Home

Pro-Series Sea-Doo Blow-off Valve Kit

image

Contents

1. air or at RIVA s option replace any defective unit without charge if product is returned to RIVA Racing freight prepaid within the warranty period Any equipment returned which in RIVA s opinion has been subjected to misuse abuse overheating or accident shall not be covered by this warranty RIVA Racing shall have no liability for special incidental or consequential damages or injury to persons or property from any cause arising from the sale installation or use of this product No other warranty express or implied including but not limited to the implied warranties of merchantability and fitness for a particular purpose applies Various states do not allow for the limitation of incidental or consequential damages and therefore the above exclusion or limitation may not apply to you Warranty does not include the expenses related to freight or transportation of parts or compensation for any inconvenience or loss of use while being repaired A copy of the original invoice and a Return Authorization Number RA must accompany all warranty claims Warranted replacement parts will be returned freight collect Word doc RS17081 BOV SSQV H1 1 20 10 3
2. eer ie PERFORMANCE EA E MNES Pro Series Sea Doo Blow off Valve Kit ART RS17081 BOV SSQV APPLICATION S 255 215hp Sea Doo Models using RIVA Power Cooler Kits Required tools Snap Ring Pliers 45 degree Star Socket Set Star Hex Bit Set Service Manual Remove seait s Remove engine coolant tank from mounting location RXP X RXP Remove engine cowling 5 bolts total RXT X RXT GTX SC Remove top half of deck beam 4 bolts total and bottom half of deck beam Remove oil level gauge dip stick Remove plastic cover on top of valve cover Replace oil level gauge dip stick Disconnect the wiring harness connectors 2 from ECU and move aside Remove bolts 4 securing ECU to ECU mounting plate Remove ECU and set aside Word doc RS17081 BOV SSQV H1 1 20 10 Part N A RS09531 RS35187 CALL Remove only three of the bolts securing ECU mounting plate to intake manifold ECU Mounting Bolts to Remove Rotate plate to the left Take care not to damage wires or throttle cable ae PS r al TE Locate the protrusion exposed when ECU mounting plate is rotated to left T a im TE a 25 Using the supplied 3 32 drill bit carefully and slowly drill straight into the end of the protrusion NOTE The material you are drilling into is made of thin plastic Do not push or force drill bit Drill slowly Inspect newly created hole for rough edges or protruding
3. plastic Clean any rough edges or filings left from the drilling procedure Install longer section of supplied vacuum line onto fitting and secure using a supplied zip tie Route vacuum line along wiring harness under ECU towards throttle body NOTE Do not over tighten zip tie Replace ECU mounting plate ECU and reconnect wiring harness connectors NOTE Carefully install ECU connectors so as not to bend connecting pins Use blue Loc tite on threads of bolts securing ECU mounting plate and ECU Do not over tighten bolts Install supplied billet mounting flange onto aluminum tube between supercharger outlet and intercooler inlet Secure using supplied hardware and gasket NOTE Apply blue Loc tite to bolts Do not over tighten bolts Word doc RS17081 BOV SSQV H1 1 20 10 Install supplied o ring into o ring groove in billet mounting flange Place supplied snap ring over flange on blow off valve Supplied snap ring Place blow off valve on top of billet flange so vacuum tube is facing throttle body While pressing down on valve secure snap ring into groove using 45 degree NOTE Ensure snap ring securely locks into groove in billet mounting flange Install shorter section of supplied vacuum line onto open fitting on top of Blow off Valve and secure with a supplied zip tie Install supplied vacuum filter so that longer side is facing motor Secure using supplied zip ties Longer side of supplied fil
4. ter Secure middle section of vacuum line to OE wiring harness under ECU with a supplied zip tie NOTE Do not over tighten zip ties RXP X RXP Replace engine cowling 5 bolts total RXT X RXT GTX SC Replace top half of deck beam 4 bolts total and bottom half of deck beam NOTE Apply blue Loc tite to bolts Do not over tighten bolts Replace engine coolant tank Check bilge for tools rags etc Start craft and run using flush kit to check for leaks at connecting points Do not run craft out of water for more than two minutes at a time Remember the water belongs to everyone Please ride responsibly and respect the environment Technical Support For answers to questions regarding installation or trouble shooting RIVA Performance Products contact RIVA Technical Support directly at 954 247 0705 or by e mail at tech _support rivamotorsports com Limited Warranty RIVA Pro Series Blow off Valve Kits carry a 90 day limited warranty to the original purchaser They are warranted to be free of defects in materials and workmanship under normal use and service Customer modified components will be void of warranty This warranty is limited to defects in the primary components only Finish and or wear marks in or on primary components are not covered under this warranty RIVA Racing s liability is expressly limited to the repair or replacement of the components contained within or associated with this kit RIVA Racing agrees to rep

Download Pdf Manuals

image

Related Search

Related Contents

  Instrucciones de montaje y servicio  MS Memo-2pages-Candidat 2015-2016_Mise en page 1  取扱説明書/メニュー集 もちつきベーカリー 品番 SPM-MP31  Tributaries AC200 User's Manual  MODE D`EMPLOI  AT1000 シリーズ  Position Control and Earthquake Analysis Shake Table II User Manual  PowerKey Pro Model 600 User Manual    

Copyright © All rights reserved.
Failed to retrieve file