        Global Tender Invite for Establishment & Demonstration of Hydrogen
         Contents
1.     Grid               Grid Solear   i   Grid Tie  Co   i   inverter                            Hydrogen Dispensing Facility             Fig 1  General block diagram of power supply    Page 1 of 17    ANNEXURE   I    The fig 1 depicts the configuration of the Solar PV system which will be used for  generating power to Hydrogen Dispensing Station     1 0 Tender Gualification   The complete hydrogen dispensing station is to be set up on turnkey basis and the  vendor should have experience of setting up of at least 2 similar facilities comprising of  electrolyzer  compressor  dispenser  associated electrical and instrumentation control  system and related accessories during last five years  Vendor should provide the details  of the similar facilities set up during the period supported by technical documents and  list of users with contact details  Vendor should have their Service Centre   operation in  India  with sufficient spares and trained manpower for after sales service     The detailed specifications of the complete system are given below     2 0 Hydrogen Generation Plant Using Electrolysis of Water  1 No     a  Type   Electrolytic  KOH based     Hydrogen gas generation capacity  Min    5 Nm  hr      Max  Oxygen impurity in Hydrogen   2 ppm     Delivery Pressure   7 12 bar     Location temperature   0  C to 50  C  Purity of Hydrogen 3 99 999    Bipolar sealed compact design     Microprocessor based control for fully automatic operation and integrated  safety controls     
2.    MAWP   13 8 bar    Material i As per International standard                  e    Design compliance i ASME section VIII Div 1 2007    Approval certificate   PESO  Nagpur    g  Vessel should be compatible with Hydrogen storage as per International  practice     Page 5 of 17       ANNEXURE   I    h  Vessel should have pressure safety valve     i  Drain line valve should be of Swagelok make     j  Vessel should have suitable pressure gauges of WIKA make  suitable range      Hydrogen Compressor  Oil Free   1 No     TECHNICAL SPECIFICATION   a  Type    b  Quantity   c  Driver   d  Single   Double Acting  e  Duty   f  Stage    Triple Metallic Diaphragm with leak  detection system  Non Lubricating type    One No    FLP Motor suitable for Gas Group lIC  Single   Continuous    Two    Compressor should be capable of accepting delivered hydrogen from outside  production facilities     4 2    OPERATING CONDITIONS   a  Gas  Composition    Relative Humidity            Suction Temperature       e  Suction Pressure    Capacity    Discharge Pressure  Discharge Temp   after cooler      Cylinder  amp  Jacket cooling    Hydrogen   Hydrogen   99 999    Oil     Nil  90   at max  temperature  0  C to 50  C   Variable from 200 bar to 5 bar    5 Nm3   hr at 5 bar suction  pressure  min      450 bar  minimum   40   C maximum    By closed loop chillers   refer 2 1d of electrolyzer     Common Chiller for electrolyzer  compressor and other accessories     Page 6 of 17       ANNEXURE   I    4 3 LUBRICA
3.   will be held with the lowest techno commercially acceptable tenderer only   UPES has the right to reject the offer s  in case tenderer s  give suo moto increase and  not to consider suo moto reduction for evaluation    6  The un priced bid of offers shall be opened in presence of the authorized representatives  of intending tenderers on the date and time as mentioned above    7  Tender s received after the prescribed due date and time shall be rejected summarily    8  The offer must accompany the Safety Data Sheet  Catalogue  etc   as the case may be  in  respect of the product offered     Page 3 of 3       ANNEXURE   I    TENDER DOCUMENT    Establishment 8 Demonstration of Hydrogen Production and  Utilization Facility through Photovoltaic Electrolyzers system at the  solar Energy Centre  SEC   GwalPahari   Gurgaon     General Description   University of Petroleum and Energy Studies  UPES  intends to set up a Hydrogen  dispensing station on behest of Ministry of New 8 Renewable Energy at its Solar  Energy Centre  Gwalapahari  Gurgaon  The electrical supply to this station will be  sourced through PV systems which will be supplemented through grid supply  The  purpose of creating a hydrogen dispensing facility at this location is to dispense pure  hydrogen for hydrogen ICE powered vehicles and fuel cell vehicles  The proposed  facility will have onsite hydrogen generation  compression  storage unit and dispensing  unit  which can dispense hydrogen at 350 bar to the vehicles 
4.  approval of the station    Manufacturers test reports   Warranty certificate   U L mark certificate  Underwriters Laboratories Inc   wherever applicable  should be provided at the time of PESO clearance   approval of the station     Page 16 of 17       ANNEXURE   I    19 0 TIME SCHEDULE  The Hydrogen Dispensing Station should be supplied within six months after  acceptance of purchase order  The installation and commissioning has to be completed  within three months of receipt of consignment at Solar Energy Centre  Gwal Pahari and  site readiness     20 0 UPES scope of work     a  UPES will provide storage space for safe keeping of all materials during the  construction period    b  UPES will provide electricity for construction    c  The civil work for the station will be undertaken by UPES     The tender should be addressed to     THE MANAGER  PROCUREMENT  DR  A  K  TIWARI  SR  PRINCIPAL SCIENTIST   UNIVERSITY OF PETROLEUM AND ENERGY STUDIES   HERS  3     FLOOR  PHD CHAMBER    4 2  SIRI INSTITUTIONAL AREA   AUGUST KRANTI MARG   NEW DELHI 110016   INDIA    Ph   91 11 41730151 53  Fax   91 11 41730154  E mail  aktiwari upes ac in    Page 17 of 17       ANNEXURE  II     AGREED TERMS AND CONDITIONS TO BE ATTACHED WITH UNPRICED SETS OF  OFFERS EACH POINT MUST BE COMMENTED UPON           SR  Description COMMENT YES NO  NO   1  Please confirm that the firm price on the FCA  FOB    International Airport basis in the country of dispatch is  mentioned in price bid        2  Please a
5.  fills   b  One Coriolis mass flow meter with internal transmitters for hydrogen     e The meter should totalize volume of gas dispensed    e The fill quantity should be data logged and displayed locally on the  dispenser face for each fill    e The dispenser should meet or exceed applicable codes and standards    Electronic computer display  all displays should be backlit and intrinsically   safe    Internal gas detection system that alarms at 20  LEL and 40  LEL    e At 20  LEL it should disable electrical power to dispenser  amp  send a signal  to an external alarm  A sounder and red flashing lamp mounted on the  dispenser  should be triggered  NOTE  The sounder and flashing lamp  should be intrinsically safe   An air or nitrogen purge should be activated at  the 20   LEL  level    At 40  LEL the alarms should be the same as at 20  LEL with additional  trigger to signal a station emergency shutdown    Hose leak detection system with automatic shutdown and alarm    Local and remote Emergency Stop switches that can be operated by the   vehicle driver or others to stop the filling process    Manual fuel shutoff valve in close proximity to operator    Stainless steel piping fittings  Swagelok   Parker make  on pressure lines    Personal Identification Number capability to ensure only qualified operators   can fill vehicles     Excess flow programming to interrupt the fill process if parameters leave  established norms for fast fills     Telemetry capability for remote troubles
6.  supply to be  included     All necessary equipment for automatic operation of the Hydrogen plant     Process Instrumentation   a  The unit should be equipped for automatic operation with necessary  instrumentation such as transmitters  indicators  switches  detectors  solenoid  valves  manual valves  relief  amp  check valves  pipe work and SS fittings  hard  wired signals on all critical parameters  explosion proof junction box etc    electrical control panel and cables    b  All the electrical  amp  instrumentation components must conform to hazardous  area classification Gas Group IIC  hydrogen gas      2 2 2 Electrolyzer Power Supply   a  Metal enclosure with doors for easy accessibility and with supports for the  electrical components like transformer  rectifier and set of SCR   s to be  provided    b  Complete automatic independent unit designed to rectify the AC power to the  necessary DC power    c  Integrated current regulation for smooth and fast reaction times of the  hydrogen generator    d  The unit should be either in flameproof enclosure  Gas Group IIC  or to be  located in safe area     Page 3 of 17       ANNEXURE   I    2 2 3 Electrical Control Panel   a  Microprocessor controlled board    b  Human Machine Interface  HMI  with system start up  shut down  alarm  system  parameter setting  status indication and event logging     Audio and visible alarm on man machine interface  Emergency shutdown button  General alarm   ready contact    Uninterrupted power sup
7.  tax payable in India on such site services and also the  statutory deductions of Income Tax and or Service Tax  from the payment will be as per Govt  of India Regulations  in force from time to time will be acceptable to you              ANNEXURE  II    ADDITIONAL INFORMATION   CONFIRMATION REQUIRED TO BE FURNISHED BY  THE VENDOR       a  Confirm that you are submitting the Earnest Money Deposit   EMD  5  of the total order value  If yes  kindly indicate    a  Mode of EMD whether Demand Draft  on the name of     University of Petroleum and Energy Studies     or Bank  Guarantee payable at New Delhi    b  Demand Draft No    Bank Guarantee No  amp  date    c  Amount of EMD     d  Issuing Bank        b  Following information   confirmation may be  furnished in case the items are being quoted in Indian  Rupees and to be supplied locally    1  Suppliers Name  amp  complete address   2  Manufacturers name  amp  complete address   3  Telephone No  Fax No    E mail address   4  Price basis  whether excise   FOR dispatch point or  FOR destination    5  Discount offered if any   6  Packing  amp  Forwarding charge if any   7  Excise Duty if applicable   8  CST  Concessional rate   full rate    9  Freight Charges   10  Transit Insurance   11  Delivery Period   12  Payment Terms   13  Any Other Conditions          c  Confirm whether a repeat order within 6 months of  original order date for the same quantity  rate and  terms and conditions shall be acceptable to you  applicable  to both f
8.  voltage variations    Vendor should take full responsibility of satisfactory performance and after  sales service of all the components of the system irrespective of the makes     17 2 Additional points for the vendors   a  All the electrical components used in the unit or in the control cabinet should    be of reputed company  The vendor shall provide an exhaustive list of  components  equipment along with their makes for UPES approval prior to  procurement    An appropriate lighting system shall be designed and provided for the station   During onsite installation  unpacking of crates  placing of the unit at desired  location etc  is in the scope of the vendor    All the equipment   components   instruments etc  required for meeting the  performance of the station but not specifically mentioned above should be in  the scope of the vendor     e  All flow meters should be provided with bypass line with isolation valves     18 0 DOCUMENTATION    Four sets of following documents  hardcopy  English  must be provided by the vendor  along with the equipment beside their soft copies in CDs     a   b     Operating manual   Detailed maintenance   service manual   P amp ID diagram     to be provided at the time of PESO clearance   approval for  the station    Electrical cabling   instrumentation wiring diagram   Detailed bill of material    List of places similar plant has been supplied earlier    Required site dimensions and layout     To be provided at the time of PESO  clearance  
9. 572   g  Temperature Classification  T 3  Hazardous Area Class  Type    E       h  Power Supply System   415 V   10   3 Phase  50 Hz   3     Other Requirements    a  Enclosure service   TEFC  FLP  IP 55  Type    E    for hydrogen   NFPA 496   b  Insulation Class   F   c  Codes a NFPA 70   d  Motor should be flame proof and suitable for Gas Group IIC    High pressure storage after Compressor  a  Capacity   Total 1500 lit WC  split between  2 3 vessels of smaller size   Storage pressure   450 bar  minimum   MAWP 8 500 bar  Test pressure   700 bar    Material   As per International standard  SA 372   grade J  Class 70 vessel material     Approval certificate   PESO  Nagpur    Design compliance   ASME boiler and pressure vessel code   Section VIII  Div 2 2007    Storage system layout should conform to the Indian   International norms     Storage system should have pressure safety valve  pressure gauges etc     Page 8 of 17       ANNEXURE   I    6 0 Hydrogen Dispenser  1 No     The dispenser unit should be designed to supply hydrogen to vehicles  The dispenser  should be equipped with a hose and nozzle to provide pure hydrogen at a pressure of  350 bar  max   Nozzle geometry should be compliant with SAE J2600 for H35 nozzle   The dispenser should be designed for fast filling of the vehicle storage tanks with a  maximum flow rate of 1 kg  min  and minimum of 4 successive full fills     For the safe operation of the unit  the dispenser should be equipped with hydrogen gas  leak dete
10. DER ENOUIRY NO  CAER UPES R8 D 01 2010 11    Important Notes    1  Vendor may be put on the  holiday list    in case    a  The tender is accepted and the tender fails to furnish the Performance Bank  Guarantee or to execute the contracts with in the stipulated period    b  In case the tender alters  modifies  withdraws the bids suo moto after opening the  bids  technical bids in case of two bids system  and within the validity period  In  such a case  the tender submitted by the tenderer shall be liable to be rejected    2  Please note that the tender can be abandoned without assigning any reason and in such  case  no compensation will be paid for the efforts made by the bidders    3  In case of composite jobs where site activities are involved  two separate contracts to be  issued  one for supply of material and another for execution of the site work  However   both the contracts will be inter linked for the purpose of liabilities and performance of the  vendor    4  Cutting and corrections in the bid document should be avoided and 1f it is unavoidable  it  should be kept at the dare minimum and it should be neatly cut and re written without  over writing and use of white fluid  All corrections should be duly signed by the tenderer   In case the tenderers resorting to many corrections including usage of white fluid in  tender document  the tender shall be liable for rejection    5  Bidders to quote competitive prices considering the fact that price negotiations  if  required
11. Electrical Distribution System with appropriate voltage regulating system     Treatment system of water to make it suitable for use in the Electrolyzer   section 2 10      Suitable analyzer system for continuous display of hydrogen purity dispensed  in percent  oxygen content  ppm  and dew point in degree C     The unit should be fully automatic  suitable for unattended operation and laid out in a  manner so as to conform to national   international standards applicable to hydrogen  dispensing stations     2 1 Other facilities to be provided along with the hydrogen generation plant to  meet the above specifications     Page 2 of 17       ANNEXURE   I    Deoxo dryer for Oxygen removal     Hydrogen Gas   electrolyte separator  hydrogen gas cooler  hydrogen demister   and drier for moisture removal     Water treatment plant   DM water plant with automatic regeneration facilities   supply water conductivity should be max 5 micro seimens   cm   Raw water  analysis report will be provided by UPES     Common air cooled chiller in order to reduce hydrogen losses in the regeneration  process of the deoxo dryer and cooling reguired for electrolyzer 8  compressor  etc     e Chiller should have all internal piping  external piping  amp  storage vessel    tank of SS material     e Closed     loop cooling with chiller should be provided     Wiring of control cabling between control panel and electrolyzer to be provided     Wiring of power cabling between electrolyzer and electrolyzer power
12. TENDER ENOUIRY NO  CAER UPES R8 D 01 2010 11    GENERAL GUIDELINES FOR THE VENDOR    1     Bids offers are reguested for the subject items complete in accordance with our enguiry  document attachments under Two Bid System    Definition of Two Bid System      The bidder should be a reputed Electrolyzer manufacturing company and experienced in  installation of the same  The quotation shall comprise of two priced and two unpriced  copies each of the four in separate sealed envelopes duly super scribed and all these  envelopes should be enclosed in a common sealed envelope  The priced  unpriced and the  common sealed envelope shall be super scribed with our tender enquiry number  due  date  item and name  amp  address of the bidder captioned above  The priced  amp  unpriced  quotations shall be identical in all respects excepting that the unpriced quotation shall  keep the price blank and only the priced quotation shall contain the price    a  The price bid should contain only the detailed FCA Free Carrier    FOB Freight  on Board  price  break up with estimated insurance  air freight   sea freight  charges and FCA   FOB charges of the items offered including discount  if any  and must bear on top  the word    price quotation    and also reference No  and the  date of opening of the tender  The unpriced offers shall be opened in public on the  due date and priced offers of only those tenders whose unpriced offers are found  technically suitable shall be opened subsequently for wh
13. TION SYSTEM    Pressure lubrication with oil filter  oil pump  cooler and pre lube hand operated  pump etc  as per manufacturers standard     HYDROGEN COMPRESSOR INSTRUMENTATION    Pressure Gauges   a  Compressor Inlet    b     Gas Discharge final stage          Intermediate    Oil header  e  Coolant supply   return      Diaphragm rupture detection system with shutdown mechanism    4 4 2 Pressure Switches     Oil pressure low  2 nos  One for pre alarm    Temperature Gauges   Switches   a  Compressor delivery  suction  amp  intermediate  b  Coolant in   out    c  Coolant flow switch with trip arrangement    Level Gauges     Oil circuit    Other Instruments    a  Secondary leak detection circuit   b  PLC control to provide alarm indication and compressor status   c  Junction Box   d  Pressure relief valve in hydrogen circuit at all required points like suction   intermediate  amp  discharge     4 4 6 Inspection  amp  Testing    a  X Ray examination for pressure vessels   b  Test certificate for all instruments as per standard   c  CMRS  PESO certificates of electrical  amp  instrument components   equipments    motors etc     Page 7 of 17       ANNEXURE   I    4 5 ELECTRICAL MOTOR FOR HYDROGEN COMPRESSOR    Technical Specification  PLC Controlled    a  Duty   Continuous  Control   PLC   Reference ambient temp   50   C for design    Operating range a 0   50  C                  e  Equipment Location   Indoor      Area Classification   Suitable for hydrogen atmosphere   Ref  IS  5
14. aily   hourly report generation   Editing   modification capability for graphics and tag database  Capability for calibration of process parameters    Page 12 of 17       ANNEXURE   I    7 4 PLC SOFTWARE     a  PLC program downloading facility from backup  b  Capability to modify the program logic  c  PLC fault diagnosis facility    The application programs should be developed utilizing modular approach  It should be  properly documented for better understanding and maintainability  Documentation  should cover layout  electrical as built diagrams  service manuals for the bought out  components  configurations and service parameters etc  A copy of the back up  software s  should be given with proper instructions for reloading in case of hard disk  crash  PC should have integrated modem for long distance diagnostics    8 0 FACTORY ACCEPTANCE TEST  FAT   5 days   Objective of this test is to verify the equipment   instrument layout and other operating  limits of the plant  The maximum and minimum limits of all the variables e g  pressure   temperature  flow etc  will be checked during FAT  The computer software features   interlocks etc  will also be checked during FAT  UPES will nominate two executives for  FAT and inform the vendor well in time     9 0 SITE ACCEPTANCE TEST  SAT   2 weeks   All the instruments   equipment will be tested for functionalities as per the specification   Vendor will be fully responsible to replace all the damaged   malfunctioning instruments    equi
15. at the surge  rating is as minimum as possible   The vendor should provide surge  amp  continuous rating  for individual  equipment and complete system   Voltage THD  Total Harmonic Distortion   from grid  Current THD drawn by load and kWh required per Kg of hydrogen   The power factor of the overall system should be at or greater than 0 8   UPES will provide power and raw water at one location  The interconnecting  piping and cabling for power and raw water are in the scope of the vendor   All the equipment   components should have to be chosen   sized as per the  ambient conditions  The ambient condition of the temperature as prevalent in  Delhi is as given below  Ambient temperature  Min Max    0  C 50  C  Relative Humidity   90  max   Altitude   225m    13 0 INSTALLATION  TESTING  amp  COMMISSIONING   This project has to be executed on total turnkey basis and vendor will execute  installation  integration  testing and commissioning of all the equipment covered in the  scope of supply  The cost of travel  boarding and lodging of vendor   s engineers should  be borne by vendor     14 0 WARRANTY   The vendor shall guarantee that all materials and equipment used shall be in strict  compliance with characteristics  requirements and specifications as per standard test  procedures and the same shall be free from any defect  The vendor shall guarantee that  all materials and equipment shall be repaired and replaced  as the case may be  on its  own expense in case the same have be
16. bove stipulations  are liable to be ignored        25     Please indicate the name  amp  address of your  Bankers with your Account Number  SWIFT  Code for the purpose of payments   Letter of credit        26     Confirmation that you do not have any relationship  with any of our Board members or Employees        27     Confirmation that you shall supply Maintenance manual  complete  with circuit diagram  component layout with  Diagnostic package for testing and evaluating the  operational conditions and key electronic parts or assembly  on individual or isolated basis  with the eguipment FREE  OF COST        28     Confirmation to assume responsibility of satisfactory  performance    after sales service of all the components   of the system irrespective of make within the warranty  period        29     Please also confirm that spare parts will be made available  as  amp  when required for a minimum period of 10 years from  the date of successful completion of warranty period  The  price of the spare parts to be quoted separately for this        30     Confirmation that system has adequate in built protection  device against component failure due to electrical surges        31     Confirm that in case of an order  the pre installation  requirement will be provided by you within a period of  maximum 1 month from the date of receipt of order           32        Confirm unconditionally that separate prices guoted for  site activities are inclusive of Income tax and   or Service 
17. by their foreign principal abroad  even with  authorization letter from foreign principal to quote  amp  execute orders in Indian    Rupees for their products manufactured abroad  will be rejected out rightly and no  further opportunity will be extended for revising such offers   UPES reserves the right to accept or reject any tender in part or full without assigning any  reason whatsoever  UPES also reserves its right not to accept the lowest rates quoted by  the tenderers and also to split the order as per our requirement      The bidders to  i  Confirm that their company is not engaging child labor and is complying with  various legislations as applicable from time to time as per the various labor laws   statutes of the land applicable to them with regard to engagement of child labor   ii  Confirm Unconditional acceptance that any bidder making a false claim would  have its contract terminated forthwith  if detected later      UPES will not be responsible for delay  loss or non  receipt of tender documents sent by  the post   Negotiations will not be conducted with the bidders as a matter of routine  However   UPES reserves the right to conduct negotiations   Jurisdiction for all disputes related to this tender shall be at New Delhi Court     Following Documents are to be returned  enclosed with the technical bid      Agreed Terms  amp  Conditions enclosed as Annexure  II below  duly filled   commented on each point  signed  amp  stamped on each page     Page 2 of 3    TEN
18. ctor unit  break away hoses and nozzles  intrinsically safe electrical  components and emergency stop buttons suitable for Gas Group IIC     The system must consist of the following major components     6 1 Dispenser Specification     a  Working pressure   350 bar  maximum     Maximum flow rate    1kg min    Electrical requirement f 220 VAC  50 Hz    Ambient temperature range f 0   50  C    Nozzle compliance   SAE J2600  Pressure rating i Mechanical components rated to  1000 bar  Hydrogen dispensing  hose rated to 500 bar using a 6 1  safety factor  Grounding provisions   Grounding to be included with  Communication cable  however   vehicles should be grounded via  tires and concrete foundation   Code and Standards  e NEC for Class 1  Division 2  Group B hazardous location   e ASME B31 3  NFPA 52  NFPA 70  NFPA 55 codes     6 2 Electronic computer and interface for dispenser with user friendly controls    a  Mass display  kg     b  Pressure display  bar        c  Price per unit display  d     To provide step by step instruction similar to commercial gasoline dispensers     Page 9 of 17       ANNEXURE   I    e  Typical messages may be    Turn ignition off        Attach fuel hose    and    Fill  complete        f  PLC based controls backed up with hard wired shut downs for ultimate safety  performance for the compressor and dispenser   g  Remote shut off switch    6 3 Technical Features of Dispenser unit     a  Equipped with stand alone fill computer for temperature compensated
19. d  amp  stamped on all pages  The same    Page 1 of 3    TENDER ENOUIRY NO  CAER UPES R8 D 01 2010 11    10     11     12     13     14     should be returned to us along with your unpriced bids  Bids received without duly filled  in guestionnaire are liable to be rejected    The validity of the offer should be for a minimum period of Six  6  months from the  closing date of this enguiry  However  in case we reguire further validity extension due to  some unforeseen conditions  the same should be extended at the same price  terms  amp   conditions as guoted in the original offers       In case of any delays in supply or installation at the site  price reduction will be as per the    UPES norms  As in  6  Annexure ID       Any effort by bidder  consultant or representative  however described  to influence the    owner in any way concerning scrutiny  consideration  evaluation  comparison of the bid  or decision concerning the award of the contract shall entail rejection of the bid       In case the Indian Counterpart of the foreign manufacturer submits offer on their    letter head on behalf of the foreign manufacturer in foreign currency  such offer  should essentially contain the specific authorization of the foreign manufacturer  authorizing their behalf and will execute the order in line with the prices  terms  amp   conditions agreed by the Indian counterpart    Bidders to note that offers received from Indian Counterparts in Indian Rupees for    the products manufactured 
20. en found to be defective within a period of 12  months after successful commissioning  The maintenance of the complete facility during  warranty period will be the responsibility of the vendor     Page 14 of 17       ANNEXURE   I    15 0 MAINTENANCE OF COMPLETE SYSTEM FOR TWO YEARS  AFTER WARRANTY PERIOD   It is also the responsibility of the vendor to maintain the system for two years after   warranty and the cost of the maintenance for two years should be quoted separately    The party shall be responsible for periodic maintenance as well as breakdown   maintenance of the complete system  The spares required during this period will also be   the responsibility of vendor     16 0 PRICING   The cost break up of all major items i e  electrolyzer  buffer storage  hydrogen  compressor  high pressure storage  dispenser  electrical  amp  instrumentation  FAT  SAT   Installation  testing and commissioning and two years maintenance charges with spares  for complete system should be quoted in the price bid by the vendor     17 0 VENDOR   S SCOPE   a  Vendor   s scope will cover design  detailed engineering  procurement   fabrication  supply  installation  testing  commissioning and training as per the  scheme and specifications given above   Vendor to provide details of layout scheme of the equipment  building design   foundation pipe  cable trenches etc  to UPES within one month after  placement of purchase order  Vendor to provide design and drawings for civil  modification works o
21. ent shall be made in Indian Rupees  only which would not be subject to variation on account of  exchange rates     iii  Confirm unconditional acceptance that any   all  communications received by UPES from your said Indian  Agent   representative will be fully binding on you and will  be honored by you without any dispute     iv  Please furnish the following information in respect of  your said Indian agents   Associates   Representative     a  The precise relationship between the foreign  manufacturers   Principal bidders and their Indian agents    Associate  Representative     b  The mutual interest which the manufacturer principal and  the Indian agents   Associates have in the business of each  other     c  Any payment which the Agent   Associate receive in  India or aboard from the manufacturer   principal whether  as a commission for the contract or as a general retainer fee     d  Indian Agent   s Income Tax permanent Account  Number     e  All Service to be rendered by the Agent Associate  whether of general nature or in relation to the particular  contract              ANNEXURE  II       f  Confirmation that the Indian Agent is registered with  DGS    D and a copy of their valid registration is enclosed     g  Acceptance that the Agent commission shall be paid in  Indian Rupees only after receipt of materials and  satisfactory installation   commissioning of the eguipment at  site subject to fulfilling all conditions above     Note  tenders which do not comply with a
22. f the existing facility  building etc  so as to conform to the  specifications of hydrogen dispensing station  UPES will undertake the civil  construction work as per the layout finalized by the vendor   All interconnection cables to be laid from main supply board  control panel  etc  will be in the scope of vendor  Vendor   s scope also covers the successful  factory acceptance and site acceptance tests of the complete facility   All the necessary approvals from Petroleum Explosives  amp  Safety  Organization  PESO   Nagpur including HAZOP analysis for complete  hydrogen dispensing station  wherever required  should be in the scope of  vendor     17 1 Special terms and conditions    a  Vendor to offer a system capable of adopting future development   expansion  in instrumentation and software development by the manufacturer  Minimum  20  spares capability shall be considered for all the system and sub  systems   Vendor to furnish pre installation requirements well in advance   Vendor to agree to supply spare parts for at least ten years from the date of  installation in case the supplied model is discontinued     Page 15 of 17       ANNEXURE   I    Vendors to supply the names of their Indian agent  if any    Vendors should certify the competence of the Indian agent  if any  in respect  of after sales service  technical knowhow etc    Vendor should certify that the system should have adequate in built  protection devices against component failure due to electrical surges and 
23. hat you have guoted Lump sum discount and  UPES do not intend to procure all items guoted by you   UPES will be at liberty to spread the total discount on pro  rata basis on the total value of the guotation to derive the  discount on percentage basis for each item price         12     Confirm that Complete technical literature   catalogues etc   have been enclosed with your unpriced bid        13     Please indicate the total number of packages  which will  be reguired to be shipped in case of an order for the  complete scope guoted by you        14     With respect to  13  above  please also indicate the  approximate gross weight  amp  shipping dimensions of each  such package        15     Confirm unconditionally that in case of an order emerging  out of this tender in your favor within your offer validity   the guoted prices shall remain firm and fixed till completion  of order  without any escalation on any account   whatsoever           16        Confirm unconditional acceptance of comprehensive  warranty  inclusive of absolutely free of charge delivery at  our site and installation of replacement parts   spares and  maintenance of the complete system free of all expenses   for a period of clear 12 months from the date of satisfactory             ANNEXURE  II       completion of onsite installation  commissioning at our  location        17     Confirm unconditionally acceptance of extended  warranty of 2 years after the warranty period including the  periodic and breakdo
24. hooting and data logging     Inlet valves should be pneumatically controlled     Page 10 of 17       ANNEXURE   I    m  Pressure relief valve should be there to protect the vehicles against  overpressure  NOTE  This should be backup protection method  the electronic  control system should serve as the primary means for controlling the filling  pressure and preventing an overfill     Internal vent line should be combined with nozzle vent line  This line should be  piped to base of dispenser for connection to vent line away from dispenser     Filters on dispenser hydrogen with coalescing element to remove oil  water  and particulate    Liquid filled  panel mounted pressure gauges for dispenser line pressure  Delivery hose for 350 bar  max   neat hydrogen filling    Nozzle holster for hydrogen nozzle    Breakaway system for pressure and vent line on hose    Twin line delivery hose for hydrogen service    Ground cable reel mounted inside dispenser for additional vehicle grounding     Emergency shutdown button  intrinsically safe  mounted on dispenser cabinet     6 4 Safety Features     An emergency shutdown interface should be provided to react to a contact closure from  local or remote emergency shutdown switches  Other fueling shutdown input signals  include     a  Over pressure  b  Drive off   c  Excessive flow  d        e  Leak    Over temperature  including large temperature differential     Safety interlocks to be installed to address   Vehicle check valve failure  Excess f
25. ich intimation shall be  given to vendors  Quotation received through Fax or E mail will not be  accepted    b  The unpriced bid shall be exact replica of the price bid except that all places  where prices are indicated in the priced bid will be marked as    Quoted    in  the unpriced bid  In addition  it shall also contain all particulars regarding  specifications  delivery schedule  payment terms and all other commercial terms  excluding price along with technical literature and must bear on top the word  technical   unpriced offer  The Earnest Money Deposited must be kept in this  envelope only    Bids complete in all respects  enclosing the attachments  should reach our office on or  before 20 02 2012 by 1430 HRS  IST   The unpriced bids shall be opened on the  same day i e  20 02 2012 at 1500 HRS  IST  in our office  The price bids of technically  and commercially accepted offers shall be opened separately under due intimation to  techno  commercially qualified bidders only    Foreign Manufactures should indicate the FOB price  amp  CIF price to New Delhi  airport    Tugalkabad  Dry port  separately in their offers    The technical specification should be as per specification sheet enclosed as Annexure  I   In case of any deviation  please spell them out in your bid under the heading    Deviations  to Technical Specifications       The commercial requirements are specified in the enclosed Agree Terms  amp  Conditions   Annexure  II   which should be duly filled in  signe
26. ill time  Fuel supply initiated alarms   trips  Minimum flow  Flame scanners    High supply pressure    Page 11 of 17       ANNEXURE   I    g  Combustible gas sensors    h  Fuel supply pressure failure    i  Excess fuel flow rate       j  Loss of control power    6 5 Accessories to be quoted as optional equipment for Dispenser    Vibration switch mounted in dispenser   7 0 INSTRUMENTATION AND CONTROL SYSTEM    The control system wherever applicable should be PLC based and preferable make is  Allen Bradley   Honeywell   Siemens  Details of the make and model of each component  should be submitted  High speed data transfer to the MMI PC should be possible  The  230 VAC supply will be provided at one point  The vendor should arrange for other  internal distribution   supplies  Minimum 20  fully wired spare capacity should be  available for maintenance purpose  The control panel should be designed as per proper  industrial practice     7 1 MMI  amp  PLC SOFTWARE SPECIFICATION   The MMI   PLC software should be licensed to UPES name and should have  following minimum features       7 2 MMI COMPUTER     a  Latest Pentium Processor with authorized windows system   b  4 GB RAM or advanced version   DVD R W Drive  Graphics card  500 GB HD  c  19    Color Monitor  Laser Black  amp  White Printer     2 nos    d  Preferred Makes are Lenovo  HP or Dell     7 3 MMI SOFTWARE     Software should be Windows based   Plant control through graphics display   Historical and real time trending   D
27. lso indicate separately  the Airfreight Charges  from the FCA  FOB Airport of dispatch to New Delhi  Airport in India and Sea freight from origin to Bombay  Port        3  Confirm unconditionally that the quoted price for the  main equipment  accessories  amp  spares etc  are valid for the  acceptance up to six months from the closing date of this  enquiry        4  Please indicate the earliest FIRM period of Delivery of  goods at FOB FCA point of shipment from the date of  receipt of Letter of Credit        5  Please indicate the minimum but FIRM period of  completing UPES   on  site activities of installation   commissioning  amp  training  inclusive of time required for  visa  travel time as well as time required at the site for  completion of installation  commissioning  amp  training  after  receipt of officials notification from UPES regarding arrival  of goods at site and site readiness        6  Please confirm unconditionally that in case of any delays  on the part of the vendor or any one authorized by the  vendor either in shipment or on site activities beyond the  above stipulated periods  the price reduction clause as per  the UPES norms will be applicable   2  of the total value  of the order  supply   on site activities value  per week of  such delay or part thereof subject to maximum 5  of such  total order value        Te Please confirm whether the UPES   on site activities of  installation  commissioning and training will be provided  directly by you or by an
28. oreign offer as well as indigenous offer                   ANNEXURE  II    Si  nat  res     8  lt sassnutevncnaveastenanonaunaueanreeseiasocene  Name 1   _ AREE ance a AE O E  D  signation     oreraa ea a kese te leb     OFFICE STAMP  0    ceeen as boca aise    
29. ply  The Inverter of suitable capacity  minimum 20  KVA  to maintain all critical parameters of the system during power failure   Inverter is specially required for the control panel of electrolyzer  In case of  power failure  the hydrogen production should be stopped immediately and the  unit should be put in stand  by mode  If the power supply is not restored within  5 hours  the remaining power of the battery should allow the microprocessor to  depressurize the system and put all parameters into a safe position     Safety Requirement    The equipment will be built according to the international standards and should  fulfill the necessary requirements towards pressure vessel directives and  hazardous area classification vis a vis inter equipment distances   clearances for  installation and selection of equipment conforming to latest international  standards  amp  prevalent Indian norms     The complete process  together with all relevant parameters  should be  constantly monitored and controlled by microprocessor s   Each action that might  cause a dangerous situation should be by passed by a hard wired safety system   In case of malfunction of the microprocessor s  or in an emergency situation  the  unit should shut down immediately     Hydrogen in the atmosphere should be constantly checked using suitable  hydrogen leak detectors and if hydrogen in the atmosphere is detected at a level  of 20  of Lower explosion level  LEL  for hydrogen  the unit should immediately  stop 
30. pment found during installation   commissioning   performance demonstration  If  any component is found to be not performing to the desired level or causing any bottle  neck to the overall trouble free operation   maintenance  vendor will provide suitable  replacement without any additional cost     10 0 TRAINING   Vendor shall provide training in operation maintenance  amp  trouble shooting of the  electrolyzer  hydrogen compressor  hydrogen dispenser  Instruments and other support  systems to the technical staff at the time of the system start up     11 0 SPARE PARTS  a  The spare parts for comprehensive maintenance of the electrolyzer  hydrogen  compressor  dispenser etc  should be included for 2 years and quoted  separately with itemized prices   b  Special tools non sparking type suitable for use in hydrogen plants should be  supplied by the vendor     Page 13 of 17       ANNEXURE   I    12 0 POWER  WATER SUPPLY 8 AMBIENT CONDITIONS  The electrical supply to hydrogen dispensing station will be sourced through PV  systems which will be supplemented through grid supply     a  Vendor should clearly indicate the power requirement  AC   DC  of the total  station   Vendor to provide voltage and frequency range for continuous operations   The power supply available at site is 220 V   10    50 Hz  1     and 415 V   10   50 Hz  3    with wide voltage variations for which static voltage  regulator should be provided   The vendor should supply the equipment with soft start  such th
31. production and put itself in standby     Vendor should provide the appropriate hydrogen sensors  heat sensors  smoke  detectors etc  at suitable location s      Pressure transmitter should constantly monitor and control the system pressure   If the system pressure increases out of range  the production should be stopped    Page 4 of 17       ANNEXURE   I    and put in standby  A temperature transmitter should constantly monitor and  control the electrolyte temperature  The electrolyte levels should be measured by  a level transmitter and controlled by a level controller     Safety devices to protect microprocessor s  against power line disturbance  should be provided  The system should be capable of taking electrical surges  and wide voltage fluctuations     List of Preferable Manufacturers For Major Components    Components Make   Fittings  amp  tubing Swagelok   Ball valve  Needle valve Whitey   Check valve Nupro   Pressure relief valve Circle seal   Nupro  Solenoid valve ASCO    Pressure gauge Wika  For Non FLP components As per the Standard codes    Electrical  instrument components  FLP  As per the Standard codes    Electrical Main Distribution Panel Siemens   L amp T    Vendor may recommend superior alternative makes for the items  However  the  above may be adhered to as far as possible  Any other make will be subject to  UPES approval     Buffer storage between Electrolyzer  amp  Compressor 1 No   a  Capacity   1000 lit WC  approx    Storage pressure   10 bar  approx 
32. ue to be  valid for the warranty period    For Site Activities Order  100  of the order value  minus  statutory deductions on account of Income tax and Service  Tax etc  as per Govt  of India regulations in force  only after  satisfactory completion of site activities of installation   commissioning and training on cash against documents  through bank basis subject to our receiving a separate  performance bank guarantee for 10  of the value of this  order to be valid for the warranty period           22        All bank charges and stamp duties payable outside India in  connection with payment to be made under this purchase  order shall be borne by the supplier  All Bank Charges and  stamp duties payable in India shall be borne by the             ANNEXURE  II       purchaser  Confirm unconditional acceptance             23  All taxes  duties and levies of any kind payable up to FCA    FOB port of shipment shall be borne by the supplier   Confirm unconditional acceptance   24  Direct offer without the Intermediary of Indian Agent       only will be considered  However  if the foreign supplier  has an Indian agent or associate  the following  information may be furnished   i  Please indicate the commission payable to Indian agents  if any in terms of DGS amp D registration certificate  enclose  the copy of the valid DGS amp D registration certificate  in    of the total FOB   Ex Works order value     ii  Confirm acceptance that the payment for commission  to be paid to Indian ag
33. wn comprehensive maintenance for  which the maintenance cost has to be quoted in cost  breakdown        18     Confirm that the vendor has provided an exhaustive list of  Spare Parts  amp  Consumables  with unit rate of each item of  spares  amp  consumables quoted  that may be required for  smooth working of the equipment for a period of at least 02  years  Extended warranty period  after the standard  warranty period of 12 months from the date of  commissioning        19     Confirm clearly whether you have quoted the cost break   up of all major items i e  electrolyzer  buffer storage   hydrogen compressor  high pressure storage  dispenser   electrical  amp  instrumentation  FAT  SAT  Installation  testing  and commissioning        20     If yes  to  19  above  please confirm unconditionally that  such quoted charges for onsite activities are inclusive of all  your expenses related to this activity  such as travel   boarding  lodging  transport or any other expected expense   on Lump sum basis        21     Confirm unconditional acceptance of 2 separate orders  from UPES as under with terms of payment indicated  against each order    For Supply Order  90  payment through unconfirmed but  irrevocable letter of credit against shipping documents and  balance 10  after satisfactory completion of site activities  of installation  commissioning and training on cash against  documents through bank basis subject to our receiving the  performance bank guarantee for 10  of order val
34. y of your authorized representative           8  If by your any authorized representative    1  Please confirm that the same will be carried out by  them FREE of CHARGE    2  Indicate the complete name  address  phone no   fax  no   e  mail address and contact person   s details                 ANNEXURE  II       3  Please ask your representative to confirm the same in  writing directly to UPES    4  Confirm that that the overall responsibility for  completion of these on site activities will also be  yours and in case of failure on the part of your  Indian Representative to complete these activities   the same will be carried out by you without any  additional financial liability to UPES  Free of  Charge  by deputing your representative from  abroad    5  Confirm that any commitments made by your Indian  Representative during the period of onsite activities  will be binding on you        Indicate the Country of origin of goods offered        Confirm unconditionally that the quoted prices are  in the currency of country of origin of goods        11     Confirm unconditionally that discount  if any  indicated by  you in your priced bid is NOT on Lump sum value basis but  is indicated only on percentage basis against each such  guoted price  This is essentially reguired to be complied  with because UPES reserves the right to select any   all  items of your guotation for the purpose of ordering   It  may please be noted that in case it is observed after opening  the priced bid t
    
Download Pdf Manuals
 
 
    
Related Search
    
Related Contents
Conditions générales du Contrat-cadre d`affiliation pour  Sunbeam 6092 Blender User Manual  Betriebsanleitung Operating instructions Mode d'emploi    Copyright © All rights reserved. 
   Failed to retrieve file