Home
        Manuel d`installation
         Contents
1.              INT  RIEUR  DE LA DOUCHE  INTERIOR  SHOWER SIDE       INT  RIEUR  DE LA DOUCHE    INTERIOR  SHOWER SIDE    Y                                                                     INT  RIEUR   DE LA DOUCHE  INTERIOR   SHOWER SIDE            tape   Step  ENGAGER LES PANNEAUX DE PORTE DANS LES RAIL SUP  RIEUR  amp  INF  RIEUR  INSERT DOOR PANELS INTO TOP  amp  BOTTOM TRACK  PAGE 8            TAPES D INSTALLATION DE LA PORTE   DOOR INSTALLATION STEPS         tape   Step   13  UTILISER UNE TOURNE   CROU OU UNE PINCE POUR UN AJUSTEMENT VERTICAL  USE HEX NUT DRIVER OR PLIERS FOR VERTICAL DOOR ADJUSTMENT                SERREZ  TIGHTEN    DESSERREZ  LOOSEN          N AJUSTEMENT VERTICAL  Sa VERTICAL ADJUSTMENT    INT  RIEUR  DE LA DOUCHE  INTERIOR  SHOWER SIDE                                             tape   Step INSTALLER LES JOINTS LAT  RAUX  SUR LE PANNEAU DE PORTE  1   INSTALL SIDE PANEL GASKET    ONTO DOOR PANEL 1  1           PAGE 9      TAPES D INSTALLATION DE LA PORTE   DOOR INSTALLATION STEPS         tape   Step     5  INS  REZ LES COUVERCLES EXTENSEUR  INSERT EXPANDER CAPS                                                     INT  RIEUR  DE LA DOUCHE   INTERIOR  SHOWER SIDE                        mal    tape   Step                          VIS 3 8    LG  8    CAPUCHON COUVRE VIS  8  00  SCREW 3 8    LG  8    SCREW CAP  8  INTERIOR  SHOWER SIDE                      SUR LES DEUX C  T  S  ON BOTH SIDE                PAGE 10      TAPES D INSTALLATION DE LA PORTE   DOO
2.    LG  6           INSERT THE WALL PLUGS  6   AND PUT IN EACH A DROP OF SILICONE     SECURE THE WALL JAMB USING 1 3 8    SCREWS  6     PAGE 5         TAPES D INSTALLATION DE LA PORTE   DOOR INSTALLATION STEPS      tape   Step        INS  REZ UN C  T   DU CADRE DANS LE JAMBAGE  INSERT ONE SIDE OF FRAME INTO WALL JAMB          Descendezie ca dhe  Lover hame                                       INT  RIEUR  DE LA DOUCHE       INTERIOR O   4H    Glissez  W Slide           Poussez  y Push         tape   Step  ENGAGER L AUTRE C  T   DU CADRE DANS LE JAMBAGE       ENGAGE THE OTHER SIDE OF FRAME INTO WALL JAMB    PAGE 6         TAPES D INSTALLATION DE LA PORTE   DOOR INSTALLATION STEPS       RAIL SUP  RIEUR  TOP TRACK                         INT  RIEUR  DE LA DOUCHE  INTERIOR    SHOWER SIDE   tape   Step       PANNEAU FIXE  2  SUR LES DEUX C  T  S  FIXED PANEL  2  ON BOTH SIDE       SUPPORT VITRE     GLASS SUPPORT                   RAIL INF  RIEUR  BOTTOM TRACK       INT  RIEUR  DE LA DOUCHE    INTERIOR  SHOWER SIDE                         INT  RIEUR  DE LA DOUCHE    INTERIOR  SHOWER SIDE         tape   Step    SUPPORT VITRE  8    VIS      LG  8   GLASS SUPPORT  8    SCREW     LG  8           PAGE 7      TAPES D INSTALLATION DE LA PORTE   DOOR INSTALLATION STEPS         tape   Step         INSTALLATION DES PANNEAUX DE PORTE            INSTALL DOOR PANELS          ENFONCER  PUSH DOWN                                                                    ENFONCER  PUSH DOWN                
3.   2                    PAGE 1    LISTE DES OUTILS REQUIS   REQUIRED TOOLS LIST    14  I a  TOURNEVIS    SCREWDRIVERS MECHE POUR TUILE EN CERAMIQUE MECHE  CERAMIC TILE DRILL BIT DRILL BIT                SCELLANT PER  EUSE NIVEAU TOURNE   CROU CRAYON RUBAN    MESURER MAILLET  SILICON DRILL LEVEL HEX NUT DRIVER PENCIL MEASURE TAPE MALLET                   LISTE DES PI  CES ET DE LA QUINCAILLERIE   PACKAGING CHECK LIST  amp  HARDWARE    7 2     rg    SUPPORT VITRE  G  4  SUPPORT VITRE  D 4  JOINT LAT  RAL  4  ENS  DE POIGN  E  2   GLASS SUPPORT  L  4  GLASS SUPPORT  R  4  SIDE GASKET 4  SET OF HANDLES  2      POUR VERRE  POINT PARIS  3  SEULEMENT      FOR    PARIS POINT     M4 X 8     GLASS ONLY     CAPUCHON  JOINT MAGN  TIQUE  2     JOINT LAT  RAL C  T   JAMBAGE  2  MAGNETIC DOOR COUVRE VIS  8  VIS 3 8    LG  8   SIDE GASKET WALL JAMB SIDE  2  GASKET  2  SCREW CAP  8  SCREW 3 8    LG  8                  M4 X 35     VIS      LG  4  CHEVILLE  8  VIS 1 3 8    LG  14           SCREW 4    LG  4  WALL PLUG  8  SCREW 1 3 8    LG  14        PAGE 2         TAPES D INSTALLATION DE LA PORTE   DOOR INSTALLATION STEPS         tape   Step     POSEZ ET CENTREZ LE CADRE AVEC LES JAMBAGES  SUR LE SEUIL DE LA BASE DE DOUCHE        O               POSITION AND CENTER THE FRAME TOGETHER  WITH WALLJAMBS ONTO THRESHOLD OF  SHOWER BASE     THE INSTALLATION SHOWN IS BASED ON PLUMB FINISHED WALLS  AND A LEVELLED BASE  IF THESE CONDITIONS ARE NOT MET   PLEASE ADJUST ACCORDINGLY        L INSTALLATION ILLU
4.  porte et les panneaux lat  raux avec une solution d   eau et d  tergent  doux  Cela suffira pour conserver l aspect neuf des panneaux de verre et du cadre d aluminium   N utilisez jamais de poudre ou tampons de r  curage  ni d instruments tranchants sur les surfaces  en m  tal et en verre de la porte     HOW TO CARE FOR YOUR DOOR  Never use scouring powder pads or sharp instruments on metal work or glass panels  An occasional    wiping down with a mild detergent diluted in water is all that is needed to keep the panels and  aluminum parts looking new        Des changements peuvent   tre apport  s au produit sans pr  avis   Product specifications are subject to change without notice     LISTE DES PI  CES ET DE LA QUINCAILLERIE   PACKAGING CHECK LIST  amp  HARDWARE       RAIL        HAUT AVEC CANAL ARRONDI           TOP TRACK WITH ROUNDED CHANNEL       Oo    O                            RAIL DU BAS AVEC CANAL PLAT          BOTTOM TRACK WITH FLAT CHANNEL                         JAMBAGE  2  WALL JAMB  2      1          EXPANDER  2            PANNEAU FIXE  2   FIXED PANEL  2     SUPPORT VITRE  G  4   GLASS SUPPORT LL  4           SUPPORT VITRE  D 4   GLASS SUPPORT    4      RAIL DU BAS  1  BOTTOM TRACK  1   PANNEAU DE PORTE  2     DOOR PANEL  2        JOINT LAT  RAL  4   SIDE GASKET  4           ENS  DE POIGN  E  2   SET OF HANDLES  2          JOINT LAT  RAL C  T   JAMBAGE  2   SIDE GASKET WALL JAMB SIDE  2   RAIL DU HAUT  1   TOP TRACK  1     JOINT MAGN  TIQUE  2   MAGNET GASKET
5. Guide d installation   Instruction manual    3005    PORTE COULISSANTE COURB  E   CURVED GLASS SLIDING SHOWER DOOR                   10 13    PORTE COULISSANTE COURB  E   CURVED GLASS SLIDING SHOWER DOOR       INSTRUCTIONS D INSTALLATION POUR PORTE COULISSANTE COURB  E                        Please keep this manual and product code number for future reference  and replacement parts ordering if necessary     Veuillez conserver ce manuel et le code de produit pour votre r  f  rence future  et au besoin la commandent les pi  ces de rechange           PORTE COULISSANTE COURB  E   CURVED GLASS SLIDING SHOWER DOOR       LIRE ATTENTIVEMENT AVANT DE COMMENCER  READ CAREFULLY AND COMPLETELY BEFORE PROCEEDING    IL EST RECOMMAND   DE PORTER DES LUNETTES DE S  CURIT   EN TOUT TEMPS LORS DE L INSTALLATION  IT ISRECOMMENDED THAT YOU WEAR SAFETY GLASSES AT ALL TIMES DURING INSTALLATION       INSTALLATION SUR LES TUILES EN C  RAMIQUE    Si votre porte de douche est install  e sur des tuiles en c  ramique  les tuiles doivent   tre prolong  es  compl  tement sous les jambages muraux  Utilisez du compos   aux silicones pour sceller le joint  entre les tuiles en c  ramique et la base de la douche     INSTALLATION OVER CERAMIC TILE    If your shower door is to be installed over ceramic tile  tile should extend completely under both  wall jambs  Silicone should be used to seal the line where ceramic tile meets the base              ENTRETIEN DE LA PORTE DE DOUCHE    De temps    autre  nettoyez la
6. R INSTALLATION STEPS     POUR VERRE MENT  PARIS   POUR VERRE 6mm  OR   OU ___ SEULEMENT           08   PARIS       GLASS ONLY   FOR 6mm GLASS ONLY             INS  RER JOINT LATERAL  Etape   Step C  T   JAMBAGE  2                   les deux c  t  s       2 INT  RIEUR  INSERT SIDE GASKET  DE LA DOUCHE    WALL JAMB SIDE  2  INTERIOR   both sides     SHOWER SIDE                   INT  RIEUR  DE LA DOUCHE   INTERIOR   SHOWER SIDE                                           2 Heures  Hours         tape   Step  CALFEUTRAGE EXT  RIEUR  RAIL INF  RIEUR   LE LONG DU JAMBAGE        SILICONE EXTERIOR OF   BOTTOM TRACK   ALONG WALL JAMB        PAGE 11    
7. STR  E EST BAS  E SUR DES MURS FINIS  D   APLOMB ET UNE BASE DE DOUCHE NIVEL  E  SI CES CONDITIONS  NE SONT PAS PR  SENT  ES  VEUILLEZ AJUSTER EN CONS  QUENCE       AJUSTEZ ET NIVELEZ LE CADRE       tape  Step   TRACEZ LES LIGNES DE REP  RE LE LONG    DU C  T   EXT  RIEUR DU JAMBAGE     ENLEVEZ LE CADRE DE LA BASE                            ADJUST AND LEVEL THE FRAME ASSEMBLY     TRACE OUTER EDGE OF WALL JAMBS     REMOVE FRAME ASSEMBLY FROM BASE        SUR LES DEUX C  T  S  ON BOTH SIDE                PAGE 4      TAPES D INSTALLATION DE LA PORTE   DOOR INSTALLATION STEPS                                            tape   Step           EXTENSEUR  2   RAIL  2    VIS 1 3 8    LG  8   EXPENDER  2    TRACK  2    SCREW 1  3 8    LG  8                         tape   Step          INS  REZ LES JAMBAGES TEMPORELLEMENT  INSERT WALL JAMBS TEMPORALLY       PAGE 3         TAPES D INSTALLATION DE LA PORTE   DOOR INSTALLATION STEPS                           R  ALIGNEZ LE JAMBAGE     LA LIGNE DE REP  RE   2       MARQUEZ LES POINTS DE REP  RE DE PER  AGE    SUIVANT LES AVANT TROUS     tape   Step   PERCEZ LES TROUS EN UTILISANT UNE M  CHE           APPROPRI  E  1 4        REALIGN WALL JAMB WITH REFERENCE LINE  2      MARK DRILLING LOCATION FOLLOWING PILOT HOLES     DRILL HOLES BY USING SUITABLE 1 4    DRILL BIT        SUR LES DEUX C  T  S  ON BOTH SIDE                  tape   Step      INSEREZ LES CHEVILLES  6   ET METTEZ Y UNE GOUTTE DE SILICONE        FIXEZ LES JAMBAGES AVEC LES VIS 1 3 8 
    
Download Pdf Manuals
 
 
    
Related Search
    
Related Contents
Manual  Manual de instrucciones  l`utilisation et  LB 1 - Wacker Neuson  7537型工具  TWM862-R  KUDA 085255 holder  入札説明書等に関する質問回答書        Copyright © All rights reserved. 
   Failed to retrieve file