Home

manuale operativo d`installazione uso e manutenzione operating

image

Contents

1. IIALIARAD MANUALE OPERATIVO D INSTALLAZIONE USO E MANUTENZIONE OPERATING AND INSTALLATION MANUAL USE AND MAINTENANCE QUADRO DI RIFASAMENTO AUTOMATICO AUTOMATIC POWER FACTOR CORRECTION EQUIPMENT CE MANUALE OPERATIVO D INSTALLAZIONE Conformit r USO E MANUTENZIONE Conformity OPERATING AND INSTALLATION MANUAL TALIARAD USE AND MAINTENANCE Indice Pag Index Page Generalit 2 General remarks 2 Collegamento alla linea 2 Connection to the network 2 Regolatore di potenza reattiva 2 Reactive power regulator 2 Avviamento ed uso 3 Start and use 3 Controllo del funzionamento automatico 4 Control of the automatic operation 4 Manutenzione 5 Maintenance 5 Posizione T A 6 CT Connection place 6 Collegamenti 7 Connections 7 ITALFARAD 8 ITALFARAD 8 1 Generalit Le apparecchiature di rifasamento a regolazione automatica a gradini tipo PF sono utilizzate per mantenere automaticamente il fattore di potenza di un impianto ad un valore medio superiore al minimo contrattuale fissato a 0 9 Tale regolazione automatica ottenuta mediante un apposito regolatore elettronico di potenza reattiva ad alta sensibilit e precisione L apparecchiatura costituita da batterie realizzate con condensatori modulari che vengono inserite o disinserite automaticamente mediante contattori dotati di un dispositivo atta a limitare il picco di corrente d inserzione in funzione della potenza reattiva capacitiva richiesta dall imp
2. and the load see Fig 2 e CT inserted on the supply cables of the power factor correction equipment see Fig 2 e Defective or unsuitable CT MANUALE OPERATIVO D INSTALLAZIONE USO E MANUTENZIONE OPERATING AND INSTALLATION MANUAL USE AND MAINTENANCE TA LIARAD 6 Manutenzione Le apparecchiature non prevedono particolari interventi manutentivi controlli periodici devono essere operati e Sulle apparecchiature elettroniche regolatore di potenza reattiva e modulo SPC2 al fine di verificarne l efficienza e Sui fusibili di protezione dei circuiti ausiliari F21 26 e Sui fusibili di protezione delle batterie di condensatori muniti di segnalatore e GSull efficienza dell impianto di ventilazione forzata verificando che i ventilatori non siano guasti o meccanicamente bloccati e pulendo con un getto d aria le relative griglie e Sull efficienza dei contattori controllando periodicamente il serraggio dei morsetti e Sulla presenza di condensatori con il dispositivo antiscoppio intervenuto necessario sostituire tali unit monofase per non pregiudicare il rendimento di tutta l apparecchiatura Quest ultimo controllo particolarmente importante per i PF A e PF HA nei quali fondamentale verificare che nel tempo la frequenza di accordo del filtro non si modifichi pur essendo i componenti utilizzati estremamente affidabili pu accadere che qualche condensatore si guasti causando l intervento del relativo di
3. ALFARAD have succeeded in obtaining a share of the world market At present they export to more than 90 Countries all over the world
4. MATICO lt 24 CORRECTION RIFASAMENTO AUTOMATIC BANK WRONG CT CONNECTION PLACE m x T S SUPPLY S MORSETTO DEL T A BB TERMINAL OF CT FASER PHASE R QUADRO 7 POWER FACTOR AUTOMATICO SN E CORRECTION RIFASAMENTO AUTOMATIC BANK ITALTARRD MANUALE OPERATIVO D INSTALLAZIONE USO E MANUTENZIONE OPERATING AND INSTALLATION MANUAL USE AND MAINTENANCE Conformit Conformity CE SCHEMA DI COLLEGAMENTO DI DUE QUADRI IN PARALLELO RETE TA ICE RIFASAMENTO P FISSO TRASFORMATORE K L RIS T KIL RIS T QUADRO QUADRO AUTOMATICO AUTOMATICO RIFASAMENTO RIFASAMENTO NNN SCHEMA DI COLLEGAMENTO CON T A SOMMATORE RETE ne T A SOMMATORE 5 5 5 CARICO QUADRO AUTOMATICO RIFASAMENTO CARICO PARALLEL CONNECTION OF TWO CABINETS SUPPLY TRANSFORMER STATIC POWER FACTOR CORRECTION POWER FACTOR CORRECTION AUTOMATIC BANK POWER FACTOR CORRECTION AUTOMATIC BANK WIRING DIAGRAM OF TWO CT WITH ADDING CT SUPPLY AE o e ADDING CT 5 5 5 POWER FACTOR CORRECTION AUTOMATIC BANK LOADS MANUALE
5. OPERATIVO D INSTALLAZIONE Conformit USO E MANUTENZIONE Conformity OPERATING AND INSTALLATION MANUAL I R L ARAD USE AND MAINTENANCE C ITALFARAD S p A fondata nel 1950 specializzata nella produzione di condensatori elettrici per impieghi generali in corrente alternata quali il rifasamento lampade l utilizzo permanente sui motori e il ritasamento industriale vedere cataloghi relativi L ITALFARAD inoltre specializzata nella produzione di quadri fissi e automatici per il rifasamento industriale in bassa tensione con inserimento dei condensatori sia elettromeccanico teleruttori che statico triac Le apparecchiature dell TALFARAD sono costruite in serie utilizzando linee automatiche e semiautomatiche e questo unitamente all utilizzo di componenti di grande affidabilit ne garantisce un alto livello di qualit e allo stesso tempo un prezzo estremamente competitivo La qualit un imperativo costante ed irrinunciabile per l TALFARAD ej condensatori utilizzati 60831 1 2 IEC 831 1 2 e quadri hanno superato le prove di tipo previste dalle Norme CEI EN 60439 1 CEI 17 13 1 effettuate dal CESI L ITALFARAD S p A detiene dal 1993 una certificazione del Sistema di Qualit secondo le Norme UNI EN ISO 9001 aggiornato con la certificazione UNI EN ISO 9001 2000 ed attualmente in corso l iter per ottenere la certificazione del Sistema Ambientale secondo la Norma UNI EN ISO 14001 Tutto
6. ed In the equipments which are equipped with SPC2 device the ventilation and the alarm signal are generated by SPC2 In the PFS series the ventilation is natural ATTENTION Using the manual control please wait at least 1 minute before connecting the same bank again MANUALE OPERATIVO D INSTALLAZIONE USO E MANUTENZIONE OPERATING AND INSTALLATION MANUAL USE AND MAINTENANCE IALIARAD 5 Controllo del funzionamento automatico La verifica del corretto funzionamento del regolatore automatico pu essere effettuata facendo variare opportunamente le condizioni di carico Se il funzionamento non corretto deve essere ricercata in uno dei seguenti possibili errore e Trasformatore amperometrico non inserito sulla fase corretta vedi figura 2 e Apparecchiatura di rifasamento inserita a monte del punto cui montato il trasformatore amperometrico vedi figura 2 e Trasformatore amperometrico inserito sui cavi di alimentazione dell apparecchiatura di rifasamento vedi figura 2 e Trasformatore amperometrico difettoso o inadatto Conformit Conformity CE 5 Control of the automatic operation The check of the correct operation of the automatic regulator can be effected by modifying the load conditions in a suitable way If the operation is not correct the reason should be founded among one of the following errors e CT connected on the wrong phase see Fig 2 e CT instaled between the equipment
7. ianto condensatori che costituiscono le batterie sono del tipo ITALFARAD VRC o MFHC con resistori di scarica e interrompibile antiscoppio a sovrappressione L apparecchiatura contenuta in un armadio metallico verniciato con resine epossidiche con grado di protezione minimo IP30 Allegato a questo manuale troverete lo schema elettrico di come collegare il quadro 2 Collegamento alla linea le tre fasi dela linea devono essere collegate rispettivamente ai morsetti R L1 S L2 e T L3 in ingresso al sezionatore generale Per il collegamento di terra utilizzare l apposita barra presente sul lato destro dell apparecchiatura morsetti 51 ed L S2 devono essere collegati al secondario di un trasformatore amperometrico TA con corrente secondaria 5A inserito sulla fase R L1 vedi figura 1 Affinch la regolazione automatica funzioni in modo corretto indispensabile che l apparecchiatura sia collegata come indicato in figura 1 nella stessa pagina sono riportati alcuni tipici errori di collegamento 3 Regolatore di potenza reattiva Il tipo di regolatore automatico montato pu variare in funzione delle specifiche richieste del cliente pertanto relativamente alle sue caratteristiche ed alle modalit di taratura necessario riferirsi alle specifiche istruzioni 2 1 General remarks The automatic power factor correction equipments type PF are used to keep the power factor of a plant to an average value highe
8. ic parts reactive power regulator and module SPC2 in order to check their efficiency e Protection fuses on the auxiliary circuits F21 F26 e Protection fuses on the capacitor banks provided with signal e The efficiency of the coolong system checking that the fans are not defective or mechanically blocked and cleaning with an air jet the relevamt grilles e The efficiency of the contactors by replacing those which are defective and periodically checking the tightening of the terminals e The presence of capacitors with overpressure device tripped these single phase units must be replaced to do not jeopardize the performance of the complete equipment This last check is particularly important for PF A and PF HA where checking that the tuning frequency of the filler does not change in the time is basical even using high quality components it can occur that some capacitor fails causing the trip of the overpressure safety device The consequent loss of capacitance may cause a change of the tuning frequency of the filter with consequent dangerous overloads In view of the above a periodical test has to be carried out to check the presence of capacitors with tripped overpressure device these have an expansion of the upper part of the case replacing them with new capacitors In order to prevent possible reduction of the original capacitance values this phenomena can involve more than a capacitor it is useful to chec
9. k during the installation after the first month of operation and then two or three time a year the current adsorbed by the banks connecting them manually with no load condition and taking note of the results on a table Big differences in measures or eventual unbalances of the three phases show the need of a special maintenance ATTENTION Further to the check of the correct thighteing af all the connection periodically clean the equipment inside by removing possible dust not compatible with the good operation of the equipment MANUALE OPERATIVO D INSTALLAZIONE Conformit USO E MANUTENZIONE Conformity OPERATING AND INSTALLATION MANUAL C R L ARAD USE AND MAINTENANCE T POSIZIONE T A CORRETTA FIG 1 SUPPLY S MORSETTO DEL T A TERMINAL OF CT FASE R PHASE QUADRO i 4 POWER FACTOR AUTOMATICO m CORRECTION RIFASAMENTO AUTOMATIC BANK M CARICO SUPPLY S POSIZIONE T A ERRATA FIG 2 WRONG CT CONNECTION PLACE MORSETTO DEL T A Ta FE TERMINAL OF FASE R PHASE R QUADRO 7 POWER FACTOR AUTOMATICO 2 CORRECTION RIFASAMENTO AUTOMATIC BANK IRIS IT MORSETTO DEL T A Ta 1 gt ME TERMINAL OF CT FASE R PHASE R QUADRO 7 POWER FACTOR AUTO
10. on modalities it is necessary to refer to the specific instructions enclosed MANUALE OPERATIVO D INSTALLAZIONE USO E MANUTENZIONE OPERATING AND INSTALLATION MANUAL USE AND MAINTENANCE IALIARAD 4 Avviamento ed uso ATTENZIONE Prima di energizzare l apparecchiatura controllare il corretto serraggio di tutti i collegamenti Ripetere periodicamente tale operazione Con il regolatore installato correttamente l apparecchiatura inserisce e disinserisce automaticamente le varie batterie di condensatori in funzione dell andamento del carico in questo caso il numero di batterie inserite viene segnalato dall accensione dei leds STEP presenti sul regolatore di potenza reattiva L inserzione manuale pu avvenire tramite il regolatore Se nel corso della prima messa in servizio il regolatore di potenza reattiva dovesse indicare capacitivi senza che nessuna batteria sia stata inserita il collegamento del trasformatore amperametrico TA stato erroneamente montato sulla fase sbagliata vedi fig 1 e 2 Al fine di evitare che vengano oltrepassati i limiti di sovratemperatura all interno dell apparecchiatura tramite il regolatore della potenza reattiva viene fatto partire il ventilatore quando la temperatura superiore a 35 C quando la temperatura stata riportata sotto i 35 C precisamente 28 C viene disattivato il ventilatore oe nonostante l intervento del ventilatore la temperatura interna dell apparecchiatura
11. quanto sopra ha permesso all TALFARAD di affermarsi sui mercati mondiali dove attualmente esporta in oltre 90 Paesi di tutti i Continenti sono omologati IMQ EN ITALFARAD S p A Via IV novembre 1 40061 Minerbio Bo Italy Tel 39 051 6618311 Fax 39 051 6605594 E mail italfarad italfarad com Web http www italfarad com Edizione 09 2007 Founded in 1950 ITALFARAD S p A specialises in manufacturing electrical capacitors for A C general applications such as lighting motor run and Power Factor Correction see relevant Catalogues ITALFARAD also produces L V fixed and automatic P F C equipment switching the capacitors by electro mechanic components contactors or by static system triac ITALFARAD P F C equipment is produced en masse using automatic and semiautomatic machinery The utilisation of highly reliable components guarantees a superior level of quality at extremely competitive prices Quality has always been the primary objective of ITALFARAD eCapacitors are approved IMQ EN 60831 2 831 1 2 e The P F C equipment conform to tests carried out by CESI in accordance with CEI EN 60439 1 CEl 17 13 1 Standards In 1993 ITALFARAD was awarded a Quality System Certificate according to UNI EN ISO 9001 Standards this certificate has been updated to UNI EN ISO 9001 2000 The procedure to obtain the Environmental System approval according to UNI EN ISO 14001 Standards is pending IT
12. r than the minimum fixed at 0 9 The regulation is obtained by means of a suitable electronic regulator of reactive power with high sensitivness and precision The equipment consist of modular capacitors banks which are connected and disconnected automatically in function of the capacitive reactive power required by the load by mean of contactors provided with a device able to limit the current peak The capacitors used inthe bank are ITALFARAD type VRC or MFHC provided with discharge resistors and overpressure safety disconnector The plant is contained in a metal cabinet painted with epoxy resins with min protection degree IP30 A complete wiring diagram of the equipment is enclosed showing the way to install the equipment 2 Connection to the network The three phases of the network must be connected respectively to R L1 S L2 and T L3 terminals onto the main switch input For earthing the bar on the right side of the equipment must be used Terminals K S1 and L S2 must be connected to the secondary of a Current Transformer CT with secondary current 5A connected on the phase R L1 see Fig 1 In order to work properly the equipment must be connected as indicated in Fig 1 on the same page some typical connection mistakes are shown 3 Reactive power regulator The model of regulator installed may change according to the performance required For this reason with regards to its characteristics and calibrati
13. sale a 55 oltre a staccare le batterie viene generato un allarme per segnalazione remota Nel caso sia montato il modulo di controllo e protezione SPC2 opzionale la ventilazione ed il relativo segnale di allarme viene gestito dallo strumento SPC2 Nella serie PFS la ventilazione naturale ATTENZIONE Utilizzando il comando manuale e necessario attendere almeno 1 minuto prima di reinserire la stessa batteria Conformit Conformity CE 4 Start anduse ATTENTION Before switching to the equipment on check the correct tightening of all the connections Repeat this operation periodically If regulator is correcty installed the equipment connects and disconnects automatically the capacitor banks according to the load variation in this case the number of banks connected is evidence by the leds STEP on the regulator If during the first installation the regulator of reactive power would show a capacitive load and no banks have been connected the CT has been installed on the wrong phase see fig 1 and 2 In order to avoid that the limits of overtemperature are passed inside the cabinet the reactive power regulator starts the fan when temperature passes 35 C When the temperature goes down below 35 exactly at 28 C the is disconnected If the temperature inside the cabinet in spite of the cooling due to the fan operation reaches 55 C all the banks are disconnected and a remote signal alarm is activat
14. spositivo antiscoppio Il conseguente calo di capacit pu causare una variazione della frequenza di accordo del filtro innescando pericolosi sovraccarichi Pertanto ad intervalli periodici deve essere verificata l eventuale presenza di condensatori con il dispositivo antiscoppio intervenuto facilmente riconoscibili per via dell espansione della zona superiore della custodia provvedendo al loro immediato reintegro con condensatori nuovi AI fine di salvaguardarsi nel tempo da eventuali riduzioni dei valori di capacit iniziale il fenomeno pu anche interessare pi condensatori utile verificare in fase di prima installazione dopo il primo mese di funzionamento e successivamente due o tre volte all anno i valori di corrente delle varie batterie inserendole manualmente ad impianto fermo ed annotandoli su di una apposita scheda evidenti differenze tra misure successive o eventuali squilibri tra le tre fasi sono sintomi di un funzionamento non pi affidabile che pu richiedere un intervento straordinario ATTENZIONE Periodicamente oltre al controllo del corretto serraggio di tutti i collegamenti buona norma procedere ad una pulizia interna del quadro eliminando eventuali accumoli di polvere incompatibili con il buon funzionamento dell apparecchiatura Conformit Conformity CE Our equipments do not need special maintenance periodical check must be however carried out on 6 Maintenace e All electron

Download Pdf Manuals

image

Related Search

Related Contents

VTech Letter Engine User's Manual    Manual de Utilizacao M2000 Rev 3  Samsung SC9150 Manuel de l'utilisateur  

Copyright © All rights reserved.
Failed to retrieve file