Home

E-0266 Carma Industries (Div. of 1276437

image

Contents

1. The purpose of revision 1 was to include the addition of a test interface circuit Rev 2 Issued Date 1991 04 16 The purpose of revision 2 was to include two additional current ratings 200 A 400 A and one additional voltage rating 347 V Various hardware firmware and mechanical modifications as well as the 30 3 wire delta and 3 4 wire wye circuits where included Rev 3 Issued Date 1992 07 19 The purpose of revision 3 was to include the demand and time of use functions as well as one additional current rating 5A Rev 4 Issued Date 1993 10 07 The purpose of revision 4 was to include three additional current ratings 2A 10A 125A and five additional voltage ratings 240V 277V 416V 480V 600V Rev 5 Issued Date 1996 10 25 The purpose of revision 5 was to include various hardware and mechanical changes as well as a repackaging of the current transducers Page 10 of de 19 R VISIONS Original Date d mission 1989 07 19 R v 1 Date d mission 1990 04 10 La r vision 1 visait ajouter un circuit d interface d essai R v 2 Date d mission 1991 04 16 La r vision 2 visait ajouter deux valeurs de courant nominal 200 A et 400 A et une valeur de tension nominale 347 V taient galement incluses diverses modifications du mat riel du microprogramme et des modifications m caniques ainsi que des modifications des circuits triphas s trois fils mont s en triangle et des
2. CT TRANSFER RATIO 6 2 Vac AT 100 PRIMARY CURRENT APPROVED PTs 120 240 277 347 416 480 600 Vac PT TRANSFER RATIO 5 65 VAC Sec AT 120 347 600 Vac Prim CT PT CABLES 22 AWG Min TWISTED PAIR MAX 1000 FT METER CONFIGURATIONS WYE 3PH 4W 1 EL 2 EL 3 EL DELTA 3PH 3W 1 EL 2 EL RESDTL 2 EL METER MULTIPLIERS INCLUDED IN DISPLAYED ENERGY amp DEMAND SPECIFIC PARAMETERS PRODUCTION DATE CODE NETWORK ADDRESS SERIAL NUMBER NUMBER OF METERS DEMAND VERIFIED TOU VERIFIED COMMUNICATIONS TYPE COM BAUD RATE E A Toll Free 1 888 298 3336 INDUSTRIES ING Local 705 743 2401 Rev 11 Name Plate Change Name to Type T R v 11 Plaque signal tique Changement de nom pour Type T Page 14 of de 19 Project Projet AP AE 09 0006 APPROVAL No N D APPROBATION E 0266 Rev 13 DIRECTIONS 1 PRESS 0 KWn Original EMP I Display Unit Dispositif d affichage originale MSE I R v 8 Dispositif d affichage du MS II Rev 1 EMP I Doors open Rev 5 EMP IT Removable Logic Module R v 1 MSE I Portes ouvertes R v 5 MSE II Module logique d tachable Page 15 of de 19 Project Projet AP AE 09 0006 Rev 1 EMP I Old Layout Doors close R v 1 MSE I Configuration originale Portes ferm es Rev 2 EMP I Display Unit New R v 2 MSE I Nouveau dispositif d affichage Pa
3. ceux qui sont d crits dans la documentation re ue et pour lesquels des chantillons repr sentatifs ont t fournis par le requ rant aux fins d valuation conform ment aux articles 13 et 14 du R glement sur l inspection de l lectricit et du gaz Ce qui suit est une br ve description de leurs principales caract ristiques DESCRIPTION SOMMAIRE Le syst me vis par le pr sent avis d approbation est destin mesurer l nergie KW h et la puissance appel e kW et kVA tout en indiquant le temps d utilisation Le syst me est con u pour des applications de mesure de vrac et de comptage divisionnaire et fait appel la m thode des trois wattheurem tres pour circuits polyphas s Le syst me peut mesurer jusqu 4080 circuits monophas s trois fils ou circuits en r seaux En tant que syst me 1l peut mesurer jusqu 4845 circuits monophas s trois fils ou circuits mont s en triangle ou 4590 circuits en r seau ou 3060 circuits quatre fils mont s en toile Le syst me se compose des six sous syst mes distincts illustr s ci dessous la figure n 1 a Transducteur de tension TT Transformateur de potentiel TP b Transducteur de courant TC c Module de surveillance nerg tique MS d Affichage du MS facultatif e R seau local f Ordinateur central sur place facultatif Nota Le r seau local et l ordinateur central constituent en fait le syst me de consign
4. in accordance with sections 13 and 14 of the Electricity and Gas Inspection Regulations The following is a summary of the principal features only SUMMARY DESCRIPTION The metering system herein approved is intended for metering energy kW h demand KW and KVA and time of use metering The system is intended for metering both the bulk metering applications and the sub metering applications by means of the three wattmeter method for polyphase circuits As a system it is capable of measuring up to 4080 three wire single phase circuits or network circuits As a system it is capable of measuring up to 4845 three wire single phase or delta circuits or 4590 network circuits or 3060 four wire Wye circuits The system consists of the following six functionally distinct subsystems as depicted in Figure N 1 a Voltage Transducers VT Potential Transformer PT b Current Transducers CT c Energy Monitoring Pods EMP d EMP Display Optional e Local Area Network LAN and f On Site Host Computer Optional Note The LAN and HOST computers are merely the tele metering reporting system for the Meter Manager system As such no metrological functions are performed outside of the EMP Page 2 of de 19 APPROVAL No N D APPROBATION E 0266 Rev 13 REMARQUE Cette approbation ne vise que les compteurs dont la conception la composition la construction et le rendement sont identiques en tout point
5. l ordinateur central sur place Le MS comprend une interface d talon Radian qui produit une impulsion de synchronisation visant amorcer et interrompre l talon Radian synchronis avec le lecteur du MS Il est ainsi possible de v rifier le syst me Project Projet AP AE 09 0006 The EMP specifications are as follows Auxiliary Supply 100 115 220 230 240 V ac Jumper selectable 47 to 63 Hz 95 watts Frequency Burden The EMP can be a stand alone device with local display or operate as part of a network The local area network LAN consists of all EMP s in the system and the on site host computer A Host computer PC computer can act as a coordinator for all EMPs data On any one comport serial IP address etc the Host can manage up to 255 EMP s for a total metering capacity of 4845 three wire single phase or delta poly phase meter nodes 2 El circuits or 4590 network meter nodes 2 El of 3ph 4w or 3060 four wire poly phase meter nodes The Host does not contribute to the metrological functions of the system and merely acts as a tele metering coordinator collects stored data from EMPs and network status observer As a result the Host computer itself does not require verification Communications between the host computer and the remote billing host may be done by standard telephone lines LAN Internet or by other communications technology typically once per bi
6. s au moyen de la m me configuration de service Les TC doivent tre correctement associ s leur TT de service conform ment au sch ma de c blage et la configuration effectu e en usine afin de mesurer avec exactitude la consommation de puissance et d nergie lectriques Project Projet AP AE 09 0006 For network metering in a four wire wye service three voltage transducers are connected in a three line to neutral configuration Fewer voltage transducers may be required for other configurations For example with two voltage transducers 19 separate 2 element circuits can be metered by each EMP Both three wire network and single phase circuits are metered by the two wattmeter method Data sampled from each meter node 1s stored within non volatile memory The EMP consists of four distinct components a a multiplexer which acts as a switch that in response to microprocessor commands passes transducer signals to the analog to digital subsystem b an analog to digital converter which converts the continuous current and voltage transducer signals into discrete numbers digital signals which can be analyzed by the microprocessor c a microprocessor which controls the operation of the entire measurement process within the EMP d a local area network interface which 1s the communications channel between the EMP and the on site host computer The EMP incorporates an EMP Radian standard interface which ge
7. 05 m tres qui s applique aux CT s applique aux TT Project Projet AP AE 09 0006 The EMP Energy Monitoring Pod performs the KW h metering functions Through use of multiplexing and computation the EMP can sequentially measure the signals from up to 40 transducers Those transducers will be a mixture of voltage and current transducers whereby the current transducers are associated to a particular voltage source in the factory configuration In order to accurately measure energy the EMP requires a set of VTs for each voltage service source that CTs are placed on The EMP may be configured for multiple services whereby related VTs and CTs are associated in the factory configuration by means ofthe building wiring chart to form each meter node The EMP is available in two versions as identified below EMP I Old style EMP IT New style The EMP IT logic module can be interfaced with the EMP I enclosure using an upgrade kit The maximum number of VTs is determined by the number of service sources entering the EMP panel and limited to the number of associated CTs one VT for each CT The EMP is more commonly configured for a one to many relationship between VTs and CTs whereby all meters are supplied by the same service configuration CTs must be correctly associated with their service VTs as per the wiring chart and factory configuration in order to accurately meter power and energy consumption Page 4 of d
8. F Le Measurement Canada An Agency of Industry Canada Un organisme d Industrie Canada Mesures Canada NOTICE OF APPROVAL Issued by statutory authority of the Minister of Industry for TYPE OF DEVICE Electricity Meter Energy and Demand AVIS D APPROBATION mis en vertu du pouvoir statutaire du ministre de l Industrie pour TYPE D APPAREIL Compteur d lectricit nergie et puissance appel e APPLICANT REQU RANT Carma Industries Inc 494 The Parkway Peterborough Ontario K9L 7L9 MANUFACTURER FABRICANT Carma Industries A Division of 1276437 Ontario Inc 494 The Parkway Peterborough Ontario K9L 7L9 MODEL S MOD LE S RATING CLASSEMENT Meter Manager 120 208 240 277 347 416 480 600 V ac c a Meter Manager Type T 2 Element 3 Wire single phase 2 l ments 3 fils monophas 2 Element 3 Wire Delta 2 l ments 3 fils triangle 3 Element 4 Wire Wye 3 l ments 4 fils en toile 0 04 2 amperes amp res 0 1 5 amperes amp res 0 2 10 amperes amp res 2 100 amperes amp res 2 125 amperes amp res 2 200 amperes amp res 4 400 amperes amp res pd Canada Page 1 of de 19 Project Projet AP AE 09 0006 NOTE This approval applies only to meters the design composition construction and performance of which are in every material respect identical to that described in the material submitted and that are typified by samples submitted by the applicant for evaluation for approval
9. ation des donn es de t l mesure du Meter Manager En cons quence aucune fonction m trologique n est ex cut e l ext rieur du MS Project Projet AP AE 09 0006 The voltage transducers are potential transformers PT O to rated volts RMS primary 0 to 5 65 volts RMS secondary The current transducers are ring type current transformers RMS primary currents as listed on page 1 RMS secondary current is 2 to 100 mA converted to volts by means of an integral resistor across the secondary Resistor rating is 62 ohms 0 1 1 watt Current transducers are either tape wrapped or encapsulated The voltage and current transducers for each metered circuit shall be located as close together as possible and the current transducers shall be connected to the EMP by a maximum 1000 feet 305 metres of 22 AWG cable or 3 pair shielded cable Belden 8777 or equivalent as detailed in the installation manual In the case of one set of voltage transducers being shared by two EMP panels Dual EMP configuration the VT s must be installed within 10 feet of the EMP panels and must be connected to the EMP s with 3 pair shielded cable Belden 8777 or equivalent as detailed in the installation manual If the set of VTs is only connected to one EMP the same 1000 feet 305 metres distance that applies to the CTs shall apply to the VTs Page 3 of de 19 APPROVAL No N D APPROBATION E 0266 Rev 13 Les transducteur
10. circuits triphas s quatre fils mont s en toile R v 3 Date d mission 1992 07 19 La r vision 3 visait ajouter les fonctions de mesure de puissance appel e et de mesure par temps d utilisation ainsi qu une autre valeur de courant nominal 5 A R v 4 Date d mission 1993 10 07 La r vision 4 visait ajouter trois valeurs de courant nominal 2 A 10 A et 125 A et cinq valeurs de tension nominale 240 V 277 V 416 V 480 V et 600 V R v 5 Date d mission 1996 10 25 La r vision 5 visait incorporer diverses modifications de mat riel et des modifications m caniques et de d crire le nouveau conditionnement des transducteurs de courant Project Projet AP AE 09 0006 Rev 6 Issued Date 1998 06 10 The purpose of revision 6 was to include firmware version 6 0 which allows for expanded memory so as to increase storage data Rev 7 Issued Date 1998 07 16 The purpose of revision 7 was to include firmware version 5 0 Rev 8 Issued Date 2001 03 02 The purpose of revision 8 was to include a new display unit Rev 9 Issued Date 2005 09 22 The purpose of revision 9 was to include a change in the mounting of the current transformer on the 5A Interposing Transducer printed circuit board The current transformer has been mounted vertically instead of horizontally The revised PCB uses plugs in place of terminals for interconnections Rev 10 Issued Date 2007 02 14 The purpose of revis
11. construction and performance of the meter type s identified herein have been evaluated in accordance with regulations and specifications established under the Electricity and Gas Inspection Act Approval is hereby granted accordingly pursuant to subsection 9 4 of the said Act The sealing marking installation use and manner of use of meters are subject to inspection in accordance with regulations and specifications established under the Electricity and Gas Inspection Act The sealing and marking requirements are set forth in specifications established pursuant to section 18 ofthe Electricity and Gas Inspection Regulations Installation and use requirements are set forth in specifications established pursuant to section 12 ofthe Regulations Verification of conformity is required in addition to this approval for all metering devices excepting instrument transformers Inquiries regarding inspection and verification should be addressed to the local inspection office of Industry Canada ORIGINAL COPY SIGNED BY Adnan Rashid Senior Engineer Electricity Measurement Engineering and Laboratory Services Directorate APPROVAL No N D APPROBATION E 0266 Rev 13 APPROBATION La conception la composition la construction et le rendement du des type s de compteurs identifi s ci dessus ayant fait l objet d une valuation conform ment au R glement et aux normes tablis en vertu de la Loi sur l inspection de l
12. d only entry to the data via an access code LCD This display may be incorporated within the outer door of the EMP cabinet or provided as a separate display unit Page 8 of de 19 APPROVAL No N D APPROBATION E 0266 Rev 13 Descripteur du temps d utilisation Le descripteur du temps d utilisation indique la p riode d utilisation et le type de jour comme suit Hors pointe Off Transition 1 Shl Transition 2 Sh2 Pointe On Jour de semaine Wkday Fin de semaine Wkend Cong f ri Hol Le descripteur du temps d utilisation est suivi du signe dollar afin d indiquer que les donn es correspondent la p riode de facturation courante Voici une br ve description de chaque type d affichage Dispositif d affichage pilot par PC Ce dispositif d affichage utilise un ordinateur personnel PC Il offre deux options la premi re est une version mul e de l affichage cristaux liquides voir affichage cristaux liquides La seconde option offre l affichage d un menu qui permet un acc s la consommation en nergie et la demande du client Dispositif d affichage du terminal de r seau Essentiellement le dispositif d affichage du terminal du r seau est identique celui d crit ci dessus sauf que le clavier est remplac par un bloc curseur Le consommateur peut utiliser un code d acc s afin de consulter les donn es Dispositif d affichage cristaux liquides Le dis
13. e 19 APPROVAL No N D APPROBATION E 0266 Rev 13 Le MS module de surveillance nerg tique assure les fonctions de mesure en kW h Par multiplexage et calcul le MS peut mesurer s quentiellement les signaux en provenance d au plus de 40 transducteurs r partis en transducteurs de tension et de courant associ s une source particuli re de tension lors de la configuration en usine Pour mesurer l nergie avec exactitude le MS utilise un groupe de transducteurs de tension chaque source de tension de service laquelle le transducteur de courant est associ Le MS peut tre programm en fonction de multiples tensions de service auxquelles les transducteurs de tension et les transducteurs de courant sont associ s lors de la configuration en usine conform ment au sch ma de c blage du b timent pour former des noeuds de compteurs Le MS est disponible en deux versions Voir ci dessous MS I Ancien style MS II Nouveau style Le module logique de MS II peut tre interfac avec le bo tier de MSE I en utilisant un un ensemble pr fabriqu d am lioration Le nombre maximal de TT est tabli en fonction du nombre de sources de tension de service entrant dans le tableau du MS et est limit au nombre de TC associ s un TT pour chaque TC Le MS est habituellement configur pour un rapport entre les TT et les TC de un plusieurs par lequel tous les compteurs sont aliment
14. e v rification Les communications entre l ordinateur central sur place et l ordinateur de facturation distance se font par ligne t l phonique normale LAN Internet ou par d autres techniques de communication habituellement une fois par p riode de facturation Au cours de ces communications l ordinateur central transmet toutes les donn es de consommation de chaque noeud du syst me ainsi que l ventuel journal des erreurs de chaque MS Project Projet AP AE 09 0006 The on site host computer enables the operator to query local area network status consumption data specific information regarding status of any consumption node and any errors which have occurred in the system The metering system permits factory and user programmable features for demand measurements of KW and kVA The system may be programmed for sliding window or block interval demand as well as for the demand interval The system when metering both the bulk metering applications and the sub metering applications can measure co incidental peak demand by means of synchronizing signal which is broadcasted across the local area network to each EMP The system employs one or more of the following displays PC based display two available options Network terminal display Liquid crystal display LCD and Multiple display At least one of these displays shall be installed in a location accessible to the consumers being metered The consum
15. eris thereby able to interrogate the on site host computer for specific data relating to his her individual consumption and 1f time of use metering is being used the date time and time of use TOU descriptor A consumer enters his her personal identification number and the display shows the date time TOU descriptor 1f applicable and 6 kW h Page 7 of de 19 APPROVAL No N D APPROBATION E 0266 Rev 13 L ordinateur central sur place permet l utilisateur de consulter l tat du r seau les donn es de consommation des donn es pr cises relatives l tat de tout node de consommation et les erreurs qui se sont produites dans le syst me Le syst me de mesure permet la programmation l usine et par l utilisateur des caract ristiques m trologiques permettant la mesure de la puissance appel e en kW et en kVA Le syst me peut tre programm pour mesurer par fen tre mobile ou par intervalle d int gration Lorsque le syst me est utilis avec des applications de mesure de vrac et de comptage divisionnaire 1l peut mesurer les puissances appel es de pointe coincidentes au moyen d un signal de synchronisation transmis chaque MS dans l ensemble du r seau local Le syst me utilise un ou plusieurs des dispositifs d affichage suivants Dispositif d affichage pilot par PC deux options possibles Dispositif d affichage du terminal du r seau Dispositif d affichage cristaux liq
16. ge 16 of de 19 APPROVAL No N D APPROBATION E 0266 Rev 13 n DS E A 6 Le amp Le ee F3 7e M NN Mn iZl en Es ER ED en Pre 2e Rev 5 EMP II New Layout Doors open R v 5 MSE IT Nouvelle configuration portes ouvertes Rev 12 fully welded hinge R v 12 charni re soud e Project Projet AP AE 09 0006 APPROVAL No N D APPROBATION E 0266 Rev 13 CELLES Rev 10 Voltage Potential Transformers R v 10 Transformateurs de tension Rev 13 The EMP II logic module interfaced with the EMP I enclosure R v 13 Le module logique de MSE IT avec interface du bo tier de MSE I Page 17 of de 19 Project Projet AP AE 09 0006 APPROVAL No N D APPROBATION E 0266 Rev 13 Rev 3 Interposing Transducer PCB Old layout Rev A R v 3 Carte de circuits imprim s Interposing Transducer ancienne configuration Rev A Rev 13 Voltage transformer sealing R v 13 Sc llage du transformateur de tension Rev 9 Interposing Transducer PCB Rev 9 Interposing Transducer PCB New Layout New Layout Rev C Bottom View Rev C Top View R v 9 Carte de circuits imprim s R v 9 Carte de circuits imprim s Interposing Interposing Transducer nouvelle Transducer nouvelle configuration Rev C Vue configuration Rev C Vue du du dessus dessous Page 18 of de 19 Project Projet AP AE 09 0006 APPROVAL The design composition
17. ion 10 was to approve the use of one set of Potential transformers by two co located EMP panels Also to restrict the Meter Manager s use in certain applications Rev 11 Issued Date 2007 05 22 The purpose of revision 11 was to include a new nameplate Page 11 of de 19 APPROVAL No N D APPROBATION E 0266 Rev 13 R v 6 Date d mission 1998 06 10 La r vision 6 visait inclure la version 6 0 du microprogramme de m me qu une m moire d expansion pour augmenter la capacit de stockage des donn es R v 7 Date d mission 1998 07 16 La r vision 7 visait inclure la version 5 0 du microprogramme R v 8 Date d mission 2001 03 02 La r vision 8 visait inclure un nouveau dispositif d affichage R v 9 Date d mission 2005 09 22 La r vision 9 visait inclure une modification du montage du transformateur de courant 5A sur la carte de circuits imprim s Interposing Transducer Les transformateurs ont t mont s verticalement plut t que horizontalement La nouvelle carte de circuits imprim s emploie des fiches pour les interconnexions au lieu de bornes R v 10 Date d mission 2007 02 14 La r vision 10 visait approuver l utilisation d un groupe de transformateurs de tension pour deux panneaux MSE colocalis s Et galement restreindre sont utilisation dans certaine condition R v 11 Date d mission 2007 05 22 La r vision 11 visait inclure une no
18. lectricit et du gaz la pr sente approbation est accord e en application du paragraphe 9 4 de ladite Loi Le scellage l installation le marquage et l utilisation des compteurs sont soumis inspection conform ment au R glement et aux normes tablis en vertu de la Loi sur l inspection de l lectricit et du gaz Les exigences de scellage et de marquage sont d finies dans les normes tablies en vertu de l article 18 du R glement sur l inspection de l lectricit et du gaz Les exigences d installation et d utilisation sont d finies dans les normes tablies en vertu de l article 12 du R glement Sauf dans les cas des transformateurs de mesure une v rification de conformit est requise en plus de la pr sente approbation Toute demande de renseignements relative l inspection et la v rification de conformit doit tre adress e au bureau local d Industrie Canada COPIE AUTHENTIQUE SIGN E PAR Adnan Rashid Ing nieur principal Mesure de l lectricit Direction de l ing nierie et des services de laboratoire Date 2010 03 04 Web Site Address Adresse du site Internet http mc ic gc ca Page 19 of de 19 Project Projet AP AE 09 0006
19. lling period During this communication the on site host computer transmits all consumption data for each node in the system as well as the error log that may exist for each EMP Page 6 of de 19 APPROVAL No N D APPROBATION E 0266 Rev 13 Le MS pr sente les caract ristiques suivantes Alimentation auxiliaire 100 115 220 230 et 240 V c a s lection par cavalier Fr quence 47 63 Hz Consommation 95 watts Le MS peut tre un appareil autonome avec affichage local ou faire partie d un r seau Le r seau local LAN comprend tous les MS du syst me et l ordinateur central sur place Un ordinateur central ordinateur personnel peut servir pour coordonner l ensemble des donn es des MS Sur l un ou l autre des ports de communication s rie adresse IP etc l ordinateur central peut prendre en charge jusqu 255 MS pour une capacit de mesure totale de 4845 nodes de compteurs monophas s trois fils ou polyphas s mont s en triangle circuits 2 l ments ou 4590 nodes de compteurs mont s en r seau circuits triphas s 2 l ments 4 fils ou 3060 nodes de compteurs polyphas s 4 fils L ordinateur central ne contribue pas aux fonctions m trologiques du syst me et doit simplement agir comme coordonnateur de la t l mesure recueille les donn es provenant des MS et d observateur de l tat du r seau En cons quence l ordinateur central lui m me n exige pas d
20. n S N YXX EMPXX VER 3 5 MMXXXX In house serial number Num ro de s rie interne Energy monitoring pod network address Adresse du r seau du module de surveillance nerg tique YXX EMPXX marked also in serial number space on door nameplate YXX EMPXX inscrit galement dans l espace r serv au num ro de s rie sur la plaque signal tique de la porte Firmware version Version de la microprogrammation Meter Manager variation number in house control number used to identify transducer scaling factors burnt into PROM Autre num ro du syst me Meter Manager num ro de contr le interne servant identifier les facteurs d chelle des transducteurs grav s en m moire morte programmable PROM Page 13 of de 19 Project Projet AP AE 09 0006 APPROVAL No N D APPROBATION E 0266 Rev 13 METER MANAGER ENERGY MONITORING POD HAMAAQUENRES PETERBOROUGH ONT K9J 7L9 TRANSFORMER TYPE LOSS COMPENSATED Original Name Plates EMP I only Plaque signal tique originale MSE I seulement EN m 2N ONE NN mamie T VI EX IAA NINNI A NE EX ENERGY MONITORING POD TYPE T EMP LR85853 AUXILIARY SUPPLY 120 Vac 50 60 Hz 24VA MC APPROVAL E 0266 INDUSTRY CANADA APPROVED FREQUENCY 50 60 Hz TEMPERATURE 40 C TO 55 C METROLOGY INPUTS 6 2 Vac Typical 10Vdc Max CONFIGURATION DETAILS SEE WIRING CHART FOR PRGD VOLTS AMPS APPROVED CTs 2A 5A 10A 100A 125A 200A 400A
21. n clavier de dix touches et un afficheur deux lignes de vingt caract res chacune Le dispositif d affichage cristaux liquides du nouveau mod le de MS comporte un clavier trois touches et un afficheur deux lignes de quarante caract res chacune Affichage multiple Ces dispositifs d affichage sont constitu s de multiples afficheurs connect s en r seau r seau local de communication L affichage multiple permet aux consommateurs d avoir un acc s largi au syst me de mesure Autres caract ristiques sauf indication contraire Temp rature de fonctionnement 40 C 53 C Alimentation auxiliaire 115 V c a eff 10 de 47 63 Hz D bit en bauds 1200 9600 Versions du microprogramme 3 0 3 5 4 0 5 0 6 0 et 7 1 pour plus de d tail consulter la figure 2 Identification du syst me Meter Manager Le couvercle int rieur de bo tier du MS doit tre scell et le couvercle ext rieur peut tre scell par le fournisseur La charni re du couvercle ext rieur du bo tier du MS IT est soud e Pour obtenir de plus amples renseignements sur la conception la construction les principes de fonctionnement l talonnage l installation et l utilisation de l appareil consulter les manuels ou la documentation du fabricant ou s adresser au fabricant ou ses agents Project Projet AP AE 09 0006 REVISIONS Original Issued Date 1989 07 19 Rev 1 Issued Date 1990 04 10
22. nerates a synchronizing pulse to start and stop the Radian standard synchronized to the EMP scan This permits verification of the system Page 5 of de 19 APPROVAL No N D APPROBATION E 0266 Rev 13 Pour la mesure de circuits en r seau quatre fils mont s en toile chacun des trois TT est raccord suivant l une des trois configurations de tension phase neutre ou de tension ligne ligne Un nombre moins lev de TT peut tre requis pour d autres configurations Par exemple dans le cas de deux TT 19 circuits distincts deux l ments peuvent tre mesur s par chaque MS Les r seaux trois fils et les circuits monophas s sont mesur s par la m thode des deux wattm tres Les donn es recueillies de chaque node de compteurs sont stock es dans une m moire r manente Le MS est constitu de quatre l ments distincts a un multiplexeur qui joue le r le de commutateur et qui en r action aux commandes du microprocesseur transmet les signaux des transducteurs vers le sous syst me analogique num rique b un convertisseur analogique num rique qui convertit les signaux continus des transducteurs de courant et de tension en nombres discrets signaux num riques que le microprocesseur analyse c un microprocesseur qui commande le d roulement de tout le processus de mesure l int rieur du MSE d une interface r seau local qui constitue le moyen de communication entre le MSE et
23. ois phase 3 fils R v 13 La r vision 13 vise approuver l utilisation du module logique de MS II interfac avec le bo tier de MS I en utilisant un un ensemble pr fabriqu d am lioration La image de scellage du transformateur de tension est chang e pour r v ler le mod le de production VALU PAR Bissagar Fred Originale R v 1 R v 06 M trologiste l gal principal Maranda Michel R v 07 Coordonateur technique int rimaire Gagn Alain R v 08 M trologiste l gal Rozeboom Michael R v 09 R v 10 M trologiste l gal Brown Michael R v 11 M trologiste l gal junior Abderrahmane Cherradi R v 12 M trologiste l gal junior Greg Neff R v 13 M trologiste l gal junior Project Projet AP AE 09 0006 APPROVAL No N D APPROBATION E 0266 Rev 13 FIGURE N 1 METER MANAGER C Distribution Panel Module de surveillance de l nergie Transducteurs de courant Tableau de distribution Transducteurs de tension R seau local T l affichage T l facturation Ordinateur central sur place LI um E nt za za g Remote Billing HIT AL On w n pm O i SYSTEM A ARCHITECTURE Figure n 2 Meter Manager System Identification Identification du syst me Meter Manager Legend L gende S N YXX EMPXX _ ar VER 3 5 MMXXXX EPROM LABEL Y Alphabetic alphab tique tiquette EPROM X Numberic num rique Definition D finitio
24. positif peut tre install sur la porte ext rieure du bo tier du MS ou fourni comme dispositif d affichage distinct Project Projet AP AE 09 0006 For the Old style EMP the LCD unit consists of a ten key keypad and a display consisting of two lines of twenty characters each For the New Style EMP the LCD unit consists of a three key keypad and a display consisting of two lines of forty characters each Multiple display These displays consist of a number of remote displays linked via a communications local area network Multiple displays allow for expanded access by consumers at the site being metered Additional Specifications except as otherwise stated Operating Temperature 40 C to 53 C Auxiliary Supply 115 V ac RMS 410 47 to 63 Hz Baud Rate 1200 9600 Firmware Versions 3 0 3 5 4 0 5 0 6 0 and 7 1 for explanation see Meter Manager System Identification Figure 2 The inner cover of the EMP enclosure shall be sealed and the outer cover can be sealed by the contractor The outer cover hinge of the EMP IT1s fully welded For further information regarding design construction theory of operation calibration installation and use consult manufacturer s manuals etc or consult the manufacturer or his agent s Page 9 of de 19 APPROVAL No N D APPROBATION E 0266 Rev 13 Le dispositif d affichage cristaux liquides de l ancien mod le de MS comporte u
25. s de tension sont des transformateurs de tension dont la tension efficace au primaire va de 0 volt la capacit nominale en volts et la tension efficace au secondaire de 0 5 65 volts Les transducteurs de courant sont des transformateurs de courant de type annulaire les courants efficaces au primaire sont num r s la page 1 Le courant efficace au secondaire va de 2 100 mA convertis en volts au moyen d une r sistance aux bornes du secondaire La capacit nominale de la r sistance est de 62 ohms 0 1 1 watt Les transducteurs de courant sont soit enrubann s soit encapsul s Les transducteurs de tension et de courant destin s chaque circuit mesur doivent tre install s le plus pr s possible les uns des autres et les transducteurs de courant doivent tre reli s au MS par un c ble de calibre 22 AWG de 1000 pieds 305 m tres au plus ou trois paires de c bles arm s Belden 8777 ou l quivalent comme indiqu dans le manuel d installation Dans le cas d un groupe de transducteurs de tension connect s deux panneaux MS configuration double MS les TT doivent tre install s moins de 10 pieds des panneaux MS et tre connect s ces derniers au moyen de trois paires de c bles arm s Belden 8777 ou l quivalent comme indiqu dans le manuel d installation Dans le cas d un groupe de transducteurs de tension connect s un seul panneau la r gle de la distance de 1000pieds 3
26. uides Dispositif d affichage multiple Au moins un de ces dispositifs doit tre install un endroit accessible par le consommateur Ce dernier peut ainsi interroger l ordinateur central pour obtenir des donn es relatives sa propre consommation et s1 la mesure est effectu e en fonction du temps d utilisation la date l heure et le descripteur du temps d utilisation Le consommateur entre son num ro d identification et le dispositif d affichage indique la date l heure le descripteur du temps d utilisation s il y a lieu et CET EE kW h Project Projet AP AE 09 0006 Time Of Use Descriptor The TOU Descriptor indicates the present TOU period and type of day as follows Off peak Off Shoulder 1 Shl Shoulder 2 Sh2 On peak On Weekday Wkday Weekend Wkend Holiday Hol The TOU descriptor is followed by a dollar sign to indicate the information as being in the current billing period The following are summary descriptions of the displays PC based display This display utilizes a personal computer PC The display offers two options the first being an emulated version of the liquid crystal display see LCD The second option provides a menu display which allows access to the consumer s energy consumption and demand Network terminal display Essentially the network terminal display is the same as above except that the keyboard is replaced by a cursor pad The consumer may gain rea
27. uvelle plaque signal tique Project Projet AP AE 09 0006 Rev 12 Issued Date 2009 01 21 The purpose of revision 12 was to include a new firmware which allows for the removal of the restrictions of revision 10 on delta metering 3 phases 3 wires where loading could exceed 0 5 power factor and reverse accumulation Revision 12 also included one additional voltage rating 208 V for 3 phase 3 wire metering Rev 13 The purpose of revision 13 is to approve the usage of the EMP II logic module interfaced with the EMP I enclosure using an upgrade kit The voltage transformer sealing image is changed to reflect the production model EVALUATED BY Bissagar Fred Original and Rev 1 to Rev 06 Senior Legal Metrologist Maranda Michel Rev 07 Acting Technical Coordinator Gagn Alain Rev 08 Legal Metrologist Rozeboom Michael Rev 09 Rev 10 Legal Metrologist Brown Michael Rev 11 Junior Legal Metrologist Abderrahmane Cherradi Rev 12 Junior Legal Metrologist Greg Neff Rev 13 Junior Legal Metrologist Page 12 of de 19 APPROVAL No N D APPROBATION E 0266 Rev 13 R v 12 Date d mission 2009 01 21 La r vision 12 visait inclure un nouveau progiciel afin de retirer les restrictions dans la r vision 10 sur la configuration triangle 3 phases 3 fils un facteur de puissance exc dant 0 5 et en cas de flux inverse d nergie gale elle visait inclure le mesurage 208V tr

Download Pdf Manuals

image

Related Search

Related Contents

User`s manual - AT&T FactoryOutletStore.com  Manual - Pioneer    MANUEL D`UTILISATEUR  DETERBAC - Quimicas Morales  Mise en page 1 - Sausset-les-pins    Manual de Instalación y Uso    SD cover.indd - Instrumentors Supply, Inc.  

Copyright © All rights reserved.
Failed to retrieve file