Home
        LF_ComChecklist_English_June_2012(webready)
         Contents
1.     Y BOART LONGYEAR    cn                 E  5   E                   LF    DRILLS CHECK LIST             Copyright    2012 Boart Longyear  All rights reserved    Commissioning Procedure    Ensure you have a copy of the sales order with you to review content with the customer   no pricing to be listed on your copy  prior to starting the commissioning process        COMMISSIONING PROCESS    ODrilling Safety  Refer to the Drilling Safety guide in front of the parts book   Train drill crew in safe drilling procedures and practices     Ensure that all safety guards are left installed on the equipment  the site is keep clean with no  tripping hazards  train in rod handling  fuel storage etc     O Drill Inspection    Upon receipt of the drill the first thing to do is visually inspect the rig for any obvious damage  or oil leaks that may have occurred during shipping  With the customer present inspect all  items received  Using the packing lists check off all items and quantities received  Note any  shipping errors     Drill Introduction          Discuss drill depth capacities  power unit HP  KW rating  torque ratings etc  Describe the drill  components  weights etc  Cover all tech data information with the customer and drill crew     LF    DRILLS CHECK LIST          O Operation  Engine Maintenance  Hydraulic System Maintenance  etc    Refer to the operation and service manual     Using the table of contents as a guide read and discuss all sections of this manual with the  drill cre
2.  Moscow   7 495 748 51 68 Ndola   260 21 2651530              Oboartlongyear com Khabarovsk   7 4212 78 97 06 infoSAO boartlongyear com  Chile info AP  boartlongyear com    Santiago   56 2 361 6300 South Africa  infochile Oboartlongyear com Johannesburg   27 11 767 9300  infoSA  boartlongyear com    BOART      LONGYEAR    5   5  www boartlongyear com 6 O re     Services available vary from region to region  Please contact your local office for more information  Copyright    2012 Boart Longyear  All Rights Reserved        YSN   s608 LN  NVAHOF HLNOS   009 3 LINS   AYMAYYd LNOHS YJAlH  S 80801  dNOY9 1005 WOINHOAL    LYUVOg                        
3.  hydraulic circuits     The motor operates off the auxiliary circuit   2000PSI  It drives the lube pump     The pump is protected by a suction filter  metered oil on the pump   s outlet at 2 Y  GPM is  controlled by a PCFC  pressure compensated flow control  valve  through a flow meter and  then into an oil cooler  Leaving the cooler oil returns to the head box to be re circulated by the    lube pump      continued on following page        Copyright    2012 Boart Longyear  All rights reserved    p  m  s     sjyBu   y 1es  Buo7 Weog 2106             OPQ Chuck    All grease fittings on the chuck should be lubricated daily  The fittings that lubricate the chuck  jaw ramps must be lubricated when the chuck is in the open position     Demonstrate how to change the chuck jaws and bushings and how to identify proper jaw and  bushing sizes by part number    Drill Maintenance          Follow recommended service intervals and oil specifications in the operation and service  manual  For information on the power unit servicing refer to the power unit maintenance  manual     O Complete and Submit Warranty Registration Check List    Fill out the form on the following page and send to Boart Longyear for warranty consideration                 WARRANTY REGISTRATION CHECK LIST    Once the drill commissioning has been completed fill out the warranty registration check list below  Fold in half  seal   add correct postage and mail to Boart Longyear  fax to 385 234 3095 or scan and email to warran
4. SI  The main valve controls oil to the rotation circuit  fast feed circuit  main hoist  and wire line hoist circuit     The main relief valve in the main valve bank is set at 4800 PSI  This relief adjustment is  factory set and should not be tampered with  The load sense relief valve for the fast feed is  fixed at 3000 PSI for A  amp  B ports  The wire line winch load sense relief is fixed   2500 PSI  for A  amp  B ports  These valves are internal in the work sections and factory set  Oil returns  from the main valve to the return manifold  then to the oil cooler  then to the main return filter  to the reservoir     O Secondary Hydraulic System    Oil from the secondary pump is sent to the water pump flow control valve in the control  panel  Oil from the flow control valve is sent to the water pump hydraulic motor  Return   oil from the water pump hydraulic motor passes thru the main return filter to the hydraulic  reservoir  Since the secondary pump is load sensing the water pump flow and pressure can  be regulated by turning this control valve  Pump compensator pressure setting is 3 000 PSI  and load sensing standby pressure is 300 PSI  The case drain oil is sent to the case drain  return manifold  then to hydraulic reservoir        LF    DRILLS CHECK LIST          O Auxiliary Hydraulic System    The secondary pump sends oil to the secondary manifold for the chuck  rotation speed control   rod clamp  fine feed  rod making   breaking  mud mixer  head side shift and set up va
5. ensator Pressure Setting  PQ Chuck  Rod Clamp  Mud Mixer Sequence Valve    COMMISSIONING SIGN OFF        The commissioning technician is responsible for checking off all boxes beside headings as training progresses  Also signing off that     the customer has been fully trained on the safe operation and maintenance of the drill rig  The customer is responsible for signing     off that he fully understands and is satisfied with all aspects of the training provided      Commissioning Date Technician Signature       Customer Name Customer Signature                                                                                  TECHNICAL SUPPORT GROUP    BOART LONGYEAR GENUINE PARTS    Each Boart Longyear drill rig is a highly engineered system  rugged and reliable  with every part designed and built  to precise specifications  To maintain quality and maximize efficiency  it is critical to use only genuine Boart Longyear  parts  Parts repair and rebuild services are offered as a more efficient replacement parts option for major components     Australia Kazakhstan United Kingdom  Adelaide   61 08 8375 8375 Almaty   7 727 244 51 03 Mansfield   44 1623 747 898  infoAP  boartlongyear com infoAP  boartlongyear com infoEU  boartlongyear com    Brazil Peru United States  Rio de Janeiro   55 21 2506 2300 Lima   511 203 4200 Salt Lake City   1 801 952 8350  infochile  boartlongyear com infochile  boartlongyear com info boartlongyear com    Canada Russia Zambia   North Bay   1 800 461 7333
6. how to determine the bit weight pressure  review chart in Operations Manual      O Corebarrel and Diamond Products Training    Refer to the coring catalogue to train the drill crew in core barrel and diamond product  selection  use and maintenance     Train in core barrel options such as landing indicator  water retention  types of bits and casing  shoes etc           O Service Tools Required for Commissioning    Basic hand mechanics hand tool kit  hydraulic test gauges with connecting hoses  hydraulic flow  meter  digital tachometer  infrared temperature sensor  Also an assortment of JIC test fittings   tees  etc   supplied with tool kit      Train customer in use of these tools     OPQ Drill Head    Review the separate drill head and chuck assembly instructions in the operation and service  manual the customer   s mechanic and drill crew     Demonstrate how to change the chuck jaws and bushings and how to identify proper jaw and  bushing sizes by part number     Refer to the hydraulic schematic and the hydraulic adjustment procedures to train the customer  on the hydraulic system explaining the flow path from pumps  valves etc     Copyright    2012 Boart Longyear  All rights reserved    Copyright    2012 Boart Longyear  All rights reserved    O Primary Hydraulic System Explanation Pressure Settings    The primary pump sends oil thru the high pressure filter to the load sensing main valve  bank  The pump compensator is set at 4500 PSI  load sensing standby pressure is  300 P
7. lve  all  hydraulic rams   The secondary pump compensator pressure is 2000 PSI     Pressure adjustments on the secondary valves are as follows    PQ Chuck   1400 PSI    Rod Clamp   750 to 850 PSI      Mud Mixer Sequence Valve   1900 PSI    Oil returns from the auxiliary manifold to the return manifold  to the return filter to the reservoir     Oil from the auxiliary pump case drain is sent to the case drain return manifold and then to the  reservoir     O Main Winch Brake Release Valve    The main line brake is released electronically  when the fine feed valve is actuated in    the down     feed position     O Rod Handling    To prevent damage to the spragg clutch in the main line winch it is important to instruct the driller  to properly tension the hoisting cable before opening the chuck  If the rods are allowed to drop  against the hoist cable each time the chuck is opened the resulting shock load may prematurely  damage the spragg bearing in the main line winch     OPQ Rotation Unit    Review the separate drill head and chuck assembly instructions in the operation and service  manual with the customer   s mechanic and drill crew    Particular attention should be made to first checking the oil level in the PQ head when the mast  is in the vertical position as per the operation and service manual  Once the mast is set at the  required drilling angle the level should be noted  The rotation unit   s lube system is controlled by  a pump motor combination  which run on separate
8. ty boartlongyear com   Warranty registration must be completed and on file to obtain warranty consideration     Customer Name  Company   Customer Address    Rig Model  Rig Serial Number   Drill Site  Date In Service     O Drilling Safety  O Drill Inspection        Drill Introduction  O Operation  Engine Maintenance  Hydraulic System Maintenance etc   O Ordering Parts  O Drill Setup  amp  Anchoring        Drill Startup  O Check the hydraulic reservoir oil level  O Check the engine oil level   O Check the coolant level in the radiator   O Check the oil level in the W 11 pump  O Check the main winch oil level  O Check the battery water level in each cell  O Check the oil level in the PQ rotation unit and four speed transmission after raising the mast to the vertical position    O Check all the fastening hardware on the drill mast  base frame  power unit etc  to ensure that they have not  become loose in shipment     Copyright O 2012 Boart Longyear  All rights reserved    Drilling Operations   Corebarrel and Diamond Products Training   PQ Drill Head   Primary Hydraulic System Explanation Pressure Settings                   Pump Compensator Set at   Load Sensing Standby Pressure   Main Relief Valve in the Main Valve Bank Set at   Load Sense Relief Valve for the Fast Feed for A  amp  B Ports Fixed at  Wire Line Winch Load Sense Relief Fixed at    O Secondary Hydraulic System  Pump Compensator Pressure Setting  Load Sensing Standby Pressure    O Auxiliary Hydraulic System  Pump Comp
9. w     Ordering Parts          Review the parts book with the customer discuss drill warranty  part numbering system  how  to locate items in the parts book  procedure for ordering parts etc     O Drill Setup  amp  Anchoring  Ensure that the drill is properly anchored before the drilling operation begins      Refer to the anchoring procedure in the operation and service manual  if published      O Drill Startup    Prior to starting the engine  ensure that all shut off valves on the suction lines are tagged in the  open position       Check the hydraulic reservoir oil level     Check the engine oil level      Check the coolant level in the radiator      Check the oil level in the W 11 pump     Check the main winch oil level     Check the battery water level in each cell      Check the oil level in the PQ rotation unit and four speed transmission after raising the mast  to the vertical position      Check all the fastening hardware on the drill mast  base frame  power unit etc  to ensure that  they have not become loose in shipment        2  oO  17             L  90  g  R       2  z     oO  S  E  o  4            O  m       2  o                      z   gt   a  jo   5    Copyright    2012 Boart Longyear  All rights reserved    O Drilling Operations    Before the drilling starts  allow the driller to operate the drill to become familiar with the  directional controls  speeds of functions  etc     Train driller in chuck jaw installation  foot clamp slip installation  etc   Explain 
    
Download Pdf Manuals
 
 
    
Related Search
    
Related Contents
Mazda 2005 6 SPORTS SEDAN Automobile User Manual  ZKiVision User Manual (Mobile Phone)  EN-US - Getinge Infection Control    Copyright © All rights reserved. 
   Failed to retrieve file