Home

Assembly Manual Guide d`assemblage

image

Contents

1. 13 Y4 ASSEMBLY Step 2 2 1 Install the door tracks D on the front of the solarium using the screws washer and cap nut W as illustrated Repeat these steps with the second identical assembly ASSEMBLAGE Etape 2 2 1 Installer les rails de porte D tel qu illustr en utilisant les vis rondelles et crous borgnes W R p ter ces tapes avec le deuxieme montage identique Parts required for this step Pieces requises pour cette tape 14 24 15 Y4 ASSEMBLY Step 3 3 1 Slide the door wheels found on the door B indo the door tracks D Repeat these steps with the second identical assembly ASSEMBLAGE tape 3 3 1 Glisser les roulettes trouv es sur la porte B dans les rails de porte D R p ter ces tapes avec le deuxieme montage identique Parts required for this step Pieces requises pour cette tape 5 2 16 17 SZ ASSEMBLY b e AN Step 4 4 1 Install the door stoppers D1 into the door tracks D using the screws R as illustrated 4 2 Install one door lock Z on the frame B1 as illustrated using the scre
2. Guide d assemblage Assembly Manual Kingston Solarium 12 x 12 ft NF NZ a A TABLE OF CONTENTS Safety Information cci rac aa aaa 3 Warranty iicet cci ect de eae rg 4 What is 4 What is Not Covered Operation Maintenance Care and Cleaning 5 Pre assembly s sss 6 Planning 6 Tools 6 Hardware Included 5 es 7 Package Contents sass s aaa 8 11 ASSOmDIy niii bii ees 12 45 SZ SAFETY INFORMATION It is very important to read and follow the safety precautions before assembly and during the use of the product 1 Keep all children and pets away from assembly area 2 When assembling and using this product basic safety precautions must always be followed to reduce risks of personal injuries and damages to the product and its surroundings 3 Ensure that all the parts are in the boxes before starting the assembly It is recommended to wear protective gloves since some of the parts have sharp edges 4 This solarium will take at least 8 hours to put up You must schedule enough time to complete the assembly You cannot leave the solarium unattended if it is not fully assembled even if bolted to the ground A minimum of 3 people is r
3. P5 tel qu illustr en utilisant les vis V Chaque vis V dois tre ins r e dans deux trous se trouvant aux extr mit s des barres de renfort de toit avant d tre viss e aux barres de toit Parts required for this step Pieces requises pour cette tape P cl P1 4 8 44 98 D 11 D P4 P DM d bow 5 lt A 5 VM LA PR LA OS EN Zo 7 2 1 b y A gt 1 1 1 1 1 NA 1 x 1 1 kW x s 1 1 1 1 1 1 1 1 1 e Vue sous View from 1 la structure underside the solarium 45 Notes 46 Notes 47 SOJAG HI WWW Sojag ca Printed in China Imprim en Chine
4. d une pellicule de plastique identifiant le c t ayant une protection UV Une fois que cette pellicule est enlev e il est impossible d identifier quel c t est prot g contre les rayons UV du soleil est recommand de retirer les pellicules de plastique une la fois avant l installation de chacun des panneaux MISE EN GARDE Un des c t s du panneau de toit a une protection UV S assurer d exposer le c t prot g contre les rayons UV du soleil vers l ext rieur du solarium Cette tape est tr s importante si elle n est pas respect e telle que d crite le toit ne sera pas couvert par la garantie tape 14 14 1 Installer les panneaux de toit Sa Qa et tel qu illustr en les glissant dans les rails des barres de toit F et G S assurer que les panneaux de toit Sa Qa et Q1a soient compl tement ins r s dans les rails 14 2 Installer les barres de support de toit J K et L tel qu illustr en les glissant dans les rails des barres de toit F et G Enligner les extr mit s des barres de support de toit J K et L ensemble Parts required for this step Pi ces requises pour cette tape Qa 38 39 v ASSEMBLY IN NOTE The roof panels are covered with a plastic film identifying which side has a UV protector Once the plastic film is removed it is impossible to know which side has the UV protector We recommen
5. finition de toit N et enligner les trous les uns par dessus les autres Placer un embout de finition M par dessus les trous et les attacher avec une vis V 16 3 Placer une barre de finition de toit N2 droite de la barre de finition de toit N1 et enligner les trous les uns par dessus les autres Placer un embout de finition M1 par dessus les trous et les attacher avec une vis V 16 4 R p ter ce proc d jusqu ce que vous ayez fait le tour de l abri et rejoint la premi re barre de finition N que vous aviez install e 16 5 Enlever la vis V du d but et enligner les trous de la premi re et de la derni re barre de finition que vous aviez install e Attacher les deux barres au coin avec un embout de finition M1 en y ins rant de nouveau la m me vis V Parts required for this step Pi ces requises pour cette tape N WMD 42 AS Sa NES ER Ny A 0 NS N 43 4 ASSEMBLY Step 17 17 1 From the inside of the solarium install the roof support bars to P5 as illustrated using the screws V Each screw V must be inserted into two predrilled holes prior to be screwed to the roof bars ASSEMBLAGE tape 17 17 1 Positionnez vous sous la structure du toit Installer les barres de renfort de toit
6. meaning that it may be left up year round However any accumulation of snow must be removed from the roof of the solarium 2 The solarium must be anchored using the appropriate screws based on the flooring which it is being anchored to not includea 3 Roof panels must be installed with the UV protected side facing the sun 4 This solarium should not be used as a storage shelter during the winter 5 Check all screws for tightness before and during usage of the solarium Tightened the screws at least twice a year 6 Do not hang any items to the structure 7 The application of silicone is not recommended This would prevent the water to evacuate by the holes provided for this purpose GARANTIE CE QUI EST COUVERT Ce solarium est garanti pendant un an partir de la date d achat contre les d fauts de fabrication bas s sur un usage normal et r sidentiel Cette garantie limit e est applicable sur les pi ces seulement la main d oeuvre est en sus Cette garantie est non transf rable CE QUI N EST PAS COUVERT Les dommages caus s par le vandalisme les abus ou le mauvais usage de ce produit ne sont pas couverts par la garantie Les dommages caus s par les conditions climatiques difficiles telles que les orages la gr le et les temp tes de vent ou de neige ne sont pas couverts La rouille l infiltration d eau les trous dans les panneaux de polycarbonate la d coloration de la structure ou des panneaux de poly
7. pour cette tape 22 po Inside doors Option ave 23 y 74 AN ASSEMBLY Step 7 7 1 Slide a gap cover bar O into the inside upper lip on top of the panel A as illustrated 7 2 Attach a second panel A next to the first panel A in order to create a 45 corner by inserting a panel connector E outside of the corner and a panel connector E1 on the inside of the corner Ensure to place the panel A mosquito net side outside the solarium and the mica side inside the solarium 7 3 Attach a third panel A next to the second panel A by sliding from the top two panel connectors C face to face Ensure to place the panel A mosquito net side outside the solarium and the mica side inside the solarium Repeat these steps with the second identical assembly ASSEMBLAGE tape 7 7 1 Glisser une barre couvre espacement O et une barre dans la fente int rieure se trouvant au dessus du panneau A tel qu illustr 7 2 Attacher un second panneau A c t du premier panneau A d ja install pour cr er un coin de 45 comme illustr Utiliser un connecteur de panneau E a l exterieur du joint et un connecteur de panneau 1 a l int rieur du joint S assurer de placer le c t moustiquaire du panneau A vers l ext rieur et l
8. to actual size and not to scale Le mat riel n est pas repr sent l chelle ya 2 8162 ES E168 cado A1 B1 D1 E E M 1 1 Panel Corner Finishing End CCT A fe 8 Ponecouissane 2 G connecteur de panneau 8 D a D1 ave pone 8 LE Connecteur de panneau 8 Ei Connecteur de panneau 8 FT Banedetor Je i connecteur de toit int reu 1 mi Emboutdefriiondecom 8 PARTS LIST CONTINUED NOTE Parts not shown to actual size and not to scale N1 N29 Omg BEE O1 O2 Gap Cover Sar Desorption N Fishing Inside Support Bar Inside Support Bar Inside Support Bar P LM P2 inside Suppor Bar LM ES N Ni N2 P1 P2 P2 P4 P5 LISTE DE PI CES SUITE NOTE Le mat riel n est pas repr sent l chelle P x4 Pd A P1 4 d 4 2 a Zy x4 a Description Lo N 14 o Bare def Lm P5 Bare definition 4 Bare definition 4 Barecoureespacemen 4 N N1 N2 KS i i P5 i Barre de suppor
9. 13 13 1 Install the outside roof connector on top of 13 1 Attacher le connecteur de toit ext rieur H au the inside roof connector 0 using the screw V connecteur de toit int rieur I en utilisant une vis V Parts required for this step Pi ces requises pour cette tape V WMD 36 37 v ASSEMBLY IN NOTE The roof panels are covered with a plastic film identifying which side has a UV protector Once the plastic film is removed it is impossible to know which side has the UV protector We recommend removing the film one at a time just prior to installing the roof panel CAUTION One side of the roof panels is UV protected Ensure that the UV protected side is facing up It is a very important procedure if not followed as described your roof will not be covered by the warranty Step 14 14 1 Install the roof panels Sa Qa and 313 as illustrated by sliding them into the track of roof bars F and G Ensure they are completely inserted into the tracks 14 2 Install the roof support bars J K and L as illustrated by sliding them into the track on the roof bars F and G Align the extremty of the roof support bars J K and L together ASSEMBLAGE NOTE Les panneaux de toit sont recouverts
10. carbonate ne sont pas couverts par la garantie Si l une des instructions de la section OP RATION ou R GLES DE S CURIT n est pas respect e la garantie sera alors annul e Toute modification apport e la structure du solarium annulera la garantie OP RATION 1 Ceci est un solarium quatre saisons ce qui signifie qu il peut tre laiss l ext rieur durant toute l ann e Cependant toute accumulation de neige doit tre retir e du toit du solarium 2 Le solarium doit tre ancr au sol en utilisant les vis appropri es au type de plancher sur lequel il sera install non inclus 3 Les panneaux de toit doivent tre install s en placant le c t prot g contre les rayons UV vers l ext rieur du solarium afin que ce c t soit plac face au soleil 4 Le solarium ne doit pas tre utilis comme abri d entreposage durant la p riode hivernale 5 V rifier l ensemble des vis avant et pendant l utilisation du solarium et les resserrer au minimum 2 fois par ann e 6 Nerien suspendre la structure L application de silicone est d conseill e Celui ci emp cherait l eau de s vacuer par les trous pr vus cet effet yA MAINTENANCE ENTRETIEN If this solarium needs repairs Si ce solarium a besoin de r parations 1 In case of a defective part or if a problem occurs while 1 Pourune pi ce d fectueuse ou si un probl me survient using this product please contact your retailer pendant l utilisatio
11. d removing the film one at a time just prior to installing the roof panel CAUTION One side of the roof panels is UV protected Ensure that the UV protected side is facing up It is a very important procedure if not followed as described your roof will not be covered by the warranty Step 15 15 1 Install the roof panels 56 and Q1b as illustrated by sliding them into the track of roof bars F and G Ensure they are completely inserted into the tracks ASSEMBLAGE NOTE Les panneaux de toit sont recouverts d une pellicule de plastique identifiant le c t ayant une protection UV Une fois que cette pellicule est enlev e il est impossible d identifier quel c t est prot g contre les rayons UV du soleil est recommand de retirer les pellicules de plastique une la fois avant l installation de chacun des panneaux MISE EN GARDE Un des c t s du panneau de toit a une protection UV S assurer d exposer le c t prot g contre les rayons UV du soleil vers l ext rieur du solarium Cette tape est tr s importante si elle n est pas respect e telle que d crite le toit ne sera pas couvert par la garantie tape 15 15 1 Installer les panneaux de toit Sb Qb et Q1b tel qu illustr en les glissant dans les rails des barres de toit F et G S assurer que les panneaux de toit Sb Qb et Q1b soient compl tement ins r s dans les rails Parts required for this step Pi ces requises pour cet
12. de suivre les r gles de s curit avant de proc der l assemblage et durant l utilisation du solarium 1 2 10 Garder les enfants et les animaux loin de la zone d assemblage Pendant l assemblage et l utilisation de ce produit les r gles de s curit de base doivent toujours tre suivies dans le but de r duire les risques de blessures et les dommages caus s sur le produit et son environnement V rifier que toutes les pi ces sont dans la boite avant d en faire l assemblage Certaines pi ces peuvent avoir des c t s coupants il est recommand de porter des gants de protection Ce solarium prendra au moins huit heures assembler est important de planifier assez de temps pour compl ter l assemblage On ne doit pas laisser ce solarium sans surveillance si l assemblage n est pas compl tement termin m me si ce dernier est viss au sol Un minimum de trois personnes est requis pour effectuer l assemblage du solarium D buter l assemblage et installer le solarium plus de six pieds de toutes obstructions incluant mais ne se limitant pas une cl ture des branches une corde linge ou des fils lectriques et le plus possible un endroit prot g du vent Toujours installer la structure sur un sol nivel Le solarium doit tre ancr un plancher de bois ou de b ton en utilisant les vis appropri es pour chaque type de plancher non inclus V rifier l ensemble des vis avant et penda
13. e c t mica vers l int rieur du solarium 7 2 Attacher un troixieme panneau A c t du deuxi me panneau A d ja install deux connecteurs de plac s face face tel qu illustr S assurer de placer le c t moustiquaire du panneau A vers l ext rieur et le c t mica vers l int rieur du solarium R p ter ces tapes avec le deuxieme montage identique Parts required for this step Pieces requises pour cette tape AGS e r 24 25 ASSEMBLY ISS Step 8 8 1 Slide a gap cover bar O1 followed by a gap cover bar 02 into the inside upper lip on top of the panels A as illustrated IF YOU HAVE TWO IDENTICAL ASSEMBLY 8 2 Attach the identical assembly together using the panels A ans the pannel connectors E ans El IF YOU DID NOT ASSEMBLE SIMULTANEOUSLY BOTH IDENTICAL SECTIONS 8 3 Follow the draw indicating the order of panels frames and doors to build the outline of the solarium by following the same techniques used in the previous steps Ensure to insert a gap cover bar before installing the following panel ASSEMBLAGE tape 8 8 1 Glisser une barre couvre espacement O1 suivi d une barre couvre espace
14. equired for a safe assembly of the solarium 5 Begin the assembly and install the solarium more than 6 feet away from any obstructions including but not limited to a fence overhanging branches a laundry line or electrical wires 6 Always install the solarium on a leveled platform The solarium must be anchored to either wood or concrete using the appropriate screws for the chosen flooring not included 7 Check all screws for tightness before and during the use of the solarium Tighten the screws at least twice a year 8 Your solarium has been created for all four seasons However you must remove any snow accumulation on the roof 9 Do not place any type of heat source under the solarium or within 5 feet of the unit including but not limited to a barbecue or a space heater 10 Do not install the solarium in a space where there is the possibility of high winds TABLE DES MATIERES R gles de S curit sisi 3 Garantie correnti Remi 4 Ce qui est couvert sine 4 Ce qui n est pas 4 Op ration rj Dis zeen Soins et nettoyage wise es 5 Pr assemblage u ee 6 Planification de l assemblage 6 Outils requis ceteri eret een 6 Trousse de quincaillerie incluse 7 Liste des pieces centres 8 11 Assemblage estet 12 45 REGLES DE S CURIT Il est tr s important de lire et
15. l Come down the panels A to espacement O dans la fente int rieure se trouvant the final position au dessus du panneau A Redescendre les panneaux A a leur position finale Parts required for this step Pieces requises pour cette tape 28 IMPORTANT Use this draw as reference only Your last panel mays be in an other corner IMPORTANT Utiliser ce dessin titre de r f rence seulement II se peut que votre dernier panneau ins r soit dans un autre coin lt 29 4 ASSEMBLY ASSEMBLAGE Step 10 tape 10 10 1 Install an iron angle X on a roof bar 10 1 Installer un fer angle X sur la barre de toit using a screw V en utilisant une vis V 10 2 Install an iron angle Y on a roof bar F 10 2 Installer un fer angle Y sur la barre de toit F using a screw V en utilisant une vis V Repeat for remaining roof bars F and G R p ter pour les barres de toit F et G restantes Parts required for this step Pi ces requises pour cette tape X a Y 8 S V 12 30 31 Y ASSEMBLY 4 Step 11 11 1 Attaching the iron angle Y found on the roof bar F to the unit as illustrated using the screws T and the other ext
16. le as illustrated IMPORTANT Ce manuel installe les portes coulissantes et les rails de portes l ext rieur du solarium Cependant vous pouvez choisir d installer les portes et les rails de portes l int rieur Pour ce faire vous devez installer le panneau A en choisissant l angle optionnel comme indiqu sur l image de droite NOTE NOTE In order to be able to insert the parts E and E1 you may need Pour ins rer les pi ces E et E1 il se peut que vouz ayez besoin to slightly slide the gap cover bar 02 to the side de glisser l g rement la barre de couvre espacement 02 d j install e sur le c t Step 6 tape 6 6 1 Attach a panel A next to the frame B1 in 6 1 Attacher un panneau A c t du cadre B1 d j install order to create a 45 corner by inserting a panel pour cr er un coin de 45 comme illustr Utiliser un connector E outside of the corner and a panel connecteur de panneau E l ext rieur du joint et un connector E1 on the inside of the corner Ensure connecteur de panneau E1 l int rieur du joint S assurer to place the panel A mosquito net side outside de placer le c t moustiquaire du panneau A vers the solarium and the mica side inside the solarium l ext rieur et le c t mica vers l int rieur du solarium Repeat these steps with the second R p ter ces tapes avec le deuxi me montage identique identical assembly Parts required for this step Pi ces requises
17. ment O2 dans la fente int rieure se trouvant au dessus des panneaux A tel qu illustr SI VOUS AVEZ ASSEMBL SIMULTAN MENT LES DEUX SECTIONS IDENTIQUES 8 2 Attacher vos deux assemblages identiques ensemble en utilisant les panneaux A et les connecteurs de panneaux E et E1 SI VOUS N AVEZ PAS ASSEMBL SIMULTAN MENT LES DEUX SECTIONS IDENTIQUES 8 3 Suivre le plan indiquant l ordre des panneaux des cadres et des portes pour construire le contour du solarium en suivant les m mes techniques utilis es aux tapes pr c dentes S assurer de toujours ins rer une barre couvre espacement avant d installer le panneau suivant Se r f rer l tape 9 pour la technique d insertion de la derni re barre couvre espacement Parts required for this step Pi ces requises pour cette tape 0142 O2 42 26 FH 27 ASSEMBLY ASSEMBLAGE Step 9 Etape 9 9 1 In order to install the last gap cover bars 9 1 Pour installer les dernieres barres couvre espacement O over the last panels A lift the panels A and au dessus des derniers panneaux A lever les slide the gap cover bar O into the inside upper panneaux A puis glisser une barre couvre lip of the pane
18. n de ce produit nous vous prions de contacter 2 Toorder replacement parts use the model number and the votre marchand part numbers on the parts list 2 Pour passer votre commande et identifier les pi ces remplacer r f rez vous au num ro de mod le du solarium ainsi qu aux lettres qui sont indiqu es sur la liste de pi ces v2 CARE AND CLEANING SOINS ET NETTOYAGE 1 For cleaning use a domestic soap or a soft detergent and 1 Pour le nettoyage utiliser un savon domestique ou un d tergent wash with warm water using a sponge or fabric cloth Rinse doux et laver avec une ponge ou un linge en microfibre et de with clean water l eau ti de Rincer l eau claire Y 2 PRE ASSEMBLY IMPORTANT Do not remove the protective film on the polycarbonate roof panels before installation Ensure to put the UV protected side facing the sun It is a very important procedure if not followed as described your roof will not be covered by the warranty PLANNING ASSEMBLY 1 It is the consumer s responsibility to comply with building rules regulations zoning restrictions orders or any other regional restrictions and obtain the required permits before purchasing this product and installing it 2 Make sure that every part is in the box before beginning installation 3 Some parts may have sharp edges it is recommended to wear gloves protection glasses and closed shoes 4 This solarium will take at least 8 hours to p
19. nt l utilisation du solarium et les resserrer au minimum 2 fois par ann e Ceci est un solarium quatre saisons ce qui signifie qu il peut tre laiss l ext rieur durant toute l ann e Cependant toute accumulation de neige doit tre retir e du toit du solarium Ne placer aucune source de chaleur sous le solarium ou moins de cinq pieds incluant sans toutefois s y limiter un BBQ ou un chauffage d appoint Ne pas installer le solarium dans un endroit o il y a possibilit de vent important 4 NY 74 WARRANTY WHAT IS COVERED This solarium is guaranteed against defective materials for one year from the date of purchase and based on normal residential use of the product This limited warranty is applicable on parts only labour is not included The warranty is not transferable PN WHAT IS NOT COVERED Damages due to vandalism abuse or wrong use of the product are not covered by the warranty Damages caused by severe weather conditions such as thunderstorms hail storms wind or snow storms are not covered by the warranty Rust water infiltration holes in polycarbonate roof panels discolouration of the structure or the polycarbonate roof panels are not covered by the warranty In any of the instructions of the OPERATION or SAFETY INFORMATION sections is not met the warranty will be voided Any modifications made to the solarium will void the warranty 4 OPERATION 1 The solarium is a four season solarium
20. remity of the roof bar F to the inside roof connector 1 using the screws V Repeat for remaining roof bars F ASSEMBLAGE tape 11 11 1 Attacher le fer angle Y de la barre de toit F la structure l aide des vis T tel qu illustr et l autre extr mit de la barre de toit F au connecteur de toit I en utilisant les vis V R p ter pour les barre de toit F restantes Parts required for this step Pi ces requises pour cette tape 32 WMD 33 Y ASSEMBLY 4 Step 12 12 1 Attaching the iron angle X found on the roof bar to the unit as illustrated using the screws T and the other extremity of the roof bar G to the inside roof connector l using the screws V Repeat for remaining roof bars G ASSEMBLAGE tape 12 12 1 Attacher le fer angle X de la barre de toit G la structure l aide des vis T tel qu illustr et l autre extr mit de la barre de toit F au connecteur de toit I en utilisant les vis V R p ter pour les barre de toit G restantes Parts required for this step Pi ces requises pour cette tape V 8 998 34 35 74 ASSEMBLY ASSEMBLAGE l Step 13 Etape
21. s peuvent avoir des c t s coupants Il est recommand de porter des gants et des lunettes de protection et des souliers ferm s 4 Ce solarium prendra au moins huit heures assembler Vous devrez planifier assez de temps pour compl ter l assemblage 5 Onne doit pas laisser ce solarium sans surveillance si l assemblage n est pas compl tement termin m me si ce dernier est viss au sol 6 minimum de trois personnes est requis pour effectuer l assemblage de ce solarium 7 Suivre toutes les instructions pour s assurer de la solidit du solarium 8 Pour viter les dommages au solarium et ses composantes utilisez les outils appropri s Ne pas utiliser la structure comme support L utilisation d un escabeau est recommand e 9 Garder le manuel d instructions et la liste de pieces en cas de besoins futurs 10 Ne pas assembler par journ e de vent ou de pluie OUTILS REQUIS Non inclus l int rieur de la boite reete SAFETY GOGGLES SAFETY HAT LEVEL LUNETTES DE S CURIT CASQUE DE S CURIT NIVEAU GLOVES STEPLADDER PHILLIPS SCREW DRIVER GANTS ESCABEAU TOURNEVIS TOILE 24 HARDWARE KIT NOTE Parts not shown to actual size and not to scale TROUSSE QUINCAILLERIE NOTE Le mat riel n est pas repr sent l chelle V 677 982 amp 24 Seien 99 m sw COI 65 m w E 72 PARTS LIST LISTE DE PIECES NOTE NOTE Parts not shown
22. t int rieur Barre de support int rieur P5 Barre de support int rieur Description Cas 86522 3 Qo RoofPanei Sa 86 86 v tron Angle Sa Roof Panel Y 7 5 Q1a 4 8 wm ve dio COR CT Can Panneaudetot 4 6 Panneau detoi 4 Panneaudetot 4 v fe 11 ASSEMBLY as IMPORTANT Always install the shelter on a level platform wood or concrete Step 1 1 1 Join the panel A1 to the frame B1 by sliding from the top two panel connectors C face to face Ensure to place the panel A1 mosquito net side outside the solarium and the mica side inside the solarium Repeat for remaining panel A1 and frame B1 to create an identical assembly ASSEMBLAGE IMPORTANT Toujours installer la structure sur une surface de niveau Etape 1 1 1 Joindre un panneau A1 a un cadre B1 en glissant a partir du haut des pi ces deux connecteurs de panneaux C plac s face a face tel qu illustr S assurer de placer le c t moustiquaire du panneau A1 vers l ext rieur et le c t mica vers l int rieur du solarium R p ter pour le panneau A1 et le cadre B1 restants de facon cr er deux montages identiques Parts required for this step Pi ces requises pour cette tape E 2 12
23. te tape 40 41 74 ASSEMBLY ASSEMBLAGE Step 16 16 1 Secure the left side of the roof finishing bar N with a screw V in the Start Here corner Do not use a finishing end M1 now as you will have to unscrew this screw V later 16 2 Place a roof finishing bar N1 next to the right of the roof finishing bar N and align the pre drilled holes in each bar one on top of the other Place a finishing end M over the aligned holes and secure with screw V 16 3 Place a roof finishing bar N2 next to the roof finishing bar N1 and align the pre drilled holes in each bar one on top of the other Place a finishing end M1 over the aligned holes and secure with screw V 16 4 Repeat this process with all finishing bars as illustrated Note the finishing ends change depending on where you are along the unit Always refer to the illustration 16 5 In order to finish the installation of the last finishing bar N2 you have to unscrew the first screw V at your starting point and place a finishing end M1 then re install the screw V tape 16 16 1 Attacher le c t gauche de la barre de finition de toit N dans le coin identifi D buter ici l aide d une vis V Ne pas utiliser d embout de finition M1 maintenant car cette vis V sera retir e plus tard 16 2 Placer une barre de finition de toit N1 droite de la barre de
24. ut up You must schedule enough time to complete the assembly 5 You cannot leave the solarium unattended if it is not fully assembled even if bolted to the ground 6 A minimum of 3 people is required for a safe assembly of the solarium 7 Follow each instruction carefully to ensure the strength of the solarium 8 To avoid damages to the solarium and its parts use the proper tools Do not use the shelter as a support The use of a ladder is recommended 9 Keep the instruction manual and the parts list in case of future needs or references 10 Do not assemble the solarium in days of wind or rain TOOLS REQUIRED Not included in the box up PREASSEMBLAGE IMPORTANT Ne pas retirer la pellicule protectrice des panneaux de polycarbonate avant leur installation S assurer d exposer le c t prot g contre les rayons UV du soleil vers l ext rieur du solarium Ceci est une proc dure tr s importante sans quoi si elle n est pas suivie telle que d crite le toit ne sera pas couvert par la garantie PLANIFICATION DE L ASSEMBLAGE 1 ll est de la responsabilit du consommateur de se conformer aux r gles de b timent aux r glements limitation de zonage aux ordonnances ou toutes autres restrictions r gionales et d obtenir les permis requis avant l achat de ce produit et d en faire son installation 2 S assurer que toutes les pi ces sont dans la boite avant de d buter l assemblage 3 Certaines piece
25. ws V Repeat these steps with the second identical assembly ASSEMBLAGE tape 4 4 1 Installer les arr ts de porte D1 l int rieur des rails de porte D en utilisant les vis R tel qu illustr 4 2 Installer un loquet de porte Z au cadre B1 tel qu illustr en utilisant les vis V R p ter ces tapes avec le deuxi me montage identique Parts required for this step Pi ces requises pour cette tape V OD 18 19 ASSEMBLY ASSEMBLAGE ai Step 5 5 5 1 Slide a gap cover bar 1 and gap cover bar 02 5 1 Glisser une barre couvre espacement O1 et une barre into the inside upper lip on top of the frame B1 couvre espacement 02 dans la fente int rieure se trouvant as illustrated au dessus du cadre B1 tel qu illustre Repeat these steps with the second R p ter ces tapes avec le deuxieme montage identique identical assembly Parts required for this step Pieces requises pour cette tape 20 21 SZ ASSEMBLY ASSEMBLAGE IMPORTANT This manual install the sliding doors and the door tracks outside of the solarium However you have the option to put the sliding doors and the door tracks inside of the solarium In order to do it you have to install the panel A following the optional ang

Download Pdf Manuals

image

Related Search

Related Contents

HD-SDI Universal DVR User Manual  Samsung Galaxy Mini manual do usuário(CLARO)  MOTO-1 USER MANUAL  LBH150 & LBH150G - Ross & Pethtel, Inc.  

Copyright © All rights reserved.
Failed to retrieve file