Home
        Creation 30 X`Press
         Contents
1.  rev  tement PVC afin d   optimiser la valeur   nerg  tique du sol chauffant    UNDERFLOOR HEATING  floor temperature  lt  28  C   The regulations require   lt  0 15 m  x    Kelvin   Watt    RADIANT ELECTRIC UNDERFLOOR HEATING    Possible    Not recommended    The regulations require   lt  0 15 m  x    Kelvin   Watt    LOW TEMPERATURE WATER REVERSIBLE UNDERFLOOR  HEATING Possible  The regulations require   lt  0 13 m  x    Kelvin   Watt    Please contact us if the substrate is not in this list     SUBSTRATES NOT ALLOWED  NON EXHAUSTIVE LIST     CALCIUM SULPHATE BASED LIQUID SCREED LEVELLED OR NOT IN E2 OR E3 PREMISES    WOODEN SUBSTRATES  FLOORBOARDS ON JOISTS  FLOATING PARQUET  GLUED PARQUET  FLOATING PARTICLE BOARDS  OSB BOARDS  LAMINATES  RUBBER    LAYING ON SOUNDPROOFING OR INSULATING UNDERLAYER  TEXTILE FLOORING  CARPET   LINOLEUM   LINOLEUM WITH BACKING FOAM    TILES AND LVT SNAP TOGETHER PLANKS       IMPORTANT     The information in this document is valid from  01 04 2015 and is subject to change without notice  In the face of continuous technical  improvements  before starting any work  our customers should check with us that this document is still in force     Floor covering laid in temperature regulated premises    TEMPERATURE BETWEEN 15 and 25  C   Acceptable temperature range after installation   10  C to  30  C    Beyond these values  the planks must be entirely glued all over the surface with a glue that is  resistant to high temperatures  and in areas with a gl
2. Gerflor    theflooringroup    LAYING PRINCIPLE  CREATION 30 55 X   PRESS       Before laying the flooring  it is a good idea to inspect it and to  identify any problems with the appearance  If there are visible    defects  please notify GERFLOR and wait to hear from them  before laying the flooring     Ambient temperature Substrate temperature  Min  15   C Min  15   C       1  AREAS OF APPLICATION    CREATION 30 X   PRESS CREATION 55 X   PRESS  KOIERELE PLANKS AND TILES PLANKS AND TILES    DESCRIPTION 4 mm including 0 30 of wear layer 4 mm including 0 55 of wear layer        UPEC  U2SP3 E2 C2 UPEC  U3 P3 E2 C2  UPEC OR EUROPEAN CLASSIFICATION European  23 31 European  32 41  Technical Report request in progress Atex N  2098    AREAS OF USE Please refer to the Material selection guide in GERFLOR   s general catalogue    SUBSTRATES ALLOWED       n case of irregularity  apply a levelling compound  Sand  vacuum carefully and apply a primer   CONCRETE FLOOR  LIQUID SCREEDS  PAINTED Consult glue and primer manufacturers such as Akzo Nobel  Bostik  HB Fuller  F Ball  Mapei   CONCRETE  LEVELLING CONCRETE Uzin  etc  Gerflor recommends that you refer to the technical specifications of these primers for  instructions    n case of irregularity  apply a levelling compound  Sand  dust off  Apply a primer recommended in the  screed   s Technical Report to protect the surface from dust  Consult glue and primer manufacturers  such as Akzo Nobel  Bostik  HB Fuller  F Ball  Mapei  Uzin  etc  Ge
3. azed opening and exposed to direct sunlight     you are recommended to install temperature regulation  air conditioner  or to stop the direct  sunlight  curtains  blinds  reaching the material    Installations in areas close to bay windows or skylights  considerable temperature variation   will require acrylic adhesives such as Gerflor Clim Adhesive or Bostik Power Elastic  In case of a  temperature  gt  50  C  we recommend a two part polyurethane adhesive         lt  200 kg support and  lt  30 kg cm     2  FLOOR PREPARATION       E 2 1  NEW or REFURBISHED substrate requirements   The laying must be done on a flat floor  without any permanent glue or adhesive residue     The flatness of the floor must be  lt  5mm under the 2m rule  3mm under the 2 m rule for toppings   with no uneven areas      Moisture content   lt  4 5  for concrete floors and liquid cement screed and  lt  0 5  for anhydrite screeds and wooden substrates     E 2 2  PREPARATORY WORK ON CONCRETE SUPPORTS    Preparation    The surfaces should be prepared with care so as to remove any soiling  laitance  treatment products or any other foreign body   If the substrate does not meet the requirements  a substrate preparation must be carried out    e With a substrate moisture content of  lt  4 5   the grouting must meet class P3 specifications   Crack treatment    Treat cracks before applying a patching compound if the unevenness is  gt  1 mm or there is a gap of  gt  4 mm   Joint treatment    Contraction joints  Tr
4. e edges  the width of the planks   tiles must  if possible  be the same on both sides    At the ends of rows  the length of the planks   tiles must be greater than 1 3 of a plank    The length of the planks   tiles and the offsets between them must be greater than 1 3 of a plank                 W 3 3  MARKING OUT THE AXIS   Determine the laying direction  the planks should preferably run in the same direction as the light entering the room    Mark a centre line on the floor  dividing the room in two in the laying direction    To ensure that the cuts are the same on each side  mark out the axes so that the cut planks   tiles are  gt  1 3 of their  format in both directions     E 3 4  LAYING PLANKS   TILES  3 4 1  TOOLS    Chalk  chalk line       Ruler  knife  cut resistant gloves  tape measure   30 50 kg roller          3 4 2  LAYING METHOD    3 4 2 1  Basic principle   e Start laying along the longitudinal axis or across the layout    e Pull off the protective paper    e Lay the planks on a clean  dust free surface    e For tiles lay at 90   to each other    e Use the piece cut off from the last plank   tile lif it is  gt  1 3 the length of  the plank   tile  to start the next row        3 4 2 2  Edges 5 mm   Direction of length   width of planks   tiles    T    In standard sections  the border edges must be 5 mm in all places except  for lengths or parts greater than 10m where the edge must be 8 mm  The  gap must be covered by a finishing profile     3 4 2 3  Smoothing   Thi
5. eat joints before applying a patching compound    Construction joints  Similar to cracks  same treatment    Expansion joint  Flush joints  ROMUS profile CJ 20 5 or 3 may be suitable    Expansion joints with overlay profile  The profile is fitted over the flooring and is secured on one side only     3  INSTALLATION       W 3 1  LAYING CONDITIONS   The planks   tiles must be stored in the room in which they are going to be laid for at least 24  hours before laying  minimum ambient temperature 20  C   To avoid major colour differences  or repeated designs  mix the planks   tiles from several different boxes from the same series     The room temperature must be between 15 and 25  C  Beyond or below these temperatures   during installation  the material may contract or dilate over time   For these reasons  installation close to bay windows or skylights  considerable temperature    variation  requires special precautions to be taken  see laying conditions      E 3 2  LAYOUT   Unless otherwise specified in market specific documents  the arrangement of planks   tiles must follow these principles     Each enclosed room must be considered separately      The planks   tiles used in one room must belong to the same batch     The contractor must carefully analyse the plank   tile layout to meet these requirements  The planks   tiles must be  oriented towards the wall with the main window  or lengthwise  In corridors  the planks   tiles must be arranged in the  direction of traffic   At th
6. he skirting is  already installed  GERFLOR recommends fitting a quadrant onto the  wooden skirting to finish the junction between floor and wall     E 4 2  4 2  EXPANSION JOINTS IN SUBSTRATE     Flush joints  ROMUS profile CJ 20 5 or 3 or equivalent may be suitable     Joints with overlay profile  The profile is fitted over the flooring and is  secured on one side only     E 4 3  ENDS    ROMUS sells different types of threshold bars depending on the  required finish type             E 4 4  DOOR FRAMES     Use high leverage gripper shears to cut the planks   tiles    After cutting  it is possible to putty around the door frames  Available  from Gerflor   Mitre shears  Reference   Gerflor  0566  0001       E 4 5  CONNECTION TO ADJACENT ROOMS   To join two rooms with CREATION X PRESS planks   tiles  Gerflor recom   mends installing a door threshold type profile with concealed fixings   covering the edges that were left exposed when the flooring was laid   Various thresholds are available from manufacturers such as ROMUS Z  threshold which caters for materials with different levels     5  FIRST USE       The flooring can be used as soon as it is laid  Do not use rubber feet on your furniture  We recommend manual washing with a very small amount of  water or use of a wet vacuum cleaner to prevent water from penetrating between the joints     6  REPAIRS       If a plank   tile needs to be replaced      The damaged CREATION X   PRESS can be easily removed as the planks   tiles are n
7. ot interlocked     Clean the surface    Replace with a new plank   tile     We recommend keeping a few planks   tiles from the installed series to use as replacements in the future     
8. rflor recommends that you refer to  he technical specifications of these primers for instructions     The floor surface must not have any uneven areas  and the joints must not be recessed  otherwise   TILES ill them with a grouting product  Clean thoroughly and then lay the Creation Xpress planks   tiles   It may be necessary to apply a primer depending on the surface finish of the tiles      RAISED ACCESS FLOO The floor surface must not have any uneven areas and the joints must not be curved  The  0 FOR CREATION 55 application of a primer may be necessary depending on the surface finish     ANHYDRITE SCREED ONLY FOR E1 CLASS PREMISES       The floor covering must be bonded in all places  Thoroughly clean the existing floor  Otherwise  the  FACUENGEEOORS entire flooring will have to be taken up and the substrate prepared from scratch     Creation 30 X Press has only class CEN 31  Creation 55 X Press has only class CEN 32  The floor  PVC FLOORS WITH SOUNDPROOF LAYER  FOAM  covering must be bonded in all places  Thoroughly clean the existing floor  Otherwise  the entire  flooring will have to be taken up and the substrate prepared from scratch     Refer to the Technical Guide for Overlaying asbestos floors available at www gerflor com    The panels must not have any unevenness between them  Parquet nailed onto battens spaced no  more than 0 30 m apart  ventilated  Lining board  19 mm  fixed to nailed and ventilated parquet   Apply primer to the panels     ns pas de recouvrir un
9. s must be done in two passes    e By smoothing them out manually while they are being laid    e By running a  50 kg  smoothing roller over them after they have been laid   Concentrate on the edges and on areas which will be less walked on   Smoothing with a roller has an influence on the adherence of the planks    tiles over time     E 3 5  CUTTING  PROCEDURE  TOOLS  ETC     Cutting the edges    Scribing is used for cutting the edges    Position the plank   tile to be cut  remove the protective paper  decora   ive surface visible  on top of the last installed plank tile    Use the entire plank   tile as a template  removing the protective   paper    Place it on top of the plank   tile to be cut  offsetting the plank   tile  rom the wall to leave the required space for the border edge    e Mark the plank   tile to be cut along the edge of the template using a   cutter equipped with a straight blade    e Bend the plank   tile to snap it    e Use the hooked blade to remove the burrs    e Position the plank   tile    e Carefully smooth over the surface with your hand before smoothing  with a roller                                                     4  SPECIAL FEATURES          E 4 1  SKIRTING   If the flooring is laid before the skirting  GERFLOR recommends  Gerflor   s DECOR SKIRTING type skirtings to finish the junction between  floor and wall   Position the skirtings  making sure that they are not applying too much  pressure on the planks   tiles  to allow for dilation   If t
    
Download Pdf Manuals
 
 
    
Related Search
    
Related Contents
academia de bombeiros militar salvamento terrestre cfsd 2014  cronotermostato_rf_portatil  User Guide - - Fedora Documentation    Copyright © All rights reserved. 
   Failed to retrieve file