Home

E6590248

image

Contents

1. Table 1 Wiring Conductor and Tightening Torque JU gatze BZG Tightening Frame Type __ Dimensions of terminals mm buia BERTZE Rear Connected Stud Type Po FIVER ZAKEN Angle steel mounting Panel mounting 40 50 400 500 NJ400F NJ400N NJ400H NJV400F l RARI h NJV400N f lt hood bolt Insulation tube ES ZZ HC HRT bY 600A 800A Table 2 Wiring Conductor and Tightening Torque E EE Bama BARI Ez a PE a Wiring conductor IS Dimensions of terminals mm mm N m kgf cm B if Rear Connected Stud Type RH IN Pv FW INR x IVER Insulation cover Angle steel mounting Panel mounting NJ600F NJ600N NJ600H TAR 600A NJV600F NJV600N 40 50 400 500 M12x40 45 800A HBS 7 Interphase barrier ESA Flush Plate Type RHS Insulation cover ABRIL b Hexagonal head bolt NJ800F NJ800N 800A NJV800F NJV800N 43 600A M12x40 HSU Interphase barrier ad NOTES BE EGOZ Y EGOSIRIK CHL ET The studs of type B and P are assembled and shipped the condition shown in ERHI KPAH the side view figure above EGKK FEJO Terminal block on power side Horizontal direction Zu KIZ OO SIOIEZTO ZZ SEE Terminal block on load side Vertical direction The studs can be turned 90 degrees ie SE ae ta TAN Circuit diagram Line side of
2. E L ZAS ZTO ABICHMROREL ET CTEM GEDREPECET BRRILOR LUBA GOZ ERBESTE SEE ZEZ Lia CBI Y PRRU TS Sls AARE LE ZEREZ Kau CATH LABS EA f O ICB SRA LT H SRB AERA EES Fa TF CARRE EY SU EA i TDEMIERA ORE Es GORO OEE METSI OGZ EO OBORET baaa lea KEA eda TH TIES MBI SBE NPBVET ORRE REO ZERG RO ORRE R TAICHRL TEAL RENY PUZBAL FA GS ASL CHS HEBL TK REL OSARBOP AMIS BSL EZ EZ a RSEHBS B I DBREF LEGAZ MEERET T N OTESESALZE UVR HAL GREEN Ey AFATE tthe BORO TOL HRROBMEOBREL EZ EZ La ONBRERNISRAl BIRSOR EO EE e EZ EZE ORRETZAZ RR EEK ZG ISRNVRELETOT HOK EZERREZ KEE BUR ER TESO PIE ORS PEG ERIS CREME DSW SAFETY PRECAUTIONS Before installation wiring operation maintenance and inspection of the device be sure to read the operating instructions carefully to ensure proper operation Care should be taken that the operating instructions will be furnished to the maintenance supervisors of final users Safety precautions items are classified into Warning and Caution Z WARNING CAUTION Even some CAUTION items may also result in a serious accident Turn off the upstream circuit breaker prior to installation removal wiring maintenance or inspection to prevent electric shocks and burns due to short circuit Do not touch two live lines at the same time Earth leakage circuit breaker does not operate even if an electric shock occurs CAUTION Do not use one found damaged or de
3. TOSHIBA 6590248 BEREN EES INSTRUCTION MANUAL g EZA eskar ZEHE RAREN compactNJ GU XR TOSHIBA NO FUSE CIRCUIT BREAKERS EARTH LEAKAGE CIRCUIT BREAKERS SES B SGAE P 400 800AF Rear Connected Stud Type and Flush Plate Type Frames 400A to 800A RE ENCE RA KRIS RESAORG MRTA RUBS RCO KETA PW BERKS GEO E ELS ZEREZ EZ La GOSEA GAU EAE eka zaiei CRBRUET PRRCRTY 22 ZAI Za SRPICTBR lt LEU O COT Se POES AR BAO mI CL TRALT GU ZZ AA ESK PGL gtatEOE ROSKGERERYSTAEDHVST AZE EEE AO ATEKA ee NER peurat WRIC dh gt EAK AA OSU dz O MHH WIL IRER d KURT PURIST EIERE E o TITT lt E Si BBS SMMC ESKERO ZORU ET 2 AMOR MAC RFC SHS ESS LEWC S61 BBL COMME SEEL ECA O HRC HE BVOHSEMDISHALEVEC ESA ha OMT BALK LORE ARS SMR eH ORRBEP TT OTC ES OAACRMOEKBE IDORO RIK ORRI LZ ZEZEN EBA ER DOK ZRSRIIEORR EGU ZEZ O AENOR 1 ROB MALO CHIT EE REDBENBPOW ET OA DAN CAMHOBROSS bO Mag HER LT ZEEN KE GERORIK CHET OZ 8 VAS BRHAZ BEDERE ERE ee ERM CRANE LEWC HSU KK REESE EO DAR ZZ O ARM REM LAMA ESPA RUTH ONY KLEONIELTC HSU BE KLOBTNPSVET ORTH ARE EDEMARE TT OTK FSU RENFOBTOP SWEET O33 GG Uz H ROC ERMPMBARICA SWE DICHMOIUTC E SW BRIZ SERE B d E ORES EOS IOSU ET OAASNTGUNARCOMEEITO ECS ESE d SIRA ZEREZ DRE EEEREN E L ZERURA ZEZ Lia OEI SGS WEDT L DREAN Tb oS L ESL HBR NG tu Guri 5W 27 140 430 900MHz ABO 1 MUA CRE LEWCC HSU EEEREN ZEZ SERES EEZP ZRSER
4. earth leakage circuit breaker tip aot a Ih MATER Overcurrent i a tripping device MERHER H Solid state amplifier TA NBE Test resistor FAKRAY Test button 246 RER Load side PRISER REVASORASA TOSHIBA INDUSTRIAL PRODUCTS SALES CORPORATION 103 0023 9 11 Nihonbashi honcho 4 Chome RRBPRE AAA 4TH 9E1115 AIPRE I Chuo ku Tokyo 103 0023 JAPAN Tel 03 5644 5502 Tel 81 3 5644 5502 URL http www toshiba tips co jp URL http www toshiba tips co jp INB F58980793b JE
5. formed when unpacked Installation electric work maintenance and inspection of the device should be performed by qualified engineers having special knowledge Use the breaker in a range of the rated voltage and current shown on the name plate Or the breaker may malfunction Conductors should be tightened by the torque shown on Table 1 to prevent fire accident a i Make connection on line side and load side in a correct manner Or fire accident may or malfunction may occur Do not install the device in a place of environment with high temperature humidity dust corrosive gases excessive vibration shock etc to prevent fire accidents and malfunction of the device Turn on the handle after a cause is removed when it is interrupted automatically Failure to operate may result in electric shock or burns Make sure that terminals are fully tightened periodically to prevent malfunction Care should be taken to prevent entry of foreign objects such as dust concrete chips iron powder etc or it may result in poor contacts defective release unless it is permitted Do not modify the device unless it is permitted When the device is to be disposed of it should be handled as an industrial waste Do not connect aluminum terminals and conductors to the breaker directly Do not send by portable transceiver ex 5W 27 140 430 e 900MHZz within 1m of this container Or the breaker may malfunction Earth leakage c
6. ircuit breaker does not operate normally when dew is generated Do not use and storage the earth leakage circuit breaker in the place where the temperature change is extreme The product marked CBI Y is a switch which has no overcurrent protective devices The product marked HORI has Go short circuit protection which has no overload protective devices OTHER CAUTIONS Earth leakage circuit breaker cannot measure insulation resistance between R and T or dielectric strength test between R and T Remove the breaker from the circuit before performing the test between lines of the circuit Otherwise the breaker may malfunction If 3 pole ELCB is used in single phase 2 wire line each cable must be connected with phase R and T After completing the wire connection turn on the handle and check the operation by pushing the test button Install the grounding terminal of the electric device surely Press the test button of Earth leakage circuit breaker at least once a month to perform an operation check A breaker equipped with the under voltage tripping device UVR can not be reset while power is not been supplied Detach the accessory cover screw only when you install accessories Refer to accessory instruction manual for their installation Since an enormous electro magnetic force is generated between the conductors when a short circuit is interrupted ensure that the support is adequately rigid Incorrect handli
7. ng of the device may result in death or serious injury Incorrect handling of the device may result in minor injury or physical damage B PRIZE 400A 600A 800A 7 L L Procedure of install 400A 600A 800A Frame d Bilt Rear Connected Stud Type EAZ Flush Plate Type INR IVERfY In case of panel mounting 7 7 VET Incase of angle steel mounting WRT SATZA IAE OIZ e 7 Attach the installation frame GZ Larz OZ BRING FUL AERTS to the panel Attach the breaker Attach the breaker TOKUH ZN LZME EAO L RES BRI MO Tightening torque 5 8 N m i This screw is not appended SEE PEZ i Please prepare it SIOA SIOA For 600A and 800A Frame 400A For 400A Frame installation frame ZZ SEBER GEORGEK EEE EE V Caution g Pay attention to directionality of installation frame for line side and for load side Poy ba Zs SER E Attach the flush plate Bi Connection MEDR BR HOM EEEE I GEL ZZ EE Ray KERMES EEUE SICH TSE SU Sk GRSEGOOEE SPE PZ RS R TEIZ LEZ ESL SGG BEAL GO Mdg CHL ZENE EMER L TCU Refer to Table 1 and Table 2 Wiring Conductor and Tightening Torque for connecting to conductors Be careful not to deform the studs If 3 pole ELCB is used in single phase 2 wire line each cable must be connected with phase R and T After completing the wire connection turn on the handle 739727b b and check the operation by pushing the test button Flush plate f EIR MLM SEK KIL 400A

Download Pdf Manuals

image

Related Search

E6590248

Related Contents

Kenmore Elite 24 cu. ft. Counter-Depth Bottom-Freezer Refrigerator w/ Grab-N-Go Door ENERGY STAR Owner's Manual  HydroClear 8 - Site interministériel sur l`assainissement non collectif    

Copyright © All rights reserved.
Failed to retrieve file