Home

400 Watt WIND TURBINE ÉOLIENNE 400 Watts TURBINA EÓLICA

image

Contents

1. ie ES A a ee WP P sP 9 Be e DR 7 ae a dus SSS F z P G a a 12 EZ d x p gasp lt kaz rr ve a ite cl PU 4 ER y r e s ye di RE 3 E a AR ms Pre Y aes ip sleds Eppes AR 400 Watt WIND TURBINE OLIENNE 400 Watts TURBINA E LICA DE 400 Watts User s Manual Notice D utilisation Manual del Usario Congratulations on your Sunforce Products Purchase This product is designed to the highest technical specifications and standards It will supply years of maintenance free use Please read these instructions thoroughly prior to installation then store in a safe place for future reference If at any time you are unclear about this product or require further assistance please do not hesitate to contact our trained professionals operating the customer support line 1888 478 6435 or email to info sunforceproducts com ACCESSORIES INCLUDED Stop Switch 50 amp DC stop switch This is used to safely apply a brake to your turbine during either periods of intense wind or general maintenance Plastic Disks Anti static plastic components that will prolong the life span of the turbine protecting from weather corrosion and static build up Your Sunforce Wind Turbine is designed with your personal safety as the first priority However there are still some inherent dangers involved with any electrical and or mechanical equipment Safety must be the primary concern as you plan the l
2. el ctricos El calor en un sistema de cableado es generalmente el resultado de demasiada corriente fluyendo por cables de calibre insuficiente o por conexiones incorrectas CONTENIDOS DEL PAQUETE Compare la siguiente ilustracion para verificar que la caja contenga todas las partes necesarias Eje del alternador Cono Nariz Buje Usuario Cuerpo de la unidad Manual del giratorio LED Llave hex de 4mm f T Llave hex de 5mm Discos pl sticos 6 Llave hex de 8mm Dum Tornillo cilindrico M6 22 6 Aspas del rotor 3 PB Interruptor CC ewob ap epuny UOI9U3 al ap OJjIUY 9 soonsel St SNW OJIIUIOL soosiq wuy ejunf OLIN eens UOI9U8 21 ap OJ IUY 9 ZZ 9IN oljjiuio ZIJeu 0Uu0 2 UBzI sap ojjiuy L SS 9N Oll uiol IE evan J0ye s3 ws 10U9 X3 eJjaulje Jopejojuoy 40 04 3 leg c sedsy VISTA DESPIEZADA SISTEMA ELECTRICO DIAGRAMAS DEL SISTEMA DE CABLEADO Turbina e lica Amper metro Tierra de la torre Interruptor de parada Positivo de la turbina L nea roja Banco de bater as Negativo de la turbina L nea negra Conexi n a tierra Varilla de tierra Precauci n Respete la polaridad correcta a trav s del sistema Cualquier polaridad inversa puede da ar tanto el banco de bater as como el generador Esta turbina e lica est dise ada para sistemas de 12 Voltios solamente PROTECCI N DE SOBREVELOCIDAD Su turbina e lica Su
3. fundamento y cableado de la torre que no hayan sido instaladas operadas reparadas o mantenidas de acuerdo a las instrucciones provistas por el fabricante Si cualquiera de los servicios en la lista previa fueran identificados en la unidad o si no se determinara ningun defecto de mano de obra o materiales el cliente sera responsable por los costos de reparaciones y demas gastos incurridos por Sunforce Products DESCARGO DE REPSONSABILIDAD LEGAL A EXCEPCI N DE LA GARANT A EXPRESA PRESENTADA ANTERIORMENTE EL FABRICANTE NIEGA TODA OTRA GARANT A EXPRESA O IMPL CITA INCLUYENDO GARANT AS IMPL CITAS O IDONEIDAD PARA UN PROP SITO PARTICULAR COMERCIABILIDAD Y NO VIOLACI N NINGUNA OTRA GARANT A EXPRESA O IMPL CITA YA SEA O NO SIMILAR EN NATURALEZA A CUALQUIER OTRA GARANT A AQU PROVISTA EXISTIR CON RESPECTO AL PRODUCTO VENDIDO BAJO LAS DISPOSICIONES DE ESTOS T RMINOS Y CONDICIONES EL FABRICANTE NEIGA EXPRESAMENTE TODA RESPONSABILIDAD DE LESIONES CORPORALES O MUERTE QUE PUEDAN OCURRIR DIRECTA O INDIRECTAMENTE POR EL USO DEL PRODUCTO POR CUALQUIER PERSONA EL CLIENTE RENUNCIA EXPRESAMENTE A TODA OTRA GARANT A Reclamaciones de garant a y pol tica de devoluci n Para ser elegible para el servicio bajo esta garant a el cliente debe contactar al fabricante ya sea por escrito o por tel fono para solicitar servicio para la turbina e lica cubierta bajo esta garant a y obtener un n mero de autorizaci n de retorno dentro del period
4. la parte superior del poste ayudando asi a reducir la transmision de ruido a lo largo del tubo Apriete firmemente los tornillos de la abrazdera del eje giratorio con la llave hexagonal de 4mm Verifique que este bien asegurado Junta de goma Deslice hasta el fondo el eje vertical giratorio sobre el tubo de la torre con cuidado de no pellizcar los cables ASegurese de dejar suficiente holgura en los cables en caso de que sea necesario desmontar la turbina Si es necesario marque ambos extremos de los cables con cinta adhesiva para identificar el negativo el positivo y la tierra Negativo O TEA O O O Discos pl sticos 6 _ T D Encaje una de las aspas en el buje del rotor e inserte uno de los tornillos cilindricos M6 22 Coloque uno disco plastico en el extremo del tornillo luego agregue la tuerca auto ajustable M6 y apriete usando la llave hexagonal 5 mm Repita este procedimiento con las otras dos aspas 7 Tornillo M6 22 6 j PRECAUCI N NO FORZAR LA ROSCA LR Ss gt A DEL TORNILLO YA QUE PUEDE DANAR o LAS ASPAS Y LA TURBINA AN Tuerca M6 6 Disco pl stico 6 Remueva la tuerca M16 del eje del rotor Inserte el ensamblaje de las aspas en el eje y coloque la tuerca en el mismo NO EMPUJE el eje del rotor hacia el cuerpo de la turbina TUERCA M16 Inserte la llave hexagonal de 8mm en el eje del rotor y enrosque la tuerca haciendo girar el ensamblaje de las aspas
5. raux plus la tour est haute moins il y a d obstruction a la circulation de l air assurant ainsi une capacit plus efficace de charge La hauteur minimale recommand e pour la tour est de 30 pieds 9 metres ou 20 pieds 6 metres au dessus des obstructions environnantes comme l indique l illustration suivante Viento dominante TOUR Votre eolienne Les Produits Sunforce est con ue pour rendre le montage aussi simple et facile que possible Si vous ne souhaitez pas vous procurer la tour standard Sunforce soyez libre d utiliser de la tuyauterie d acier de 1 5 pouce 38 mm de s rie 40 qui devrait tre disponible votre quincaillerie locale Veuillez contacter votre fournisseur local de Les Produits Sunforce pour obtenir des renseignements sur nos trousses de tour pour cette olienne INSTALLATION OUTILS REQUIS Interrupteur d arr t de service inclus Disques de plastique inclus Cle hexagonale 4 mm incluse Cl hexagonale 5 mm incluse Cl hexagonale 8 mm incluse Cables d alimentation non inclus Batteries non incluses Tuyaux d acier 1 po 38 mm s rie 40 diam ext 1 875 po 48 mm non inclus Cl dynamom trique non incluse Ruban lectrique ou manchon thermor tr cissable 1 4 po 6 7 mm non inclus Sertisseur non inclus VERIFICATION PRELIMINAIRE Suivez les processus suivants pour v rifier si votre olienne Sunforce fonctionne correctement Pivotez lentement l arbre avec vo
6. should spin freely Should this not be true please contact supplier or Sunforce Products 4 With your Sunforce Wind Turbine connected to your battery bank use an electric hand drill to spin the rotor shaft 5 Below 500 RPM the rotor should spin freely without friction 6 At 500 RPM and above the Wind Turbine should be charging the battery You should feel resistance on the rotor shaft if the shaft is not rotating contact your turbine dealer or Sunforce Products Be aware your battery banks needs to be under fully charged as the Turbine needs to read a charge Warranty Sunforce Products warrants your product to be free from defects in material and or workmanship for a period of 3 years from original date of purchase Warranty coverage is extended only to customer original purchaser If product proves defective during warranty period Sunforce Products at its option will 1 Replace wind turbine with new or refurbished product 2 Correct reported problem Customers warranty continues to be valid on repaired or replaced product from original warranty date Restrictions This warranty covers defects in manufacturing discovered while using the product as recommended by the manufacturer The warranty does not apply to a equipments materials or supplies not manufactured by Sunforce Products b Product that has been modified or altered other than by Sunforce Products or without prior Sunforce Products approval c Has been exposed to wind
7. 00 RPM y mas la turbina e lica debe cargar la bater a Si el eje del rotor no gira contacte a su detallista o a Sunforce Products Aseg rese que su bater a no est cargada a capacidad de lo contrario no se podr verificar el proceso de carga de la unidad Garant a Sunforce Products garantiza que ste producto est libre de defectos de material o mano de obra por periodo de 3 a os a partir de la fecha original de compra El respaldo de la garant a cubre solamente al cliente comprador original Si el producto resulta defectuoso durante el periodo de garant a Sunforce Products dispondr 1 Reemplazar la turbina e lica con un producto nuevo o reacondicionado 2 Corregir el problema reportado La garant a del cliente continuar su validez sobre el producto reparado o reemplazado a partir de la fecha original de garant a Restricciones Esta garant a cubre defectos de f brica descubiertos durante el uso del producto de acuerdo a las recomendaciones del fabricante La garant a no se aplica a A Equipos materiales o partes no fabricadas por Sunforce Products B Productos que hayan sido modificados o alterados por terceras partes o sin aprobaci n de Sunforce Products C Una turbina que haya sido expuesta a mas de 157 MPH D Da os por tormentas de viento relampagos o granizo E Reparaciones realizadas por personal que no sea de Sunforce Products F Todos los actos de Dios mal uso negligencia o accidentes G Instalaciones de
8. C National Electrical Code Code national de l lectricit 6 Votre olienne Sunforce doit tre install e conform ment aux directives de ce manuel et aux codes local et national du batiment Une installation incorrecte peut annuler votre garantie 7 Les pales de l olienne tournent a une vitesse potentiellement dangereuse cette situation doit tre prise en ligne de compte en tout temps N approchez jamais une eolienne en operation Dangers m caniques Les pales pivotantes pr sentent le danger m canique le plus grave Les pales du rotor sont fabriqu es d un thermoplastique tr s robuste A leur extr mit les pales peuvent se d placer a des vitesses exc dant 15 m sec A cette vitesse l extr mit d une pale est presque invisible et peut causer des blessures graves En aucun cas devriez vous installer l olienne la ou une personne pourrait entrer en contact avec les pales en mouvement Dangers electriques L eolienne Sunforce est quip e d un syst me lectronique sophistiqu con u pour assurer la protection contre les dangers lectriques Veuillez noter que les dangers des courants lectriques inh rents la personne existent toujours par cons quent une attention particuli re doit tre toujours exerc e lors des raccordements de l olienne et d autres appareils lectriques La chaleur dans un syst me de c blage est souvent le r sultat d un courant trop lev circulant dans un conducteur d un cali
9. EJETTE EXPRESSEMENT TOUTE REPONSABILIT POUR LES BLESSURES CORPORELLES OU LA MORT POUVANT SURVENIR LORS DE L UTILISATION DIRECTE OU INDIRECTE DE CE PRODUIT PAR TOUTE PERSONE TOUTES LES AUTRES GARANTIES SONT EXPRESS MENT REJET ES PAR LE CLIENT Reclamations sous garantie et politiques de retour Pour tre eligible a des services sous cette garantie le client doit communiquer avec le fabricant par crit ou par telephone pour soumettre une demande de service pour l olienne couverte par cette garantie pendant la p riode sp cifi es de garantie de trois 3 ans a partir de la date de l achat initial et pour obtenir un num ro de bon d autorisation de retour MRA Ce numero d autorisation de retour doit tre emis avant que le produit puisse tre retourn Tous les avis de r clamation doivent inclure les renseignements suivants a La description de la defectuosite alleguee b De quelle fa on l olienne etait utilis e c Le num ro de s rie d La date d achat initiale e Le nom le num ro de t l phone l adresse de la personne demandant des services de garantie Dans les 2 ou 3 jours ouvrables suivants Les Produits Sunforce fournira au client le numero d autorisation de retour et indiquera l endroit o l appareil doit tre retourn Lorsqu une autorisation de retourner a ete emise le client doit retourner le produit dans les 30 jours qui suivent Le manquement de retourner le produit dans les 30 jours invalidera l autorisation de
10. QUIER OTRA CAUSA A N SI EL FABRICANTE SU AFILIADO O PROVEEDOR HAYAN SIDO NOTIFICADOS DE LA POSIBILIDAD DE TAL DA O Nota algunos estados o provincias no permiten la exclusi n o limitaci n de da os incidentales o consecuentes por ende estas limitaciones podr an no aplicar a su caso Ni el fabricante ni sus afiliados o proveedores ser n responsables de cualquier da o o p rdida de cualquier aparato o producto conectado alimentado o unido de otra manera al equipo La responsabilidad total acumulada hacia el cliente de toda causa de acci n y toda teor a de responsabilidad ser limitada y no exceder el precio de compra del producto pagado por el cliente Esta garant a le da al cliente derechos legales espec ficos El cliente puede tener otros derechos legales que var en de estado a estado o provincia a provincia For more information or technical support Pour obtenir plus de renseignements ou de l assistance technique Para mayor informacion o soporte tecnico 1 888 478 6435 www sunforceproducts com info sunforceproducts com Man400WT 09 04 13
11. Sostenga el ensamblaje de las aspas y apriete la tuerca M16 ligeramente con la llave de 8mm Finalmente gire las aspas lentamente para verificar que estas roten libremente Llave Hex 8mm PRECAUCI N NO FORZAR LA TUERCA M16 YA QUE PUEDE IMPEDIR LA LIBRE ROTACI N DE LA TURBINA Coloque el cono nariz sobre el centro del ensamblaje de aspas y enc jelo fijamente en su lugar Cono nariz Acerque los cables a las baterias Conecte el interruptor de parada de acuerdo al diagrama del manual PRECAUCION NO CONECTE LAS BATERIAS EN ESE MOMENTO ASEGURSE QUE SU TURBINA ESTE CORRECAMENTE CONECTADA A TIERRA Levante con cuidado la torre y asegure la base y o los cables tensores Aseg rese que el interruptor de parada est en la posici n OFF y conecte los cables a las bater as ROJO a y NEGRO a Ponga el interruptor de parada en la posici n ON observe el LED rojo iluminarse intermitentemente cuatro veces para indicar que el regulador est operando correctamente FELICITACIONES HA COMPLETADO LA INSTALACI N D ETURBINA E LICA MANTENIMIENTO Su turbina e lica Sunforce ha sido dise ada para operar por largos periodos sin necesidad de mantenimiento El rendimiento puede mejorarse si inspecciona su sistema peri dicamente Revise los siguientes simples procedimientos de mantenimiento y aplique cada seis meses Precauci n No se acerque a la turbina e lica durante la operaci n e Verifique da os superficiales en
12. a tour prennent des chocs lectriques caus s par les clairs ou les pannes lectriques Veuillez prendre le temps de revoir le Code national de l lectricit VEC le code du b timent et les reglements de zonage locaux pour connaitre toutes les exigences M me pour les syst mes hors r seau il existe diff rentes fa ons de mettre la tour a la terre la m thode la plus courante tant une ou des lectrode s d acier cuivr enfonc e s dans le sol Veuillez analyser le schema de mise a la terre suivant Votre eolienne Sunforce est quip e d un conducteur argente de mise a la terre a cette fin y Tour ta Conducteur de mise WENA a la terre 6 AWG min ED ll Ve Doit tre s curitaire et L4 enfoui pour protection lt 1 pi A Bride du conducteur 0 3 m if de mise a la terre i Tige de mise la terre Sol existant Conducteur argent de mise la terre Exemple de mise la terre d une oliennet EMPLACEMENT Avant de monter votre olienne Sunforce vous devez consid rer avec soin le choix de son emplacement Certains elements consid rer lors du choix de l emplacement sont les suivants 5 La distance de tous les obstacles susceptibles de causer de la turbulence arbres immeubles etc 6 La distance entre l olienne et le groupe de batteries 7 Les restrictions de zonage locales 8 La distance minimale des lignes de tension du secteur En termes g n
13. a tranquilo para instalar o mantener su turbina 3 Ponga atenci n a ruidos mec nicos producidos por su turbina De requerirse mantenimiento contacte al servicio al cliente de Sunforce Products 4 Luego de la instalaci n reajuste con fuerza tornillos y tuercas 5 Siga las t cnicas correctas de conexi n a tierra establecidas por el C digo El ctrico Nacional NEC 6 Su turbina e lica Sunforce debe ser instalada de acuerdo a este manual y los c digos locales y nacionales de construcci n Una instalaci n incorrecta puede anular su garant a 7 Favor tener en cuenta que las aspas de la turbina giran a una velocidad potencialmente peligrosa Nunca se acerque a una turbina en movimiento Peligro Mec nico La rotaci n de las aspas representa el peligro mec nico m s serio Las aspas del rotor est n hechas de material termopl stico muy fuerte Sus puntas pueden moverse a velocidades de 15 m s apareciendo casi invisibles lo cual puede causar lesiones severas Bajo ninguna circunstancia instale la turbina en un lugar donde una persona pueda acercarse al movimiento de las aspas del rotor Peligro El ctrico La turbine e lica Sunforce est equipada con componentes electr nicos sofisticados dise ados para proveer protecci n contra riesgos el ctricos Favor de notar que los peligros personales inherentes al trabajar con corriente el ctrica a n existen y por lo tanto siempre se debe tener precauci n al conectar este y otros aparatos
14. al et national de l lectricit ont priorit sur les pr sentes recommandations g n rales Mise en garde L utilisation de fils trop petits causera des pertes de performance et des dommages possibles a votre eolienne Sunforce et a votre groupe de batteries Nombre de 0 30 pi i turbines 0 9m 90 150 pi 150 190 pi 190 250 pi 27 46m 46 58 m 58 76 m 2 34 1 53 0 53 00 67 000 85 0000 107 000 85 0000 107 s Acheminez les fils que vous avez choisis dans le tuyau and approchez l ensemble pr s des batteries ne les branchez pas aux batteries maintenant d nudez chaque fil d un courte partie de son isolation Calibres indiqu s en AWG mm Branchez l olienne aux fils et isolez les connexions au moyen de tube thermor tr cissable pour connexions serties ou un ruban lectrique de haute qualit Le joint de caoutchouc inclus pr vient le bas du m canisme d orientation d entrer en contact avec le haut du tuyau Ce joint de caoutchouc aidera a minimiser la transmission du bruit vers le bas de la tour Serrez fermement les vis de la bride du m canisme d orientation au moyen de la cl hexagonale de 4 mm Assurez vous qu elle soit bien fix e aux montures J Joint de caoutchouc Glissez l arbre du m canisme d orientation jusqu au fond sur l extr mit du tuyau prenant soin de ne pas pincer les fils du m canisme d orientation Assurez vous de laisser les fils suffisamment l ches pour que l ol
15. as been designed to run for long periods without requiring any maintenance Performance will be enhanced if you periodically inspect your system Review the following simple maintenance procedures and implement every six months Caution Do not go near the wind turbine during operation e Check blades for superficial damage Replace blades if damaged It is important to not use blades that are damaged as you will lose overall balance resulting in a decrease in efficiency Should you notice damage to the blades you must replace all 3 The blades are balanced as sets e Check the blade bolts and the hub nut for tightness Check nosecone for cracks and tighten nuts e Wipe any excess dirt build up from the blades e Check all electrical connections to make sure they are tight and free from corrosion e Check the voltage of your battery bank with a Multi meter and clean the terminals e Sunforce Products suggests replacing the blades every five years for optimal performance Trouble shooting Caution You may require an extra person to assist with these tests 1 Remove the blade hub from the turbine Replace the rotor hub nut on the rotor shaft 2 Quickly spin the rotor shaft manually with your fingers while connecting and disconnecting the red and black wires turbine must not be connected to batteries 3 With the red and black wires connected to each other the shaft should be more difficult to turn When the wires are disconnected it
16. bre trop petit ou travers d une connexion d fectueuse CONTENU DE L EMBALLAGE Comparant avec les pi ces identifi es dans l illustration suivante assurez vous que l emballage contienne toutes les pi ces requises Arbre de l alternateur 1 Pointe avant Manuel de l utilisateur Moyeu DEL CET Arbre du m canisme d orientation Cl hexagonale 4 mm T Cl hexagonale 5 mm _ Disque de plastique 6 Cl h le 8 e nexagonale o mm T Omm Vis d assemblage 6 pans creux M6 22 6 Pales du rotor 3 Interrupteur d arr t 9119 e e asiw ap lqeO UOI e USIIO p uusiueS ui Np pug 2noy92 n0e9 ap uodweL he ns 9 enbnseld op onbsig Sy SIN SIA SE SIN SIA e ww y ulor v SIN n0193 uonejuano p SUISIULI2U ses wu g S uo OLIN NO0193 np anbijseja neauuy uol e UaIIO p 99113991109 onbeg ns on i 9 SZ 9IN SIA L 09 9IN SIA sd109 np onbijseja neouuy Inauequi JUBAR 191 ed 9 SW no193 sdioo np 191 8d onb110 julor siejeg i Si IN9119 X9 1n9 01 U09 JOJOY yueae Jae y VUE ECLATEE saled jediouiid sdio4y y yueae ajulod SYSTEME ELECTRIQUE SCHEMAS DE CABLAGE DU SYSTEME Amp rem tre ame Wai Mise la terre de la tour Interrupteur d arr t de service Fil positif de l olienne rouge Groupe de batteries Fil n gatif de l olienne noi
17. cadores descritos por favor contacte a su detallista de Sunforce INSTALACI N Elija un d a de vientos calmados y tenga a una personar disponible para ayudarlo durante el proceso de instalaci n PRECAUCIONES LOS BORDES DE LAS ASPAS SON FILOSOS POR FAVOR MAN JELOS CON CUIDADO NO INSTALE EL ENSAMBLAJE DE LAS ASPAS HASTA QUE EL CUERPO DE LA TURBINA EST MONTADO EN LA TORRE TODA BATER A DEBE ESTAR DESCONECTADA DURANTE TODO EL PROCESO DE INSTALACI N PROCESO DE INSTALACI N Por favor revise la tabla de calibre del cableado para instalar el grosor correcto Sunforce recomienda estos como el calibre m nimo requerido para obtener un rendimiento ptimo Utilice siempre los cables de calibre m s grandes que sean pr cticos y abordables Los c digos el ctricos locales estatales o nacionales tienen prioridad sobre estas recomendaciones generales Precauci n El uso de calibre inferior al recomendado puede resultar en la p rdida de rendimiento y posibles da os a su turbina e lica Sunforce y su banco de bater as Unidades dadas en AWG mm Pase el cableado necesario a trav s del tubo y ac rquelo a las bater as sin conectarlo a stas y pele segmentos adecuados de aislamiento de cada cable Conecte la turbina e lica a los cables y a sle las conexiones utilizando conectores de tubo termorretr ctil o cinta aislante de alta calidad La junta de goma incluida previene el contacto del eje giratorio vertical con
18. ch Electrical tape or 1 4 6 7mm heat shrink not included Wire strippers not included Wire crimpers not included PRECHECK Follow these processes shown below to verify if your Sunforce Wind Turbine is working correctly Spin rotor shaft slowly with your fingers while at the same time touching the Wind turbines positive and negative wires With the wires touching the rotor shaft should become more difficult to rotate With the wires disconnected it should spin freely This creates a short Connecting the wind turbine s wires RED Positive BLACK Negative directly to the corresponding posts of the battery blinks the red LED four times This will show the turbines internal controller is operating correctly Should you not see the above mentioned indicators please contact your Sunforce Dealer INSTALLATION Choose acalm day and have someone available to help during the entire installation process Caution THE BLADE EDGES ARE SHARP PLEASE HANDLE CAREFULLY Caution Do not install the blade assembly until the body is mounted on the tower Caution ALL BATTERIES MUST BE DISCONNECTED THROUGHOUT THE ENTIRE INSTALLATION PROCESS Please review the following wire gauge table to install the correct wire gauge Sunforce recommends these as the minimum wire sizes for optimal performance Always use the largest gauge wires that are practical and affordable Local state and or national electrical codes take precedence over the
19. corde au client des droits l gaux sp cifiques et celui ci peut aussi avoir d autres droits l gaux qui varient d un tat d une province l autre Felicitaciones por la compra de su producto Sunforce Products Este producto ha sido disenado de acuerdo a los mas altos estandares y especificaciones tecnicas Este proveera anos de uso sin mantenimiento Por favor lea estas indicaciones antes de su instalacion y guardelas para referencia futura Si requiere asistencia con este producto no dude en contactar a nuestro equipo tecnico al 1 888 478 6435 o a info sunforceproducts com ACCESORIOS INCLUIDOS Interruptor CC 50 Amperios Utilizado para frenar de manera segura su generador durante periodos de vientos intensos o para mantenimiento Discos plasticos Componentes antiestaticos de plastico que prolongan la vida util del generador protegi ndolo de la corrosion climatica y la acumulacion estatica Su turbina e lica Sunforce est dise ada con su seguridad personal como prioridad No obstante aun existen riesgos inherentes a cualquier equipo el ctrico y o mec nico La seguridad debe ser su preocupaci n primaria al planificar la ubicaci n instalaci n y operaci n de la turbina Por favor leer lo siguiente Instrucciones importantes de seguridad Favor de tomar el tiempo necesario para leer este manual previo al montaje e instalaci n 1 Guarde este manual de instrucciones en un lugar seguro para referencia 2 Espere a que haya un d
20. d by this warranty within specified period 3Years from original purchase and request a return authorization RA number This RA must be issued before any product can be returned All notifications must include the following information a Description of alleged defect b How the wind turbine was being used c Serial d The original purchase date e Name phone address of party requesting warranty Within 2 to 3 business days Sunforce Products will provide the customer with the RA and will direct customer to location where the product is to be returned Once an RA has been issued the customer has 30 days to return the product Failure to deliver the product within the 30 days results in the RA as no longer being valid and a new RA must be issued Manufacturer is under no obligation to accept any product that is returned to them without a proper RA LIMITATION OF LIABILITY UNDER NO CIRCUMSTANCES WILL THE MANUFACTURER OR ITS AFFILIATES OR SUPPLIERS BE LIABLE OR RESPONSIBLE FOR ANY LOSS OF USE INTERRUPTION OF BUSINESS LOST PROFITS LOST DATA OR INDIRECT SPECIAL INCIDENTAL OR CONSEQUENTIAL DAMAGES OF ANY KIND REGARDLESS OF THE FORM OF ACTION WHETHER IN CONTRACT TORT INCLUDING NEGLIGENCE STRICT LIABILITY OR OTHERWISE RESULTING FROM THE DEFECT REPAIR REPLACEMENT SHIPMENT OR OTHERWISE EVEN IF The manufacturer OR ITS AFFILIATE OR SUPPLIER HAS BEEN ADVISED OF THE POSSIBILITY OF SUCH DAMAGE Note some states and province
21. do el electrodo de acero revestido de cobre enterrado en el suelo Por favor vea el diagrama de la conexi n a tierra Su turbina e lica Sunforce cuenta on una linea PLATEADA de tierra incluida para este prop sito To rre ia EEN ae dorer Conductor de tierra Minimo 6 AWG l fl 4 X Debe ser asegurado ul LE JA TA y enterrado por lt 4 protecci n WEB _Abrazadera de cable de tierra Z Vvarila de tierra Grado existente L nea de Tierra PLATEADA Ejemplo de conexi n a tierra de una turbina e lica EMPLAZAMIENTO Considere cuidadosamente el emplazamiento de la turbina eolica Sunforce previo a su instalaci n Algunos puntos a considerar sobre el emplazamiento son 1 La distancia de cualquier obst culo que pueda crear turbulencia tales como rboles edificios etc 2 La distancia entre la turbina y el banco de bater as 3 Restricciones locales de zonificaci n 4 La distancia de cualquier l nea el ctrica Generalmente entre m s alta es la torre habr menos obstrucci n del flujo de aire y por ende mejor eficacia en la capacidad de carga La altura m nima recomendada es de 20 a 30 pies 6 a 9 metros sobre cualquier obst culo cercano tal como se ilustra abajo Viento dominante gt _ TORRE Su turbine e lica Sunforce esta dise ada para hacer el montaje lo mas simple y sencillo posible Si no desea adquirir el kit de torre de Sunforce puede utilizar
22. ection that prevents possible damage in periods of extreme high winds A brake is applied when the turbine senses 20 M S or 45 MPH At this point your turbine will stop spinning the internal charging system will cycle and wait for a drop in wind speed STOP SWITCH Your Sunforce Wind Turbine includes a stop switch 50 amps D C which can be used to stop the Wind Generator Stop Switch Diagram for Stop Switch Black Wire maner Closed Open Short Circuit Circuit Circuit Caution Prolonged periods of open circuit or free spin can cause excessive wear and tear on the turbine GROUNDING Every wind turbine and turbine tower needs to be grounded at the tower base even though the system may be grounded at the battery bank Grounding the tower at its base may help prevent shocks to persons touching the tower due to lightning or electrical faults Please take the time to review the National Electrical Code NEC and local building and zoning regulations for complete requirements Even in Off Grid Systems there are multiple ways for tower grounding the most common method is a copper clad steel electrode s driven into the soil Please view the following grounding diagram Your Sunforce Wind Turbine has an ARGENTATE ground line included for this purpose Tower frome Clamp Grounding Conductor 1 6 AWG Min MIA qi _ Must be secured and ES JU Y buried for protect
23. fficacit Si vous notez des dommages les trois pales doivent tre remplac es Les trois pales sont equilibrees comme un ensemble e Assurez vous que les boulons des pales et l crou du moyeu soient bien serr s Verifiez la pointe avant pour toute indication de fissures resserrez les crous e Essuyez toute accumulation de saletes sur les pales e V rifiez toutes les connexions lectriques pour vous assurer qu elles soient bien serr es et libre de corrosion e V rifiez la tension de votre groupe de batteries au moyen d un multim tre et nettoyez les bornes e Sunforce sugg re de remplacer les pales a tous les cing ans pour assurer une performance optimale D pannage Mise en garde Vous pourriez avoir besoin que quelqu un vous aide pour effectuer ces essais 1 Retirez les pales le moyeu de l olienne Remettez l crou du rotor en place sur l arbre du rotor 2 Pivotez rapidement l arbre du rotor avec vos doigts en branchant ensemble et en d branchant les fils rouge et noir olienne ne doit pas tre raccord e aux batteries 3 Lorsque les fils rouge et noir sont branches ensemble l arbre devrait tre plus difficile tourner Lorsque les fils sont d branch s l un de l autre l arbre devrait pivoter librement Si tel n est pas le cas veuillez communiquer avec votre fournisseur Les Produits Sunforce 4 Alors que votre olienne est raccord e votre groupe de batteries utilisez une perceuse main pour tour
24. ical dangers Please note that the inherent personal dangers from electrical current still exist therefore caution should always be used when connecting this and other electrical devices Heat in a wiring system is often a result of too much current flowing through an undersized wire or through a bad connection PACKAGE CONTENTS Compare the parts shown in the following figure to ensure that the contents of the box contain all necessary parts Alternator Shaft Main Body Nose Cone Owner s Hub Manual 4mm Hex Key F T 5mm Hex Ke cr X KEY Plastic Disk 6 8mm Hex Key IN Dum M6 22 Socket Head Cap Screw 6 Rotor Blades 3 3 q89 Buipunolg jaise 4aqqny duel mei p majos gd p MN an EN Cr S Bury deus me Bury dis LM819S 09 9W EXPLODED VIEW Bury deus 30e4 maios Sr Jauu fulleag soe 9 NN 9N saysnig 29 4 JOJEYS 4J3 NO fuuesg soe4 Jajjoyyuog 191074 c sapeig uoo ason ELECTRICAL SYSTEM SYSTEM WIRING DIAGRAMS Amp Meter Tower Tower Ground Stop Switch Turbine Positive Red Lead Battery Bank Turbine Negative Black Lead Ground Rod Earth Ground Caution Observe correct polarity throughout your system Any reverse polarity can cause damage to both battery bank and wind turbine This turbine is designed for 12 Volt systems only OVER SPEED PROTECTION Your Sunforce wind turbine has built in prot
25. ienne puisse tre retir e au besoin Marquez les deux extr mit s de tous les fils au moyen d un ruban pour identifier le fil n gatif le fil positif et le fil de mise la terre Codes de couleur des fils ROUGE Positif NOIR Negatif O O O Disques de plastique 6 _ earl Placez une des pales dans une cavite du moyeu et inserez un des boulons d assemblage a six pans creux M6 20 Placez un disque de plastique a l extr mit de la vis et montez un crou autofrein M6 et serrez la vis au moyen de la cle hexagonale de 5 mm Repetez cette procedure pour les deux autres pales Ecrou M6 6 MISE EN GARDE LE SURCOUPLE DES VIS PEUT ENDOMMAGER LES PALES ET L EOLIENNE Retirez l crou M16 de l arbre du rotor Glissez l ensemble des pales sur l arbre du rotor et remontez l crou sur l arbre NE PRESSEZ PAS l arbre du rotor vers l int rieur du corps de l olienne ECROU M16 Ins rez la cle hexagonale de 8 mm dans l arbre du rotor et taraudez l crou en pivotant l ensemble des pales Tout en retenant l ensemble des pales serrez l g rement l crou M16 au moyen de la cle hexagonale de 8 mm Finalement tournez lentement les pales pour vous assurer qu elles pivotent librement Cle hexagonale de 8 mm MISE EN GARDE NE SERREZ PAS TROP L ECROU M16 CECI EMPECHERA LA TURBINE DE TOURNER LIBREMENT Montez la pointe avant en suivant la ligne centrale de l ensemble des pales et pressez
26. ion H A L i es a 4 ft seal Z L I 0 3m Grounding Wire Clamp _ Grounding Rod ARGENTATE Ground Line Example of grounding a wind turbine SITING Prior to the mounting of your Sunforce Wind Turbine you must carefully consider a location Things to consider when thinking about your location 1 Distance from any obstacles that will cause turbulence trees buildings etc 2 Distance between turbine and battery bank 3 Any local zoning restrictions 4 Clearance of power lines In general terms the higher the tower the less obstruction to air flow there is leading to a more efficient chare capacity The minimum recommended tower height is 30 ft or 20 ft above Prevailing wind TOWER Your Sunforce Products Wind Turbine is designed to make mounting as simple and straightforward as possible Should you not wish to purchase the custom Sunforce tower kit feel free to utilize schedule 40 1 5 inch steel tubing This should be available through your local hardware outlet Contact your local Sunforce Products dealer for information on tower kits for this turbine INSTALLATION REQUIRED TOOLS Stop Switch included Plastic Disks included 4mm hex key wrench included 5mm hex key wrench included 8mm hex key wrench included Power cables not included Batteries not included Steel Pipe 1 1 2 Schedule 40 steel pipe Actual OD 1 875 inches 48mm not included Torque wren
27. la en place Pointe avant Approchez tous les fils du groupe de batteries Raccordez l interrupteur d arr t de service en vous r f rant au sch ma de ce manuel MISE EN GARDE NE BRANCHEZ PAS LES BATTERIES MAINTENANT ASSUREZ VOUS QUE VOTRE EOLIENNE SOIT MISE CORRECTEMENT A LA TERRE Erigez la tour avec soin et s curisez la base et ou les haubans Assurez vous que l interrupteur d arr t de service soit la position OFF ARR T puis branchez les fils aux batteries fil rouge la borne positive fil noir la borne n gative Placez l interrupteur d arr t de service la position ON MARCHE vous verrez la DEL rouge clignoter lentement quatre fois indiquant que le contr leur fonctionne correctement F LICITATIONS VOUS AVEZ TERMIN L INSTALLATION DE VOTRE OLIENNE ENTRETIEN Votre eolienne Sunforce a t con ue pour fonctionner pendant de longues p riodes de temps sans requ rir aucun entretien Cependant la performance sera am lior e si vous inspectez p riodiquement votre syst me Jetez un coup d il sur les procedures d entretien simples suivantes et effectuer les a tous les six mois Mise en garde N approchez pas l olienne lorsqu elle est en op ration V rifiez les pales pour toute indication de dommage superficiel Remplacez les pales si elles sont endommag es Il est important de ne pas utiliser des pales endommag es puisqu elles peuvent affecter l quilibre g n ral et r duire l e
28. las aspas y reemplace de ser necesario Es importante utilizar aspas sin da os ya que se puede perder balance y eficacia De encontrar da os en cualquiera de las aspas se deber reemplazar las tres ya que stas son equilibradas en grupo Verifique que est n ajustados los tornillos de las aspas al igual que la tuerca del buje del rotor Verifique si hay grietas en el cono nariz y asegure tornillos Remueva acumulaciones de tierra de las aspas Verifique que sus conexiones el ctricas est n firmes y libres de corrosi n Verifique el voltaje de su banco de bater as con un mult metro y limpie los bornes terminales Sunforce Products recomienda reemplazar las aspas cada cinco a os para un rendimiento ptimo Soluci n de problemas Precauci n Puede requerir una persona extra para asistirle en estas pruebas 1 Retire el ensamblaje de aspas incluyendo el buje Enrosque nuevamente la tuerca en el eje del rotor 2 Gire r pidamente el eje del rotor con su mano conectando y desconectando a la vez el cable rojo y negro la turbina no debe estar conectada a las bater as 3 Con el cable rojo y el negro conectados juntos el eje del rotor debe encontrar resistencia al girarlo Al desconectar los cables ste debe girar libremente 4 Con la turbina conectada al banco de bater as utilice un taladro de mano el ctrico para hacer girar el eje del rotor 5 A menos de 500 RPM el rotor debe girar libremente sin ninguna fricci n 6 A 5
29. n it with the 5mm hex key Repeat this procedure on all three blades S M6 22 Screw 6 CAUTION OVER TORQUE OF SCREWS CAN DAMAGE THE BLADES AND WIND TURBINE Remove the M16 nut from the rotor shaft Slide the blades assembly onto the rotor shaft and place the nut on the shaft DO NOT press the rotor shaft into the body M16 NUT Insert the 8mm hex key into the rotor shaft and thread the nut by spinning the blade assembly Hold the blade assembly and tighten the M16 nut lightly with the 8mm hex key Finally spin the blades slowly to be sure they turn freely 8mm Hex Key CAUTION DO NOT OVERSCREW THE M16 NUT THIS WILL PREVENT THE TURBINE FROM SPINNING FREELY Place the nose cone over the center line of the blades assembly and snap the nose cone into place Nose Cone Run all wires close to the batteries Connect the Stop Switch referring to the diagram in your manual CAUTION DO NOT CONNECT TO THE BATTERIES AT THIS POINT ENSURE YOUR TURBINE IS CORRECTLY GROUNDED Carefully raise the tower and secure base and or guy cables Make sure the Stop Switch is in the off position then connect wires to the batteries Red wire to Positive Black wire to Negative Turn on the Stop Switch you will see the red LED slowly blink four times to indicate that the controller is running properly CONGRATULATIONS YOU HAVE COMPLETED YOUR WIND TURBINE INSTALLATION MAINTENANCE Your Sunforce Products Wind Turbine h
30. n toute s curit pendant les p riodes de vents violents ou d entretien general Disques de plastique Des composantes de plastique antistatique qui prolongera la vie utile de l eolienne en la prot geant de la corrosion caus e par les conditions atmosph riques et de l accumulation de charges lectrostatiques Votre olienne Sunforce est con ue en ayant votre s curit personnelle comme priorit principale Cependant il existe toujours des dangers inh rents lors de l utilisation de l quipement lectrique et ou m canique La s curit doit demeurer le premier souci lors de la s lection de l endroit et de la planification de l installation et de l exploitation de l olienne Veuillez lire les directives suivantes Directives importantes portant sur la s curit Veuillez prendre le temps de lire attentivement ce manuel au complet avant de commencer l assemblage 1 Sauvegardez ce manuel de l utilisateur dans un endroit s r pour r f rence ult rieure 2 Profitez d une journ e calme sans vent pour installer ou effectuer l entretien de votre olienne 3 coutez avec soin les bruits g n r s par votre olienne La pr sence de tout bruit m canique peut indiquer le besoin d entretien Dans ce cas veuillez communiquer avec le service la client le de Sunforce 4 Suite l installation r ajustez et resserrez les vis et les boulons 5 Adh rez aux techniques reconnues de mise la terre tablies par le NE
31. ner l arbre du rotor 5 moins de 500 r volutions la minute le rotor devrait tourner librement sans friction 6 500 r volutions la minute et plus l olienne devrait charger les batteries Vous devriez ressentir de la r sistance de l arbre du rotor lorsque l arbre ne tourne pas Si tel n est pas le cas veuillez communiquer avec votre fournisseur Les Produits Sunforce Soyez conscient que le niveau de la charge de votre groupe de batteries doit tre inf rieur au niveau charg fond puisque l olienne doit avoir une indication qu une charge est requise Garantie Les Produits Sunforce garantit que votre produit sera libre de d fectuosit de mat riaux et de main d uvre pendant une p riode de trois 3 ans partir de la date d achat La couverture de la garantie ne s applique qu l acheteur initial Si votre produit s av re d fectueux au cours de la p riode de garantie Les Produits Sunforce a sa discretion 3 Remplacera l olienne d fectueuse par une nouvelle olienne ou une olienne remise a neuf 4 Corrigera la defectuosite rapport e La garantie au client continuera d tre valide pour le produit r par ou remplac a partir de la date initiale de la garantie Restrictions Cette garantie couvre les defectuosites de fabrication d couvertes alors que le produit est utilise selon les directives et recommandation du fabricant La garantie ne s applique pas a aux quipements et mat riaux non fabriq
32. nforce cuenta con protecci n integrada para prevenir posibles da os en periodos de vientos extremos Un freno se aplica cuando el generador detecta 20 m s o 45 MPH 72 Km h Su generador dejara de girar y un sistema interno de carga har una verificaci n peri dica de la velocidad del viento esperando una disminuci n de la misma INTERRUPTOR DE PARADA DE CORRIENTE CONTINUA Su turbina e lica Sunforce incluye un interruptor de corriente continua 50 Amperios CC el cual puede ser usado para frenar el generador Diagrama del disyuntor y el interruptor CC Cable negro Interruptor de parada gt E h gt e gt o Circuito Circuito Corto cerrado abierto Circuito Bateria Precauci n Los periodos prolongados de circuito abierto o giro libre pueden causar un desgaste excesivo en la turbina CONEXION A TIERRA Cada turbina e lica y torre debe ser conectado a tierra en la base de la misma aun si el banco de baterias del el sistema cuenta con su conexi n a tierra Conectar a tierra la base de la torre puede prevenir choques el ctricos a personas que entren en contacto con sta en casos de rel mpagos o fallos el ctricos Por favor t mese el tiempo necesario para revisar el C digo Nacional El ctrico NEC y las normas locales de construcci n y de zonificaci n para verificar todos los requisitos necesarios A n en sistemas fuera de red off grid existen varias maneras de conectarse a tierra la mas comun sien
33. o espec fico de 3 a os a partir de la fecha original de compra El n mero de autorizaci n de retorno debe ser emitido antes de que cualquier producto pueda ser regresado Toda notificaci n debe incluir la siguiente informaci n a Descripci n del presunto defecto b De qu forma era utilizada la turbina e lica c N mero de serie d Fecha original de compra e Nombre tel fono y direcci n de la persona que solicita la garant a Sunforce Products proveer al cliente el n mero de autorizaci n de retorno dentro de 2 a 3 d as h biles e indicar a d nde se deber dirigir el producto Una vez se emita el n mero de autorizaci n de retorno el cliente tendr 30 d as para regresar el producto De no regresarse el producto dentro de este periodo un nuevo n mero de autorizaci n de retorno deber ser emitido El fabricante no tiene ninguna obligaci n de aceptar cualquier producto regresado sin un n mero de autorizaci n correcto LIMITACI N DE LA RESPONSABILIDAD BAJO NINGUNA CIRCUNSTANCIA EL FABRICANTE SUS AFILIADOS O PROVEEDORES SER N RESPONSABLES POR CUALQUIER P RDIDA DE USO INTERRUPCI N DE NEGOCIOS P RDIDA DE GANANCIAS P RDIDA DE DATOS O DA OS INDIRECTOS ESPECIALES INCIDENTALES O CONSECUENTES DE NING N TIPO INDEPENDIENTEMENTE DEL TIPO DE ACCI N YA SEA EN CONTRATO AGRAVIO INCLUYENDO NEGLIGENCIA RESPONSABILIDAD ESTRICTA O CUALQUIER OTRA FORMA QUE RESULTE DEL DEFECTO REPARACI N REEMPLZAO EMBARQUE O CUAL
34. ocation installation and operation of the turbine Please read the following Important Safety Instructions Please take the time to read through this manual prior to assembly 1 Place this instruction manual in a safe place for reference 2 Wait until a calm day to install or perform maintenance on your Turbine 3 Listen to your Turbine should you hear any mechanical noise maintenance may be required please contact Sunforce Products Customer Service 4 After installation re adjust and tighten the screws and bolts 5 Adhere to proper grounding techniques as established by the NEC 6 Your Sunforce Wind Turbine must be installed in accordance with this manual and local and national building code Incorrect installation may void your warranty 7 Wind turbine blades spin at a potentially dangerous speed Installation instructions must therefore be followed carefully and respected Never approach a turbine in motion Mechanical Hazard Rotating blades present the most serious mechanical hazard The rotor blades are made of very strong thermoplastic At the tip the blades may be moving at velocities over 15m s At this speed the tip of a blade is nearly invisible and can cause serious injury Under no circumstances should you install the turbine where a person could come in contact with moving rotor blades Electrical Hazard The Sunforce Wind Turbine is equipped with sophisticated electronics designed to provide protection from electr
35. r Prise de terre Tige de mise la terre Prudence Observez la bonne polarit travers tout votre syst me Toute polarit invers e peut endommager le groupe de batteries et l olienne Cette olienne est con ue uniquement pour les syst mes de 12 volts PROTECTION SURVITESSE Votre olienne Sunforce est quip e d une protection int gr e qui pr vient les dommages possibles durant les p riodes de vents extr mes Un frein est appliqu lorsque l olienne d tecte des vents de 20 m sec 45 mi h Dans cette condition votre olienne arr ta de tourner le systeme de charge interne se recyclera et attendra que la vitesse du vent diminue INTERRUPTEUR D ARRET DE SERVICE L emballage de votre olienne Sunforce inclut un interrupteur d arr t de service 50 amperes CC qui peut tre utilis pour arr ter l eolienne Schema pour le disjoncteur et l interrupteur d arr t de service de u Interrupteur noir rouge dan tde service p Ss e gt Circuit Circuit Court circuit ferme ouvert Batterie Mise en garde Les p riodes prolong es de l tat a circuit ouvert ou de rotation libre gt peuvent causer une usure excessive de l olienne MISE A LA TERRE Chaque olienne et chaque tour doivent tre mises a la terre au pied de la tour m me si le systeme est mis a la terre au groupe de batteries La mise a la terre de la tour aidera a pr venir que des personnes touchant l
36. retour et une nouvelle autorisation de retour devra tre emise Le fabricant n a aucune obligation d accepter tout produit qui lui est retourn sans un numero valide d autorisation de retour LIMITATION DE LA RESPONSABILITE DANS AUCUN CAS LE FABRICANT SES ASSOCIES OU FOURNISSEURS NE SERONT TENUS RESPONSABLES POUR TOUTE PERTE D USAGE D INTERRUPTION D ACTIVITE DE PERTE DE PROFIT DE PERTE DE DONN ES OU DE DOMMAGES DIRECTS PARTICULIERS ACCESSOIRES OU INDIRECTS DE QUELQUE GENRE QU ILS SOIENT INDEPENDAMMENT DE LA NATURE DE LA RECLAMATION SOIT POUR BRIS DE CONTRAT DELIT CIVIL INCLUANT LA NEGLIGENCE RESPONSABIITE STRICTE OU AUTREMENT RESULTANT DE LA DEFECTUOSITE DE LA REPARATION DU REMPLACEMENT DE L EXPEDITION OU AUTRE MEME SI LE FABRICANT SES ASSOCIESS OU SES FOURNISSEURS ONT ETE AVISES DE LA POSSIBILITE DE TEL DOMMAGE Remarque Certains tats et provinces ne permettent pas l exclusion ou les limitations des dommages indirects ou accessoires ainsi cette limitation peut ne pas s appliquer dans votre cas De plus ni le fabricant ni ses associ s et ses fournisseurs ne seront tenus responsables pour tout dommage ou perte de tout article ou produit raccord aliment par ou autrement reli au mat riel La responsabilit globale envers le client pour toutes causes de r clamation et toutes les th ories de responsabilit sera limit e et n exc dera pas le prix d achat du produit pay par le client Cette garantie ac
37. s do not allow the exclusion or limitation of incidental or consequential damages so these limitations may not apply to you Neither the manufacturer nor its affiliates or suppliers will be held liable or responsible for any damage or loss to any items or products connected to powered by or otherwise attached to the hardware The total cumulative liability to Customer from all causes of action and all theories of liability will be limited to and will not exceed the purchase price of the Product paid by Customer This warranty gives the Customer specific legal rights and the Customer may also have other legal rights that vary from state to state or province to province Merci d avoir choisi un produit Sunforce Ce produit est con u conform ment aux specifications techniques et aux normes les plus strictes Il pourra tre utilis pendant des annees sans entretien Veuillez lire ces instructions avec soin avant de commencer l installation et sauvegardez les dans un endroit sur pour reference ult rieure En tout temps si vous avez des questions au sujet de ce produit ou avez besoin d assistance suppl mentaire n h sitez pas a communiquer directement avec nos professionnels responsables de l assistance technique t l phonique au 1 888 478 6435 ou par courrier lectronique a info sunforceproducts com ACCESSOIRES INCLUS Interrupteur d arr t de service Interrupteur de 50 amperes CC Cette composante est utilis e pour freiner votre turbine e
38. s doigts en touchant ensemble en m me temps les fils positif et n gatif de l olienne cr ant ainsi un court circuit Lorsque les fils se touchent l arbre du rotor devrait devenir plus difficile a tourner Lorsque les fils ne se touchent plus l arbre devrait tourner facilement Lorsque les fils ROUGE positif NOIR n gatif de l olienne sont branches directement aux bornes correspondantes du groupe de batteries la DEL rouge clignote quatre fois indiquant que le contr leur interne de olienne fonctionne correctement Si les indications mentionn es ci dessus ne surviennent pas veuillez communiquer avec votre fournisseur Sunforce INSTALLATION Choisissez une journ e calme sans vent et assurez vous la disponibilit d une personne pour vous aider tout au long du processus d installation Mise en garde LES ARETES DES PALES SONT COUPANTES VEUILLEZ LES MANIPULER AVEC SOIN Mise en garde N installez pas l ensemble des pales avant que le corps de l olienne ne soit monte sur la tour Mise en garde TOUTES LES BATTERIES DOIVENT ETRE DEBRANCHEES TOUT AU LONG DU PROCESSUS DE L INSTALLATION Veuillez consulter le tableau suivant des calibres de fils pour vous assurez d utiliser des fils du bon calibre pour l installation Sunforce recommande ces calibres comme les calibres minimaux pour une performance optimale Utilisez toujours des fils de plus gros calibre qui sont pratiques et abordables Les codes local provinci
39. s exceeding 15 mph d Windstorms lightning and Hail damage e Repairs performed by other than authorized Sunforce Products support staff f All acts of God misuse negligence or accidents g Tower foundation and wire h has not been installed operated repaired or maintained in accordance with the instructions supplied by manufacturer Any service identified in the above list or product is found not to have any defect in manufacturers workmanship or materials the customer will be responsible for the costs of all repairs and expenses incurred by Sunforce Products DISCLAIMER EXCEPT FOR THE EXPRESSED WARRANTY SET FORTH ABOVE THE MANUFACTURER DISCLAIMS ALL OTHER EXPRESSED AND IMPLIED WARRANTIES INCLUDING THE IMPLIED WARRANTIES OR FITNESS FOR A PARTICULAR PURPOSE MERCHANTABILITY AND NON INFRINGEMENT NO OTHER WARRANTY EXPRESSED OR IMPLIED WHETHER OR NOT SIMILAR IN NATURE TO ANY OTHER WARRANTY PROVIDED HEREIN SHALL EXIST WITH RESPECT TO THE PRODUCT SOLD UNDER THE PROVISIONS OF THESE TERMS AND CONDITIONS The manufacturer EXPRESSLY DISCLAIMS ALL LIABILITY FOR BODILY INJURIES OR DEATH THAT MAY OCCUR DIRECTLY OR INDIRECTLY BY USE OF THE PRODUCT BY ANY PERSON ALL OTHER WARRANTIES ARE EXPRESSLY WAIVED BY THE CUSTOMER Warranty Claims amp Return Policies To be eligible for service under this warranty customer must either contact manufacturer either through written request or by telephone to submit a service request for the wind turbine covere
40. se general recommendations Caution The use of undersized wire will result in loss of performance and potential damage to your Sunforce Wind Turbine and battery bank Units given in AWG mm Run your chosen wire through the pipe and drag the wires close to the batteries Do not connect to the battery at this point strip the insulation back from each set of wires Connect the Wind Generator to the wires and insulate the connections using either heat shrink tubing crimp connects or a high quality electrical tape The included rubber gasket helps prevent the bottom of the yaw from contacting the top of the pole This rubber gasket will assist in reducing the transmission of noise down the tower Firmly tighten the yaw clamp screws with the 4mm hex key Be sure that it is securely attached to the mounts J Rubber Gasket Slide the yaw shaft all the way down over the end of the tower being careful not to pinch the yaw wires Be sure to leave enough slack in the wires so that if necessary the Wind Generator can be removed Mark both ends of all the wires with tape to identify which is negative positive and ground Wire Color Codes RED Positive BLACK Negative i AA sa O Plastic Disk 6 _ gt 7 H Place one of the blades on the hub socket and insert one of the M6 20 socket head cap screws Place a plastic disk on the end of the screw and then place a self locking nut M6 and tighte
41. u s par Les Produits Sunforce b au produit qui a t modifi ou chang par une entit autre que Les Produits Sunforce ou sans l approbation pr alable de Les Produits Sunforce c a une olienne qui a ete expos e des vents excedant 157 mi h 251 2 km h d aux dommages caus s par les vents violents les clairs ou la gr le e les r parations effectu es par une entit autre que le personnel de soutien de Les Produits Sunforce f aux dommages r sultant de forces majeures d utilisation abusive de n gligence ou d accidents g la fondation de la tour et le c blage h si olienne n a pas t install e exploitee reparee ou entretenue conformement aux directives offertes par le fabricant Les couts et les d penses encourus par Les Produits Sunforce pour toute reparation d un produit qui s av re n tre pas d fectueux en ce qui a trait aux mat riaux ou la main d uvre seront couverts par le client AVIS DE NON RESPONSABILITE EXCEPTION FAITE DE LA GARANTIE EXPRESSE D FINIE CI DESSUS LE FABRICANT REJETTE TOUTES LES AUTRES GARANTIES EXPRESSES ET TACITES INCLUANT LES GARANTIES D AD QUATION OU D APTITUDE UNE T CHE PARTICULI RE DE VALEUR MARCHANDE OU D ABSENCE DE CONTREFA ON AUCUNE AUTRE GARANTIE EXPRESSE OU TACITE DE NATURE SIMILAIRE OU NON A TOUTE AUTRE GARANTIE OFFERTE DANS LE PRESENT DOCUMENT NE SERA RECONNUE RELATIVEMENT A CE PRODUIT VENDU SOUS LES PROVISIONS DE CES CONDITIONS G N RALES LE FABRICANT R
42. un tubo de acero de 1 5 pulgadas segun la Tabla 40 de estandares de tuberia Este se puede obtener en sus proveedores locales de ferreteria y materiales Contacte a su detallista local de productos Sunforce para mayor informacion sobre el kit de torre INSTALACION HERRAMIENTAS REQUERIDAS Interruptor de parada incluido Discos plasticos incluidos Llave hexagonal de 4 mm incluida Llave hexagonal de 5 mm incluida Llave hexagonal de 8 mm incluida Cables de alimentacion no incluidos Cable trenzado de 6 mm2 en calibre m trico o 10AWG en calibre americano Baterias no incluidas Tubo de acero 1 5 Tabla 40 di metro exterior real de 1 875 o 48 mm no incluido Llave dinamometrica Cinta aislante o tubo termorretr ctil de 1 4 6 7 mm no incluidas Pelacables y remachadora no incluidos VERIFICACION PREVIA Siga los pasos siguientes para verificar si su turbina e lica Sunforce funciona correctamente Gire el eje del rotor lentamente con sus dedos manteniendo en contacto las puntas de los cables negativo y positivo provenientes de la turbina Esto debe dificultar la rotaci n Desconecte los cables y gire el eje nuevamente para obtener rotaci n libre Conecte los cables a los bornes correspondientes en la bater a ROJO es y NEGRO es Observe la intermitencia del LED rojo en la turbina para confirmar el funcionamiento correcto del regulador interno de la unidad Si no observa ninguno de los indi

Download Pdf Manuals

image

Related Search

Related Contents

QY-9263S SBC Hardware Manual  Alen Paralda Air Purifier  SYSTEM Manuel d`instructions  詳細表示 - アックスヤマザキ  

Copyright © All rights reserved.
Failed to retrieve file