Home

Installation Instructions

image

Contents

1. This separation will provide clearance for bottom overlap of the Advantium 120 and the other appliance overlaps Construct a solid oven floor of 3 8 min thick plywood supported by 2 x 4runners on all sides e The support must be level and rigidly mounted flush with the bottom edge of the cutout PREPARE THE OPENING conr Installation over a GE Monogram Warming Drawer 27 or 30 23 1 2 Construct Solid Bottom Min 3 8 Plywood Supported by 2x4 or 1x2 Runners all Four Sides Install 2 x 4 or2x2 Runners or Solid Bottom Must Support 100 Ibs NOTE Additional clearances between the cutouts may be required Check to be sure the oven supports above the Warming Drawer location does not obstruct the required interior depth and height See Warming Drawer installation instructions for details Installation Preparation PREPARE THE OPENING conr Installation over a GE Monogram Oven 27 or 30 23 1 2 Construct Solid Bottom Min 3 8 Plywood Supported by 2x4or 1 x 2 Runners all Four Sides Requirement If you are replacing a GE Monogram electric double oven with the combined installation of an Advantium 120 and a single oven use the dimensions shown The middle rail separating the two openings may need to be larger than the 2 minimum shown PREPARE THE OPENING conr Installation over a GE Monogram Oven and Warming Drawer Construct 27 or 30 23 1 2 So
2. ancho IMPORTANTE este horno no est aprobado para usarlo sobre otro horno Speedcook empotrado una instalaci n pegada a otra o debajo de una superficie de trabajo e Para su seguridad personal este horno no puede ser instalado en arreglos de alacenas como por ejemplo una isla o una pen nsula e El horno debe instalarse por lo menos a 36 3 4 del piso e Deje espacio libre para esquinas paredes cajones adyacentes etc e Las alacenas instaladas al lado de hornos de pared deben tener una especificaci n de adhesi n de potencia de temperatura de por lo menos 194 F El horno debe instalarse en forma segura en una alacena sujeta firmemente a la estructura de la casa Si coloca peso sobre la puerta del horno ste podr a volcarse y provocar lesiones Nunca permita que nadie se trepe se siente o se cuelgue de la puerta del horno ni que se pare sobre ella Preparacion para la instalacion REQUISITOS ELECTRICOS Instalacion nica del Advantium 120 Este producto requiere un circuito de 120 voltios 60 Hz 15 amp y toma 1 8 kilovatios Este producto debe conectarse a un circuito de alimentaci n del voltaje y la frecuencia adecuados e El tama o del cable debe respetar los requisitos del Codigo El ctrico Nacional National Electrical Code o el c digo local en vigencia para esta potencia de kilowatios e El cable y el enchufe de suministro de energ a deben llevarse hacia un recept culo individual conecta
3. or oven circuit breaker before beginning installation to avoid severe or fatal shock injury CAUTION For personal safety the mounting surface must be capable of supporting the cabinet load in addition to the added weight of the 75 pound product plus additional oven loads of up to 50 pounds or a total weight of 125 pounds CAUTION For personal safety this product cannot be installed in cabinet arrangements such as an island a peninsula or below a countertop MISE EN GARDE Pour votre s curit personnelle retirez les fusibles de la maison ou le disjoncteur du four avant l installation pour viter des blessures graves ou m me le d c s pouvant tre caus par un choc lectrique MISE EN GARDE Pour votre s curit personnelle la surface de montage doit tre capable de supporter le poids du cabinet en plus du poids suppl mentaire du produit soit 34 kg en plus du poids suppl mentaire du four pouvant aller jusqu 22 7 kg ou un poids total de 56 7 kg MISE EN GARDE Pour votre s curit personnelle ce produit ne peut tre install dans des arrangements d armoires dont un lot une p ninsule ou le dessous d un comptoir Installation Instructions Step 1 Slide the Oven into the Cutout Step 2 Install Bottom Trim Step 3 Install Side Trim Step 4 Install Mounting Screws Step 5 Finalize Installation Design Information MODELS AVAILABLE Profile Models Monogram Models SCB
4. que el cable de alimentaci n no quede atrapado debajo del horno ni en los laterales Instalacion PASO 3 INSTALE EL RECORTE LATERAL PARA INSTALACION DE ALACENAS DE 30 UNICAMENTE OMITA ESTE PASO SI TIENE ALACENAS DE 27 DE ANCHO e Abra la puerta del horno e Cuelgue las piezas de recorte lateral en las leng etas que se encuentran detr s del saliente del horno Los orificios de los tornillos en el recorte lateral deben alinearse con los orificios en el saliente del horno e Aseg rese de empujar el horno hacia el fondo de la abertura y contra la estructura de la alacena PASO 4 INSTALE LOS TORNILLOS DE MONTAJE e Realice orificios piloto con el taladro en los salientes laterales 2 de cada lado e Coloque los tornillos de color combinado en el saliente lateral y en el recorte lateral si corresponde PASO 5 FINALICE LA INSTALACI N e Conecte la energ a en la fuente La luz interior se encender al abrir la puerta e Consulte el Manual del propietario para obtener instrucciones acerca de c mo operar el horno Notas 10 Notas 11 NOTA Al realizar las instalaciones descritas en este libro deben utilizarse anteojos o gafas de seguridad NOTA La mejora de los productos es un esfuerzo permanente de General Electric Por lo tanto los materiales la apariencia y las especificaciones esta
5. 1000 WW White ZSC1000 BB Black SCB1000 BB Black ZSC1001 SS Stainless Steel SCB1000 CC Bisque SCB1001 SS Stainless Steel PRODUCT DIMENSIONS AND CLEARANCES 22 9 16 _ 29 3 4 With Optional Side Trim 1 1 8 3 4 Po iste a Ba 1 1116 NOTE Appearance may vary slightly by model TOOLS REQUIRED PARTS SUPPLIED e 2 Phillips screwdriver e 6 Brass screws 3 required 3 extra e Hand held drill e 5 Color matched screws 4 required 1 extra e High speed drill bit 1 8 diameter e 2 Side trim pieces e 3 8 slot head screwdriver e Bottom Trim Design Information ADVANCE PLANNING e These ovens may be installed directly into a 27 or 30 wide oven cabinet e The front surface of the oven will be nearly flush with surrounding cabinetry doors e This oven can be installed over any GE or GE Monogram single electric built in oven or a warming drawer or both e Color matched side trim pieces are provided for installation into a 30 wide space Use the side trim when installing the oven above a 30 wide wall oven or warming drawer Discard the side trim pieces if you are installing over a 27 wide oven e Cutout dimensions are the same for both 27 or 30 wide cabinet installations IMPORTANT This oven is not approved for use above another built in Speedcook oven a side by side installation or below a countertop e For personal safety this oven cannot be installed in a cabinet arrange
6. C Almendra SCB1001 SS Acero inoxidable DIMENSIONES DEL PRODUCTO Y ESPACIO LIBRE 29 3 4 con recorte 22 9 16 n lateral opcional 1 1 8 26 3 4 m 21 1 2 ist el pe 1 1116 NOTA La apariencia puede variar levemente de modelo a modelo HERRAMIENTAS NECESARIAS PARTES INCLUIDAS e Destornillador Phillips N 2 e 6 tornillos de lat n 3 necesarios 3 adicionales e Taladro manual e 5 tornillos de color combinado 4 necesarios e Broca para taladro de alta velocidad de 1 8 de 1 adicional di metro e 2 piezas de recorte lateral e Destornillador para tornillos de cabeza ranurada e Recorte inferior de 3 8 Informacion sobre el diseno PLANIFICACION ANTICIPADA e Estos hornos pueden instalarse directamente en alacenas para horno de 27 o 30 de ancho e La superficie delantera del horno quedar casi al mismo nivel que las puertas de las alacenas circundantes e Este horno puede instalarse sobre cualquier horno empotrado individual GE o GE Monogram o sobre un caj n calentador o ambos e Se proporcionan piezas de recorte lateral en colores combinados para su instalaci n en un espacio de 30 de ancho Use el recorte lateral cuando instale el horno sobre un horno o un caj n calentador con una pared de 30 de ancho Si lo instala sobre un horno de 27 de ancho descarte las piezas de recorte lateral e Las dimensiones del corte son las mismas para las instalaciones de alacenas de 27 o 30 de
7. Installation Instructions Advantium 120 Built In SpeedCook Ovens SCB1000 SCB1001 ZSC1000 ZSC1001 For a Spanish version ofthis manual visit our Website at ge com Para consultar una version en espanol de este manual de instrucciones visite nuestro sitio de internet ge com Safety Information BEFORE YOU BEGIN Read these instructions completely and carefully o IMPORTANT Save these instructions for local inspector s use e IMPORTANT observe all governing codes and ordinances Note to Installer Be sure to leave these instructions with the Consumer Note to Consumer Keep these instructions with your Owner s Manual for future reference Skill Level Installation of this appliance requires basic mechanical and electrical skills Completion time 1 hour Proper installation is the responsibility of the installer Product failure due to improper installation is not covered under the Warranty See Owner s Manual for warranty information IMPORTANT e Use this oven only for its intended purpose e Never use the oven for warming or heating a room Prolonged use of the oven without proper ventilation can be hazardous CONTENTS Design Information Models Available Product Dimensions and Clearances Tools Required Parts Supplied Advance Planning Installation Preparation Electrical Requirements Prepare the Opening Remove the Packaging CAUTION For personal safety remove house fuse
8. a referencia PRECAUCION Para su seguridad personal este producto no puede ser instalado en arreglos de alacena como por ejemplo islas peninsulas o debajo de superficies de trabajo Nivel de habilidad la instalaci n de este aparato requiere habilidades mecanicas y el ctricas basicas Tiempo total 1 hora La instalaci n adecuada es responsabilidad del instalador La garantia no cubre fallas producidas por la instalaci n inadecuada del producto Consulte el Manual del propietario para obtener informaci n sobre la garant a IMPORTANTE e Use este horno nicamente para los fines para los que est destinado e Nunca use el horno como calefacci n o para calentar una habitaci n El uso prolongado del horno sin la ventilaci n adecuada puede ser peligroso NDICE Informaci n sobre el dise o Instrucciones de instalaci n Modelos disponibles Paso 1 deslice el horno dentro del corte Dimensiones del producto y espacio libre Paso 2 instale el recorte inferior Herramientas necesarias Paso 3 instale el recorte lateral Partes incluidas Paso 4 instale los tornillos de montaje Planificaci n anticipada Paso 5 finalice la instalaci n Preparaci n para la instalaci n Requisitos el ctricos Prepare la apertura Retire el embalaje Informacion sobre el diseno MODELOS DISPONIBLES Modelos Profile Modelos Monogram SCB1000 WW Blanco ZSC1000 BB Negro SCB1000 BB Negro ZSC1001 SS Acero inoxidable SCB1000 C
9. alentador no obstruyan la profundidad y la altura interior necesarias Consulte las instrucciones de instalaci n del caj n calentador para obtener m s detalles PRECAUCI N para su seguridad personal la superficie de montaje debe poder soportar la carga de la alacena adem s del peso adicional de este producto de 75 libras aproximadamente m s las cargas adicionales del horno de hasta 50 libras o un peso total de 125 libras RETIRE EL EMBALAJE e Saque el horno de la caja e Retire todo el material y la cinta de embalaje e Abra la puerta y saque la caja con las piezas e Tome el paquete de repuestos que contiene los tornillos de montaje Instalacion PASO 1 DESLICE EL HORNO PASO 2 INSTALE EL RECORTE DENTRO DEL CORTE INFERIOR e Alinee las leng etas del recorte inferior con las PRECAUCION se requieren dos personas para Sell ranuras de la parte inferior del horno levantar el horno e introducirlo en la abertura Agarre la parte inferior por delante y por detr s NO USE LA MANIJA PARA LEVANTAR EL HORNO jPUEDE DANARSE e Ajuste el recorte inferior del horno usando los 3 tornillos de metal incluidos L e Levante y sostenga el horno delante de la abertura Sostenga el horno en un ngulo de 45 y enchufe el cable de alimentaci n e Con cuidado deslice parcialmente el horno dentro de la alacena Deje que el horno sobresalga algunas pulgadas de la estructura de la alacena e Aseg rese de
10. andard three prong grounding wall receptacle to minimize the possibility of electric shock The customer should have the wall receptacle and circuit checked by a qualified electrician to make sure the receptacle is properly grounded and has the correct polarity e Where a standard two prong wall receptacle is encountered it is the personal responsibility and obligation of the customer to have it replaced with a properly grounded three prong wall receptacle Do not under any circumstances cut or remove the third ground prong from the power cord DO NOT USE AN EXTENSION CORD Installation Preparation PREPARE THE OPENING The Advantium 120 can be installed in combination with other GE Monogram appliances Always follow each product s Installation Instructions to complete the installation Single Advantium 120 Installation Order a 27 or 30 wide single oven cabinet or cut the opening in a wall to the dimensions shown 27 or 30 23 1 2 Construct Base Min 3 8 Plywood Supported by2x4 or1x2 Runners all Four Sides e Always maintain 36 3 4 minimum height from the floor to the cutout in any single or combined installation e Allow 1 1 4 case trim overlap at the top and 7 8 overlap on the bottom and each side of the opening e Oven overlaps will conceal cut edges on all sides of the opening When installed over a single oven or a warming drawer allow at least 2 between the two openings
11. da producto para realizar la instalaci n Instalacion nica del Advantium 120 Pida una alacena para horno nico de 27 o 30 de ancho o corte la abertura en la pared de acuerdo con las dimensiones indicadas 27 6 30 23 1 2 Base de construcci n de madera contrachapada de m n 3 8 sostenida por correderas de 2x461x2 en los cuatro lados e Siempre mantenga una altura m nima de 36 3 4 desde el suelo hasta el corte en todas las instalaciones nicas o combinadas e Tenga en cuenta el espacio para la superposici n de un recorte de caja de 1 1 4 en la parte superior 1 8 en la parte inferior y a cada lado de la abertura e La superposici n de los recortes ocultar los bordes cortados en todos los lados de la abertura Cuando se instale sobre un horno nico o un caj n calentador deje un espacio de por lo menos 2 entre las dos aberturas Esta separaci n proporcionar el espacio necesario para la superposici n del recorte inferior del Advantium 120 y la superposici n de los dem s elementos del aparato Construya un piso de horno s lido para el horno de madera contrachapada de m n 3 8 de espesor sostenido por correderas de 2 x 4 en todos los lados e El sost n debe estar nivelado y montado con rigidez empotrado en el borde inferior del corte PREPARE LA ABERTURA conr Instalaci n sobre un caj n calentador GE Monogram Construya una base inferior 27 6 30 23 1 2 a c
12. do a tierra en un circuito derivado de 15 6 20 amperios La caja de distribuci n debe estar ubicada al alcance del cable de alimentaci n de 48 UBICACI N EL CTRICA Coloque la caja del tomacorriente en el rea sombreada Instale un tomacorriente el ctrico empotrado en la pared posterior de la abertura a 6 de cada lado y por lo menos a 9 sobre el piso del corte IMPORTANTE lea con atenci n El cable de alimentaci n de este aparato est equipado con un enchufe de tres patas conexi n a tierra que se acopla a un recept culo de pared con conexi n a tierra de tres patas est ndar para minimizar la posibilidad de choque el ctrico El cliente debe hacer que un electricista calificado controle el recept culo de pared y el circuito para asegurarse de que el recept culo est correctamente conectado a tierra y tenga la polaridad apropiada e Cuando existe un recept culo de pared de dos patas est ndar el cliente tiene la responsabilidad y la obligaci n personal de cambiarlo por un recept culo de pared de tres patas correctamente conectado a tierra Bajo ninguna circunstancia debe cortar o eliminar la tercera conexi n a tierra pata del cable de alimentaci n NO USE ESTE PRODUCTO CON UN CABLE DE EXTENSION Preparacion para la instalacion PREPARE LA ABERTURA El Advantium 120 puede instalarse en combinaci n con otros aparatos GE Monogram Siempre siga las indicaciones de instalaci n de ca
13. lid Bottom Min 3 8 Plywood Supported by 2x4or1 x 2 Runners all Four Sides 2 Min Per Oven Requirement NOTE Additional clearances between the cutouts may be required Check to be sure the oven supports above the Warming Drawer location does not obstruct the required interior depth and height See Warming Drawer installation instructions for details CAUTION For personal safety the mounting surface must be capable of supporting the cabinet load in addition to the added weight of this approximate 75 pound product plus additional oven loads of up to 50 pounds or a total weight of 125 pounds MISE EN GARDE Pour votre s curit personnelle la surface de montage doit tre capable de supporter le poids du cabinet en plus du poids suppl mentaire du produit soit 34 kg en plus du poids suppl mentaire du four pouvant aller jusqu a 22 7 kg ou un poids total de 56 7 kg REMOVE THE PACKAGING e Lift the oven out of the carton e Remove all packing material and tape e Open the door and remove parts box e Locate parts package containing mounting screws Installation STEP 1 SLIDE THE OVEN INTO THE CUTOUT CAUTION Two people are required to lift the oven into the opening Grasp the bottom at the front and rear DO NOT USE THE HANDLE TO LIFT THE OVEN DAMAGE WILL OCCUR MISE EN GARDE Deux personnes sont n cessaires pour soulever le four et l ins rer dans l ouverture Saisissez le par le desso
14. ment such as an island or peninsula e The oven must be installed at least 36 3 4 above the floor e Allow for clearance to adjacent corners walls drawers etc e Cabinets installed adjacent to wall ovens must have an adhesion spec of at least 194 F temperature rating The oven must be securely installed in a cabinet that is firmly attached to the house structure Weight on the oven door could cause the oven to tip and result in injury Never allow anyone to climb sit stand or hang on the oven door Installation Preparation ELECTRICAL REQUIREMENTS Single Advantium 120 Installation This product requires a 120 volt 60 Hz 15 amp circuit and draws 1 8 kilowatts This product must be connected to a supply circuit of the proper voltage and frequency e Wire size must conform to the requirements of the National Electrical Code or the prevailing local code for this kilowatt rating e The power supply cord and plug should be brought to a separate 15 or 20 ampere branch circuit single grounded receptacle The outlet box should be located within reach of the 48 power cord ELECTRICAL LOCATION Ei Locate outlet box in the shaded area Install a recessed electrical outlet in the back wall of the opening within 6 of either side and at least 9 above the cutout floor IMPORTANT Please read carefully The power cord of this appliance is equipped with a three prong grounding plug that mates with a st
15. n sujetos a cambios sin notificaci n alguna Pub Nro 49 40459 1 GE Consumer amp Industrial Appliances 07 05 JR General Electric Company Louisville KY 40225 Impreso en Corea 2005 General Electric Company
16. ner s Manual for operating instructions Notes 10 Notes 11 NOTE While performing installations described in this book safety glasses or goggles should be worn NOTE Product improvement is a continuing endeavor at General Electric Therefore materials appearance and specifications are subject to change without notice Pub No 49 40459 1 GE Consumer amp Industrial Appliances 07 05 JR General Electric Company Louisville KY 40225 Printed in Korea O 2005 General Electric Company Instrucciones de instalacion Advantium 120 Hornos empotrados SpeedCook SCB1000 SCB1001 ZSC1000 ZSC1001 Informacion de seguridad Lea con cuidado todas las instrucciones ANTES DE COMENZAR e IMPORTANTE guarde estas instrucciones para uso del inspector local e IMPORTANTE respete todos los c digos y ordenanzas regulatorias Nota al instalador aseg rese de dejarle estas instrucciones al consumidor PRECAUCION Para su seguridad personal retire el fusible dom stico o el disyuntor antes de comenzar la instalaci n para evitar lesiones severas o fatales PRECAUCI N Para su seguridad personal la superficie de montaje debe poder sostener la carga del gabinete adem s del peso adicional de las 75 libras del producto m s las cargas adicionales del horno Nota al consumidor guarde estas instrucciones de hasta 50 libras o un peso total de 125 libras al su Manual del propietario par
17. ontrachapada de min 3 8 de espesor sostenida por correderas de 2x461x2 en los cuatro lados correderas de2x46 2x2 o una base inferior solida Debe sostener 100 Ib NOTA es posible que se requieran espacios adicionales entre los cortes Verifique para asegurarse de que los soportes del horno sobre el caj n calentador no obstruyan la profundidad y la altura interior necesarias Consulte las instrucciones de instalaci n del caj n calentador para obtener m s detalles Preparacion para la instalacion PREPARE LA ABERTURA cont Instalacion sobre un horno GE Monogram Construya una base inferior 27 30 23 1 2 s lida de min 3 8 sostenida por correderas de2x46 1 x 2 en los cuatro lados Requisito por horno Si est reemplazando un horno el ctrico doble GE Monogram por la instalaci n combinada de un Advantium 120 y un horno nico use las dimensiones indicadas Es posible que el riel del medio que separa las dos aberturas deba ser mayor que el m nimo de 2 indicado PREPARE LA ABERTURA conr Instalaci n sobre un horno y un caj n calentador GE Monogram Construya una base inferior 27 6 30 a3 1j2 S ida de 3 8 sostenida por correderas de2x46 1x2enlos cuatro lados Min 2 Requisito por horno NOTA es posible que se requieran espacios adicionales entre los cortes Verifique para asegurarse de que los soportes del horno sobre el cajon c
18. us a l avant et a l arri re N UTILISEZ PAS LA POIGNEE POUR SOULEVER LE FOUR DES DOMMAGES SE PRODUIRONT e Lift and hold the oven at the front of the opening Hold the oven at a 45 angle and plug in the power cord e Carefully slide the oven into the cabinet part way Leave the oven a few inches forward of the cabinet frame e Check to be sure the power cord is not trapped under the oven or along the sides of the oven STEP 2 INSTALL BOTTOM TRIM e Align bottom trim tabs to slots in the bottom of the oven e Secure the bottom trim to the bottom of the oven using 3 brass screws provided L Installation STEP 3 INSTALL SIDE TRIM FOR 30 CABINET INSTALLATION ONLY SKIP THIS STEP IF YOU HAVE 27 WIDE CABINETRY e Open the oven door e Hang the side trim pieces on the tabs behind the oven flange The screw holes in the side trim should align with the holes in the oven flange e Check to be sure the oven is pushed back into the opening and against the cabinet frame STEP 4 INSTALL MOUNTING SCREWS e Drill pilot holes through the side flanges 2 on each side e Drive the color matched screws into the side flange and side trim if applied STEP 5 FINALIZE INSTALLATION e Turn power on at the source The interior light should come on when the door is opened e Refer to the Ow

Download Pdf Manuals

image

Related Search

Related Contents

  Cub Cadet 5000 Series Lawn Mower User Manual  Instruções de Utilização Istruzioni per l`uso Bedienungsanleitung  Notice utilisateur  Guía del usuario  PROLITE-30B user manual (optical fibre identifier)  

Copyright © All rights reserved.
DMCA: DMCA_mwitty#outlook.com.