Home
        Technical Manual
         Contents
1.                                                                              BE         CLOSED     CENTER          SERIES PARA  LSA TONG CLAMP m ESA BACKUP              A    1   1   1   j       1 LOAD  SENSE RETURN        PRESSURE a 1749        1          Y    THIS DOCUMENT IS THE PROPERTY OF SUPERIOR MANUFACTURING  amp   HYDRAULICS AND IS CONSIDERED CONFIDENTIAL  THIS INFORMATION  MAY NOT BE USED  DISCLOSED  COPIED  OR REPRODUCED IN ANY  FORM  WITHOUT THE EXPRESS WRITTEN CONSENT OF SUPERIOR  MANUFACTURING  amp  HYDRAULICS         SUPERIOR     Manufacturing  amp  Hydraulics    4225 HWY  90 EAST  BROUSSARD  LA 70518   318  837 8847    04 23 07                LOG  DATE    REF  anual Equip Manuals Dwgs   CLEBU2300 33 Schematic sh2 wpg                            TONG CLAMP  INTENSIFY    AIR SUPPLY  120 PSD  3 8    BACKUP CLAMP       INTENSIFY    Page 5 12       g     S                  HPU STOP N C    CONSOLE    BLACK    HPU START N O          MAINTAINED    MOMENTARY          240 IN    TO  CONSOLE    HPU CONTROL CABINET    WHITE  NEUTRAL                CONTROL CABINET  STOP N C       MOMENTARY      lt    gt              gt     onzo             CONTROL CABINET  START N O    MOMENTARY    3 PHASE POWER  480 VOLT    L1 L2 L3    TI T2 T       1               PILOT LIGHT RESET N O           5   E    ELECTRONIC          RELAY COIL  1 N O 120 VOLT  HOT FROM  40004  TRANSFORMER    LOW FLUID  LEVEL STROBE    FLOAT  1    LOW FLUID  LEVEL SHUTDOWN    FLOAT 42            RELAY COIL   2       
2.                                                            Cy                                                                                                                               22                                                 d                                                                               APPROX WEIGHT  lbs     13319       15  BUCKING UNIT   TYPE 3       SUPERIOR    SX P he  OVE RALL VI EW w Manufacturing  amp  Hydraulics  318  837 8847    THIS DOCUMENT IS THE PROPERTY OF SUPERIOR MANUFACTURING  amp        HYDRAULICS AND IS CONSIDERED CONFIDENTIAL  THIS INFORMATION  MAY NOT BE USED  DIS  D  COPIED  OR REPRODUCED IN ANY REV      LOG     DATE       FORM  WITHOUT  THE EXPRESS WRITTEN CONSENT OF SUPERIOR        MANUFACTURING  amp  HYDRAULICS                          Part Number Part Name  CLEBU15 A1 TONG HUB ASSEMBLY  CLEBU15 A2 TONG BODY ASSEMBLY  CLEBU15 A3 TONG BEARING RING HUB KEEPER ASSY   CLEBU15 A4 TONG SWIVEL ASSEMBLY  CLEBU15 A5 TONG GEAR MOTOR ASSEMBLY  CLEBU1519 SWIVEL KEEPER ASSEMBLY                                             r  8             APPROX  WEIGHT  LBS     5302       4225 HWY  90 EAST  AB SUPERIOR    S555 LA 70518       TONG ASSEMBLY w Manufacturing  amp  Hydraulics  318  837 8847  a a pre pr s THIS DOCUMENT IS THE PROPERTY OF SUPERIOR MANUFACTURING  amp  12 27 05  HYDRAUI         AND IS CONSIDERED CONFIDENTIAL  THIS INFORMATION  MAY NOT BE USED  DISCLOSED  COPIED  OR REPRODUCED IN ANY REV      LOG     DATE             ASSEMBLY 
3.                                  RIVETED IN  PLACE DURING  ASSEMBLY       DETAIL A  SCALE 1 6    APPROX  WEIGHT  LBS    422          HYDRAULIC JACK ROLLER SYSTEM Ah _ SUPERIOR 555555         i nauli  818  837 8847  BOLT ON ASSEMBLY Y Manufacturing  amp  Hydraulics        THIS DOCUMENT IS THE PROPERTY OF SUPERIOR MANUFACTURING  amp              HYDRAULICS AND IS CONSIDERED CONFIDENTIAL  THIS INFORMATION  MAT REV    LOG    DATE    ASSEMBLY NO  CB2020 01 uu               B O wpg                SECTION9 MOTOR SERVICE MANUALS    To request copy of Rineer Motor  Service Manuals  please contact     Superior Manufacturing  amp  Hydraulics  4225 Hwy  90 East   Broussard  LA 70518   Phone  337 837 8847   Fax  337 837 8839    www superior manf com    SUPERIOR Manufacturing  amp  Hydraulics  Inc   15  CLINCHER   BUCKING UNIT  Revision  01 06 Page 9        Page 9   2    Note  Some CLINCHER   Bucking Units feature Rineer Motors with two  rotor sections to provide greater output torque  Please contact SUPERIOR    Manufacturing  amp  Hydraulics for additional information concerning these  motors  spare parts  and replacement procedures        SUPERIOR Manufacturing  amp  Hydraulics  Inc   15  CLINCHER   BUCKING UNIT  Revision  01 06 Page 9   3    Page9 4    AIR DRIVEN  HYDRAULIC PRESSURE INTENSIFIERS    These optional air driven hydraulic pressure intensifiers boost  the hydraulic clamping pressure to levels greater than can be  produced using your main hydraulic power unit     Two intensifi
4.                       CARRIAGE    SPRING RETRACTION   db    SUPERIOR    FREI  STOP ASSEMBLY Manufacturing  amp  Hydraulics    APPROX  WEIGHT  LBS     60                                TE PET OF SUPERGA               ME  MAY NOT BE USED  DISCLOSED  COPIED  OR REPRODUCED IN ANY REV    LOG    DATE  AS SEMBLY NO CB 23 1 2 FORM  WITHOUT THE EXPRESS WRITTEN CONSENT OF SUPERIOR     MANUFACTURING  amp  HYDRAULICS        REF  S  Equip Manuals Dwgs   ICLEBU2300 30 CB2312 wpa       Page 8   19              g                        agar sos  38 1 6 X a 1 4  SHCS  4  REQD    6  REQD     JAW CLIP  P N  BUCST1508   2  REQD     DIE ADAPTER CLIP  P N  CLEBU1121   2  REQD     11 3 4  DIE  P N  CLEBU1175 XXXXX    P N  BUC15000 XXXXX    JAW CLIP  P N  BUCST1508   2  REQD     DIE ADAPTER  15    11 3 4     3 8  16 x 1 1 4  SHCS  P N  104 P N  BUA1500 11750    3 816 x 1 1 4  SHCS    1042 P N  1042   6  REQD      6  REQD             DIE ADAPTER CLIP DN    De Bee   8  REQD   2  REQD   8  REQD   DIE ADAPTER       P N  CLEBU9644 7 5 8    514    P N  BUA76 5500   7 5 8  DIE PN             387 16 x 1 1 4  FLAT SHCS       _ x     P N  BUC7625 XXXXX  4  REQD  P N  1036    4  REQD    DIE ADAPTER CLIP   P N  BUC7620    2  REQD     5 1 2  DIE  P N  BUC5500 XXXXX       Ab SUPERIOR    22570567    USSARD  LA 70518       DIE ADAPTER VARIATION         ns DOCUMENT IS THE PROPERTY OF SUPERIOR MANUFACTURING  amp              IRAULICS AND IS CONSIDERED CONFIDENTIAL  THIS INFORMATION REV     DISCLOSED  COPIEI      LOG 
5.                STROBE          1 8 LS STAMP  P N  amp                  ON NON CRITICAL SURFACE                   ON NON CRITICAL SURFACE    TAG  Description of Revision    P N  amp  MATLP O                         2   3       Dimensions are in inches    Remove burrs  amp  sharp edges with 1 64x45 max       Normality Squareness  amp  parallelism of machine surfaces             Machine diameters on a common centerline must be concentric       UNLESS OTHERWISE SPECIFIED TOLERANCES ARE    2 PLACE DEC  3 PLACE DEC    FRACTIONS   ANGLES   SURFACE   FLATNESS AR PL  b        4 020   005   1 16  5         015 per foot Manufacturing  amp  Hydraulics    4225 HWY 90 E  BROUSSARD LA 70518   337  837 8847       SUPERIOR     PART NAME  ELECTRICAL  SCHEMATIC  Machined fillet rodii are 1 32       PART       IDRAWN BY  MFG Matl Req      002 per inch  to           of  012 inches for    single surfoce  MATERIAL SPECIFICATION         within  005 T I R  amp  unmachined diameters concentric within  032 T I R       THIS DOCUMENT IS THE PROPERTY OF SUPERIOR MANUFACTURING  amp  HYDRAULICS AND IS CONSIDERED  CONFIDENTIAL  THIS INFORMATION MAY NOT BE USED  DISCLOSED  COPIED  OR REPRODUCED IN ANY FORM   WITHOUT THE EXPRESS WRITTEN CONSENT OF SUPERIOR MANUFACTURING  amp  HYDRAULICS             ZAG   Revision No        5                                        Zero     Critical Dimension 100  Inspection Required            APPROVED BY  DSB Initial Condition            BY NM DATE  4 9 07          Mots    1 o
6.         N          N                   CAEN                       DETAIL A  TO BE RIVETED IN SCALE 1 6  PLACE DURING   ASSEMBLY       APPROX  WEIGHT  LBS    1073       HYDRAULIC JACK ROLLER SYSTEM db SUPERIOR EEE   STAND ALONE ASSEMBLY        zan    THIS DOCUMENT IS THE PROPERTY OF SUPERIOR MANUFACTURING  amp   HYDRAULICS AND IS CONSIDERED CONFIDENTIAL  THIS INFORMATION REV  4 LOG 4 DATE    MAY NOT BE USED  DISCLOSED  COPIED  OR REPRODUCED IN ANY  ASS EM BLY NO CB201 0 01 RM  WITHOUT THE EXPRESS WRITTEN CONSENT OF SUPERIOR REF  P  Manuals Equip Manuals Dwgs     FOI U  MANUFACTURING  amp  HYDRAULICS  CB2000 01 CB2010 01 S A wpg                                     vz   8                                                    Item     Qty  Part Number Part Name  1 1  CB2001 01 HYDRAULIC JACK UPPER SECTION  2 2      2003 ALL THREAD WELDMENT  3 2  CB2004 01 SCALE FOR HYDRAULIC JACK  4 1  CB2005 CLEVIS PIN 1 1 4  x 6 1 2   5 2  CB2006 ROLLER MOUNTING PLATE  6 1  CB2007 BULKHEAD PLATE  7 2  CB2008 HEAVY DUTY BALL TRANSFER UNIT  8 2  CB2011 FIXING CLIP FOR BALL TRANSFER UNIT  9 1      2014 CLEVIS PIN 1 1 4  x 7 5 8   10   1  CB2022 01 HYDRAULIC JACK LOWER SECTION BOLT ON  11   1  CB2023 CYLINDER 4  BORE 8  STROKE 2 1 4  ROD  12   14  1027 3 8  LOCKWASHER  13   14  1047 3 8  16 x 1  HHCS  14   6  272 3 4  16 JAM NUT  15  2  6009 HAIRPIN COTTER PIN 0 243 F  1 1 8    1 1 2  ROUND  16   2  6WFTX MALE BULKHEAD CONNECTOR 37   FLARE NPTF  17  1  BUC5524            CHECK VALVE     NOTSHOWN    Y 
7.         REF  P  Manuals Equip Manuals Dwgs   CLEBU1501 CLEBU15 A5 rev1 wpg          L 6   8                                                                                                                                              Item    Qty   Part Number Part Name  1  1 CLEBUI517  GEAR HOUSING COVER PLATE  2 1 CB11753015   REAR BEARING HOUSING  3  1 CB1538 BEARING COVER WELDMENT  4  1 1902 BEARING P N MRC5308MZZ  5  1     2219 BEARING SPACER  AN 6  1 CB2215 PINION SHAFT  S  N    7  11    2216 MIDDLE GEAR  aD 8  1 CB2218 BEARING SPACER     al    9 111905 BEARING        VER   10 1 CB11753014 FRONT BEARING HOUSING  11  111319 1 1 4  FLAT WASHER  12 1225 1 1 4 7 HEX NUT    13 1     1539 MOTOR ASSEMBLY      2  14  41155 5 8 11 x 2 SHCS  00 15 12141 3 8  16 X 1 3 4  HHCS  16 4256 5 8  11 X 1 1 4  SHCS   18  17  2 CLEBU9654   1 2 13X 5 1 2  ALL THREAD  N    18  41101 NUT  HEX  1 2 13    A I    A 19  411103 1 2  LOCKWASHER  5            APPROX WEIGHT  lbs     506           SUPERIOR  FORO       TONG DRIVE ASSEMBLY NO ENCODER Sy Manutacturing  amp  Hydraulics  318  837 8847  a      DATE  ASSEMBLY NO  CLEBU15 A6 MEW OUT TE                              2 6   8                                      Vi        lt       JU J          TONG DRIVE ASSEMBLY       ASSEMBLY NO  CLEBU15 A7       Item               Number    Part Name                                                                                           1 1 CLEBU1517           HOUSING COVER PLATE  2  1 CB11753015   REAR BEARIN
8.     RELEASE INTENSIFY INTENSIFY         3 8   O  3 8  O  3 8   Y  88  O  3 8      3 8      BUCKING UNIT Type Three  HYDRAULIC SCHEMATIC    INCLUDES JACK ROLLER  Page 5   7       BACKUP            Qty   Part Number  CB11440               PVG 120 32  5  VALVE  TONG CONTROLS       _    CRSS20009    RELIEF VALVE  REMOTE  PANEL MOUNT       CB11041    AIR FILTER   REGULATOR       CB11045    BALL VALVE  PANEL MOUNT       BAC 30025RCFF   GAUGE 300 PSI  PANEL MOUNT       B11048    HYDRAULIC MOTOR  DUAL SPEED       B11043    DUAL SPEED MANIFOLD       CLEBU1709    HYDRAULIC SWIVEL                                   N    CLEBU1660    ROTARY SEALS  4 PCS   1 SET        3P0 008    CLAMPING MANIFOLD ASSEMBLY  INCLUDES          17 B3P0 001    CLAMPING MANIFOLD  CLOSED HEAD        17 B3P0 005    RELIEF VALVE       17 B3P0 004    PILOT OPERATED CHECK VALVE       17 B3P0 003    SEQUENCE VALVE W  REV CHECK       1  2  1  1  1  1  4  1  1  1  1  1  1    17 B3P0 002    FLOW DIVIDER   COMBINER          3         5  25           PRESSURE GAUGE  0 5000    TONG  BACKUP  CONSOLE       2  BULJ4035    M 71 HASKEL PUMP  INTENSIFIER OPTIONAL     TONG  BACKUP       3  BUC5524    PILOT OPERATED CHECK VALVE    BACKUP  JACK       RELIEF VALVE    BACKUP       RELIEF VALVE SPRING KIT  WHITE     BACKUP       2070    DUAL PILOT CARTRIDGE VALVE  DUMP VALVE    TONG  CONSOLE       58058 S  CM4565    SOLENOID VALVE NOR  CLOSED  CHECK VALVE    CONSOLE  TONG  BACKUP       CB2023    JACK   ROLLER    CYLINDER 4  BORE  8  S
9.    DATE             FOR CYLINDER ASSEMBLY CLEBU1514 ee          L     5 225                   ALUMINUM DIES CLEA1175 XXXXX     13 625                                                                                      NOTES    1 BORE TO DESIRED         NOMINAL PIPE DIA     035 MIN     040 MAX   2 SAW CUT 7 X 15 TOOTH SECTIONS TOOTH ON CENTER    3 SAW CUT 1 X 3 TEETH TOOTH ON CENTER  SCRAP     4 STAMP PART NUMBER AND PATENT NO S 4576067  amp  5911796   EXPLANATION OF PART NUMBER  BUCL5500   BASE     XXXXX    THREE PLACE DECIMAL DIE SIZE EQUIVALENT  DECIMAL OMITTED    e g   05500   5 1 2      I     5 225                                       ALUMINUM DIES BUCA7625 XXXXX   SIZES 2 3 8   7 3 4      8 875 OD      5 225   5 220  B  NOTE 4           SIDE VIEW END VIEW  NOTES   NOTE 3    1 BORE TO DESIRED 1     NOMINAL PIPE DIA    035 MIN    040 MAX    2 SAW CUT 4 X 16 TOOTH SECTIONS ROOT ON CENTER    3  SAW CUT 1 X 6 TOOTH SECTION  SCRAP     4  STAMP PART NUMBER AND PATENT NO S 4576067  amp  5911796   EXPLANTATION OF PART NUMBER  BUCL5500   BASE     XXXXX                 MN  DIE SIZE EQUIVALENT  DECIMAL OMITTED    5  TOOTH MILL NOT REQUIRED FOR BUCKING UNITS     Page 8   21                m 1              SECTION A A                            SECTION             AB SUPERIOR     y Manufacturing  amp  Hydraulics    4225 HWY  90 EAST  BROUSSARD  LA 70518   318  837 884          Ins DOCUMENT IS THE PROPERTY ror SUPERIOR                  i    THE N CONSENT OF SUPERIOR  MANO ACTURING  a
10.   50000 ft Ibs max    Parallel Mode   9  High Speed   Low Torque 6 rpm max    50000 ft Ibs max   Low Speed   High Torque 3 rpm max    100000 ft Ibs max    Dies per Tong or Backup    3 each  6 total   Drive Type Hydraulic   Number of Drive Speeds 2   Max  Hydraulic Power Unit Operating   Pressure  psi  3 000   Max  Clamping Pressure  psi    Intensified using air operated pump   4 500    SPECIFICATIONS for  CLINCHER   BUCKING UNITS  TOOL SIZE 15    Unit Style  CLEBU 1500 30  Type HI Unit  w  LOCKJAW     Backup                      Backup Torque Gauge Handle 35              Min Tubular OD  in     2 062   Max Tubular OD    in  15 000    Standard Torque Rating      ft Ibs   CLEBU1500 30 50 000    Dies per Tong or Backup Y 4                            Drive Type Hydraulic             Number of Drive Speeds 2       Max  Hydraulic Power Unit  Operating Pressure  psi                 Max  Clamping Pressure  psi   Intensified using air operated pump          Important Notes     Handle length is based on use of 8 75  OD  see illustration of Tandem Load  Cell Retainer   Reduction from Pinion Shaft  where encoder is attached  to  Ring Gear is 8 308 1  Small diameter electronic loadcells may require a  bushing or mounting plates to maintain 35  handle length  If diameter of  loadcell changes  handle length will change     The maximum tubular OD is the limit ofthe diameter which can be handled in  this unit  The end user should carefully review the maximum diameter of the  coupling for the t
11.  3  1   73007          FOLLOWER RACE    4   1   1257 1 4  DRIVE ZERT       APPROX  WEIGHT  LBS     1920 553   In AR     SUPERIOR_ BROUSSARD  LA Sosis  w Manufacturing  amp  Hydraulics  318 837 8847   BACKU P ASSEM B LY 01 03 06    THIS DOCUMENT IS THE PROPERTY OF SUPERIOR MANUFACTURING  amp   HYDRAULICS AND IS CONSIDERED CONFIDENTIAL  THIS INFORMATION  MAY NOT BE USED  DISCLOSED  COPIED  OR REPRODUCED IN ANY REV   LOG   DATE    AS S E M B LY N O    B U CS 1 50 00  0 1 FORM  WITHOUT THE EXPRESS WRITTEN CONSENT OF SUPERIOR BUS 5000 01 be   wen ren                                  ZL  8                          Part Number  BUCST1508       3 1  BUCS15017 OUTSIDE DOOR WEDGE  5 1  BUCS15033 CYLINDER JAW  7 1        515035 CYLINDER KEY  a  1  CLE18504 PISTON  3 8  16 x 1 1 4  SHCS  11 2  1208 3 4  10 x 6  SHCS  12 3 4  10 x 7  SHCS    3 4  10 x 1 1 2  SHCS  3 4  10 x 2 1 4  SHCS               Qty   1    Part Name                               CYLINDER ASSEMBLY    ASSEMBLY NO  BUCS15006 01    STROKE   9 800          7   lt       ALL                                                       B  SECTION A   A  POLYPACK SEAL  3 1 8 x 3 1 2 x 3 16    ZZ ZX    WEAR BAND  P N  18703125 NY PIN  W52500625     N     ROD WIPER 5   77 f    P N  959 45  k s  ss      22222222234         31206375 POLYPACK SEAL POLYPACK SEAL    6 1 2 x 7 1 4 5  5 1 2   1 4  P N  25006500 P N  25005000  DETAIL B    SEAL KIT P N  ASAP2350  APPROX  WEIGHT  LBS     396 532       Ab    SUPERIOR_ BROUSSARD   A 70518  Y Manuf
12.  3 4    BB1500 xxxx GRIT FACEM dies  contact Superior  f  size availability     Note when using dies on tubulars with OD of 11 3 4  or less it  Is necessary to install reducing adapters in the bucking unit  cylinder   Die Adapter 15  11 3 4  P N BUAIS5 11750A   15  10 3 4  P N BUA15 1075A and Die Adapter 15  8 5 8   P N BUA15 8625A    The adapters will accommodate smaller  sizes listed below    CLEBU1175 xxxx fine toothed steel dies available in sizes  from 11 3 4  to 7 5 8    aluminum dies available in sizes from  11 3 4  to 7 5 8    GRIT FACE    dies available in sizes  from 11 3 4  to 7 5 8     CLEA1175 xxxx    BB1175 xxxx    SUPERIOR Manufacturing  amp  Hydraulics  Inc   15  CLINCHER   BUCKING UNIT  Revision  07 07    Page 3 3    BUC7625 xxxx fine toothed steel dies available in sizes  from 7 5 8  to 2 1 16    aluminum dies available in sizes from  7 5 8  to 2 1 16    GRIT FACE M dies available in    sizes from 7 5 8  to 2 1 16     BUCA7625 xxxx    BB7625 xxxx    ORDERING EXAMPLE  Fine toothed steel dies are needed  to makeup 8 5 8  OD casing with 9 5 8  OD couplings    Qty  Req   d  Six pieces BUA1500 11750   for tong and backup assembly    and   Qty  Req   d  Three pieces BUC1175 9625   for tong assembly    and   Qty  Req   d  Three pieces BUC1 175 8625   for backup assembly      Replace xxxx with size req   d in inches     Contact SUPERIOR Manufacturing  amp  Hydraulics  Inc   for information concerning availability of stock and special  die sizes     Page3 4       Adj
13.  BAC 3M25RCFF    2  3    2 PU4060 S3    Description  PRESSURE GAUGE  0 3000  HIGH PRESSURE FILTER       24 PU7560 S1    ELECTRIC MOTOR       25 PU2500 15    CHECK VALVE       28  29  30A    PU4060 S20  PU2500 H19  PU2500 H15       nm   ja fa  a    HYDRAULIC PUMP  SUCTION STRAINER  RETURN FILTER             30B         K3          REPLACEMENT CARTRIDGE          I 0 3000 PSI  AN  Y     1           LOAD SENSE     PRES  URE  989 45  J             1  1  1  1  1  1        lt  gt      1  1  1  1    um     w Tus Lm  m rh 1          e         61             EATON PVHI31 W TORQUE LIMIT  amp  LSob  PVHI31RO2AF 30E2520090014A0104  800 IN3 REV   COMP  SET   3000 PSI   DELTA P SET 8 300 PSI  TORQUE LIMIT SET   2300 PSI   45 Kw   1500 RPM                 SCHROEDER  55 25 100 3  SUCTION STRAINER    RETURN     1 45    SCHROEDER  RT 2K10 P24 NN Y2  RETURN FILTER                      HYDRAULIC POWER UNIT  SCHEMATIC       AB __SUPERIO    Manufacturing  amp  Hydraulic    4225 HWY  90 EAST  BROUSSARD  LA 70518  s  318  837 8847       THIS DOCUMENT IS THE PROPERTY OF SUPERIOR MANUFACTURING  amp   HYDRAULICS AND IS CONSIDERED    ED IN ANY    MAY NOT BE USED  DISCLOSED  COPIED  OR REPRODUCE  E  ITTEN CONSENT OF SUPERIOR    FORM  WITHOUT THE EXPRESS WRI  MANUFACTURING  amp  HYDRAULICS        CONFIDENTIAL  THIS INFORMATION    6 5 09                   REV    LOG    DATE             Page 11 5       Page 11 6    
14.  NO  CLEBU15 A4  ASSEMBLY NO  CLEBU15 A3          Part Number  CLEBU1520 SWIVEL KEEPER WELDMENT    2 8  1171 3 4  LOCKWASHER  3 8  1173 3 4  10 x 1 3 4  HHCS  4    1  CLEBU1730 S1 _   SWIVEL KEEPER PLATE                   APPROX  WEIGHT  LBS     49    SWIVEL KEEPER ASSEMBLY       ASSEMBLY NO  CLEBU1519 Ab SUPERIOR    SS LA 70518    Y Manufacturing     Hydraulics  318  837 8847    THIS DOCUMENT IS THE PROPERTY OF SUPERIOR MANUFACTURING  amp  01 03 06             HYDRAULICS AND IS CONSIDERED CONFIDENTIAL  THIS INFORMATION REV    LOG  DATE             MAY NOT BE USED  DISCLOSED  COPIED  OR REPRODUCED IN ANY  FORM  WITHOUT THE EXPRESS WRITTEN CONSENT OF SUPERIOR REF  PaManuals Equip Manuals Dugs   MANUFACTURING  amp  HYDRAULICS  ICLEBU1501 CLEBU15 A3 8  4 CLEBU1519 wpg          Page 8   10    LL   8                                                   Item     Qty  Part Number Part Name  1 2  BUCDP9618 DOOR PIVOT BUSHING  2 10  BUCS11825 01 CAM FOLLOWER ASSEMBLY  3 1  BUCS15005 OUTSIDE DOOR ASSEMBLY  4 1  BUCS15006 01 CYLINDER ASSEMBLY  5 8  BUCS15012 CYLINDER GUIDE  6 1  BUCS15015 INSIDE DOOR ASSEMBLY  7 2  BUCS15021 BACKUP PIVOT PIN  8 1  BUCS15101 TOP PLATE WELDMENT  9 1  BUCS15102 BOTTOM PLATE WELDMENT  10   2  BUCS23103 LOADCELL BRACKET WELDMENT  11 9  BUCS23104 SPACER  12 48  1171 B 1 2  18 x 1 1 2  SHCS             CAM FOLLOWER ASSEMBLY NO  BUCS 1 1825 01             Item 4  Qty   Part Number Part Name  1   1   73009 FLANGE BUSHING  2   1         511825  CAM FOLLOWER STUD    
15.  PAN CEN DET INTENSIF INTENSIFY  PIN        1048     _ DO NOT INTENSIFY  REMOTE OPERATED PRESSURE 2  REGD  PRESSURE UNLESS  RELIEF VALVE CONTROL PIPE IS IN PLACE  P N  CRSS20009    5                 QD EM qu cbe        DIRECTIONAL CONTROL    SUPERIORES ar    MANUFACTURING RIESEN  AND HYDRAULICS  ST PIN     Bit 081 EMERGENCY    U  START LEGEND ON OFF SHUTDOWN p HANDLE F PVG VALVE    P N  CB11422   6  REQD     P N  CB11082 e    STOP BUTTON   P N  CB11080   STOP RED LEGEND  P N  CB11083          UCAO  PU    5000_     gt  535 0    C                            2020     5000     039 0                            SUPERIOR    502        in    amp  Hydrauli     CONTROL PANEL Manufacturing  amp  Hydraulics  un    TNDRAUIESAND IS CONSIDERED CONFIDENTIAL  THIS INFORMATION  D  DI ED  COPIED  OR    ICED IN ANY REV    LOG  DATE    IED  OR REPRODUCED  FORM  ESS WRITTEN CONSENT OF SUPERIOR REF  P  Manuals Equip Manuals Dwgs   MANUFACTURING  amp  HYDRAULICS  CLEBU1500    30 Control Panel wpg                               9                 Part Number  CB11410  CB11440    CONTROL CONSOLE WELDM  W PIPE JACK CONTROLS    DIRECTIONAL CONTROL VALVE PVG120   5  PVG32       CB11410 S3    CONTROL PANEL BACK PLATE       CB11412    CONTROL PANEL COVER PLATE       CB11413    CONSOLE BOLT ON PLATE WELDMENT  TORQUE COMPUTER MOUNT WELDMENT       3 8  LOCKWASHER     4  1048  386 x 1 1 4  HHCS       BAC 30025RCFF    1  CB11029 TAG  DO NOT INTENSIFY PRESSURE UNLESS PIPE IS IN PLACE   2  CB11045 PANEL MOUNT BALL 
16.  Restart HPU     33  Actuate backup clamp valve lever to retract clamping  cylinder and open the backup  Release lever and  allow it to return to the neutral position     34  STOP HPU using switch on console     SUPERIOR Manufacturing  amp  Hydraulics  Inc   15  CLINCHER   BUCKING UNIT  Revision  04 07    Page4 4    35  Install test sub in bucking unit with midline of  coupling approximately adjacent to end of dies in tong  to avoid clamping on female thread to be made up     36  Insure test sub is level  positioned vertically on  center in tong and aligned with centerline of the  bucking unit     37  RESTART HPU     38  Actuate tong clamp valve lever to extend clamping  cylinders and clamp on the test sub s coupling   System pressure should rise to approximately 2500  psi or pressure established by operator for specific  tubular application  CAUTION  Use minimum  clamping pressure possible to avoid possible  crushing damage to tubular goods  Release the  lever and allow it to return to the neutral position     39  Actuate backup clamp valve lever to extend  clamping cylinder  System pressure should rise to  approximately 2500 psi or pressure established by  operator for specific tubular application  CAUTION   Use minimum clamping pressure possible to avoid  possible crushing damage to tubular goods   Release lever and allow it to return to the neutral  position     40  NOTE  Ifusing smooth aluminum dies or if slippage  is experienced  torque capability may be increased  by u
17.  and INSTRUMENTATION    Visually confirm proper backup position before activating its  dies  Close the backup jaws on the pipe using the Backup Jaw  DCV  Release Backup Jaw DCV and allow it to return to its  center position  The height of the backup assembly has been  adjusted at the factory to position its centerline at the same  elevation as the tong assembly s centerline and should not  require further adjustment     CAUTION  Activating the jaws or applying torque with  improperly closed jaws could result in mechanical damage or  injury to personnel  Improper clamping can occur if the pipe  is incorrectly positioned within the CLINCHER BUCKING  UNIT or if the improper combination of dies and pipe  diameters are used     CONSIDERATIONS WHEN APPLYING TORQUE TO  TUBULARS    The application of torque to a tubular by a tong or similar  devise requires a backup tong  vise or wrench to generate a  reactive torque  When this reactive torque must pass through a  single point  such as a load cell  an unbalanced force is  created  If the tubular is sufficiently slender  its OD is small  relative to its length  or if torques are high  the tubular may be  seen to deflect under this bending load  To minimize the  consequence of this bending it is important the backup be  positioned as closely to the tong as possible     SUPERIOR Manufacturing  amp  Hydraulics  Inc   15  CLINCHER   BUCKING UNIT  Revision  04 07    Page 5  3    MAKEUP PROCEDURE    Insure jaws are fully extended and clampe
18.  jaws  die adapters and dies required for a  Fine Tooth Steel Dies  GRIT FACE    Dies and Aluminum specific tubular OD are also described in this section of the  Dies  manual     P N P N  Straight   Diamond  Thickness   Width   OAL Tooth Tooth     39 114 378  pres             Available upon request     II                   NNN    P N P N  Straight   Diamond  Thickness   Width   OAL Tooth Tooth                  STRAIGHT TOOTH DIAMOND TOOTH    Note  Diamond Tooth Dies are used when a more    aggressive bite 1s required        SUPERIOR Manufacturing  amp  Hydraulics  Inc   15  CLINCHER   BUCKING UNIT  Revision  01 06 Page3 1    CLINCHER   WRAP AROUND DIES    CLINCHER   wrap around dies are available in three types     Fine Toothed Steel Dies  for low to ultra high torque appli   cations on carbon steel tubulars including tubing   casing and drill pipe    Smooth Faced Aluminum Dies  for low to moderate torque  applications on fiberglass and corrosion resistant  alloy  stainless steel  tubulars    GRIT FACE    Dies  for low to high torque applications on  fiber glass and corrosion resistant alloy  stainless  steel  tubulars where the use of steel dies is  prohibited as well as on carbon steel tubulars where  reduced marking is desired    CLINCHER   Bucking Units utilize wrap around dies to  maximize pipe coverage allowing maximum torque  transmission while minimizing marking and virtually  eliminating the possibility of deforming the pipe  These tools  have 3 or 4 jaws which accep
19.  to a level which can cause  burns     WARNING  Personal protective gear including safety  glasses  face shields  protective gloves and protective clothing  must be worn to guard against the hazards of high pressure  fluids  Tight fitting clothing is required to prevent  entanglement in rotating components  These units should be  serviced by thoroughly trained and qualified hydraulic  technicians using procedures to safely insure hydraulic  pressure 15 bled from these circuits     No attempt should be made to operate the CLINCHER    Bucking Unit for any purpose other than which it is intended   This system is capable of generating very large clamping  forces and torsional loads which  if improperly applied or  controlled  could result in damage to the tubular  to the  Bucking Unit  or could possibly result in injury or death of  personnel  Do not attempt to operate the unit without correct  dies and the proper size tubular being in the tong and backup  sections of the Bucking Unit  See Section 3 for more  information concerning the selection and use of dies     CAUTION  Operating this equipment without the correct  size  type  and orientation of dies can result in damage to the  equipment or tubulars being handled     WARNING    TWO TROLLY SHIPPING BRACKETS  TWO BACKUP SHIPPING HOLD DOWN BOLTS AND TWO  BACKUP SHIPPING SPACERS MUST BE REMOVED BEFORE ATTEMPTING TO OPERATE THIS  BUCKING UNIT  THESE COMPONENTS ARE PAINTED YELLOW AND PICTURED BELOW   Failure to remove these compon
20.  to approxi   mately 2500 psi or pressure established by  operator for specific tubular application   CAUTION  Use minimum clamping pressure  possible to avoid possible crushing damage to  tubular goods  While holding the control valve  lever in the clamp position  rotate the backup  clamp intensify valve allowing air pressure to  drive backup booster pump  Pressure will rise in  the backup to approximately 3500 psi and can be  observed on the pressure gage in the backup   Release the lever and allow it to return to the  neutral position     d  Return tong and backup intensify valves to the  off position     41           Shift mode valve lever to  LOW  position  Note   Connections requiring a large number of turns can be  rotated in  HIGH  mode to reduce makeup time   Connections requiring makeup torques greater than  50  of the Bucking Units maximum torque rating  will require shifting to    LOW    mode to complete  makeup to final torque     42            Slowly shift motor valve lever from neutral to     MAKEUP    position and allow the unit to rotate  until desired makeup torque is observed on the torque  gage  Immediately release the motor valve lever and  allow it to return to the neutral position to avoid  over torquing the connection  Alternately hold the  motor valve lever in the  MAKEUP  position until  the torque turn computer system reads the required  makeup torque and opens the dump valve to stop  rotation  Immediately release the motor valve  control and allow 
21. 003 SEQUENCE VALVE W  REV CHECK  17 B3P0 002 FLOW DIVIDER   COMBINER                  _                                                    N                      1  2  1  1  1  1  4  1  1  1  1  1  1          3         5  25           PRESSURE GAUGE  0 5000 TONG  BACKUP  CONSOLE  I 2  BULJ4035 M 71 HASKEL PUMP  INTENSIFIER OPTIONAL  TONG  BACKUP  3  BUC5524 PILOT OPERATED CHECK VALVE BACKUP  JACK  RELIEF VALVE BACKUP    RELIEF VALVE SPRING KIT  WHITE  BACKUP  DUAL PILOT CARTRIDGE VALVE TONG    19  1  58058 5 SOLENOID VALVE NOR  CLOSED CONSOLE  i 22   2  CB2023 CYLINDER 4  BORE  8  STROKE  2 1 4  ROD JACK                                                 JACK   ROLLER                            I        I  I  I  I                 I  I  I  I  1        1                                 I                    Bt                                                                                x             EENE                        zes      a            gt  2  MOTOR A  MOTOR B CASE DRAINI HIGH GEAR LOW GEAR TONG TONG BACKUP  BACKUP TONG BACKUP REAR JACK REAR JAC   17   1   ver   3 8    3 8   CLAMP_  RELEASE CLAMP     RELEASE INTENSIFY INTENSIFY UP DOWN      3 8         3 8       3 8                   38           88   3 8   o  3 8                        4225 HWY  90 EAST  B UCKI NG U NIT Ty pe Three ab    SUPERIO R_ BROUSSARD  LA 70518  ww Manufacturing  amp  Hydraulics  318  837 8847  H Y D R AU LI C S C H E M ATI C THIS DOCUMENT IS THE PROPERTY OF SUPERIOR MANUFACTURING  amp  01 09 
22. 06                                       O    pRMnn            MT     M              HYDRAULICS AND IS CONSIDERED CONFIDENTIAL  THIS INFORMATION REV    LOG   DATE  FORM WITHOUT THE EXPRESS WRITTEN CONSENT OP SUPERIOR  REE P Manuals Equip Manuals Dwg  INC LU D ES JACK ROLLE R MANUFACTURING  amp  HYDRAULICS  GLEBUIS0030 Schematic Shtt                                5 9                         6 8 6 5 8 8 8 58 5 8 5 FE 8                    TONG TONG BACKUP BACKUP FWD  JACK FWD  JACK REAR JACK REAR JACK TONG BACKUP  MOTOR Aj  NOTRE B CASE  DRAINI        GEAR          GEAR CLAMP  RELEASE CLAMP  RELEASE      DOWN UP DOWN INTENSIF INTENSIFY    G en         Ge    q 85             Ge    8 8   48 85  3 85               1  MAKEUP   A B   BREAKOUT HIGH   A B   LOW CLAMP     B   RELEASE CLAMP      B   RELEASE FORWARD          REVERSE FORWARD  A B  REVERSE   V V  PVB 120 PVB 32 PVB 32 PVB 32 PVS 32 A A       CASE DRAIN  4 0      LDAD SENSE   378            IE                                                                   17    PRESSURE       TONG MOTOR                 a          ze    Ly ve  DN 9       IS      av       c                    lt              LSB  MOTOR SHIFT       TONG CLAMP       CUNT RUL CUNSULE    LSB  BACKUP CLAMP          LSB  FWD  JACK                LSB  REAR JACK       BUCKING UNIT Type Three  HYDRAULIC SCHEMATIC  INCLUDES JACK ROLLER    Page 5   10          FIGURE 2          Ad SUPERIOR     4225 HWY  90 EAST  BROUSSARD  LA 70518    Manufacturing  amp  Hydraulics  
23. 318  837 8847          THIS DOCUMENT IS THE PROPERTY OF SUPERIOR MANUFACTURING  amp   HYDRAULICS AND IS CONSIDERED CONFIDENTIAL  THIS INFORMATION  MAY NOT BE USED  DISCLOSED  COPIED  OR REPRODUCED IN ANY   FORM  WITHOUT THE EXPRESS WRITTEN CONSENT OF SUPERIOR  MANUFACTURING  amp  HYDRAULICS     01 09 06          REV          LOG   DATE          REF  P Manuals Equip Manuals Dwgs        CLEBU1500 30 Schematic Sht2 wog       Documentation INT 10 x    Functional description   The INT 10 is a signal converter which converts standardized industrial signals into a  potentiometric signal  as is required by a Danfoss proportional valve    The INT 10 can be delivered in four models  depending on the control signal      Model    Control signal  INT 102  0 20mA  INT 0 3  0 0            4  20 mA   10   10 V                      Connecting information   The INT 10 and the Danfoss valve share the same power supply  just like a common  potentiometer    For the INT 10 the same rules are valid for connecting cables as it is with a potentiometer   see connection diagram at the back of this page     The supply cables will go directly from the battery to the Danfoss valve and then from the  Danfoss valve to the INT 10  Further the   and   wires between the Danfoss proportional  valve and the INT 10 have to be the same diameter and the same length     Specifications    Less than 196 deviation      9   30 VDC  max  200 mA    Ambient temperature ETT    Mounting                             Cable conn
24. 9 activator   Loctite 542 thread sealant   Never Seez   150 gallons of premium hydraulic oil  Texaco Rando HD   68 or equivalent  as well as means to transfer and pre    filter the oil from barrels to hydraulic power unit reservoir   Grease gun and grease specified in bucking unit techni    cal manual   If anchor bolts are not pre installed in concrete slab   Hammer drill and drill bits  3 4  diameter x 6  long or equivalent anchor bolts   nuts  and locknuts          Electrical Checklist    0 Electrical cable     Q Electrical conduit      1 Misc  electrical parts to supply point to bucking unit        At minimum  install at least one  1  6    long  2 meter   ground rod to earth the hydraulic power unit and  2AWG  ground wires for use between the hydraulic power unit   control console  and bucking unit  NOTE  These items  are not supplied as local electrical codes may dictate  other means       1 Wire cutters    1 Wire strippers      Volt   OHM meter    1 110 240 VAC 50 60Hz Uninterruptable Power Supply   UPS  with electrical filter and surge suppressor for  WinCATT system and printer      NOTE  Power to PLC  solenoids  and proportional  controller should be provided from a clean source   not direct from a generator or mains where voltage  variation  surges  or outages are frequent     Air Hookup Checklist     1  CB11041 Regulator   filter    1  1480 Ball Valve   Fittings depending on proximity of unit from main line    current setup   Minimum 50 of air hose  length may vary d
25. AB SUPERIOR     oy Manufacturing  amp  Hydraulics    Technical Manual    15  CLINCHER      TYPE 3 BUCKING UNIT  Model Numbers CLEBU1500 30  amp   32          MODEL CLEBU1500 30   with console     MODEL CLEBU1500 32    CLINCHER Electrically Driven    Hydraulic Power Unit    Model PU7560  1800 RPM  60 Hz  75 HP  3000 PSI  60 GPM    AB SUPERIOR     w Manufacturing  amp  Hydraulics    Technical Manual    15  CLINCHER     TYPE 3 BUCKING UNIT  Model Numbers CLEBU1500 30  amp   32    CLINCHER Electrically Driven    Hydraulic Power Unit    Model PU7560  1800 RPM  60 Hz  75 HP  3000 PSI  60 GPM    TABLE OF CONTENTS    Hazard Warnings    Description  Illustrations  Specifications   amp     Certificate of Origin Conformance    Wrap Around Die Selection    Installation Instructions   Lubrication Specs    Operating Instructions  Controls  amp  Instrumentation     Hydraulic Schematic  Maintenance Instructions  amp  Trouble Shooting  Options and Accessories    Bucking Unit Component Illustrations    Motor Service Manuals    Hydraulic Pressure Intensifier Systems    Operating Procedures    Pump Service Manual and Technical Data                                    PR      TN   a          ha         Hydraulic Power Unit Parts List  amp  Illustrations    em  N    Control Valve Technical Data    HAZARD WARNING    Nomenclature used in this manual     WARNING Concerns an operating procedure or practice  that  if not strictly observed  can result in injury  to personnel or loss of life     Caution C
26. Air leak  Pump speed insufficient    Damaged or worn equipment    Pump not primed    Low or no flow from supply line    Hydraulic bypass valve malfunction    Insufficient Torque     A     B   C     D     E     E   G     H     Problem    Relief valve malfunctioning    Damaged or worn pump parts  Slow pump speed    Improper system fluid    Directional control valve set improperly    Damage to motor  Restriction of supply line  excessive back pressure    Defective gauge or load cell    SUPERIOR Manufacturing  amp  Hydraulics  Inc   15  CLINCHERO BUCKING UNIT    Revision  01 06    Solution    Check alignment  insure proper lubrication to non sealed  bearings     Solution   Clear supply line and check intake on reservoir   Add fluid to proper volume    Locate and repair leak    Assure proper pump speed for application     Isolate pump and check pressure to determine whether motor or  pump is defective  Repair or replace defective part     Check fluid viscosity and restrictions of intake line  Replace  fluid if inadequate for operating temperature     Check to assure couplings are securely fastened     Inspect   necessary     Adjust unloading pressure  Replace or repair as    Solution    Relief set too low  broken valve spring  contamination or  defective seals     Inspect  repair or replace   Assure proper pump speed for application     Check fluid viscosity and replace fluid if inadequate for  operating temperature     Check relief and directional control valve  Neutral should re
27. CB1175302101    2 1 4  x 1 8  FLAT WASHER  BEARING  3 8  16 x 2  HHCS                       1  7  1    2  1286 1 2  13 x 7  SHCS  CB11043 TWO SPEED MANIFOLD    CB11048    RINEER HYDRAULIC MOTOR       7 1            CLEBU1517  1174         CB2219    5 8  11 x 2  SHCS  5 8  11 x 1 1 2  SHCS  BEARING SPACER           GEAR HOUSING COVER PLATE       30028    90  SOCKET WELD FLANGE       3 4  10 x 2 1 4  HHCS       9    10 CB11753015 REAR BEARING HOUSING    11    2 CB11753014 FRONT BEARING HOUSING    1171    CB2216    3 4  LOCKWASHER        1 1 4  90    SOCKET WELD ELBOW  DUAL PILOT CARTRIDGE VALVE          MIDDLE GEAR          ENCODER MALE COUPLING   10 32 x 1 4  SET SCREW  ENCODER COUPLING MOUNT             1  13 1902 BEARING  14 CB11753021 MOTOR PINION GEAR    15                        la       1268    1 1 4  7 JAM NUT       16       a          1319 B       1 1 4  FLAT WASHER MODIFIED       TONG DRIVE ASSEMBLY       ASSEMBLY NO  CLEBU15 A5                  1 2  13 NUT  NOT SHOWN IN THIS ILLUSTRATION   ADDED 07 06 07        APPROX  WEIGHT  LBS     484          AB     SUPERIOR     Manufacturing  amp  Hydraulics    THIS DOCUMENT IS THE PROPERTY OF SUPERIOR MANUFACTURING  amp   HYDRAULICS AND IS CONSIDERED CONFIDENTIAL  THIS INFORMATION  MAY NOT BE USED  DISCLOSED  COPIED  OR REPRODUCED IN ANY  FORM  WITHOUT THE EXPRESS WRITTEN CONSENT OF SUPERIOR  MANUFACTURING  amp  HYDRAULICS        4225 HWY  90 EAST  BROUSSARD  LA 70518   318  837 8847    1 07 06 07          REV    LOG    DATE  
28. CKUP CLAMPING  MANIFOLD ASSEMBLY   PN  B3P0 008    TONG HUB ASSEMBLY    ASSEMBLY NO  CLEBU15 A1                                     Item   Qty  Part Number  Part Name  1  4     11753006  RING GEAR  36  108 TOOTH  2  1 CLEBU1502 HUB WELDMENT  3  2 CLEBU1514   CYLINDER ASSEMBLY  4  31 CLEBU1514 C  CYLINDER ASSEMBLY  5  16 1063 1 2 13 x 1 1 2 SHCS  6  1        5  25          5000 PSI GAUGE  7  3 1150 C  6 32 X 1 1 2  BRASS BOLT  8  31150     6 32 BRASS NUT  9  1 BULJ4035 A   HUB HASKEL PUMP ASSEMBLY                   APPROX WEIGHT  Ibs     1736          AB     SUPERIOR 555555485  tA 70518    Y Manufacturing  amp  Hydraulics  818  837 8847    THIS DOCUMENT IS THE PROPERTY OF SUPERIOR MANUFACTURING 8     04 13 09          HYDRAULICS AND IS CONSIDERED CONFIDENTIAL  THIS INFORMATION REV    LOG   DATE    MAY NOT BE USED  DISCLOSED  COPIED  OR  MANUFACTURING  amp  HYDRAULICS     REPRODUCED IN ANY  FORM  WITHOUT THE EXPRESS WRITTEN CONSENT OF SUPERIOR                      CYLINDER ASSEMBLY NO  CLEBU1514    CENTER CYLINDER ASSEMBLY NO  CLEBU1514 C                                                                   Item   Part Number Part Name  1 1      2302 51 CYLINDER ROD CB2302 81 CYLINDER ROD  2 CLEBU1515 CYLINDER JAW CLEBU1515 CYLINDER JAW  3 CB2304 CYLINDER CB2304 CYLINDER  4 BUCS15035 CYLINDER KEY BUCS15035 CYLINDER KEY  5 CLE18511 GLAND CLE18511 GLAND  6 CLE18504 PISTON CLE18504 PISTON  7 1171 B 3 4  10 x 1 1 2  SHCS 3 4  10 x 1 1 2  SHCS  8 1332 3 4  10 x 2 SHCS 3 4  10 x 2 1 4  S
29. E CORRECT ELECTRICAL VOLTAGE AND ADEQUATE CURRENT TO POWER  THE SOLENOIDS AS TABULATED BELOW                                            FUNCTION VOLTAGE Required POWER Required  Proportional motor control module  10VDC to  10VDC 0 80 amps  6VDC to 12VDC forward  Tong motor control solenoid    from control module  12VDC neutral 0 44 amps  12VDC to 18VDC reverse  Tong motor high low control solenoids  24VDC 0 33 amps  Tong motor series parallel control solenoids 24VDC 0 33 amps  Tong cylinder clamp release control solenoids     24VDC 0 33 amps  Backup cylinder clamp release control solenoids  2  24VDC 0 33 amps  Tong cylinder intensifier control valve solenoid    24VDC 0 60 amps  Backup cylinder intensifier solenoid   24VDC 0 60 amps  Tong motor circuit dump valve solenoid Y 24VAC VDC 31w  78VA hold  264      inrush           Sauer Danfoss PVG120 proportional control valve   Sauer Danfoss PVG32 on off control valve     requires two separate signals to control both functions   Ross 2771B4011 normally closed solenoid valve   Veljin VV V01 or Denison VVOlsolenoid operated vent valve  driven by torque turn computer or PLC supplied by others     Du    b  Energize  low  motor speed   parallel low     Gf equipped  and tong motor valve  solenoids to    makeup    position  Rotate  tong in makeup direction until centering  cylinder is in bottom position     10  Energize backup clamp circuit to insure cylinder  extends and lockjaw backup is gripping pipe     a  Energize backup clamp inten
30. ENT ROD WELDMENT   3  2 CB11753031 ROLLER ASSEMBLY   4  1 CB22003 CARRIAGE WELDMENT   5  11     22005 SPRING RETAINER PLATE WELDMENT     41218 1  LW   7  41210 1  8 NUT GR  8   8  2 CB22006 STOP TUBE   9 2 CB22007 CARRIAGE ALL THREAD ROD  10  2 CB22008 TOP SPRING RETAINER  11   6 SSCF1875 1 7 8  SEVERE SERVICE CAM FOLLOWER  12 1 CB22003 S9  CARRIAGE COVER  13  41027 WASHER  LOCK 3 8   14  41047 3 8  16 X 1  HHCS       APPROX WEIGHT  Ibs     565       AB     SUPERIOR 559055455  LA 70518    k j Manufacturing  amp  Hydraulics  318  837 8847          MAY NOT BE    THIS DOCUMENT IS THE PROPERTY OF SUPERIOR MANUFACTURING  amp   HYDRAULICS AND IS CONSIDERED CONFIDENTIAL  THIS INFORMATION REV    LOG    USED  DISCLOSED  COPIED  OR REPROI       FORM  WITHOUT THE EXPRESS WRITTEN CONSENT OF SUPERIOR  MANUFACTURING  amp  HYDRAULICS     12 02 05  DAT  18    REF  S  Equip Manuals Dwgs   CLEBU2300 30 Carriage wpg       DUCED IN ANY                         g     8               tem  aty   Part Number    CB1175303101 3  x 8 1 2  ROLLER       CB1175303102 ROLLER SHAFT FOR 8 1 2  ROLLER       1213 1  12 NYLOCK JAM NUT       1001 1 8  NPT ZERT       1984 CYLINDRICAL ROLLER BEARING       2095 DUMBELL ROLLER SPACER       14070 SEAL ASSEMBLY       14070 S1 DUMBELL ROLLER SEAL       2 041 O RING       CB1175303104 ROLLER SPACER                  N             DETAIL D  SCALE 1 5   1  SECTION A A  APPROX  WEIGHT  LBS     17 54               Ab     SUPERIOR  BROUSSARD LA 70518       03 25 03       RO L 
31. ERIOR Manufacturing  amp  Hydraulics  Inc     15  CLINCHER   BUCKING UNIT  Revision  07 07 Page 4   7    Use an EP synthetic grease that meets or exceeds the following specifications      Used in tong case     Type   NLGI Consistency Grade  Color   Lithium Complex Soap  wt   Serv  Temperature    Base Oil Viscosity  9 100   F  E 200   F    Viscosity Index   Penetration  dmm  Worked  ASTM D 217    Dropping Point    F  ASTM D 566  Rust Protection  5  SSW    Water Washout   wt loss   175  F    Timken  OK Load  Ibs    Bomb Oxidation  100 hrs   210  F  psi drop    Applications    High Temp MP   1   Medium Green   Non Soap   0 Deg  F     450 Deg  F    1300 SUS  89 SUS    TI    325 340    500      N A    N A    50    N A    High  amp  Low Speed Bearings   Wheel Bearings  Pumps  Gears   Lubrication    Use a premium quality hydraulic fluid that meets or exceeds the following    specifications     Humble Hydraulic H  ISO Viscosity Grade    Base Oil Viscosity   ASTM D 445    Viscosity Index     ASTM D 2270  Pour Point   ASTM D 97   Flash Point   ASTM D 92 CCF   Demulsibility   ASTM D 1401  Vickers 104C  IP281    Vickers    2950 5   Vickers 1 286 S             ASTM D 943    SUPERIOR Manufacturing  amp  Hydraulics  Inc   15  CLINCHER   BUCKING UNIT    Revision  04 07    Page 4 8    cSt   40  C  cSt   100  C    LUBRICATION SPECIFICATIONS    Use an EP synthetic grease that meets or exceeds the following specifications      Used as bearing grease     Type   NLGI Consistency Grade  Color   Lit
32. ESS WRITTEN CONSENT OF SUPERIOR  MANUFACTURING  amp  HYDRAULICS    Critical Dimension 100  Inspection Required    SHEET    HK BY NM DATE  08 14 07        Moss  1 of 1                      n      Dept             Sensor     The control signal  can be produced by a  PLC  an industrial control computer or a    The INT 10    valve throug    100     Output signal   percentage of the supply voltage     2596    The INT 10 converts this control signal to a corres     ponding potentiometer range  so that the Danfoss  proportional valve will be controlled correctly     In the first characteristic  the output    signal is plotted as a function of the    input signal     The second characteristic  reflects the    response time  measured between    10  and 9096 of the maximum values     Specifications   Input signals  galvanically isolated      0 20 mA       10 2     0 10 Volt INT 10 4     4 20 mA         10 4     10  10 Volt  INT 10 5     Output signal       potentiometer output  min  2596 and max  7596    of supply voltage     output limiting  of supply voltaqe  Response time   2 ms max     Linearitity   better than 196 deviation   Supply voltage    9 30 VDC         200 mA    Mounting   on DIN rail   Cable connections  M3 screws   Dimensions   l  x wxh  77 x 32 5    114 mm  oe con    2 22                 esign      min     1396 and max     8796        Krachtenveld 46  P O  Box 1309  3890 BC ZEEWOLDE    Page 5   15    0          offers you the possibility to    control a Danfoss hydrauli
33. G HOUSING  3  1 CB11100 ENCODER ASSEMBLY PROTECTOR WELDMENT  4  1 1902 BEARING P N MRC5308MZZ  5  1   82219 BEARING SPACER  6  11     2215 PINION SHAFT  7  1l CB2216 MIDDLE GEAR  8 1 CB2218 BEARING SPACER  9  1 1905 BEARING  10   1     11753014  FRONT BEARING HOUSING  11 111319 1 1 4  FLAT WASHER  12 11225 1 1 4 7 HEX NUT  13  1     1539 MOTOR ASSEMBLY  14 41155 5 8 11 x 2 SHCS  15  121141 3 8  16 X 1 3 4  HHCS  16  41256 5 8 11 X 1 1 4  SHCS  17  2 CLEBU9654  1 2 13X 5 1 2  ALL THREAD  18  41103 1 2  LOCKWASHER  19  51101 NUT  HEX  1 2 13  20  1 51031 ENCODER COUPLING MOUNT  21 111034  10 32 X 1 4  SET SCREW  22  1155144 ENCODER COUPLING                APPROX WEIGHT  lbs     506       Ab  SUPERIOR    Raine LA Tots    y Manufacturing  amp  Hydraulics  318  837 8847       FORM  WITHOUT            THIS DOCUMENT IS THE PROPERTY OF SUPERIOR MANUFACTURING  amp   HYDRAULICS AND IS CONSIDERED CONFIDENTIAL   MAY NOT BE USED  DISCLOSED  COPIED  OR                 MANUFACTURING  amp  HYDRAULICS     1                THIS INFORMATION  REV   LOG    DATE          DUCED IN ANY  WRITTEN CONSENT OF SUPERIOR                          Qty   Part Number Part Name            Qty   Part Number Part Name  1 4  CLEBU1508 HUB KEEPER 1 1  CLEBU1709 HYDRAULIC SWIVEL          2 1  CLEBU1507 BEARING RING 2 4  CLEBU1660 ROT GLYD RING  3 16  1183 3 4  10 x 2 1 2  HHCS    1171 3 4  LOCKWASHER                APPROX  WEIGHT  LBS     424    TONG BEARING RING  TONG SWIVEL ASSEMBLY    HUB KEEPER ASSEMBLY ASSEMBLY
34. HCS  9 1 CLEBU1621 PISTON RETAINER PIN  AQ        EE 10   1      2305 CENTER CYLINCER SPACER  11   2  BUCST1508 CLIP 11   2  BUCST1508 CLIP  12   6  1042 3 8  16 x 1 1 4  SHCS 12   6  1042 3 8  16 x 1 1 4  SHCS  13   2  1003 1 8  x 1  COTTER PIN 13   2  1003 1 8  x 1  COTTER PIN  14   4  1005 A 3 16  x 1 2  ROLL PINS 14   4  1005 A 3 16  x 1 2  ROLL PINS                                Al             POLYPACK SEAL  6 3 8 x 7 x 5 16  P N  31206375    CYLINDER ASSEMBLY       ASSEMBLY NO  CLEBU1514    CENTER CYLINDER ASSEMBLY  ASSEMBLY NO  CLEBU1514 C             8 6       POLYPACK SEAL    SEAL KIT P N  ASAP2350    ROD WIPER 5   P N  959 45    WEAR BAND  P N  W52500625    POLYPACK SEAL  6 1 2x 7 x 1 4  P N  25006500    POLYPACK SEAL  3 1 8 x 3 1 2 x 3 16  P N  18703125                5x51 2x 1 4  P N  25005000    SECTION A A       4225 HWY  90 EAST  BROUSSARD  LA 70518   318  837 8847         SUPERIOR     uw Manufacturing  amp  Hydraulics    THIS DOCUMENT IS THE PROPERTY OF SUPERIOR MANUFACTURING  amp     04 16 09       REV    LOG  DATE          HYDRAULICS AND IS CONSIDERED CONFIDENTIAL  THIS INFORMATION  MAY NOT BE USED  DISCLOSED  COPIED  OR REPRODUCED IN ANY       FORM  WITHOUT THE EXPRESS WRITTEN CONSENT OF SUPERIOR  MANUFACTURING  amp  HYDRAULICS                        Item     Qty  Part Number Part Name  1 CLEBU1505 TONG BODY REAR PLATE         2   1   CLEBU1506 TONG BODY FRONT PLATE  TONG MOUNTING BRACKET ASSEMBLY NO  CB11753035   5   4  CB11753035 TONG MOUNTING BRACKET AS
35. L E R ASS E M B LY  lt  Manufacturing  amp  Hydraulics  318  837 8847  ASSEMBLY NUMBER     11753031 mu VN peo   REV   LOGS             DATE             REF  S  Equip Manual  CLEBU1175 31 Roller Assy wpg    s Dwgs                     USE 5 8  11 SWIVEL HOIST RING  CROSBY   1016924 TORQUED TO 60 FT LBS    REMOVE ONCE INSTALLED             Qt    y   Part Number           BUCS23110 E CHAIN MOUNT BRACKET  1  BUCS23111 BULKHEAD PLATE       2  BUCS23203 SPACER  2  BUCS23204 LOAD CELL BRACE                      rn    6  BUCS23205 HOUSING SPACER  1  CB22010 S1   DUMMY LOAD CELL    1       zs    co    CB22029 INTENSIFIER PROTECTOR  2  CB2307 LOAD BRACKET WELDMENT       1  CLEBU1510 BACKUP HOUSING REAR PLATE  1  CLEBU1511 BACKUP HOUSING FRONT PLATE       40   1171 3 4  LOCKWASHER  32   1173          3 4  10 x 1 3   4  HHCS  8 3 4  10 x 5  HHCS  8  283  2    3 4  10 HEX NUT  2  BUCS23303 SPRING ASSEMBLY          SPRING ASSEMBLY NO  BUCS23303       Part Number    Part Name       1757  BUCS23304    EXTENSION SPRING    5 16  x 5  EYEBOLT ZINC PLATED       1756       5 16  QUICK LINK ZINC PLATED  5 16  18 HEX NUT SS             5 16  LOCKWASHER SS       APPROX  WEIGHT  LBS     1131                ASSEMBLY NO  CLEBU1509    5 16  FLAT WASHER SS    15   BACKUP HOUSING ASSEMBLY          4225 HWY  90 EAST  BROUSSARD  LA 70518   318  837 8847    AB SUPERIOR     Manufacturing  amp  Hydraulics  01 05 06  REV    LOG    DATE      PAManuals Equi uals Dwgs   CLEBU1500 30 CLEBUTSOS Wp  gt     THIS DOCUME
36. NO  CLEBU1501                      8                                                          Item    Qty  Port Number Part Name   1 1 CLEBU1533 TONG BODY ASSEMBLY   2  1 CLEBU15 A  TONG HUB ASSEMLBY   3     CLEBU15 A3 TONG BEARING RING HUB KEEPER ASSEMBLY  4   1  CLEBUI5 A4 TONG SWIVEL ASSEMBLY   5              01519 SWIVEL KEEPER ASSEMBLY      1 CLEBU15 A   MOTOR ASSEMBLY  NO ENCODER    ya 7  l CLEBUI5 A7 MOTOR ASSEMBLY   8  1122238 SERIES PARALLEL VALVE ASSEMBLY  9   1 BAC 5M25RCFF   5000 PSI GAUGE  10  31150     06 32 X 1 1 2  BRASS BOLT  11  3 1150     6 32 BRASS NUT                      LOCATE SERIES PARALLEL  VALVE DURING ASSEMBLY        TONG ASSEMBLY    ASSEMBLY NO  CLEBU1532                                                             8     o  o                                                                                                                                     m                                                                                                                               p B  CE                        O                               APPROX WEIGHT  Ibs     5844       AB     SUPERIOR            Manufacturing  amp  Hydraulics  318  837 8847       ORM  WITHOUT THE                  ST TOREN                 MAY NOT      USED  DISCLOSED  COPIED  OR REPRODUCED IN ANY REV    LOG    DATE        EXPRESS WRITTEI    MANUFACTURING  amp  HYDRAULICS                 IN CONSENT OF SUPERIOR  REF                     g                    NOT SHOWN    TONG  BA
37. NT IS THE PROPERTY OF SUPERIOR MANUFACTURING  amp   HYDRAULICS AND IS CONSIDERED CONFIDENTIAL  THIS INFORMATION  MAY NOT BE USED  DISCLOSED  COPIED  OR REPRODUCED IN ANY   FORM  WITHOUT THE EXPRESS WRITTEN CONSENT OF SUPERIOR  MANUFACTURING  amp  HYDRAULICS                       Item   Qty   Part Number    Part Name          CB22012    TONG MOUNTING BRACKET       1  2  3       12  1171 3 4  LOCKWASHER  6  1183 3 4  10 x 2 1 2  HHCS    3 4  10 x 3  HHCS                ASSEMBLY NO  CB22013  APPROX  WEIGHT  LBS     67    4 3  1176  5 3  1201 3 4  10 x 1 1 2  HHCS            Part Number    Part Name       CB22026    TONG MOUNTING BRACKET  3 4  LOCKWASHER       3 4  10 x 2 1 2  HHCS  3 4  10 x 3  HHCS                   ASSEMBLY NO  CB22025  APPROX  WEIGHT  LBS     50          3 4  10 x 1 1 2  HHCS       Ab   SUPERIOR    SG SS LA 70518          TONG MOUNTING  BRACKET ASSEMBLY    Y Manufacturing  amp  Hydraulics  318  837 8847       THIS DOCUMENT IS THE PROPERTY OF SUPERIOR MANUFACTURING  amp  12 06 05                   HYDRAULICS AND IS CONSIDERED CONFIDENTIAL  THIS INFORMATION      REV  8  LOG    DATE  FORM WITHOUT THE EXPRESSWAITIEN CONSENT OF SUPERIOR  S Edi  MANUFACTURING  amp  HYDRAULICS  REF  S  Equip Manuals Dwgs                         G0 Mn  Brackets wpq          Page 8 18                  Qty   Part Number Part Name    1 1  CB2309 CARRIAGE SPRING RETRACTION SHIPPING BRACKET WELDM   3 1  CB2311 CARRIAGE STOP   5 2  1232 EYE BOLT 3 8  16 x 1 1 4    6 8  1103 1 2  LOCKWASHER
38. PE NIPPLE  10  LONG           APPROX WEIGHT  lbs     2394       AB __SUPERIO    w Manufacturing  amp  Hydraulics  318  837 8847    4225 HWY  90 EAST  BROUSSARD  LA 70518          THIS DOCUMENT IS THE PROPERTY OF SUPERIOR MANUFACTURING  amp   HYDRAULICS AND IS CONSIDERED CONFIDENTIAL   USED  D    MAY NOT BE ISCLOSED  COPIED     MANUFACTURING  amp  HYDRAULICS     OR REPR     THIS INFORMATION         ODUCED IN ANY REV    LOG  DATE  FORM  WITHOUT THE EXPRESS WRITTEN CONSENT OF SUPERIOR                            1 4  DRIVE ZERT    P N  1257    N    7 8  14 JAM NUT  P N  1178       Ar    7 8  LOCKWASHER    NM      P N  1224    CAM FOLLOWER STUD    wem P N  73008    FLANGE BUSHING 20FDU16  P N  73009  PRESS INTO RACE    7            SY  Y                CAM FOLLOWER RACE  P N  73007                     CLA LL  DL      I7    d          SECTION VIEW       1 7 8  SEVERE SERVICE      SUPERIOR BES    EAST  BROUSSARD  LA 70518           FOLLOWER ASSEMBLY                  THIS DOCUMENT IS THE PROPERTY OF SUPERIOR MANUFACTURING  amp   LOG    DATE    1  HYDRAULICS AND IS CONSIDERED CONFIDENTIAL  THIS INFORMATION REV     Piu p    T  ASS EM BLY NO  SSCF1 875 MANUFACTURING  amp  HYDRAULICS  CLESS25DASSCF1875                  8   8                         6 8                Item      Qty     Part Number  CB2215       Part Name    Item   Qty        Part Number    Part Name          PINION SHAFT       N                     CB2218  CB11100    BEARING SPACER  ENCODER ASSY  PROTECTOR WELDM          
39. PU  Some units  be anchored to the foundation using 3 4  anchor bolts  may be equipped with optional second fluid level  Install the bucking unit  hydraulic power unit and torque warning lamp which will flash when fluid level is  turn control system as required on location  NOTE  If low but not low enough to cause HPU shutdown     pipe roller rack systems are being installed they must be  accurately leveled and aligned with the bucking unit to 6  CONNECT HOSES   Remove all hose dust caps as    deliver pipe into the bucking unit on the centerline of the required and clean all hydraulic quick disconnect  rotating tong  couplings with safety solvent and blow dry using low   pressure compressed air     SUPERIOR Manufacturing  amp  Hydraulics  Inc   15  CLINCHER   BUCKING UNIT  Revision  04 07 Page4 2    Manual PLC Controlled Bucking Unit  INSTALLATION  amp  SETUP INSTRUCTIONS    a  Connect airlines to DE ENERGIZED source of clean  and dry air with maximum supply pressure of 120    psi     b  Connect hydraulic hoses and insure all quick  disconnects are fully seated  Connect case drain line  directly to reservoir  do not attach to a return circuit     c  CAUTION  Failure to connect case drain circuit  directly to hydraulic reservoir will result in motor  shaft seal failure and cause hydraulic leakage that  will not be covered by your warranty     d  Failure to connect load sense line will inhibit the  hydraulic power unit   s ability to automatically shift  into a standby mode whe
40. Page 7 1    Page 7   2    TABLE OF CONTENTS    CLINCHER   Bucking Units in the 9 5 8   10 3 4   11 3 4   15   16   and 23  sizes  are very similar and feature a number of common components     SECTION 8 CLEBU1500 30  amp   32 CLINCHER   BUCKING UNIT ILLUSTRATIONS          OVERALL VIEW  Assy  No  CLEBU1500 30  rn                        i cp chee             8 3   OVERALL VIEW  Assy  No  CLEBU1500 32  en ed 8 3 1  TONG ASSEMBLY FOR CLEBU1500 30  Assy  No          01501  ttt 8 4   TONG ASSEMBLY FOR CLEBU1500 32  Assy  No  CLEBUI532  ttt 8 41  TONG HUB ASSEMBLY  Assy  No  CLEBUI5 Al         aa ett teo ro         8 5   CYLINDER ASSEMBLY  Assy  No  CLEBU1514    n cti bep o RIDE               8 6   CENTER CYLINDER ASSEMBLY  Assy                 1514     ettet 8 6   CLEBU1500 30 TONG BODY ASSEMBLY  Assy  No          015 42  ette 8 7   CLEBU1500 32 TONG BODY ASSEMBLY  Assy  No  CLEBU1533  tenete 8 7 1  1 7 3  SEVERE SERVICE CAM FOLLOWER ASSEMBLY  Assy  No  SSCF 1875     8 8   CLE1500 30 TONG DRIVE ASSEMBLY  Assy       CLEBUIS AS  ttt ttt 8 9   CLE1500 32 TONG DRIVE ASSEMBLY  NO ENCODER   Assy  No  CLEBUIS A6         8 9 1  CLE1500 32 TONG DRIVE ASSEMBLY  Assy       CLEBUIS A7  ttt 8 92  TONG BEARING RING HUB KEEPER ASSEMBLY  Assy  No  CLEBU15 A3  ces 8 10  TONG SWIVEL ASSEMBLY  Assy       CLEBUIS A4  ttt ttt ttt ttti 8 10  SWIVEL KEEPER ASSEMBLY  Assy  No  CLEBUI519       ttt ttt ttt ttti 8 10  15  LOCKJAW BACKUP ASSEMBLY  Assy  No  BUCSI5000 01          ttt 8 11  CAM FOLLOWER ASSEMBL
41. SEMBLY 1   1  CB1175303502           MOUNTING BRACKET WELDMENT  80   SSCF1875 CAM FOLLOWER ASSEMBLY  16   1027 3 8  LOCKWASHER 3   6  1218 1  LOCKWASHER   5   3  1210 1  8 NC HEX NUT  1    16   1049 3 8  16 x 1 1 2  HHCS  CB11090 MOUNTING BRACKET PLATE                                                      34   1171 3 4  LOCKWASHER    10   34   1174 3 4  10 x 2 1 4  HHCS             9             APPROX  WEIGHT  LBS     2430 485 APPROX  WEIGHT  LBS     36 725               SUPERIOR    BROUSSARD LA 70818    TONG BODY ASSEMBLY      esee acu             THIS DOCUMENT IS THE PROPERTY      SUPERIOR MANUFACTURING  amp           HYDRAULICS AND IS CONSIDERED CONFIDENTIAL  THIS INFORMATION  MAY NOT BE USED  DISCLOSED  COPIED  OR REPRODUCED IN ANY REV    LOG   DATE    ASS E M B LY N O    C L E B U 1 5 A2 FORM  WITHOUT THE EXPRESS WRIT TEN CONSENT OF SUPERIOR an                           8                      TONG BODY ASSEMBLY       ASSEMBLY NO  CLEBU1533                                                             Item    Gty          Number Part Name   1                 518  MIDBODY  2  1 CLEBUI1534           BODY REAR PLATE  3  1 ICLEBU1535           BODY FRONT PLATE  4  1 CLEBUIS16  TONG BODY CENTER SPACER  5  4 CB11753035   TONG MOUNTING BRACKET ASSEMBLY  6  80 55    1875 1 7 8  SEVERE SERVICE CAM FOLLOWER  7  16 1027 WASHER  LOCK 3 8   8  16 1049 3 8  16 X 1 1 2  HHCS  9  3411171 3 4  LOCKWASHER   10  34 1174 3 4  10 X 2 1 4  HHCS   11 3 1398 1 4  COLLAR   12   1 PN4 10 1 4  NPT PI
42. TONG MNT  BRACKET ASSEMBLY  CB22025 REAR TONG MNT  BRACKET ASSEMBLY       5  6    CB2312 CARRIAGE SPRING RETRAC  STOP ASSY   1   CLEBU1501 TONG ASSEMBLY  1   CLEBU1509 5  BACKUP HOUSING ASSEMBLY    CLEBU1512 FRAME WELDMENT       7  8  9    CLEBU1513 BOLT ON TRAY      la               CLEBU1521 COVER WELDMENT  CLEBU1523 HOLD DOWN STRAP ASSEMBLY          ala    1169 3 4  10 x 5  HHCS  CB11411 CONTROL CONSOLE ASSEMBLY    WITH PIPE JACK CONTROLS                APPROX  WEIGHT  LBS     13618    AB     SUPERIOR 22520 LA 70518  Y Manufacturing  amp  Hydraulics  318  837 8847    THIS DOCUMENT IS THE PROPERTY OF SUPERIOR MANUFACTURING 8 12 27 05  HYDRAULICS AND IS CONSIDERED CONFIDENTIAL  THIS INFORMATION   MAY NOT BE USED  DISCLOSED  COPIED  OR REPRODUCED IN ANY REV    LOG   DATE  FORM  WITHOUT THE EXPRESS WRITTEN CONSENT OF SUPERIOR REF  S  Equip Manuals Dwgs   MANUFACTURING  amp  HYDRAULICS  CLEBU1500 30 Overall                                           Le   8                                                    Item    Qty   Part Number Part Name  1 1 CLEBU1512 BUCKING UNIT FRAME   6  2  2     22013 TONG MOUNTING BRACKET ASSEMBLY  3J 2     22025 TONG MOUNTING BRACKET ASSEMBLY  4  1 CLEBU1532 15  100 000 ft lb TONG ASSEMBLY  5  _1J CLEBU1521 COVER WELDMENT  6  2 CLEBUI536 CARRIAGE ASSEMBLY  7   1 CLEBU1509 15  BACKUP HOUSING ASSEMBLY  8  1   0  515000 01  15  DRILL PIPE BACKUP  9   1  CLEBUI513 BOLT ON TRAY  Ol 611112 1 2 13x 1 1 2  HHCS  1 611103 1 2  LOCKWASHER                      
43. TROKE  2 1 4  ROD                   JACK    FIGURE 2       Ad SUPERIOR     ww Manufacturing  amp  Hydraulics    4225 HWY  90 EAST  BROUSSARD  LA 70518   318  837 8847       THIS DOCUMENT IS THE PROPERTY OF SUPERIOR MANUFACTURING  amp   HYDRAULICS AND IS CONSIDERED CONFIDENTIAL  THIS INFORMATION  MAY NOT BE USED  DISCLOSED  COPIED  OR REPRODUCED IN ANY  FORM  WITHOUT THE EXPRESS WRITTEN CONSENT OF SUPERIOR  MANUFACTURING  amp  HYDRAULICS        01 09 06  LOG  DATE       REV       REF  P Manuals Equip Manuals Dwgs   CLEBU1500 30 Schematic Sht1                                            o                                                                                                                                                  a              o               CASE DRAIN  4 0    SE   8  PRESSURE  RETURI  1   4               o           gt   TUNG TONG BACKUP  BACKUP FWD JACK  FWD  JACK REAR JACK  REAR JACK TONG BACKUP        AA Mir ded        uat a CLAMP  RELEASE CLAMP  RELEASE      DOWN UP DOWN INTENSIF INTENSIFY    G 8         G en  3 85  3 8    8 8    3 8    3 8    3 89  3 89                                                                                                         TUNG CLAMP BACKUP CLAMP     1  MAKEUP   A B  BREAKOUT HIGH   A B   LOW CLAMP  A B   RELEASE CLAMP A B   RELEASE FORWARD          REVERSE FORWARD      B reverse INTENSIFY V V INTENSIFY    15565022 PVS 32       5                                                                                H            
44. UCDP15012 BOTTOM INSIDE DOOR PLATE  BUCS15009 INSERT PIVOT PIN       Tur    BUCS15010 DOOR ROLLER  BUCS15011 DOOR ROLLER PIN    fs  c  O          e  N  5    800515020  DOOR INSERT       DOOR SPACER  REAR PIVOTING INSERT SPRING          0  o         _              gt        Io      J fafa ja   UJ  W  55  8 2                        BUCS15076 FRONT PIVOTING INSERT SPRING  BUCS15054 INSERT SPRING SPACER    N       A              BUCST1508 CLIP  SMH1501 L TORSION SPRING               Ao    2       1001 1 8         ZERT  1315 1  8 x 8 1 2  HHCS  2               x  NJO          2  2  1    1218 1  LOCKWASHER  1210 1  8 HEXNUT  6  1042 3 8  16 x 1 1 4  SHCS  2          19    A                 s   op  1  36DU40 02 MODIFIED GARLOCK BUSHING    GARLOCK BUSHING                            APPROX  WEIGHT  LBS     308 948            z 4225 HWY  90 EAST    ASSEMBLY NO  BUCS15015       THIS DOCUMENT IS THE PROPERTY OF SUPERIOR MANUFACTURING  amp  1 01 04 06  HYDRAULICS AND IS CONSIDERED CONFIDENTIAL  THIS INFORMATION REV    LOG    MAY NOT BE USED  DISCLOSED  COPIED  OR REPRODUCED IN ANY     FORM         WRIT TEN CONSENT OF SUPERIOR REF  P  Manuals Equip Manuals y   MANUFACTURING  amp  HYDRAULICS  BUCS15000 BUCS15015 Door                      Page 8   14                            g     8                CARRIAGE ASSEMBLY  ASSEMBLY NO  CLEBU1536                                                             Item   Qty  Port Number Part Name   1  A CBI536 COMPRESSION SPRING   2  2 BUCS11823   ADJUSTM
45. UPERIOR MANUFACTURING  amp   HYDRAULICS AND IS CONSIDERED CONFIDENTIAL  THIS INFORMATION  MAY NOT BE USED  DISCLOSED  COPIED  OR REPRODUCED IN ANY  FORM  WITHOUT THE EXPRESS WRITTEN CONSENT OF SUPERIOR  MANUFACTURING  amp  HYDRAULICS        01 05 06             REV    LOG    DATE          REF  P  Manuals Equip Manuals Dwgs   CLEBU1500 30 Dimensions wpg                                         15  BUCKING UNIT  DIMENSIONS    CLEBU1500 32             130 1 2                                                                                                                                      U                                                                                     APPROX WEIGHT  Ibs     13319       Ab __SUPERIO    4225 HWY  90 EAST  BROUSSARD  LA 70518    Manufacturing  amp  Hydraulics  318  837 8847       THIS DOCUMENT IS THE PROPERTY OF SUPERIOR MANUFACTURING  amp   HYDRAULICS AND IS CONSIDERED CONFIDENTIAL  THIS INFORMATION  MAY NOT BE USED  DISCLOSED  COPIED  OR REPROD    FORM  WITHOUT THE EXPRESS WRITTEN CONSENT OF SUPERIOR  MANUFACTURING  amp  HYDRAULICS              REV      LOG        DATE                CLINCHER   BUCKING UNITS  TOOL SIZE 15  Unit Style  CLEBU 1500 32  Type III Unit   w  LOCKJAWTM  Backup   Backup Torque Gauge Handle 35m   Min Tubular OD  in      2 062    Max Tubular OD Y  in  15 000     Standard Torque Rating       ft lbs  100 000   Series Mode   9     High Speed   Low Torque 12 rpm max    25000 ft lbs max   Low Speed   High Torque 6 rpm max  
46. VALVE    PANEL MOUNT GAUGE 300 PSI       BAC 5M25RCFF    CB11041 A    PANEL MOUNT GAUGE 0 5000 PSI    PANEL MOUNT NUT F  AIR REGULATOR       CB11080    STOP BUTTON       CB11081  CB11082    START BUTTON  START LEGEND       CB11083    STOP RED LEGEND          CRSS20009  CB11422    PANEL MNT  REMOTE OPR  RELIEF VALVE    HANDLE F PVG VALVE             CONTROL CONSOLE ASSEMBLY    ASSEMBLY NO  CB11411                 4225 HWY  90 EAST    AB SUPERIOR    CO            Uy Manufacturing  amp  Hydraulics  318  837 8847          THIS DOCUMENT IS THE PROPERTY OF SUPERIOR MANUFACTURING  amp  01 11 06  HYDRAULICS AND IS CONSIDERED CONFIDENTIAL  THIS INFORMATION REV    LOG  DATE  MAY NOT BE USED  DISCLOSED  COPIED  OR REPRODUCED IN ANY    t   FORM  WITHOUT THE EXPRESS WRITTEN CONSENT OF SUPERIOR REF  P  Manuals Equip Manuals Dwgs   MANUFACTURING  amp  HYDRAULICS  CLEBU1500 30 CB11411 wpg                                                                             21  4                     O  GEEXTCEXT  INTP          ral  S                   3 EE     E  3 4    E       2 RET       Per _ RE  i      9                          P   4           j                  d  l I I                         i E  mp  A ua                  RR a ee        ee ee ae A re 1                                                                                                              lk    MOTOR A  MOTORB CASE DRAIN  HIGH GEAR LOW GEAR TONG TONG BACKUP   BACKUP TONG   1   17   1 2    3 8    3 8   CLAMP    RELEASE CLAMP
47. Y  Assy  No  BUCS11825 01        ttt            8 11  CYLINDER ASSEMBLY  Assy       BUCS15006 O1         ettet ttt          ttti 8 12  OUTSIDE DOOR ASSEMBLY  Assy  No  BUCS15005               aasan                            8 13  INSIDE DOOR ASSEMBLY  Assy  No  BUCSI15015         ettet ttt ttt ttt 8 14  CARRIAGE ASSEMBLY  Assy  No  CLEBU1536  ttt ttt ttt ttti 8 15  ROLLER ASSEMBLY  Assy  No  CB11753031  ttt ercer 8 16  15  BACKUP HOUSING ASSEMBLY  Assy       CLEBUIS09          ttt ttt 8 17  TONG MOUNTING BRACKET ASSEMBLY  Assy  No  CB22013 de CB22025         8 18  CARRIAGE SPRING RETRACTION STOP ASSEMBLY  Assy  No  CB2312  e 8 19  DIE ADAPTER VARIATION FOR CYLINDER CLEBUI514                                  8 20  ALUMINUM DIES CLEA1175 XXXXX AND BUCA7625 XXXXX isset ttt a 8 21  HYDRAULIC JACK ROLLER SYSTEM ASSEMBLY  Assy  No      2000 01                                             8 22  JACK ROLLER STAND ALONE ASSEMBLY  Assy  No  CB2010 01          cte 8 23  JACK ROLLER BOLT ON ASSEMBLY  Assy  No  CB2020 01          ctt 8   24    SUPERIOR Manufacturing  amp  Hydraulics  Inc   15  CLINCHER   BUCKING UNIT  Revision  01 06 Page 8 1    SUPERIOR Manufacturing  amp  Hydraulics  Inc   15  CLINCHER   BUCKING UNIT  Revision  01 06 Page 8 2                      15  BUCKING UNIT   TYPE 3    OVERALL VIEW  ASSEMBLY NO  CLEBU1500 30    Part Number    Qty   1       a    BUCS15000 01 15  LJ DRILL PIPE BACKUP ASSEMBLY  CLEBU1536 CARRIAGE ASSEMBLY               N     N  N  N    CB22013 FRONT 
48. acturing     Hydraulics  318  837 8847    THIS DOCUMENT IS THE PROPERTY OF SUPERIOR MANUFACTURING  amp  01  05 06       HYDRAULICS AND IS CONSIDERED CONFIDENTIAL  THIS INFORMATION  MAY NOT BE USED  DISCLOSED  COPIED  OR REPRODUCED IN ANY REV      LOG     DATE             FORM  WITHOUT THE EXPRESS WRITTEN CONSENT OF SUPERIOR REF  P  Manuals Equip Manuals Dwgs   MANUFACTURING  amp  HYDRAULICS  BUCS15000 01 15006 01 Cyl wpg                            Qty  Part Number Part Name  BUCDP15003 TOP OUTSIDE DOOR PLATE    3 1  BUCS15009 INSERT PIVOT PIN  5 BUCS15011 DOOR ROLLER PIN    8    8 BUCS15075 REAR PIVOTING INSERT SPRING  10 BUCS15054 INSERT SPRING SPACER  2  x  6                         1 SMH1501 L TORSION SPRING  1 8  NPT ZERT   14  2  1315 1  8   81 2  HHCS  2 1  LOCKWASHER   1 2  1210 1  8 HEXNUT   17 1042 3 8  16 x 1 1 4  SHCS    1942 18   5 1 4  SHCS  19 36DU40 02 MODIFIED GARLOCK BUSHING    20 GARLOCK BUSHING                         APPROX  WEIGHT  LBS     216 677            SUPERIOR       OUTSIDE DOOR ASSEMBLY ww Manufacturing  amp  Hydraulics  318  837 8847  IS DOCUMENT IS THE PROPERTY OF SUPERIOR MANUFACTURING  amp  1 01 04 06    TH  HYDRAULICS AND IS CONSIDERED CONFIDENTIAL  THIS INFORMATION REV    LOG    Dor cule      beer  l REF  P  Manuals Equip Manuals Dwgs   MANUFACTURING  amp  HYDRAULICS  BUCS15000 BUCS  5605 Door FP                      8   13                                           Part Number Part Name          BUCDP15013 TOP INSIDE DOOR PLATE             B
49. bular should be held  as close to the unit centerline as is possible  It will be  necessary to feed the tubular through the backup and into the  tong  Close the tong jaws on the pipe using the Tong Jaw  DCV  During the clamping operation you will be able to read  the clamping pressure on the system pressure gauge  Release  Tong Jaw DCV and allow it to return to its center position   Pressures cannot be monitored when the valves are in the  neutral position  Clamping pressure will be trapped within the  jaw cylinders by means of pilot operated check valves   Trapping pressure by means of these check valves allows the  pressure to be bled off the rotary swivel seals before rotation  begins  thus extending the life of the rotary seals     Note  This unit has been equipped with optional air driven  pressure booster pumps to provide enhanced torque capacity  when using non marking aluminum dies  To operate  shift  DCV to clamp position until maximum system pressure is  achieved  Simultaneously open respective booster pump air  control to allow cylinder pressure to build to required 4500  psi  Only a few strokes are required to achieve required  pressure  Continued pumping will not over pressurize the  system as a pressure relief valve is built into each pump  circuit  Actual clamping pressures can be observed by a  means of a gauge located on the rear  lower section of the  backup or by means of an observation window at the 12  o clock position on the rotating section     CONTROLS
50. c proportional    h a 0  10 Volt  0  20 mA     4  20 mA or a  10  10 Volt signal              INT 10 2 0 0 10 0 20 0 mA  INT 10 3 0 0 5 0 10 0 V  INT 10 4 4 0 12 0 20 0 mA  INT 10 5  10 0 0 0 10 0 V  Input signal  Transfer characteristic  30 0V     22 5        8  9 5    5  S  v  gt  2        15 0V     He s s  Et        gt     e  9  RoN   100   0        0 2 4  time    Response time       222 d    Phone   31 36 522 11 34  Fax    31 36 522 13 14  THE NETHERLANDS    Documentation INT 10 x    Functional description   The INT 10 is a signal converter which converts standardized industrial signals into a  potentiometric signal  as is required by a Danfoss proportional valve    The INT 10 can be delivered in four models  depending on the control signal            Model    Control signal  INT 10 2 0  20 mA  INT 10 3 0  10 V    4  20 mA  10 410 V _                     Connecting information   The INT 10 and the Danfoss valve share the same power supply  just like a common  potentiometer    For the INT 10 the same rules are valid for connecting cables as it is with a potentiometer   see connection diagram at the back of this page     The supply cables will go directly from the battery to the Danfoss valve and then from the  Danfoss valve to the INT 10  Further the   and   wires between the Danfoss proportional  valve and the INT 10 have to be the same diameter and the same length     Specifications                 Output voltage Ratiometric output  min  25  and max 75  of the supply x  
51. can only be accessed after  removing the covers from these assemblies  Check fluid  levels in hydraulic power unit reservoir  chain drive case  and gear reducer     N  Inspect hydraulic fluid for foreign material and  contaminants  Filter or replace  You must filter or replace  entire system including power unit tank and lines along  with tong to insure all contaminants are removed     ANNUAL MAJOR MAINTENANCE  Inspection and Repair    Routine preventative maintenance will significantly extend the  operating life of your equipment  reduce operating cost  and  avoid downtime  CLINCHER   recommends a program of  frequent routine inspection and if equipment is suspected to  have been damaged during transit or is to be mobilized to a  remote location where maintenance operations are difficult to  carry out  perform the following     A  Visually inspect components on Bucking Unit and Power  Unit  which could possibly have been damaged either  during operation or transit     B  Check test date  Ensure that a load test and inspection  was carried out within the last 9 months     C  Remove motor and valve assembly from the Bucking  Unit     MAINTENANCE    D  Check motor seal  Apply hydraulic power  run the motor  and visually check the motor seal for any signs of  leakage     E  Check gear reducer per manufacturers specifications     F  Remove covers from Tong and Backup Assemblies   Inspect hydraulic hoses and components for leaks   Lubricate internal grease zerts     G  Check condi
52. d m  I 5    CLOSED CENTER    TONG MOTOR LS       SA  Moro sher  F      TONG CLAMP LSAT BACKUP CLAMP       ano  JACK         REAR JACK          i    1                                l      t    I                                a     enan daya a ci runc uc                     a                        v         l      a  El   2   X  rA        CUNT RUL CUNSULE          FIGURE 2  BUCKING UNIT Type Three Ab    SUPERIOR     BROUSSARD  LA 70518    w Manufacturing  amp  Hydraulics  318  837 8847    Y D R U      SC H E M TI C THIS DOCUMENT IS THE PROPERTY OF SUPERIOR MANUFACTURING  amp  01 09 06      A   A Ics D CONFIDENTIAL  THIS INFORMATION  REV    LOG   DATE     EEE EEE EEE E ED eet    HYDRAULICS AND IS CONSIDERED CO  MAY NOT BE USED  DISCLOSED  COPIED  OR REPRODUCED IN  ITHOUT THE EXPRESS WR ITTEN CONSENT OF SUPERIOR REF  PWanualsEquip ManualsDwgs     INCLUDES JACK ROLLER WAR        E NORAS GLEBU 800 30 Shemale              Page 5 8                                          Qty   Part Number  CB11440 PVG 120 82  5  VALVE  TONG CONTROLS  CRSS20009 RELIEF VALVE  REMOTE  PANEL MOUNT  CB11041 AIR FILTER   REGULATOR  CB11045 BALL VALVE  PANEL MOUNT  BAC 30025RCFF   GAUGE 300 PSI  PANEL MOUNT  B11048 HYDRAULIC MOTOR  DUAL SPEED  B11043 DUAL SPEED MANIFOLD  CLEBU1709 HYDRAULIC SWIVEL  CLEBU1660 ROTARY SEALS  4 PCS   1 SET   3P0 008 CLAMPING MANIFOLD ASSEMBLY  INCLUDES     17 B3P0 001 CLAMPING MANIFOLD  CLOSED HEAD   17 B3P0 005 RELIEF VALVE  17 B3P0 004 PILOT OPERATED CHECK VALVE  17 B3P0 
53. d on the pipe   Operate Tong Rotation DCV to makeup  or breakout  joint to  required torque  Torque can be monitored using the optional  torque gauge or the Data Acquisition System  The computer  system features a dump valve which controls the maximum  applied makeup torque  Note this dump valve has no effect on  breakout torque  Torque can be controlled using the adjust   able pressure relief valve on the power unit  Accessories are  also available to dump hydraulic pressure and control  rotational speed     Attach crane to tubular  if required  after proper makeup  torque has been reached  Use Tong Jaw DCV to fully retract  the dies  Carefully remove the tubular from the Bucking Unit   Using Tong Rotation DCV  rotate the tong to insure the  bottom centering jaw is located at the lowermost point in the  head by aligning the paint stripes on the tong with the  matching stripes on the frame  The BUCKING UNIT is now  ready for the next tubular operation     BREAKOUT PROCEDURE    Load cells are to be installed on both sides of the Backup to  all measurement of torque in makeup and breakout mode   Operations for breaking out of tubulars are precisely the same  as for making up except for the direction of rotation controlled  by Tong Rotation DCV     Page 5   4    G   G             AIR FILTER      FIGURE 1               GAUGE PANEL MOUNT  P N  BAC 5M25RCFF P N  BAC 30025RCFF NUT  P N  CB11041 A      e  SYSTEM AIR AIR PRESSURE  PRESSURE PRESSURE CONTROL      TONG CLAY BACKUP CLAMP 
54. d the die since this  system relies on radial loads and the coefficient of friction  instead of teeth  This clearance also allows the installation of  our silicon carbide screen cloth which is required when using  the non marking system at high torques    Note  The use of improperly sized dies can result in reduced  torque capacity  increased pipe marking and reduced die life     SUPERIOR Manufacturing  amp  Hydraulics  Inc   15  CLINCHER   BUCKING UNIT  Revision  01 06    Page 3   2    The bucking unit cylinders  which hold our dies  have  considerable stroke which could cause some people to believe  they can use a die ona tube which is significantly smaller than  the nominal size  For example  someone could use a 7  die to  grip on a non standard tubular with an OD of 6 75   While  one could successfully grip tubulars with such an arrangement   the pipe would not be exactly centered within the rotating and  fixed portions of the bucking unit  The resulting eccentric  pipe movement seen when rotating the collar could cause  some variation in apparent torque readings  Therefore  we  recommend nominal die sizes be matched to specific pipe or  coupling diameters and using specially manufactured dies for  non standard premium couplings     CAUTION  Do not attempt to grip tubular diameters which  are larger than the dies being used  Failure to observe this  precaution can result in damage to the tubular or the bucking  unit     CAUTION  Do not attempt to use combinations of diffe
55. e 11 3 4  x 7 5 8  die adapters  in the tong and backup before installing the 7 5 8  x 6 050  die   required for OD of API coupling  in the tong and the 5 500   die in the backup     CAUTION  Do not operate the jaws unit without correct dies  and the proper size tubular being in the tong and backup     SUPERIOR Manufacturing  amp  Hydraulics  Inc   15  CLINCHER   BUCKING UNIT  Revision  01 06    Page 5   2    PRE JOB UNIT INSPECTION    Connect all hydraulic hoses and insure suction valve is open  on power unit reservoir  Energize the hydraulic power unit all  it can operate for 10 minutes to warm oil  Operate each valve  while monitoring for leaks     PIPE INSTALLATION    Operate Tong Jaw and Backup Jaw Directional Control Valves   DCV  as labeled on Figure 1 to insure jaws are in the fully  open position  Using Tong Rotation         rotate the tong to  insure the bottom centering jaw is located at the lowermost  point in the head by aligning the paint stripes on the tong with  the matching stripes on the frame     CAUTION  Rotational alignment is a very critical operation  as the bottom jaw has controlled stroke to center the pipe in  the jaws     Refer to the hydraulic schematic  Figure 2  for more details  regarding the hydraulic circuitry and components     Manually adjust the spacing between the tong and backup to  accommodate the tool joint being torqued  Using pipe  handling systems or a crane  carefully install the pipe in the  Bucking Unit in a level position  The tu
56. ections   with M3screws     000000000      Dimensions Ixwxh  77 x 32 5 x 114 mm       Guarantee   During a period of 12 months production and component failures are guaranteed   Exchanging a defect INT 10 will be shipped f o b    Guarantee will be void at injudicious use  opening of the case  usage out of  specifications and mechanical damage  such at the judgement of Tildesign BV     Tildesign bv  Krachtenveld 46  NL 3893 CD Zeewolde  The Netherlands  Phone  31    0 36 522 11 34  Fax  31      0 36   522 13 14  e mail i i  website www tildesign nl           01993 2005 Tildesign BV INT 10 Rev  C  Zeewolde  The Netherlands    Page 5   1    i  x  Y    A A                               CASE DRAINI              CASE DRAIN                  asa qa    r        15565022    MOTOR                                                        ds e O O O        O O O                 a fl    O     1 1  1 1         Ihe                                                                  IR           L            HIGH GEAR    LOW GEAR  HIGH Low TONG TONG BACKUP  BACKUP       N    CLAMP  RELEASE             RELEASE   3 8    378   3 8  3782  3 85  3 89  3 85  3 8    1 1  1 1                    HIGH  A E B   LOW HIGH   A B   LOW CLAMP   A    RELEASE _ CLAMP A B   RELEASE  PVB 120 PVE 32 1 PVB 32 PVE 32 PVE 32             hb    E              LES 2 6 GPM 2 8 GPM      10 6 GPM 5 10 6                         Bm               is    y S  Ac IC     St   e FER             o                       E      LY       
57. ed out if equipment is suspected to have been  damaged during transit or is to be mobilized to a remote  location where maintenance operations are difficult to carry  out     ROUTINE MAINTENANCE    Cleaning   Upon return from each and every job  perform the  following     A  Pre wash unit to remove majority of dirt and grease build  up as to allow removal of dies  and inspection of overall  condition of unit     B  Remove and inspect dies from tong and backup  Note  any missing or damaged die retainers  and or die retainer  bolts     C  Clean and inspect jaws for damage or excessive wear   Lubricate splines and all grease zerts     D  Inspect all hoses for wear  replace as necessary     E  Inspect backup hanger assembly to assure all parts are in  operating condition     F  Install dies of a size needed for testing purposes  and  attach hydraulic power unit to Bucking Unit  Before  energizing power unit make certain no one is working on  Bucking Unit and all tools and parts are removed from the  tong and backup assemblies     G  Insert test mandrel of the exact same size as the dies  which are installed in the tong and backup assemblies     Caution  Testing the function of the backup without the  proper size dies installed and or without the proper sized  mandrel in place  you risk serious damage to the back up  cylinder     H  After power unit has reached operating temperature   operate the backup control valve and close backup around  test mandrel using sufficient flow and 
58. efore attempting to make any of  these adjustments otherwise warranty coverage on the unit  may be limited     A hydraulic compression style load cell and hydraulic torque  gauge are optional features on CLINCHER   BUCKING  UNITS     CAUTION  The electronic load cell  if supplied by  Superior  has been removed for shipping and must be  reattached to the right side  same side as control panel  of  the backup before operating the unit  In this position it  will read torque during makeup operations only  A  dummy load cell is attached to the left side of the backup   Should measurement of torque be required during  breakout operations  the end user must relocate the  electronic load cell and the dummy load cell to the opposite  sides of the backup     A Turns Encoder can be installed  ref Gear Box Assembly  Dwg  in Section 9      DIE INSTALLATION    Insure hydraulic power unit is turned off  Bleed system  pressure by moving all control valve levers several times   Remove cap screws and clips from jaws  Insure jaw  amp  die  spline surfaces are free of debris or damage and are lightly  greased  Install the required dies in the tong and backup by  sliding in until they contact the fixed clip  Reinstall clips and  cap screws  Tighten cap screws firmly to prevent them from  vibrating loose  Do not over tighten  Note  The larger  Bucking Units require die adapters be installed when using  smaller dies  For example  when using the 11 3 4  unit with 5  1 2  casing you must install thre
59. ents will result in severe equipment damage that will void all warranties     SUPERIOR Manufacturing  amp  Hydraulics  Inc   15  CLINCHER   BUCKING UNIT  Revision  01 06       Pagel 1       HYDRAULIC PRODUCT    GENERAL INFORMATION ery       HYDRAULIC PRODUCT SAFETY       WARNING  Valve lever  Spool  may  stick   not center  under  certain conditions allowing the hydraulic equipment to continue to    operate and could cause serious injury  death or equipment failure        VALVE SAFETY  Read and follow instructions carefully  Failure to observe instructions  and guidelines may cause serious injury  death or equipment failure  A sticking valve   spool bind  may be caused by one or more of the following factors    DIRTY OIL  Oil must be filtered to a minimum of 25 microns  Filters should be changed regularly    spin on types after 50 hours of initial use and then after every two hundred fifty hours of use  Use of  a condition indicator is recommended  Consult your tractor or implement owner   s manual for filtra   tion and changing recommendations for internal systems    OIL REQUIREMENTS  Premium quality anti wear type oil with a viscosity between 100 and 200  SSU at operating temperatures  Certain synthetic oils may cause spool seals to swell and the valve  to stick  If in doubt  call CROSS Engineering    IMPROPER HOOK UP OR MOUNTING  Always use the proper size fittings  Hook up  in   amp   out   as noted on the valve body  Do not overtorque pipe fittings  Mounting surfaces sho
60. epending on  existing installation and proximity                                   Contingency Materials     1 Safety Solvent for cleaning pneumatic     hydraulic quick  disconnects      Electrical contact cleaner solution    1 Soldering iron  for WinCATT cable connector repair    r   Teflon tape      Loctite sealing compound      Electrical material as required to suit installation and local electrical code    Manual PLC Controlled Bucking Unit  INSTALLATION  amp  SETUP INSTRUCTIONS    IMPORTANT NOTICE  Insure steps 1 through 7 b  SUPERIOR strongly recommends the use of our  have been completed before notifying Superior LASER ALIGNMENT TOOLS to verify proper  Manufacturing  amp  Hydraulics that a factory technician alignment before permanently fixing anchor bolts   is needed to perform installation inspection and final c  CAUTION  Failure to align rack centerline with  startup services  If these steps have not been bucking unit may cause tubulars to hang on dies  completed  additional charges will be applied while when passing through the  bucking unit   our technician stands by for the installation to be Misalignment can result in unacceptable torque turn  completed by the buyer  results        d  Remove shipping bolts brackets etc   as shown in  illustration on page 1 1     1  UNPACK   Inspect for shipping damage and or missing       shipping damage  Remove all banding straps and locations as required  Refer to order documents for  protective coverings  Do not remove shipp
61. er systems are used in the unit  Each consists ofa  pump and preset pressure relief valve  One system is located  within the tong section and the other located within the backup  section of your bucking unit  The pumps are supplied with  hydraulic oil from the low pressure  upstream  side ofthe pilot  operated check valve  High pressure is returned to the high  pressure  downstream  side of the pilot operated check valve   see schematic   Both intensifiers are remotely operated by  means oftwo 1 4 turn air control ball valves located near your  bucking unit s hydraulic directional control valves  These two  ball valves control the air supply to each pump     Haskle Pump  M 36 Series 1 3 hp pumps  maximum rated  output 4 500 psi  using 10 CFM   125 psi for  maximum pressure and flow rate performance     Swagelok Pressure Relief Valve  SS 4R3A5 G with RED  spring kit 177 R3A K1 G for 4000 to 5000 psi  cracking pressure     OPERATING PROCEDURES    1  Check all fluid levels including diesel  engine oil   hydraulic oil  compressor oil  if applicable      2  Drain all water from air dryer  Add oil to air lubricator   3  Install correct dies in tong and backup sections     4  Start electric or diesel hydraulic power unit  electrical  generator and air compressor  as required for your  system      5  Determine clamping pressure requirement     a  For low torque large diameter tubulars use only  hydraulic power unit pressure     b  For moderate torque smaller diameter tubulars use  on
62. f 1   of 1 SEE NOE      NOTE LT Ins ons            Depth        v     sabed    PLC    PVG 120      10v  Signal                           Note  The wire length and dia  from  power supply to the coil and  coil to INT 10 device need to  be the same                    PVG  Coil    120                UNLESS OTHERWISE SPECIFIED TOLERANCES ARE R8 Ai   4225 HWY 90 E  PLACE DEC  3 PLACE DEC    FRACTIONS   ANGLES   SURFACE   FLATNESS AR PL     SUPE RIO R_ BROUSSARD LA 70518      020   005   1 16    5   8 7    015 per foot Manufacturing  amp  Hydraulics  337  837 8847                        ETCH 1  Dimensions ore in inches IPART NAME   P N  amp  MATL  P O  2  Remove burrs  amp  sharp edges with 1 64x45 max         ON NON CRITICAL SURFACE   3  Machined fillet radii are 1 32 Electronic proportional controls  4  Normality Squareness  amp  parallelism of machine surfaces ore      TAG  002 per inch  to a max of  012 inches for a single surface  MATERIAL SPECIFICATION  Rev By   Date    Description of Revision P N  amp  MATLP O  5  Machine diameters on a common centeriine must be concentrie        DRAWN EY  W  LeBlanc Matl Req   within 4 JJ unmachined diameters concentric within 4     THIS DOCUMENT IS THE PROPERTY OF SUPERIOR MANUFACTURING  amp  HYDRAULICS AND IS APPROVED BY  DAN B Initial Condition            CONSIDERED CONFIDENTIAL  THIS INFORMATION MAY NOT BE USED  DISCLOSED  COPIED  PR  1   Revision No   X   STAMP ETCH TAG                     Zero  REPRODUCED IN ANY FORM  WITHOUT THE EXPR
63. hium Complex Soap  wt   Serv  Temperature    Base Oil Viscosity    40      cSt  ASTM D445   100  C  cSt    Viscosity Index   Penetration  dmm  Worked  60X  ASTM D 217    Dropping Point    F  ASTM D 2265    Rust Protection  5  SSW  ASTM D 5969    Water Washout   wt loss   175  F  ASTM D 1264    Timken  OK Load  lbs  ASTM D 2509    Bomb Oxidation  100 hrs   210  F  psi drop  ASTM D 942    Applications    68  68    65 0  8 5    95    9   222  432   41 39 0  20   Pass   Quality Level  Quality Level    2000     N A    Blue    N A    150  14 5    N A    280    450     Pass    6 8    45    5 max    Industrial application where a high  temperature multipurpose extreme  pressure grease is needed  Trailers    Page 4 9    OPERATING INSTRUCTIONS    The basic procedures to be used when handling and bucking  up collars on tubulars should be as follows     1     2     Couplings should be started by hand on the pipe     The pipe and coupling are moved by means of a crane or  pipe roller system into the bucking unit to position the  coupling within the tong section  Itis very important that  both the bucking unit and the pipe be level at this time     The tong is then clamped on the coupling  The centering  cylinder should rise until it just contacts the coupling  It  should not stop short  nor should it push the coupling  upward  If the tubular is excessively heavy  it may be  necessary to adjust the setting of the sequence valve to  insure the centering cylinder fully extends  As the  press
64. if  pipe will be made up using    high    mode     low     mode or combination of high and low modes  Note  some units may also have    series high  and    parallel  low  controls to increase rotational speed     b  Insure PLC is programmed for the following typical  sequence of makeup operations     1  Energize hydraulic power unit     2  Optional   Verify hydraulic system pressure is  available     3  Optional     Verify air pressure is available   4  Optional   Verify absence of coupling in tong     5  Energize tong release circuit to insure cylinders  are retracted     6  Energize backup release circuit to insure  cylinder s  is  are  retracted     7  Verify tong centering cylinder is in bottom dead  center  BDC  position  sense using customer  supplied proximity sensor or absolute encoder      a  Ifcentering cylinder is not in BDC position   energize the gear shift valve solenoid to  shift to    low gear    position     SUPERIOR Manufacturing  amp  Hydraulics  Inc   15  CLINCHER   BUCKING UNIT    Revision  04 07 Page 4 5    Manual PLC Controlled Bucking Unit  INSTALLATION  amp  SETUP INSTRUCTIONS    REMOTELY OPERATED BUCKING UNITS REQUIRE OPTIONAL ELECTRICALLY CONTROLLED  SOLENOID OPERATED HYDRAULIC CONTROL VALVES  ELECTRICAL CONTROL PANELS   PROGRAMMABLE CONTROLLERS  POWER SUPPLIES AND SENSORS ARE OPTIONAL AND  NOT INCLUDED  END USERS WHO ARE PROVIDING THEIR OWN CONTROL SYSTEMS MUST  INSURE THEIR ELECTRICAL CONTROL SYSTEM AND POWER SUPPLIES ARE CAPABLE OF  DELIVERING TH
65. imal pipe marking  Non marking aluminum dies are  available for use with fiberglass or corrosion resistant alloy   CRA  tubulars  CLINCHER   GRIT FACE    dies are  available for chrome and stainless steel tubing applications  where steel dies are not acceptable and which require greater  torque capacity than non marking aluminum dies can provide   Adapters which utilize Dovetail strip dies may be available on  special order  See Section 3 for more information concerning  Die selection and usage     CLINCHER   BUCKING  components  see Figure 1      UNITS have three main     1  A powered  rotating tong assembly with hydraulically  operated jaws which grip the tubular   s coupling      2  A non rotating backup assembly with hydraulically  operated jaws which grip the body of the tubular      3  A frame system which supports the first two items and  contains the drive mechanisms and Bucking Unit Control  Panel     A separate hydraulic power unit is required to supply the  required hydraulic power to drive the tong and operate jaws     SUPERIOR Manufacturing  amp  Hydraulics  Inc   15  CLINCHER   BUCKING UNIT  Revision  01 06    ASSEMBLY    Page 2        SUPERIOR Manufacturing  amp  Hydraulics produces three  different types of Bucking Units  Type One is primarily  intended for use in pipe mills or pipe yards for the installation   make up  or removal  break out  of couplings  This unit will  readily accommodate different sizes of tubulars while allowing  the spacing between the t
66. important information is contained a  CAUTION  Insure hydraulic fluid reservoir is  throughout the technical manual  Thoroughly familiarize totally clean and dry before filling with oil  All  yourself  and others working with you with this hydraulic fluids  including new hydraulic oil  must be  information before commencing installation or operation  filtered to 5 microns before adding to the reservoir     Fill the hydraulic reservoir with the appropriate    a  AJSA should be undertaken before commencing     om  filtered hydraulic fluid to within 4 inches from top of    installation work or using installed equipment     Untrained personnel must not handle  install or reservoir   operate this equipment  b  CAUTION  Insure the suction isolation valve is  3  INSTALL   CLINCHER   BUCKING UNITS must be open before starting power unit  Failure to open   installed on a foundation suitable for the weight of the this valve will cause catastrophic pump failure   unit  its accessories  pipe handling equipment plus the c  Note  The electrically driven hydraulic power unit is  weight of the heaviest tubulars being processed  Leveling equipped with a low fluid level switch which will  jacks are not provided  but are available as options  and automatically shut down HPU electrical motor if  may be required to insure the unit is supported on each of fluid level drops below safe operating level  Refill  the four corners  When possible  we recommend the unit unit before attempting to restart H
67. ing bolts and lengths of hoses supplied with equipment     brackets before the Bucking Unit has been moved to its  final location and no further handling is required  Refer 5  FILL POWER UNIT RESERVIOR WITH          to illustration on page 1 1 to identify location of shipping HYDRAULIC FLUID   Unless specifically noted  all  brackets and bolts  hydraulic power units are shipped without hydraulic oil        Refer to order documents to determine the volume of   a  WARNING   CLINCHER   15    Bucking Units hydraulic oil required to fill the hydraulic reservoir  The  weight more than 13 500 Ibs  and must be handled SUPERIOR Hydraulic Power Units and the CLINCHER     with appropriate equipment and procedure to BUCKING UNIT are designed to work with conventional   avoid exposing personnel to hazards or potentially industrial hydraulic oils  Superior Manufacturing  amp   damaging the equipment  Hydraulics utilizes TEXACO Rando HD 68 hydraulic oil    2  READ HAZARD WARNINGS and TECHNICAL Substitution of brands with comparable properties is  MANUAL      The first section of the technical manual acceptable  Use of low viscosity fluids or high viscosity    fluids  synthetic  fire resistant or water based fluids  should not be considered without consulting with  SUPERIOR Manufacturing and Hydraulics     contains specific information about Operating Procedures  which if not strictly followed could result in serious  injury  loss of life  damage to equipment or damage to    tubulars  Other 
68. it to return to the neutral position     a  To break out connection  slowly shift motor  valve lever from neutral to  BREAKOUT   position and allow the unit to rotate until the  connection has backed off at least two turns     43           Actuate tong clamp valve lever to retract clamping  cylinders  Release lever and allow it to return to the  neutral position     44  Actuate backup clamp valve lever to retract clamping  cylinder     45  STOP HPU using switch on console     46  Release any trapped hydraulic pressure by fully  actuating all control valve levers in both directions  several times     47  Bucking unit should now be ready for operation   Refer to technical manual to review maintenance  procedures and for selecting  changing  and using  dies     FOR USERS OF REMOTELY OR AUTOMA   TICALLY OPERATED EQUIPMENT USING PLC    CONTROLLERS PLEASE MAKE NOTE OF  RECOMMENDED OPERATING PROCEDURES  AND SETUP LISTED IN STEP 10        10  Refer to electrical schematic for connecting PLC to    electrical terminal strip located in control console  enclosure  Note  Electrical cables between valves and  enclosure are long enough to allow the enclosure to be  removed from the interior of the console for easy  servicing  Refer to Solenoid Power Requirements and  table on page 5     a  Manually setup bucking unit for pipe to be made up  including selecting and installing dies in tong and  backup  adjusting system hydraulic pressure   determining if pressure intensification is required  
69. ize dump valve solenoid coil  indicating makeup has been completed     Manual PLC Controlled Bucking Unit  INSTALLATION  amp  SETUP INSTRUCTIONS    c  NOTE  Torque Turn systems provide an  alternate means of identifying incorrect  make ups which must be used to initiate a  connection breakout cycle to permit  inspection of connection     13  De energize tong and backup clamp intensifier  circuits     14  Energize backup retract  open  circuit to insure  cylinder retracts and lockjaw backup opens to  clear pipe  Monitor system pressure verses time  to verify backup is fully open  or use customer  supplied proximity switch to sense position      15  De energize backup retract circuit     16  Energize tong retract  open  circuit to insure  cylinders retract and tong opens to clear  coupling  Monitor system pressure verses time  to verify tong is fully open     17  De energize tong retract circuit   18  Feed pipe to rack to clear Bucking Unit     19  Energize    low    motor speed   parallel low  Gf  equipped  and tong motor valve solenoids to   makeup  position  Rotate tong in makeup  direction until centering cylinder is in BDC  position     20  Optional     De energize HPU   21  Repeat steps 1 thru 20 as required     INSTALLATION INSTRUCTIONS  TANDEM LOAD CELL RETAINER       After installing electronic load cell in retainer bracket  the load  cell must be rotated to close the gap until the button just  contacts the load cell brace  Ref  pg  8 17  Item 4  PN  BUCS23204      SUP
70. ly hydraulic power unit pressure plus limited  intensified pressures  Limited intensified pressures  are controlled by reducing air supply pressure at air  regulator     Do NOT ATTEMPT TO ADJUST  SWAGELOK PRESSURE RELIEF VALVES     Failure to comply with this regulation may  cause irreparable equipment damage and  expose personnel to potentially fatal hazards        c  Forhigh torque small diameter tubulars use hydraulic  power unit pressure plus maximum intensified  pressure  Maximum intensified pressure 1s achieved  by adjusting regulator to maximum air pressure  setting     SUPERIOR Manufacturing  amp  Hydraulics  Inc   15  CLINCHER   BUCKING UNIT  Revision  01 06    Page 10 1    6  Install tubular to be bucked up in bucking unit tong and  backup     a  Actuate directional control valve to clamp backup  If  intensified pressure is required  maintain directional  control valve in clamped position and rotate backup  intensifier air control valve to turn on air to actuate  intensifier  Pump will actuate several times building  pressure in clamping cylinders     Do NOT EXTEND CYLINDERS OR ACTUATE  INTENSIFIERS UNLESS PIPE CORRECT DIES  ARE INSTALLED IN THE BUCKING UNIT     Failure to comply will cause extensive  equipment damage and expose personnel to  dangerous high pressure hydraulic leaks        Note  The hydraulic system pressure gauge reading  will not change as it is measuring pressure on low  pressure side of pilot operated check valve  Note   Pump will continue to slo
71. mp  HYDRAULICS     07 21 05          REV    LOG    DATE          REF  SAE    uip Manuals Dwgs   CLEBU117  m d      Alum Die wpg                    8             HYDRAULIC JACK ROLLER SYSTEM ASSEMBLY cc i c ONIS    Part Name    CB2012 01 BRACKET MOUNTING PLATE   CB2013 01 ANGLE BRACKET   CB2020 01 HYDRAULIC JACK ROLLER SYSTEM BOLT ON  1171 3 4  LOCKWASHER    1201 3 4  10 x 1 1 2  HHCS  1300 02 3 4  10 x 1 1 4  HHCS 12 POINT FLG                                                                 APPROX  WEIGHT  LBS    1635    MD     SUPERIOR                  Uy Manufacturing  amp  Hydraulics  318  837 8847                   HYDRAULICS AND IS CONSIDERED CONFIDENTIAL  THIS INFORMATION  MAY NOT BE USED  DISCLOSED  COPIED  en REPRODUCED IN REV    LOG   DATE    ASSEMBLY NO  CB2000 01        THE ACRESSWRITTENCONSENT OF SUPERIOR REF T Were Exp Manuals gs                   ez   8                Item     Qty  Part Number Part Name  1 1  CB2001 01 HYDRAULIC JACK UPPER SECTION          CB2002 01 HYDRAULIC JACK LOWER SECTION STAND ALONE       CB2007 BULKHEAD PLATE  CB2008 HEAVY DUTY BALL TRANSFER UNIT  CB2011 FIXING CLIP FOR BALL TRANSFER UNIT    CB2014 CLEVIS PIN 1 1 4  x 7 5 8     CB2023 CYLINDER 4  BORE 8  STROKE 2 1 4  ROD  1027 3 8  LOCKWASHER    1047 3 8  16 x 1  HHCS  272 3 4  16 JAM NUT  6009 HAIRPIN COTTER PIN 0 243 F  1 1 8    1 1 2  ROUND     WFTX MALE BULKHEAD CONNECTOR 37  FLARE NPTF  BUC5524     P O  CHECK VALVE     NOT SHOWN             a  2  m       ja             se           
72. n work is not being  performed  This may cause undesirable heat build  up  higher energy costs  and could result in shortened  life of hydraulic fluid and or components     ELECTRICAL POWER FOR HYDRAULIC POWER  UNIT   LOCKOUT ELECTRICAL POWER AT  DISTRIBUTION POINT  Refer to order documents to  determine the electrical voltage and power requirements   DO NOT ENERGIZE CIRCUITS AT THIS TIME     a  Connect appropriate electrical power to motor starter   Connect remote control cord from control console to  hydraulic power unit   s motor starter enclosure     b  Insure all components are electrically interconnected  with heavy gauge ground wires and to a suitable  ground rod     c  CAUTION  Use locally licensed electrical  contractors to insure proper hookup complying  with local electrical codes     If unit is to be started up by Superior s factory  technicians  STOP installation procedures now and  notify Superior Manufacturing  amp  Hydraulics that the  unit is now ready for Superior s technicians to  perform startup services  If owner is performing  installation and startup  follow procedures in step 9     INITIAL START UP      a  CAUTION  Insure all control valve levers are in  neutral position     1  Remove cover from HPU pump motor adapter  housing    2  Energize electrical power to HPU starter  Do not  energize air supply at this time     3  Setcontrol console selector switch to manual control   for PLC controlled units only      4  Bump Start and Stop motor controls to ve
73. ol Valves    Inspect and replace defective chain  sprocket or gear reducer   Inspect and replace defective parts  Damaged hub or bearings     Replace control valve     Replace motor shaft seal     Solution  Check pipe O D  and match die size to pipe O D     Clean dies with wire brush and inspect for worn teeth  Replace  with new dies if necessary     Inspect relief valve on power unit to make sure enough system  pressure is being delivered to backup     Remove side plates on backup  Bench test and replace the  counter balance valve defective     Disconnect lines and bench test cylinder  Repair or replace as  necessary     Counter balance valve is stuck  Replace counter balance valve   Repair or replace cylinder     Inspect control valve for damage and or incorrect spool  Repair  or replace as necessary     Page 6   5    Page 6   6    OPTIONS AND ACCESSORIES    OPTIONAL Features and Equipment   Several customer specified options are available including     Maximum diametrical gripping capacity  Maximum backup travel distance  Maximum torque rating   Maximum rotational speed and optional two speed motors  Types of power units   Elevation control systems   Hydraulic load cell and torque gauge  Electronic data acquisition control systems  Hydraulic load control   Hydraulic speed control   Remotely actuated control valve system  Pipe handling systems   Removable  swiveling control panel    SUPERIOR Manufacturing  amp  Hydraulics  Inc   15  CLINCHER   BUCKING UNIT  Revision  01 06 
74. on console     23  Release any trapped hydraulic pressure by fully  actuating all control valve levers in both directions  several times     24           Top off hydraulic fluid level in reservoir to makeup  for volume of fluid used to fill lines and cylinders   NOTE  Some HPU s may be equipped with optional  fluid level sensors which will shut down the HPU ifa  low fluid level condition develops     INSTALL LOCKOUT on electrical disconnect     Install compression load cell  hydraulic or electronic  as applicable  through    MAKEUP    window into  position within the backup  CAUTION  Load cells  with diameters other than 8 750 inches will alter  torque handle length and will require compen   sation to indicate correct torque     25  26    YE x    27  Attach hydraulic torque gage to control console or rig  up electronic torque turn system   s turns encoder   electronic load cell and hydraulic dump valve  solenoid cables  supplied by others  using third party  instructions as applicable  Set torque turn system for  test sub connection   s makeup torque     28    x    Install dummy load cell  aluminum or steel blank   through    BREAKOUT    window into position within  the backup     29  Obtain test sub with threaded connection and start  coupling by hand     30  Install correctly sized dies in tong and backup   REFER TO OPERATING INSTRUCTIONS  DIE  INSTALLATION page 5 2 for details regarding die  installation and operation     31  REMOVE LOCKOUT from electrical disconnect   32 
75. oncerns an operating procedure or practice  that  if not strictly observed  can result in  damage to or destruction of equipment    Note Concerns an operating procedure or practice that    needs highlighting     CLINCHER   Bucking Units are manufactured to provide a  means of making up or breaking out high torque tubular  connections  They utilize high pressure hydraulic fluid power  which can cause the unit to move suddenly and with great  force if not properly anchored  The pipe can also move when  the unit is not anchored and if the pipe is bent or is not  adequately supported  CLINCHER   Bucking Units contain  rotating and reciprocating parts which can severely or fatally  injure personnel who are operating  repairing  or near this  equipment during its operation     WARNING  Bucking Units and Power Units must be  maintained and operated by trained personnel  Personnel with  diminished physical or mental capacity must not operate this  equipment  No work of any type  including changing of dies   15 to be carried out while the Bucking Unit is connected to the  Hydraulic Power Unit     CLINCHER   Bucking Units and Hydraulic Power Units  utilize high pressure hydraulic fluids  Portions of the unit   control valves  hydraulic lines and cylinders may contain high  pressure fluid even when the Power Unit is de energized and  the fluid supply hoses are disconnected  During normal  operation the temperature of the hydraulic fluids as well as  hoses  piping  valves  etc   can rise
76. ong and backup to be adjusted  approximately two feet  When using this type of unit the  couplings and tubulars must be fed through either the backup  or tong into the other component     The Type Two and Type Three  see Figure 1  Bucking Unit is  used for the make up or break out of tool assemblies which  have varying diameters and lengths  The Type Two and Type  Three unit will readily accommodate different sizes of  components  The tong and backup spacing can be adjusted  from a few inches to many feet     The Type Two unit features a chain driven tong with a top  loading  open style LOCKJAW    Backup to allow easy  installation or removal of tubulars or tools using an overhead  crane     The Type Three unit features a gear driven tong with either a  Closed Head Backup  Type 1  or a top loading  open style  LOCKJAW    Backup  Type 2      BACKUP  ASSEMBLY        TONG FRAME    SYSTEM    FIGURE 1  CLINCHER   TYPE 3  BUCKING UNIT    2                            70 13 16  OVERALL HEIGHT       46 11 16  CENTERLINE                                         46                          HH 39 1 16                                             15  BUCKING UNIT  DIMENSIONS    CLEBU1500 30                                                 120  FRAME OVERALL LENGTH       126 1 2  OVERALL LENGTH       FIGURE 2    APPROX  WEIGHT  LBS     13618       AB SUPERIOR     w Manufacturing  amp  Hydraulics    4225 HWY  90 EAST  BROUSSARD  LA 70518   318  837 8847       THIS DOCUMENT IS THE PROPERTY OF S
77. orn relief valve  D Damaged or worn check valve  J  Restricted discharge    K  Valve system restricted    Excessive Wear to Hydraulic Components   Problem   A  Fluid contamination   B  Components misaligned   C  High operating pressures   D  Exhausted fluid  depletion of additives     E  Airin fluid    SUPERIOR Manufacturing  amp  Hydraulics  Inc   15  CLINCHER   BUCKING UNIT    Solution   Clean line  check for contamination   Flush system change fluid    Clean or replace air vent     Check for leaks and be certain fluid suction in tank is well below  hydraulic fluid in reservoir     Repair or replace damaged parts  check fluid for contamination     Check PTO  gears and recommended speed to assure proper  pump is in stalled for operation     Make sure pump has been assembled using correct torque values   Replace relief valve    Replace check valve    Check to make sure relief valve is set to proper pressure     Inspect and repair or replace defective parts  check system for  contamination     Solution   Flush fluid system  replace with new fluid   Inspect and realign   Gauge and set to proper pressure    Flush fluid system  replace with new fluid     Check for leaks  and be certain fluid suction in tank is well  below hydraulic fluid in reservoir     Revision  01 06 Page 6 3    TROUBLE SHOOTING    HYDRAULIC TONG SECTION    A     Problem    Shortened bearing life    Slow Tong Speed     A   B   C   D     E     P     G     H     Problem  Restricted supply line  Low fluid level  
78. oth handles to the  extend position until contact on pipe  Hold for 5 to 10  seconds then release  For 4500 psi setting open both air  valves with air compressor running  Close air valves  you  will be at 4500 psi     If air pressure is adjusted at maximum pressure  there is a  relief valve mounted in each unit hooked to the air pump  that will not allow pressure over 4500 psi     Outside gauges will not measure the intensified 4500 psi  hydraulic supply pressure  just the 3000 psi  Pressure  gauges inside tong and backup will show holding  pressure  To adjust from 4500 psi to 3000 psi  the air  regulator must be adjusted down     To calibrate air gauge to hydraulic pressure  remove the  cover from the tong and close cylinders on pipe   Hydraulic pressure on the inside gauge and air pressure  on the regulator gives you the calibration     For more information  reference Section 11     CONTROLS and INSTRUMENTATION    Figure 1 depicts a standard Bucking Unit Control Panel  arrangement  Figure 2 15 a hydraulic schematic ofthe bucking  unit system  Part numbers for components can be found on  illustrations  The pressure valves  shown in the schematic   have been set at the factory for proper performance and should  not require adjustment under normal conditions  Situations  which would dictate adjustments include handling of  fiberglass tubulars or other easily collapsed thin wall materials  or if steel dies slip at high torques  We recommend you  contact the factory for advise b
79. pressure to clamp  mandrel and maintain pressure to backup    Recommended operating pressure of 3 000    5       Control Panel pressure gauge should match Power Unit  System operating pressure     SUPERIOR Manufacturing  amp  Hydraulics  Inc   15  CLINCHER   BUCKING UNIT  Revision  01 06    Page 6 1    D While maintaining pressure on backup visually inspect  hoses  stainless steel lines  fittings  etc   for seepage of  hydraulic fluid  Repair or replace parts causing leaks     J  Ifatthis time your backup is functioning correctly  open  and close unit several times to insure consistent operation     K  With the proper dies installed in the tong and backup  and  test mandrel locked in the backup  operate tong DCV  through several cycles of locking and releasing  While  maintaining pressure on Tong Assembly  visually inspect  hoses  stainless steel lines  fittings  etc   for seepage of  hydraulic fluid  Repair or replace parts causing leaks     L  Operate Rotational DCV to apply torque to test mandrel  up to value required for tubulars to be made up or broken  out  While maintaining pressure on motor visually  inspect hoses  stainless steel lines  fittings  etc   for  seepage of hydraulic fluid  Repair or replace parts  causing leaks     M  Recommended lubrication schedule performed after  completion of each job  Lubricate all externally  accessible grease zerts  Note there are grease zerts for  lubricating the cylinders which slide within the tong and  backup assemblies which 
80. r implement or tractor manufacturer     CYLINDER SAFETY    Check clevis clearances before  during and after extending the cylinder and before using the cylinder  under pressure to avoid possible injury  or bent or broken rods caused by binding  Never operatea  cylinder above recommended pressures  Never use a cylinder as a safety device when trans porting  equipment     PINHOLE LEAKS   If you observe a pinhole leak  discontinue use of the component  If oil has penetrated your skin or  contacted your eye  seek medical attention immediately     Page    2       DESCRIPTION    SUPERIOR Manufacturing  amp  Hydraulics    CLINCHER    BUCKING UNITS are used to make up or break out tubular  connections in a horizontal position  They are most frequently  used in steel mills  pipe yards  or workshop environments   While they are readily transportable and can be trailer  mounted  Bucking Units are not usually used at a drill site   For drill site applications  refer to our CLINCHER    MAKE BREAK Tool Operating Manual for information  regarding a compact high torque unit     CLINCHER   BUCKING UNITS utilize the patented  CLINCHER   Die System which features a self aligning  spline system that wraps around the pipe providing coverage  up to 330 degrees  The dies distribute the radial load over the  largest possible area to minimize pipe stress and deformation   Three different types of dies are available  Our fine tooth steel  dies provide the highest possible torque transmission with  min
81. raw the electric motor   Example  40 gpm    1500 psi  The maximum compensator setting is set to 2500 psi  The pump requires a load sense  signal from the control valve to match the operating pressure with the load requirement  If there is  no load requirement  the load sense signal will be    0    and the pump will be at a standby pressure   approximately 400 600 psi      Hyd HP    max flow  gpm  x max pressure  psi     1714    SUPERIOR Manufacturing  amp  Hydraulics  Inc   15  CLINCHER   BUCKING UNIT  Revision  04 07 Page 11 1    SECTION 11 HYDRAULIC POWER UNIT                      HIGH PRESSURE  RETURNFILTER  CARTRIDGE FILTER  NOT SHOWN  ASSEMBLY                 75 HP STARTER                         PUMP MOTOR    ADAPTER  amp   COUPLING       SKID MOUNTED  150 GAL  RESERVOIR   amp  DRIP PAN             Photo 1    HYDRAULIC POWER UNIT    SUPERIOR Manufacturing  amp  Hydraulics  Inc   15  CLINCHER   BUCKING UNIT  Revision  04 07 Page 11 2    SECTION 11 HYDRAULIC POWER UNIT               RETURN FILTER  CARTRIDGE  ASSEMBLY          Photo 2  HYDRAULIC POWER UNIT COMPONENTS    SUPERIOR Manufacturing  amp  Hydraulics  Inc   15  CLINCHER   BUCKING UNIT  Revision  04 07 Page 11  3    SECTION 11          HIGH PRESSURE    FILTER          HYDRAULIC POWER UNIT COMPONENTS    SUPERIOR Manufacturing  amp  Hydraulics  Inc   15  CLINCHER   BUCKING UNIT                         HYDRAULIC POWER UNIT    1 1 4   MALE Q D              PU7560 S32                 lt        Item   Qty  Part Number  2
82. re installed in the unit and tightened  correctly  both chains on the driving side should have the same  amount of tension  Note  We use a double strength chain   Half links cannot be used with this chain  use only master  links when installing these chains  Do not attempt to remove  all slack from both sides of the chains  Movement on the slack  side of 3 8 to 3 4 inch at the middle of the slack section is  acceptable     Excessive chain tension can cause bronze bushings to become  excessively worn  Youcan use a feeler gauge to determine the  amount of clearance between the rotating hub and the ID of  the bushings     The amount of slack on the non driven side should be the  same for both chains  If this is not the case and both chains  are the same length  then you may have misalignment between  the centerline of the rotating tong section and the centerline of  the drive shaft  Misalignment must be removed to insure  uniform load distribution in both chains  Use the tension  adjustment bolts to correct this condition     When properly aligned and tensioned  chains will have an  acceptable safety factor  You should avoid shock loading by  gradually applying and releasing loads     TROUBLE SHOOTING    HYDRAULIC SYSTEM    Hydraulic Pump Making Excessive Noise   Problem   A  Restricted or clogged intake line   B  Contaminated fluid   C  Restricted vent    D  Airin fluid    E  Damaged or worn parts    F  Excessive RPM  I C engines only     G  Increased friction   H  Damaged or w
83. rent  die sizes to accommodate a nonstandard tool joint or coupling  OD when the correct size dies are not available  Using  mismatched die sizes or different die types can cause the  tubulars to run eccentrically resulting in erratic torque  measurements  This can also initiate thread galling     CLINCHER   Wrap Around Dies are manufactured in  specific diameters to match standard tubing and casing  diameters  API coupling diameters  selected work string  connection diameters and certain commonly used premium  connection coupling diameters  CLINCHER   Wrap Around  Dies should not be used on tubulars which are larger than the  nominal die size  Steel toothed dies can be used on tubulars  which are no smaller than 3 32   0 093   less than the nominal  die size  Aluminum and GRIT FACE    dies should be  matched with the specific tubular diameters required     Note  Fine toothed steel dies in sizes 7 5 8  and smaller are  normally stocked in our Broussard  Louisiana facility   Aluminum and GRIT FACE    Dies are normally made to  order although a limited range of sizes and small quantities  may be available from stock  Contact SUPERIOR  Manufacturing  amp  Hydraulics  Inc  for information concerning  availability of stock  large diameter and special die sizes     CLINCHER   WRAP AROUND DIES    DIE Nomenclature for CLINCHER   Bucking Unit    BUC1500 xxxx fine toothed steel dies available in sizes  from 15  to 11 3 4    BUCA1500 xxxx aluminum dies available in sizes from  15  to 11
84. rify motor  direction of rotation is correct as indicated by  directional arrow      HPU coupling housing   CAUTION  Running pump in the wrong  direction will cause catastrophic pump failure  which will not be covered by manufacturer s  warranty  Change direction of motor rotation if  required by swapping electrical phases in motor  starter enclosure     5  De Energize electrical power to HPU starter   Reinstall cover on HPU coupling housing     6  Energize electrical power to HPU starter  Start HPU  using switch on console and allow HPU to run for 10  minutes to purge air from primary circuits while  monitoring for leakage     7  Shift mode shift valve lever to    LOW    position    8  Slowly shift motor valve lever from neutral to     MAKEUP    position and allow the unit to rotate for  1 minute    9  Shift motor valve lever to  BREAKOUT  position  and allow the unit to rotate for 1 minute    10  Shift mode shift valve lever to    HIGH    position  while rotating in    BREAKOUT    for one minute     11  Reverse motor valve lever to    MAKEUP    and allow  unit to rotate for 1 minute     12  Release motor valve lever     13  Return mode shift valve lever to mid or neutral  position     14  Verify hydraulic power unit automatically shifts from  operating mode to standby mode by observing  system pressure gage dropping to approximately 500  psi a few seconds after the demand for power has  been removed     15    wm    Actuate tong clamp valve lever to extend clamping  cylinder
85. s  Release lever and allow it to return to the  neutral position  CAUTION  Do not allow  pressure to build beyond 1 000 psi unless the dies  and pipe are installed  Pressurizing the tong  clamping cylinders without dies and pipe in  position can cause failure of the cylinder gland  bolts     16  Actuate tong clamp valve lever to retract clamping  cylinders  Release lever and allow it to return to the  neutral position     17  Repeat steps 15  and 16  six  6  times     18  Actuate backup clamp valve lever to extend  clamping cylinder  Release lever and allow it to  return to the neutral position  CAUTION  Do not  allow pressure to build beyond 1 000 psi unless  the dies and pipe are installed  Pressurizing the  backup clamping cylinder without dies and pipe  in position can cause failure of the cylinder gland  bolts     SUPERIOR Manufacturing  amp  Hydraulics  Inc   15  CLINCHER   BUCKING UNIT    Revision  04 07 Page 4   3    Manual PLC Controlled Bucking Unit  INSTALLATION  amp  SETUP INSTRUCTIONS    19  Actuate backup clamp valve lever to retract clamping  cylinder  Release lever and allow it to return to the  neutral position    20  Repeat steps 18  six  6  times and 19  five  5  times  leaving backup in closed position    21  For bucking units equipped with optional hydraulic  jacks  pipe rollers  backup carriage positioners  etc    duplicate steps 18   19  and 20  for each control  valve and circuit to purge air and confirm proper  operation     22  STOP HPU using switch 
86. sifier if  required     b  De energize backup clamp circuit to allow            ip E Win poup nng t  l   Bucking ut unu directional control valve to return to neutral  coupling is correctly positioned in tong adjacent osition  clamping press  reswill be trapped  to dies  sense correct position of coupling using E il E T k val       customer supplied proximity switch   y pilot operated check valves     9  Energize tong clamp circuit to insure cylinders 11  ee d ewen re   be    are extended and gripping pipe  5 P quipp   required    a     Ener gize t  n             reduire  12  Energize tong motor makeup circuit to tighten    b  De energize tong clamp circuit to allow  directional control valve to return to neutral  position  clamping pressure will trapped by  pilot operated check valves   CAUTION   if clamp circuit is not de energized to  allow hydraulic pressure to bleed off  before rotating the tong  you will  experience heat buildup in the swivel  housing  premature seal failure  and or  accelerated wearing of hub sealing  surfaces which will not be covered by  your warranty     SUPERIOR Manufacturing  amp  Hydraulics  Inc   15  CLINCHER   BUCKING UNIT    Revision  04 07    Page 4 6    connection     a  Monitor makeup of connection  using time  or number of turns  and shift from    HIGH     to  LOW  and  series  to  parallel  mode  if required     b  Monitor makeup of connection using torque  turn computer until required torque is  reached and computer sends power to  energ
87. sing GRIT FACE    or steel dies  Alternately  increasing clamping pressure using intensifiers may  provide higher torque capability  Refer to Air Driven  Hydraulic Intensifier information on pages 10 1 and  10 2     a  Energize air circuit  CAUTION  Use minimum  clamping pressure possible to avoid possible  crushing damage to tubular goods   CAUTION  Do not actuate intensifiers unless  the pipe and the correct sizes of dies are  installed in the tong and backup  Failure to  comply with this requirement will cause  extensive equipment damage and expose  personnel to dangerous high pressure  hydraulic leaks     b  Actuate tong clamp valve lever to extend  clamping cylinders and clamp on the test sub   s  coupling  System pressure should rise to  approximately 2500 psi or pressure established  by operator for specific tubular application   CAUTION  Use minimum clamping pressure  possible to avoid possible crushing damage to  tubular goods  While holding the control valve  lever in the clamp position  rotate the tong clamp  intensify valve allowing air pressure to drive    Manual PLC Controlled Bucking Unit  INSTALLATION  amp  SETUP INSTRUCTIONS    tong s booster pump  Pressure will rise in the  tong to approximately 3500 psi and can be  Observed on the pressure gage in the tong head   Release the lever and allow it to return to the  neutral position     c  Actuate backup clamp valve lever to extend  backup clamping cylinder and clamp on the test  sub  System pressure should rise
88. t our dies  CLINCHERQ Dies  are designed to match the OD of the tubing  casing  coupling  or accessory being made up or broken out  Each die is  stamped on the top or side to identify its size     Using fine toothed steel dies which are slightly larger than the  tubular is acceptable provided the difference in diameters is  less than 3 32   0 093    The fine toothed steel dies we are  providing for pipe and couplings are manufactured with an ID  which is approximately 0 050  larger than the nominal die  size  This provides a die which will readily grip pipe and  couplings which are manufactured to API external diameter  tolerances  In the case of pipe and couplings whose nominal  OD is greater than 5 1 2   the API maximum diameter  tolerance range can theoretically exceed the die diameter   Should this situation arise  the die will still grip the pipe but  will have reduced contact area as the pipe may not contact the  die along its midline  It is important to note we have not had  any reports of die problems with extremely oversized tubulars   This 15 probably due to the fact that modern mills are able to  control the OD of their products to much tighter tolerances  than permitted by the API standards     Aluminum and GRIT FACE    dies should be matched with  the specific tubular diameters required  Our non marking  aluminum die system is manufactured with an ID which is  0 035  larger than the nominal die diameter  We have to use a  closer fit between the nominal tubular an
89. tact     Superior Manufacturing  amp  Hydraulics  4225 Hwy  90 East   Broussard  LA 70518   Phone  337 837 8847   Fax  337 837 8839    www superior manf com    SUPERIOR Manufacturing  amp  Hydraulics  Inc   15  CLINCHER   BUCKING UNIT  Revision  01 06 Page 10  3    Page 10 4    SECTION 11 HYDRAULIC POWER UNIT    PARTS LIST    PU7560 Electrically Driven Hydraulic Power Unit  1800 RPM  60 HZ  75 HP  3 PH  230 460 V  60 GPM  3 000 PSI Power Unit with  Horse Power Limiting Load Sense    Description Manufacturer Part Number    Reservoir Saint Mfg  PU4060 S37  75 HP Electric Motor Rexel PU7560 S1  Pump Motor Adapter Magnalloy PU2500 H16             Motor     PU2500 H14       Motor Pump Coupling Magnalloy  Pump     PU2500H18       Motor Pump Coupling Spider Magnalloy PU2500 H17  Suction Strainer Schroeder PU2500 H19          Hydraulic Pump Vickers PU4060 S20  Return Filter Cartridge Assembly Schroeder PU2500 H15  Pressure Filter Assembly Schroeder PU4060 S3    75 HP S S Starter  480 VOL ACC 0275 Schroeder PU7560 S32    HP3CPTPPLSS 480                      Note  Standard industrial hydraulic system components including hydraulic hoses  pipe fittings  and low  pressure suction isolation valve components are not specifically identified     Note  This Power Unit features a piston pump system with a pressure compensator   horsepower limiting    load sense control  The pump will deliver a maximum of 60 gpm below pressures of 1000 psi   Above 1000 psi  the flow is decreased as not to overd
90. tion of control valve spools  Activate valves  and check for any sign of wear  pitting or scoring of the  chrome surface of the spools  If the spool is damaged in  any way  the complete section must be changed out as  spools are not interchangeable     H  Remove covers and inspect chain and sprockets for wear  or excess slack   Refer to Chain Adjustment      D Check condition of all hydraulic hoses and fittings   Visually inspect all hydraulic hoses fitted to the tong and  in the backup for any signs of leaks  cuts  or wear     J  Reinstall all parts which were removed for inspection  and or damage  Connect to hydraulic power supply and  function test operation  Torque test utilizing appropriate  dies and test mandrel     K  Sample power unit fluid and have processed for contami   nants  Replace return filter according to manufacturer s  specifications     L  Lubricate tong and backup according to maintenance  schedule preceding this section     M  Paint  remembering to mask off surfaces not intending to  paint with grease or masking tape     N  Complete dated inspection report giving details of all  duties performed along with complete list of items  replaced     SUPERIOR Manufacturing  amp  Hydraulics  Inc   15  CLINCHER   BUCKING UNIT  Revision  01 06    Page 6  2    CHAIN ADJUSTMENT    When the chains are removed from the machine and laid out   both chains should      the same length  If they are not  one has  been stretched and both must be replaced     When the chains a
91. turn  slightly to reservoir     Inspect  repair or replace    Check to assure couplings are securely fastened    Inspect  repair or replace  Assure unit has been calibrated to  proper arm length  NOTE  When using CLINCHER integral    backup system  it is the length of backup arm  NOT the tong arm  length     Page6 4    TROUBLE SHOOTING    Failure to Grip Tubulars     A     B     C   D   E   P   G     Problem    Jaws move out from neutral  but fail to penetrate    Jaws fail to move out of neutral    Tong will not release from tubular   Motor runs but Tong does not rotate   Tong binds under light load   Tong rotates while control lever is in neutral    Hydraulic fluid leaking from motor    HYDRAULIC BACKUP SYSTEM    Backup Fails to Hold Tubular     A     B     C     D     E     P   G     H     Problem  Incorrect die for size tubular    Dies have material compacted in tooth area    Power unit pressure set Incorrectly    Counter balance valve not holding pressure    Internal leakage in backup cylinder    Jaws will not retract  External leakage of cylinder    Control valve set to neutral  but Jaws extend    SUPERIOR Manufacturing  amp  Hydraulics  Inc   15  CLINCHER   BUCKING UNIT  Revision  01 06    Solution    Inspect die size and replace with correct dies for pipe  Wrong  size dies for tubular     Inspect and replace defective cylinders for debris or damage   Remove rust and debris from Jaws  and Jaw pockets  Repair   replace and lubricate as needed    Inspect Directional Contr
92. ubular being handled to insure it can be accommodated in the  CLINCHER   BUCKING UNIT  Contact the manufacturer if other diameters  are required        Note  After installing electronic load cell in retainer bracket  the load cell must  be rotated to close the gap until the button just contacts the load cell brace Tandem   Ref  pg  8 17  Item 4  PN BUCS23204   Load Cell Retainer    Higher torque ratings available upon request    Dies and die adapters must be ordered separately    This unit will accommodate large and small diameter tubular goods  Users  should exercise caution when making up small diameter low torque  connections  Testing should be performed to confirm torque turn system will  dump pressure quickly enough to prevent over torquing connections  Reduced  rotational speed when approaching make up torque may be required   Requires optional series parallel valve    7 Requires 125 PSIA 10 SCFM air supply     Speeds when driven by 40 HP electric hydraulic power unit with 60 GPM  variable displacement hydraulic pump     SUPERIOR Manufacturing  amp  Hydraulics  Inc   15  CLINCHER   BUCKING UNIT  Revision  07 07 Page 2 3    Page2 4    CLINCHER   DIES    Many CLINCHER   Tongs and Backups utilize jaws and or        drawings in this section describe the jaw and adapter  adapters which accept Dovetail Inserts  AKA Pencil Dies or systems    Strip Dies  to effectively grip tubulars  Jaw systems and jaw   adapters are also available which accommodate Wrap Around The appropriate
93. uld be flat and  care should be used when tightening mounting bolts  Over tightened bolts can cause spool bind  and casting breakage  When hooking a valve in series  always use a power beyond sleeve  Con   sult your tractor or implement manual to make sure you have the proper quick disconnect line  connected to the inlet of the remote valve    MISAPPLICATION  Always use the proper valve for the job  CONVERTA  CD  CS or CA valves  should never be used for metered heavy load lifting   loaders or similar applications  Use an open  center valve for open center applications and a closed center valve for closed applications  If in  doubt  check with your tractor dealer  Contact CROSS if the valve allows the hydraulic equipment to  creep excessively    MAINTENANCE  Make sure all bolts are tightened and torqued to the recommended specification   Bent or broken parts should not be used  Replace immediately  Always use exact replacements   Always protect valve spool from paint overspray    Faulty quick disconnects can cause high back pressures and sticking spools  Check quick discon   nects periodically to make sure they are functioning properly  If valve spool does not center or  appears to stick  do not use     PUMPS  amp  MOTORS SAFETY    A relief or bypass in your hydraulic system is necessary to prevent pump from breakage due to  overpressurization  Use correct fittings and proper oil as noted in the technical service manual  packed with each unit  Change oil as recommended by you
94. ure in the clamping system increases  the other two  cylinders should start extending and moving downwards  until they contact the pipe  It is important these two  cylinders move in sequence so they contact the pipe atthe  same time  Significant time delays between contact of the  two cylinders can push the pipe off center  Timing is  easily adjusted by means of two flow control valves  located within the tong and two flow controls within the  backup  The pipe should still be level after full clamping  pressure is applied  The coupling should be centered  within the tong at this time     The backup clamping sequence should be identical to the  tong  The centering cylinder should rise until it just  contacts the pipe  It should not stop short  nor should it  contact the pipe with so much force that it cause the  backup suspension spring to be compressed as the backup  is forced downward  or alternatively  cause light weight  tubulars to be picked up  The pipe should be centered  within the backup at this time  If the pipe is not level  when the backup is clamped on the pipe  you will observe  eccentric movement of the pipe  substantial backup  movement and quite possibly very wavy torque graphs as  the pipe is flexed     SUPERIOR Manufacturing  amp  Hydraulics  Inc   15  CLINCHER   BUCKING UNIT    Revision  01 06    Page 5   1    AIR INTENSIFIER    For regular settings of 2500 psi use as previously  push  handles without using air valves     For High Pressure Operation  Push b
95. ustment Bolts  P N HHCS 3 4  10 x 5  GR8    Foot Positioner Washer  P N CB11030 S16            OI Anchor Down Feet  Washers are welded in place  and fastened to anchor down  floor lugs once bucking unit is  perfectly aligned    i Vertical Adjustment Feet  Use to align center of bucking  unit tong vertically with pipe  Pusher Foot Weldment rack system  P N CB2335  Horizontal Adjustment Feet    Use to align center of buck   ing unit tong horizontally with  pipe rack system    CLINCHER        SUPERIOR     AY WORLDWIDE  YEARS AHEAD Manufacturing  amp  Hydraulics    PUBLISHED BY SUPERIOR MANUFACTURING  amp  HYDRAULICS  INC   4225 HWY 90 E   Broussard  LA 70518 USA  TEL  337 837 8847   FAX  337 837 8839   sales superior manf com    Page 4   1    CLEBU1500 32    Tools  amp  Equipment Required  for Setup and Commissioning    Laser transit and qualified operator to align bucking unit   with pipe racks   Welding machine and qualified welder to fix foot posi    tioner washers to bucking unit mounting feet   Wire brush to clean up weld zone and touch up paint    2  sets of 1 2  to 1 1 8  open box end wrenches    1  1 2  Drive set of 1 2  to 1 1 8  sockets    1  1 2  Drive set of 5 16  to 5 8  allen sockets    1  1 1 2  Socket    1  1 7 16  Socket    1  3 32  Allen wrench    2  5 16  Allen wrenches    1  15 64  Allen wrench    1  1 2  Drive ratchet    1  1 2  Drive impact wrench    2  18  Crescent wrenches    2  18  Pipe wrenches   Set of screwdrivers  phillips and flathead    Loctite 764
96. voltage     Limitation output Minimum  gt  1396 and maximum  lt  87  of the supply voltage     Response time              2ms maximum   Linearity TT  Less than 196 deviation     Supply Voltage 9   30 VDC  max  200 mA         10 to  50   C   On a DIN rail   with M3 screws  Ixwxh 77x32 5x114 mm    Ambient temperature    Mounting     Cable connections  Dimensions             i       Guarantee   During a period of 12 months production and component failures are guaranteed   Exchanging a defect INT 10 will be shipped f o b    Guarantee will be void at injudicious use  opening of the case  usage out of  specifications and mechanical damage  such at the judgement of Tildesign BV     Tildesign bv   Krachtenveld 46   NL 3893 CD Zeewolde   The Netherlands   Phone  31     0 36 522 11 34  Fax  31      0 36 522 13 14  e mail info tildesign nl    website www tildesign n      01993 2005 Tildesign BV INT 10 Rev  C  Zeewolde  The Netherlands    Page 5   1    MAINTENANCE    CLINCHER   recommends that owners of CLINCHER    Hydraulic Power Tongs  Backups  CHROMEMASTER      Bucking Units  and accessories adopt a regularly scheduled  maintenance program  Implementation of this type of program  offers several benefits  First  you increase the life of your  equipment  Second  you may find a problem before it  escalates to a costly repair or down time on the job  and most  importantly  prevent injury to operating personnel     A major inspection  described at the end of this section   should be carri
97. wly cycle if air pressure  setting allows pump to intensify pressure greater than  the relief valve setting    Return air control valve to closed position  Release  backup directional control valve     b  Actuate directional control valve to clamp tong  If  intensified pressure is required  maintain directional  control valve in clamped position and rotate tong  intensifier air control valve to actuate intensifier   The pump will actuate several times building  pressure in clamping cylinders     Do NOT EXTEND CYLINDERS OR ACTUATE  INTENSIFIERS UNLESS PIPE CORRECT DIES  ARE INSTALLED IN THE BUCKING UNIT     Failure to comply will cause extensive  equipment damage and expose personnel to  dangerous high pressure hydraulic leaks        Note  The hydraulic system pressure gauge reading  will not change as it is measuring pressure on low  pressure side of pilot operated check valve  Note   Pump will continue to slowly cycle if air pressure  setting allows pump to intensify pressure greater than  the relief valve setting     Return air control valve to closed position  Release  tong directional control valve     c  Actuate tong make break directional control valve as  required     d  Release clamping cylinders in tong and backup using  directional control valves     SUPERIOR Manufacturing  amp  Hydraulics  Inc   15  CLINCHER   BUCKING UNIT  Revision  01 06 Page 10 2    SECTION 10 PUMP SERVICE MANUAL  amp   TECHNICAL DATA    To request copy of Haskel Pump  Technical Data  please con
    
Download Pdf Manuals
 
 
    
Related Search
    
Related Contents
Bosch PFZ 500 E  IMS B014 User Manual (DRAFT)  #10788942#32905966共通説明書  TYLT Energi 2K  User Guide Booklet - Country Cousins Abroad  Bedienungsanleitung Operating instructions - Geier  Bedienungsanleitung  manual de instrucciones    Copyright © All rights reserved. 
   Failed to retrieve file