of changes in loading due to varying wastewater characteristics vii Consequences of overloading the system viii Consequences of underloading the system ix Consequences of lack of operation maintenance and monitoring attention and x Any other relevant considerations related to the use of the system The following reports must be submitted to t
12. d by micro organisms bacteria on the lower filter media surface while suspended solids are captured in the lower section Suspended solids accumulated on the bottom are constantly transferred to the sedimentation chamber by a recirculation air lift pump Clarification Chamber This chamber is designed to temporarily store the treated water coming out of the aeration chamber The treated water is pumped out to the disinfection chamber by an air lift pump Pump Chamber The treated water from the Clarification chamber passes through the chlorinator for final disinfection After disinfection the treated effluent is stored in the pump chamber The irrigation pump in this chamber is controlled by a high and low water level float switch Date of issue 13 January 2012 Director Building Control Ce delegate of Minister for Workplace Relations Page 3 of 17 Department of Justice Certificate of Accreditation BSRO599 2012 Hydraulic Loading and Effluent Qualit CE 1500EX is designed to treat all household wastewater from the kitchen bathroom toilet and laundry and capable of producing Secondary Quality Effluent as specified below The daily design flow rate of CE 1500EX is 1 500 L day 10EP e BOD equal to or less than 20mg L e Total Suspended Solids equal to or less than 30mg L e E coli equal to or less than lOcfu 100mL Date of issue 13 January 2012 Director Building Control Cc delegate of Minister for Workplace R
13. ding Control Cc delegate of Minister for Workplace Relations Page 8 of 17 Department of Justice Certificate of Accreditation BSRO599 2012 3 6 Each system installation must be inspected and checked by the designer or the designer s agent The designer on completion is to certify that the system has been constructed installed and commissioned in accordance with its design the conditions of accreditation and any additional requirements set out in the permit Note Where the designer is not available to supervise the installation the designer should obtain signed certification from the installing plumber stating that the installation has been constructed installed and commissioned in accordance with its design the conditions of accreditation and any additional requirements of the council and or permit authority 3 7 Where discharging wastewater to a land application system by irrigation a lockable sampling tap or gate valve is to be provided on the outlet pipe to the irrigation system 3 8 A report is to be prepared by the installing plumber detailing the inspection of the installation and the results of the commissioning tests and be accompanied by a certificate certifying that the system is operating and performing adequately see 2 15 3 9 Copies of the following reports certificates must be submitted to the council and the owner as soon as practicable after the commissioning of the system and after each schedul
14. ed or unscheduled service or inspection for the period specified in the permit a The initial plant installation and commissioning report b All required laboratory analytical test reports and c All inspection and maintenance reports 3 10 Copies of any report or certificate required by the conditions of accreditation must be made available to the Director on request 3 11 The designer is to provide a statement warning the user of which items and products that must not be placed in the system 3 12 To verify that the plant is commissioned sampling must be carried out by a council approved person for BOD TSS and Free Residual Chlorine The samples are to be tested and reported on by a NATA certified laboratory 4 0 Maintenance and monitoring 4 1 Each installation must be serviced and monitored at not less than 3 monthly intervals in accordance with the conditions of accreditation the conditions of permit and manufacturer s requirements Notes Only a plumber can carry out the maintenance and required monitoring of the system other than electrical work unless licensed to do so 2 The plumber may need to complete training by the supplier before carrying out any maintenance on the system 3 The maintenance and monitoring intervals may be combined provided the monitoring frequency remains at 3 month intervals 4 2 The owner of the system must enter into and maintain a maintenance contract with the council
15. elations s Page 4 of 17 Department of Justice Certificate of Accreditation BSRO599 2012 Schedule 2 Conditions of Accreditation 1 0 Definitions In this schedule AS NZS 1547 means the Joint Australian New Zealand Standard AS NZS 1547 2000 On site domestic wastewater management AS NZS 1546 3 means the Joint Australian New Zealand Standard AS NZS 546 3 2001 On site domestic wastewater treatment units Part 3 Aerated wastewater treatment systems AS NZS 3000 means the Joint Australian New Zealand Standard AS NZS 3000 2000 Wiring rules AS NZS 5667 means the Joint Australian New Zealand Standard AS NZS 5667 1 1998 Water quality Sampling Part Guidance on the design of sampling programs sampling techniques and preservation and handling of samples BOD means 5 day Biochemical Oxygen Demand Council means the Municipal Council having jurisdiction Commissioned means when the test results from a NATA Certified Laboratory show that the water quality requirements for the system have been met and all pre commissioning tests have been carried out in accordance with AS NZS 1547 on all associated equipment including the land application system Designer means a person that is an accredited building practitioner or licensed plumber under the Act and who has a specialty in the area of designing on site waste water management system installations Director means the Direc
16. em has demonstrated that the a effluent can be retained within the authorised land application area b where applicable the land application system has been designed and is capable of being installed and maintained in accordance with AS NZS 1547 c the location of the land application system satisfies the relevant requirements of the State Policy on Water Quality Management 997 and d the discharge is capable of satisfying the relevant water quality limits see 5 2 Installation and Commissioning The installation and operation of the system must comply with the conditions of accreditation and the manufacturer s instructions All plumbing work carried out in connection with the system installation must satisfy the requirements of the Building Act 2000 TPC and the Tasmanian Plumbing Regulations and be carried out by a registered plumber with appropriate training and competencies All installations of the system must satisfy the installation requirements set out in Appendix Al On site Waste Water Management Systems of the TPC All electrical work must be carried out by a licensed electrician and in accordance with relevant provisions of AS NZS 3000 The system requires a 240V AC power supply A weather proof isolating switch must be provided at the power outlet The power supply must have its own clearly marked designated circuit breaker in the electricity supply fuse box Date of issue 13 January 2012 Director Buil
17. gate of Minster far Workplace Relations Page 10 of 17 Department of Justice Certificate of Accreditation BSRO599 2012 5 2 Water Quality Limits Treated effluent from the system must not exceed the following limits 90 of samples for the uses specified in section 7 0 or those specified by the Permit Authority whichever are the more stringent For sub surface irrigation 5 day Biochemical Oxygen Demand BOD 20 g m max 30 g m Total Suspended Solids TSS 30 g m max 45 g m For surface irrigation 5 day Biochemical Oxygen Demand BOD 20 g m max 30 g m Suspended Solids SS 30 g m max 45 g m E coli 10 cfu 100 mL max 20 cfu 100 mL Free Residual Chlorine concentrations 2 0 5 g m and less than 2 0 g m 6 0 On going management 6 1 The mandatory servicing and monitoring is to commence 3 months after the system is commissioned The servicing and monitoring is to coincide with the supplier s required on going routine scheduled maintenance program 6 2 Where a system installed at a site has been found not to operate satisfactorily during its service life and as a result requires modification to achieve the required performance requirements in particular water quality limits the installed system is to be modified accordingly Any modifications must be recorded on the service report 6 3 In the event of failure to comply with the water quality l
18. he permit authority and owner and be made available to the Director upon request after commissioning of the system Installation and commissioning report The Installation and Commissioning Report is to cover the as constructed records of the system installation together with the results of commissioning tests to demonstrate correct construction and installation and is to be provided to the owner and permit authority on completion of the work Refer to and AS NZS 1547 Clause 4 5 6 3 and associated appendices to Clause 4 5 Inspection and Maintenance Report Maintenance reports cover ongoing inspection and maintenance operations in order to monitor the operation of the installation Refer to AS NZS 1547 Clause 3 7 4 and associated Appendix 3A Where the supplied pump is not suitably rated for the proposed land application area it must be replaced with a pump which has a rated capacity that matches the hydraulic characteristics of the irrigation system and be capable of discharging at least 5076 more than the 30 minute flow rate For drip irrigation systems ensure that drip emitter flow rates do not vary more than 1076 from the design rate over the whole of the system when installed on a sloping site Note The pump selection is to be based on flow head loss and pressure requirements Effluent distribution by sub surface application may be permitted where the Permit Authority is satisfied that the application for a permit to install the syst
19. imits set out in these conditions fortnightly sampling and testing for BODs TSS and Free Residual Chlorine must be carried out until the plant is re commissioned 6 4 The method of preserving and the handling of samples taken from the plant must satisfy the relevant requirements of AS NZS 5667 6 5 Copies of the following reports and certificates must be submitted to the permit authority and the owner as soon as practicable after the commissioning of the system and after each scheduled or unscheduled service for the period specified in the permit a the initial plant installation and commissioning report b all laboratory analytical test reports and c all inspection and maintenance service reports 6 6 The system is to be de sludged strictly in accordance with the manufacturer s recommendations and the sludge is to be disposed of in accordance with the Tasmanian Biosolids Reuse Guidelines and the conditions of permit 6 7 Only persons with a waste transport business Environment Protection Notice are to be engaged for the removal transporting and disposal of accumulated sludge removed from the system 6 8 Any waste material removed from the system must be collected and disposed of or utilised by an approved facility or agency 6 9 Measures are to be put in place so that during servicing activities all persons and the environment will be protected from the results of the servicing activities Date of issue 13 January 2012 Director Building
20. llowing results must be reported to the Director e Address of premises Date inspected and sampled e Sample identification number e Chlorine Residual e BODs e TSS E coli and e Service history 2 11 Where due to a design fault the system has been found not to operate satisfactorily during its service life and as a result requires modification to achieve the required water quality limits all installed systems are to be modified accordingly 2 12 When granting a permit the permit authority is to satisfy itself that the designer s choice of the system configuration is optimal for the proposed use and site conditions 2 13 The system must not be deployed to areas where seasonal climatic conditions will negatively affect its proper operation refer to manufacturer s specifications 2 14 Prior to the granting of a permit to install a system the following reports must be submitted with an application to the permit authority Site and soil evaluation report The site and soil evaluation report is to detail results of an assessment of the individual lot s for the public health environmental legal and economic factors which are likely to impinge on the location and design of a land application system Refer to AS NZS 1547 Clause 4 1 5 and associated appendices to 4 1 Design report The Design Report is to include the following a Relevant aspects of the Site and soil Evaluation Report b A report on the selection of the l
21. onents of the system including the associated land application system as appropriate The monitoring servicing and reporting of the installation must include but not be restricted to the following matters as appropriate a Reporting on weather conditions ambient temperature effluent temperature b Odour c Check and test pump d Check and test air blower fan or air venturi and clean replace air filters e Check and test alarm system f Check slime growth on membranes and report the on condition of membranes g Check and report operation of sludge return sludge level and de sludging h Check and record water meter reading if fitted i Check and record operation of irrigation area irrigation fittings Check and clean replace irrigation filters k Check and report on water quality testing for pH Turbidity EC and dissolved oxygen Check and replenish chlorine disinfection system m Cleaning of the following items at above the waterline l clarifier Il pipework Ill valves IV walls of chambers Performance Hydraulic and Organic Loading The system is accredited for treatment of domestic wastewater from residential and commercial premises with the following MAXIMUM hydraulic and organic loads Model Hydraulic load L day Biochemical Oxygen Demand g day Fuji Clean CEI 500EX 1500 700 Date of issue 13 J 2012 Director Building Control W Edi dvi dele
22. the supplier of the system or plumbing contractor 4 3 The owner must enter into an agreement with the council to maintain the maintenance contract where that contract is with the supplier of the system or other council approved plumbing contractor 4 4 The system must be operated and maintained to ensure it performs continuously and without any intervention between inspections carried out by the plumber Date of issue 13 January 2012 Director Building Control Oc delegate of Minister for Workplace Relations Page 9 of 17 Department of Justice Certificate of Accreditation BSRO0599 2012 4 5 4 6 4 7 4 8 4 9 4 10 5 0 5 1 A service report is to be prepared by the plumber who carried out the work detailing the inspection of the installation and the results of all servicing tests and conditions at the completion of all scheduled or unscheduled services or inspections The service report is to be accompanied by a signed document certifying that the system is operating and performing adequately A copy of the service report and certifying document is to be provided to the occupant and council Each service report is to contain a statement reminding the user about items and products that must not be placed in the system Each service must include monitoring the operation of the system and associated land application system Maintenance must be carried out on all mechanical electrical and functioning comp
23. tor of Building Control EC means electrical conductivity E coli means Escherichia coli of the family Enterobacteriaceae which is a bacterium used in public health as an indicator of faecal pollution g m means grams per cubic metre Manufacturer means Fuji Clean Pty Ltd N means Nitrogen NATA means National Association of Testing Authorities PCA means Vol 3 of the National Construction Code Plumbing Code of Australia Permit means a Permit issued by the council pursuant to section 82 of the Building Act 2000 Permit authority means a person or body authorised for that purpose by the council of the municipal area in which the on site waste water management system is installed Plumber means a person who holds an appropriate class of licence under the Occupational Licensing Act 2005 as a Plumber Practitioner Certifier Supplier means the party that is responsible for ensuring that products meet and if applicable continue to meet the requirements on which the certification is based The supplier for the Fuji Clean CE1500EX is Fuji Clean Pty Ltd System means Fuji Clean CEI500EX TPC means the Tasmanian Plumbing Code TSS means Total Suspended Solids Date of issue 13 January 2012 Director Building Control Ce delegate of Minister for Workplace Relations Page 5 of 17 Department of Justice Certificate of Accreditation BSRO599 2012 2 0 General 2 1 The s
24. ystem must be supplied constructed and installed in accordance with the design submitted and accredited by the Director 2 2 The system must not be installed in a plumbing installation other than in accordance with the conditions of permit issued by the Permit Authority 2 3 The system must not be used in a plumbing installation other than in accordance with the conditions of permit issued by the Permit Authority 2 4 Each system must be permanently and legibly marked on a non corrosive metal plaque or equivalent attached to the lid with the following information The brand and model name or designation of the system e The manufacturer s name or registered trademark e Top load limitations and The month and year of manufacture 2 5 The supplier must supply the owner and occupier of each installation with a user manual setting out the following a the treatment process b procedures to be followed in the event of a system failure c emergency contact number d care operation monitoring and maintenance requirements and e inspection and sampling procedures to be followed as part of the on going monitoring and program required by the permit authority 2 6 Any proposed modifications to the system s specified processes equipment materials fittings or manuals must have prior authorisation in writing from the Director and may be subject to additional verification or testing 2 7 Each application to a permit authority
Download Pdf Manuals
Related Search
BSR0599/2012
Related Contents
AOO11.2011 Manual de usuario Philips 190WV7 User's Manual Honeywell The Series 7020 Dissolved Oxygen Analyzer User Manual Pando I-1100 Dicota Reclaim 10-11.6 X-Rite D19C Standard > D19C Full Upgrade Samsung 40" LED SyncMaster ME40A LH40MEPLGC/EN Brugervejledning Copyright © All rights reserved.
Failed to retrieve file