Home
        Manual de Instalación Installation Guide Manuel d`installation
         Contents
1.    At pneumatic switch   c  Leak in flexible tube     Pump disconnected     Pump faulty       Water level too low      Belt pulley obstructed      Water intake circuit blocked     Electrical fault      Motor faulty       The ends of the flexible pipe on the  pneumatic on off are damaged   2  The said flexible pipe is either twisted or  Squashed     1  Inadequate ventilation        1  Obstruction in water distribution circuit   2  Obstruction in water in take circuit     1  Obstruction in air regulator   2  Obstruction in venturis     1  Back plate that secures the in take grill is  loose or broken   2  Leak in connections     1  Obstruction of the venturi     1  Obstruction in the pump   2  Defective pump ball bearings   3  Obstruction in in take circuit     1  Defective glueing   2  Cracked piping     1  Defective joint between venturis and jets   2  Damaged venturi     1  See above as per pump     1  Non return valve blocked     1  Air blower fault  2  Electrical fault    1  Low water level    2  Fault in water flow sensor   3  Fault in electric resistivity   4  Safety thermostat activated     1  Led defective   2  Cable disconnected   3  Electrical failure     21    SOLUTION    1  Check electrical connections     2a  Change flexible pipe  2b  Reconnect pneumatic pipe     2c  Change flexible pipe     Connect pump     Contact after sales service       Fill bathtub above jets      Contact after sales service     Check water in take circuit     Conctact after sales service    
2.   TOP    El equipamiento de esta ba  era es el m  s alto de gama  viene equipada con sistema de agua  sistema de aire   calentador y cromoterapia   El mando que incorporan es un mando capacitivo de 8 funciones igual al de la Fig 12     oq    O   OC    Ti T2 T3 T4 T5 T6 T7 T8  Calentador Sistema de Agua Cromoterapia Sistema de Aire    Fig 12       Ed  1 0610    3 2   GRUPO IMPULSOR NEUM  TICA 1 FUNCION  MODELOS JET        1   Bomba de impulsi  n    2   Interruptor de puesta en marcha   paro bomba   3   Cable de toma de tierra    4   Tubo flexible transparente        Fig 13    NOTA  En algunos modelos el interruptor  2  y el tubo flexible transparente  4  est  n en caja de conexi  n  ver   8  en apartado 3 3      3 3   GRUPO IMPULSOR NEUM  TICA DE 2 FUNCIONES  MODELOS SUPER JET     1   Bomba de impulsi  n    2   Interruptor de puesta en marcha  paro bomba   3   Cable de toma de tierra    4   Tubo flexible transparente    5   Doble Loop    6   V  lvula Antiretorno    7   Solpante    8   Caja de conexi  n         s                  Fig  14    NOTA  En todos los modelos  Interruptor  2  y tubo flexible  4  del soplante  7  en caja de conexi  n  8   En  algunos modelos el interruptor  2  y el tubo flexible transparente  4  de la bomba  1  en caja de conexi  n  8      7    Ed  1 0610 M METAL  DER CA    3 4   GRUPO IMPULSOR ELECTR  NICA DE 1 FUNCI  N  MODELOS JET        1   Bomba de impulsi  n    2   Caja electr  nica de Conexi  n    3   Cable de toma de tierra    4   V  lvula antire
3.   The bathtub comes with a set of adjustable feet to facilitate installation    Ensure that the floor area is flat and clean  and then install the syphonic waste unit     Place the bathtub in position and ensure that the rims are level on all four sides  using the adjustable feet for  this purpose     If profiles are to be used for fixing the bathtub to the wall the bath should not rest exclusively on the profiles     2 1 1   PLUMBING  JET MODELS  No special connections are required  Only that of the waste   overflow unit     SUPER JET and TOP MODELS  No special connections are required  METALIB  RICA supplies an automatic waste    overflow unit with these models     13    Ed  1 0610    2 1 2   ELECTRICAL INSTALLATION       METALIB  RICA carries out the necessary safety checks during product manufacture  This hydromassage bath is  a Class 1 product       Check that the voltage and frequency of this product coincide with that of the mains supply in your area       This product to a permanent electrical installation and comes with an 3x  0 75 1 0 1 5  5 mm  cable  along  with a earthing wire     If for any reason it should prove necessary change the cable  it should be disconnected from the electrical  control box and substituted by another of the same characteristics and of the required length       This product should be connected to a good quality earthing connection       This product must be connected to an electrical circuit protected with an appropriate omnipolar  magnet
4.   voir fig  1 et 2            VOLUME  D INTERDICTION       VOLUME  DE PROTECTION          Fig  1 Fig 2      Cet appareil doit   tre connect   a la liaison   quipotentielle de la maison  Il est fourni avec une borne de  connections dans la structure m  tallique de la baignoire avec la marque de la fig  2 b  Connecter la  bonde d     vacuation a la liaison   quipotentielle        25    Ed  1 0610 M METAL  DER CA    2 2   TEST   LECTRIQUE   V  rifier le fonctionnement correct du systeme    MODELES JET  remplir la baignoire jusqu    couvrir les jets et activer la commande pneumatique du systeme  Jet  Les jets doivent injecter de l eau a pression m  lang  e avec des microbulles d air  Tourner le r  gulateur d air  pour confirmer son fonctionnement    MODELES SUPER JET et TOP  remplir la baignoire jusqu a couvrir les jets et activer la commande pneumatique  du systeme Jet  Les jets doivent injecter de l eau a pression m  lang  e avec des microbulles d air  Tourner le  r  gulateur d air pour confirmer son fonctionnement  Activer le systeme air  Des bulles d air doivent sortir des  injecteurs du fond de la baignoire    2 3   TEST HYDRAULIQUE   Les baignoires de METALIBERICA sont rigoureusement test  es pendant leur fabrication  Cependant  et avant de  vider la baignoire une fois r  alis  es les   preuves ant  rieures  v  rifier l absence de fuites  la baignoire pourrait    tre endommag  e suite a une mauvaise manipulation ou pendant le transport     Touchez les connections et assurez
5.  2 3    HYDRAULIC TESTING   Each and every bathtub is rigorously checked during production  Nevertheless  for additional safety  check  before emptying the bathtub that there are no water leaks produced by either during transport or on site    handling    Touch all the joints and connections with your fingers to ensure that there is no water present on them     2 4   MASONRY WORK  BATH ENCLOSURE     Metaliberica has  for certain models  an exclusive panel system that avoids the needs for bath enclosure work  and which also facilitates any needed repairs     Should masonry work be required for bath enclosure ensure that you have first disconnected the bathtub from  the mains  before undertaking any work     A sufficiently large access grill should be installed so as to permit repairs and maintenance work on the  hydromassage system  Place the grill as near as possible to and in line with the motor and pump     ACCESS  GRILL       Fig  3    15    Ed  1 0610 4 PM h   M E T A      fem     Minimum grill dimensions  fig 4         JET models  A 600mm  B 400 mm   SUPER JET and TOP models  A 600 mm  B 450 mm        Fig 4    The grill must provide sufficient ventilation for the equipment     The grill should only be open using an adequate tool  and the design of the grill should make it impossible to  introduce anything that could come in to contact and prevent the normal function of the equipment     If the bathtub is to be installed along with the Metaliberica panel systems there wil
6.  3  Contacter le service technique   4  Thermostat de s  curit   activ    4  Reconnecter le thermostat     La chromoth  rapie ne 1  Diode   Ampoule d  fectueuse 1  Changer le kit   fonctionne pas  2  Cable d  connect    2  R  viser la connexion   3  Probl  me   lectrique  3  Contacter le service technique     LLI  Yo   L  D  LL LLI  T   o  OS  LU m  er  O       32    Ed  1 0610    5   CARACTERISTIQUES TECHNIQUES    CARACT   RISTIQUES TECHNIQUES DU MOTEUR  A A A   er  50Hz 60Hz 50Hz 60Hz 60Hz  IN METEO   noosa   EGO 335241   Encossaar   eneosasza      EENS     CARACTERISTIQUES TECHNIQUES DU BLOWER  VENTILATEUR     500 W 220V 50HZ  220   230 V  50 60 Hz  500 W  500 W  0 60 HP  2 3A  EN 60335   1  EN 60 335 2 41    Puissance  Fr  quence    Consommation    Intensit    Ampere     Conformes aux normes     P     ow    O  m    TUV    CARACT  RISTIQUES TECHNIQUES R  CHAUFFEUR    1 5 Kw 220 V 50 Hz  220   230 V  50 60 Hz  1500 W  60   C  0    45  C  6 5 A    Puissance   Fr  quence   Consommation   Protection temp  rature max     R  gulation thermostat    Intensite  Ampere     O  M  i    Conformes aux normes     CARACTERISTIQUES TECHNIQUES DE LA CHROMOTERAPIE    12 V  1 W    Puissance    Conommation    Intensite  Ampere  120 mA    Protection IP 67    Metaliberica se reserve le droit de modifier les carateristiques des produits sans preavis        33    Ed  1 0610    METALIB  RICA  S A U     Paseo de Moret 9  28008   MADRID  Tel  91 562 66 30   91 562 66 31  Tel  Export  Tel  91 564 47 8
7.  Contact after sales service       Cut the ends and reconnect       Check the flexible pipe       Improve ventilation     1  Check circuit   2  Conctact after sales service       Clear air regulator     Clear venturis     1  Remove grill and either tighten or change back  plate   2  Contact after sales service       Contact after sales service       Contact after sales service     Contact after sales service     Check in take circuit       Clean and glue again     Change damaged pipe section        1  Take out venturi  clean and joint again   2  Change venturi     1  Follow indications as per pump     1  Contact after sales service       See above as per pump     Contact after sales service        1  See above as per pump    2  Contact after sales service   3  Contact after sales service   4  Reconnect thermostat       Change Light kit     Check electrical cables     Contact after sales service     5   TECHNICAL CHARACTERISTICS    MOTOR AND PUMP TECHNICAL CHARACTERISTICS    50Hz 60Hz 50Hz 60Hz 60Hz  5    H P  0 74 HP 0 74 HP 1 2 HP 1 26 HP 1 29 HP  Thermic protection 1550C     50C 1550C     50C 1550C     50C 1550C     50C 1550C     50C       TECHNICAL CHARACTERISTICS OF AIR BLOWER    500 W 220V 50HZ  220   230 V  50 60 Hz  500 W  500 W  0 60 HP  23A  EN 60335   1  EN 60 335 2 41    Voltage  Frecuency    Consumption    D      e  Pp    Intensity  Amperes     Homologation Certificates    EO   lt     HEATER TECHNICAL CHARACTERISTICS    1 5 Kw 220 V 50 Hz  220   230 V  50 60 Hz  1
8.  faible a la   1  Circuit de propulsion de l eau obstru    1  R  viser le circuit   sortie des Jets  2  Circuit d inspiration obstru    2  R  viser le circuit   M  lange d   air incorrect 1  Commande d   air obstru  e  1  Nettoyer la commande   dans le systeme Air Eau 2  Obstruction de la grille d   aspiration  2  Nettoyer la grille   Fuite dans l aspiration 1  La visse en dessous du filtre d aspiration est 1  Retirer la grille d aspiration et visser   d eau d  viss  e  Pression d eau faible dans 1  Jet obstru    1  Nettoyer le Jet   l un des jets  La pompe fonctionne avec 1  Corps   tranger dans la turbine du moteur  1  Contacter le service technique   beaucoup de bruit 2  Mauvais   tat des roulements  2  Contacter le service technique   3  Circuit d inspiration obstru    3  R  viser le circuit   Fuite d eau dans les 1  Rupture dans les tuyaux 2  Changer la piece concern  e   tuyauteries  Fuite d eau dans les Jets  1  Probleme de colle entre le jet et le venturi  1  Refaire le collage   2  Venturi endommag    2  Changer la pi  ce   Le Blower ne marche pas  1  Voir les cas similaires de la pompe  1  Voir les cas similaires de la pompe    T      Le blower fonctionne mais 1  Clapet antiretour bloqu    1  Contacter le service technique   U    l air ne sort pas     Le r  chauffeur ne chauffe 1  Niveau de l eau bas  1  Voir cas similaire de la pompe    pas d eau  2  D  faillance du d  tecteur du niveau de l eau  2  Contacter le service technique   3  R  sistance ne fonctionne pas 
9.  n del registro     Ponga especial cuidado en no estrangular los tubos flexibles que van de los pulsadores neum  ticos a los  elementos sobre los que act  an  Compruebe igualmente que no se han desconectado en sus extremos     Cuando haya terminado los trabajos de alba  iler  a vuelva a conectar la alimentaci  n de la red el  ctrica     Ed  1 0610 M METAL  DER CA    3   ELEMENTOS DEL HIDROMASAJE   3 1   MANDOS   Seg  n el modelo de su ba  era se pueden encontrar los distintos tipos   3 1 1   MODELOS JET   NEUM  TICA   Su ba  era llevar   incorporados los siguientes mandos     1   Pulsador neum  tico del sistema de agua   Fig 5   2   Regulador de entrada de aire   Fig 6     ELECTR  NICA    Tienen instalado un mando t  ctil como del de la Fig  7         Recuerde que este tipo de mandos no requieren de una fuerte presi  n para su utilizaci  n  un  suave toque con el dedo hace que el sistema se ponga en marcha o se detenga     3 1 2   MODELOS SUPER JET  NEUM  TICA    Su ba  era llevar   incorporados los siguientes mandos colocados en el mismo orden en que aparecen a la  derecha     1  Pulsador neum  tico del sistema de agua  Fig 8    2  Pulsador neum  tico del sistema de aire  Fig 9    3  Regulador de entrada de aire  Fig 10    ELECTR  NICA   Tienen instalados dos mandos t  ctiles como los de la Fig  11    Recuerde que este tipo de mandos no requieren de una fuerte presi  n para su    utilizaci  n  un suave toque con el dedo hace que el sistema se ponga en marcha o se  detenga   
10.  vous de l   tanch  it   du circuit    2 4   MACONNERIE    METALIBERICA offre pour certains modeles de baignoires un systeme exclusif de tabliers     Si vous d  cidez de recouvrir la baignoire par d autres mat  riaux  assurez vous que tous les systemes soient  d  branch  s pendant les travaux     Prevoyez l installation d une trappe de visite pour l entretien du systeme  La trappe devra   tre centre et le plus  proche du syst  me de fa  on a faciliter son acc  s   voir fig 3      TRAPPE       Fig  3    26    Ed  1 0610       fem        Dimensions minimales de la trappe    voir fig  4        Mod  les JET  A 600 mm  B 400 mm     Modeles SUPER JET et TOP  A 600 mm  B 450 mm        Fig  4    La trappe de visite doit permettre la ventilation des systemes    La trappe de visite doit pouvoir s ouvrir seulement avec l aide d un outil  La trappe ne permettra pas la  manipulation ext  rieure du systeme et prot  gera le systeme des corps   trangers qui pourraient alt  rer son  fonctionnement     V  rifiez que les tuyaux transparentes ne soient   trangl  s ou pli  s  V  rifier que ses extr  mit  s soient bien  raccord  es     Une fois les travaux termin  s  rebranchez le systeme     27    Ed  1 0610 M METAL  DER CA    3   ELEMENTS DE L HYDROMASSAGE   3 1   COMMANDES   Selon le modele  votre baignoire sera   quip  e de diff  rentes commandes   3 1 1 MODELES JET    PNEUMATIQUE   Votre baignoire est   quip  e des commandes suivantes    1  Touche pneumatique du systeme d eau  Fig 5    2  R  
11. 1  Fax 91 563 01 31    SAT  902 181733  Emails   dptocomercial metaliberica com    export metaliberica com    sat metaliberica com    34    Ed  1 0610    
12. 3s2ai   encossaar  A e e   e  68  e      tw       LA LA    CARACTERISTICAS TECNICAS DEL SOPLANTE    500 W    DES    Intensidad  Amperios  2 3 A  Certificados de Homologaci  n EN 60335   1    CARACTERISTICAS TECNICAS CALEFACTOR    MAM    CARACTERISTICAS TECNICAS DE LA CROMOTERAPIA    Voltaje 12 V  w    Intensidad  amperios  120 mA    m       11    Ed  1 0610    INDEX  En     1   RECOMMENDATIONS     2   INSTALLATION   2 1   Bathtub placement   2 1 1   Plumbing  2 1 2   Electrical installation  2 2   Electrical testing  2 3   Hydraulic testing  2 4   Masonry work    3   HYDROMASSAGE COMPONENTS     3 1   Controls   3 2   Water pump and motor Pneumatic 1 function control  Jet  models    3 3   Water pump and motor Pneumatic 2 functions control  Super  Jet models    3 4   Water pump and motor Electronic 1 function control  Jet  models    3 5   Water pump and motor Electronic 2 functions control  Super  Jet models    3 6   Water pump and motor Electronic mutifunction control  Top  models     3 4   Water suction grill  4   PROBLEM INDICATOR LIST    5   TECHNICAL CHARACTERISTICS    12    Ed  1 0610    1   RECOMMENDATIONS   Please read this manual thoroughly before proceeding to install the bathtub    The bathtub should only be installed by professional plumbers or officially authorized installers   Check carefully that the bathtub has not suffered any damage during transport    Do not lift the bathtub with the pipe work or drag the bathtub across the floor     Ensure that no heavy prod
13. 500 W  60   C  0 to 45  C  6 5 A    Homologation Certificate CEI    Voltage   Frecuency   Consumption   Maximum temperature protection  Adjustable thermostat    Intensity  Amperes     TECHNICAL CHATACTERISTICS CHROMOTHERAPY    12 V  1 W    Voltage    Consumption    Intensity  Amperes  120 mA    Protection IP 67       22    Ed  1 0610    Sommalre  Fr     1   AVERTISSEMENTS     2   INSTALLATION   2 1   Emplacement de la baignoire  2 1 1   Plomberie  2 1 2   Installation electrique  2 2   Test electrique  2 3   Test hydraulique  2 4   Maconnerie    3   ELEMENTS DE LHYDROMASSAGE   3 1   Commandes  3 2   Groupe moteur pneumatique 1 fonction  modeles Jet   3 3   Groupe moteur pneumatique 2 fonctions  modeles Super Jet   3 4   Groupe moteur electronique 1 fonction  modeles Jet   3 5   Groupe moteur electronique 2 fonctions  modeles Super Jet   3 6   Groupe moteur electronique multifonction  modeles Top   3 7   Grille d aspiration    4   PANNES LES PLUS FREQUENTES     5   CARACTERISTIQUES TECHNIQUES     23    Ed  1 0610    1   AVERTISSEMENTS  Lisez ce guide attentivement avant d installer la baignoire   Ce produit doit   tre install   uniquement par des professionnels et installateurs agr    s   V  rifiez que la baignoire n a pas souffert de dommages pendant le transport   Ne trainez pas la baignoire sur le sol  Ne soulevez pas la baignoire par la tuyauterie   Ne pas introduire d   objet lourd dans la baignoire   Manipulez la baignoire avec attention    vitez les chocs pendant son tr
14. Manual de Instalaci  n  Installation Guide  Manuel d installation  Fr           Ba  eras de Hidromasaje  Hydromassage Bathtubs  Baignoires hydromassage       Ed  1 0610    INDICE  Es     1   ADVERTENCIAS     2   INSTALACION   2 1   Colocacion de la ba  era   2 1 1   Fontaner  a   2 1 2   Instalaci  n el  ctrica   2 2   Prueba el  ctrica   2 3   Prueba hidr  ulica   2 4   Alba  iler  a     3   ELEMENTOS DEL HIDROMASAJE    3 1   Mandos    3 2   Grupo impulsor Neum  tica de 1 funci  n  modelos Jet     3 3   Grupo impulsor Neum  tica de 2 funciones  modelos Super  Jet     3 4   Grupo impulsor Electr  nica de 1 funci  n  modelos Jet     3 5   Grupo impulsor Electr  nica de 2 funciones  modelos Super  Jet     3 6   Grupo impulsor Electr  nica Multifunci  n  modelos Top     3 7   Rejilla de aspiraci  n de agua     4   AVER  AS M  S FRECUENTES     5   CARACTER  STICAS T  CNICAS     Ed  1 0610    1   ADVERTENCIAS    Lea atentamente este manual en su totalidad antes de proceder a la instalaci  n de su ba  era    Esta ba  era debe ser instalada solamente por profesionales e instaladores autorizados    Compruebe visualmente que la ba  era no ha sufrido da  os durante el transporte    No transporte la ba  era sujet  ndola por las tuber  as ni la arrastre por el suelo    Evite los golpes y cargar la ba  era con objetos pesados    Si el agua de la red es muy dura se recomienda la instalaci  n de un descalcificador    En cualquier caso es recomendable la instalaci  n de filtros en la red de 
15. agua    Antes de proceder a cualquier limpieza o reparaci  n del equipo  desconecte la ba  era de la red el  ctrica   Si la ba  era es un modelo acr  lico  adem  s       Evite que una llama al descubierto  como por ejemplo de un soplete se ponga en contacto con cualquier  parte de la ba  era durante la instalaci  n o cuando se lleven a cabo trabajos de soldadura       No coloque cigarrillos encendidos en la superficie de la ba  era   En caso de que en la instalaci  n de esta ba  era no se respeten las instrucciones de este manual  as   como las  disposiciones y normas internacionales y nacionales aplicables en cada caso en lo relativo a instalaciones  el  ctricas e hidr  ulicas en la vivienda  METALIBERICA S A U  declina toda responsabilidad   METALIB  RICA se reserva el derecho a introducir cualquier modificaci  n en sus productos con respecto a este  manual   2   INSTALACI  N  Para reconocer los elementos que se mencionar  n  vea el cap  tulo 3  ELEMENTOS DEL HIDROMASAJE    Siga las instrucciones dadas a continuaci  n y en el orden indicado   2 1   COLOCACI  N DE LA BA  ERA    Las ba  eras de hidromasaje METALIB  RICA se entregan montadas y preparadas para su colocaci  n     No es necesario un lecho de arena para el soporte de la ba  era  se sustentar   sobre las patas que se  suministran montadas en la ba  era     Nivele el suelo donde se apoyar  n las patas y prepare el sif  n del desague de la forma tradicional     Sit  e la ba  era en el lugar elegido y verifique que lo
16. ansport   Si l eau de votre r  seau est dure  nous vous conseillons l installation d un adoucisseur d eau   Avant une intervention   ventuelle sur le produit  d  brancher le systeme du r  seau   lectrique   Si votre baignoire est un modele en acrylique     Ne pas exposer la baignoire au feu  comme par exemple aux flammes d un chalumeau lors de  l installation de la baignoire ou lors de travaux de soudure     Ne d  posez pas de cigarettes allum  es sur la baignoire   Dans le cas o   l installation de cette baignoire ne respecte pas les instructions contenues dans ce guide  ainsi  que les dispositions et normes internationales et nationales en ce qui concerne l installation   lectrique et    hydraulique  Metaliberica d  cline toute responsabilit       METALIBERICA se r  serve le droit de modifier les produits r  f  renc  s dans ce manuel sans pr  avis     2   INSTALLATION   Pour connaitre les elements mentionn  s dans ce chapitre voir 3  ELEMENTS DE L HYDROMASSAGE   Suivez les instructions ci dessous dans l ordre indiqu      2 1   EMPLACEMENT DE LA BAIGNOIRE    Les baignoires   quip  es d un systeme hydromassage de Metaliberica sont fournies entierement mont  es et  pr  par  es pour son installation     La baignoire se tiendra sur son systeme de pieds r  glables    Niveler le sol et pr   voyer un siphon pour le vidage    Placer la baignoire et v  rifier le niveau de tous les bords sup  rieurs  R  gler la hauteur des pieds si n  cessaire   Si la baignoire est fix  e au mur  assu
17. eed to apply a light touch to either turn on or turn off the  system     TOP    Air Water  The equipment provided with this version is our highest range  being equipped with a Fig 11  water system  air system  heater and cromotherapy     The control is a capacitive version with 8 different functions as detailed in Fig  12     CCC    T1 T2 T3 T4 T5 T6 T7 T8  Heater Water system Chromotherapy Air system    Fig 12       17    Ed  1 0610         3 2   WATER PUMP AND MOTOR PNEUMATIC 1 FUNCTION CONTROL  JET MODELS        Pump    Switch for starting   stopping pump   Earthing wire    Flexible transparent pipe     UNA    ES         a     D Le  ay    IN  E       fig 13    NOTE  In some models  Switch for starting   stopping pump  2  and Flexible transparent pipe  4  are into a  connection box  see  8  in 3 3  paragraph      3 3   WATER PUMP AND MOTOR PNEUMATIC 2 FUNCTIONS  SUPER JET MODELS     Pump    Switch for starting   stopping pump   Earthing wire    Flexible transparent pipe    Double loop    Non return valve    Air Blower    Connection box     ee ee ee       A Fig 14  NOTE  In all models  Switch for starting   stopping  2  and Flexible transparent pipe  4  for air blower  7  are  inside of connection box  8   In some models  Switch for starting   stopping pump and Flexible transparent pipe   4  are inside of connection box  8      18    Ed  1 0610 M METAL  DER CA    3 4   WATER PUMP AND MOTOR ELECTRONIC 1 FUNCTION  JET MODELS        Pump    Electrical connection box   Earthing 
18. erpo extra  o en el rodete de la bomba  1  Avisar al Servicio T  cnico   2  Mal estado de los rodamientos  2  Avisar al Servicio T  cnico   3  Obstrucci  n en el circuito de aspiraci  n  3  Revisar el circuito de aspiraci  n     Fuga de agua en el sistema de tuber  as 1  Fallo uni  n tuber  as con abrazadera  1  Apretar correctamente   2  Rotura en las tuber  as  2  Sustituir el tramo da  ado     Fuga de agua en los jets 1  Abrazadera floja entre venturi y jet  1  Apretar abrazadera   2  Venturi da  ado  2  Sustituir la pieza     No funciona el soplante 1  Ver caso an  logo de la bomba  1  Ver caso an  logo de la bomba     El soplante funciona pero no sale aire 1  V  lvula antirretorno atascada  1  Avisar al servicio t  cnico        SISTEMA  SUPER JET    No funciona el secado 1  Fallo del Soplante 1  Ver caso an  logo de la bomba  2  Fallo Electr  nico 2  Avisar al Servicio T  cnico    El calentador no calienta el agua 1  Bajo nivel de agua 1  Ver caso an  logo a bomba    2  Fallo Sensor de flujo 2  Avisar al Servicio T  cnico  3  Resistencia deteriorada 3  Avisar al servicio T  cnico  4  Salto termostato seguridad 4  Rearmar t  rmico    No funciona la cromoterapia 1  Led fundido 1  Cambiar kit luz  2  Cable desconectado 2  Revisar conexi  n luz  3  Fallo Electr  nico 3  Avisar al Servicio T  cnico    CALENTADOR   CROMOTERAPIA       10    Ed  1 0610    5   CARACTER  STICAS T  CNICAS    Pu     EE TA eee  50Hz 60Hz 50Hz 60Hz 60Hz    HA  sa aas a ai   osaa   EN GO 335241   ensoa
19. eur de mise en marche   arr  t de la pompe  2  et le tuyau flexible  4   sont plac  s dans une boite de connections  voir  8  en paragraphe 3 3       3 3   GROUPE MOTEUR PNEUMATIQUE 2 FONCTIONS  MODELES SUPER JET     1   Pompe    2   Interrupteur de mise en marche   arr  t de la pompe    3   Cable prise terre    4     Tuyau transparent flexible pour commande pneumatique   5   Double Loop    6   Valve anti retour    7   Blower  ventilateur     8   Boite de connections        Fig  14    NOTE  in toutes les modeles  interrupteur de mise en marche   arr  t  2  et tuyau transparent  4  de le blower   7  sont places dans le boite de connections  8   In quelques modeles  Interrupteur de mise en marche   arr  t   2  et tuyau transparent  4  de la pompe  1  sont plac  s dans le boite de connections  8      29    Ed  1 0610 M METAL  DER CA    3 4   GROUPE MOTEUR   LECTRONIQUE 1 FONCTION  MODELES JET        1   Pompe   2   Boite de connections    3   Cable prise terre    4     Valve anti retour d aspiration     si        a        A  e          Fig  15  3 5   GROUPE MOTEUR ELECTRONIQUE 2 FONCTIONS  MODELES SUPER JET     1   Pompe   2   Boite de connections   3   Cable prise terre    4   Blower  ventilateur    5   Double Loop    6   Valve anti retour        Fig 16    30    Ed  1 0610 M METAL  DER CA       3 6   GROUPE MOTEUR   LECTRONIQUE MULTIFONCTION  MODELES TOP     1   Pompe    2   Rechauffeur    3   Cable prise terre    4     Blower  ventilateur   5   Double Loop    6   Valve anti re
20. gulateur d entr  e d air  Fig 6      ELECTRONIQUE        Toutes les baignoires   lectroniques sont   quip  es d une commande tactile  Fig 7      En touchant la commande avec un doigt  vous activerez le systeme hydromassage et le  d  sactiverez en touchant la commande une seconde fois     3 1 2   MODELES SUPER JET   PNEUMATIQUE    Votre baignoire est   quip  e des commandes suivantes  et dans l ordre suivant    1  Touche pneumatique du systeme d eau  Fig 8     2  Touche pneumatique du systeme air  Fig 9     3  R  gulateur d entr  e d air  Fig 10         ELECTRONIQUE  Toutes les baignoires   lectroniques sont   quip  es de commandes tactiles Fig  11     En touchant les commandes avec un doigt  vous activerez les systemes  hydromassages et les d  sactiverez en touchant les commandes une seconde fois        TOP  Baignoire avec l   quipement le plus   lev   de la gamme  systeme de massage air  eau  systeme de massage    air  r  chauffeur  et chromoth  rapie   Toutes les baignoires TOP sont   quip  es d une commande tactile multifonction Fig 12     o OS   FA  e O o    Ti T2 T3 T4 T5 T6 T7 T8  R  chauffeur Syst  me Eau Chromoth  rapie Syst  me Air    Fig 12       28    Ed  1 0610    3 2   GROUPE MOTEUR PNEUMATIQUE 1 FONCTION  MODELES JET        1   Pompe    2   Interrupteur de mise en marche   arr  t de la pompe    3   Cable prise terre    4     Tuyau transparent flexible pour commande pneumatique           y      A N  t       IN  2    Fig 13  NOTE  In quelques mod  les    inTerrupt
21. l be adequate ventilation  available without the need for separate ventilation  except possibly in countries where there are unusually high  temperatures and humidity     After carrying out the above you should proceed with installation  always remembering the location of the  access grill     Take special care not to cut or squeeze the flexible transparent plastic pipe work that connect the on   off  control with the control box  Also check carefully that the said plastic pipes have not become loose or  disconnected     Once the masonry work has been concluded you can connect the equipment to the electrical mains     16    Ed  1 0610 M METAL  DER CA    3   HYDROMASSAGE COMPONENTS  3 1   CONTROLS   Depending on which model you have acquired you will have one of the following control options   3 1 1   JET MODELS   PNEUMATIC   Your bathtub will have the following controls     1   Pneumatic water jet on   off control  Fig 5    2   Air regulator control  Fig 6         ELECTRONIC   A finger touch electronic control as shown in Fig  7     Rememeber that you only need to apply a light touch to either turn on or turn off the  system     3 1 2   SUPER JET MODELS  PNEUMATIC   Your bathtub will have the following controls  located in this order   1  Pneumatic water jet on   off control  Fig 8      2  Pneumatic air blower on   off control  Fig 9    3  Air regulator control  Fig 10      ELECTRONIC   Your bathtub will have 2 finger touch controls as per Fig  11     Remember that you only n
22. mba  alto     Circuito de aspiraci  n obstruido    Avisar al Servicio T  cnico     Motor averiado   Revisar el circuito de aspiraci  n     Fallo Electr  nico   Avisar al Servicio T  cnico    Avisar al Servicio T  cnico    La bomba se pone en marcha pero luego   El tubo flexible del pulsador neum  tico no 1  Cortar los extremos y conectar de  no se para ajusta bien en sus extremos  nuevo     El tubo flexible del pulsador neum  tico esta 2  Revisar el recorrido del tubo  estrangulado  flexible     La bomba se pone en marcha pero se   Inadecuada ventilaci  n del motor  1  Facilitar la renovaci  n del aire en  para al cabo de un rato la zona del motor     SISTEMA JET    Bajo flujo de agua por todos los jets   Obstrucci  n en el circuito de impulsi  n  1  Revisar el circuito de impulsi  n     Obstrucci  n en el circuito de aspiraci  n  2  Revisar el circuito de aspiraci  n     Mezcla del aire incorrecta   Obstrucci  n del mando del aire  1  Revisi  n Cambio del mando del    Obstrucci  n del Venturi  aire   2  Avisar al Servicio T  cnico     Fuga en la aspiraci  n de agua de la 1  La tuerca que est   debajo de la rejilla de 1  Quitar la rejilla de aspiraci  n y  ba  era aspiraci  n est   floja o rota  apretar la tuerca o cambiarla   2  Fuga por codo aspiraci  n 2  Avisar al Servicio T  cnico    Flujo bajo o nulo por alguno de los jets 1  Obstrucci  n del agujero del agua y o del aire 1  Avisar al Servicio T  cnico   en el venturi del jet     Funcionamiento ruidoso de la bomba 1  Cu
23. othermic circuit breaker  there being a minimum distance of 3mm between contacts  and the  installation should include a ground fault circuit interruptor differential of a maximum 30mA  sensibility  It is recommended to install a interruptor differential of a maximum 10mA sensibility       The connection to the permanent electrical installation  the magnetothermic circuit breakers and the  differentials should be outside the prohibition and protection areas as indicated in figs 1 and 2         PROHIBITION       PROTECTION  AREA       Fig  1 Fig 2    This product should be connected to the buildings equipotential earthing system  being supplied with an  earthing point situated on the metalic support structure of the bathtub and identified with the symbol as  per fig 2 b  The waste unit should also be connected to the earthing point        14    Ed  1 0610 M METAL  DER CA    2 2   ELECTRICAL TESTING  Before enclosing the bathtub with either panels or tiling first check that the system is working properly   JET MODELS  Fill the bathtub to a level at least 2cms above the jets and then press the on   off control once     The jets should then supply a mix of water and air bubbles  Check that the air regulator works properly by  turning the control in both directions     SUPER JET and TOP MODELS  Repeat the same instructions as above and then press the air blower on   off  control  The air bubbles should then enter the bathtub from the injectors situated in the base of the bathtub  
24. r diferencial de sensibilidad m  xima 10 mA       La conexi  n a la canalizaci  n el  ctrica fija y los interruptores magnetot  rmico y diferencial deben estar  fuera de los vol  menes de prohibici  n y protecci  n  ver fig  1 y 2                VOLUMEN  PROHIBICI  N                         Fig  1 Fig 2      Este aparato se debe conectar al circuito equipotencial de la vivienda  para lo cual dispone de un borne  de conexi  n situado en la estructura met  lica de la ba  era e identificado con el s  mbolo de la fig  2 b   Conecte asimismo el desague al circuito equipotencial        Ed  1 0610 M METAL  DER CA    2 2   PRUEBA EL  CTRICA    Antes de empezar el revestimiento de la ba  era se debe verificar el correcto funcionamiento del sistema de  hidromasaje     MODELOS JET  Llene la ba  era por encima del JET m  s alto y accione el pulsador del sistema de agua  Los JETS  deben expulsar un chorro de agua y burbujas  Compruebe que el regulador de entrada de aire regula el flujo   gir  ndolo en los dos sentidos     MODELOS SUPER JET y TOP  Repita las operaciones descritas para los modelos JET  Accione el pulsador del  sistema de aire  El aire debe fluir hacia arriba desde los inyectores de la parte inferior de la ba  era     2 3   PRUEBA HIDR  ULICA   Las ba  eras de METALIB  RICA son rigurosamente probadas durante la producci  n  Sin embargo  en todos los  casos compruebe  antes de vaciar la ba  era en la operaci  n anterior  que no existen fugas producidas por  transporte o manip
25. rez vous que la baignoire ne s appuie pas seulement sur ces fixations   2 1 1   PLOMBERIE   MODELES JET  Aucune connexion sp  cifique n est demand  e  Raccorder le vidage    la baignoire     MODELES SUPER JET et TOP  Aucune connexion specifique n est demand  e  METALIBERICA fourni ces modeles  avec vidage     24    Ed  1 0610    2 1 2   INSTALLATION   LECTRIQUE       Durant la fabrication  METALIB  RICA r  alise plusieurs tests pour garantir votre s  curit    Cette baignoire est un  appareil de classe 1       V  rifier que la tension et la fr  quence de la baignoire correspondent a celles du r  seau   lectrique       Cet appareil doit   tre connect   a une canalisation   lectrique fixe  Il est   quip   d un cable de 3x 0 75   1 0 1 5  mm    avec un conducteur de terre       Si le cable doit   tre change  d  connectez le et remplacez le par un cable de meme type et de longueur  appropri  e       Cet appareil doit   tre connect   a une prise terre      Cet appareil doit   tre connect   a un circuit prot  g   au moyen d un interrupteur  magn  tothermique adapte a la consommation de l   quipement  coupure omnipolaire et  s  paration entre contacts d au moins 3 mm  ainsi qu un interrupteur diff  rentiel de  sensibilit   maximum 30mA  Cependant il est conseill   d installer un interrupteur max  10mA       Le point de connections au circuit   lectrique  les interrupteurs magn  tothermiques et diff  rentiels  doivent   tre situes en dehors des volumes d interdiction et de protection 
26. s bordes superiores est  n a nivel  Regule las patas si es  necesario     Si se utilizan perfiles para la fijaci  n a las paredes  aseg  rese de no apoyar la ba  era s  lo sobre los perfiles     2 1 1   FONTANER  A    MODELOS JET  No necesitan ninguna conexi  n especial  Solamente debe montar la v  lvula de desag  e  rebosadero     MODELOS SUPER JET y TOP  No necesitan ninguna conexi  n especial  METALIB  RICA suministra estos modelos  con una v  lvula de desag  e rebosadero especial que incluye el sif  n     Ed  1 0610    2 1 2   INSTALACI  N EL  CTRICA       METALIB  RICA durante la fabricaci  n realiza las pruebas necesarias para garantizar su seguridad  Esta ba  era  de hidromasaje es un aparato de clase I          Compruebe que la tensi  n y la frecuencia de la ba  era coinciden con las de la red       Este aparato debe conectarse a canalizaci  n el  ctrica fija y se suministra con un cable de 3x 0 75 1 0   1 5  mm     dotado de un hilo de tierra       Si por cualquier causa se debe sustituir el cable  descon  ctelo de la caja de control y sustit  yalo por  otro del mismo tipo y de la longitud adecuada       Este aparato debe estar conectado a una buena toma de tierra       Este aparato debe estar conectado a un circuito protegido con un interruptor  magnetot  rmico apropiado a su consumo  de corte omnipolar y separaci  n m  nima entre  contactos de 3 mm   y con un interruptor diferencial de sensibilidad m  xima 30 mA  No  obstante  es recomendable instalar un interrupto
27. torno de aspiraci  n     E     lt    a        A  e  _       Fig  15  3 5   GRUPO IMPULSOR ELECTR  NICA DE 2 FUNCIONES  MODELOS SUPER JET     1   Bomba de impulsi  n    2   Caja electr  nica de conexi  n   3   Cable de toma de tierra    4     Soplante    5     Doble Loop    6     Valvula antiretorno        Fig 16    Ed  1 0610 M METAL  DER CA       3 6   GRUPO IMPULSOR ELECTR  NICA MULTIFUNCI  N  MODELOS TOP     1   Bomba de impulsi  n    2   Calentador    3   Cable de toma de tierra   4     Soplante    5   Doble Loop    6   Valvula Antiretorno    7   Caja de conexion        3 7   REJILLA DE ASPIRACION DE AGUA    Para desmontar la rejilla de aspiracion de agua  A  de la tuerca  C   desenrosque los dos tornillos  B    Fig 18        Ed  1 0610 M METAL  DER CA    4   AVER  AS M  S FRECUENTES    AVER  A SOLUCI  N    La bomba no funciona   No hay corriente  1  Ver el registro el  ctrico     No funciona el pulsador neum  tico por   a  Obstrucci  n del tubo flexible  2a  Cambiar el tubo flexible   b  Desconexi  n del tubo flexible  2b  Conectar el tubo flexible     En el pulsador neum  tico     En el interruptor neum  tico   c  Fuga en el tubo flexible  2c  Cambiar el tubo flexible     Motor desconectado  3  Conectar el motor a la red     Motor averiado  4  Avisar al Servicio T  cnico     Fallo Electr  nico 5  Avisar al Servicio T  cnico    La bomba arranca y se para al instante   Nivel de agua demasiado bajo  1  Llenar por encima del jet m  s    Cuerpo extra  o en el rodete de la bo
28. tour    7     Boite de connections     a  X eu     gt  sito 1    A  y       3 7   GRILLE D ASPIRATION    Pour d  monter la grille d aspiration  quitter les deux visses voir Fig 18       31    Ed  1 0610 M METAL  DER CA    4   PANNES LES PLUS FREQUENTES    Le moteur ne fonctionne 1  Absence de tension  1  V  rifier le compteur   lectrique   pas  2  La touche pneumatique ne marche pas   a  Obstruction du petit tuyau transparent 2a  Remplacer le tuyau   b  Tuyau d  branch    2b  Rebrancher le tuyau     de la touche pneumatique  2c  Remplacer le petit tuyau     de l interrupteur  3  Brancher le moteur  c  Fuite dans le petit tuyau  4  Contacter le service technique  3  Le moteur est d  branch    4  Moteur en panne     La pompe se met en   Niveau d   eau insuffisant  1  Remplisser la baignoire au dessus des Jets  marche et s   arr  te a   Corps   tranger dans la roue de la turbine  2  Contacter le service technique  l instant    Circuit d aspiration d  fectueux  3  R  viser Circuit d aspiration     Moteur en panne  4  Contacter le service technique    La pompe se met en 1  Extr  mit   du tuyau de la commande 1  Contacter le service technique  marche et ne s arr  te pas  pneumatique est endommag  e   2  Extr  mit   du tuyau de la commande 2  R  viser le parcours du tuyau  pneumatique est   trangl  e        mi La pompe se met en 1  Ventilation du moteur insuffisante  1  Faciliter la ventilation du moteur   E marche et s arr  te au bout    d   un moment     LU  T  E Pression de l eau
29. ucts are placed in the bathtub  and ensure that no solid articles come in to contact  with the bathtub and or the hydromassage equipment     If the mains water in your area is hard we recommend you install a water softener with your bathtub   We always recommend that a filter system be used with our products     Before either cleaning or repairing the hydromassage system make sure that you have disconnected the system  from the electrical mains     In the case of acrylic bathtubs  also       Ensure that no soldering work is carried near the bathtub  and that no naked flame could come in to  contact with the bath surface       Ensure that no cigarettes come in to contact with acrylic surfaces   Should the installation of this bathtub be carried out without complying with the instructions indicated in this  manual  as well as with both international and local standards and requirements with regard to both the  electrical and hydraulic installations in the place of installation  METALIBERICA SAU declines all responsibility   METALIBERICA SAU reserves the right to carry out modifications to the technical characteristics of its products  without prior advice     2   INSTALLATION    For better knowledge of the massage components please refer to part 3    HYDROMASSAGE COMPONENTS    of  this manual     Please follow there instructions in the established order    2 1   BATHTUB PLACEMENT   The hydromassage bathtubs of METALIBERICA are supplied full assembled and ready for installation 
30. ulaci  n    Toque los empalmes y conexiones para asegurarse de que no hay escapes     2 4   ALBA  ILER  A    METALIB  RICA dispone  para algunos modelos  de un exclusivo sistema de paneles para evitar los trabajos de  alba  iler  a y facilitar la reparaci  n     Si decide recubrir la ba  era con alba  iler  a  por seguridad  desconecte la alimentaci  n de la red el  ctrica  durante los trabajos     Se debe prever la colocaci  n de un registro para el mantenimiento del equipo  fig 3    Sit  elo en el punto m  s cercano a los grupos impulsores de agua y de agua y aire y c  ntrelo con respecto a los  mismos de modo que sean accesibles desde el exterior     La   amp  Trampilla  ES    Fig  3    Ed  1 0610       Dimensiones m  nimas del registro  fig  4           Modelos JET  A 600 mm  B 400 mm     Modelos SUPER JET y TOP  A 600 mm  B 450 mm        Fig  4    La trampilla deber   permitir la ventilaci  n de los grupos impulsores    La trampilla s  lo podr   abrirse con el uso de una herramienta  y su dise  o ser   tal que no permita la  manipulaci  n de los elementos del sistema desde el exterior ni el acceso al mismo de cuerpos extra  os que  puedan interferir en su funcionamiento     Si se usa el sistema de paneles desmontables METALIB  RICA para el recubrimiento de la ba  era  los propios  paneles permitir  n el acceso a la instalaci  n y la ventilaci  n de los grupos impulsores     A continuaci  n proceda al tabicado de los laterales de la ba  era  teniendo en cuenta la ubicaci 
31. wire    Intake non return valve     KR CN e           AM    AUA    3 5   WATER PUMP AND MOTOR ELECTRONIC 2 FUNCTIONS  SUPER JET MODELS     1  Pump    2  Electrical connection box   3  Earthing wire    4  Air blower    5  Double loop    6     Non return valve        Fig 16    19    Ed  1 0610 M METAL  DER CA       3 6   WATER PUMP AND MOTOR ELECTRONIC MULTIFUNCTION  TOP MODELS     Pump    Heater    Earthing wire    Air Blower    Double loop    Non return valve   Electrical connection box     oe A       fig 17    3 7   WATER SUCTION GRILL    To separate the water suction grill  A  from part  C  simply remove the two screws  B    Fig 18         20    Ed  1 0610 M METAL  DER CA    4   PROBLEM INDICATOR LIST    FAULT    The pump does not start    The pump starts but then stops  immediately    The pump starts but then does  not stop    The pump starts but then stops  alter a short period     Low water pressure at jets     JET SYSTEMS    Inadequate air mixture    Leak in water in take    Low or zero water from any  one jet    Noisy pump    Water leak in circuit     Water leak at jets    Air blower not working     Air blower working but no air  distribution    SUPER JET  SYSTEMS    Dryer not working    The Heather does not heat the  water    Chromotherapy not working    HEATER AND  CHROMOTHERAPY        Ed  1 0610    CAUSE    1  No electrical current     2  The pneumatic on off control not working     a  Flexible pipe blocked   b  Flexible pipe not connected     At pneumatic control  
    
Download Pdf Manuals
 
 
    
Related Search
    
Related Contents
lid stuip janvier 2014_01  DVB Monitor v2 User Manual 2.00 - R  Unitech MS840  FR - Rasor 1946  Développement Professionnel Continu DPC : Mode d`emploi  MANUAL PIEPS Freeride  Cables Direct RB-296 power cable  Xerox 1XX Specifications  Sandberg Print Cover SIII Glowing Heart  Fujitsu Storagebird 35EV821    Copyright © All rights reserved. 
   Failed to retrieve file