Home

Handbuch - ECOLAB Healthcare

image

Contents

1. t 45 93 H oS D 22 150 100 200 250 Cu Rohr 010 mm 300 ww KW Oo o W oe a 5 E 5 E 23 r4 S E Misch Batterie Connection Material and Accessories Connection Material Designation T Union G MS chromium plated brass T Union R R 75 R 4 MS chromium plated brass Copper pipe 10 x 1 chromium plated brass Angled valve G a x D 10 MS chromium plated brass supplied Accessories Designation Adapter 3 4 internal thread R1 2 external thread chromium plated brass Swivel drain outlet length 150 mm Swivel drain outlet length 200 mm Swivel drain outlet length 300 mm Thermal mixer valve unit including screw coupling Conversion kit for restoring the unit to a clearance pipe segment configuration only for to low water pressure up to 0 1 MPa 1 bar Bracket for 10L Can L NOTE If necessary please ask for part numbers together with the spare part drawing separately 417101158_DG1 45 Rev 05 03 13 ECOLAB 10 Dismantling Disposal Dismantling The DG1 Il m ay only be dismantled by specialist personnel Before commencing dismantling ensure that the DG 1 I has been fully isolated from the power supply The device m ust be flushed through with care in
2. 26 1 1 le En ue 26 1 2 Transport damage Unpacking the Device sssrneennnnnnnnennnnnnnnnnnnnnnnnnnnnnnennnnnnnennn nenn nnnn nennen 26 1 3 SCOPE QUarantee a ee non ner 27 1 4 Contact Address Manufacturer nennen 27 2 gp 28 2 1 lu In OEITC 28 2 2 Microbiological examination of decentralized disinfectant dspenserg nennen 28 2 3 General Safety Information ee la 29 2 4 Maintenance and Repair sssi suseso ta naeh QR OR e EXT ea Or ab td Erkunde 29 2 5 Safety measures to be performed by the owner operator sssssee e 29 2 5 1 urhmeneee 30 2 5 2 Qualified PeErSON mL E 30 2 6 Responsibilities of the Owner ttnn rns nns nne nnme sns nn nn nennen enne 30 2 7 System Separallon EE 30 2 8 Emphases Numwberings cce rentre erectae EEN dae qaid e ade essen ren LEERE 31 2 9 EIE 31 2 10 Machine Identification rere na en eet e entren dee aeo e Td nk ad eee ad e E ee dera ae aga 31 3 GS VI TTC 32 4 Functional Description and Operation ssssscssesssssssssssssssssseseeeeeeeeeeesesseeseeeneeees 33 4 1 Description of Display Screen and Operating Controls cccceceeeeeceeececeeeeeeececaeceeeeeeetecsnnaeeeeees 33 5 Connection and Insta
3. sssssssssssee ee 42 8 4 ases 42 9 Technische Daten 44440nnnnnnn nn nnnnnnnnnnnnn nenn nnnnnnnnnnnennnnnnnnnnnnnnnnennnnnnnnnnnnnneen 43 9 1 Allgemeine Daten u 2 aaa ke ae anna 43 9 2 Connection Diagram Cold Water een nee 44 9 3 Connection Diagram Hot Walter eee aene pa FEIER ee engen 45 9 4 Connection Material and Accessories eene nnne nnn nnns 45 10 Dismantling Disposal eee 46 11 Declaration of Conformity su u nee 47 417101158_DG1 25 Rev 05 03 13 ECOLAB General This Operating Manual contains all the information required for the installation start up and maintenance of the DG 1 I disinfectant metering unit The relevant chapters of this manual must be read and noted before installing the device using it for the first time and before carrying out any maintenance or repair work The DG 1 Il is a metering unit for adding disinfectant in order to prepare a ready to use disinfecting solution DG1 EPDM Article No 102410 Metering pump Flow control and Suction pipe with EPDM O Rings Recommended use in connection with products without glucoprotamine DG1 Il SILICONE Article No 1024 Metering pump Flow control and Suction pipe with SILOCONE O Rings Recommended use in connection with products containing glucoprotamine This Operating Manual is a component of the equipment and must be available at all times to the operating and maintenance staff
4. Bei Ger t mit der Artikel Nr 1024 Bei Einsatz von Produkten MIT Glukoprotamin z B INCIDIN PLUS sind die O Ringe auf dem Kolben und Kolbenstange der Dosierpumpe sowie die O Ringe des Str mungsw chters auf EPDM umzur sten Umr stsatz EPDM auf Anfrage Q ACHTUNG Bei Ger t mit der Artikel Nr 102410 Bei Einsatz von Produkten OHNE Glukoprotamin ist zu empfehlen die O Ringe auf dem Kolben und Kolbenstange der Dosierpumpe sowie die O Ringe des Str mungsw chters auf Silikon umzur sten Umr stsatz Silikon auf Anfrage Bei Verwendung des Umr stsatzes ist der beiliegende Aufkleber sichtbar am Dosierger t anzubringen 2 4 Wartung und Reparatur Reparatur und Wartungsarbeiten d rfen grunds tzlich nur von autorisiertem Fachpersonal durchgef hrt werden Bei allen Wartungs und Reparaturarbeiten ist geeignete Schutzausr stung PSA zu tragen A VORSICHT Elektroreparaturen d rfen nur durch Elektrofachkr fte ausgef hrt werden Beim ffnen von Abdeckungen oder Entfernen von Teilen au er wenn dies ohne Werkzeug m glich ist k nnen spannungsf hrende Teile freigelegt werden Auch k nnen Anschlussstellen spannungsf hrend sein d WICHTIG Bei Reparaturen d rfen nur Original Ersatzteile verwendet werden 2 5 Sicherheitsma nahmen vom Betreiber durchzuf hren Es wird darauf hingewiesen dass der Betreiber sein Bedien und Wartungspersonal e ber die Schutzeinrichtungen des Gerate
5. berpr fung der Sicherheitseinrichtungen Folgende Funktionen m ssen berpr ft werden gt Funktion der Niveausauglanze gt Funktion des Str mungsw chter Funktionspr fung der Niveausauglanze Funktionspr fung wie folgt durchf hren Sauglanze aus dem Produktvorratsbeh lter entfernen Nach ca 3 Sekunden muss das Ger t auf St rung gehen rote St rungsanzeige blinkt 417101158_DG1 15 Rev 05 03 13 ECOLAB 6 2 4 6 2 5 Funktionspr fung des Str mungsw chters Funktionspr fung wie folgt durchf hren Haube abnehmen Randelmutter siehe Abb 6 1 Pos 3 am Exzenter entfernen und den kompletten Exzenter von der Exzenteraufnahme des Wassermotors abziehen Taste EIN AUS 1 0 dr cken Das Ger t muss ca 10 Sekunden nach dem Einschalten auf St rung gehen rote LED Dauerlicht Exzenter wieder installieren Taste EIN AUS I 0 zur Entst rung RESET dr cken Taste EIN AUS 1 0 erneut dr cken Ger t dosiert Frischwasserzulauf langsam gegen 0 MPa 0 bar drosseln Das Ger t l st bei Unterschreitung von ca 0 14 MPa 1 4 bar St rung aus rote LED Dauerlicht Frischwasserzulauf wieder ffnen Taste EIN AUS UO zur Entst rung RESET dr cken Haube aufsetzen Umstellung auf ein neues Produkt Bei Produktwechsel m ssen vor Anschluss des neuen Kanisters die Sauglanze die Pumpe und alle produktf hrenden Leitungen gr ndlich mit Wasser durchgesp lt we
6. 417101158_DG1 32 Rev 05 03 13 ECOLAB 4 Functional Description and Operation The DG1 Il is a mixing equipment for disinfectants It is used for the production of a ready to use disinfectant solution The DG1 Il metering unit includes a double action piston metering pump driven by a hydraulic motor The disinfectant is metered proportionally to the water flow rate By means of an eccentric located at the hydraulic motor you can set the concentration of the disinfecting solution to a value between 0 25 and 3 To make sure that the concentration is maintained at its correct value the minimum d IMPORTANT tapping quantity must be 1 liter 4 1 Description of Display Screen and Operating Controls On the front of the DG 1 I is a control panel It has a membrane keypad and an error indicator red LED You use the membrane keypad to operate the unit To start or stop the tapping process press the ON OFF UO switch In case of water shortage or a failure in the unit metering pump defective flow control device defective etc the metering process is stopped immediately After eliminating the cause of the trouble press the 1 0 switch to reset the unit Indicator Green LED Operation standby indicator Fig 3 1 pos 3 Permanent light indicates standby mode Flashing light indicates metering mode Red LED Product shortage and fault indicator Fig 3 1 pos 4 Permanent light indicates a fault Flashing l
7. Bauteil Arbeitsschritt Wartungsintervall Magnetventil Wechsel des Schmutzfilters Jahrlich Verbindungsschlauch Wasser Trennung amp Ausgang Jahrlich Systemtrennung Rohrunterbrecher DB Membrantausch alle 3 Jahre Reparaturhinweise Reparaturhinweise mit Ersatzteillisten und Explosionszeichnungen sind auf Anfrage erhaltlich A VORSICHT Bei Arbeiten an Teilen die mit dem Produkt in Beruhrung kommen sind die entsprechenden Gefahren und Sicherheitshinweise unbedingt zu beachten Es ist geeignete Schutzausristung zu tragen Vor jeglichen Reparaturarbeiten ist das Gerat vom Stromnetz zu trennen Dazu ist der Netzstecker zu ziehen Vor Reparturarbeiten an Produkt und Wasserf hrenden Bauteilen z B Magnetventil muss das Eckventil geschlossen und der Wasserdruck im Gerat abgebaut werden Dazu ist die Taste EIN AUS 1 0 zweimal zu dr cken Q ACHTUNG Es d rfen nur Original Ersatzteile verwendet werden siehe Kapitel 1 3 Gew hrleistungsumfang 417101158_DG1 19 Rev 05 03 13 ECOLAB 9 Technische Daten 9 1 Allgemeine Daten Versorgungsspannung AC 230 V Leistungsaufnahme 15W Schutzart Ger t Steuerung IP 24 IP 65 Schutzklasse Il nach EN 60335 1 Vorsicherung max 16A Betriebsspannung AC 24 V Interne Absicherung Feinsicherung 5 x 20 630 mA Tr ge Wasseranschluss Konusquetschverschraubung NW 10 f r Cu Rohr D 10 x 1
8. Wassereingangstemperatur max 30 C Flie druck min 0 16 MPa 1 6 bar max 0 7 MPa 7 bar Dosierleistung ca 850 l h Gebrauchsverd nnung Konzentrationseinstellung Exzenter wei 0 25 96 1 Exzenter blau 1 5 3 Dosiertoleranz Max 6 Systemtrennung DIN EN 1717 Typ DB Einbauma e Breite 500 mm mit Konsole H he 425 mm Tiefe 200 mm Gewicht 13 5 kg HINWEIS Technische nderungen m ssen wir uns vorbehalten da unsere Produkte einer st ndigen Weiterentwicklung unterliegen 417101158_DG1 20 Rev 05 03 13 ECOLAB 9 2 Anschlussschema Kaltwasser Abb 9 1 La ID peces o 8 o sf 2475 Ei 170 235 63 5 150 200 250 Cu Rohr 210 mm 300 J 260 H aoa 1 T a 2 Ve 2475 2 m 1 bd 170 150 200 250 300 235 Cu Rohr 210 mm 417101158_DG1 21 Rev 05 03 13 ECOLAB 9 3 Anschlussschema Warmwasser Abb 9 2 260 200 Be a BE e A F max R2600 l m me 1 Bi
9. Exzenter Funktionskontrolle Siehe Kapitel 6 2 1 berpr fung der Konzentrationseinstellung Zur Kontrolle der einwandfreien Funktion des Exzenters die Konzentation auf drei verschiedene Werte einstellen und mittels Auslitern berpr fen Bei Abweichung Exzenter Pleuel und ggf komplette Dosierpumpe austauschen Bei eingeschaltetem Ger t auf Konzentrataustritt an Kolbenstange Leistungskontrolle Systemtrennung Rohrunterbrecher DB auf Dichtheit pr fen ierpumpe GC em achten Wenn Konzentrat austritt gt Kolben O Ringe austauschen ggf P 9 Dosierpumpe austauschen Bei eingeschaltetem Gerat Exzenter umfassen Wenn der Wassermotor Wassermotor mit geringem Kraftaufwand angehalten werden kann Wassermotor defekt gt Wassermotor austauschen Gummimembrane ggf Rohrunterbrecher austauschen Sauglanze Funktionspr fung Siehe Kapitel 6 2 3 Funktionspr fung der Niveausauglanze Sauglanze Dichtheitspr fung Becher mit Desinfektionsmittel bis unter die Elektroden der Sauglanze eintauchen wenn die Dosierpumpe Luft ansaugt ist der Schlauch in der Sauglanze defekt gt Sauglanze bzw Schlauch austauschen Schmutzf nger Abb 3 3 Pos 7 Betroffene Schmutzf nger verschmutzt Magnetventilschmutzf nger Siebe der entsprechenden Schmutzf nger ausbauen und reinigen berwurfmutter des Schr gsitzfilters l sen Empfehlungen zum Austausch von Verschlei teilen
10. Repair instructions including spare parts lists and exploded views you can get on request A CAUTION For any work on parts which come in contact with the product the corresponding hazard information and safety instructions must be observed at all times Always wear suitable protective equipment Before carrying out any repair work make sure to disconnect the metering unit from the mains To do so pull the mains plug out of the wall outlet Before performing any repair work on parts which come in contact with the product and or with water e g solenoid valve make sure that the angled valve is closed and that the water pressure inside the unit is down To do so press the ON OFF l 0 switch twice wD ATTENTION Only original spare parts may be used see chapter 1 3 Scope of guarantee 417101158_DG1 42 Rev 05 03 13 ECOLAB 9 Technische Daten 9 1 Allgemeine Daten Supply voltage AC 230 V Power consumption 15W Protection of metering unit control unit IP 24 IP 65 Protection class Il according to EN 60335 1 Superposed fuse max 16A Operating voltage AC 24 V Internal fuse protection Microfuse 5 x 20 630 mA slow blow Water connection Conical coupling NW 10 for copper pipe D 10x1 Water supply temperature max 30 C Flow pressure min 0 16 MPa 1 6 bar max 0 7 MPa 7 bar Metering capacity approx 850 l h dilution for norma
11. ho first maintenance session or the period between two consecutive maintenance sessions must not exceed 12 months 8 1 Microbiological examination of decentralized disinfectant dispensers Ka Ka Unscrew nut from S spout of unit and remove aerator The outside of outlet has to be to disinfected with an alcoholic surface disinfectant Incidin Liquid Incides N or to treated with a flame After flow of approx 1 liter collect at least minimum 1 liter of disinfectant solution from the device in a sterile sampling container Note 1L is the minimum amount to be drawn see also note on the device Neutralizing agents must only be added after recommended contact time for the relevant use concentration of disinfectant against bacteria and yeast see product label Appropriate neutralizers chemical composition and concentration can be selected and validated according to EN 13727 ort the Standard Methods of DGHM VAH or be asked from the disinfectant manufacturer Neutralizing agent must be sterile Sample has to be investigated in a microbiological laboratory by filtration method for total microbial count Ideally this value is determined per 1 ml per 10ml and per 100 ml A refrigerated transport 4 C in lightproof containers is desirable it is mandatory to transport the samples within 3 hours of sample collection The treatment of the sample should be completed 2 to 3 hours after taking out During the assessment proc
12. ist auf die Einhaltung der geltenden nationalen Vorschriften VDE 0100 und rtlichen Vorschriften zu achten Der im DG1 Il integrierte Netztrafo versorgt das gesamte Ger t mit Spannung Die Absicherung des Ger tes erfolgt durch eine Schmelzsicherung auf der Platine 630 mA tr ge und mittels einer Thermosicherung im Trafo Zum Anschluss an die Stromversorung ist das DG1 mit einer 2 4 m langen Netzleitung mit Stecker ausger stet Die Netzleitung kann bei Bedarf in das Geh use zur ckgezogen werden eer t d CS HINWEIS Falls erforderlich kann die Netzleitung an die linke Gehauseseite verlegt werden siehe Kapitel 5 4 Verlegung Sauglanze und Netzleitung an die linke Gehauseseite 5 4 Verlegung Sauglanze und Netzleitung an die linke Geh useseite Sauglanze und Netzleitung wie folgt an die linke Geh useseite verlegen Die Haube siehe Abb 3 1 Pos 1 abnehmen Dazu m ssen die zwei Deckelschrauben siehe Abb 3 1 Pos 8 entfernt werden Haube zum abnehmen anheben Die Schlauchschelle l sen die berwurfmutter siehe Abb 3 2 Pos 10 von der Sauglanze abschrauben und die Sauglanze zusammen mit der Saugleitung und dem Anschlusskabel aus dem Geh use ziehen Die Netzkabeldurchf hrung aus der Halterung ziehen und gemeinsam mit der Netzleitung in das Geh use zur ckziehen Die Abdeckplatte an der linken Geh useseite entfernen x Die Durchf hrung an der rechten Gehauseseite mit de
13. 2475 360 425 t 45 93 H oS D 22 150 100 200 250 Cu Rohr 010 mm 300 ww KW Oo o W 9 5 e a 5 E 5 s 23 r4 S E Misch Batterie 9 4 Anschlussmaterial und Zubehor Anschlussmaterial Bezeichnung T St ck G MS verchromt T St ck R 34 R 2 R 34 MS verchromt Kupferrohr 10x1 verchromt Eckventil G a x D 10 MS verchromt im Beipack Zubeh r Bezeichnung Adapter 3 4 Innengewinde R1 2 Aussengewinde MS verchromt Schwenkauslauf 150 mm lang Schwenkauslauf 200 mm lang Schwenkauslauf 300 mm lang Thermomischbatterie mit Anschlussverschraubung R ckbausatz auf Freistrecke nur Verwendung bei zu niedrigem Wasserdruck bis 0 1 MPa 1 bar Konsole f r 10L Beh lter mit Ablagefach Ce HINWEIS Artikelnummern bitte gegebenenfalls separat mit der Ersatzteilzeichnung anfordern 417101158_DG1 22 Rev 05 03 13 ECOLAB 10 Demontage Entsorgung Demontage Die Demontage darf nur vom Fachpersonal durchgef hrt werden Achten Sie darauf dass vor Beginn der Demontagearbeiten das DG1 I komplett von der Stromversorgung getrennt wurde Das DG1 Il muss sorgf ltig durchgesp lt werden um Chemie
14. 55 Disinfectant quantity to be set according to the above formula K x VW 0 55 x 8 000 44 24 ml D 100 K 100 055 To check the concentration setting proceed as follows Unscrew the flow control unit from the mixing chamber and seal the mixing chamber opening with the supplied sealing plug Insert the flow control unit into the provided measuring jar and place a bucket below the swivel drain outlet Press the ON OFF UO switch and tap approx 2 3 liters of water Empty the bucket and the measuring jar Insert the flow control unit back into the measuring jar and place the bucket below the swivel drain outlet again Start the unit by pressing the ON OFF 1 0 switch Tap exactly 8 liters of water Switch off the unit press the ON OFF 1 0 switch Read the disinfectant quantity collected in the measuring jar Calculate the concentration according to the above formula If it deviates from the desired concentration plus buffer adjust the setting as described in chapter 6 2 Setting the Concentration Remove sealing plug from mixing chamber opening and screw flow control device in again Checking the Safety Equipment A check of the safety equipment obligatory includes the following test procedures functional test of the level suction pipe functional test of the flow control device Functional Check of the Level Suction Pipe For the functional test of the suction pipe empty signal devic
15. ERE ices acdeeasiieesedeescdenesscniseceeess 16 7 St rungs berpr fung und beseitigung eeeeeseeeeeeeeeeeeeeeeeen nennen 17 8 Wartungs und Reparaturhinweise eeeeeeeeeeeeeeeeeeenee enne nennen enun nn nenne nennen 18 8 1 Mikrobiologische berpr fung von dezentralen Desinfektionsmittel Dosierger ten 18 8 2 Generelle Warturigsarbelten 3 case cee crga rna Rr na p Ra Rea nae ea Han ae ER 18 8 2 1 lares M 19 8 3 Empfehlungen zum Austausch von Verschleiiellen ene 19 8 4 Reparaturhinweilse 19 9 Technische Daten n44440nn0nnnn nn nnnnnnnnnnnnn nen nnnnnnnnnnnnennnnnnnnnnnnnnnnennnnnnnnnnnnnneen 20 9 1 Allgemeine Daten een ke ee anne 20 9 2 Anschlussschema Kaltwasser 444000004444nnnnnnnanennnnnnnnnnnnnannnnnnnnnnnnnnnannnnnnnnnnnnnsnannnnnnn nnn 21 9 3 Anschlussschema Warmwasser eene nennen nene eren e nnne renre nnne n nn 22 9 4 Anschlussmaterial und Zubeb r eren nene rere r enn n nennen nennen 22 10 NN e E Ae Un E 23 11 Konformit tserklarung e0ue iana eaaa aana a aeaa Nan K aiana Kanae E Ea 24 417101158_DG1 2 Rev 05 03 13 ECOLAB Allgemeines Diese Betriebsanleitung enthalt alle Anweisungen zur Installation Einstellung Inbetriebnahme Wartung und Reparatur des Desinfektionsmittel Dosiergerates DG 1 Il
16. The safety information contained therein must be observed In the event the equipment is resold the Operating Manual must always be supplied with it NOTE The German chapters of this manual constitute the ORIGINAL OPERATING INSTRUCTIONS and take legal precedence All other languages are translations of the ORIGINAL OPERATING INSTRUCTIONS If you have questions please contact us as outlined in chapter 1 4 Contact address manufacturer 1 1 1 2 EBS Article numbers Within this operating instruction article numbers and EBS numbers are represented EBS numbers are Ecolab internal article numbers and used only concern internal Transport damage Unpacking the Device When removing the DG 1 I from its box make sure that you do not rest the device on its lower side since this can damage the dosing pipe that protrudes from the connection for the swivel spout QD ATTENTION If transport damage is discovered at the time of unpacking the DG1 Il unit may not be installed The carrier in question must be notified immediately and a damage confirmation slip must be requested A copy of the damage confirmation slip must be sent to Ecolab Engineering GmbH immediately CAUTION 417101158 DG1 26 Rev 05 03 13 ECOLAB 1 3 Scope of guarantee The manufacturer only guarantees the operational safety reliability and performance of the DG1 Il under the following conditions e The installation connection setti
17. Vor der Installation der Inbetriebnahme und vor allen Wartungs bzw Reparaturarbeiten m ssen die einschl gigen Kapitel des Handbuches gelesen und beachtet werden Das DG 1 Il ist ein Zumischgerat f r Desinfektionsmittel Es dient zur Herstellung einer gebrauchsfertigen Desinfektionsmittell sung DG1 II EPDM Artikel Nr 102410 Dosierpumpe Str mungsw chter und Schwenksauglanze mit EPDM O Ringen best ckt Empfohlene Verwendung in Verbindung mit glukoprotaminhaltigen Produkten DG1 II SILIKON Artikel Nr 1024 Dosierpumpe Str mungsw chter und Schwenksauglanze mit Silikon O Ringen best ckt Empfohlene Verwendung in Verbindung mit glukoprotamin freien Produkten Diese Betriebsanleitung ist Bestandteil der Anlage und muss f r das Bedien und Wartungspersonal jederzeit zur Verf gung stehen Die darin enthaltenen Sicherheitshinweise sind zu beachten Bei einem Weiterverkauf der Anlage ist die Betriebsanleitung immer mitzuliefern HINWEIS Bei den deutschsprachigen Kapiteln dieser Anleitung handelt es sich um die ORIGINALBETRIEBSANLEITUNG die rechtlich relevant ist Alle anderen Sprachen sind bersetzungen der ORIGINALBETRIEBSANLEITUNG Bitte diese Anleitung sorgf ltig lesen und als Referenz f r Bedienung und Service aufbewahren Bei Fragen kontaktieren Sie uns bitte wie in Kapitel 1 4 Kontaktadresse angegeben 1 1 1 2 EBS Nummernreihe Innerhalb dieser Betriebsanleitung werden sowohl Artikelnummern als a
18. evetag xxxn pud enu pue ex cuu pus reni gp exe eux pude cem py eee cepa eu opua Ac e Ce ERE ERRS 7 2 8 Hervorhebungen Aufz hlungen cecccceceecceeeeeeneeeeeneneeseeseneeseeneeseesaneeceessaceseesaeeeeeseeeeeeeteneeetensaes 8 2 9 Sicherheitssymbole 1 een een 8 2 10 Geratekennzeic hng EE 8 3 PUT DAU pm EE E E A E A A B 9 4 Funktionsbeschreibung und Bedienung uusssssnennnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnn 10 4 1 Beschreibung der Anzeigen und Bedienelemente nn mann 10 5 Montage und Anschluss aaa aaa ee 11 5 1 Wandmontage ernannt 11 5 2 VE UE 12 5 3 Elektrischer Anschlussa 2 2 ee euh eid Aet edad anh anedceaaselddueastaldateeliGvraededeetad 12 5 4 Verlegung Sauglanze und Netzleitung an die linke Geh useseite nnnnnssnnnnnneeesrnrrnrnererrrnrrnnee ee 12 6 Einstellung und Inbetriebnahme uunuunnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnn nun 13 6 1 InbetrlebriablTie rod adi ee en nenne ia need 13 6 2 Einstellung der Konzentration nenn ea 14 6 2 1 berpr fung der Konzentrationseinstellung ANEN 15 6 2 2 berpr fung der Sicherheitseinrichtungen en nnnnnnnnnnnnnnennnnnnnnnnnnnnnnnnnnnnnnnnn ernennen n nenne enne 15 6 2 3 Funktionspr fung der Niveausauglanze nennen ennt enne nen nnne enne nnns 15 6 2 4 Funktionspr fung des Str mungsw chters sss enne nenne ener nennen eterne enne 16 6 2 5 Umstellung auf em neues Produkt reri itr rtr Er Rr rer EE RREE
19. housing This involves moving the suction lance and the outlet for the power cable to the left hand side of the housing The following connection and installation instructions reflect the recommended method The connection and installation method to be used however depends on the actual environmental conditions All local regulations must be adhered to at all times Housing measurements and connection diagram see chapter 9 2 Connection Diagram Cold Water eg chapter 9 3 Connection Diagram Hot Water L NOTE The DG1 Il is designed to be mounted on a wall preferably above or close to a sink The water supply temperature must not exceed 30 C In case of higher water temperatures a thermal mixer valve must be fitted upstream The water flow pressure should be at least 0 16 MPa 1 6 bar and must not exceed 0 7 MPa 7 bar If the water flow pressure is gt 0 4 MPa 4 bar we urgently recommend to fit a pressure governor in the water supply line The supply voltage is 230 V AC Ex works the unit is shipped with the suction pipe and mains cable fitted on the right CS NOTE hand side If required the suction pipe and the mains cable can be shifted to the left hand side of the unit see chapter 5 4 This operation should be carried out before the unit is mounted to the wall Delivery 1 pce swivel drain outlet length 250 mm 1 pce angled valve 1 set of attachment parts 1 pce drilli
20. mains cable attachments in place Fit the suction pipe to the left hand side of the housing 417101158 DG1 35 Rev 05 03 13 ECOLAB 6 Settings and Start Up 6 1 Start Up Le NOTE All item numbers in this section refer to the exploded view unless otherwise stated X qb ATTENTION If products are used which contain glucoprotamine e g INCIDIN PLUS the O rings on the piston and on the piston rod need to be replaced by EPDM O rings After connection and installation work proceed as follows Open the angled valve G to its full open position and check it for tightness Connect the disinfectant supply container as follows swivel suction pipe to front position and insert it into opening of supply container place the supply container onto the bracket Bleed the metering pump as follows unscrew the flow control device see Fig 3 2 pos 18 black coupling nut and place it in a suitable jar Close the opening of the mixing chamber see Fig 3 2 pos 16 by inserting the sealing plug see Fig 3 2 pos 15 unscrew the knurled nut see Fig 6 1 pos 3 and withdraw the eccentric see Fig 6 1 pos 1 from its holder located on the hydraulic motor see Fig 6 1 pos 6 move the connecting rod including the piston rod see Fig 6 1 pos 7 forth and back until disinfectant runs out from the flow control device and no more bubbles are visible in the hoses remove the sealing pl
21. must observe that e Personnel safety Ordinance on Industrial Safety and Health and Accident Prevention Guidelines Workplace Directives e g operating manuals also pursuant to 820 GefStoffV personal protective equipment PPE preventive examinations e the safety of the work equipment protective equipment instructions for work process risks and maintenance e the product condition Safety Data Sheets Register of Hazardous Substances e product disposal the Waste Act e material disposal de commissioning Waste Act e cleaning cleaning agents and disposal e as well as the latest environmental protection requirements In addition the owner must e provide the personal protective equipment PPE Safety footwear safety gloves safety eyewear protective mask protective clothing e guarantee the training of the operating personnel e prepare work procedures Connections Before operating the equipment the owner operator must ensure that local regulations e g for the electrical connection were observed during the assembly and commissioning if this work was carried out by the owner operator himself System Separation The integrated system separation according to DIN EN 1717 prevents the intruding of disinfection fluids into the drinking water pipeline in the case of a vacuum in the water supply line 417101158 DG1 30 Rev 05 03 13 ECOLAB 2 8 Emphases Numberings The emphases indicated here ha
22. repair and disposal The service life of the equipment according to the properly conducted maintenance work is approximately 10 years An audit potentially followed by a general overhaul is required subsequently by the manufacturer or a specialist company Microbiological examination of decentralized disinfectant dispensers The end user is responsible for the proper operation of the dosing device according to the recommended process from the RKI requirements for design features and operation of decentralized disinfectant dispensers Federal Health Bulletin 2004 47 67 72 In the device manual the annual required hygiene technical checks are described in section related to maintenance If the end user requires to test for a situation related hygienic microbiological verification of the dosing device Ecolab suggests the process described in RKI recommendation requirement on hygiene in cleaning and disinfection of surfaces Federal Health Bulletin 2004 47 51 61 Item 4 5 Kindly follow the following process as described in chapter 8 1 Microbiological examination of decentralized disinfectant dispensers 417101158 DG1 28 Rev 05 03 13 ECOLAB 2 3 General Safety Information e Any connection and repair work on the DG 1 Il may only be undertaken by authorised and trained experts e The DG 1 may only be operated with a supply voltage of 230 V AC Work on electrical equipment must above all be undertaken with the ma
23. und Leistungsbedingungen der Firma Ecolab Engineering GmbH 1 4 Kontaktadresse Hersteller Ecolab Engineering GmbH Raiffeisenstra e 7 D 83313 Siegsdorf Telefon 49 86 62 61 0 Telefax 49 86 62 61 2 35 eMail engineering mailbox ecolab com 417101158_DG1 4 Rev 05 03 13 ECOLAB 2 Sicherheit amp b ACHTUNG Das DG1 Il darf nur mit validierten Produkten verwendet werden Bei Verwendung unvalidierter Produkte kann keine Gew hrleistung bernommen werden AA vorsicht Ah Die Sicherheitshinweise und Hervorhebungen sind in jedem Fall zu beachten Q Achtung 2 1 2 2 Bestimmungsgem e Verwendung Das DG 1 I ist ein Zumischgerat fur Desinfektionsmittel Es dient zur Herstellung einer gebrauchsfertigen Desinfektionsmittell sung und wurde ausschlie lich f r die industrielle und gewerbliche Nutzung entwickelt konstruiert und gebaut Eine private Nutzung der Anlage wird ausgeschlossen Zur bestimmungsgem en Verwendung geh ren auch die Einhaltung der vom Hersteller vorgeschriebenen Bedienungs und Betriebsanweisungen sowie die Wartungs und Instandhaltungsbedingungen Die Lebensdauer des Dosierger tes betr gt in Abh ngigkeit zu den ordnungsgem durchgef hrten Wartungen ca 10 Jahre Anschlie end ist eine Revision ggf anschlie ende General berholung durch die Herstellerfirma oder eine Fachfirma notwendig Mikrobiologische berpr fung von dezentralen Desinfektionsmittel Dos
24. 0 ml ermittelt Ein gek hlter Transport 4 C in lichtundurchl ssigen Beh ltern ist w nschenswert dies ist bei Transporten gt 3h vorgeschrieben Die Bearbeitung der Probe sollte 2 bis 3 Stunden nach Entnahme erfolgt sein Neben der Anzahl der gefundenen Mikroben ist zur Bewertung auch die gefundene Art der Mikroorganismen zu ber cksichtigen Z B kann das Vorkommen von Sporen bei nicht sporiziden Mitteln nicht als Qualit tsmangel betrachtet werden Generelle Wartungsarbeiten Nach Abschluss der Wartungsarbeiten sind folgende Arbeiten durchzuf hren Innenpflege des Ger tes Ger teboden reinigen und Kalkr ckst nde entfernen Aussenpflege des Ger tes Haube feucht reinigen trockenreiben und anschlie end mit Edelstahlpfleger z B Chromol behandeln Konsole Kanister Standfl che reinigen Die Wartung des DG1 Il ist gem der nachfolgenden Wartungstabelle siehe Kapitel 8 2 1 Wartungstabelle durchzuf hren 417101158 DG1 18 Rev 05 03 13 ECOLAB 8 2 1 8 3 8 4 Wartungstabelle Gerateteil Wartungsart Pr fkriterium Ausf hrungshinweise Verweise Str mungsw chter Funktionspr fung Dichtheit des Druckhalteventils Siehe Kapitel 6 2 4 Funktionspr fung des Str mungsw chters Str mungsw chter aus Verschraubung l sen wenn Desinfektionsmittelaustritt am Str mungsw chter Str mungsw chter austauschen berpr fung der Konzentrationseinstellung
25. 1 St Schwenkauslauf L nge 250 mm 1 St Eckventil 1 Satz Befestigungsmaterial 1 St Bohrschablone 1 St Technisches Handbuch Wandmontage Q ACHTUNG Je nach Wandbeschaffenheit sind spezielle Befestigungselemente zu verwenden Die Montageh he ist so zu bemessen dass ein Entnahmegef ohne Probleme unter den Ce HINWEIS Schwenkauslauf gestellt werden kann Die Einbauh he von ca 130 cm Unterkante Ger t sollte dabei nicht berschritten werden Unfallgefahr beim Wechseln des Kanisters Die Montage des DG 1 Il ist wie folgt vorzunehmen Mittels Bohrschablone Beipack Bohrl cher f r Ger t und Konsole markieren Angezeichnete L cher bohren Haube siehe Abb 3 1 Pos 1 abnehmen Dazu m ssen die zwei Deckelschrauben siehe Abb 3 1 Pos 8 entfernt werden Haube zum abnehmen anheben Ger t und Konsole an der Wand befestigen 417101158 DG1 11 Rev 05 03 13 ECOLAB 5 2 5 3 Wasseranschluss Eckventil mit integriertem Schmutzsieb ggf unter Verwendung eines T St ckes an den bauseitigen Wasseranschluss anschlie en Verbindungsleitung geeignet Cu Rohr verchromt 10 x 1 zwischen das Eckventil und den Wasseranschluss an der Ger teunterseite verlegen Schwenkauslauf im Beipack an der Ger teunterseite befestigen Elektrischer Anschluss Das Dosierger t darf nur an 230 V Wechselspannung 50 60 Hz angeschlossen werden Beim elektrischen Anschluss des DG1 I
26. 158 Version Revision version review Erstelldatum date of issue 2008 Letzte Anderung last changing 07 03 2013 Copyright Ecolab Engineering GmbH 2013 Alle Rechte vorbehalten All rights reserved Nachdruck auch auszugsweise nur mit Genehmigung der Firma Ecolab Engineering GmbH gestattet Reproduction also in part only with permission of Ecolab Engineering GmbH
27. 2 1 berpr fung der Konzentrationseinstellung berpr fen 417101158_DG1 16 Rev 05 03 13 ECOLAB 7 Storungsuberprufung und beseitigung Nach jedem Abschalten und nach jeder behobenen St rung muss das Ger t durch L HINWEIS Dr cken der Taste EIN AUS 1 0 RESET entst rt werden St rung Ursache Fehlerbehebung Steuerung ohne Funktion keine Lampe leuchtet keine Reaktion auf Tastendruck Versorgungsspannung fehlt Versorgungsspannung sicherstellen Sicherung der Steuereinheit defekt Sicherung erneuern Steuerplatine defekt Steuerplatine austauschen Temperatursicherung des Trafos spricht an Ger t abk hlen lassen Trafo defekt Trafo austauschen Die Taste EIN AUS 1 0 gedr ckt keine Funktion St rungsanzeige blinkt Desinfektionsmittelkanister leer Neuen Kanister anschlie en Sauglanze verschmutzt Sauglanze defekt Fu ventil der Sauglanze reinigen Anschlusskabel der Sauglanze defekt Sauglanze austauschen St rungsanzeige Dauerlicht Dosierpumpe undicht oder defekt Dosierpumpe austauschen Saug und Dosierleitung Schlauchanschl sse undicht Schlauch WasserflieRdruck lt 0 16 MPa 1 6 bar Schlauchschellen anziehen ggf Schlauch austauschen Eckventil defekt Eckventil geschlossen ffnen Wasserflie druck sicherstellen gt 0 16 MPa 1 6 bar Schmutzf nger verstopft Schmutzf nger reinigen ggf austaus
28. D bel Magnetventil Dosierpumpe Rohrunterbrecher 417101158 DG1 Rev 05 03 13 ECOLAB 4 Funktionsbeschreibung und Bedienung Das DG1 II ist ein Zumischger t f r Desinfektionsmittel Es dient zur Herstellung einer gebrauchsfertigen Desinfektionsmittell sung Das DG1 Il arbeitet mit einer doppelwirkenden Kolbendosierpumpe die von einem Wassermotor angetrieben wird Das Desinfektionsmittel wird mengenproportional in das durchflie ende Wasser dosiert Die Konzentration der Desinfektionsmittell sung kann am Exzenter des Wassermotors zwischen 0 25 und 3 96 eingestellt werden d WICHTIG Zur Gewahrleistung der Einhaltung der Konzentration muss die minimale Entnahmemenge 4 1 1 Liter betragen Beschreibung der Anzeigen und Bedienelemente An der Frontseite des DG1 befindet sich das Bedienfeld der Steuerung mit einer Folientastatur sowie einer Betriebsanzeige gr ne LED und einer St rungsanzeige rote LED ber die Folientastur erfolgt die Bedienung des Ger tes Die Entnahme wird gestartet bzw unterbrochen wenn die Taste EIN AUS 1 0 gedr ckt wird Bei Wassermangel oder bei St rung im Ger t Defekt der Dosierpumpe Defekt des Str mungsw chters etc wird die Dosierung sofort unterbrochen Nach Beseitigung der St rungsursache muss die Taste 1 0 zur Entst rung RESET des Ger tes gedr ckt werden Anzeigen Gr ne LED Betriebs Betriebsbe
29. ECOLAB Betriebsanleitung Operating Instruction DG 1 Il 1024 Silikon Art Nr Art no 102410 EPDM Stationares Dosiergerat f r Desinfektionsmittel Stationary Metering Unit for Disinfectants Deutsch English S LZ VAIS 417101158_DG1 Rev 05 03 13 ECOLAB Inhaltsverzeichnis 1 Allgemeines o 3 1 1 EBS N mmertirelle oet pee ar een hene teda nen p e x Ru gn rd ea shan x e e Rh nau d etn Deae 3 1 2 Transportsch den Auspacken eren enne eren nnne nere tren n nnne 3 1 3 Eine D lun e WEE A 1 4 Kontaktadresse Hersteller enne eren nnn nennen rne nnne nmn 4 2 KIIpci ee M 5 2 1 Bestimmungsgem e Verwendung 5 2 2 Mikrobiologische berpr fung von dezentralen Desinfektionsmittel Dosierger ten 5 2 3 Allgemeine Hinweise zur Sicherheit sessi eiiis dann itte dann anne 6 2 4 Wartung und Reparatur etd pedazo ande cvv bed aex yp baee theca y albae d vg leac pie dv pieza b dd Y ta d de 6 2 5 Sicherheitsma nahmen vom Betreiber durchzuf hren ssssssseeeee eee 6 2 5 1 Unterwiesene eren T one 7 2 5 2 glide M 7 2 6 Pflichten des Betrelbers nenne en pa RO ae ex ee pns e RA Ye ee XE EISES 7 2 7 Systemtrennlllg 5 racks eed eem pp cec cinpeg
30. ING to wear protective gloves NOTE Environment symbol identifies environmental safety measures When working in areas that are identified by the symbol shown here it is necessary ON WARNING to wear safety footwear 2 10 Machine identification The correct information is important for all queries e the name amp NOTE e the type e the consecutive serial number of the unit All of this information is required for specific and fast processing For the English version of DG1 ll a corresponding front label can be obtained on request 417101158_DG1 31 Rev 05 03 13 ECOLAB 3 Design Description Cover Mains cable with plug Operation indicator green LED Product shortage and fault indicator red LED ON OFF switch 1 0 Bracket COIN OD ony A Swivel drain outlet Screw 2 x Description Cover Mains cable with plug Operation indicator green LED Product shortage and fault indicator red LED ON OFF switch 1 0 Bracket Swivel drain outlet Screw 2 x Rear housing cover Coupling nut Control unit Suction pipe Hydraulic motor Eccentric concentration setting Mixing chamber Sealing plug Fixing screw Flow control device Dowel Pin Solenoid valve Metering pump Flow interrupter
31. al face seal Hydraulic motor blocked Replace hydraulic motor Coil of solenoid valve defective Replace coil Unit switched OFF swivel drain outlet leaks Solenoid valve soiled or defective Clean solenoid valve replace defective parts Concentration does not reach the set value Metering pump Suction and pressure valves soiled or defective Suction pipe Bottom valve soiled or defective Clean valves replace if necessary Clean bottom valve replace if necessary Water feed pipe soiled Clean strainers in valve and in fresh water supply pipe replace if necessary Hydraulic motor defective Replace hydraulic motor Product shortage monitoring device does not switch the unit off when the product container is empty Suction pipe electrodes soiled or defective connecting cable damaged Replace suction pipe Unit cannot be reset Control PCB defective Replace control PCB 417101158_DG1 40 Rev 05 03 13 ECOLAB 8 Maintenance and Repair Information come into contact with disinfectant The safety regulations which apply for handling chemicals must always be observed Suitable protective equipment must be worn when servicing or repairing parts which A caution To ensure operational safety and correct operation of the DG 1 Il the specified A ATTENTION maintenance intervals must be respected The interval between the installation and the
32. at the product responsabilit que le produit Desinfektionsmitteldosiergerat DG1 Il 1024ff G ltig ab valid from valable d s 26 02 2013 auf das sich diese Erkl rung to which this declaration relates auquel se r f re cette bezieht mit der den folgenden is in conformity with the following d claration est conforme la Norm en oder normativen standard s or other normative aux norme s ou autre s Dokument en bereinstimmt document s document s normatif s EN 12100 EN 60335 1 A11 A1 A12 A2 EN 61000 6 2 EN 61000 6 3 EN 1717 2006 42 EG 2011 65 EG 2004 108 EG Bevollmachtigter f r die Zusammenstellung der technischen Unterlagen Ecolab Engineering GmbH Authorised person for compiling the technical file Postfach 1164 Personne auteris e pour constituer le dossier technique D 83309 Siegsdorf D 83313 Siegsdorf 26 02 2013 Ort und Datum der Ausstellung Name Unterschrift des Befugten Place and date of issue name signature of authorized person Lieu et date nom signature du signataire autoris e Appendix 1 to WI EE RD amp E 04 03 2012 Ce NOTE This declaration of conformity corresponds to the status of this operating instruction Should in the meantime one of those standards be subject of change you can download the latest version here under http www ecolab engineering de uploads media CE 1024ff DG1 pdf 417101158_DG1 47 Rev 05 03 13 Dokumenten Nr document no 417101
33. ation replace eccentric connecting rod and if necessary complete metering pump Metering pump Leak test Hydraulic motor Performance test Backflow preventer Leak test of DB type flow interrupter With the unit running watch for concentrate escaping at the piston rod If yes gt replace piston and O rings or replace the complete metering pump if necessary With the unit switched on grasp the eccentric If it is possible to block the hydraulic motor without applying force Hydraulic motor defective gt replace hydraulic motor Replace rubber diaphragm or flow interrupter if necessary GE See chapter 6 2 3 Functional Check of the Level Suction Pipe Functional test Suction pipe Immerse suction pipe end and electrodes in a beaker filled with Leak test disinfectant if the metering pump sucks air the suction pipe hose is defective replace hose or suction pipe if necessary Strainer Fig 3 3 pos 7 One or more strainers soiled Solenoid valve strainer Remove insets from the affected strainers and clean them Remove the coupling nut from the slanted seat filter Recommendations for the replacement of wearing parts Component Work step Maintenance interval Solenoid valve Exchange of the filter annual Connectinghose Water separation amp outlet annual System separation pipe interrupter DB Exchange of the diaphragm every 3 years Repair Instructions
34. chen Durchflussbegrenzer verkalkt oder verstopft Durchflussbegrenzer reinigen oder austauschen Wassermotor undicht Gleitringdichtung austauschen Wassermotor blockiert Wassermotor austauschen Spule des Magnetventils defekt Spule austauschen Ger t ausgeschaltet Wasseraustritt am Schwenkauslauf Magnetventil verschmutzt oder defekt Magnetventil reinigen defekte Teile austauschen Eingestellte Konzentration wird nicht erreicht Dosierpumpe Saug und Druckventile verschmutzt bzw defekt Ventile reinigen ggf austauschen Sauglanze Fu ventil verschmutzt bzw defekt Fu ventil reinigen ggf austauschen Verschmutzung im Wasserzulauf Wassermotor defekt Schmutzf nger im Ventil und im Frischwasserzulauf reinigen ggf austauschen Wassermotor austauschen Produktmangelsicherung schaltet bei leerem Produktvorratsbeh lter nicht ab Ger t l sst sich nicht entst ren Elektroden der Sauglanze verschmutzt bzw defekt ggf Anschlusskabel besch digt Steuerplatine defekt Sauglanze austauschen Platine austauschen 417101158 DG1 17 Rev 05 03 13 ECOLAB 8 Wartungs und Reparaturhinweise Bei Wartungsarbeiten an Teilen die mit Desinfektionsmittel in Ber hrung kommen ist VORSICHT geeignete Schutzausr stung zu tragen Die Sicherheitsbestimmungen im Umgang mit Chemikalien sind stets zu beachten 8 1 8 2 Um die Be
35. e proceed as follows Pull suction pipe out of product supply container After approx 3 seconds unit should change to fault mode red fault indicator flashes 417101158 DG1 38 Rev 05 03 13 ECOLAB 6 2 4 6 2 5 Functional Check of the Flow Control Device For the functional check proceed as follows Remove the cover Unscrew the knurled nut see Fig 6 1 pos 3 from the eccentric and remove the complete eccentric from its holder on the hydraulic motor Press the ON OFF 1 0 switch Approx 10 seconds after the unit has been started it should change to fault mode the red LED is permanently ON Refit the eccentric Press the ON OFF I 0 switch to reset the unit Press the ON OFF 1 0 switch again unit starts metering Slowly reduce the supply of fresh water to reach 0 MPa 0 bar of pressure When the pressure falls below 1 4 MPa 1 4 bar the unit changes to fault mode red LED is permanently ON Reopen the fresh water supply Press the ON OFF I 0 switch to reset the unit Reposition the cover Changing over to a New Product When changing over to a new product make sure to thoroughly flush the suction pipe the metering pump and all lines in contact with the product before you connect the new supply container Ah ATTENTION If products are used which contain glucoprotamine e g INCIDIN PLUS the O rings on Lo 4 the piston and on the piston rod need to be rep
36. ess of the results identification of the micro organism is also recommended and not only the microbial count to allow assessment of results with regard to the efficacy spectrum of the disinfectant dosed 8 2 General maintenance work After completion of the maintenance work perform the following tasks Care of internal parts clean bottom plate of unit and remove any lime residues Care of external parts Clean the cover with a damp cloth rub it dry and then treat it with product for stainless steel care e g Chromol Bracket Clean surface where you place supply container To perform maintenance work on the DG 1 Il proceed as specified in the following Maintenance Table see chapter 8 2 1 Maintenance Table 417101158_DG1 41 Rev 05 03 13 ECOLAB 8 2 1 8 3 8 4 Maintenance Table Component Maintenance Task Check Criterion Work Instructions References Flow control device Functional test Tightness of pressure control valve See chapter 6 2 4 Functional Check of the Flow Control Device If disinfectant is running from the flow control device unscrew it from the threaded union gt replace flow control device Checking the concentration setting See chapter 6 2 1 Checking the Concentration Setting Eccentric Functional test To check the eccentric for correct operation set the concentration to three different values and gauge them by liters In case of devi
37. gerat DG1 Il 1024ff G ltig ab valid from valable d s 26 02 2013 auf das sich diese Erkl rung to which this declaration relates auquel se r f re cette bezieht mit der den folgenden is in conformity with the following d claration est conforme la Norm en oder normativen standard s or other normative aux norme s ou autre s Dokument en bereinstimmt document s document s normatif s EN 12100 EN 60335 1 A11 A1 A12 A2 EN 61000 6 2 EN 61000 6 3 EN 1717 2006 42 EG 2011 65 EG 2004 108 EG Bevollmachtigter f r die Zusammenstellung der technischen Unterlagen Ecolab Engineering GmbH Authorised person for compiling the technical file Postfach 1164 Personne auteris e pour constituer le dossier technique D 83309 Siegsdorf D 83313 Siegsdorf 26 02 2013 Ort und Datum der Ausstellung Name Unterschrift des Befugten Place and date of issue name signature of authorized person Lieu et date nom signature du signataire autoris e Appendix 1 to WI EE RD amp E 04 03 2012 CS HINWEIS Diese Konformitatserklarung entspricht dem Stand der Erstellung dieser Betriebsanleitung Sollte sich in der Zwischenzeit eine hier benannte Norm ge ndert haben konnen Sie die aktuellste Konformitatserklarung hier herunterladen http www ecolab engineering de uploads media CE 1024ff DG1 pdf 417101158_DG1 24 Rev 05 03 13 ECOLAB CONTENTS 1 General
38. ichnet sind ZN Bei Arbeiten in Bereichen die mit nebenstehendem Symbol gekennzeichnet sind WARNUNG sind entsprechende Schutzhandschuhe zu tragen sind entsprechende Sicherheitsschuhe zu tragen ON WARNUNG Bei Arbeiten in Bereichen die mit nebenstehendem Symbol gekennzeichnet sind HINWEIS Umweltzeichen kennzeichnet Ma nahmen des Umweltschutzes 2 10 Ger tekennzeichnung Wichtig fur alle Ruckfragen ist die richtige Angabe e der Benennung e des Types Se HINWEIS e der fortlaufenden Ger tenummer Nur so ist eine einwandfreie und schnelle Bearbeitung m glich F r die englische Ausf hrung der DG1 Il ist ein entsprechender Frontaufkleber auf Anfrage erhaltlich 417101158 DG1 8 Rev 05 03 13 ECOLAB 3 Aufbau Bezeichnung Haube Netzleitung mit Stecker Betriebsanzeige gr ne LED Produktmangel und St rungsanzeige rote LED EIN AUS Taste l 0 Konsole Schwenkauslauf CIN Diy A Schraube 2 x Bezeichnung Haube Netzleitung mit Stecker Betriebsanzeige grune LED Produktmangel und St rungsanzeige rote LED EIN AUS Taste l 0 Konsole Schwenkauslauf Schraube 2 x Geh user ckwand berwurfmutter Steuerung Sauglanze Wassermotor Exenter Einstellung Konzentration Mischkammer Verschlussstopfen Befestigungsschraube Str mungsw chter
39. ierger ten Der Betreiber ist f r den ordnungsgem en Betrieb des Dosierger tes nach RKIRichtlinie Anforderungen an Gestaltung Eigenschaften und Betrieb von dezentralen Desinfektionsmittel Dosierger ten Bundesgesundheitsblatt 2004 47 67 72 verantwortlich Die j hrlich geforderten hygienisch technischen berpr fungen sind in der Betriebs und Montageanleitung der Dosierger te im Punkt Wartung beschrieben Sofern der Betreiber eine situationsbezogene hygienisch mikrobiologische berpr fung des Dosierger tes nach RKI Empfehlung Anforderung an die Hygiene bei der Reinigung und Desinfektion von Fl chen Bundesgesundheitsblatt 2004 47 51 61 Punkt 4 5 durchf hrt sollte dies wie in Kapitel 8 1 Mikrobiologische berpr fung von dezentralen Desinfektionsmittel Dosierger ten Wartung beschrieben erfolgen 417101158_DG1 5 Rev 05 03 13 ECOLAB 2 3 Allgemeine Hinweise zur Sicherheit e Anschluss und Reparaturarbeiten am DG1 d rfen nur von autorisiertem und geschultem Fachpersonal ausgef hrt werden e Das DG1 Il darf nur mit einer Versorgungsspannung von 230 V AC betrieben werden e Vor allen Arbeiten an elektrischen Teilen unbedingt den Netzstecker ziehen e Beim Wechseln des Desinfektionsmittelkanisters sind unbedingt die Gefahren und Sicherheitshinweise auf dem Original Desinfektionsmittelkanister zu beachten e Die Sicherheitsbestimmungen im Umgang mit Chemikalien sind stets zu beachten
40. ight indicates product shortage The DG 1 Il is equipped with the following safety devices Water shortage monitoring The electronic system indirectly monitors the water flow pressure through intelligent evaluation of the pulses emitted by the flow control device Flow rate limitation The maximum quantity of water supplied is controlled by a quantity regulator located inside the solenoid valve Product shortage monitoring The flow control device with its integrated pressure control valve which is fitted upstream from the metering point monitors the flow of the disinfectant product If a failure of the metering pump suction line drive or level suction pipe causes a product shortage or if an unsuitable disinfection product is used the metering unit changes to fault mode The red fault LED lights up permanent light Suction pipe with integrated level electrodes If the supply container is empty the metering unit stops operating and the red fault LED flashes Backflow preventer Upstream from the disinfection metering point a backflow preventer according to DIN EN 1717 is fitted This is a safeguard against disinfectant penetrating into the water supply network in case of a backflow 417101158 DG1 33 Rev 05 03 13 ECOLAB 5 Connection and Installation The DG1 Il is designed for the connection of the product reservoir on the right hand side If required the product reservoir can be placed on the left hand side of the
41. ins plug unplugged e When changing the disinfectant canister the warning and safety information on the original disinfectant canister must be observed e Safety regulations covering the handling of chemicals must always be observed At units with Article no 1024 If using products that contain glucoprotamin such as INCIDIN PLUS the O rings of the metering pump piston and piston rods and the O rings of the flow monitor must be converted for EPDM conversion kit EPDM on request A ATTENTION Atunits with Article no 102410 If using products that do not contain glucoprotamin we recommend that you convert the O rings of the metering pump piston and piston rod and the O rings of the flow monitor for silicone conversion kit Silicone on request When using the conversion kit the provided sticker must be attached to the metering unit in a visible position 2 4 Maintenance and Repair Repair and maintenance work must be carried out only by authorized trained service technicians For maintenance and repair work suitable protective equipment PSA hast to be worn A CAUTION Opening covers or removing parts even if possible without tools may expose hot wires Connecting points may also carry an electrical current d IMPORTANT Only original spare and replacement parts may be used for repairs 2 5 Safety measures to be performed by the owner operator Attention is drawn to the fact that the ow
42. l operation Concentration setting White eccentric 0 25 96 1 96 Blue eccentric 1 5 3 Metering tolerance Max 6 Backflow preventer DIN EN 1717 Typ DB Mounting dimensions Width 500 mm with bracket High 2425 mm Depth 200 mm Weight 13 5 kg Ce NOTE Due to the company s policy of continuous improvements to its products the specifications may be changed without notice 417101158_DG1 43 Rev 05 03 13 ECOLAB 9 2 Connection Diagram Cold Water Fig 9 1 La ID peces o 8 o sf 2475 Ei 170 235 63 5 150 200 250 Cu Rohr 210 mm 300 J 260 H aoa 1 T a 2 Ve 2475 2 m 1 bd 170 150 200 250 300 235 Cu Rohr 210 mm 417101158_DG1 44 Rev 05 03 13 ECOLAB 9 3 9 4 Connection Diagram Hot Water Fig 9 2 260 200 E M A E E Max R2600 a Seen m me 1 Bi 2475 360 425
43. laced by EPDM O rings If products are used which dont contain glucoprotamine the O rings on the piston and on the piston rod need to be replaced by SILICONE O rings see chapter 2 3 General Safety Information To change over to a new product proceed as follows Fill an appropriate vessel with water and immerse the suction pipe Flush suction pipe metering pump and the lines in contact with the product as follows unscrew the flow control device see Fig 3 2 pos 12 insert the sealing plug and place the flow control device in an appropriate vessel unscrew the knurled nut see Fig 6 1 pos 3 from the eccentric and pull the eccentric from its holder on the hydraulic motor manually move the piston rod see Fig 6 1 pos 7 forth and back until clear water without product residues is running from the flow control device Insert the suction pipe into the new supply container Bleed metering pump until product running out of flow control device is bubble free see chapter 6 1 Start Up Push the eccentric back onto its holder and tighten the knurled nut Remove the sealing plug and screw the flow control device in again Check the unit for leaks and malfunctions Set the concentration as described in chapter 6 2 Setting the Concentration or check it as described in chapter 6 2 1 Checking the Concentration Setting 417101158 DG1 39 Rev 05 03 13 ECOLAB 7 Troubleshooting a
44. liter Mengeneinstellung auf eine Wasserentnahme von exakt 8 Liter Formeln f r die Konzentrationseinstellung Legende Formel K Konzentration 96 VD x 100 KxVW VD Volumen Desinfektionsmittel ml K VD vw Volumen Wasser ml VW VD 100 K Beispiel Gew nschte Konzentration 0 5 plus Sicherheitsfaktor 10 0 55 Kx VW _ 0 55 x 8 000 100 K 100 0 55 Einzustellende Desinfektionsmittelmenge VD 44 24 ml Die Konzentrationseinstellung ist wie folgt zu berpr fen Str mungsw chter aus der Mischkammer herausschrauben und ffnung der Mischkammer mit dem beiliegenden Verschlussstopfen abdichten Str mungsw chter in die bereitgestellte Messmensur f hren und einen Eimer unter den Schwenkauslauf stellen Taste EIN AUS 1 0 dr cken und ca 2 3 Liter Wasser zapfen Eimer und Messmensur entleeren Str mungsw chter wieder in die Messmensur f hren und Eimer unter den Schwenkauslauf stellen Ger t einschalten Taste EIN AUS 1 0 dr cken Genau 8 Liter Wasser zapfen Ger t abschalten Taste EIN AUS I 0 dr cken Desinfektionsmittelmenge in Messmensur ablesen Konzentration gem Formel siehe oben errechnen Bei Abweichungen zur gew nschten Konzentration plus Sicherheitsfaktor ist die Einstellung gem Kapitel 6 2 Einstellung der Konzentration zu korrigieren Stopfen aus ffnung der Mischkammer entfernen und Str mungsw chter einschrauben
45. llation 2 riter er ee titre penne nennen 34 5 1 W all MOUNTING ee S 34 5 2 VE een ue EE 35 5 3 Electrical Connection wis egene 35 5 4 Shifting Suction Pipe and Mains Cable to Left Hand Side of Housing sse 35 6 Settings and En E C 36 6 1 icu zs P 36 6 2 Setting the Concentration emersit ee had ere E dev ERR TR lan eee RAE ee Ea de ev Reed a 37 6 2 1 Checking the Concentration Setting uec eiecie eese e dee ennt ne aa enne aa tla aan Ma aera dac ate xa d tea datus 38 6 2 2 Checking the Safety Eoutpment eene en enne nestr sten enn teneti sisi sh nete renis asa tnnt tenens nas 38 6 2 3 Functional Check of the Level Suction Pipe enm nennen nennen en nennen enne nns 38 6 2 4 Functional Check of the Flow Control Device nennen ennt nenne Enaren enne nnn sn nn nnn 39 6 2 5 Changing over toa New Product erre ERE RUHERFIRREHERTEREERRRIR EXER ars te Eai CER EERERRRR r EE 39 7 UE d DT 40 8 Maintenance and Repair Information cceeeeseeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeneneeeeees 41 8 1 Microbiological examination of decentralized disinfectant dspensers nennen 41 8 2 General maintenance work cece eeeeeeaeaeceeeeeeesaaaaeaeceeeeecesdaanaeeeeeeeseeeecaneeeeeeeeeneenaees 41 8 2 1 IE TTRIIREDIe MEUM 42 8 3 Recommendations for the replacement of wearing parts
46. mp NOTE Each time you stop the unit and or take corrective action to eliminate a fault make sure to reset the unit by pressing the ON OFF 1 0 switch Failure Cause Corrective Action Control unit does not work no LED lights up pressing a button has no effect No supply voltage available Restore power supply Fuse of control unit defective Replace fuse Control PCB defective Replace control PCB Thermal fuse of power transformer blown Let metering unit cool down Power transformer defective Replace power transformer Pressing the ON OFF UO switch does not start the unit fault indicator is flashing Disinfectant container empty Connect new supply container Suction pipe soiled suction pipe defective Clean bottom valve of suction pipe Connecting cable of suction pipe defective Replace suction pipe Fault indicator permanently ON Metering pump leaks or defective Replace metering pump Suction and metering line Hose clamps leak hose defective angled valve closed Tighten hose clamps replace hose if necessary open angled valve Water flow pressure 0 16 MPa bar 1 6 bar Ensure that water flow pressure is gt 0 16 MPa 1 6 bar Strainer clogged Clean strainer replace it if necessary Flow limiter encrusted with lime or clogged Clean flow limiter replace it if necessary Hydraulic motor leaks Replace axi
47. n Bedienungsanweisungen A VORSICHT Arbeitsanweisungen vorgeschriebenen Arbeitsablaufen und dergleichen zu Verletzungen oder Unfallen fuhren kann 4h wird benutzt wenn ungenaues Befolgen oder Nichtbefolgen von Bedienungsanweisungen amp b ACHTUNG Arbeitsanweisungen vorgeschriebenen Arbeitsabl ufen und dergleichen zur x Besch digung des Ger tes f hren kann d WICHTIG wird benutzt wenn auf eine besondere Aufmerksamkeit im Umgang mit dem Gerat geachtet werden muss Cer HINWEIS wird benutzt wenn auf eine Besonderheit aufmerksam gemacht werden soll Aufz hlungen die mit diesem Vorzeichen markiert sind beschreiben eine T tigkeit die durch den Monteur Anwender durchgef hrt werden muss 2 9 Sicherheitssymbole Gefahren durch elektrischen Strom sind mit nebenstehendem Symbol GEFAHR gekennzeichnet Vor den Pausen und am Arbeitsschluss unbedingt H nde waschen Die beim GEFAHR Umgang mit Chemikalien blichen Vorsichtsma nahmen sind zu beachten Das jeweilige Sicherheitsdatenblatt ist zu beachten WARNUNG Bei Arbeiten in Bereichen die mit nebenstehendem Symbol gekennzeichnet sind ist eine Schutzbrille zu tragen Bei Arbeiten in Bereichen die mit nebenstehendem Symbol gekennzeichnet sind WARNUNG ist ein Gesichtsschutz zu tragen ist entsprechende Schutzkleidung zu tragen Q WARNUNG Bei Arbeiten in Bereichen die mit nebenstehendem Symbol gekennze
48. ner operator has the following responsibilities towards his operating and maintenance personnel e To provide briefing on the protective devices on the equipment e Monitor observance of the safety measures This operating manual must be retained for future use The frequency of inspections and control measures must be observed The tasks described in this Operating Manual are explained in such a way that e any tasks outlined in the chapters Operation and Operating Modes are carried out by a trained person e the tasks explained in the chapters Transportation Setup and Assembly Errors Causes Remedies are understood by a qualified person The chapters Transportation Setup and Assembly Errors Causes Remedies are only intended for qualified personnel Tasks that are described in these chapters may only be performed by qualified personnel 417101158_DG1 29 Rev 05 03 13 ECOLAB 2 5 1 2 5 2 2 6 2 7 Trained person A person who has been trained in the tasks assigned to him her by a skilled person in the possible dangers that improper handling can cause and has been taught about the necessary protective equipment and safety measures Qualified person A person with suitable training and having suitable education and experience who is in the position of being able to recognize the risks and knows how to avoid hazards The definition is based on EN 60204 1 2007 Responsibilities of the Owner The owner
49. ng maintenance and repair work is carried out by qualified and authorised specialists e The metering unit must be used in accordance with the specifications as given in the technical manual e Only original equipment spare parts are used for repairs e Only validated Ecolab disinfectants are used If other than Ecolab products are used it is recommended that the disinfectant is validated for the dosing unit according to BAM 2004 47 67 72 For the remainder the general warranty and service terms of Ecolab Engineering GmbH shall apply 1 4 Contact Address Manufacturer Ecolab Engineering GmbH Raiffeisenstra e 7 D 83313 Siegsdorf Telephone 49 86 62 61 0 Fax 49 86 62 61 2 35 eMail engineering mailbox ecolab com 417101158_DG1 27 Rev 05 03 13 ECOLAB 2 Safety Zr The DG1 Il system must be used with validated products 9 ATTENTION No warranty for the unit function when using unvalidated products AA caution Ah Safety warnings and emphases must be observed in all cases Q Attention 2 1 2 2 Intended use The DG 1 I is a mixing equipment for disinfectants It is used for the production of a ready to use disinfectant solution and has been developed designed and built exclusively for the industrial and commercial use A private use of the equipment is excluded It is part of the intended use of dosing system to follow the manufacturer s instructions for maintenance service
50. ng jig 1 pce amp O Manual 5 1 Wall Mounting o ATTENTION Depending on the wall condition the use of special attachment parts may be necessary Be sure to mount the unit at a location high enough to be able to place a drain pan below L NOTE the swivel drain outlet The installation height of approx 130 cm bottom line DG 1 should not overstep risk of accident when changing the can To mount the DG 1 Il proceed as follows Mark drilling holes for metering unit and bracket using the supplied drilling jig Drill marked holes Remove cover see Fig 3 1 pos 1 for this purpose unscrew the two cover screws Fig 3 1 pos 8 Lift the cover to remove it Mount unit and bracket on the wall 417101158_DG1 34 Rev 05 03 13 ECOLAB 5 2 Water connection Connect angled valve with its built in strainer to the wall water supply using a T union if necessary Route the connecting line suitable type chromium plated copper pipe 10 X 1 between the angled valve and the water connector at the bottom of the unit Attach the supplied swivel drain outlet to the bottom of the unit 5 3 Electrical Connection The metering unit may only be connected to a supply voltage of 230 V AC with 50 60 Hz For the electrical connection of the DG 1 Il all valid national and local regulations must be complied with The integrated power transformer of the DG 1 II supplies the entire unit with electric power The
51. nn der Produktvorratsbehalter auch an der linken Geh useseite plaziert werden Dazu muss die Sauglanze und der Ausgang f r das Netzkabel an die linke Geh useseite verlegt werden Nachfolgende Anschluss und Montageanweisungen werden als bevorzugte Methode empfohlen Die Umgebungsbedingungen bestimmen jedoch die tats chlich anzuwendende Montage und Installationsmethode Die rtlichen Bestimmungen sind in jedem Fall zu amp HINWEIS ber cksichtigen Geh useabmessungen und Anschlussma e siehe Kapitel 9 2 Anschlussschema Kaltwasser bzw Kapitel 9 3 Anschlussschema Warmwasser Das DG1 Il ist zur Wandmontage vorgesehen vorzugsweise ber bzw in unmittelbarer N he eines Ablaufbeckens Die Wasserzulauftemperatur darf max 30 C betragen Bei h heren Wassertemperaturen muss eine Mischbatterie vorgeschaltet werden Der Wasserflie druck muss min 0 16 MPa 1 6 bar betragen und darf 0 7 MPa 7 bar nicht berschreiten Betr gt der Wasserflie druck gt 0 4 MPa 4 bar wird der Einbau eines Druckminderers in die Wasserzuleitung empfohlen Die Spannungsversorgung betr gt AC 230 V Vom Werk wird das Ger t mit rechtsseitig angeschlossener Sauglanze und Netzleitung HINWEIS ausgeliefert Falls erforderlich k nnen die Sauglanze und Netzleitung an die linke Geh useseite verlegt werden siehe Kapitel 5 4 Dies sollte vor der Wandmontage des Ger tes vorgenommen werden 5 1 Lieferumfang
52. order to get rid of any residual chemicals Disposal The DG1 Il is predominantly made of steel and also of aluminium to a certain extent apart from the electrical equipment and is to be disposed of in accordance with the local environmental regulations prevailing at that time Depending on the condition existing regulations and with due regard for current requirements dispose of it for example as electrical waste printed circuit boards plastics housing metal plates steel copper aluminium separate after sorting Prior to disposal all parts which are in contact with media must be decontaminated Oils solvents detergents and contaminated cleaning tools brushes cloths etc must be disposed of in compliance with local requirements in accordance with the prevailing waste code and with due attention to the notes contained in the manufacturers safety data sheets 417101158 DG1 46 Rev 05 03 13 ECOLAB 11 Declaration of Conformity EG Konformitatserklarung 2006 42 EG Anhang II A ECOL AB Declaration of Conformity 2006 42 EC Annex II A D claration de Conformit 2006 42 CE Annexe II A Dokument Document Document KON029339 ECOLAB Engineering GmbH Postfach 11 64 D 83309 Siegsdorf Name des Herstellers supplier s name nom du fournisseur Anschrift address adresse erkl ren in alleiniger Verant declare under our sole declarons sous notre seule wortung dass das Produkt responsibility th
53. otors siehe Abb 6 1 Pos 6 abziehen das Pleuel mit der Kolbenstange siehe Abb 6 1 Pos 7 so lange vor und zur ckbewegen bis Desinfektionsmittel aus dem Str mungsw chter austritt und keine Luftblasen in den Schlauchleitungen sichtbar sind den Stopfen entfernen und Str mungsw chter VA Stifte unten wieder einschrauben den Exzenter aufstecken und die R ndelmutter wieder aufschrauben Die gew nschte Konzentration gem Kapitel 6 2 Einstellung der Konzentration einstellen und gem Kapitel 6 2 1 berpr fung der Konzentrationseinstellung berpr fen Die Sicherheitseinrichtungen gem Kapitel 6 2 2 berpr fung der Sicherheitseinrichtungen berpr fen Alle Wasser und Desinfektionsmittelf hrenden Leitungen und Bauteile auf Dichtheit berpr fen 417101158_DG1 13 Rev 05 03 13 ECOLAB 6 2 Einstellung der Konzentration Es lassen sich zwei Konzentrationsbereiche einstellen gt Konzentrationsbereich 1 0 25 1 weisser Exzenter gt Konzentrationsbereich 2 1 5 3 blauer Exzenter Das Ger t ist werksseitig auf 0 5 Konzentration eingestellt F r den Konzentrationsbereich 2 muss der weisse Exzenter gegen den blauen Exzenter Ce HINWEIS im Beipack ausgetauscht werden Dazu muss die Randelmutter siehe Abb 6 1 Pos 3 und die Skalenscheibe siehe Abb 6 1 Pos 4 entfernt werden Q ACHTUNG Die Konzentration ist mit einem Sicherheitsfaktor von 10 ein
54. r Abdeckplatte verschlie en Die Netzleitung durch die linksseitige Geh use ffnung ziehen und die Kabeldurchf hrung fixieren Darauf achten dass das Kabel nicht verletzt wird und keine scharfkantigen Teile ber hren kann Belassen der internen Netzleitungsfixierungen Die Sauglanze an die linke Geh useseite montieren 417101158 DG1 12 Rev 05 03 13 ECOLAB 6 Einstellung und Inbetriebnahme 6 1 Inbetriebnahme Ce HINWEIS Die in diesem Kapitel aufgef hrten Positionsnummern beziehen sich auf die Explosionszeichnung soweit kein anderweitiger Verweis Bezug vorgegeben wird ACHTUNG Bei Einsatz von Produkten die Glucoprotamin enthalten z B INCIDIN PLUS sind die O Ringe auf dem Kolben und auf der Kolbenstange gegen EPDM umzuristen Nach Abschluss der Anschluss und Montagearbeiten Das Eckventil G ganz ffnen und auf Dichtheit pr fen Desinfektionsmittelkanister anschlie en die Sauglanze nach vorne schwenken und in die Kanister ffnung einf hren den Kanister auf der Konsole absetzen Die Dosierpumpe wie folgt entl ften den Str mungsw chter siehe Abb 3 2 Pos 18 abschrauben schwarze berwurfmutter und in ein Gef f hren den Verschlussstopfen siehe Abb 3 2 Pos 16 in die ffnung der Mischkammer siehe Abb 3 2 Pos 15 einsetzen die R ndelmutter Abb 6 1 Pos 3 abschrauben und den Exzenter siehe Abb 6 1 Pos 1 von der Exzenteraufnahme des Wasserm
55. rden Q Bei Einsatz von Produkten die Glucoprotamin enthalten z B INCIDIN PLUS sind die v ACHTUNG O Ringe auf dem Kolben und auf der Kolbenstange auf EPDM umzur sten Bei Einsatz von Produkten die KEIN Glucoprotamin enthalten sind die O Ringe auf dem Kolben und auf der Kolbenstange auf SILIKON umzur sten siehe Kapitel 2 3 Allgemeine Hinweise zur Sicherheit Umstellung wie folgt durchf hren Geeigneten Beh lter mit Wasser f llen und die Sauglanze eintauchen Sauglanze Dosierpumpe und produktf hrenden Leitungen wie folgt durchsp len Str mungsw chter siehe Abb 3 2 Pos 12 abschrauben Stopfen einsetzen und Str mungsw chter in ein geeignetes Gef f hren gt Randelmutter siehe Abb 6 1 Pos 3 vom Exzenter abschrauben und den Exzenter von der Exzenteraufnahme des Wassermotors abziehen Kolbenstange siehe Abb 6 1 Pos 7 der Dosierpumpe manuell so lange vor und zur ckbewegen bis klares Wasser ohne Produktr ckst nde aus dem Str6mungswachter austritt Sauglanze in den neuen Kanister einsetzen Dosierpumpe entl ften bis Produkt blasenfrei aus dem Str mungsw chter austritt siehe Kapitel 6 1 Inbetriebnahme Exzenter aufstecken und R ndelmutter festziehen Stopfen entfernen und Str mungsw chter wieder einschrauben Ger t auf Dichtheit und Funktion pr fen Konzentrationseinstellung gem Kapitel 6 2 Einstellung der Konzentration durchf hren oder nach Kapitel 6
56. reitschaftsanzeige Abb 3 1 Pos 3 gt Dauerlicht bei Betriebsbereitschaft gt Blinklicht bei Dosierbetrieb Rote LED Produktmangel und St rungsanzeige Abb 3 1 Pos 4 gt Dauerlicht bei Betriebsst rung gt Blinklicht bei Produktmangel Das DG 1 Il verf gt ber folgende Sicherheitseinrichtungen Wassermangelsicherung Die Elektronik berwacht durch intelligente Auswertung der Str mungsw chterimpulse indirekt den Eingangsflie druck Durchflussmengenbegrenzung Zur Begrenzung der max zuflie enden Wassermenge befindet sich im Magnetventil ein Mengenregler Produktmangelsicherung Der vor der Eindosierstelle eingebaute Str mungsw chter mit Druckhalteventil berwacht den Desinfektionsmittelfluss Bei Produktmangel infolge eines Defektes der Dosierpumpe der Saugleitung des Antriebs oder der Niveausauglanze sowie bei Verwendung eines falschen Produktes geht das Ger t auf St rung Die St rungs LED leuchtet auf Dauerlicht Sauglanze Niveauelektroden Bei leerem Kanister schaltet das Ger t ab die rote St rungs LED blinkt Systemtrennung Vor der Desinfektionsmitteleinspeisung befindet sich eine Systemtrennung gem DIN EN 1717 Hierdurch ist sichergestellt dass kein Desinfektionsmittel in das Wasserleitungsnetz eindringen kann 417101158 DG1 10 Rev 05 03 13 ECOLAB 5 Montage und Anschluss Das DG1 Il ist f r eine rechtsseitige Plazierung des Produktvorratsbehalters vorbereitet Bei Bedarf ka
57. reste zu beseitigen Entsorgung Das DG1 Il ist berwiegend aus Stahl in bestimmtem Umfang auch aus Aluminium hergestellt auRer der Elektroausr stung und ist entsprechend den dann g ltigen rtlichen Umweltvorschriften zu entsorgen Entsorgen Sie je nach Beschaffenheit existierenden Vorschriften und unter Beachtung aktueller Bestimmungen z B als Elektroschrott Leiterplatten Kunststoffe Gehause Blech Stahl Kupfer Aluminium nach Sorten trennen Vor dem Entsorgen sind alle medienber hrten Teile zu dekontaminieren le L sungs und Reinigungsmittel und kontaminierte Reinigungswerkzeuge Pinsel Lappen usw m ssen den rtlichen Bestimmungen entsprechend gem dem geltenden Abfall Schl ssel und unter Beachtung der Hinweise in den Sicherheitsdatenbl ttern der Hersteller entsorgt werden 417101158_DG1 23 Rev 05 03 13 ECOLAB 11 Konformitatserklarung EG Konformitatserklarung 2006 42 EG Anhang II A ECOL AB Declaration of Conformity 2006 42 EC Annex II A D claration de Conformit 2006 42 CE Annexe II A Dokument Document Document KON029339 ECOLAB Engineering GmbH Postfach 11 64 D 83309 Siegsdorf Name des Herstellers supplier s name nom du fournisseur Anschrift address adresse erkl ren in alleiniger Verant declare under our sole declarons sous notre seule wortung dass das Produkt responsibility that the product responsabilit que le produit Desinfektionsmitteldosier
58. s unterweist e bez glich der Einhaltung der Sicherheitsma nahmen berwacht Diese Betriebsanleitung ist f r die zuk nftige Verwendung aufzubewahren Die H ufigkeit von Inspektionen und Kontrollma nahmen muss eingehalten werden Die hier beschriebenen Arbeiten sind so aufgef hrt dass sie e in den Kapiteln Bedienung von einer unterwiesenen Person e in den Kapiteln Transport Aufstellung und Montage Wartung St rung Ursache Behebung von einer Fachkraft verstanden werden Die Kapitel Transport Aufstellung und Montage Wartung St rung Ursache Behebung sind nur f r Fachkr fte vorgesehen Arbeiten die in diesen Kapiteln beschrieben sind sind nur von Fachkr ften auszuf hren 417101158 DG1 6 Rev 05 03 13 ECOLAB 2 5 1 2 5 2 2 6 2 7 Unterwiesene Person Eine Person die durch eine Fachkraft ber die ihr bertragenen Aufgaben und die m glichen Gefahren bei unsachgem em Verhalten unterrichtet und erforderlichenfalls angelernt sowie Uber die notwendigen Schutzeinrichtungen und Schutzma nahmen belehrt wurde Fachkraft Eine Person mit geeignetem Training geeigneter Ausbildung und Erfahrungen die sie in die Lage versetzt Risiken zu erkennen und Gef hrdungen zu vermeiden In der Definition angelehnt an die EN 60204 1 2007 Pflichten des Betreibers Der Betreiber muss e die Sicherheit des Personals BG und Unfallverh tungsvorschriften Arbeitsstatten Richtlinien z B Betriebsanwei
59. sungen auch nach 820 GefStoffV pers nliche Schutzausr stung PSA Vorsorgeuntersuchungen e die Sicherheit der Arbeitsmittel Schutzausr stung Arbeitsanweisungen Verfahrensrisiken und Wartung e die Produktbeschaffung Sicherheitsdatenblatter Gefahrstoffverzeichnis e die Produktentsorgung Abfallgesetz e die Materialentsorgung Au erbetriebnahme Abfallgesetz e die Reinigung Reinigungsmittel und Entsorgung einhalten e sowie die aktuellen Umweltschutzauflagen beachten Au erdem ist betreiberseitig e die pers nliche Schutzausr stung PSA zur Verf gung zu stellen Sicherheitsschuhe Schutzhandschuhe Schutzbrille Schutzmaske Schutzanzug e die Ausbildung des Bedienpersonals zu gew hrleisten e essind Arbeitsanweisungen zu erstellen Anschl sse Vor dem Betreiben der Anlage ist vom Betreiber sicherzustellen dass bei der Montage und Inbetriebnahme wenn diese vom Betreiber selbst durchgef hrt werden rtliche Vorschriften z B f r Elektro Anschluss beachtet werden Systemtrennung Durch die integrierte Systemtrennung gem DIN EN 1717 ist bei eventuell auftretendem Unterdruck in der Wasserzuleitung ein Eindringen von Desinfektionsmittel in das Trinkwasserleitungsnetz zuverl ssig ausgeschlossen 417101158 DG1 7 Rev 05 03 13 ECOLAB 2 8 Hervorhebungen Aufz hlungen Die hier dargestellten Hervorhebungen folgende Bedeutung wird benutzt wenn ungenaues Befolgen oder Nichtbefolgen vo
60. triebssicherheit und Funktionst chtigkeit des DG 1 zu gew hrleisten m ssen Ab ACHTUNG die vorgeschriebenen Wartungsintervalle eingehalten werden Der Zeitraum zwischen WR Installation und der ersten Wartung oder zweier aufeinanderfolgenden Wartungen darf 12 Monate nicht berschreiten Mikrobiologische berpr fung von dezentralen Desinfektionsmittel Dosierger ten Entfernung des Perlators am Schwenkauslauf des Ger tes Der Auslauf ist u erlich mit einem alkoholischen Desinfektionsmittel zu desinfizieren Incidin Liquid Incides N bzw abzuflammen Nach einem Vorlauf von ca 1 Liter ist mindestens 1 Liter Desinfektionsl sung in einem sterilen Gef aufzufangen Achtung 1 Liter ist die Mindestentnahmemenge siehe auch Hinweis auf dem Ger t Neutralisationsmittel sogenannte Enthemmer sind erst nach Ablauf der Einwirkzeit des betreffenden Desinfektionsmittels in der entnommenen Konzentration f r bakterizide und levurozide Wirksamkeit zuzusetzen siehe Produktetikett Geeignete Neutralisationsmittel chemische Zusammensetzung und Konzentration k nnen gem den Vorgaben der EN 13727 oder der Standardmethoden DGHM VAH ausgew hlt und validiert oder beim Hersteller erfragt werden Neutralisationsmittel m ssen steril sein Die Probe soll in einem mikrobiologischen Fachlabor durch Filtration auf ihre aerobe Gesamtkoloniezahl untersucht werden Idealerweise wird dieser Wert pro 1 ml pro 10 ml und pro 10
61. uch EBS Nummern dargestellt EBS Nummern sind Ecolab interne Artikelnummern und werden Konzernintern verwendet Transportsch den Auspacken Beim Herausnehmen des DG1 Il aus dem Karton ist unbedingt darauf zu achten dass das Ger t nicht auf der Unterseite abgestellt wird da sonst das Dosierrohr welches aus dem Anschluss f r den Schwenkauslauf herausragt beschadigt wird VORSICHT Wird beim Auspacken ein Transportschaden festgestellt darf das DG1 Il nicht installiert werden Das jeweilige Transportunternehmen ist unverz glich zu verstandigen und eine QD ACHTUNG Schadensbestatigung zu beantragen Eine Kopie der Schadensbestatigung ist umgehend an die Firma Ecolab Engineering GmbH zu senden 417101158 DG1 3 Rev 05 03 13 ECOLAB 1 3 Gew hrleistungsumfang Gewahrleistung in Bezug auf Betriebssicherheit Zuverlassigkeit und Leistung des DG1 Il wird vom Hersteller nur unter folgenden Bedingungen bernommen e Montage Anschluss Einstellung Wartung und Reparaturen werden von autorisiertem Fachpersonal durchgef hrt Das Dosiergerat wird entsprechend dieser Betriebsanleitung verwendet Bei Reparaturen werden nur Original Ersatzteile verwendet e Es werden nur validierte Ecolab Produkte eingesetzt F r den Fall dass andere als Ecolab Produkte eingesetzt werden wird empfohlen das Produkt gem BAM 2004 47 67 bis 72 mit dem Dosierger t zu validieren Im brigen gelten die allgemeinen Garantie
62. ug and screw in the flow control device again with the VA pins pointing downwards plug in the eccentric back in and tighten the knurled nut Set the desired concentration as described in chapter 6 2 Setting the Concentration and check it as described in chapter 6 2 1 Checking the Concentration Setting Check the safety equipment as described in chapter 6 2 2 Checking the Safety Equipment Check all lines and components which come in contact with water and or disinfectant for tightness 417101158 DG1 36 Rev 05 03 13 ECOLAB 6 2 Setting the Concentration Two concentration ranges can be set Concentration range 1 0 25 1 white eccentric Concentration range 2 1 5 3 blue eccentric Ex works the unit is set to a concentration of 0 5 If you plan to use concentration range 2 the white eccentric must be replaced by the Ce NOTE supplied blue eccentric For this purpose remove the knurled nut see Fig 6 1 pos 3 and the graduated dial see Fig 6 1 pos 4 Q ATTENTION When setting the concentration allow for a safety margin of 10 Description Eccentric Red mark Knurled nut Graduated dial Metering pum Drive unit hydraulic motor U Njajah oN gt Q Piston rod Bon Fig 6 1 To set the nominal concentration proceed as follows Unscrew knurled nut see pos 3 from eccentric see pos 1 by appro
63. unit is protected by a fuse which is located on the PCB 630 mA slow blow and by a thermal fuse inside the power transformer For the connection to the power supply the DG 1 II is equipped with a mains cable length 2 4 m with an integrated plug If necessary the mains cable can be retracted into the housing ce NOTE If required the mains cable can be shifted to the left hand side of the housing see chapter 5 4 Shifting Suction Pipe and Mains Cable to Left Hand Side of Housing 5 4 Shifting Suction Pipe and Mains Cable to Left Hand Side of Housing To shift suction pipe and mains cable to the left hand side of the housing proceed as follows Remove the cover Fig 3 1 pos 1 For this purpose unscrew the two cover screws Fig 3 1 pos 8 Lift the cover to remove it Detach the hose clamp unscrew the coupling nut Fig 3 2 pos 10 from the suction pipe and pull the suction pipe along with the suction line and the connecting cable out of the housing Pull the mains cable bushing out of its holder and retract it into the housing together with the mains cable Remove the cover plate at the left hand side of the housing Use the cover plate to close the cable opening at the right hand side of the housing Pull the mains cable through the left hand opening of the housing and attach the cable bushing Make sure that the cable is not damaged and cannot get in touch with any sharp edged parts leave the internal
64. ve the following meanings CAUTION This heading is used where imprecise or non adherence to the operating instructions prescribed work processes or similar could lead to injuries or accidents 4 A ATTENTION This heading is used where imprecise or non adherence to the operating instructions ww prescribed work processes or similar could lead to damage to the equipment d IMPORTANT Is used when special attention is required when for handling the equipment Le NOTE This heading is used to indicate an aspect of particular importance Numberings marked with this sign 4 describe an activity which must only be performed by the installer user 2 9 Safety symbols DANGER Dangers due to electrical power are identified with the symbol shown here Always wash hands before breaks or at the end of work Observe the precautionary DANGER measures that are usual when handling chemicals Observe the respective Safety Data Sheet When working in areas that are identified by the symbol shown here it is necessary WARNING to wear safety eyewear When working in areas that are identified by the symbol shown here it is necessary WARNING to wear safety face protection shield When working in areas that are identified by the symbol shown here it is necessary WARNING to wear protective clothing When working in areas that are identified by the symbol shown here it is necessary WARN
65. x 5 mm Pull graduated dial see pos 4 from indented part of eccentric and hold it in place Preset the concentration for this purpose turn the eccentric so that the red mark aligns with the desired concentration value on the graduated dial Insert the graduated dial back into the indented part of the eccentric and tighten the knurled nut Check the concentration as described in chapter 6 2 1 Checking the Concentration Setting If it deviates from the nominal value repeat the setting procedure Align the arrow of the red mark on the eccentric with the appropriate concentration value on the graduated dial For this purpose loosen the locking screw on the eccentric 417101158_DG1 37 Rev 05 03 13 ECOLAB 6 2 1 6 2 2 6 2 3 Checking the Concentration Setting Required auxiliaries Bucket with a minimum capacity of 10 to collect the water Measuring jars to collect the disinfectant up to 100 ml for concentrations of 1 96 max up to 300 ml for concentrations of 1 96 to 3 In the following example which shows how to determine the nominal concentration the quantity settings given in millimeters refer to a tapped water quantity of exactly 8 liters Formulas for setting the concentration Explanantion Formula K Concentration 76 VD x 100 Kx VW VD Volume of disinfectant ml I _ vw Volume of water ml VW VD 100 K Example Desired concentration 0 5 plus 10 buffer 0
66. zustellen U o o Bezeichnung Exzenter Rote Markierung Randelmutter Skalenscheibe Dosierpumpe Antrieb Wassermotor Kolbenstange TA G N NOD Abb 6 1 Die Einstellung der Sollkonzentration ist wie folgt vorzunehmen Randelmutter siehe Pos 3 vom Exzenterrad siehe Pos 1 ca 5 mm abschrauben Skalenscheibe siehe Pos 4 aus der Verzahnung des Exzenters ziehen und festhalten Konzentration voreinstellen dazu das Exzenterrad mit der roten Markierung auf den gew nschten Konzentrationswert der Skalenscheibe drehen Skalenscheibe in die Verzahnung des Exzenters stecken und die R ndelmutter festziehen Konzentration gem Kapitel 6 2 1 berpr fung der Konzentrationseinstellung berpr fen Bei Abweichung vom Sollwert die Konzentrationseinstellung wiederholen Pfeil der roten Markierung des Exzenterrads auf den entsprechenden Konzentrationswert der Skalenscheibe nachf hren Dazu die Arretierungsschraube am Exzenter l sen 417101158_DG1 14 Rev 05 03 13 ECOLAB 6 2 1 6 2 2 6 2 3 berpr fung der Konzentrationseinstellung Ben tigte Hilfsmittel Eimer mit min 10 Fassungsverm gen zum Auffangen des Wassers Messmensuren zum Auffangen des Desinfektionsmittels bis 100 ml bei Anwendungen bis 1 96 bis 300 ml bei Anwendungen ab 1 96 bis 3 96 Im nachfolgenden Beispiel zur Ermittlung der Sollkonzentration bezieht sich die Milli

Download Pdf Manuals

image

Related Search

Related Contents

  Westinghouse LCM-20v5 Computer Monitor User Manual  Aspire Digital Laptop 5810TZ User's Manual  Note - Frank`s Hospital Workshop    Parallels Desktop 9 für Mac  LTBIS_Manual_Rev01 - Fibotec Fiberoptics GmbH  

Copyright © All rights reserved.
Failed to retrieve file