Home
417101376 ClO2 Dosierstationen
Contents
1. 18 to the assembly bracket 16 using M8 x 16 allen screws 19 Fig 5 19 e Lock the MFV 10 into the pipe clamps 18 as illus trated Note the direction of flow e Insert the three o rings delivered with the MFV 10 into the connection slots 21 e Screw the upper swivel nut of the double threaded un ion 20 onto the connecting thread on the input of the MFV 10 and tighten by hand 417101376 ClO2_Dosierstationen doc 43 Rev 1 12 07 ECOLAB ECOLAB Engineering GmbH Fig 5 20 e Readjust the assembly bracket 16 on the pump head so that the double threaded union is unable to cause any stress e Retighten the pump head screws 17 using 8 Nm e Fitthe swivel nut 24 of the elbow _ 5 21 connection 25 onto the return con e nection 23 of the multi function valve 10 e Screw the threaded union for the dos ing line 22 onto the output 26 of the MFV 10 5 1 5 Metering Valve Fig 5 23 e Lay the PTFE metering pipe 6 8 or 12 2 16 from the MFV output to the dosing point Fig 5 24 e Attach the metering valve to the dosing point with the G2 fig 5 23 or G34 fig 5 24 thread e Shorten the metering pipe and connect to the metering valve 417101376 ClO2_Dosierstationen doc 44 Rev 1 12 07 ECOLAB ECOLAB Engineering GmbH 5 1 6 Pump Wiring 5 1 6 1 Power Supply Fig 5 25 e Unscrew and remove the lid of the metering station control Metering gt Station
2. Betrieb der ClO Dosierstation 7 1 Betriebszust nde Schaltausg nge und Alarm Der eingebaute Niveaugeber mit vier Schwimmerschaltern berwacht den F llstand im Tank Abb 7 1 High Level Alarm berf llsicherung HHL oberer Arbeitsf llstand Standby A unterer Arbeitsf llstand Refill Low Level Alarm Leermeldung LL _ Die Schalter f r oberen und unteren Arbeitsf llstand schalten die ClO2 Erzeugungsanlage ein und aus Bei Erreichen des HHL bleibt das Freigabesignal f r die Pumpe Pump Enable erhalten und die CIO Erzeugungsanlage wird ausgeschaltet Die Leermeldung LL schaltet die Pumpe aus und die Freigabe f r die ClO2 Erzeugungsanlage bleibt erhalten Wird der Arbeitsbereich wieder erreicht erlischt der jeweilige Alarm ohne Quittierung automatisch Wird ein Alarm durch den Leckageschalter in der Auffangwanne ausgel st geht die Anlage in den Standby Betrieb Sowohl die ClO2 Erzeugungsanlage als auch die Pumpe wird ausgeschaltet solange das Signal ansteht Nachfolgende Tabelle beschreibt die Anzeigen der Steuerung und die Beschaltung der Ausg nge bei den unterschiedlichen Betriebszust nden FUNKTIONSTABELLE ZUR METERING STATION CONTROL LED Anzeigen Ausg nge Re Alarm LL Refill Standby end e STANDBY FEED Summer Alarm Abb 7 2 Pos Bezeichnung LED berf llsicherung Metering Station Quit Taste Durch Dr cken der Quit Taste wird der Summer und der ext Alarm quittiert Di
3. HHL SN EXTERN gt lt S EES ENABLE ce be HL Refill LL LEAKAGE 10 11 X4 LINE LINE STANDBY INPUT OUTPUT ALARM FEED 230V AC 230V AC 230V AC 38316005 i Ausgabeindex 02 al aie u H Ke 22 11 Z000 Prod a E Power ban m supply EMP For the E60 design the proportioning lock must be activated in the configuration WARNING _ see the E60 manual Link from terminal 20 to terminal 22 417101376 ClO2_Dosierstationen doc 49 Rev 1 12 07 ECOLAB ECOLAB Engineering GmbH 5 1 10 1 External Power Supply Pass the current free feeder over the clamping connection beneath it into the metering station control unit Using the circuit diagram on the inside of the lid as a guide connect to the screw plug terminal X1 terminal positions 1 2 and 3 Pull the terminal board out of the slot to carry out the installation as in 5 1 6 1 fig 5 26 Once the clamping is complete replace the screw plug terminal board and tighten the cable threaded union 5 1 10 2 Product Release for Halox ClO Generator The grey 2 wire cable with the white and brown strand leading from the metering station control unit must be connected to the terminal marked ORP in the Halox ClO control unit There is no need to pay attention to the polarity For specific information on the configuration of the control unit and more information on RE MOTE operation see the instruction manual for the Halox CIO generator If th
4. Uberpr fung des Refill Schwimmers am Niveaugeber Uberpr fung des Standby Schwimmers am Niveaugeber Uberpr fung des HHL und Standby Schwimmers am Niveaugeber Uberpr fung des Standby und Refill Schwimmers am Niveaugeber Uberpr fung des Refill und LL Schwimmers am Niveaugeber Verschraubungen berpr fen Kohlefilter austauschen Rev 1 12 07 ECOLAB ECOLAB Engineering GmbH 10 Zubehor 10 1 Photometer zur Schnellbestimmung von Chlordioxid Photometer fur ClO Cl und Br 415711161 im Plastikkoffer komplett mit einem Satz Reagenz Chemikalien Optik LED Filter I 528nm Batterie 9 V Block Batterie Lebensdauer ca 600 Tests Auto Off Automatische Ger teabschaltung ca 5 Minuten nach der letzten Tastenbet tigung Umgebungsbedingungen 5 40 C 30 90 rel Feuchtigkeit nicht kondensierend Messbereich Chlordioxid 0 1 11 mg l ppm Messtoleranz 0 1 9 mg l 0 1 mg l gt 1 9 3 8 mg l 0 2 mg l gt 3 8 5 7 mg l 0 4 mg l gt 5 7 7 6 mg l 0 6 mg l gt 7 6 11 0 mg l 0 8 mg l Ersatzreagenzien DPD 1 Pufferl sung 15ml 415711162 DPD 1 Reagenz 15ml 415711163 10 2 Kontaktwassermesser Magnetisch Induktiver Durchflussmesser Nennweite Anschluss Nenndurchfluss Untere Messbereichsgrenze Bestell Nr Kontaktabstand DN 20 R 3 4 2 5m 7 h 30I h 11 Imp DN 20 R 3 4 2 5m h 30I h 2l Imp DN 20 R 3 4 2 5m h 30Il h 5 Imp DN 25 R 1 6
5. 1 Auffangwanne Die ClO Dosierstation sollte zusammen mit der HALOX CIO Erzeugungsanlage auf die Auffangwanne gestellt werden Abb 5 1 Abb 5 2 Typ 16 und 54 I h Typ 210 l h Pos Bezeichnung Pos Bezeichnung O Leckageschalter Leitung f r Pumpenfreigabe Pump Enable Gewindeeins tze f r EMP III 6 R cklauf vom Mehrfunktionsventil MFV 3 Adapterplatte fur EMP IV 7 Anschlussverschraubung fur Produktleitung aus der Halox CIO Erzeugungsanlage 4 Steuerung Metering Station Control Leitung f r Produktionsfreigabe Halox ClO gt Erzeugungsanlage Der Aufstellungsort muss folgende Eigenschaften beinhalten e M glichst nahe zur Dosierstelle e Auffangwanne muss auf ebenem Untergrund stehen e Raum ohne direkte Sonneneinstrahlung frostsicher und bel ftbar e Umgebungstemperatur maximal 40 C e Bodenablauf und Sp lwasser zur gefahrlosen Entfernung von bergelaufenen Produkten 417101376_CIO2_Dosierstationen doc 11 Rev 1 12 07 ECOLAB ECOLAB Engineering GmbH 5 1 2 Pumpe Abb 5 3 e Pumpe aus der Originalverpackung entnehmen und auf den Sockel des Beh lters stellen e Montagelocher der Pumpengrundplatte auf die Gewindeeins tze des Sockels bei Typ 210 I h auf die Gewinde der Zwischenplatte ausrichten und mittels mitgelieferter Schrauben M5 x 25 und Beilagscheiben montieren Schrauben nicht mit Gewalt L HINWEIS anziehen Abb 5 4 Bei TYP 210 l h die Schrauben noch nicht fest
6. 12 07 ECOLAB ECOLAB Engineering GmbH 1 General Points This technical manual contains all information required for the installation commissioning maintenance and repair of CIO metering stations Safety warnings and emphases must be observed in all cases 1 1 Standards CIO metering stations comply with the required protection goals The following European standards were used to assess them EN 61000 6 2 EN 61000 6 4 EN 60335 1 EN 12100 1 EN 12100 2 DIN EN 809 1 2 Extent of Warranty The manufacturer only guarantees the operational safety reliability and performance of ClO2 metering stations under the following conditions e All installation connection calibration maintenance and repair work is carried out by qualified and authorized specialists e The CIO metering station is used in accordance with the operating instructions included in the scope of delivery e Only original equipment spare parts must be used for repairs The general warranty and performance conditions of ECOLAB Engineering GmbH also apply 1 3 Contact Address Manufacturer ECOLAB Engineering GmbH Raiffeisenstra e 7 D 83309 Siegsdorf Tel 49 86 62 61 0 Fax 49 86 62 61 235 E mail engineering mailbox ecolab com 417101376_ClO2_Dosierstationen doc Rey 1 12 07 ECOLAB ECOLAB Engineering GmbH Safety 2 1 Safety Information e All connection and repair work that takes place on the CIO metering station may only
7. 25 screws 4 Less 413031023 Washers 4 Multi function valve MEV II III 249243 Suction connection with suction line and floor suction valve Return connection Diaphragm metering pump type EMP Ill 16 l h E60 PVDF FPM 149561 Diaphragm metering pump type EMP III 54 l h E60 PVDF FPM 149761 Diaphragm metering pump type EMP IV 210 l h E60 PVDF FPM 413501720 Pump fastening Multi function valve MFV III IV 250064 417101376 ClO2_Dosierstationen doc 35 Rev 1 12 07 ECOLAB ECOLAB Engineering GmbH 16 l h type 54 l htype 210 l h type Assembly bracket for MFV m g 38316202 M8 x 16 screw 2 p 413031054 Level sensor x 418264038 en Active carbon filter a 417806041 415730060 6 8 PTFE 417400224 10m metering pipe Metering valve 1 2 245037 Metering valve 3 4 283169 Collecting tray Double threaded union 1 1 aps 283165 DK BE Instruction manual 417400259 250076 417101376 417101376_CIO2_Dosierstationen doc 36 Rev 1 12 07 ECOLAB ECOLAB Engineering GmbH 4 Unit Description CIO metering stations were designed specially for dosing chlorine dioxide solution produced by Halox H1000SRE 16l h and 54l h types H2000SRE generators The basic set up consists of a specially coated tank level monitoring with alarms a collecting tray with leak notification and a terminal box with an integrated control unit metering s
8. Benennung Typ 210 l h Art Nr 183162 Saugleitung enth lt EEE HE O Ring 2x Sauganschluss O Ring Bodensaugventil 4170085938 gt O Pumpe enth lt Membrane 84950264 gt gt S y O Schutzmembrane 34950163 TI Saug Druckventil 249074 Mehrfunktionsventil MFV enth lt Membrane 35006004 gt S y O Membrane 35006014 gt SS y O O Ring 417003312 TI O Ring 417003346 TI O Ring 417003326 TI O Ring 3x 417003593 _ __ S Dosierventil enth lt Dosierventil ohne Rohr 249086 TI O Ring 417003590 Schlauch PVC 0 6m Aktivkohlefilter 415730060 zusammen mit Kassettenwechsel Halox sp testens Lo j hrlich Wartungsintervall j hrlich OOS 417101376 ClO2_Dosierstationen doc 26 Rev 1 12 07 ECOLAB ECOLAB Engineering GmbH 8 2 Ersatzteile Siehe Kapitel 3 Lieferumfang Typ 16 Typ 54 Typ 210 _ Verschraubung G2 f r Saugleitung AufAnfrage _Adapterplatte f r Pumpe EMPIV 898316203 Montagewinkel f r MFV WV 1 38316202 Schrauben f r Befestigung MFV III IV 1 413031054 Anschluss G1 f r Dosierleitung IL 250076 WinkelanschlussG1 1 AufAnfrage DoppelverschraubungG1v LL AufAnfrage 417101376_CIO2_Dosierstationen doc 27 Rev 1 12 07 ECOLAB ECOLAB Engineering GmbH 9 Fehler Alarm und Statusmeldungen gt SE CH O K a OI O
9. Chlorine Dioxide Solutions 2 4 1 General Handling Instructions 2 4 1 1 Storage Because of the danger of explosion chlorine dioxide cannot be stored as a gas or aS a con centrated aqueous solution for a long period of time It is therefore only produced for immedi ate usage as a diluted aqueous solution in special chlorine dioxide generators 2 4 1 2 Spillage Leakage Gas Escape and Disposal Douse escaped gas with sprayed water Douse leaked solution with sodium thiosulphate dilute with copious amounts or water and rinse away down the drain 417101376 ClO2_Dosierstationen doc 33 Rev 1 12 07 ECOLAB ECOLAB Engineering GmbH 2 4 1 3 2 4 2 2 4 2 1 2 4 2 2 2 4 3 2 4 4 Fire Chlorine dioxide itself is not combustible but it is an oxidising agent It is subject to explosive decomposition at temperatures of 100 C or higher If fire occurs in the vicinity of the contain ers douse escaped chlorine dioxide gas with sprayed water There are no restrictions on fire extinguishing agents that may be used for fires in the surrounding area Health Protection MAC Value of Chlorine Dioxide Gas MAC value 0 1 ppm ml m or 0 3 mg m Personal Protective Equipment Inhalation protection Respirator mask filter B grey Eye protection Gogogles face mask Hand protection Rubber gloves Other Protective clothing Health Risks Concentrations of chlorine dioxide gas of above 45 mg ClO m cause breathing diffi
10. Einschrankung fur Feuerloschmittel bei Umgebungsbranden Gesundheitsschutz MAK Wert Chlordioxidgas MAK Wert 0 1 ppm ml m bzw 0 3 mg m Pers nliche Schutzausr stung Atemschutz Atemschutzmaske Filter B grau Augenschutz Schutzbrille Gesichtsschutz Handschutz Gummihandschuhe Andere Schutzkleidung Gesundheitsgefahren Eine Chlordioxid Gaskonzentration ber 45 mg CIO m bereitet Atembeschwerden und f hrt zu Reizungen der Schleimh ute und Kopfschmerzen Allgemein ruft Chlordioxid starke Reizerscheinungen im Bereich der Schleimh ute von Augen und Atemorganen hervor Erste Hilfe Mit Chlordioxid oder seiner w ssrigen L sung in Kontakt gekommene Kleidung sofort entfernen Haut mit Seife und viel Wasser gr ndlich waschen Spritzer in die Augen mehrere Minuten unter flie endem Wasser bei gut ge ffnetem Lidspalt aussp len Nach Einatmen von Chlordioxid gt Frischluft absolute Ruhigstellung Horizontallagerung W rmeschutz Umgehend Arzt verst ndigen auch wenn nicht sofort Beschwerden auftreten ggf schneller schonender Transport ins Krankenhaus 417101376_CIO2_Dosierstationen doc 6 Rev 1 12 07 ECOLAB ECOLAB Engineering GmbH 3 Lieferumfang Darstellung Typ16l h Typ54l h Typ 210 Uh Beh lter 34124005 Steuerung Metering Station Control Metering Station 283160 Control Schwimmerschalter f r Leckagemeldung 288521 Eingangsverschraubung 3 8 Zoll 415101969 Eingangsver
11. S ab gt Allgemein Fehler Alarm Statusmeldung Standby blinkt orange Alarm blinkt rot Leckagemeldung durch den Schwimmerschalter in der Auffangwanne Refill blinkt rot Alarm LED aus Standby blinkt rot HHL leuchtet rot Alarm blinkt rot Standby orange HHL leuchtet rot Alarm blinkt rot Standby blinkt rot Refill blinkt rot LL leuchtet rot Alarm blinkt rot Wahrnehmung von Cl oder CIO Gas 417101376_CIO2_Dosierstationen doc Ursache Fl ssigkeit in der Auffangwanne Kontaktunterbrechung in der Leitung des Schwimmerschalters Stellung der Schwimmer bei Bef llung nicht plausibel LL und Standby in oberer Position aber Refill bleibt unten Stellung der Schwimmer bei Bef llung nicht plausibel alle Schwimmer in oberer Position aber Standby bleibt unten Stellung der Schwimmer bei Entnahme nicht plausibel alle Schwimmer in oberer Position aber Standby sinkt nach unten Stellung der Schwimmer bei Entnahme nicht plausibel LL und Standby in oberer Position aber Refill sinkt nach unten Stellung der Schwimmer bei Entnahme nicht plausibel Refill in oberer Position aber LL sinkt nach unten Leckage an einer Verschraubung Kohlefilter besch digt oder Kapazit t ist aufgebraucht 28 Problembehebung Uberpr fung der Auffangwanne und Untersuchung von Dosierstation und Erzeungsanlage auf Undichtigkeiten Uberpr fung der Verbingungsleitung auf Sch den
12. be carried out by authorized specialists e Work on electrical parts must only be conducted once the mains plug has been discon nected e Suitable protective clothing must be worn during maintenance and repair work e Safety regulations covering the handling of chemicals must always be observed 2 2 Emphases In this manual the expressions CAUTION WARNING IMPORTANT and INFORMATION have the following meanings CAUTION Used when failure to follow the operating instructions work instructions prescribed work ing procedures and the like may lead to injuries or accidents WARNING Used when failure to follow the operating instructions work instructions prescribed work ing procedures and the like may lead to damage to equipment di m Used when particular care must be exercised when handling the equipment E Re A Used to indicate an aspect of particular importance 2 3 Special Safety Instructions for Maintenance and Repair Work Repair work may only be carried out once the mains plug has been disconnected that is no power supply may be connected to the equipment CAUTION Mandatory protective clothing protective goggles gloves and apron must be worn during maintenance and repair work on parts that come into contact with hazardous products or when changing the container This is to prevent against chemical burns d IMPOR TANT Only original equipment spare parts must be used for repairs 2 4 Handling Aqueous
13. der Steuerung durch die Verschraubung durchf hren und wie rechts beschrieben auf die Klemmen montieren e Die Uberwurfmutter der Kabelverschraubung wein em f ek ddef S hlie schwarz gt Klemme 7 estziehen und die Front wieder verschlie en blau Se Bei E60 Ausf hrungen muss die Dosiersperre in der Konfiguration aktiviert werden siehe Handbuch EMP E60 d WICHTIG F r die Impulsansteuerung muss die Betriebsart der Pumpe ber das Men von INTERN Werkseinstellung auf EXTERN umgeschaltet werden Abb 5 30 Bei Auslieferung ist die Pumpe gegen das Auslaufen des Getriebe les durch einen dichtenden Verschluss an der Oleinf ll ffnung versehen Vor Inbetriebnahme Verschlussschraube an Oleinf ll ffnung durch die beiliegende Entl ftungsschraube ersetzen 417101376_CIO2_Dosierstationen doc 18 Rev 1 12 07 ECOLAB ECOLAB Engineering GmbH 5 1 7 Aktivkohlefilter Abb 5 31 e Gewinde mit mehreren Lagen Teflonband nicht im Lieferumfang umwickeln und Aktivkohlefilter vorsichtig in das G1 Gewinde des Beh lters schrauben Q Der Einschraubstutzen kann bei zu viel ACHTUNG Kraftaufwand beim Einbau aus dem Kohlefilter brechen Der Aktivkohlefilter ist ein Verschlei teil und wichtig f r den sicheren Betrieb der Anlage Der Filter sollte beim Kassettenwechsel der Halox CIO2 Erzeugungsanlage sp testens aber nach 3 Monaten getauscht werden 5 1 8 Niveaugeber Der Niveaugeber ist bei Ausl
14. eines angeschlossenen Wasserz hlers werden ber das Freigabekabel auf den Pumpeneingang f r Impuls Normsignal und Dosiersperre durchgeschaltet F r andere Ansteuerungsarten z B messwertabh ngig oder manuell m ssen die Signale entsprechend der Bedienungsanleitung f r E60 Dosierpumpen direkt auf die Pumpe gegeben werden oder die interne Betriebsart Werkseinstellung gew hlt werden 417101376_CIO2_Dosierstationen doc 17 Rev 1 12 07 ECOLAB ECOLAB Engineering GmbH 5 1 6 2 1 Typ EMP III Abb 5 28 e Bei Dosierstationen mit Pumpenausf hrung EMP Ill 16 und 54 I h ist das Freigabekabel Pump Enable Kabel aus der Steuerung mit Stecker ausgef hrt e Den Stecker auf den rechten oberen Eingang f r Impuls Normsignal und Dosiersperre auf der Pumpenfront aufstecken und mit der berwurfmutter sichern Bei E60 Ausf hrungen muss die Dosiersperre in der Konfiguration aktiviert werden siehe Handbuch EMP E60 F r die Impulsansteuerung muss die Betriebsart der Pumpe ber das Men von INTERN Werkseinstellung auf EXTERN umgeschaltet werden d WICHTIG 5 1 6 2 2 Typ EMP IV e Frontplatte 27 abnehmen und Platine aus dem ADD ee H Pumpengeh use ziehen damit der AN Klemmenraum zug nglich ist V Die Klemmen k nnen abgesteckt werden e 28 e Mitgelieferte Kabelverschraubung aus dem Beipack der Pumpe am Impulseingang 28 29 einschrauben e Die 3 adrige Leitung Pump Enable Kabel aus
15. function valve is to be carried out in accordance with the supplied manuals Wearing Parts 16l h and 54l h Types 16 I h 54 Uh Maintenance interval ltem no 183160 ltem no 183161 Floor suction valve 249080 Annually Pump consisting of 149561 149761 Annually Diaphragm 34900108 34900110 EEE EK O Suction valve 249474 Pressure valve 249494 Multi function valve 249243 Once twice yearly MFV cassettes but at least four times a year 210 I h Type 210 l h Maintenance interval Item no 183162 eC Suction line consisting of O ring 2x suction connection 417008412 S O ring floor suction valve 417003598 S O Pump consisting of Diaphragm 34950261 Protective diaphragm 34950163 Suction pressure valve 249074 Multi function valve MFV consisting 250064 Annually of Diaphragm 35006004 Diaphragm 35006014 O ring Ars O ring 417003346 TI O ring 417008326 TI O ring 3x 417003593 Ir O Metering valve consisting of Metering valve without pipe 249086 TI O ring 417003590 TI Active carbon filter 415730060 When changing the Halox cas settes but at least four times a year 417101376_CIO2_Dosierstationen doc 55 Rev 1 12 07 ECOLAB ECOLAB Engineering GmbH 8 2 Spare Parts See section 3 Scope of Supply toe er 183160 183161 183162 Floating switch for leakage notification G24 threaded union for suction line TI JL Onrequest Adapter plate for EMP IV
16. h 2l imp DN 20 R 3 4 2 5m h 30l h Sl imp Nominal width connection nominal diameter lower range limit contact clear Part number 419901201 419901202 419901203 DN 25 R 1 6 0m h 70l h 1l imp 419901205 DN 25 R 1 6 0m h 70l h 2l imp 419901206 DN 25 R 1 6 0m h 70l h 5l imp 419901207 DN 40 R 1 10 0m h 100I h 2l imp 419901229 DN 40 R 1 10 0m h 100I h Si imp 419901209 DN 80 flange hole circle 160mm 8 screws 40 0m h 0 8l h 10I imp 10 3 Static Mixer a Length m Material Connections Nominal width 780 mm 283125 inner edge insert to insert Mixer PVC Expansion element PVDF DN25 80 PVC PVDF Complete with pipe clips Mixing pipe DN80 Scope of supply incl fastening clamps and screws 417101376_CIO2_Dosierstationen doc 58 Rev 1 12 07 ECOLAB ECOLAB Engineering GmbH 11 Technical Data 54 Uh 183161 16 I h 50 Hz 54 I h 50 Hz 210 l h 50 Hz at 10 bar 19 I h 60 Hz 64 Uh 60 Hz 252 I h 60 Hz 10 bar connection 417101376 ClO2_Dosierstationen doc 59 Rev 1 12 07 ECOLAB ECOLAB Engineering GmbH 12 Conformity Declaration EG Konformitatserklarung Declaration of Conformity D claration de Conformite ECOLAB Engineering GmbH Postfach 11 64 D 83309 Siegsdorf Name des Herstellers supplier s name nom du fournisseur Anschrift address adresse erkl ren in alleiniger Verant declare under our sole
17. pump 88316203 Assembly bracket for MFV IN 88316202 Screws for fastening MFV II IV 413031054 G1Y4 connection for dosing line po 250076 G14 elbow connection On request_ G14 double threaded union Onrequest 417101376_CIO2_Dosierstationen doc 56 Rev 1 12 07 ECOLAB ECOLAB Engineering GmbH 9 Error Alarm and Status Notifications Error alarm status Troubleshooting notification Standby LED flashes Fluid in the collecting tray Check the collecting tray and in orange alarm flashes vestigate the metering station and red leakage notifica generator for leaks tion from floating Contact interruption in the float Check the connection lead for a in collecting ing switch circuit damage ray Refill LED flashes red Position of the float not feasible Check the refill float on the level alarm LED is out when filling LL and standby up sensor refill remains down Standby LED flashes Position of the float not feasible Check the standby float on the red HHL is lit in red when filling all floats are up but level sensor alarm flashes red standby is down Standby is orange Position of the float not feasible Check the HHL and standby floats HHL is lit in red alarm when tapping all floats are up on the level sensor flashes red but standby moves down Standby flashes red Position of the float not feasible Check the standby and refill floats when tapping LL and standby on the level
18. 0m h 70l h 1l Imp DN 25 R 1 6 0m h 70I h 2l Imp DN 25 R 1 6 0m h 70l h 5l Imp DN 40 R 1 r 10 0m h 100I h 2l Imp DN 40 R 1 10 0m h 100I h 5l Imp DN 50 Flansch Lochkreis 125mm 4 Schrauben 15 0m h 100I h 5l Imp DN 50 Flansch Lochkreis 125mm 4 Schrauben 15 0m h 100I h 101 Imp DN 80 Flansch Lochkreis 160mm 8 Schrauben 40 0m h 0 8l h 10l Imp DN 100 Flansch Lochkreis 220mm 8 Schrauben 60 0m h 1 21 h 10I Imp DN 100 Flansch Lochkreis 220mm 8 Schrauben 60 0m h 1 21 h 20I Imp DN 150 Flansch Lochkreis 240mm 8 Schrauben 150 0m h 2 0l h 25l Imp 10 3 Statischer Mischer L nge 780 mm 283125 N mg Innenkante Einlegteil zu Einlegteil Material Mischer PVC F llk rper PVDF Anschl sse DN25 80 PVC PVDF komplett mit Rohrklemmen Nennweite Mischrohr DN80 Lieferumfang inkl Befestigungsklemmen und Schrauben 417101376_CIO2_Dosierstationen doc 29 Rev 1 12 07 ECOLAB ECOLAB Engineering GmbH 11 Technische Daten 210 Uh 183162 210 l h 50 Hz 252 h 60 Hz Erzeugungsanlage 1715 mm 54 I h 183161 16 I h 50 Hz 54 I h 50 Hz gegen 10 bar 19 l h 60 Hz 64 l h 60 Hz 10 bar Schutzart IP DS au en 417101376 ClO2_Dosierstationen doc 30 G au en Rev 1 12 07 ECOLAB ECOLAB Engineering GmbH 12 Konformitatserklarung EG Konformitatserklarung Declaration of Conformity Declaration de Conformite ECOLAB Engineering GmbH Postfach 1
19. 1 64 D 83309 Siegsdorf supplier s name nom du fournisseur address adresse Name des Herstellers Anschrift declarons sous notre seule responsabilite que le produit declare under our sole responsibility that the product erkl ren in alleiniger Verant wortung dass das Produkt CIO Metering Station 16 l h 10 bar 1 831 60 ClO Metering Station 54 l h 10 bar 1 831 651 CIO Metering Station 210 l h 10 bar 1 831 62 ab Prod Code 14907 to which this declaration relates auquel se refere cette is in conformity with the following declaration est conforme a la standard s or other normative aux norme s ou autre s document s document s normatif s auf das sich diese Erklarung bezieht mit der den folgenden Norm en oder normativen Dokumenten bereinstimmt EN 12100 1 2003 11 EN 60335 1 A11 A1 A12 A2 EN 61000 6 2 2005 08 EN 12100 2 2003 11 EN 61000 6 3 A11 2004 07 DIN EN 809 conformement aux dispositions de directive Gem den Bestimmungen der Richtlinie following the provisions of directive 2006 95 EG 2004 4 08 EG sdorf 03 12 2007 _ Ort und Datum der Ausstellung Name Unterschrift des Befugten Place and date of issue name signature of authorized person Lieu et date nom signature du signataire autorisee D 83313 Sieg 4 1 2001 233 10 2007 417101376 ClO2_Dosierstationen doc 31 Rev 1
20. 24 des _ oF Abb 5 22 Winkelanschlusses 25 auf den e R cklaufanschluss 23 des MFV 10 oe gt montieren 23 24 e Verschraubung f r die Dosierleitung 22 auf den Ausgang 26 des MFV 10 aufschrauben 5 1 5 Dosierventil Abb 5 23 e Dosierrohr PTFE 6 8 bzw 12 2 16 vom Ausgang des MFV zur Dosierstelle verlegen Abb 5 24 e Dosierventil mit Gewinde G12 Abb 5 23 bzw G34 Abb 5 24 an der Dosierstelle montieren e Dosierrohr k rzen und am Dosierventil anschlie en 417101376_CIO2_Dosierstationen doc 16 Rev 1 12 07 ECOLAB ECOLAB Engineering GmbH 5 1 6 Verdrahtung der Pumpe 5 1 6 1 Spannungsversorgung Abb 5 25 Deckel der Steuerung Metering Station Control aufschrauben und abnehmen Metering gt Station gt Control N Abb 5 26 y Das Netzanschlusskabel aus der Pumpe durch die passende Kabelverschraubung auf der Unterseite in das Geh use f hren Schraubsteckklemme X2 4 5 und 6 abziehen und Aderendh lsen wie dargestellt anklemmen BUT 230V AC hi A gelb gr n gt Klemme 4 PE Ai y K blau gt Klemme 5 N e Va schwarz gt Klemme 6 L1 N Abb 5 27 Klemme X2 wieder aufstecken und zur Zugentlastung und Abdichtung die Uberwurfmutter der Klemmverschraubung festziehen 5 1 6 2 Freigabesignal Pump Enable und Impulseingang der Pumpe Die Metering Station Control ist f r eine mengenproportionale Dosierung der Pumpe vorbereitet Impulse
21. ECOLAB ECOLAB Engineering GmbH Bedienungsanleitung Instruction Manual Chlordioxid CIO Dosierstation Chlorine dioxide ClOz Metering Station 16 I h 54 I h 210 I h 417101376_ClO2_Dosierstationen doc Rey 1 12 07 ECOLAB ECOLAB Engineering GmbH Inhaltsverzeichnis 1 AUGEMEINES con sus 4 1 1 NO IE Fe ee eee ce eee ee A erde 4 1 2 Gewahrleislungsumland ee arena ee use een 4 1 3 Kontaktadresse Hersteller eege ege ere EE AE Ee ED 4 2 SIC d EE 5 2 1 SICcherheltshinWelse nen ae ee ee See Ee Ee Eegen 5 2 2 PS EE e ee ee ee ee ee secu een Se nern mae essen eaten 5 2 3 Spezielle Sicherheitshinweise bei Wartungs und Heparaturarbeten eee eee seat nennen 5 2 4 Umgang mit w ssrigen Chlordroxvid L sungen cece eee e eee e ceca eens e eee eaeeeeeeae eat eeeeeaeegsteaeeaneeaes 5 2 4 1 Poemen r ne CC te DEE 5 2 4 1 1 e ne EE 5 2 4 1 2 Ma nahmen bei Versch tten Auslaufen Gasaustritt und Entsorgung 2us2essensenenenennennnnnennenen en en ee nennen 5 2 4 1 3 Wiel ita Wien Dei Brande WEE 6 2 4 2 EEN elek EU EE 6 2 4 2 1 MAK Wern COO kee EE 6 2 4 2 2 PErsonliche SCP Za SIS UUM EE 6 2 4 3 EE TEE 6 2 4 4 ERSTE e IO EE 6 3 Liere ram FANG E 7 4 ICT ALOIS TT ee aa ea ade en a oaa a dane a ea detente 9 4 1 ABER Be E EE 9 4 2 PUTS TU Oo D essen ee 9 4 3 Ausl ntung 210 Vi EE 9 4 4 Ee EE E 10 4 5 Bedien und Anzegeelemente ccc ece cece eee ee ee eee ee eee ene eee EEE EE EEE DEEDES EOE E DEES ESSE EEE EGE SEES S
22. ESE EES 10 5 MOMTAGC 7 Jee Eege 11 5 1 INSTALL a OM EE 11 5 1 1 PU ANON Ann EE 11 512 at tee 12 5 13 SAUGEN UN seen E Ta a Een aa ee ee rer einsehen 12 9 13 1 TYP Io U er An DEE 12 5 1 3 2 TYP 2 10 WEE 13 5 1 4 BUTS TA PUI HONS VENU EE 14 5 1 4 1 Tyo GW OZ SA EE 14 5 1 4 2 WO Ab E E wie sie E E EE E E BERN mia E E E A A E N A E E T SER 15 5 1 5 Riet 16 5 1 6 Verdrahtung der ne 17 5 1 6 1 see E SO dee e E 17 5 1 6 2 Freigabesignal Pump Enable und Impulseingang der Pumpe ssssssssssnssssrrrrsrrrrrrrrrrrrrrsrrrrrrrrrrrrrrrrrrrrr rnnr rne 17 5 1 7 Lage UE 19 5 1 8 MI VEAl QCDSP EE 19 5 1 9 le TE 20 5 1 10 Externe elektrische Anschl SSe EE 21 5 1 10 Externe Spannungsversor ung EE 22 5 1 10 2 Produktionsfreigabe f r die Halox CiO Erzeugungsanlage cece cece eee eee eee ee teeta eee eee nennen nennen nennen nen 22 5 1 10 3 Wasserzahlereingang ausg nge cece ese e ene cece eee e een n ene EEE EEE EEE E ESSE SEEDS AEDS EDS trr rrr SEE SG EE Sa SE SSE GSE EGE ESSE ES 22 fN At BL WE E a E ee Et e At Te E EE 22 9 11 10 Flere s En Le e een RE 22 5 1 10 6 Dosiermengen berwachung mit Ovalradz hler OGM optional ccceeeecceceeeeeeeeeeeseceeeeeeeeaeeeeeeeeeeeaaes 23 6 Ietet de ein Met TE 24 6 1 SE Met ee Een Ce al e TE 24 6 2 BO SS i EE 24 6 3 FS DC UM e WEE 24 7 Betrieb der CIO Dosierstatton NNN NENNEN NENNEN EEN ENNEN NENNEN NEEN NNN 25 7 1 Betriebszust nde Schaltausg nge und Alarm 25 8 NY AT UNG KEE 26 8 1
23. H here F rderleistungen sind m glich bei geringeren Gegendr cken Aktuelle Durchsatzdaten k nnen den Leistungskurven der EMP Pumpen in der Bedienungsanleitung entnommen werden F r den Umgang mit Chlordioxid L sungen m ssen die speziell g ltigen Unfallverh tungs vorschriften beachtet werden Alle Personen die mit den ClO2 Erzeugungs und Dosieranlagen in Ber hrung kommen k nnen m ssen an einer entsprechenden Sicherheitsbelehrung teilgenommen haben Die Bedienungsanleitungen der EMP Dosierpumpen sind als CD im Lieferumfang enthalten Ebenso enthalten ist die Bedienungsanleitung f r das Mehrfunktionsventil HINWEIS F r den einwandfreien Betrieb der Ger te sind alle Anweisungen Sicherheitsvorkehrungen und Wartungsvorgaben zu befolgen 417101376_CIO2_Dosierstationen doc 9 Rev 1 12 07 ECOLAB ECOLAB Engineering GmbH 4 4 Gerateaufbau Abb 4 1 Abb 4 2 Abb 4 3 Typ 16 und 54 I h Typ 210 l h 4 5 Bedien und Anzeigeelemente Abb 4 4 berf llalarm Standby 2 i Leermeldung Standby 5 17 Quit Taste Metering ee Durch Dr cken der Quit Taste wird der Summer und der ext Alarm quittiert d Su Station e 0 Die Alarm LED schaltet von Blink in Dauerlicht Control 417101376_CIO2_Dosierstationen doc 10 Rev 1 12 07 ECOLAB ECOLAB Engineering GmbH Montage Installation 5 1 Installation Nach dem Auspacken Vollst ndigkeit und Unversehrtheit des Materials berpr fen 5 1
24. METERING STATION CONTROL LCD display Outputs Operating state Pump Buzzer alar red Standby ange red ange Leakage Off Off Flashes Off Off Off On red orange Fig 7 2 Overfill protection Bed Standby Refill Emmy Pe _ Pei N Quit key Press the Quit key to acknowledge the buzzer and the external alarm The alarm LED changes from a flashing light to a permanently lit light oo a 2 Q Station gt Control Mos Chlorine dioxide is a strong oxidation agent that can cause serious irritation of the airways if not handled properly We recommend that you do not open the threaded unions on the tank if it contains chlorine dioxide If you do need to open the tank for example to carry out maintenance empty the tank to the greatest extent possible using the pump and fill up with water You must make sure that all personnel use the mandatory personal protective equipment 417101376 ClO2_Dosierstationen doc 53 Rev 1 12 07 ECOLAB ECOLAB Engineering GmbH You must also ensure that all required safety measures are carried out 417101376 ClO2_Dosierstationen doc 54 Rev 1 12 07 ECOLAB ECOLAB Engineering GmbH 8 8 1 2 Maintenance CAUTION All safety information relating to maintenance work must be observed We recommend that you coincide the maintenance runs for the ClO metering station with those of the Halox CIO generator Maintenance work on the pump and multi
25. WET SCM E 26 8 1 1 UK de malo a gi deo a p EE 26 8 1 2 TYP ZEON NEE 26 8 2 EE HEEN 27 9 Fehler Alarm Und Statusmeldungen ENEE ENEE ENEE ENEE ENEE 28 10 ZUDER OR EE 29 10 1 Photometer zur Schnellbestimmung von Chlordioxid ccc cece cece cece eect eee ee ea eee eee eee eeseeseneeeenees 29 10 2 Kontaktwassermesser Magnetisch Induktiver Durchflussmesser cece cece cece cence cease cease eeaees 29 10 3 SE EE Re 29 11 TECHNISCHE DIEN era esse ensure ee 30 12 Konlormilalserklarung russ een ee 31 417101376_CIO2_Dosierstationen doc 2 Rev 1 12 07 ECOLAB ECOLAB Engineering GmbH Table of contents 1 General FO e E 32 1 1 MA CAN E 32 1 2 EE Ee ER 1 3 Contac EE EE eer ee ER 2 EEN 33 2 1 Sale date gn E e EE 33 2 2 ETM te 33 2 3 Special Safety Instructions for Maintenance and Repair Work 33 2 4 Handling Aqueous Chlorine Dioxide Golutons ccc ccc ccc eee e eee e ee eee ence eases eee teat eeeteaeeaeeeneeeeeeaees 33 2 4 1 General Handling MMS UNC U ONS E 33 SE e EE 33 2 4 1 2 Spillage Leakage Gas Escape and Drspoeal ccc ece cece eee eee eee nents eens ene nen nnnnnnnnnnnnnnnnnnnn nenn 33 2 4 1 3 EU 34 2 4 2 Pe el Ubi le OL ON E 34 2 4 2 1 MAC Value of Chlorine Dioxide EE 34 2 4 2 2 Personal Protective EG UI MEN rn eegene Ea 34 2 4 3 ege E E 34 2 4 4 PU KA ee eelere 34 3 SCOPE OF SEENEN 35 4 upi DESCT e e EE 37 4 1 Ee WE e EE 37 4 2 SALE TOS te E 37 4 3 2101A DC e EE 37 4 4 Big WC SO E 38 4 5 Control and Display Elem
26. andby mode 5 1 10 5 Alarm Output Optional In addition to LED displays and the internal buzzer in the metering station control unit there is an output 230V AC for issuing an alarm notification via an acoustic alarm and or flashing light screw plug terminal X3 terminals 7 8 and 9 417101376 ClO2_Dosierstationen doc 50 Rev 1 12 07 ECOLAB ECOLAB Engineering GmbH 5 1 10 6 Metering Quantity Monitoring with Oval Gear Meter OGM Optional In the case of critical metering processes it may be necessary to monitor metering There are various different ways of doing this they are described in the instruction manual for the E60 pumps OGMT US offers a convenient solution The OGM US oval gear meter see accessories can precisely monitor and control the quan tity actually dosed by the pump If this quantity deviates from the target value set on the pump it adjusts the metering output accordingly In the case of the EMP III type 16l h and 54l h the so called dongle box forms the interface for this control loop the EMP IV type 210l h uses an additional PCB see accessories You can use this accessory to convert E60 pumps to E60 pumps For more information see the operating instructions for the relevant E60 pump 417101376 ClO2_Dosierstationen doc 51 Rev 1 12 07 ECOLAB ECOLAB Engineering GmbH 6 Startup 6 1 Halox CIO Generator Feed the product line from the Halox CIO generator to the ta
27. culties and lead to irritation of the mucous membranes and headaches Chlorine dioxide causes considerable irritation to the mucous membranes of the eyes and airways First Aid Immediately remove any clothing that has come into contact with chlorine dioxide or aqueous chlorine dioxide solution and thoroughly wash the skin with soap and copious amounts of wa ter If the solution splashes into the eyes of personnel thoroughly rinse their eyes open under running water for several minutes If chlorine dioxide is inhaled the person in question should immediately be placed in fresh air and remain completely immobile in a horizontal position with protection against loss of heat A doctor should be contacted immediately even if no obvious symptoms emerge If neces sary the person in question should quickly be transported to hospital for checks 417101376 ClO2_Dosierstationen doc 34 Rev 1 12 07 ECOLAB ECOLAB Engineering GmbH 3 Scope of Supply Name _ Mlustration _16 Wh type Container 34124005 Control unit metering station control erch Metering Station 283160 Control Hi D V D 2 O i O HI Floating switch for leak notification 288521 O O O O Ww P E Input threaded union 415101969 Input threaded union 1 2 415102359 H d 283163 DK 283162 DK 283164 me 38316101 415101980 nn 150161 M5 x 20 screws 4 413031022 M5 x
28. d clarons sous notre seule wortung dass das Produkt responsibility that the product responsabilit que le produit CIO Metering Station 16 l h 10 bar 1 831 60 CIO Metering Station 54 l h 10 bar 1 831 61 CIO Metering Station 210 l h 10 bar 1 831 62 ab Prod Code 14907 to which this declaration relates auquel se r f re cette is in conformity with the following declaration est conforme a la standard s or other normative aux norme s ou autre s document s document s normatif s auf das sich diese Erkl rung bezieht mit der den folgenden Norm en oder normativen Dokument en bereinstimmt EN 12100 1 2003 11 EN 60335 1 A11 A1 A12 A2 EN 61000 6 2 2005 08 EN 12100 2 2003 11 EN 61000 6 3 A11 2004 07 DINEN 809 Gem den Bestimmungen following the provisions of der Richtlinie directive 2006 95 EG 2004 108 EG conformement aux dispositions de directive H a D E D 83313 Siegsdort 03 12 2007 Ort und Datum der Ausstellung Name Unterschrift des Befugten lace and date of issue name signature of authorized person P n g p Lieu et date nom signature du signataire autorise 4 1 2001 233 10 2007 417101376 ClO2_Dosierstationen doc 60 Rev 1 12 07
29. e Alarm LED schaltet von Blink in Dauerlicht Chlordioxid ist ein starkes Oxidationsmittel welches ernsthafte Reizungen der Atemwege hervorrufen kann bei nicht sachgem em Umgang Es wird empfohlen die Verschraubungen am Tank nicht zu ffnen wenn sich Chlordioxid darin befindet Sollte ein Offnen erforderlich sein z B zur Wartung so ist der Tank ber die Pumpe so weit wie m glich zu entleeren und mit Wasser wieder aufzuf llen Das Tragen der vorgeschriebenen Schutzausr stung ist sicher zu stellen Die Einhaltung aller notwendigen Sicherheitsvorkehrungen muss gew hrleistet sein 417101376 ClO2_Dosierstationen doc 25 Rev 1 12 07 ECOLAB ECOLAB Engineering GmbH 8 Wartung VORSICHT Alle Sicherheitshinweise zur Durchf hrung von Wartungsarbeiten sind zu beachten 8 1 8 1 1 8 1 2 Es wird empfohlen die Wartungsintervalle f r die ClO2 Dosierstation mit denen der Halox ClO Erzeugungsanlage zusammenzulegen Die Wartungsarbeiten an Pumpe und Mehrfunktionsventil sind gem den mitgelieferten Handb chern durchzuf hren Verschlei teile Typ 16 I h 54 I h Typ pType Benennung 16 I h 54 Uh Wartungsintervall Art Nr 183160 Art Nr 183161 Bodensaugventil 249080 jahrlich Pumpe enthalt 149561 149761 j hrlich Membrane 34900108 34900110 Saugventil 249474 Druckventil 2494904 Aktivkohlefilter 415730060 zusammen mit Kassettenwechsel Halox sp testens Lo j hrlich Typ 210 I h
30. e metering station is in operation the timer on the Halox ClO generator must be set to 0 Minutes per Hour For more information on REMOTE operation see the operating instructions for the Halox CIO gt generator 5 1 10 3 Water Meter Inputs Outputs For quantity based metering in a pressurized line the water counter must be connected to terminal X5 of the metering station control unit in accordance with the circuit diagram on the inside of the lid gt INFORMA Water meters with mechanical reed contact and electrical Hall sensor flow monitoring TION can be connected The pulses are passed to the pump via water meter output 3 X8 terminals 19 and 20 along with the pump enable signal There are two further outputs for recording consumption data for example on screw plug terminals X6 and X7 5 1 10 4 External Enable Signal Optional In the delivery state the contact is closed by means of a link in the control unit X12 termi nals 30 and 31 In other words an enable signal is present If connecting an external enable function the link must be removed and replaced with a suit able cable 2 x 0 5mm When the external enable signal is removed the metering station control is placed on standby Neither the pump nor the Halox CIO generator can operate in this operating mode The Standby LED flashes orange INFORMA St TION Alarm notifications such as the leakage alarm are still issued in st
31. enance tasks must be observed in order to en sure that the units function correctly 417101376 ClO2_Dosierstationen doc 37 Rev 1 12 07 ECOLAB ECOLAB Engineering GmbH 4 4 Unit Design Fig 4 1 Fig 4 2 Fig 4 3 16l h and 54l h types 210 I h type 4 5 Control and Display Elements Fig 4 4 weng Beggen n e Metering Refill Press the Quit key to acknowledge the e tt buzzer and the external alarm Station em The alarm LED changes from a flashing light to a permanently lit light Control 417101376 ClO2_Dosierstationen doc 38 Rev 1 12 07 ECOLAB ECOLAB Engineering GmbH Assembly Installation 5 1 Installation After unpacking the unit check that it is complete and undamaged 5 1 1 Collecting Tray The CIO metering station should be placed onto the collecting tray along with the HALOX CIO generator Fig 5 1 Fig 5 2 16l h and 54l h types 210 l h type Pos Name Pos Name Leakage switch Pump enable lead Thread inserts for EMP Ill 6 Return line from multi functional valve MFV 3 Adapter plate for EMP IV Connection fitting for product line from Halox ClO generator Metering station control 8 Halox ClO generator product release lead The installation location must have the following characteristics e Be situated as near as possible to the metering point e The collecting tray must stand on a flat surface e The room must be protected against direct sun
32. ents us are nee 38 5 ASSEMDIN INSTALL a ON ME 39 5 1 INSTALL deu WEE 39 5 1 1 Collec A ER EE 39 5 12 PUD EE 40 5 1 3 CNG eu LIE ee ee eee a eee teen ae eee ae oe ese ee ae meted 40 5 1 3 1 Eent EH SAH E TEE 40 9 1 9 2 VO ET dE 41 5 1 4 MUU FUNC LON WAU EE 42 5 1 4 1 TG AN SAT E E E en Dee T T 42 5 1 4 2 2 OO Ee ee ee 43 Soleo ue ee NV AN EE 44 5 1 6 PUA Tele D 45 5 1 6 1 POWER OY ee 45 5 1 6 2 Pump Enable Signal and Pump Pulse Inpu sr ae ae aan 45 5 1 7 POC TING ae Te EE 47 5 1 8 Level On OT e en ot aig en see tematic neces oats ae basset lone ee teas as ede een ee 47 5 1 9 OAK AOC E 48 5 1 10 External Blecinical e tege EE 49 Bde JE ge HR Ge e E 50 5 1 10 2 Product Release for Halox CIO Generator 50 5 1 10 3 Water Meter Inputs OUl e 50 5 1 10 4 Exteral Enable e Et ee CC EE 50 iba Paar iO UO Eege 50 5 1 10 6 Metering Quantity Monitoring with Oval Gear Meter OGM Optional cccccccccceeseeeeeeeeceeeeeeeeeeeeeeeeeeeaees 51 6 ST AULD E 52 6 1 SE He e ELE e ee ee ee 52 6 2 ClO gt Metering AO EE 52 6 3 FS ll E 52 7 Operating the CIO Metering Gtatton NENNEN 53 7 1 Operating States Relay Outputs and Alarm 53 8 MAILNLEMANCEe E 55 8 1 Ed lafe KEE 55 8 1 1 TEL Hand DI EE 55 8 1 2 210 WA VDE ne ee ee neueren 55 8 2 SD EE 56 9 Error Alarm and Status Notifications uuuuuuuununnnunnnnnunnunnnununnunnnunnnnnnnnuunnunnnunnnnnnn 57 10 TC COS EE EE 58 10 1 Photometer for Quick Measurement of Chlorine Diox
33. esigns the proportioning lock must be activated in the configuration d IMPOR see the EMP E60 handbook TANT For pulse triggering the operating mode of the pump must be changed from INTERNAL factory setting to EXTERNAL using the menu 5 1 6 2 2 EMP IV Type e Remove the front plate 27 and pull the PCB out Fig 9 29 of the pump housing so that you can access the i terminal cavity The terminals can be disconnected 2 e Screw the supplied cable threaded union from the separate pump pack to the pulse input 28 29 e Thread the 3 wire lead pump enable cable from the control unit through the threaded union and at tach to the terminals as illustrated to the right e Tighten the swivel nut of the cable threaded union and replace the front plate White gt Terminal 6 Black gt Terminal 7 Blue gt Terminal 8 In the case of E60 designs the proportioning lock must be activated in the configuration d IMPOR see the EMP E60 handbook For pulse triggering the operating mode of the pump must be changed from INTERNAL factory setting to EXTERNAL using the menu Upon delivery the pump is protected against transmission oil leakage by means of a seal on the oil fill aperture Before initial operation Replace the sealing plug on the oil WARNING fill aperture with the supplied bleeder plug 417101376 ClO2_Dosierstationen doc 46 Rev 1 12 07 ECOLAB ECOLAB Engineering GmbH 5 1 7 Act
34. ght of the alarm LED changes to a permanently lit light and the buzzer switches off The CIO metering station is now automatically filled with CIO solution from the Halox ClO generator in accordance with the fill level 417101376 ClO2_Dosierstationen doc 52 Rev 1 12 07 ECOLAB ECOLAB Engineering GmbH 7 Operating the CIO Metering Station 7 1 Operating States Relay Outputs and Alarm The integrated level sensor output with four floating switches monitors the fill level in the tank Fig 7 1 High level alarm overfill protection HHL Upper operating fill level Standby Lower operating fill level Refill Low level alarm empty notification LL _ The switches for the upper and lower operating fill level switch the CIO generator on and off When the high level alarm level is reached the enable signal for the pump pump enable is sustained and the CIO generator is switched off The empty notification LL switches the pump off and sustains the enable signal for the CIO generator When the working level is re established the alarm goes off automatically without requiring acknowledgement If an alarm is triggered by the leakage switch in the collecting tray the system switches to standby mode Both the CIO generator and the pump are switched off for the duration of the signal The table below explains the control unit indicators and the output circuit for the various oper ating states FUNCTION TABLE FOR
35. gt Control Ke Fig 5 26 e Thread the mains power supply cable from the pump through the relevant cable threaded union on the bottom and into the housing e Pull out the X2 4 5 and 6 screw plug terminal and clamp on the cable end sleeves as illustrated Yellow and green gt Terminal 4 PE Blue gt Terminal 5 N Black gt Terminal 6 L1 Fig 5 27 e Clip terminal X2 back on and tighten the swivel nut of the clamping connection to provide pull relief and sealing 5 1 6 2 Pump Enable Signal and Pump Pulse Input The metering station control is primed for quantity based pump metering Pulses are passed from the connected water meter via the enable lead to the pump input for pulse and standard signals and the proportioning lock For other control types for example based on measured values or manual the signals must be passed directly to the pump or the internal operating mode factory setting must be se lected in accordance with the instruction manual for E60 metering pumps 417101376 ClO2_Dosierstationen doc 45 Rev 1 12 07 ECOLAB ECOLAB Engineering GmbH 5 1 6 2 1 EMP IlI Type Fig 5 28 e Inthe case of metering stations with EMP III pumps 16l h and 54l h types the pump enable cable is connected to the control unit with a plug e Attach the plug to the top right hand input for the pulse standard signal and proportioning lock and se cure using the swivel lock In the case of E60 d
36. ide cece ccc cece cee ee cece cence eee eaee eee eeeenees 58 10 2 Contact Water Meter Magnetic Inductive Flow Meier 58 10 3 SEs LUCA Nb E 58 11 BE Zei iv ee e E 59 12 COnlormity Declaration sense nee chen 60 417101376_CIO2_Dosierstationen doc 3 Rev 1 12 07 ECOLAB ECOLAB Engineering GmbH 1 Allgemeines Dieses Technische Handbuch enth lt alle Anweisungen zur Installation Inbetriebnahme Wartung und Reparatur der CIO Dosierstationen Die Sicherheitshinweise und Hervorhebungen sind in jedem Fall zu beachten 1 1 Normen Die ClO2 Dosiersstationen halten die geforderten Schutzziele ein Zur Beurteilung wurden folgende europ ische Normen angewendet EN 61000 6 2 EN 61000 6 4 EN 60335 1 EN 12100 1 EN 12100 2 DIN EN 809 1 2 Gew hrleistungsumfang Gew hrleistung in Bezug auf Betriebssicherheit Zuverl ssigkeit und Leistung der CIO gt Dosierstationen wird vom Hersteller nur unter folgenden Bedingungen bernommen e Montage Anschluss Einstellung Wartung und Reparatur werden von autorisiertem und geschultem Fachpersonal durchgef hrt e Die ClO Dosierstation wird entsprechend den Ausf hrungen der im Lieferumfang enthaltenen Bedienungsanleitungen verwendet e Bei Reparaturen d rfen nur Original Ersatzteile verwendet werden Im brigen gelten die allgemeinen Garantie und Leistungsbedingungen der Fa ECOLAB Engineering GmbH 1 3 Kontaktadresse Hersteller ECOLAB Engineering GmbH Raiffeisens
37. ieferung noch nicht in den Beh lter eingebaut um Transportsch den durch freies Schwingen im Tank zu vermeiden Es empfiehlt sich dennoch die Funktion der vier Schwimmer vor dem Einbau zu testen um Fehlfunktionen bei der Inbetriebnahme ausschlie en zu k nnen Zur Vorbereitung der Pr fung Stecker an die Metering Station Control anschlie en und Niveaugeber horizontal ablegen Simulation der Schaltzust nde vergleiche Funktionstabelle 7 1 durch Verschieben der Schwimmer mit der Hand Zur Pr fung muss die Metering Station Control vor bergehend an Netzspannung 230V 50 oder 60 Hz angeschlossen werden 5 1 10 1 Nach der Pr fung die Metering Station Control von der Netzversorgung trennen den Stecker des Niveaugebers von der Steuerung abstecken und den Niveaugeber wie folgt einbauen e Gewinde mit mehreren Lagen Teflonband umwickeln Die Schwimmer vorsichtig durch die Offnung des G1 Gewindes in den Beh lter f hren Abb 5 33 e Den Kopf mit der Hand fest einschrauben Abb 5 34 e Stecker an der Unterseite der Steuerung einstecken und mit der berwurfmutter sichern Abb 5 35 417101376_CIO2_Dosierstationen doc 19 Rev 1 12 07 ECOLAB ECOLAB Engineering GmbH Abb 5 33 Abb 5 34 Abb 5 35 5 1 9 Leckageschalter Die Funktion des Leckageschalters kann wie der Niveaugeber vor dem Einbau berpr ft werden Hierf r wird wieder die Netzversorgung der Metering Station Control ben tigt weiter mit 5 1 10 1 Wird de
38. ile erfolgt analog zur Rucklaufleitung 13 e Alle Uberwurfmuttern mit der Hand festziehen 417101376 ClO2_Dosierstationen doc 14 Abb 5 15 Rev 1 12 07 ECOLAB ECOLAB Engineering GmbH 5 1 4 2 Typ 210 I h Abb 5 16 e Den zweiten mit der Pumpe mitgelieferten O Ring in die Nut des Druckventils 9 oben einsetzen Abb 5 17 e Die zwei oberen und die zwei unteren Schrauben 17 am Pumpenkopf ca 4 mm herausdrehen e Den Montagewinkel 16 f r das MFV mit den Schl ssell chern ber die Schraubenk pfe einh ngen Abb 5 18 e Doppelverschraubung 20 2 x G14 auf das Druckventil 9 aufschrauben e Mehrfunktionsventil MFV 10 auspacken und beigelegte Rohrschellen 18 mit Imbusschrauben 19 M8 x 16 auf den Montagewinkel 16 montieren Abb 5 19 e MFV 10 in dargestellter Lage in die Rohrschellen 18 einrasten Durchflussrichtung beachten e Die drei beim MFV 10 mitgelieferten O Ringe in die Nuten der Anschlusse 21 einsetzen e Obere Uberwurfmutter der Doppelverschraubung 20 auf das Anschlussgewinde am Eingang des MFV 10 aufschrauben und mit der Hand festziehen 417101376 ClO2_Dosierstationen doc 15 Rev 1 12 07 ECOLAB ECOLAB Engineering GmbH Abb 5 20 e Montagewinkel 16 auf dem Pumpenkopf nachjustieren so dass auf die Doppelverschraubung keine Spannungen wirken e Pumpenkopf Schrauben 17 mit 8 Nm wieder festziehen e berwurfmutter
39. ipe 6 to the tapered part using the clamping ring You should still be able to see about 1 2 mm of pipe below the clamping ring Loosen the lower clamping connection 5 and tighten the suction pipe 6 until the tapered part can be fitted onto the suction valve 1 By hand firmly screw the swivel nut 4 onto the suction valve 1 Abb 5 7 Tighten the lower clamping connection 5 again to seal the suction pipe 6 to the container Suction pipe 5 1 3 2 210 l h Type Fig 5 8 Insert one of the supplied o rings delivered with the pump into the slot on the suction valve 1 below Align the pump suction valve 1 and the suction line insert 8 on top of each other You can use the container threaded union sealing ring 9 to ad just the height Screw on the swivel nut 4 by hand Sealing ring 8 men S Fig 5 9 Then tighten the fastening screws on the pump Cm INFOR Do not use excessive force to tighten MATION the screws 417101376 ClO2_Dosierstationen doc 41 di CE Ge mann u 7 es geg 2 Kc Rev 1 12 07 ECOLAB ECOLAB Engineering GmbH 5 1 4 Multi Function Valve 5 1 4 1 16l h and 54l h Types Fig 5 10 e Insert the second of the supplied o rings delivered with the pump into the slot on the pressure valve 9 above Abb 5 11 e The multi function valve 10 MFV is fitted directly to the pressure valve 9 of the metering pump e Insert the supplied o
40. ive Carbon Filter Fig 5 31 e Wrap thread with several layers of Teflon tape not included in the delivery and carefully screw the ac tive carbon filter to the G1 container thread The screw in fitting can break off the Q WARNING _ carbon filter if you use too much force when attaching it The active carbon filter is a wearing part that is important for the safe op eration of the system CAUTION You should replace the filter when changing the cassettes in the Halox CIO generator At the very least the filter should be replaced every 3 months 5 1 8 Level Sensor The level sensor is not fitted in the container when the unit is delivered This is to avoid trans port damage as a result of it swinging freely in the tank We recommend that you test the function of the four floats before fitting the level sensor in order to rule out malfunction when initial operation takes place As preparation for the test connect the plug to the metering station control and place the level sensor in a horizontal position Simulate the switching statuses cf function table 7 1 by mov ing the floats with your hand For the purposes of the test the metering station control unit must be temporarily connected to a 230V 50 or 60 Hz power supply Following the test disconnect the metering station control unit from the mains supply remove the sensor level plug from the control unit and fit the level sensor as follows e Wrap the thread i
41. light frost proof and have a suitable ventila tion system e The ambient temperature must not exceed 40 C e There must be a floor drain and a water supply to enable the elimination of spilled product 417101376 ClO2_Dosierstationen doc 39 Rev 1 12 07 ECOLAB ECOLAB Engineering GmbH 5 1 2 Pump Fig 5 3 e Remove the pump from the original packing and place it onto the container base e Align the assembly holes of the pump s base plate on top of the thread inserts on the base for 2101 h type on top of the thread on the intermediate plate and use the supplied screws M5 x 25 and washers to secure it c INFOR Do not use excessive force to MATION _ tighten the screws Fig 5 4 For 210l h type do not tighten the screws at this point the suction line must be aligned first for more information see 5 1 4 2 210 h Type e Remove the yellow cover caps 1 from the pres sure and suction valve 5 1 3 Suction Line 5 1 3 1 16l h and 54l h Types Tapered part Clamping ring Clamping connection e Insert the supplied o ring of the pump into the slot on the suction valve 1 below e Arrange the swivel nut 1 clamping ring 3 and tapered part 2 on the suction line as illustrated in fig 5 5 417101376 ClO2_Dosierstationen doc 40 Rev 1 12 07 ECOLAB ECOLAB Engineering GmbH Fig 5 6 Push the suction pipe 6 to the stop point on the tapered part Clamp the suction p
42. n nur bei gezogenem Netzstecker bzw in spannungslosem Zustand vorgenommen werden VORSICHT Bei Wartungs und Reparaturarbeiten an Teilen die mit gef hrlichen Produkten in Ber hrung kommen sowie bei Gebindewechsel ist wegen der Ver tzungs gefahr die vorgeschriebene Schutzkleidung Schutzbrille Schutzhandschuhe Sch rze zu tragen di WICHTIG Bei Reparaturen d rfen nur Original Ersatzteile verwendet werden 2 4 Umgang mit w ssrigen Chlordioxid L sungen 2 4 1 Allgemeiner Umgang 2 4 1 1 Lagerung Chlordioxid kann wegen seiner Explosionsgef hrlichkeit weder als Gas noch als konzentrierte w ssrige L sung ber einen l ngeren Zeitraum gelagert werden Es wird daher nur als verd nnte w ssrige L sung in speziellen Chlordioxid Erzeugungsanlagen f r die sofortige Verwendung erzeugt 2 4 1 2 Ma nahmen bei Versch tten Auslaufen Gasaustritt und Entsorgung Ausgetretenes Gas mit Spr hwasser niederschlagen Ausgelaufene L sung mit Natriumthiosulfat L sung bergie en dann mit viel Wasser verd nnen und in die Kanalisation wegsp len 417101376_CIO2_Dosierstationen doc 5 Rev 1 12 07 ECOLAB ECOLAB Engineering GmbH 2 4 1 3 2 4 2 2 4 2 1 2 4 2 2 2 4 3 2 4 4 MaBnahmen bei Branden Chlordioxid selbst ist nicht brennbar wirkt aber brandf rdernd Explosionsartige Zersetzung bei Temperaturen ab 100 C Behalter mit Wasser kuhlen ausgetretenes Chlordioxid Gas mit Spruhwasser niederschlagen Es gibt keine
43. n several layers of Teflon tape Carefully insert the floats into the con tainer through the opening in the G1 thread see fig 5 33 e Screw the cap on tightly by hand see fig 5 34 e Attach the plug to the bottom of the control unit and secure using the swivel nut see fig 5 35 417101376 ClO2_Dosierstationen doc 47 Rev 1 12 07 ECOLAB ECOLAB Engineering GmbH Fig 5 33 Fig 5 34 Fig 5 35 5 1 9 Leakage Switch Like the level sensor the function of the leakage switch can be checked before installation To do so the mains supply of the metering station control is required see 5 1 10 1 lf the float is moved into the upper position the contact opens and the Alarm LED flashes red The Standby LED flashes orange Following the test disconnect the metering station control unit from the mains e Pass the floating switch for the leakage notification through the slot in the collection tray see fig 5 36 right down to the floor e Secure using the cable tie delivered with the unit see figs 5 37 and 5 38 Fig 5 36 Fig 5 37 Fig 5 38 417101376_CIO2_Dosierstationen doc 48 Rev 1 12 07 ECOLAB ECOLAB Engineering GmbH 5 1 10 External Electrical Connections Fig 5 39 Water Meter Water Meter Es 5 m S 3 35 gt 5 8 e SS u lt SE 2 ENABLE DO X SS HHL m WI It REFILL x N J e LEAKAGE ZI verk O
44. ng Station Control f hren Gem Schaltbild auf der Innenseite des Deckels auf die Schraubsteckklemme X1 Klemmenpl tze 1 2 und 3 anschlie en Zur Montage die Klemme vom Steckplatz abziehen analog 5 1 6 1 Bild 5 26 Nach dem Anklemmen Schraubsteckklemme wieder aufstecken und Kabelverschraubung festziehen 5 1 10 2 Produktionsfreigabe fur die Halox ClO2 Erzeugungsanlage Das graue 2 adrige Kabel mit wei er und brauner Litze aus der Metering Station Control muss an die mit ORP gekennzeichneten Klemmen in der Steuereinheit der Halox CIO Erzeugungsanlage angeschossen werden Auf Polarit t muss dabei nicht geachtet werden Die spezifische Konfiguration der Steuerung und weitere Informationen zum REMOTE Betrieb k nnen der Bedienungsanleitung der Halox ClO2 Erzeugungsanlage entnommen werden Wenn die Dosierstation in Betrieb ist muss der Timer der Halox ClO Erzeugungsanlage auf 0 Minutes per Hour gestellt werden WICHTIG n Genaue Informationen zur REMOTE OPERATION Fernbetriebsmodus k nnen den Bedienungsanleitungen f r die Halox ClO2 Erzeugeranlagen entnommen werden 5 1 10 3 Wasserz hlereingang ausg nge F r die mengenproportionale Dosierung in eine unter Druck stehende Leitung ist der Wasserzahler gem Schaltplan auf der Deckel Innenseite auf die Klemme X5 der Metering Station Control anzuschlie en Wasserz hler mit mechanischer Reed Kontakt und elektronischer Hallsensor HINWEIS D
45. nk and connect to the threaded union on the container Connect the Halox CIO generator to the power supply Carry out all first initial operation and operating processes as described in the Halox ClO generator instruction manual Set the generator timer to 0 Minutes per Hour If the metering station is in operation the timer on the Halox CIO generator must be set to 0 Minutes per Hour For more information on REMOTE operation see the operating instructions for the Halox CIO generators 6 2 CIO Metering Station Check that all threaded unions on the container are secure and tight When starting up the EMP III EMP IV pump proceed in accordance with the supplied E60 instruction manual For control types other than quantity based metering for example based on measured val amp INFORMA ues or manual the signals have to be passed directly to the pump or you have to change TION from external to internal operating mode For more information see the relevant section of the E60 metering pump instruction manual 6 3 First Filling Connect the CIO metering station to the power supply Once the mains supply voltage is applied the metering station control unit immediately passes into the LL Alarm operating state because of a lack of product It issues an enable signal to the CIO generator for filling The alarm notification can be acknowledged straight away As a result the red flashing li
46. osierprozessen kann eine Uberwachung der Dosierung notwendig sein Es gibt verschiedene Ma nahmen die dazu geeignet sind und in der Bedienunganleitung der E60 Pumpen beschriebenen werden Eine konfortable L sung bietet der OGM Mit dem Ovalradz hler OGM US s Zubeh r kann die von der Pumpe tats chlich dosierte Menge exakt berwacht und geregelt werden Bei Abweichungen zu einem an der Pumpe eingestellten Sollwert wird ihre Dosierleistung entsprechend nachgeregelt Die Schnittstelle dieses Regelkreises bildet bei der EMP III 16 und 54 I h die sogenannte Dongle Box und bei der EMP IV 210 I h eine Zusatzplatine s Zubeh r Mit diesem Zubeh r k nnen die E60 Pumpen zu Ee US Pumpen erweitert werden Weitere Informationen k nnen den Bedienungsanleitungen der entsprechenden E60 Pumpen entnommen werden 417101376_CIO2_Dosierstationen doc 23 Rev 1 12 07 ECOLAB ECOLAB Engineering GmbH 6 Inbetriebnahme 6 1 Halox ClO Erzeugungsanlage Die Produktleitung aus der Halox ClO2 Erzeugungsanlage zum Tank f hren und an der Verschraubung auf dem Beh lter anschlie en Die Halox ClO2 Erzeugungsanlage an die Spannungsversorgung anschlie en Alle Inbetriebnahme und Bedienungsabl ufe befolgen wie sie in der Bedienungsanleitung der Halox ClO2 Erzeugungsanlage beschrieben sind und den Timer der Erzeugungsanlage auf O Minutes per Hour umstellen Wenn die Dosierstation in Betrieb ist muss der Timer der Halo
47. r Schwimmer in die obere Position bewegt ffnet sich der Kontakt und die LED Anzeige Alarm blinkt rot und Standby blinkt orange Nach der Pr fung Metering Station Control wieder vom Netz trennen e Schwimmerschalter f r die Leckagemeldung durch einen ffnungsschlitz der Auffangwanne Abb 5 36 bis zum Boden f hren e Mittels mitgeliefertem Kabelbinder befestigen Abb 5 37 und 5 38 Abb 5 36 Abb 5 37 Abb 5 38 417101376_CIO2_Dosierstationen doc 20 Rev 1 12 07 ECOLAB ECOLAB Engineering GmbH 5 1 10 Externe elektrische Anschlusse Abb 5 39 Water Meter Water Meter a 5 n E x 35 or 2 e Dz O PUMP 5 B ENABLE oO le E WHIS gt ph N BU S e e BK IS eut GY we J E LEAKAGE ZI HHL E Auen EXTERN gt S Vee ENABLE lu HL Refill LL LEAKAGE 10 11 X 4 LINE LINE STANDBY INPUT OUTPUT ALARM FEED BOV AC 230V AC 230V AC 38316005 i Ausgabeindex 02 al aie u H Ke 22 11 2007 Prod CO YN E m Power ban m supply EMP Bei E60 Ausfuhrungen muB die Dosiersperre in der Konfiguration aktiviert werden Siehe Handbuch E60 ACHTUNG Drahtbr cke von Klemme 20 nach 22 417101376_CIO2_Dosierstationen doc 21 Rev 1 12 07 ECOLAB ECOLAB Engineering GmbH 5 1 10 1 Externe Spannungsversorgung Die Netzzuleitung im spannungsfreien Zustand ber die darunter liegende Klemmverschraubung in die Meteri
48. rings into the slots on the MFV connections Fig 5 12 e Fit the 0 6m pipe ID6 AD8 to the return connection 11 on the multi function valve 10 as the return line 13 using the swivel nut 4 clamping ring 3 and tapered part 2 Use the relevant parts from the sepa rate suction line pack Cm INFORMA The MFV tapered part and clamping TION ring are only suitable for an ID6 AD12 PVS pipe Do not use the parts from the separate MFV pack e Attach the other end of the return line 13 to the con tainer connection 14 using the clamping connection 12 Fig 5 13 Container connection swivel nut MFV 10 MEN e Fit the 10m ID6 AD8 pipe to the upper Fig 5 14 connection of the MFV 10 as the dosing line 15 e Position and attach the parts in the same way as for the return line 13 e Tighten all swivel nuts by hand 417101376 ClO2_Dosierstationen doc 42 ECOLAB ECOLAB Engineering GmbH 5 1 4 2 210 I h Type Fig 5 16 e Insert the second of the supplied o rings delivered with the pump into the slot on the pressure valve 9 above Fig 5 17 e Unscrew the two upper and two lower screws 17 on the pump head by around 4mm e Fit the assembly bracket 16 for the MFV by placing the holes over the screw heads Fig 5 18 e Screw the double threaded union 20 2 x G11 4 onto the pressure valve 9 e Unpack the multi function valve 10 and attach the supplied pipe clamps
49. schraubung Ve Zoll Sauganschluss mit Saugleitung und Bodensaugventil R ckf hrungsanschluss 415102359 283163 DK 283162 DK 283164 o 38316101 415101980 nn 150161 Schrauben M 5 x 20 4 St ck 413031022 Schrauben M 5 x 25 4 St ck 413031023 Scheiben 4 St ck D 413501720 Mehrfunktionsventil MFV II 249243 Mehrfunktionsventil m Auslieferungszustand am Beh lter verbaut Membrandosierpumpe Typ EMP III 16 I h E60 PVDF FPM 149561 Membrandosierpumpe Typ EMP Ill 54 l h E60 PVDF FPM 149761 Membrandosierpumpe Typ EMP IV 210 l h E60 PVDF FPM Pumpenbefestigung MFV III IV 250064 417101376_CIO2_Dosierstationen doc 7 Rev 1 12 07 ECOLAB ECOLAB Engineering GmbH Darstellung Typ16l h_ Typ54l h Typ 2101h Montagewinkel f r MFV g 38316202 Schraube M8x16 2 St ck 413031054 Niveaugeber O 418264038 Kabelbinder Aktivkohlefilter a 417806041 415730060 417400224 an k Dosierventil 3 4 Zoll 283169 Auffangwanne 419800478 Doppelverschraubung 1 1 4 sE 283165 DK Pumpenanschluss Lem Bedienungsanleitung 10 m Dosierrohr 6 8 PTFE 10 m Dosierrohr 12 16 PTFE 417400259 Dosierventil 1 2 Zoll 250076 417101376 417101376 _ClO2_Dosierstationen doc Be Rev 1 12 07 ECOLAB ECOLAB Engineering GmbH 4 4 1 4 2 4 3 Geratebeschreibung Die CIO Dosierstationen wurden speziell fur die F rderung
50. sensor are up refill moves down Refill LED flashes red Position of the float not feasible Check the refill and LL floats on LL is lit in red alarm when tapping refill is up LL the level sensor flashes red moves down Cl or CIO gas de Leak on a threaded union Check the threaded unions tected Carbon filter damaged capacity Replace the carbon filter exhausted 5 Cc O O e K OI O UN oO bc eb gt 417101376 ClO2_Dosierstationen doc 57 Rev 1 12 07 ECOLAB ECOLAB Engineering GmbH 10 Accessories 10 1 Photometer for Quick Measurement of Chlorine Dioxide Photometer for CIO Cl and Br 415711161 Delivered in a plastic box complete with a reagent chemicals set Optics LED filter I 528nm Battery 9V block battery lifetime around 600 tests Auto off Automatic switch off of device around 5 minutes after the last key actuation Ambient conditions 5 40 non C 30 90 rel humidity condensating Chlorine dioxide measurement range 0 1 11 mg l ppm Measuring tolerance gt 1 9 gt 3 8 0 1 9 mg l 0 1 mg l 3 8 mg l 0 2 mg l 5 7 mg l 0 4 mg l gt 5 7 7 6 mg l 0 6 mg l gt 7 6 11 0 mg l 0 8 mg l Replacement reagents DPD 1 buffer solution 15ml 415711162 DPD 1 reagent 15ml 415711163 10 2 Contact Water Meter Magnetic Inductive Flow Meter ance DN 20 R 3 4 2 5m h 30I h 1l imp DN 20 R 3 4 2 5m h 30l
51. tation control All components and materials were carefully selected for their safety and chemical resistance The metering performance of the robust reliable EMP pumps conforms to the production rates of the Halox generators This technical manual applies to the 16l h 54l h and 210I h types 4 1 16 l h Design Type 16 doses up to 16 litres 19 litres of ClO solution per hour in pressurized delivery cur rents of up to 10 bar using a EMP III pump 19l h is the capacity of a Halox H1000 or H1000SRE with two cartridges 4 2 54 Uh Design Type 54 doses up to 54 litres 64 litres of ClO solution per hour in pressurized delivery cur rents of up to 10 bar using a EMP III pump 38 l h is the capacity of a Halox H1000 or H1000SRE with four cartridges 4 3 210 l h Design Type 210 doses up to 210 litres 252 litres of ClO solution per hour in pressurized delivery currents of up to 10 bar using a EMP IV pump 246 l h is the capacity of a Halox H2000 or H2000SRE with four cartridges When working with chlorine dioxide you must observe special accident prevention regula tions All persons who come into contact with CIO generators and metering plants must first at tend an appropriate safety briefing The operating instructions for the EMP metering pumps are contained in the delivery on a INFORMA CD The delivery also contains the instruction manual for the multi function valve TION All instructions safety measures and maint
52. tra e 7 D 83309 Siegsdorf Telefon 49 86 62 61 0 Telefax 49 86 62 61 2 35 eMail engineering mailbox ecolab com 417101376_CIO2_Dosierstationen doc 4 Rev 1 12 07 ECOLAB ECOLAB Engineering GmbH Sicherheit 2 1 Sicherheitshinweise e Die Anschluss und Reparaturarbeiten an der ClO Dosierstation d rfen nur von autorisiertem Fachpersonal ausgef hrt werden e Vor allen Arbeiten an elektrischen Teilen unbedingt vom Netz trennen e Bei Wartungs und Reparaturarbeiten ist geeignete Schutzkleidung zu tragen e Die Sicherheitsbestimmungen im Umgang mit Chemikalien sind stets zu beachten 2 2 Hervorhebungen In dieser Bedienungsanleitung haben die Hervorhebungen VORSICHT ACHTUNG WICHTIG und HINWEIS folgende Bedeutung wird benutzt wenn ungenaues Befolgen oder Nichtbefolgen von Bedienungsanweisungen VORSICHT Arbeitsanweisungen vorgeschriebenen Arbeitsablaufen und dergleichen zu Verletzungen oder Unf llen f hren kann ACHTUNG _ Arbeitsanweisungen vorgeschriebenen Arbeitsablaufen und dergleichen zur Besch digung Q wird benutzt wenn ungenaues Befolgen oder Nichtbefolgen von Bedienungsanweisungen des Ger tes f hren kann di WICHTIG wird benutzt wenn auf eine besondere Aufmerksamkeit im Umgang mit dem Gerat geachtet werden muss Le HINWEIS wird benutzt wenn auf eine Besonderheit aufmerksam gemacht werden soll 2 3 Spezielle Sicherheitshinweise bei Wartungs und Reparaturarbeiten Reparaturarbeiten d rfe
53. urchflusserfassung k nnen angeschlossen werden Die Impulse werden ber den Wasserz hlreausgang 3 X8 Klemmen 19 20 zusammen mit dem Pump Enable Signal auf die Pumpe weitergeschaltet An den Schraubsteckklemmen X6 und X7 stehen noch zwei weitere Ausg nge z B f r Verorauchsmengenerfassung zur Verf gung 5 1 10 4 Externes Freigabesignal optional Im Auslieferungszustand ist der Kontakt durch eine Drahtbr cke in der Steuerung geschlossen X12 Klemmen 30 und 31 Es liegt also ein Freigabesignal an Beim Anschlie en einer externen Freigabe muss die Br cke entfernt und durch ein entsprechendes Kabel 2 x 0 5mm ersetzt werden Mit der Wegnahme des externen Freigabesignals wird die Metering Station Control in den otandby Betrieb gesetzt Weder die Pumpe noch die Halox ClO2 Erzeugungsanlage k nnen in diesem Betriebszustand arbeiten Die LED Standby blinkt orange HINWEIS Alarmmeldungen w z B Leckage werden im Standby Betrieb ausgegeben 5 1 10 5 Alarmausgang optional Zus tzlich zur LED Anzeige und zum internen Summer in der Metering Station Control steht ein Ausgang 230V AC f r die Ausgabe der Alarmmeldung an eine Hupe und oder ein Blinklicht zur Verf gung Schraubsteckklemme X3 Klemmen 7 8 und 9 417101376_CIO2_Dosierstationen doc 22 Rev 1 12 07 ECOLAB ECOLAB Engineering GmbH M LUS 5 1 10 6 Dosiermengenuberwachung mit Ovalradzahler OG optional Bei kritischen D
54. verschraubung kann die Hu Hohe ausgeglichen werden vg Uberwurfmutter 4 handfest verschrauben Pos Bezeichnung Dichtring 8 Einlegteil Abb 5 9 e Anschlie end die Befestigungsschrauben der Pumpe festziehen Le HINWEIS Schrauben nicht mit Gewalt anziehen 417101376_CIO2_Dosierstationen doc 13 Rev 1 12 07 ECOLAB ECOLAB Engineering GmbH 5 1 4 Mehrfunktionsventil 5 1 4 1 Typ 16 l h bzw 54 I h Abb 5 10 e Den zweiten mit der Pumpe mitgelieferten O Ring in die Nut des Druckventils 9 oben einsetzen Abb 5 11 e Das Mehrfunktionsventil 10 MFV wird direkt auf das Druckventil 9 der Dosierpumpe montiert e Mitgelieferte O Ringe in die Nuten der Anschl sse am MFV einsetzen Abb 5 12 e Das 0 6 m lange Rohr ID6 AD8 als R cklaufleitung 13 mit berwurfmutter 4 Klemmring 3 und Kegelteil 2 auf den R cklaufanschluss 11 des MFV 10 montieren Es sind die entsprechenden Teile aus dem Beipack der Saugleitung zu verwenden Le HINWEIS _ Kegelteil und Klemmring vom MFV sind nur f r PVC Schlauch ID6 AD12 geeignet Nicht Teile aus Beipack MFV verwenden e Das andere Ende der R cklaufleitung 13 mit der Klemmverschraubung 12 am Beh lteranschluss 14 montieren Abb 5 13 Pos Bezeichnung 2000000000000 Dosierleitung e Das 10 m lange Rohr ID6 AD8 als moet Dosierleitung 15 am oberen Anschluss des MFV 10 montieren e Anordnung und Montage der Te
55. von Chlordioxid L sung produziert aus den Halox Generatoren H1000SRE Typ 16 l h und 54 I h sowie H2000SRE ausgelegt Der Grundaufbau beinhaltet einen speziell beschichteten Tank Nieveauuberwachung mit Alarmmeldungen eine Auffangwanne mit Leckagemeldung sowie einen Klemmenkasten mit integrierter Steuerung Metering Station Control Alle Komponenten und Materialien wurden in Bezug auf Sicherheit und chemische Bestandigkeit sorgfaltig ausgewahlt Robuste und betriebssichere EMP Pumpen entsprechen in Ihrer Dosierleistung den Erzeugungsraten der Halox Anlagen Dieses technische Handbuch beinhaltet die Typen 16 l h 54 l h und 210 I h Ausf hrung 16 l h Typ 16 f rdert pro Stunde bis zu 16 Liter 19 Liter ClO L sung in druckbeaufschlagte bis 10 bar Leitungsstr me mit einer Pumpe der Bauart EMP Ill 19 I n L sung ist die Aussto leistung einer Halox H1000 oder H1000SRE mit zwei Kassetten Ausf hrung 54 l h Typ 54 f rdert pro Stunde bis zu 54 Liter 64 Liter ClO L sung in druckbeaufschlagte bis 10 bar Leitungsstr me mit einer Pumpe der Bauart EMP III 38 l h L sung ist die Aussto leistung einer Halox H1000 oder H1000SRE mit vier Kassetten Ausf hrung 210 l h Typ 210 f rdert pro Stunde bis zu 210 Liter 252 Liter CIO L sung in druckbeaufschlagte bis 10 bar Leitungsstr me mit einer Pumpe der Bauart EMP IV 246 I h L sung ist die Aus stoBleistung einer Halox H2000 oder H2000SRE mit vier Kassetten
56. x ClO2 Erzeugungsanlage auf 0 Minutes per Hour gestellt werden WICHTIG Genaue Informationen zur REMOTE OPERATION Fernbetriebsmodus k nnen den Bedienungsanleitungen f r die Halox ClO Erzeugungsanlagen entnommen werden 6 2 CIO Dosierstation Alle Verschraubungen am Beh lter nochmals auf festen Sitz und Dichtheit pr fen Bei Inbetriebnahme der EMP Ill bzw EMP IV Pumpe entsprechend der mitgelieferten E60 Bedienungsanleitung vorgehen F r andere Ansteuerungsarten als die vorgesehene mengenproportionale Dosierung z B HINWEIS messwertabh ngig oder manuell m ssen die Signale direkt auf die Pumpe gegeben werden oder von externe auf interne Betriebsart gewechselt werden Hierzu bitte die entsprechenden Hinweise der Bedienungsanleitung f r E60 Dosierpumpen beachten 6 3 Erstbef llung Die ClO2 Dosierstation an die Spannungsversorgung anschlie en Bei angelegter Netzspannung geht die Metering Station Control wegen Produktmangel sofort in den Betriebszustand LL Alarm und gibt ein Freigabesignal an die ClO2 Erzeugungs Die Alarmmeldung kann nach dem Auftreten sofort quittiert werden Danach geht das rote Blinklicht der Alarm LED in Dauerlicht ber und der Summer schaltet aus Die ClO Dosierstation wird nun abh ngig vom F llstand automatisch mit ClO2 L6sung aus der Halox CIO Erzeugungsanlage bef llt 417101376_CIO2_Dosierstationen doc 24 Rev 1 12 07 ECOLAB ECOLAB Engineering GmbH
57. ziehen da zuvor die Saugleitung ausgerichtet werden muss siehe 5 1 4 2 Typ 210 I h e Gelbe Abdeckkappen 1 von Saug und Druckventil entfernen 5 1 3 Saugleitung 5 1 3 1 Typ 16 l h bzw 54 I h Pos Bezeichnung Saugventil Kegelteil Uberwurfmutter Klemmverschraubung e Mitgelieferten O Ring der Pumpe in die Nut am Saugventil 1 unten einsetzen e Uberwurfmutter 4 Klemmring 3 und Kegelteil 2 wie in Abbildung 5 5 auf der Saugleitung anordnen 417101376 ClO2_Dosierstationen doc 12 Rev 1 12 07 ECOLAB ECOLAB Engineering GmbH Abb 5 6 Saugrohr 6 m glichst bis Anschlag auf das Kegelteil schieben Saugrohr 6 mit dem Klemmring auf dem Kegelteil festklemmen Unterhalb des Klemmrings sollten noch mindestens 1 2 mm Rohr sichtbar sein Untere Klemmverschraubung 5 lockern und das Saugrohr 6 so weit nachziehen bis das Kegelteil plan auf das Saugventil 1 aufgesetzt werden kann berwurfmutter 4 mit der Hand fest auf das Saugventil 1 aufschrauben Abb 5 7 Die untere Klemmverschraubung 5 wieder festziehen um das Saugrohr 6 zum Beh lter hin abzudichten Bezeichnung Saugrohr 5 1 3 2 Typ 210 I h Abb 5 8 Einen der mit der Pumpe mitgelieferten O Ringe in die Nut am Saugventil 1 unten einsetzen di h q Wet Ba _ 7 es PAT PR Saugventil 1 der Pumpe und Einlegteil 8 der Saugleitung aufeinander ausrichten Uber den Dichtring 9 der Behalter
Download Pdf Manuals
Related Search
Related Contents
KK-8 小型船舶用救命胴衣 Bosch AKE 35-19 S P7 Mobile Hi-Fi SPV 1ère Génération Samsung Galaxy S Ii S2 I9100 16gb Unlocked Gsm Wi-fi Wifi Gps 8mp Android Phone - GT English LUMINARIA SUBACUATICA MOD. KL4Z1202WW Ultron UHS-1 RoofVent® - Navotherm Copyright © All rights reserved.
Failed to retrieve file