Home
GAS 222.20 ATEX 2 Bedienungsanleitung - buehler
Contents
1. 1 1 0 1 1 4 1 1 1 1 RS 211111 1 11 11 1111 1 1 1 sep INZ 2 5 Ixix d 11 11 gb bL 1 1 11 11 10 1 ZH 09 XANV 11 1 1 gg 1111 11 11 5 ZH 09 _ LLL LE 09 7 01 I w X33 0 92 II 062 X31V 21111 1 1 1 1L 60220991 2 09 77 oi v I U X33 II ON 0LL 211111 LL LL LL 820222971 vl I U X33 II IN A 72 211111 1 1 11 11 11 11 1111 1 220222971 _______2 21111 LL LL 9 0025 _________2 _ LL LL LL AE 221 2101 1127 11 110 bunjenejs nz 2 6 _ LL LL LL LL LL LL LL LL EL LA E 21111 L 0668006 2 98 91 211 6 92 Xeiv 211111 11 11 11 11 11 1111 82680061 Jeyeuosuebe pu3 1141 11 11 60000098 1
2. gt gt lt gt lt gt lt gt lt gt lt gt lt gt lt gt lt gt lt gt lt gt lt gt lt veonewvmsezze p __ 2 veonswvi z2 _ ___ 02222 gt gt gt gt gt lt gt lt gt lt gt lt LL 26 DD 461099 05 2013 Seite 2 9 009 eDeJjuy pun sidid 9 097 16866469 1 x LLL WW WW x Eg A x E _ __ 201 txt 69622297 x ueisiep3 _ Xx Ltr _ 1497 uuo PTT xpd 4t LSY xix 1 1 ET AO ISISEH
3. 000606297 Izieuequn EG EI PCT XIX IX Pax xx 000606097 Izieuequn EE E LE LE 1 LLL LL _____ Dunuueds Fu 11 E LL 88000001 9050009 YO Jeyysnaut3 30 SEELEN ee ee ee A NININININININININININININININININININININININININININININ SISISISISISISISININ GIE Ae eese 5 2 2 ala d 222122 E 21512 USUOISUSWIG SUSPSIYOSIJ9 SIS ISIS IS 24 24 2 9 9 9 9 9 2019 gt gt gt gt gt gt gt gt gt 461099 05 2013 Seite 4 9 5 5 13886 7 573 unioQ 397 e 50 460 9 LT 9Nd S9NCI 09 OOS ZO 09 OOS ISNY ZO 1484 4831311 4 8 4 Sunuuausg CN med uaya azs uny ag 1 8922 OSI
4. 5 aunssaud jaAesuodsea sepepJooe siodep sepniuued seuede 2 06 ep 0 Lojueujeuorouny ep oessaJd 5 Sunz ay apuja alysq as Sunz ay apu1a6Daa1sq1as soz 2 19 uloup go1ao30suapuoy 2 19 UIOJP go1aoa3o0susapuoy IN N y4od 11 1 11 ce 34048 11113 1 11 LAN Ssodfg LAN 110g uuou1a68ny 461099 05 2013 Seite 8 9 eDeJjuy 118Z19J917 pun LLL E L9eerozezer 541 0S1 ISNV Any BunieyeH 20102269 89 Jn 0 892600 Col EG ES ER ER ES EG ES ES EI ES ER 780800 IXIXIX XIX 0820 89800 px De o Deae e oe Xe XXIX IXIXIX ES ES ES
5. pIOUSJOS JO DA 461099 05 2013 6 9 Details A Blowback Ordering note for capacitive vessel For attachment GAS 222 11 30 35 U is required Ordering note for pneumatic actuator If a blowback controller is required only actuator P N 46222030 is possible We advise the installation of a position indicator switch to control the pneumatic actuator Integrated blowback controller in the probe controller In addition to the stand alone blowback controller RRS an integrated blowback controller is optionally available Blowback cycle time and actual blowback time can be adjusted via the keys and menu of the controller The blowback and manual operation will be shown on the display The blowback controller can be programmed via the keys manual or automatic operation is possible Besides the status output of the controller a blowback status signal is provided Blowback will be usually initiated by signals coming from the main controls lf the position indicator switch is installed the controller will use this input for the process logic B Hazardous Areas Please note that installed accessories may change the approved category of the probe Follow strictly the advices given in the installation and operation manual and regard the marking on the type plate Sample Gas Probe GAS 222 xx Atex resuting restircted with A
6. PL I X33 ONAOL AW 9b9M Z Z dxIxixl GOdI 1 Il X33 92 11 2 1 121 1 11011021 01 1 J J x 2 09 08 ADEZ 027 AN 96 M Z Z Esse e s E 2409 AW 9b9M Z Z EJ IIIJ JJ ggg gs qux J 2 2 xX uM 242121 2 2 IEEE 1eyeueqsjeJoAjnppnag An 10494117 EL LL LL LL LL LL E E HU ele EFT IT SEX BE injesad ws 1111111111111111111111111111 Em ees NININININININININININININININININININ N N N NININININININININININININININININININ N N N DININDNINININIDINININININDNININININDNINDIND IN DIN IN N 8 21318 5 5 818 215 1812 28182 21818 5 gt gt gt gt gt gt gt gt gt gt gt 0 gt x d x d Jepo 2191919 919 019 Jepo zzieyag _ 2 Se Jepo yN 68 Bunindsyond oss Qoo Hinweise A Ruckspulung Bestellhinweis fur Druckluftvorratsbehalter Fur die Kombination mit GAS 222 11 30 35 U ist eine Halterung erforderlich Bestellhinweise fur pneumatischen Antrieb
7. ees 5 XX xix xix xix xix xx xixi ITT Petz ssejureis xix 1 991S seou PET Sue ___ __ 11 1 11111111 1111 NINININININININININININININININININININININININININININ IS IN IS S SIS 2 a 2 5 5 2 2 S 15 suoisue xe pejeeuuou JO gt gt gt gt gt gt 2 0 0 0 0 6 2 6 0 0 9191 IE 8 SS SUOISUSWIP SNOLEN SlololalalZlalal SNOUEN o SUOISU9 X9 pue 69111 njis ui 594113 8 2221111111 1 1 gt DA 461099 05 2013 3 9 SVD edAL gt O awe __ veoaswvHaozzez xnvizzzz pps e ppe e qissod jou 511 DOLLZZIY 4equinu sey
8. L LLL IL Xawvozzze gt gt gt lt gt lt gt lt gt lt gt lt Svo Xawvseze _ tl LECCE zesg LGL Jejstueg 0001 Ja SIWaq 70019 069066069 600702009 600702209 20902629 0702229 200029 00009100669 00619106669 00019100669 00609100669 004270020229 00007002229 00417002229 00017002229 00507002229 00029002229 00419002229 00019002229 00409002229 5 2002209 02002229 902002209 00001002229 00611000669 0001000069 00401002229 00601002229 x 12222 gt gt gt lt gt lt gt lt gt lt gt lt gt lt gt gt lt gt lt gt lt gt lt gt lt gt lt gt lt o gt lt gt lt x x VSO ISNVv 222 gt gt gt gt gt gt lt gt gt gt lt gt lt gt lt gt lt gt lt gt lt gt gt lt gt lt gt lt gt lt gt lt gt lt gt lt gt lt o gt lt gt lt EEE 0474 gt gt lt gt E gt lt gt lt gt lt gt lt gt lt E gt lt zzz E gt lt gt lt gt lt gt lt gt lt gt gt lt gt lt gt lt
9. 10 6 2 61022297 81027797 211022297 2268 69410101 Q 9c I YOUMS YOUMS uonoe pesunsseJdun Buds pesunsseJdun peuedo Buds 0668006 826800 6002229 0602229 8002229 0 0 1569 4 uopinog pesunsseJd Jo yoddns VINAVdccc9 20862669 W WW M E E E 2 E WW WW WW 2 VL d o 8z LID ZH 09 08062 41 L1 Q 2 8 LIO ZH 09 08 A0 2 SLL XalWv Buneeu u PLO 9 9 vL Ol VU X33 9 ZH09 0S 062 41 Duneeu jjes B 9 9 L VU X33 9 II ZH09 0S 062 41 Duneeu jjes 2 09 08 ADEZ SLL WEIS S a c WA VSO TD ZH 09 AOvZ XAINV e Z WJ VSO 1n ZH 09 XAWV FL W X33 Q 92 AW AeM Z Z We M E N S9dl Il UJ X33 AW ew z z GOdI tL I X33 92 INAFZ AW em z z ZH09 0S 062 022 Z
10. R 34 7 Operation and Maintenance 36 7 1 3 0 1 in Tm 36 7 2 Check before operallOT adesse ken __ 38 7 3 Probe type GAS 222 20 qo ___ _ ee 38 7 4 Probe types GAS 222 35 ATEX 2 31 ATEX 2 and 21 ATEX 2 40 7 5 Blow back of the in situ filter inside the 40 7 5 1 Manual TS OWE ors o EE 41 7 5 2 Automatic blow back 41 93 Heated pressure 41 7 6 Maintenance program ________ _________ 42 8 Trouble shooting and 43 9 Repair and geseet 44 9 1 Neie c M 44 10 Attached 111 44 11 5 0 Cl 45 12 User book Please make copies 46 139 Drawings ESTEE 47 WV a COC E 47 13 2 Wiring diagram heated pressure vessel 48 BX460016 09 2012 Art Nr 90 310 95 3 Bedienu
11. ____ 211111 1111 11111 J J 1 1 11 1 4214100088 6 4 4 6 2 XIX 1 4 061 046 2 ZH 09 4 OEL 9 6 2 ZH 09 021 LI LLL LII Jg 08022297 4 vl I X33 On A 062 LI LLL xix 1 1 11 xix __610 2297 4 vl I WX33 ON A OLL LI LL LI LI xix 80280991 4 bl WX33 Il ON A vc 211111 1 LL LL LL LL LL __2 4 06 008 22200 8 060 211111 1111 11111 1 1 1114 092020699 4 06 0 8 0 ZHOSAOH _ 211111 1111 1 11111 111 d bp 10jenjoe 4 10 5 2 6 211111 111111 LL EL EL EL LL 1 21111111 1 11 0668006 4 981 8941 91 GE DZ II Xev YAMS 211111 1111 111111 xx 8268006 _ KA KA xix eoozeeor xix
12. lic A Date etc ELD suyo 3778 1 1944 15 4 11 531141 11 4 PISIUS 494114 5 OSL NCI OV OOOL VSO ISNV AD OSL NCI OOS VSO ISNV AD S9NC Or OOOL AD OV AD 9 v ED vc 0091 G L ZO v 3 9 V ED vc 01 20 E dee vc OOS 8 0 20 MS o i dat ZZ Wg t Gz o v ED amp v o MS dat pojeouun uobunuoBGuesJ Jo v DD 461099 05 2013 Seite 5 9 211111 e cl ETE tT ty ty 2 4 1 9mwvoeze 21411 4 111110 4 __ SVD SEL LT TTT iE TP TE TE EEE EE EE 444 cec 9 yoniq LE E 262229 ui OA SSH 211111 11 11 11 1111 J J 662222901 OWA 060 81 SSY 211111 1 LL LL LL LL EL EEE EFF 2 SSH
13. ____ 1775777 T TE 21122171 10022 E gt gt gt gt lt gt lt gt lt gt lt gt lt gt lt gt lt 7772 gt gt lt gt lt gt lt gt lt gt lt gt lt gt lt gt lt gt lt gt lt gt lt gt lt veonewvmsezze p __ 2 veonswvi z2 _ ___ 02222 gt gt gt gt gt lt gt lt gt lt gt lt DE 461099 05 2013 Page 2 9 SVD adAL Xawvseze x xan 2222 gt x xanviezzz x 222 _ vsonsnwserzze gt ___ 187222 lt lt ES W B LI xt xt e
14. vsomwvesizz vsommvmsezz 001 ee vsommvwzz exwvsezze _____ egeviezz 11 bet eee 1777773 ER w amp aevoczz __ ezz BEN 5 gt ENEE e xi e 1nevezz __ Oc ccc 9 eunsseJd Jeuiqeo eqoud 2IA SSM OVA 062 41 SSH OGAvc SSH J9j 043u09 4oeqwo g Jojenjoe 6 2 6 X3 W3 VSOln v ZH 09 XANV X3 W3 VSOl1n v ZH 09 VL q ac II ON A 06 XALV VL IU qoe II A OLL XALV VL Il YW x34 II ON A vc XALV m 2 08 066 ____ ZHOG AOL _ Jojenjoe
15. 23 10 Angef gte DOK UMM E UE 23 NW 211212 E 24 12 Betriebstagebuch 25 LUC e E 47 13 1 210501 1550180 011011 __ _ 47 13 2 Anschlussdiagramm beheizter 48 2 460016 09 2012 Art Nr 90 310 95 Bedienungs und Installationsanleitung Installation and Operation Instruction NW Gasentnahmesonden Sample Gas Probes Baureihe Serie 222 ATEX 2 TECHNOLOGIES Contents page MNO 26 2 26 2 1 General indication Of 27 3 Explanation of the type plate 29 A dios Uer GESCIIDUION E 29 4 1 General descripti 29 4 2 Included items in 9 nnn nn 30 5 Transport and storing 30 6 Installation ANd 0 30 6 1 D 30 6 2 TUD MUNO m 32 6 3 Connection of the blow back line and the pressure vessel GAS 222 21 ATEX2 31 ATEX2 2110 MR E 33 6 4 IESG Al COMME o p
16. ES ES TXT ES EI ES Ed ES ESES ES d d Das 2 Zr PX pe De II ESESESESESESESESES 212112 211122 I ER ER EISESSIG IE 21111 111111 11111 11 1111111111111 211 11111111 11111 11 1111111111111 EG ES ES XE JXIXIX X 22211110 10 EES IXX Xp XT I 22 2 022 1211120100110227 XIX ZIERT XII EI ET EI EX EN XIX ES EI EI EI EG ES ES EG EG EG XIX PPI _ EI ES ES EI EI ET EG EI ES ES LLIXIXIXL EI ES EI ES LIST JXIX PIPI XIX Ill 5 5 Sessnjyosue ndsyony sep uejuoipqy ssnjyosuejndsyony 40 9 69 eqneJuosssn uosJeA Z L 210 ssnjyosuejnds 40 ssniyosuese ssayy An BunqneJuosJoA Mz gt
17. gt lt gt lt gt lt gt lt gt lt gt lt gt gt lt gt lt gt lt gt lt gt lt gt lt gt lt gt lt o gt lt gt lt eee gt gt gt gt gt lt gt lt gt lt gt lt gt gt gt gt lt gt lt gt lt gt lt gt lt gt lt gt lt gt lt ____ 1775777 T TE 21122171 10022 E gt gt gt gt lt gt lt gt lt gt lt gt lt gt lt gt lt 7772 LL 226 SUOISU9 X9 pue njis ui Saqn DA 461099 05 2013 Page 2 9 x xan 2222 gt x x 222 _ SVD edAL Xawvsezee eed l e pepe 42001 Xew eyeudsouuje eAnonpoij uone seb jsenbei uo euin pue x d 00 seb 21111111 16562229 406 ezz 995 16 _ 6552
18. KIXI ES EG EG JXIX X X2 EG EG 20026099 SBUL O J0 195 xx 48609 Je XIX EI XX 91 22297 5 Jeu pue san Burso 2 8 GO E IU um 00590 EE EE IXIXIX Xxxx 111 19022099 115 55216 olo y LL IXIXIXI XIX 2802229 55216 Jet _ ES ES EI JXIXIXIX XIX EI ES arozzzo ssejureis pejeeld _ XXIX XIX XIX Xxxx pels L IXIXIX 0102229 eg ssejurejs pejejuis ppd IXIXIXIX XIX xxx JXIXIXIX XX 3orozzzov Px pepe PX ro poss TE Spam PETRUS CER T IIIe ees 55016152
19. Ja SIWaq 21253 3413 9 02 3513 4 Jejsiueq L t leuuey 0002 005 WLU 0001 gt lt x gt lt gt lt gt lt gt lt gt lt gt lt gt lt gt lt gt lt gt lt gt lt gt lt gt lt gt lt gt lt gt gt lt gt lt gt lt 0052 1199090 0002 euoou 009 1199094 ww 0001 euoou x x Jeuoou ww 0002 006 ww 0001 4671 ylweley x 77 WW 0002 00981 wu 000 x X x vz _ 21 USUOISUBWIG PUSPSIYOSIJ9 SUBPSIYOSIO e pun ISNvOVzze gt lt gt lt gt lt gt lt gt lt gt lt gt lt gt lt gt lt gt lt 4 gt lt gt lt gt lt gt lt gt lt gt lt gt lt gt lt gt lt gt lt gt lt gt lt gt lt gt lt gt lt ______ 222
20. veoaswvHaozzez xnvizzzz pps JOYE e ppe 015600 jou 61 DOLLZZIY Pappe seu e 98J0J8J9U pessy e ejqissod si Bununoy LLL EEE 19 o3u09 ou 10 2 LLL ISNV Pereeu vs5 ISNV E LLL eeeezzer 1 p XI peyeeyuou Xp xe X TT 804660 payeeyuou Xp xe Joszoresezzzor pejeeuuou ES ER ES EG EG 1XIXIXIX X PX XX jooozceoeceeev payeayuou PX Px Px oostzeoezzzer XIX Xxx 0026066297 payeayuou PCP x x ooorzeoezzzer peyeeuuou pepe Pe Px Pepe Pep PPX 02 payeauuou
21. zo u zo SCHER PTT _ _ EENEG Ixix xix XIX YO 19414 10 IXIX XIX 0 eut 10 9NMed 5 In nin 1 53551313 S S S S SIS S S S 2 suoisuejxe pejeeuuou JO gt gt gt gt gt gt 2 gt gt gt gt gt gt gt gt lllo c SUOISUSLUID SNOLIEN 5 81815 8 812181515 919 JE EEE JE leit 212 12 21212121212151511515 SOUEEN 021010191919 1 90 gt 2 2 2 29 S gt gt DA 461099 05 2013 4 9 5 5 13886 7 573 unioQ 397 e 50 460 9 LT 9Nd S9NCI 09 OOS ZO 09 OOS ISNY ZO 1484 4831311 4 8 4 Sunuuausg CN med uaya azs uny ag 1 8922 OSI lic A Date etc ELD suyo 3778 1 1944
22. 06022099 pezunsseJdun pasop 5 XIX xix 80022099 pezunsseJdun peuedo 5 awe 11 Wat S10jenjoe 211111 1111 111111 11111 ______ 1 1 1 1 Ix x x 09 01 0 ensseJd eqn xt LL LL LL LL LL J BE RT zosezzzor 5 pezunsseJd 21111 1 1 1 11114111 211111 1111 1 11111 111111 1J 211111 1111 111111 111111 11141 1 1 EZHNVAZZZIF PLO 9 9 PL Ol VU X33 9 LT LLL EE 12 ee er c 209 05 062 41 6 Duneeu s 1 1 1 1 11 1 1 1 1141 1 1 1 1 1 2 209 ZH09 0S 2 ege 1 1 1 1 1 1 1 1 1 9 c X3 IWJ VSO Tn ZH 09 0 2 2 1 1 1 1 11 1 c X3 WI VSI IN ZH 09 0 Aem LLL 1 1 1 1 EI TREE 1 1 1
23. Magnetventil berpr fen Pneumatische Ansteuerung berpr fen Keine Heizleistung Keine falsche Spannungsversor Spannungsversorgung ber gung pr fen Kondensatbildung Heizsystem defekt Sonde zur Reparatur einschi K ltebr cken der Entnahme K ltebr cken durch Isolierung Stelle beseitigen Das Wechseln von Ersatzteilen entnehmen Sie bitte den Gliederungspunkten aus Kapitel 7 22 460016 09 2012 Art Nr 90 310 95 Bedienungs und Installationsanleitung Installation and Operation Instruction NW Gasentnahmesonden Sample Gas Probes a UU MERA Baureihe Serie 222 xx ATEX 2 TECHNOLOGIES 9 Instandsetzung und Entsorgung Sollte ein Fehler beim Betrieb auftreten finden Sie unter Gliederungspunkt 8 Hinweise f r die Fehlersuche und Beseitigung Sollten Sie weitere Fragen haben wenden Sie sich bitte an unseren Service Tel 49 0 2102 498955 oder Ihre zust ndige Vertretung Ist nach Beseitigung eventueller St rungen und nach Einschalten der Netzspannung die korrekte Funktion nicht gegeben muss das Ger t durch den Hersteller berpr ft werden Bitte senden Sie das Ger t zu die sem Zweck in geeigneter Verpackung an B hler Technologies GmbH Reparatur Service Harkortstra e 29 40880 Ratingen Deutschland Bringen Sie zus tzlich die Dekontaminierungserkl rung ausgef llt und unterschrieben an der Verpackung an Ansonsten ist eine Bearbeitung Ihres Reparaturauftra
24. See E Freen mm ear 19 3 89 ISIS ISIS IS ISIS 59 59191919 19 19 IN 189 13 IS NIN sss ee gt gt gt gt gt gt gt 5 0 3 515 515 5 5 gt 516 5 1818 lee bs NINININ 0 7 gt suondo 194141 pue Jeu DA 461099 05 2013 9 9
25. gt lt gt lt gt lt gt lt gt lt gt lt gt lt gt lt gt lt gt lt gt lt gt lt gt lt gt lt gt lt gt lt gt lt gt lt gt lt gt lt gt lt gt lt gt lt gt lt gt lt gt lt gt lt gt lt gt lt gt lt gt lt vsonsnwserzze vsonewviezzz __ 12222 gt gt gt lt gt lt gt lt gt lt gt lt gt lt gt lt gt lt gt lt gt lt o gt lt gt lt ___ 222 gt gt gt gt lt gt lt gt lt gt lt gt lt gt lt gt lt gt lt gt lt gt lt gt lt gt lt gt lt gt lt gt lt gt gt gt lt gt lt gt lt gt lt gt lt gt lt gt lt gt lt gt lt gt lt gt lt gt lt gt lt gt lt gt lt gt lt gt lt gt gt lt gt lt gt lt gt gt gt gt lt gt lt gt lt gt lt gt lt gt lt gt lt gt lt gt lt gt lt gt lt gt lt gt lt _ vsonewvoezcc VSO ISNVv 222 gt
26. 8 000 h Emptying of condensate Operator Replace gaskets guides and lubricants Complete probe after 20 000 h Inspection by Buhler Service technician In terms of ball 3 years Buhler valves pneum and magn valves Limit switch after 5 years Replace gaskets on the shaft and in the Operator housing cover Maintenance programme under normal ambient conditions 42 460016 09 2012 Art Nr 90 310 95 Bedienungs und Installationsanleitung Installation and Operation Instruction NW Gasentnahmesonden Sample Gas Probes Baureihe Serie 222 xx ATEX 2 TECHNOLOGIES 8 Trouble shooting and elimination Risk due to defective device Personal injury or damage to property In case of failure switch off the device immediately and it should not be turned on again before elimination of the failure Problem Faure Teen mus _ blow back not efficient No heating up power supply switch off or incor check power supply rect power Condensate forming heating faulty return probe for inspection cold spots in sample line insulate cold spots For replacement of parts see chapter 7 BX460016 09 2012 Art Nr 90 310 95 43 Bedienungs und Installationsanleitung Installation and Operation Instruction NW Gasentnahmesonden Sample Gas Probes a UU MERA Baureihe Serie 222 xx ATEX 2 TECHNOLOGIES 9 Repair and disposal If the device shows irregularities see chapter 8 for t
27. Jeu pue eqn BuIso D _ Jay pue 1 xIx EX xP 02200 JOPUIG eyeoiis 886 0 X IXIXIXOX 10022699 Jepuiq uy 55216 IXIXIXIX 7902209 eJqy 55 10 ES ES ET EG 5 XIX Xxxx XP 9 Sep XIX 40102209 Sais ssejurejs peuejuis _ IXIXIX xix xix XIX X 40000299 ois SSOILIEIS LL aoroezee eejs sse urejs Dees JXIX xxxix EI EG Saz oos T IIIe
28. gt gt gt E gt lt gt lt gt lt gt lt gt lt gt lt lt gt lt gt lt gt lt gt lt gt lt oszze gt gt lt p gt lt gt lt gt lt gt lt gt lt gt lt gt lt gt lt gt lt gt lt gt lt gt lt gt lt gt lt gt lt gt lt gt lt gt lt gt lt gt lt gt lt gt lt gt lt gt lt gt lt gt lt gt lt gt lt gt lt gt lt gt lt gt lt gt lt gt lt gt lt gt lt gt lt gt lt gt lt gt lt gt lt gt lt gt lt gt lt gt lt vsonewvoezcc evezz E gt lt gt lt gt lt gt lt gt lt gt lt gt gt gt gt lt gt lt gt lt gt lt gt lt gt lt gt lt gt lt ____ 1775777 T TE 21122171 10022 E gt gt gt gt lt gt lt gt lt gt lt gt lt gt lt gt lt 7772
29. 02222 gt gt gt gt gt oc o ccc x 00021002229 00611000669 0001000069 00401002229 00601002229 Hed 4 0011 4 0011 4 0011 0002 0091 WW 0001 009 ww 00 ul 8 0 66 ut 7 6L 48 11 x X x vz _ pejeeuuou Jo SUOISUBWIP SNOLEN SOUEEN e ______ gt lt gt lt gt lt gt lt gt lt gt lt gt lt gt lt gt lt gt lt gt lt ______ 222 gt gt gt E gt lt gt lt gt lt gt lt gt lt gt lt lt gt lt gt lt gt lt gt lt gt lt oszze gt gt lt p gt lt gt lt gt lt gt lt gt lt gt lt gt lt gt lt gt lt gt lt gt lt EEE 0474 gt gt lt gt E gt lt gt lt gt lt gt lt gt lt E gt lt zzz E gt lt gt lt gt lt gt lt gt lt gt gt lt gt lt gt lt gt lt gt lt gt lt gt lt gt lt gt lt
30. 1 WW _ 1 1 1 wu IyeISIEP3 xix xix 1 HU 1YEIS OPS 1 1 1 ppt 1 1 Kojeisen _ 1 Kojeisen 1 1 ueisiep3 1 1 xix ueisiep3 _ 1 1 1 1 ET 1 1 1 1 1 TE Toeeer _ 1 1 1 1 1 Rx 1 IyeIsiep3 _ 1 1 1 1 1 _ 1 1 Kojeisen _ 1 1 1 ueisiep3 Pr 1 ueisiep3 L _ E LI ULL __ _
31. 8922 OSI lic A Date etc ELD suyo 3778 1 1944 15 4 11 531141 11 4 PISIUS 494114 5 OSL NCI OV OOOL VSO ISNV AD OSL NCI OOS VSO ISNV AD S9NC Or OOOL AD OV AD 9 v ED vc 0091 G L ZO v 3 9 V ED vc 01 20 E dee vc OOS 8 0 20 MS o i dat ZZ Wg t Gz o v ED amp v o MS dat pojeouun uobunuoBGuesJ Jo v DE 461099 05 2013 Page 5 9 adAL Xaweseee ks ETE EEE 2 eed CT CT SEN x 21 __ e _ 411111 e cec 02001 11111111111111 1 11111111111111111111111114114 __ zc __ x 5 MEIH 71 bbb 1 ee vsonswvsezz 2222 xx
32. Dro LII T IE qi SINININININININININISISISISINISISISINISISISIS ISIS 311 NIS IN ID SISISISINISISININISISINISISINISISINISISIBISISISISISIS ISIS ISIS 9 NI NTN 3zzieueq gt CH E a eel mcm ueuoisueuJig euepeluosJeA 555582 3 553 5 255 gt 0 lt x x x euepeluosJoA lt 0 2 0 gt pun J9 lj DD 461099 05 2013 Seite 3 9 SVD 1o9wvsezee gt O awe 11111 1 veoaswvHaozzez 1 151 ue 0222 29 47 IN UY ue ssnw Jeueq 29 Sun euuo up ue JNU
33. Freen IS Wesnsumeg IN IND IND IN N N IND IND IN IN IN N IR IR ISIN IR IR N IB IR IN IR IN IR IN IB IR IR IR IN IN 2121885 2 2 HI 2 2 5 9 2 55 5 S N 5 3 O gt gt gt gt gt gt gt 5 0 3 515 515 5 5 gt 516 5 1818 lee bs DINDIND N gt gt 0 2 gt 0 gt suondo 194141 pue Jeu DE 461099 05 2013 Page 9 9 vw SUN ER NIECHINOL Accessories for Sample Gas Probe GAS 222 Sample tubes Downstream filters Capacitive vessel s In situ filters Cal gas connections Pneumatic actuators Extensions Adapter flanges 3 2 way solenoid valves Blowback controllers Page 2 4 Page 8 5 7 For general information see data sheet Sample gas probes GAS 222 DA461000 Buhler Technologies LLC 1030 West Hamlin Road Rochester Hills 48309 DA 461099 05 2013 Phone 248 652 1546 Fax 248 652 1598 Page 1 9 Internet www buhlertech com e mail sales buhlertech com x gt lt gt lt gt X lt x x gt lt gt lt x gt lt gt lt x x 70019
34. siodep sepniuued seuede 2 06 ep 0 Lojueujeuorouny ep oessaJd 5 Sunz ay apuja alysq as Sunz ay apu1a6Daa1sq1as soz 2 19 uloup go1ao30suapuoy 2 19 UIOJP go1aoa3o0susapuoy met see 1320d 11113 gn1u25suo11nje8g IN N y4od 11 1 11 LAN LAN ssodf g 110g uuou1a68ny DA 461099 05 2013 8 9 SVD adAL senbaiu uo pue seoug __ LLL LIXL LLL LI LL LL 541 0S1 E ISNV 10 109219 Buyunop 9 40 uj 3exoeJq LIxixix Pee LE 11159504 PPP PPP TPR x x xxix x x x x PPP x xxxix px xxx x px x x ox xo x p o PPP xe xx xe PPX 01 ET PPT 5 8511 E x xxix PPI PPP PP rp JP XY PPP PY PPP pop ox p ox ox ox ox jx PX XI xxxix xx ox PPP poop ox p ox ox ox ox jx prx x xxx xx x xx x x p ox p xo x ox ox ox jx x px xxxix x x x xx px x x pop ox p xo i ox jx xxxix x xx px px px ox p xo xp ox ox xx o
35. xt IXIXL xt 2111 newv ve zzz vso nsNvozzzz SNY 2 222 snvs zze yso 52 222 VSO VSO WSO ISNV 02 222 VSO WW E E X ES A A Nu E a x x X A A _ 5 2021 vsezzel v ezzz 12222 vozzzze vsezzel v ezzz 12222 xx vozzzze l x x X X X X DE X X ek let dX 2222 xx 022221 112221 222 x x x X 1 1 1 1 1 1 jsenbeJ UO pue seaug 469 9 6462029 92062869 17060009 2062029 70600097 062009 419082729 70620029 020209 0 69 17060209 7062029 7202 2229 0 6669 1120620
36. 1 t L I X33 II Xeiv 2111062 21111111 NWAvazeeor 71 I X33 9 II Xeiv ONAOLL AW AeM Z Z LL LL LL 1 1 1 1 1 1 1 1 1 1 1 1 1 00 t L I X33 Xeiv AW AeM z c 211111 1 111111 Ivv 1 1 1 1 2 09 05 A0E2 022 AIW AeM z c 211111 11111 1 a3 209 AOLL AW AeM z c LE 11111111 06 40650 2 2 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 EDIT 772 eC Eee E de Ae 0201 1J 11 12 11 559 10 65910559227 211111 1111 1 LL LL LL 1111 LE E _______ EEE BE 1 1 1 ET ET ET ER EI Nd 111111111111111111111111111111 DID ISIS IBIR IS IB DINININ ININININ NININ IN NIN N N NIN IN IN J J 51551 81 5161818 2 5 815 181812 EISE Sas gt gt gt gt gt gt gt gt gt gt 01106 gt a 3 d x 3 x Jo 2 OJO pejeeu uou JO
37. The weather shield can only be closed when the handle of the filter is positioned vertically Pull cover up to the highest point to unlock support lower it down in position ensure that the latch is locked in Depending on the ambient conditions formation of condensate may occur in the pressure vessel We recommend at least once a year or if the application requires a more frequent regular maintenance to drain the pressure vessel by opening the outlet on the bottom using an Allen key 7 5 Blow back of the in situ filter inside the process High gas temperature during blow back procedure 15 possible because of adiabatic compression Blow back of explosive gas is not allowed Blow back of flammable gas is only allowed with nitrogen inert gas Plant air inert gas must be dry and free from particles Please use filtered air inert gas subject to the PNEUROP ISO class 4 Class Particle m Pressure dew point Oil content particle size 1 up to 5 um F mg m particles gt 151m 40 BX460016 09 2012 Art Nr 90 310 95 Bedienungs und Installationsanleitung Installation and Operation Instruction NW Gasentnahmesonden Sample Gas Probes Baureihe Serie 222 xx 2 TECHNOLOGIES 7 5 1 Manual blow back The shut off valve in the inlet of the pressure vessel must always be open The optional pressure gauge indicates the actual pressure For blowing back first close the shut off valve
38. atzende Gase Uber einen undichten oder offenen R cksp lanschluss k nnen sich explosive bzw toxische Gase bilden F r den Anschluss der Messgasleitung NPT 1 4 sind bei den beheizten Sonden folgende Punkte zu be achten um K ltebr cken zu vermeiden Achten Sie bei der Auswahl der Anschlussverschraubung auf eine m glichst kurze Bauform und k rzen Sie das Anschlussrohr der Messgasleitung soweit wie m glich Hierzu ist der Isoliermantel abzunehmen bzw die Isolierbacken im Bereich der Messgasleitung zu entfernen Dies geschieht durch L sen der Befestigungsschrauben Bruchgefahr Das Isoliermaterial kann zerbrechen Vorsichtig behandeln nicht fallen lassen Nach Anschluss der Messgasleitung ist diese durch die Schelle abzufangen und zu sichern Bei l ngeren Messgasleitungen sind unter Umst nden weitere Sicherungsschellen auf dem Weg zum Analysensystem vorzusehen Nach dem alle Leitungen angeschlossen und auf Dichtheit berpr ft wurden wird die Isolation wieder sorgf ltig eingesetzt und gesichert Gasaustritt Pr fen Sie die Leitungen auf Dichtheit BX460016 09 2012 Art Nr 90 310 95 11 Bedienungs und Installationsanleitung Installation and Operation Instruction Gasentnahmesonden Sample Gas Probes a ECH Baureihe Serie 222 xx 2 TECHNOLOGIES 6 3 Anschluss der Ruckspulung und des Druckluftbehalters fur GAS 22 35 ATEX2 31 ATEX2 und 21 ATEX2 GEFAHR Explosionsfahige Gasgemi
39. r die Gasentnahmesonden GAS 222 2 Die verschiedenen Sondentypen werden in einzelnen Unterabschnitten erkl rt Welche Sonde Sie vor sich haben ersehen Sie aus dem Typenschild Dort ist die Kurzbezeichnung GAS wie auch die jeweilige Typ nummer angegeben z B GAS 222 31 ATEX 2 Vorab eine Kurzzusammenfassung der Sondentypen Alle Sonden sind mit selbstregelnden PTC Heizpatronen sowie einem Temperaturkontakt versehen Die Sonden sind je nach Typ mit einem Eintrittsfilter Filter im Prozess und oder einem Austrittsfilter Filter in der Sonde ausgestattet GAS 222 20 ATEX 2 Sonde mit Austrittsfilter GAS 222 21 ATEX 2 Sonde mit Ein und oder Austrittsfilter Absperrhahn und R cksp lanschluss GAS 222 31 ATEX 2 Sonde mit Eintrittsfilter Absperrhahn und R cksp lanschluss GAS 222 35 ATEX 2 Sonde mit r ckziehbarem Eintrittsfilter und R cksp lanschluss Zubeh r siehe Datenblatt 00461099 am Ende zu diesen Sonden 8 BX460016 09 2012 Art Nr 90 310 95 Bedienungs und Installationsanleitung Installation and Operation Instruction NW Gasentnahmesonden Sample Gas Probes Baureihe Serie 222 xx ATEX 2 TECHNOLOGIES 4 2 Lieferumfang 1x Gasentnahmesonde mit Wetterschutzhaube 1x Flanschdichtung und Schrauben 1x Bedienungsanleitung Zubehorteile sind als gesonderte Position im Auftrag ausgewiesen 5 Transport und Lagerungsvorschriften Die Gasentnahmesonde nur in der Originalverpackung od
40. so ist dieser wie in Kapitel 7 3 f r die Sonde 222 20 ATEX beschrieben zu wech seln Bei der Sonde GAS 222 35 ATEX 2 Griff am hinteren Ende der Sonde unter leichtem Eindr cken um 90 drehen Griff muss dann waagerecht stehen und herausziehen Das verschmutzte Filterelement vom Griff st ck abschrauben Dichtflachen am Griffst ck kontrollieren O Ringe erneuern und anschlie end Fil terelement mit neuem Dichtring montieren Bei einem Ersatzfilter sind O Ringe und Dichtringe im Lieferum fang enthalten Den Griff dann mit neuem oder gereinigtem Filter einf hren und unter leichtem Eindr cken um 90 drehen Griff muss dann senkrecht stehen Durch Ziehen am Griff pr fen ob das Filterelement fest sitzt li HINWEIS Die Keramikfilterelemente sind von ihrer Beschaffenheit sehr zerbrechlich Daher die Elemente vorsichtig handhaben und nicht fallen lassen Die Filterelemente aus Edelstahl k nnen in einem Ultraschallbad gereinigt und fters wieder verwendet werden in diesem Falle verwenden Sie auf jeden Fall neue Dichtungen an Filter und Griffstopfen Die Wetterschutzhaube l sst sich nur wieder schlie en wenn der Griff vollst ndig in der senkrechten steht Dazu die Haube durch leichtes Anheben aus der Verriegelungsst tze l sen und dann herunterklappen Auf richtiges Einrasten der Haubenverriegelung achten Je nach Aufstellungsort und Applikationsbedingungen kann es im Druckluftbeh lter f r die R cksp lluft zu leichter Ko
41. 069066069 600702009 600702209 20902629 0702229 200029 00009100669 00619106669 00019100669 00609100669 004270020229 00007002229 00417002229 00017002229 00507002229 00029002229 00419002229 00019002229 00409002229 5 2002209 02002229 902002209 ut 0001 ut 7 61 006 ut 002 ut 008 4 e e ul 7 87 0 66 ut 7 6L 41786 ul 7 87 0 66 ut 7 6L ut 7 87 0 66 ut 2 64 1 6 7 1 e e Q1 91 oj dn 0002 005 ww 0001 wu 009 WLU 0082 0002 ww 009 ww 0001 009 0002 005 0001 ww 009 ejeds se Jejsiueq 2 2 san 207 san yed ejeds se 3413 Jejsiueq 1 Jeisiuep eqni ejdues Jeyjuey 4 057 Jeuoou Jeuoou Jeuoou 25771 Jeuoou solwieled solweleg 257 solwieled SVD edAL 122 gt gt gt Xawvozzze gt gt lt gt lt VSO
42. 1s pun e3j0Jeurqeuju3 E ___ __ 1 1 1 1 EEE ui Any EL LL 1 SV VSO ISNV _ LU EL LLL LL LLL LLL 909 Larl WSO ISNV EE aen qzieyeq LL XL Lp LL Xi Joosttesezzzor X XE oozresezzer izieuequn Xi 0 099 X 1111 XXIX 00060697 Izieuequn XIX OIX EI EI ES TEE 0060606097 Zreyaqun POX PCT XIX OIX ES ES ES ES EI ES ES ZZ jziayequn XIXIXIXIX Il 0090629 XXIX XXIX
43. 6A occurs The probe has to be fused properly fuse 8 A Assure in general to fulfil the explosion proof laws and standards Damage to the device in case of insulation testing Do not proceed insulation tests with high voltage to the device as a whole The sample gas probe is equipped with extensive EMC protection If insulation tests are carried out the electronic filter devices will be damaged All necessary tests have been carried out for all concerned groups of components at the factory test voltage 1 kV or 1 5 kV respectively depending on the device If you wish to carry out the insulation test by yourself please test only separate groups of components Disconnect the heating of the probe or of the pressure vessel and pull off the supply of the solenoid valves see wiring diagram attached Then carry out the insulation tests 34 460016 09 2012 Art Nr 90 310 95 Bedienungs und Installationsanleitung Installation and Operation Instruction Ww Gasentnahmesonden Sample Gas Probes Baureihe Serie 222 xx 2 TECHNOLOGIES If the probe is ordered with magnetic valves these are applied to the strip terminal in the factory Terminals for the connection of the magnetic valves for automatic back flushing are provided in the terminal box see attached diagram for terminal pin assignment If used in hazardous area The requirements of the EN 61241 0 1 regarding dust deposits and temperatures mu
44. ATEX2 werden nichtbrennbare und brennbare Gase geleitet die im Normalbetrieb deutlich die untere Explosionsgrenze unterschreiten oder die obere Explosionsgrenze berschreiten Die Betriebsmittel d rfen nur durch Fachpersonal installiert werden die einschl gigen Sicherheitsvorschriften sind zwingend zu beachten Die Betriebsmittel sind f r den Einsatz in Zone 2 im Gas Ex Bereich geeignet This declaration is valid for all devices manufactured according to the design and manufacturing specifications of the manufacturer These specifications are part of this declaration Sample gas probes GAS 222 xx ATEX2 are intended for installation in gas analysis systems Inflammable and flammable gases with a content above the upper explosion limit and under the lower explosion limit not explosive in normal operation are led through the sample gas probes The equipment has to be installed by trained personnel All safety regulations have to be fulfilled The equipment can be used in zone 2 in gas ex areas Zur Beurteilung der Konformit t wurden folgende harmonisierte Normen in aktueller Fassung herangezogen The following harmonized standards in actual revision have been used EN 1127 1 Explosionsf hige Atmosph ren Explosionsschutz EN 13463 1 Nicht elektrische Ger te f r den Einsatz in explosionsgef hrdeten Bereichen Teil 1 EN 13463 5 Nicht elektrische Ger te f r den Einsatz in explosionsgef hrdeten Bereichen Teil 5 EN 50014 Elektrische B
45. Atex 35 Atex mit Zubeh r Druckvorratsbeh lter PAV 01 Art Nr 46222PAV mit zugeh rigem Zubeh r resultierender eingeschr nkter Einsatzbereich kennzeichnung II 1D 2GD 21 Atex 31 Atex 20 Atex 21 Atex Keramik E intrittsfilter Art Nr 46222307 46222307F Keramik Austrittsfilter Art Nr 46222026 46222026P II 1D 3G 2GD 1D 3G 2GD 20 Atex 21 Atex Entnahmerohre Art Nr 46222001 462220011 46222006 46222004 46222016 Il1G 2GD 20 Atex 21 Atex 21 Atex 31 Atex Entnahmerohre Keramik Art Nr 4622200205 4622200210 4622200215 Pneumatikzylinder mit Endlagenschalter Atex Art Nr 46222019 Il 3G 260 II 1GD 2630 Zubeh r nicht geeignet f r die Entnahme von extrem z nde mpfindlichen St uben mit einer Mindestz ndenergie MZE von lt 3mJ aus Zone 2 d rfen Keramik Entnahmerohre nur eingesetzt werden wenn anwendungs und prozessbedingte intensive elektrostatische Aufladungsprozesse ausgeschlossen sind DD461099 05 2013 Seite 7 9 1 1 2 lt 0 _____ ___ 359 25 184 1 90 10 18413046 11 33 34118 us3uoy 8110 S sspinz ayspudsyany unu uaBunuapug 3 05
46. Temperaturbe st ndigkeit gt 100 C besitzen Achten sie auf ausreichende Zugentlastung des Anschlusskabels Kabel durchmesser dem Dichtungsring der Anschlussdose anpassen Beachten Sie beim Anschluss au erdem die g ltigen Ex Schutzvorschriften und allgemeinen Warnhinweise aus Kapitel 7 1 20 BX460016 09 2012 Art Nr 90 310 95 Bedienungs und Installationsanleitung Installation and Operation Instruction E Cr Gasentnahmesonden Sample Gas Probes EU FIERI Baureihe Serie 222 xx ATEX 2 TECHNOLOGIES GEFAHR Adiabatische Kompression Explosionsgefahr Das Auftreten hoher Gastemperaturen durch adiabatische Kompression beim R cksp len ist m glich F hren Sie die R cksp lung nie bei explosionsf higen Gasen durch Verwenden Sie f r die R cksp lung von brennbarem Gas nur Stickstoff Inertgas Sch den am Ger t Besch digung der Kabel Besch digen Sie das Kabel nicht w hrend der Montage Installieren Sie eine Zugentlastung f r den Kabelanschluss Sichern Sie die Kabel gegen Verdrehen und L sen Achten Sie auf die Temperaturbest ndigkeit der Kabel gt 100 C 7 6 Wartungsplan i HINWEIS Bei Einsatz der Sonde in explosionsgefahrdeten Bereichen ist der Wartungsplan unbedingt einzuhalten Zeitraum in Gesamte Sonde 8000 h Kontrolle Gasanschl sse Schutz und Betreiber Kontrolleinrichtungen einwandfreie Funktion Verschmutzung Bei Besch digungen wechseln bzw durch B hler
47. bei Please include the current material safety data sheet of the hazardous material Angaben zum Absender Information about the dispatcher Firma Company Anschrift Address Ansprechpartner Contact person Abteilung Division E Mail Tel Phone Fax Unterschrift Ort Datum Stempel Location date Signature Stamp Buhler Technologies GmbH D 40880 Ratingen Harkortstr 29 Tel 49 0 2102 4989 0 Fax 49 0 2102 4989 20 e mail service buehler technologies com Internet www buehler technologies com vw NIECHINOL Zubeh r fur Gasentnahmesonden GAS 222 Entnahmerohre Austrittsfilter Druckluftvorratsbeh lter Eintrittsfilter Pr fgasanschl sse pneumatische Antriebe Verl ngerungen Adapterflansche 3 2 Wege Magnetventile R cksp lsteuerungen Seite 2 4 Seite 8 Seite 5 7 Zur allgemeinen Beschreibung siehe Datenblatt Gasentnahmesonden GAS 222 DD461000 Buhler Technologies GmbH DD 461099 40880 Ratingen Harkortstr 29 05 2013 Tel 49 0 2102 4989 0 Fax 49 0 2102 4989 20 Seite 1 9 Internet www buehler technologies com e mail analyse buehler technologies com x xanw zizzz gt gt P Po x x 02222 gt gt gt gt gt oc o
48. e PICS e ejqissod si SUOISU9 X9 pue 549111 njis ui Saqn EE E LE EL LL LE LE 1 _ _ LL LL HE E E LLL 1 0 DE a EEE u u a en EEE 10 9 2 yee MSy ___ WSO ISNV Xxx u 91 467 ___ YSI ISNV E LLLLLIXIXIX yee 491 669 usi Sa xT Jooorseezcor ez payeayuou 9 XL pt 8 0 6200 payeayuou 0222 He 107 uev us Px Poo cP PY Kx aee ss wzi og T pr EECHER SCHER T lee iez uz SET pee pepe fe pen pop che Pex 880740 SE eu uro 107 PREPPED PP Po
49. for use for example legislation on flammable liquids explosion protection is to be taken into particular consideration Chemical resistance for other substance on request BX460016 09 2012 Art Nr 90 310 95 45 Bedienungs und Installationsanleitung Installation and Operation Instruction 4 Gasentnahmesonden Sample Gas Probes a MERA Baureihe Serie 222 xx ATEX 2 TECHNOLOGIES 12 User book Please make copies Maintenance performed probe Nr Operation time Remarks oignature date 46 BX460016 09 2012 Art Nr 90 310 95 Bedienungs und Installationsanleitung Installation and Operation Instruction NW Gasentnahmesonden Sample Gas Probes a PU MERA Baureihe Serie 222 xx ATEX 2 TECHNOLOGIES 13 Zeichnungen 13 Drawings 13 1 Anschlussdiagramm 13 1 Wiring diagram probe Netz Power Unter low temp alarm Anschlu belegung wiring diagramm Netz Power 115 230V AC 400W Heizung Heating 000084 Unter low temp alarm max Spannung Voltage 30V max Schaltstrom rated current 100 Kontakt ffnet bei erreichen der Betriebstemperatur contact opens at operaty temperatur Optional mit Schlie er optional with close contact Kontakt schlie t bei erreichen der Betriebstemperatur contact closed at operaty temperatur BX460016 09 2012 Art Nr 90 310 95 47 Bedienungs und Installationsanleitung Installation and Operation Instruction ww Gasentnahmesond
50. gt lt gt lt o gt lt gt lt x x VSO ISNVv 222 gt gt gt gt gt gt lt gt gt gt lt gt lt gt lt gt lt gt lt gt lt gt gt lt gt lt gt lt gt lt gt lt gt lt gt lt gt lt o gt lt gt lt EEE 0474 gt gt lt gt E gt lt gt lt gt lt gt lt gt lt E gt lt zzz E gt lt gt lt gt lt gt lt gt lt gt gt lt gt lt gt lt LL 226 0002 005 WLU 0001 gt lt x gt lt gt lt gt lt gt lt gt lt gt lt gt lt gt lt gt lt gt lt gt lt gt lt gt lt gt lt gt lt gt gt lt gt lt gt lt 0052 Jeuoou ww 0002 Jeuoou 006 euoou WW 000 Jeuoou Jeuoou WW 0002 006 WW 000 4671 2671 solweled 1 SOIWEISQ x x x WW 0002 00981 ww 000 vz x X x u16ue SUOISUS X9 JO SUOISUSWIP 5 SNOUEN e SUOISU
51. im Anhang sind Klemmen f r den Anschluss der Magnetventile bei automatischer R cksp lung vorgesehen i HINWEIS Bei Einsatz in explosionsgefahrdeten Bereichen Die Anforderungen der EN 61241 0 1 in Bezug auf Staubablagerungen und Temperaturen sind einzuhalten GEFAHR Explosionsgefahr durch ffnen des Magnetventilgeh uses Das Magnetventil ist ein geschlossenes System Es darf nicht demontiert werden Als Kurzschlussschutz muss dem Magneten eine Sicherung max 3 x ly nach IEC 60127 2 1 bzw ein Mo torschutzhalter mit Kurzschluss und thermischer Schnellausl sung Einstellung auf Bemessungsstrom vorgeschaltet werden Bei sehr geringen Bemessungsstr men des Magneten kann die Sicherung mit dem kleinsten Stromwert nach IEC Norm verwendet werden Entweder wird diese separat vorgeschaltet oder im dazugeh rigen Versorgungsger t untergebracht Die Sicherungs Bemessungsspannung muss gleich oder gr er als die angegebene Nennspannung des Magneten sein und das Ausschaltverm gen des Sicherungseinsatzes muss gleich oder gr er als der ma anzunehmende Kurzschlussstrom am Einbauort sein Der Sicherungsnennwert ist auf dem Magneten angegeben Beispiel Sicherung Fuse 0 08 A 14 BX460016 09 2012 Art Nr 90 310 95 Bedienungs und Installationsanleitung Installation and Operation Instruction Cr e Gasentnahmesonden Sample Gas Probes BUHLER Baureihe Serie 222 xx ATEX 2 TECHNOLOGIES 7 Betr
52. of the probe handle at the bottom of the weather shield then open the shut off valve between the pressure vessel and the probe with a very fast turn fully open This is recommended to achieve the best cleaning result Close the valve after about 10 seconds and open again the shut off valve of the probe 7 5 2 Automatic blow back For automatic blow back the shut off valve in the probe must be equipped with a pneumatic actuator op tional The control circuit of the main system provides the electrical contacts to reassure the following steps 1 Close shut off valve in probe 2 Open solenoid valve between pressure vessel and probe for about 10 seconds 3 Open shut off valve in probe again Note The blow back procedure can also be carried out in time sequences i e close probe valve and open solenoid valve for 10 seconds blow back open probe valve every few minutes hours or days depending on dust load in process 7 5 3 Heated pressure vessel Optional it is possible to use a heated pressure vessel for blow back The heating system is intended for antifreeze The pressure vessel has also self regulated heating system heating PTC cartridges and can therefore be connected directly to the power supply 115 230 V AC 50 60 Hz see type plate For wiring up see the attached diagram in chapter 13 2 Wire the probe strain relieved adapt cable diameter to the grommet Protect the cable against torsion and pulling Only use c
53. or the smouldering temperature of existing flammable dusts or layers of dust have to be considerably higher than the maximum surface temperature of the probe observe applicable standards and statutory rules The sample gas probes are provided with a mounting flange The installation site and the installation posi tion depend on the application Whenever possible the extension tube should point slightly downward The place of installation should be weather shielded Make sure that the access to the installation site is safe and free also for maintenance carried out later and that there is enough space to take out the probe even with the extension tube attached In case that the sample gas probe is transported in parts to the installation site the probe has to be assem bled first The downstream filter and the O ring for the handle are separate items and have to be inserted into the probe Operating without downstream filter is not allowed O ring handle The sample tube or the in situ filter and if necessary the extension must be fixed Finally the sample gas probe is put in place by using the delivered gaskets and bolts For heated probes all metal parts exposed to ambient must be fully insulated after the probe has been in Stalled properly This is necessary to avoid cold spots The type of insulation must be suitable for the partic ular application and be weather proof BX460016 09 2012 Art Nr 90 310 95 31 Bedienungs
54. und Einsatzbedingungen eingehalten werden Schutzeinrichtungen verwendet werden und vorgeschriebene Wartungsarbeiten durchgef hrt werden bei der Entsorgung die gesetzlichen Regelungen beachtet werden Wartung Reparatur Reparaturen an den Betriebsmitteln d rfen nur von Buhler autorisiertem Personal ausgef hrt werden Nur Umbau Wartungs oder Montagearbeiten ausf hren die in dieser Bedienungs und Installationsan leitung beschrieben sind Nur Original Ersatzteile verwenden Bei Durchf hrung von Wartungsarbeiten jeglicher Art m ssen die relevanten Sicherheits und Betriebsbe stimmungen beachtet werden BX460016 09 2012 Art Nr 90 310 95 5 Bedienungs und Installationsanleitung Installation and Operation Instruction v Gasentnahmesonden Sample Gas Probes Baureihe Serie 222 xx 2 TECHNOLOGIES GEFAHR Elektrische Spannung Gefahr eines elektrischen Schlages Trennen Sie das Gerat bei allen Arbeiten vom Netz Sichern Sie das Gerat gegen unbeabsichtigtes Wiedereinschalten Das Ger t darf nur von instruiertem fachkundigem Personal ge ffnet werden GEFAHR Giftige tzende Gase Messgas kann gesundheitsgef hrdend sein Sorgen Sie ggf f r eine sichere Ableitung des Gases Stellen Sie vor Beginn der Wartungsarbeiten die Gaszufuhr ab und sichern Sie sie gegen unbeabsichtigtes Aufdrehen Sch tzen Sie sich bei der Wartung vor giftigen tzenden Gasen Tragen Sie die entsprec
55. 09 LU CH 9 9 16060209 6062029 Hed X X XIX XIX X X X X X X 77773 EI EI gt lt lt gt lt gt lt gt lt gt lt gt lt gt lt gt lt gt lt gt lt gt lt gt lt gt lt gt lt pL ee I EE T LE WI LEE 9215 9JOd 009 xew eyeudsouuje eAnonpojJ seb 622 877 uy6ue 9 06 xew e1eudsouuje Burzipixo uone seb 19915 55 5 19915 55 5 29 SSIWEIOT 52 LLSV SOIWEIOT Jeoe dsip Jeoe dsip 015 55 5 Jeoe dsip uj 015 55 5 6 56 9 1615 6 56 9 1615 Jeoe dsip Jeoe dsip Jeoe dsip 015 55 5 Jeoe dsip 015 55 5 6 56 1615 6 56 9 1615 E149 N suoisua xe pejeeuuou Jo SUOISUSWIP SNOLLEN SIEUSIEU SNOEN SUOISU9 X9 pue 59111 njis ui DE 461099 05 2013 Page 3 9 SVD adAL 1 mwvsezee gt awe __
56. 1 1 xx 1 1 1 1 1 1 ocozezor uessojuoseb sopyonup 1 1 1 xx 1 1 1 1 1 1 800222971 uego soponip 4 ____ Uyeyjo ny iny JopuljAzyiyeunoug 211111 L 11 11 y y 1 1 1 1 vnAvazeeer 184 01 0 _ 111111 LI LI _ 11111 eoseeeeer bunieyeH 211111 11 11 1 211111 1 LE LLL LL LL LL EL LL LL LL LL eee xIxIx ZHAVdzee9v PLO 9 9 pL Ol VU X33 9 II mem 10 Z ZH09 0S 062 81 Bunzieueg 1 1 1 1 11 2 2 09 08 bunzieueg epujebensqies XIXIX XIXIXI LI J Lew vazeeor c INJ VSO 1n ZH 09 0 2 269M 2 2 1 1 1 1 11 _ 29 c X3 5 ZH 09 2 2 Li Li d LI IL J 1 I X33 Xeiv INAOEZ 2 2 _ LI LI
57. 15 4 11 531141 11 4 PISIUS 494114 5 OSL NCI OV OOOL VSO ISNV AD OSL NCI OOS VSO ISNV AD S9NC Or OOOL AD OV AD 9 v ED vc 0091 G L ZO v 3 9 V ED vc 01 20 E dee vc OOS 8 0 20 MS o i dat ZZ Wg t Gz o v ED amp v o MS dat pojeouun uobunuoBGuesJ Jo v DA 461099 05 2013 Page 5 9 211111 cl tT ty ty be e TT TT 2 4 21411 4 111110 4 __ adAL SEL __ zc __ cec 9 1569 4 XIXIXI 1 64066060099 jeuiqeo eqoJd 901 553 211111 1 LL EL 1 J J 66660099 5 5 OWA 082 91 554 211111 LL 1111 J 1 1114 SEN dg gd 19 043u02
58. 229 406 622 995 ssajuieis 0202229 13 0081 2571 8 2 17060009 2062029 14 0081 280 SSIWEJIST 4 0081 LZSV SOIWEIOD N MERE ES 469202099 6sezeeen X 24609 X X xix 1 38 062zzov xix 1 xix 1 pdx 1894S ssejureis xix 1 8 6 6 xix E Xix 1 xx xix 1 xix xix 1 pdx Petz seou xix 991S seou XX xix xix xix 1 XX xix xix EES DER xix
59. 9 X9 pue 59111 njis ui ISNvOVzze gt lt gt lt gt lt gt lt gt lt gt lt gt lt gt lt gt lt gt lt 4 gt lt gt lt gt lt gt lt gt lt gt lt gt lt gt lt gt lt gt lt gt lt gt lt gt lt gt lt gt lt ______ 222 gt gt gt E gt lt gt lt gt lt gt lt gt lt gt lt lt gt lt gt lt gt lt gt lt gt lt oszze gt gt lt p gt lt gt lt gt lt gt lt gt lt gt lt gt lt gt lt gt lt gt lt gt lt gt lt gt lt gt lt gt lt gt lt gt lt gt lt gt lt gt lt gt lt gt lt gt lt gt lt gt lt gt lt gt lt gt lt gt lt gt lt gt lt gt lt gt lt gt lt gt lt gt lt gt lt gt lt gt lt gt lt gt lt gt lt gt lt gt lt gt lt vsonewvoezcc evezz E gt lt gt lt gt lt gt lt gt lt gt lt gt gt gt gt lt gt lt gt lt gt lt gt lt gt lt gt lt gt lt
60. Bedienungs und Installationsanleitung Ww Installation and Operation Instruction u ERI Gasentnahmesonden Sample Gas Probes TECHNOLOGIES Baureihe Serie 222 xx ATEX 2 Lesen Sie die Bedienungsanleitung vor dem Gebrauch des Ger tes gr ndlich durch Beachten Sie insbesondere die Hinweise unter Gliederungspunkt 2 Andernfalls k nnten Gesundheits oder Sachsch den auftreten Die B hler Technologies GmbH haftet nicht bei eigenm chtigen Anderun gen des Ger tes oder f r unsachgem en Gebrauch Read this instruction carefully prior to installation and or use Pay attention particularly to all advis es and safety instructions to prevent injuries B hler Technologies GmbH can not be held respon sible for misusing the product or unreliable function due to unauthorised modifications BX460016 09 2012 Art Nr 90 310 95 B hler Technologies GmbH Harkortstr 29 D 40880 Ratingen EN Tel 49 0 21 02 49 89 0 Fax 49 0 21 02 49 89 20 Internet www buehler technologies com Email analyse buehler technologies com Bedienungs und Installationsanleitung Installation and Operation Instruction Gasentnahmesonden Sample Gas Probes a ECH Baureihe Serie 222 xx 2 TECHNOLOGIES Inhaltsverzeichnis Seite 1 1 1111 ta ata cca ces esc 4 2 WENIGE la E 4 2 1 Allgemeine nnn nennen 5 3 Erl ute
61. Gegenflansch befestigt Bei beheizten Sonden sind die blank liegenden Flanschteile und ggf der Einbaustutzen nach der Montage vollst ndig zu isolieren damit K ltebr cken unbedingt vermieden werden Das Isoliermaterial muss den Anwendungsvoraussetzungen entsprechen und wetterfest sein 6 2 Anschluss der Gasleitungen Die folgende Tabelle gibt einen berblick ber die Anschl sse der Messgassonden Sonde Vorratsbeh lter Kugelhahn Steuerventil GAS 222 PAV 01 pneum Antrieb 3 2 Wege MV Anschlussflansch DN65 PN6 DN3 150 2 Messgaseingang G3 4 Messgasausgang NPT 1 4 Sp lanschluss G3 8 Pr fgasanschluss Rohr 26 Rohr 21 42 Befullanschluss NPT 1 4 Kondensat G1 2 Bypass NPT 1 4 Steuerluft G1 8 G1 4 NPT 1 4 2 7 nach Ausf hrung 2 nur GAS 222 xx ANSI und GAS 222 xx AMEX 10 BX460016 09 2012 Art Nr 90 310 95 Bedienungs und Installationsanleitung Installation and Operation Instruction v Gasentnahmesonden Sample Gas Probes UU MERA Baureihe Serie 222 xx ATEX 2 TECHNOLOGIES Die Messgasleitung ist mittels geeigneter Verschraubung sorgfaltig und fachgerecht anzuschlieBen Dies gilt auch bei allen Sonden f r die Option Pr fgasanschluss Die Sonden der Baureihe GAS 222 21 31 35 verf gen Uber einen Sp lanschluss in G3 8 Ohne werkseitig angebaute R cksp lvorrichtung liegt dieser offen vor Vor Inbetriebnahme ist der Sp lan schluss gasdicht zu verschlie en GEFAHR Giftige
62. HNOLOGIES 6 4 Elektrische Anschlusse Der Anschluss darf nur von geschultem Fachpersonal vorgenommen werden Falsche Netzspannung kann das Ger t zerst ren Bei Anschluss auf die richtige Netzspannung gem Typenschild achten Sch den am Ger t Besch digung der Kabel Besch digen Sie das Kabel nicht w hrend der Montage Installieren Sie eine Zugentlastung f r den Kabelanschluss Sichern Sie die Kabel gegen Verdrehen und L sen Achten Sie auf die Temperaturbest ndigkeit der Kabel gt 100 C Diese Sonden werden mit zwei W rfelsteckern nach EN 175301 803 ex DIN43650 ausgeliefert Die Ste cker sind so konfiguriert dass sie nicht vertauscht angeschlossen werden k nnen Diese Einstellung darf aus Sicherheitsgr nden nicht ver ndert werden Ein Stecker dient der Stromversorgung der zwei Heizpatronen Netzanschluss 115 230 VAC 50 60 Hz siehe Typenschild der andere Stecker ist f r den Thermo Alarmkontakt vorgesehen Alarm Ausgang welcher gem EN 60079 14 und 15 energiebegrenzt anzuschlie en Umax 30V Imax 100 ist Der Anschluss erfolgt gem Belegungsplan siehe 13 2 Verwenden sie f r den Anschluss der Spannungsversorgung ausschlie lich Kabel die eine Temperaturbe st ndigkeit gt 100 C besitzen Achten sie auf ausreichende Zugentlastung des Anschlusskabels Kabel durchmesser dem Dichtungsring der W rfelstecker anpassen Bitte beachten sie dass beim Heizsystem kurzzeitig hohe Eins
63. HNOLOGIES Begriffsbestimmungen fur Warnhinweise Hinweis Signalwort f r wichtige Information zum Produkt auf die im besonderen Ma e aufmerksam gemacht werden soll Signalwort zur Kennzeichnung einer Gef hrdung mit geringem Risiko die zu einem Sach schaden oder leichten bis mittelschweren K rperverletzungen f hren kann wenn sie nicht vermieden wird Signalwort zur Kennzeichnung einer Gef hrdung mit mittlerem Risiko die m glicherweise Tod oder schwere K rperverletzungen zur Folge hat wenn sie nicht vermieden wird Gefahr Signalwort zur Kennzeichnung einer Gef hrdung mit hohem Risiko die unmittelbar Tod oder schwere Korperverletzung zur Folge hat wenn sie nicht vermieden wird Sarre Ax sess A A RRS Abese 21 Allgemeine Gefahrenhinweise Das Gerat darf nur von Fachpersonal installiert werden Beachten Sie unbedingt die fur den Einbauort rele vanten Sicherheitsvorschriften und allgemein g ltigen Regeln der Technik Beugen Sie St rungen vor und vermeiden Sie dadurch Personen und Sachschaden Der fur die Anlage Verantwortliche muss sicherstellen dass Sicherheitshinweise und Betriebsanleitungen verfugbar sind und eingehalten werden Unfallverh tungsvorschriften der Berufsgenossenschaften beachtet werden in Deutschland Grunds tze der Pr vention BGV A1 und Elektrische Anlagen und Betriebsmittel BGV die zul ssigen Daten
64. HOS AOLL AW ew z z AW em z c ESESES HMAvdeecov 1 yo 965 10 5911055929 BIETET 4220299 LO Avd jueiquuy 559 9Anioede Jo jjenuey pejeeuuou JO 5 JO yoeqmolg DE 461099 05 2013 Page 6 9 Details A Blowback Ordering note for capacitive vessel For attachment GAS 222 11 30 35 U is required Ordering note for pneumatic actuator If a blowback controller is required only actuator P N 46222030 is possible We advise the installation of a position indicator switch to control the pneumatic actuator Integrated blowback controller in the probe controller In addition to the stand alone blowback controller RRS an integrated blowback controller is optionally available Blowback cycle time and actual blowback time can be adjusted via the keys and menu of the controller The blowback and manual operation will be shown on the display The blowback controller can be programmed via the keys manual or automatic operation is possible Besides the status output of the controller a blowback status signal is provided Blowback will be usually initiated by signals coming from the main controls lf the position indicator switch is installed the controller will use this input for the pro
65. Instandsetzen lassen Kugelhahne Alle 8000 h Kugelhahn auf Dichtheit und Funktion Betreiber berpr fen Filter Alle 8 000 h Filter auf Verschmutzung berpr fen sa Alle 8 000 h 1 O Ring Dichtungen austauschen Betreiber 2 zudem nach jedem Filterwechseln Dichtungen erneuern Druckbeh lter Alle 8 000 h Kondensat ablassen Antrieb 1 x pro Jahr Dichtungen Fuhrungen und Schmier Hersteller stoffe ersetzen Gesamte Sonde Nach 20 000 h Inspektion durch B hler Service Techniker Kugelhahn pne oder 3 Jahren B hler um u magn Ven tile Endlagenschalter Nach 5 Jahren Dichtungen an der Welle und im Ge Betreiber hausedeckel austauschen Wartungsplan bei normalen Umgebungsbedingungen BX460016 09 2012 Art Nr 90 310 95 21 Bedienungs und Installationsanleitung Installation and Operation Instruction Gasentnahmesonden Sample Gas Probes a UU MERA Baureihe Serie 222 xx ATEX 2 TECHNOLOGIES 8 Fehlersuche und Beseitigung Risiko durch fehlerhaftes Ger t Personen oder Sachsch den m glich Beheben Sie St rungen am Ger t umgehend Schalten Sie das Ger t aus und trennen Sie es vom Netz Problem St rung m gliche Ursache Age Kein bzw verminderter Filterelement verstopft Filterelement reinigen bzw Gasfluss austauschen Gaswege verstopft Entnahmerohr reinigen Kugelhahn geschlossen Kugelhahn ffnen R cksp lung Option ohne Druckluftnetz berpr fen Funktion
66. Methanol 111 11 934 CH Cl Methylenchlide 110 20 CHO ____ 10 20 40 10 11 11 1 2 SFs 10 20 00 H S 11 11 44 No Nitrge 41 10 Styrene 111 30 1 0 CeHsCHs _ Methylbenzene 11 11 3 3 WO Water H Hydrogen 1 10 0 0 0 1 resistant 2 practically resistant 3 partially resistant 4 not resistant 0 no data available Two values are given for each medium left number value at 20 C right number value at 50 C Temperature Important note The tables headed Chemical resistance of plastics and Properties of plastics materials have been compiled from information from various producers of raw materials The figures relate exclusively to laboratory tests on raw materials Plastics items made from these materials are often subject to influences which cannot be detected in a laboratory test temperature pressure stresses in the material chemical substances design features etc For these reasons the figures quoted can serve only as a guideline In case of doubt we strongly recommend that a test be carried out No legal claims can be derived from these figures and we disclaim all liabil ity The chemical and mechanical resistance of a product does not suffice for the assessment of its suitability
67. PPP PPT fx Pe Toc ex Px Px ear PPP PPT PPP 15500000299 PPP PT PPT PPP PrP PT xp esser _ 1111 1111 E E dL 11 1 _____ EIC ITI ES 760 PO SNY 01854140 _ 1 1 1 1 xix 20 Jo NS U 10 5 NININININININININININININININININININININININININININININ NININININININININININININININIRINININININININININIRIRININ 10 sleli ma eaa 8 SIS RSS aa 2 zs gt gt gt gt gt gt gt gt gt gt gt gt gt gt gt gt gt suoisueuJlp 55555 5 26669258289 9 9 9 g g 7 22222221 5 5 5 SNOUe 2 9glgglg olg gt gt gt gt gt gt gt gt gt SUOISU9 X9 pue 5 njis ui Saqn DE 461099 05 2013 Page 4 9 5 5 13886 7 573 unioQ 397 e 50 460 9 LT 9Nd S9NCI 09 OOS ZO 09 OOS ISNY ZO 1484 4831311 4 8 4 Sunuuausg CN med uaya azs uny ag 1
68. T PPT 5 8511 E x xxix PPI PPP PP rp JP XY PPP PY PPP pop ox p ox ox ox ox jx PX XI xxxix xx ox PPP poop ox p ox ox ox ox jx prx x xxx xx x xx x x p ox p xo x ox ox ox jx x px xxxix x x x xx px x x pop ox p xo i ox jx xxxix x xx px px px ox p xo xp ox ox xx ox jx px 11 I RR PPX XY XI 2 2 1 000 2 0 20102669 866600 780800 660820 684800 5 Bulyoo e uonoeuuoo y 104 Bui uonoeuuoo YSNyyoe 40 m s Hulyoo7 0 10 ysem yoeq 104 9 0 Jod seb ajdwes 104 Bun 18 Wod ajdwes Jo Buys X X X X 69 800 LUS 8 Bui 7218006 611800 ZEECCCOV QEECCCOV eccc9v 60ECCCOV 70022097 9 od seb ajdwes 104 DumiJ od ejduues 104 DumiJ YOOUD 8 uonoeuuoo seb L9 uonoeuuoo seb 2942 9 sef 9 seb jeg 64 081 6 ISNV Jeydepy 501100 sayin LO t sf i os o gt gt gt BN NN X xIx ES EG JXIXIXIXO Xxxx veoccco Sea SBUL O jo 195
69. Wird eine Ruckspulsteuerung benotigt ist als pneumatischer Antrieb nur die Art Nr 46222030 moglich Wir empfehlen zur Uberwachung des pneumatischen Antriebs den Einsatz des Endlagenschalters Ruckspulsteuerung integriert in Sondenregler Neben der separat zu montierenden Ruckspulsteuerung RRS ist optional auch eine in den Sondenregler integrierte R cksp lsteuerung erh ltlich Die R cksp lparameter f r die Zykluszeit und die eigentliche R cksp lzeit werden ber die Tasten und das Men des Reglers eingestellt Auf dem Display werden R cksp lung und manueller Betrieb mit angezeigt Au erhalb des automatischen Zyklusses kann die Steuerung ber die Tastatur auch manuell angesteuert werden Neben dem normalen Statusausgangs des Reglers steht elektrisch auch das Signal des R cksp lzustands zur Verf gung Eine R cksp lung kann auch mit einem Signal von extern beispielsweise der Gesamtsystem Steuerung angesto en werden Bei Einsatz des Endlagenschalters zur berwachung des pneumatischen Antriebes f r das Messgas wird das vollst ndige Schlie en des Kugelhahnes in der Steuerung verarbeitet B Explosionsgef hrdete Bereiche Es ist zu beachten dass je nach verwendetem Zubeh r der zugelassene Einsatzbereich der Sonden eingeschr nkt sein kann Bitte beachten Sie dringend die Bedienungsanleitungen der Sonden sowie die Kennzeichnung auf dem jeweiligen Typenschild Gasentnahmesonden GAS 222 Atex Typen 21 Atex 31
70. ab Sch den am Ger t Halten Sie die Wetterschutzhaube geschlossen BX460016 09 2012 Art Nr 90 310 95 15 Bedienungs und Installationsanleitung Installation and Operation Instruction Gasentnahmesonden Sample Gas Probes UU MERA Baureihe Serie 222 xx ATEX 2 TECHNOLOGIES GEFAHR Explosionsgefahr durch elektrostatische Entladung bzw Aufladung Funkenbildung Betriebsmittel durfen nur dort eingesetzt werden wo es beim Normalbetrieb nicht zu haufigen zundfahigen elektrostatischen Entladungen kommen kann Reinigen Sie Geh useteile aus Kunststoff und Aufkleber nur mit einem feuchten Tuch Sch tzen Sie das Betriebsmittel vor externen Schlageinwirkungen GEFAHR Beschadigung des Gehauses oder von Bauteilen Maximaler Arbeitsdruck und Temperaturbereich des Antriebes darf nicht berschritten werden Antrieb steht unter Druck L sen oder entfernen Sie niemals die Deckel oder vorhandenes Zubeh r wenn der Antrieb unter Druck steht Niemals den Antrieb mit der Funktion einfachwirkend ffnen Dies darf nur im Herstellerwerk erfolgen Befestigen Sie keine Hebel oder Werkzeuge an der Spindel des Antriebes Hebel und Werkzeuge an der Spindel k nnen bei Wiedereinschalten der Druckluft oder Steuerspannung herumschlagen und zu schweren Verletzungen oder Besch digungen f hren 16 BX460016 09 2012 Art Nr 90 310 95 Bedienungs und Installationsanleitung Installation and Operation Ins
71. able with temperature resistance gt 100 C 212 F Kindly note that high switch on currents max 3A occur The probe has to be fused properly fuse 6A Assure in general to fulfil the explosion proof laws and standards Please also note chapter 7 1 DANGER Adiabatic compression explosion risk Because of adiabatic compression high gas temperature during blow back procedure 15 possible Blow back to explosive gas is not allowed Blow back to flammable gas is only allowed with nitrogen or another inert gas Damage of the device Damage of cables Wire the probe strain relieved Protect the cable against torsion and pulling Only use cable with temperature resistance gt 100 C 212 F BX460016 09 2012 Art Nr 90 310 95 41 Bedienungs und Installationsanleitung Installation and Operation Instruction e Gasentnahmesonden Sample Gas Probes 4207 TUR Baureihe Serie 222 xx ATEX 2 TECHNOLOGIES 7 6 Maintenance program If the device is used in potentially explosive atmosphere follow the instructions of maintenance program strictly Interval Complete probe every 8 000 h Check gas connection protection and Operator control devices proper function and soiling When damaged replace respectively repair by Buhler Ball valves every 8 000 h Test the ball valves for leaks and check Operator the functional efficiency every 8 000 h Check the filter for contamination pressure vessel pressure vessel
72. all relevant safety regulations and internal operating instructions during maintenance DANGER Electrical voltage Electrocution hazard Before any manipulation on the device disconnect the electrical equipment from mains power supply Make sure that the electrical equipment cannot be reconnected during repair or maintenance The wiring must be done by trained staff only Regard the correct mains voltage DANGER Toxic corrosive gases Sample gas may be harmful Before maintenance release the process pressure Protect yourself against toxic corrosive gas during maintenance Use gloves respirator and face protector under certain circumstances Hot surfaces at the sample gas probe Danger of being burned During the operation the temperature of the sample gas probe may rise up to 120 C 212 depending on the operation parameters and the probe type Before maintenance wait until the device has cooled down Sample gas probe is under pressure Before opening the probe release the process pressure and switch off the power supply 36 460016 09 2012 Art Nr 90 310 95 Bedienungs und Installationsanleitung Installation and Operation Instruction NW Gasentnahmesonden Sample Gas Probes a ISTE Baureihe Serie 222 xx ATEX 2 TECHNOLOGIES Damage to the device Keep weather protection closed DANGER Risk of explosion from electrostatic discharge or charging spark forma
73. an adequate air flow Normally these probes are free of maintenance if the blowback of the in situ filter is efficient However it may happen due to process conditions that the in situ filter clogs up after a certain time In this case the filter has to be replaced GAS 222 31 ATEX 2 and 21 ATEX 2 Therefore the probe must be completely dismounted and after chang ing the filter be installed again as described in chapter 6 If the sample gas probe 21 ATEX 2 is equipped with a downstream filter change the filter as described in chapter 7 3 probe 222 20 ATEX 2 GAS 222 35 ATEX 2 First switch off the power supply and stop the process Open the weather shield by pulling the latch and move the cover upwards it has a self locking support Push the handle slightly on the rear of the probe turn by 90 and pull the handle must be now in horizontal position the handle with the filter out Unscrew the exhausted filter element and check proper conditions of the sealing surfaces Before installing the new filter element always replace the O Ring on the handle plug carefully put a new filter element with the seal onto it and insert the handle into the probe Push to the very end and turn handle 90 spigot handle is vertical now Pull the handle to examine whether the handle stucks Filter elements made out of sintered stainless steel can be cleaned in an ultrasonic bath and be used several times as long as both seals are still in proper conditions
74. brennbarem Gas nur Stickstoff Inertgas Staub Bringen Sie elektrische Betriebsmittel die zur Instandhaltung ge ffnet werden m ssen m glichst in einen staubfreien Raum Falls dies nicht m glich ist verhindern Sie das Eindringen von Staub in das Geh use Entzunden von Staubschichten Wenn die Sonde in staubiger Umgebung eingesetzt wird entfernen Sie regelm ig die Staubschicht von allen Bauteilen Entfernen Sie die Staubschicht auch unter der W rmeisolierung der Sonde GAS 222 20 ATEX 2 BX460016 09 2012 Art Nr 90 310 95 7 Bedienungs und Installationsanleitung Installation and Operation Instruction v Gasentnahmesonden Sample Gas Probes UU MERA Baureihe Serie 222 xx ATEX 2 TECHNOLOGIES 3 Erl uterungen zum Typenschild Hersteller mit Anschrift Typbezeichnung mowacess Technologies GmbH Made in Harkortstr 29 D 40880 Ratingen Germany Zundschutzkennzeichnung Sonde GAS 222 xx ATEX 2 serien Nr Artikel Nr und Baujahr 3G EEx L c IIC Spannung Tech File Ref 45678 001 4622220 2 Bj 2004 Artikelbeschreibung 230V AC File Ref 1327 A000146Ex Ger tekategorie 3 f r Zone 2 1 3 EEx nA L c T3 T4 Gerategruppe Zundschuizart Temperaturklasse Atmosphare G Gas Explosionsgruppe Beispiel f r eine Z ndschutzkennzeichnung 4 Produktbeschreibung 4 1 Allgemeine Beschreibung Diese Bedienungs und Installationsanleitung gilt f
75. cal voltage Warning against acid and corrosive substanc Warning against respi Warning against hot ration of toxic gases surface 2 1 General indication of risk Installation of the device shall be performed by trained staff only familiar with the safety requirements and risks Check all relevant safety regulations and technical indications for the specific installation place Prevent failures and protect persons against injuries and the device against damage The person responsible for the system must secure that safety and operation instructions are accessible and followed local safety regulations and standards are obeyed performance data and installation specifications are regarded safety devices are installed and recommended maintenance is performed national regulations for disposal of electrical equipment are obeyed Maintenance and repair Repairs on the device must be carried out by Buhler authorized persons only Only perform modifications maintenance or mounting described in this manual Only use original spare parts During maintenance regard all safety regulations and internal operation instructions DANGER Electrical voltage Electrocution hazard Disconnect the device from power supply Make sure that the equipment cannot be reconnected to mains unintentionally The device must be opened by trained staff only BX460016 09 2012 Art Nr 90 310 95 27 Bedienungs und Installati
76. ccessories area marking 21 Atex 31 Atex Pressure vessel PAV 01 1 1D 2GD 35 Atex Part No 46222PAV with accessories 21 Atex 31 Atex In situ filter ceramics II 1D 3G 260 Art Nr 46222307 46222307F 20 Atex 21 Atex Downstream filter ceramic II 1D 3G 260 Part No 46222026 46222026P 20 Atex 21 Atex Sample tube II 1G 2GD Part No 46222001 462220011 46222006 46222004 46222016 20 Atex 21 Atex Sample tube ceramics 3G 2GD Part No 4622200205 4622200210 4622200215 21 Atex 31 Atex Pneumatic cylinder with end switch Atex II 1GD 2G3D Part No 46222019 A Accessory not suitable for sampling dust with extremely low ignition energy lt 3mJ When gases are sampled from Zone 2 ceramic sample tube must be used only if application related or process related electrostatic charging is eliminated DA 461099 05 2013 Page 7 9 1 1 2 lt 0 _____ ___ 359 25 184 1 90 10 18413046 11 33 34118 us3uoy 8110 S sspinz ayspudsyany unu uaBunuapug 3 05 5 aunssaud jaAesuodsea sepepJooe
77. cess logic B Hazardous Areas Please note that installed accessories may change the approved category of the probe Follow strictly the advices given in the installation and operation manual and regard the marking on the type plate Sample Gas Probe GAS 222 xx Atex resuting restircted with Accessories area marking 21 Atex 31 Atex Pressure vessel PAV 01 Il 1D 2GD 35 Atex Part No 46222PAV with accessories 21 Atex 31 Atex In situ filter ceramics Il 1D 3G 260 Art Nr 46222307 46222307F 20 Atex 21 Atex Downstream filter ceramic Il 1D 3G 2GD Part No 46222026 46222026P 20 Atex 21 Atex Sample tube Il 1G 26 46222001 46222001 1 46222006 46222004 46222016 20 Atex 21 Atex Sample tube ceramics 3G 2GD Part No 4622200205 4622200210 4622200215 21 Atex 31 Atex Pneumatic cylinder with end switch Atex 1GD 2G3D Part No 46222019 A Accessory not suitable for sampling dust with extremely low ignition energy lt 3mJ When gases are sampled from Zone 2 ceramic sample tube must be used only if application related or process related electrostatic charging is eliminated DE 461099 05 2013 Page 7 9 1 1 2 lt 0 _____ ___ 359 25 184 1 90 10 18413046 11 33 34118 us3uoy 8110 S sspi
78. chaltstr me max 6 A auftreten Es ist f r eine passende Absicherung zu sorgen Beachten sie beim Anschluss auBerdem die g ltigen Ex Schutzvorschriften HINWEIS Der Thermo Alarmkontakt ist energiebegrenzt anzuschlieBen Umax 30V y 100mA Besch digung des Ger tes bei Durchf hrung der Isolationspr fung F hren Sie keine Pr fung der Spannungsfestigkeit mit Hochspannung am Gesamtger t durch Die Gasentnahmesonde ist mit umfangreichen EMV Schutzma nahmen ausger stet Bei einer Pr fung der Spannungsfestigkeit werden elektronische Filterbauteile besch digt Die notwendigen Pr fungen wurden bei allen zu pr fenden Baugruppen werkseitig durchgef hrt Pr fspannung je nach Bauteil 1 kV bzw 1 5 Sofern Sie die Spannungsfestigkeit selbst nochmals pr fen wollen f hren Sie diese nur an den entspre chenden Einzelkomponenten durch Klemmen Sie die Heizung der Sonde bzw des Gasdruckbeh lters ab und stecken Sie die Versorgung der Magnetventile aus siehe Anschlussbelegung im Anhang F hren Sie nun die Spannungsfestigkeitsprufung durch BX460016 09 2012 Art Nr 90 310 95 13 Bedienungs und Installationsanleitung Installation and Operation Instruction Gasentnahmesonden Sample Gas Probes BUHERI Baureihe Serie 222 xx ATEX 2 TECHNOLOGIES Ist die Sonde mit Magnetventilen bestellt so sind diese werkseitig auf der Klemmleiste aufgelegt In der Anschlussdose Anschlussbelegung siehe Zeichnung
79. e by nature Handle them with care don t drop them Filter elements made out of sintered stainless steel can be cleaned in an ultrasonic bath and be used several times as long as both seals are still in proper conditions Breakage hazard Do not damage rear element spigot The weather shield can only be closed when the handle of the filter is positioned verti cally Pull cover up to the highest point to unlock support lower it down in position en sure that the latch is locked in BX460016 09 2012 Art Nr 90 310 95 39 Bedienungs und Installationsanleitung Installation and Operation Instruction e Gasentnahmesonden Sample Gas Probes Baureihe Serie 222 xx 2 TECHNOLOGIES 7 4 Probe types GAS 222 35 ATEX 2 31 ATEX 2 and 21 ATEX 2 The probes 35 ATEX 2 and 31 ATEX 2 have an in situ filter inside the process This filter can be cleaned by a blow back with plant air inert gas i e the pressurized air inert gas is blown from inside to outside and back washes the filter element The probe 21 ATEX 2 can be equipped with an in situ filter as well as a downstream filter Blow back to flammable gas is only allowed with nitrogen inert gas Blow back to explosive gas is not al lowed It is obvious that the cleaning efficiency of an in situ filter depends on the amount of air inert gas blown through the element We recommend installing a pressure vessel option close to the probe to provide
80. e is 10 bar 145 psi BX460016 09 2012 Art Nr 90 310 95 33 Bedienungs und Installationsanleitung Installation and Operation Instruction e Gasentnahmesonden Sample Gas Probes u GE E Baureihe Serie 222 2 TECHNOLOGIES 6 4 Electrical connections The device must be installed by trained staff only Wrong mains voltage may damage the device Regard the correct mains voltage as given on the type plate Damage of the device Damage of cables Wire the probe strain relieved Protect the cable against torsion and pulling Only use cable with temperature resistance gt 100 C 212 This sample gas probe is equipped with two connectors according to DIN 43650 The connectors are con figured to avoid wrong placement This configuration is not allowed to be changed One connector carries the power supply and the other one the alarm output The probe has a self regulated heating system two heating PTC cartridges and can therefore be connect ed directly to the power supply 115 230 VAC 50 60 Hz see type plate The alarm output must be con nected energy bounded Umax 30V Imax 100mA according to EN 60079 14 and 15 For wiring up see the attached diagram in chapter 13 2 Wire the probe strain relieved adapt cable diameter to the grommet Protect the cable against torsion and pulling Only use cable with temperature resistance gt 100 C 212 F Kindly note that a high switch on current max
81. e not exceeded Data on the rating plate complies with the mains voltage and frequency of the self regulating heater coincide with the mains the alarm output is connected energy bounded Umax 30V Imax 100mA all electrical connections are tightened equipment is grounded and duly protected the terminal box cover is closed check if the cable entry points are properly sealed cable is mounted strain relieved Protect the cable against torsion and dismantling 7 3 Probe type GAS 222 20 ATEX 2 DANGER Risk of explosion from the ignition of dust If the probe is used in a dusty environment remove the dust layer from all components regularly Also remove the dust layer from under the thermal insulation of the probe GAS 222 20 ATEX 2 and from the heating band The ignition temperature or the smouldering temperature of existing flammable dusts or layers of dust have to be considerably higher than the maximum surface temperature of the probe observe applicable standards and statutory rules If possible place electrical equipment which needs to be opened for servicing in dust free room If this is not possible prevent dust from entering the housing Before changing the filter element open the weather shield by pulling the latch and move the cover up wards it has a self locking support DANGER Electrical voltage Electrocution hazard Disconnect the device from power supply Make sure that the equip
82. ebuch Kopiervorlage Wartung durchgef hrt Sonden Nr Betriebsstunden Bemerkungen Unterschrift am BX460016 09 2012 Art Nr 90 310 95 25 Bedienungs und Installationsanleitung Installation and Operation Instruction Cr e Gasentnahmesonden Sample Gas Probes BUHLER Baurethe Serie 222 xx ATEX 2 TECHNOLOGIES 1 Introduction The GAS 222 xx ATEX 2 series of sample gas probes are designed for installation in gas analysing sys tems Sample gas probes are very important components in a sample conditioning system Hence it is essential to read this manual carefully and check that all application parameters are completely matched by the select ed gas probe see corresponding drawing in the data sheet attached In addition check also the shipment and make sure you have received all parts This manual is suitable for all the probes of the GAS 222 xx ATEX 2 series due to similarities of the probes see chapter 4 1 You can find the probe type on the type plate There is the order number and also an article number and type marking If there are special instructions for a certain probe type they are described in the manual Regard the specific limits of the gas probe Please only order the spare parts which matching the probe type 2 Important advices Operation of the device is only valid if the product is used under the conditions described in the installation and operation instruction equipment is connected i
83. en Sample Gas Probes BUHLER Baureihe Serie 222 xx 2 TECHNOLOGIES 13 2 Anschlussdiagramm beheizter Druckluftbehalter 13 2 Wiring diagram heated pressure vessel Heizung Heating Betriebsspannung Operating voltage 115 230V AC 200W 48 460016 09 2012 Art Nr 90 310 95 EG Konformit tserkl rung v LES _ EC declaration of conformity 812 TECHNOLOGIES Hiermit erkl ren wir dass die nachfolgenden Produkte den wesentlichen Anforderungen der folgenden EG Richtlinie in ihrer aktuellen Fassung entsprechen Herewith we declare that the following products correspond to the essential requirements of the following EC directive in its actual version 94 9 EG ATEX Die Schutzziele der folgenden EG Richtlinien wurden entsprechend Anhang II Nr 1 2 7 der Richtlinie 94 9 EG eingehalten The safety protection goals of the following EC directive are met as stated in appendix II No 1 2 7 of directive 94 9 EC 2006 95 EG Niederspannungsrichtlinie low voltage directive 2004 108 EG EMV EMC Produkte products Gasentnahmesonden Sample gas probes Typ en type s GAS 222 xx ATEX2 Zusatzliche Angaben additional details Die Erkl rung gilt f r alle Exemplare die nach den beim Hersteller hinterlegten Fertigungsunterlagen die Bestandteil dieser Erkl rung sind hergestellt wurden Gasentnahmesonden sind zum Einbau in Gasanalysesystemen bestimmt Durch die Gasentnahmesonden GAS 222 xx
84. enen zum Schutz unserer Mitarbeiter Bringen Sie die Bescheinigung an der Verpackung an Ansonsten ist eine Bearbeitung Ihres Reparaturauftrages nicht m glich Legal regulations prescribe that you have to fill in and sign the Declaration of Contamination status and send it back This information is used to protect our employees Please attach the declaration to the packing Otherwise your repair order cannot be processed Gerat Serien Nr Device Serial no R cksendegrund Reason for return Ich best tige hiermit dass das oben spezifizierte Ger t ordnungsgem gereinigt und dekontaminiert wurde und keinerlei Gefahren im Umgang mit dem Produkt bestehen herewith declare that the device as specified above has been properly cleaned and decontaminated and that there are no risks present when dealing with the device Ansonsten ist die m gliche Gef hrdung genauer zu beschreiben In other cases please describe the hazards in detail Aggregatzustand bitte ankreuzen Condition of aggregation please check Fl ssig Liquid Fest Solid Pulvrig Powdery Gasf rmig Gaseous Folgende Warnhinweise sind zu beachten bitte ankreuzen The following safety advices must be obeyed please check Komprimierte Gase Gesundheitsgef hrdend Gesundheitssch dlich Umweltgefahrdend Gas under pressure Irritant toxicity Health hazard Environmental hazard Bitte legen Sie ein aktuelles Datenblatt des Gefahrenstoffes
85. er einem geeigneten Ersatz transportieren Bei l ngerer Nichtbenutzung ist die Gasentnahmesonde gegen Feuchtigkeit und W rme zu sch tzen Die Gasentnahmesonde muss in einem berdachten trockenen vibrations und staubfreien Raum bei ei ner Temperatur von 20 bis 60 C aufbewahrt werden 6 Aufbauen und Anschlie en 6 1 Montage GEFAHR Einsatz in explosionsgefahrdeten Bereichen Brennbare Gase und Staub k nnen sich entz nden oder explodieren Die Gasentnahmesonde darf nicht au erhalb ihrer Spezifikationen betrieben werden Die Entnahme von Gasen oder Gasgemischen die auch bei Abwesenheit von Luft explosionsf hig sind ist nicht zul ssig GEFAHR Explosionsgefahr durch Zonenverschleppung bei Entnahme aus Zone 20 21 22 Wenn die Korngr e der zu filternden St ube kleiner als die Filterfeinheit der verwendeten Filterelemente ist muss mit einer Zonenverschleppung vom Prozess in die Sonde gerechnet werden Die Filterfeinheit der verwendeten Filterelemente muss deutlich kleiner als die mittlere Korngr e der Staube im Prozessgas sein GEFAHR Explosionsgefahr durch Flammendurchschlag Installieren Sie bei Gefahr eines Flammendurchschlags aus dem Prozess eine Flammsperre BX460016 09 2012 Art Nr 90 310 95 9 Bedienungs und Installationsanleitung Installation and Operation Instruction Gasentnahmesonden Sample Gas Probes Baureihe Serie 222 xx 2 TECHNOLOGIES GEFAHR Exp
86. erie 222 xx ATEX 2 TECHNOLOGIES 7 4 Sonden GAS 222 35 31 ATEX 2 und 21 ATEX 2 Die Sonden 222 31 ATEX 2 und 222 35 ATEX 2 sind mit einem Eintrittsfilter ausgerustet welcher sich per manent im Prozessstrom befindet Dieser Filter l sst sich mittels Druckluft Inertgas r cksp len d h die Luft Inertgas wird von innen nach au en durch den Filter geblasen und l st so die anhaftenden Partikel ab Die Sonde 222 21 ATEX 2 kann sowohl mit einem Eintrittsfilter als auch mit einem Austrittsfilter wie Sonde 222 20 ATEX 2 Kap 7 3 ausger stet werden Bei der Entnahme von brennbaren Gasen darf eine R cksp lung nur mit Stickstoff Inertgas erfolgen Das R cksp len von explosiven Gasen ist nicht erlaubt Die Wirksamkeit der Abreinigung eines im Prozess befindlichen Filters wird unmittelbar beeinflusst von der zur Verf gung stehenden Luftmenge Gasmenge Wir empfehlen deshalb den Einsatz eines Druckluftbe h lters direkt an der Sonde Die Sonden arbeiten bei ausreichender R cksp lung des Eintrittsfilters im Prozessstrom wartungsfrei Dennoch kann es aufgrund der Prozessbedingungen zum allm hlichen Zusetzen des Eintrittsfilters kom men Sollte dies der Fall sein muss das Filterelement ausgewechselt werden Hierzu muss die Sonde 222 31 ATEX 2 und 21 ATEX 2 vollst ndig ausgebaut und nach Wechsel des Ele mentes wie in Kapitel 6 beschrieben wieder installiert werden Wenn die Sonde 21 ATEX mit einem Aus trittsfilter ausger stet ist
87. etriebsmittel fur explosionsgef hrdete Bereiche Allgemeine Bestimmungen EN 60079 15 Explosionsf hige Atmosph re Teil 15 Zundschutzart EN 61000 6 2 Elektromagnetische Storfestigkeit Fachgrundnorm St rfestigkeit Industriebereich EN 61000 6 3 Elektromagnetische Vertr glichkeit Fachgrundnorm Storaussendung Wohnbereich Gesch fts und Gewerbebereich Kleinbetriebe e EN 60204 1 Sicherheit von Maschinen elektrische Ausr stung von Maschinen Teil1 e ENISO 12100 Sicherheit von Maschinen allgemeine Gestaltungsgrundsatze Teil 1 und 2 Dokumentationsverantwortlicher f r diese Konformitatserklarung ist der Unterzeichnende mit Anschrift am Firmensitz The person authorised to compile the technical file is the one that has signed and is located at the company s adaress Ratingen den 02 07 2012 Stefan Eschweiler Frank Pospiech Gesch ftsf hrer Managing Director Gesch ftsf hrer Managing Director B hler Technologies GmbH Harkortstr 29 D 40880 Ratingen NS KX 46 0007 Tel 49 0 21 02 49 89 0 Fax 49 0 21 02 49 89 20 8 Internet www buehler technologies com Dekontaminierungserklarung Dan eet Declaration of Contamination status G ltig ab valid since 2011 05 01 Revision 0 ersetzt Rev replaces Rev X Die gesetzlichen Vorschriften schreiben vor dass Sie uns die Dekontaminierungserklarung ausgef llt und unterschrieben zur ck zu senden haben Die Angaben di
88. explosive gas is not allowed Blow back to flammable gas is only allowed with nitrogen or another inert gas Dust Opening of electrical equipment in dust free areas only Inflame of dust If the sample gas probe is used in dust ambiance remove the layer from the components of the probe regularly Remove also the layer between thermal insulation and heating system of probe GAS 222 20 Atex 2 28 BX460016 09 2012 Art Nr 90 310 95 Bedienungs und Installationsanleitung Installation and Operation Instruction Cr e Gasentnahmesonden Sample Gas Probes BUHLER Baurethe Serie 222 xx ATEX 2 TECHNOLOGIES 3 Explanation of the type plate address type description wr Technologies GmbH Made in Harkortstr 29 D 40880 Ratingen Germany Type of protection order number position and part number Sonde GAS 222 xx ATEX 2 3G EEx nA Lc T4 A345678 001 4622220 2 Bj 2004 230V AC File Ref 1327 power supply tech File ref 000146 Category 3 zone 2 13 EEx L T3 T4 Equipment group Ignition source Temperature class protection Atmosphere Ex sub division G gas Example of a EX designation 4 Product description 4 1 General description This operating and installation manual is for the sample gas probe GAS 222 xx ATEX2 The different probe types are defined in individual subsections You can see which probe you have on the type plate The code de
89. fter all tubes have been fixed and checked put the insulation back in place and secure it carefully Emission of gas Check the tightness of all tubes 32 460016 09 2012 Art Nr 90 310 95 Bedienungs und Installationsanleitung Installation and Operation Instruction E Cr Gasentnahmesonden Sample Gas Probes EU FIERI Baureihe Serie 222 xx ATEX 2 TECHNOLOGIES 6 3 Connection of the blow back line and the pressure vessel for GAS 222 21 ATEX2 31 ATEX2 and 35 ATEX2 DANGER Explosive gases Probes with blow back port are not suited for us with explosive gases possible Blow back to explosive gas is not allowed Blow back to flammable gas is only allowed with nitrogen or another inert gas DANGER Explosion hazard due to adiabatic compression Because of adiabatic compression high gas temperature during blow back procedure is The tubes must be connected with appropriate fittings If the sample probe is equipped with a blow back pressure vessel optional a manual shut off valve ball valve must be installed at the plant air inlet inert gas Blow back of flammable gas 15 only allowed with nitrogen inert gas Blow back is not allowed with explosive gases Blowback is only possible if the pressure of the available plant air inert gas is higher than the process pressure i e pressure difference at least 3 bar 43 psi DANGER Break of the pressure vessel Max air pressure of the pressure vessel lin
90. ges nicht m glich Das Formular kann per E Mail angefordert werden service buehler technologies com 9 1 Entsorgung Bei der Entsorgung sind die gesetzlichen Vorschriften insbesondere f r die Entsorgung von elektronischen Bauteilen zu beachten 10 Angef gte Dokumente Konformitatserklarung 460007 Dekontaminierungserklarung Datenblatt Zubehor DD DE DA 461099 Datenblatt der gelieferten Sonde eingelegt DD DE DA 46 BX460016 09 2012 Art Nr 90 310 95 23 Bedienungs und Installationsanleitung f Installation and Operation Instruction Cr e Gasentnahmesonden Sample Gas Probes BUHLER Baureihe Serie 222 xx ATEX 2 TECHNOLOGIES 11 Bestandigkeitsliste Teflon Viton Konzentration PTFE FPM V4A 11 1 4 33 _ _ Ethan 10 10 120 GH Pen 0 10 10 1 Pm 10 20 10 CoHsC5H 7 10 10 20 10 41 0 40 34 Kohlendioxid 1 1 10 10 10 10 Methanol 711 141 CH Cl ___ 0 10 30 Proenxd 40 7 20 40 10 Sauerstoff __ 141 ET _ Schwefelhexafluoid 170 10 20 00 1 6 HS Schwefelwasserstoff D 141 44 No _ Stickstoff 10 17 1 1 390 10 CeHsCHs Toluol Methylbenzol MA MA 33 HO Waser 14 171 11 _ H Wa
91. gies GmbH DE 461099 40880 Ratingen Harkortstr 29 05 2013 Tel 49 0 2102 4989 0 Fax 49 0 2102 4989 20 Page 1 9 Internet www buehler technologies com e mail analyse buehler technologies com x xanw zizzz gt gt P Po x x 02222 gt gt gt gt gt oc o LL LLL Xawvozzze gt gt gt lt gt lt gt lt gt lt gt lt SVD adAL _ tl ccc se Jejsiueq 70019 069066069 600702009 600702209 20902629 0702229 200029 00009100669 00619106669 00019100669 00609100669 004270020229 00007002229 00417002229 00017002229 00507002229 00029002229 00419002229 00019002229 00409002229 5 2002209 02002229 902002209 00001002229 00611000669 0001000069 00401002229 00601002229 000 LAG san ejdues LAG uy san 2971 wed aueds se 3413 Jejsiueq 1 1 5 san ajdwes x 12222 gt gt gt lt gt lt gt lt gt lt gt lt gt lt gt gt lt gt lt gt lt gt lt gt lt
92. halb der Son de Wetterschutzhaube dann den Kugelhahn in der Verbindungsleitung vom Druckluftbeh lter zur Sonde schlagartig ffnen bis die Anzeige des Manometers auf den untersten Punkt abgefallen ist Nach Beendigung der R cksp lung den Kugelhahn schlie en und den Absperrhahn in der Sonde wieder ffnen 7 5 2 Automatische R cksp lung Zur automatischen R cksp lung muss der Absperrhahn in der Sonde mit einer pneumatischen Bet tigung versehen sein Option In der Steuerung des Systems ist eine sequentielle Ansteuerung der Ventile vorge sehen d h 1 Absperren des Absperrventils in der Sonde durch Ansteuerung der pneumatischen Bet tigung 2 Danach Offnen des Magnetventils zwischen Druckluftbeh lter und Sonde f r ca 10 Sekunden 3 Danach Absperrventil in der Sonde wieder ffnen Die R cksp lung kann auch als geschlossener Vorgang in Zeitintervallen von sowohl einigen Minuten bis Stunden als auch Tagen je nach Bedarf eingestellt werden 7 5 3 Beheizter Druckbeh lter Optional kann zur R cksp lung auch ein beheizter R cksp lbeh lter verwendet werden Die Beheizung erfolgt auch hier ber eine selbstregelnde PTC Heizpatrone und dient dem Frostschutz Der elektrische Anschluss Netzanschluss 115 230 erfolgt Uber einen W rfelstecker nach DIN 43650 Der Anschluss erfolgt gem beigef gtem Belegungsplan siehe 23 1 2 Verwenden sie f r den Anschluss der Spannungsversorgung ausschlie lich Kabel die eine
93. hende Schutzausr stung Elektrostatische Entladungen Die Betriebsmittel d rfen nur dort eingesetzt werden wo es im Normalbetrieb nicht zu h ufigen z ndf higen elektrostatischen Entladungen kommen kann 6 BX460016 09 2012 Art Nr 90 310 95 Bedienungs und Installationsanleitung Installation and Operation Instruction v Gasentnahmesonden Sample Gas Probes BUHERI Baureihe Serie 222 xx ATEX 2 TECHNOLOGIES GEFAHR Einsatz in explosionsgef hrdeten Bereichen Brennbare Gase und Staub k nnen sich entz nden oder explodieren Vermeiden Sie die folgenden Gefahrenquellen Einsatzbereich Die Gasentnahmesonde darf nicht au erhalb ihrer Spezifikationen betrieben werden Elektrostatische Entladungen Betriebsmittel d rfen nur dort eingesetzt werden wo es beim Normalbetrieb nicht zu h ufigen z ndf higen elektrostatischen Entladungen kommen kann Elektrostatische Aufladung Funkenbildung Reinigen Sie Geh useteile aus Kunststoff und Aufkleber nur mit einem feuchten Tuch Funkenbildung Sch tzen Sie das Betriebsmittel ist vor externen Schlageinwirkungen Flammdurchschlag Installieren Sie bei Gefahr eines Flammdurchschlags aus dem Prozess eine Flammsperre Adiabatische Kompression Explosionsgefahr Das Auftreten hoher Gastemperaturen durch adiabatische Kompression beim R cksp len ist m glich F hren Sie die Ruckspulung nie bei explosions f higen Gasen durch Verwenden Sie fur die Ruckspulung von
94. ieb und Wartung 7 1 Warnhinweise Reparaturen an den Betriebsmitteln d rfen nur von Buhler autorisiertem Personal ausgef hrt werden Fuhren Sie nur Umbau Wartungs oder Montagearbeiten aus die in dieser Bedienungs und Installati onsanleitung beschrieben sind Verwenden Sie nur Original Ersatzteile Sie bei der Durchfuhrung von Wartungsarbeiten jeglicher Art die relevanten Sicherheits und Betriebsbestimmungen GEFAHR Elektrische Spannung Gefahr eines elektrischen Schlages Trennen Sie das Gerat bei allen Arbeiten vom Netz Sichern Sie das Gerat gegen unbeabsichtigtes Wiedereinschalten Der Anschluss darf nur von geschultem Fachpersonal vorgenommen werden Achten Sie auf die korrekte Spannungsversorgung GEFAHR Giftige atzende Gase Messgas kann gesundheitsgefahrdend sein Schalten Sie vor Beginn der Wartungsarbeiten die Gaszufuhr ab Sch tzen Sie sich bei der Wartung vor giftigen tzenden Gasen Tragen Sie die entsprechende Schutzausr stung Hei e Oberfl che an der Gasentnahmesonde Verbrennung an den H nden Im Betrieb kann je nach Betriebsparametern und Typ eine Geh usetemperatur von bis zu 100 C entstehen Warten Sie mit dem Beginn der Arbeiten bis das Ger t abgek hlt ist Sonde steht unter Druck Die Sonde darf beim ffnen nicht unter Druck stehen Beachten Sie die Prozessbedingungen Sperren Sie vor Beginn der Wartungsarbeiten die Gaszufuhr
95. losionsgefahr durch Entzunden von Staub Wenn die Sonde in staubiger Umgebung eingesetzt wird entfernen Sie regelmaBig die Staubschicht von allen Bauteilen Entfernen Sie die Staubschicht auch unter der Warmeisolierung der Sonde GAS 222 20 ATEX 2 Die ZUndtemperatur bzw Glimmtemperatur vorhandener brennbarer Staube bzw Staubschichten muss deutlich Uber der maximalen Oberflachentemperatur der Sonde liegen zutreffende Normen u gesetzliche Regelungen beachten Die Gasentnahmesonden sind zur Flanschmontage vorgesehen Einbauort und Einbaulage bestimmen sich aus anwendungsrelevanten Voraussetzungen Falls m glich sollte der Einbaustutzen eine leichte Neigung zur Kanalmitte haben Der Einbauort sollte wettergesch tzt sein Ebenfalls muss auf ausreichenden und sicheren Zugang sowohl f r die Installation als auch f r sp tere Wartungsarbeiten geachtet werden Beachten Sie hier insbesondere die Ausbaul nge des Sondenrohres Soweit die Sonde in Einzelteilen zum Einbauort gebracht wird muss sie zun chst zusammengebaut wer den Der Austrittsfilter und der O Ring f r das Griffst ck sind lose beigelegt und m ssen vor Inbetriebnahme eingesetzt werden Kap 7 3 Betrieb ohne Austrittsfilter nicht zul ssig O Ring Griffst ck Das Entnahmerohr oder der Eintrittsfilter falls erforderlich mit der passenden Verl ngerung muss einge schraubt werden Danach wird die Sonde unter Verwendung der beigef gten Dichtungen und Schrauben am
96. lt gt lt gt lt 4 9 40 20 ssniyosuese ssayy BunqneJuosJoA 218 JN ssnjuosue ndg sn BungneuyasioA 98 Jn ssnjyosuesebssayy In BungneuyasioA 98 Jn ssnjyosuesebssayy Jn BunqneJjuos49A INusaBelyssyany 8 ssnjyosuesebjnid 692800 77 8006 611800 LEECCCOV QEECCCOV LL Z ck 60622097 70022097 4 9 ssnjyosuesebjnidg WUBSABe YOSyONY 0 541 08 6 ISNV U suejuejdepy ueuondo ZyesHury O 72000097 XIX CLOCCCOV XIX 191 2 9 X X 469912009 X X 9Lccc9Y X X dL290ccc9v 179022297 X X 1902229 X X diL02229 X X 02229 X 0102229 40102229r X X 0 02229 XIX 002229 XIX 2166 0 4 JepurjAzjdo1S OM YONISHUS 5 YONISHUS JOPUIG JEYIIS Jesejse DoJol AN 5 JeseJse DOJO A Jesejse DoJol A sep INZ Yon syus 0 1 Iueisjepa 5 U amp 1S 9p3 J9319 uIsoc U amp 1S 9p3 J9319 uIsoc U amp 1S 9p3 595 U am
97. ment cannot be reconnected to mains unintentionally The device must be opened by trained staff only 38 460016 09 2012 Art Nr 90 310 95 Bedienungs und Installationsanleitung Installation and Operation Instruction e Gasentnahmesonden Sample Gas Probes Serie 222 xx 2 TECHNOLOGIES DANGER Toxic and corrosive gases Sample gas can be hazardous Before maintenance release process pressure Before maintenance turn off the gas supply and make sure that it cannot be turned on unintentionally Protect yourself during maintenance against toxic corrosive gases Use gloves respirator and face protector under certain circumstances Press and push slightly the handle on the rear of the probe turn by 90 and pull the handle must be now in horizontal position the handle with the filter out Remove the exhausted filter element and check proper conditions of the sealing surfaces Before installing the new filter element always replace the O Ring on the handle plug carefully put a new filter element onto it and insert the handle into the probe Push to the very end and turn handle 90 spigot handle is vertical now Pull the handle to examine whether the handle stucks When the filter has been taken out of the probe it is possible if necessary to clean the extension tube internally by blowing plant air through or by mechanical means Ceramic filter elements are very brittl
98. ndensatbildung kommen Es ist daher empfehlenswert mindestens einmal j hrlich die Ablass schraube am Boden des Beh lters zu ffnen und das Kondensat abzulassen Sollte aufgrund der Betriebsverh ltnisse ein h ufiges Warten der Sonden erforderlich sein empfehlen wir im Zuge dieser Intervalle auch das Kondensat zu entleeren BX460016 09 2012 Art Nr 90 310 95 19 Bedienungs und Installationsanleitung f Installation and Operation Instruction Cr e Gasentnahmesonden Sample Gas Probes BUHLER Baureihe Serie 222 xx ATEX 2 TECHNOLOGIES 7 5 Ruckspulung des Eintrittsfilters im Prozessstrom Das Auftreten hoher Gastemperaturen durch adiabatische Kompression beim R cksp len ist m glich Sonden mit R cksp lung sind nur f r die Entnahme von nicht explosivem Gas geeignet Die R cksp lung von brennbarem Gas darf nur mit Stickstoff Inertgas erfolgen Bitte beachten sie dass zum R cksp len gefilterte Luft mindestens nach PNEUROP ISO Klasse 4 ver wendet wird Partikel Drucktaupunkt Rest lgehalt Partikelgr e 1 bis 5 um C mg m bis 1000 keine Partikel gt 15 lt 3 lt 5 7 5 1 Manuelle Ruckspulung Der Absperrhahn in der Druckluftzuf hrung Inertgaszuf hrung zum Druckluftbeh lter muss ge ffnet sein und das als Option erh ltliche Manometer am Druckluftbeh lter zeigt den vorhandenen Betriebsdruck an Zum R cksp len erst den Absperrhahn in der Gasentnahmesonde schlie en Griff unter
99. ngs und Installationsanleitung Installation and Operation Instruction Gasentnahmesonden Sample Gas Probes a MERA Baureihe Serie 222 xx ATEX 2 TECHNOLOGIES 1 Einleitung Die Gasentnahmesonden der Baureihe GAS 222 xx Atex 2 sind zum Einbau in Gasanalysesystemen be stimmt Gasentnahmesonden gehoren zu den wichtigsten Bauteilen eines Gasaufbereitungssystems Bitte beachten Sie deshalb auch die dazugeh rige Zeichnungen im Datenblatt am Ende dieser Anleitung Kap 13 und berpr fen Sie vor Einbau der Gasentnahmesonden ob die genannten technischen Daten den Anwendungsparametern entsprechen berpr fen Sie ebenfalls ob alle zum Lieferumfang geh renden Teile vollst ndig vorhanden sind Diese Bedienungsanleitung beschreibt mehrere Sondentypen aus der GAS 222 xx Atex 2 Reihe zusam men da viele Beschreibungen gleich oder hnlich sind siehe Kap 4 1 Welche Sonde Sie vor sich haben ersehen Sie aus dem Typenschild Auf diesem finden Sie neben der Auftragsnummer auch die Artikelnummer und Typbezeichnung Sofern f r einen Sondentyp Besonderheiten gelten sind diese in der Bedienungsanleitung gesondert be schrieben Bitte beachten Sie beim Anschluss die Kennwerte der Sonde und bei Ersatzteilbestellungen die richtigen Ausf hrungen 2 Wichtige Hinweise Der Einsatz der Ger te ist nur zul ssig wenn das Produkt unter den in der Bedienungs und Installationsanleitung beschriebenen Bedingungen dem Einsatz gem Typen
100. ntrinsically safe take care of directive 94 9 EC EN 60079 14 and EN 61241 14 the controller is mounted outside of potentially explosive atmospheres monitoring devices and safety devices are installed properly service and repair is carried out by B hler Technologies GmbH unless described in this manual only original spare parts are used EC directives 94 9 EC and according national safety rules for installation of electrical equipment in haz ardous areas are obeyed This manual is part of the equipment The manufacturer keeps the right to modify specifications without advanced notice Keep this manual for later use Definitions for warnings Signal word for important information to the product Signal word for a hazardous situation with low risk resulting in damaged to the device or the property or minor or medium injuries if not avoided Signal word for a hazardous situation with medium risk possibly resulting in severe injuries or death if not avoided DANGER Signal word for an imminent danger with high risk resulting in severe injuries or death if not avoided 26 BX460016 09 2012 Art Nr 90 310 95 Bedienungs und Installationsanleitung Installation and Operation Instruction NW Gasentnahmesonden Sample Gas Probes BUHEER Baureihe Serie 222 xx 2 TECHNOLOGIES Warning against possi Warning against haz ble explosive atmos ardous situation Warning against electri
101. nz ayspudsyany unu uaBunuapug 3 05 5 aunssaud jaAesuodsea sepepJooe siodep sepniuued seuede 2 06 ep 0 Lojueujeuorouny ep oessaJd 5 Sunz ay apuja alysq as Sunz ay apu1a6Daa1sq1as soz 2 19 uloup go1ao30suapuoy 2 19 UIOJP go1aoa3o0susapuoy met see 1320d 11113 gn1u25suo11nje8g IN N y4od 11 1 11 LAN LAN ssodf g 110g uuou1a68ny DE 461099 05 2013 8 9 SVD adAL senbau uo oun pue seoug __ LLL LIXL LL ILLI LL LL 541 0S1 E ISNV 10 109219 Buyunop 9 40 uj 3exoeJq LIxixix Pee LE 11159504 PPP PPP TPR x x xxix x x x x PPP x xxxix px xxx x px x x ox xo x p o PPP xe xx xe PPX 01 E
102. onsanleitung Installation and Operation Instruction v Gasentnahmesonden Sample Gas Probes a 215157 Baureihe Serie 222 xx ATEX 2 TECHNOLOGIES DANGER Toxic and corrosive gases Sample gas can be hazardous Take care that the gas is exhausted in a place where no persons are in danger Before maintenance turn off the gas supply and make sure that it cannot be turned on unintentionally Protect yourself during maintenance against toxic corrosive gases Use gloves respirator and face protector under certain circumstances Electrostatic discharge Use equipment only in areas where ignitable electrostatic discharges can not occur frequently during normal operation DANGER Application in explosive atmosphere Combustible gases and dust may inflame or explode Avoid the following hazardous situations Intended use The sample gas probe should not be operated out of the range of its specifications Electrostatic discharge Electrostatic discharge Use equipment only in areas where ignitable electrostatic discharges can not occur frequently during normal operation Electrostatic charge Clean plastic parts and labels with damp cloth only Spark formation Protect the equipment against being hit Flame breakthrough Install a flame trap with danger of a flame breakthrough Adiabatic compression explosion risk Because of adiabatic compression high gas temperature during blow back procedure is possible Blow back to
103. p 1S 9p 3 J9119 uIsoc st LO t sf i os o gt gt gt 222 xf of 2 0 gt lt gt lt gt lt lt gt lt gt lt gt lt lt I _ EG ES Xxxx 1X X aozo Se _ IXIXIXE ES EG ES ES iz ES EG EG EG EG 9202229 e LLL web NININININININININININININININININININININININININININININININ NININININININININININININININININININININININININININININININ 19 119 1 1919 9 S 89 SIAS ales SIS 8 8 8 25 25 25 25 5 55 0 7 5 0 00 0 0 0 0 210 0 0 0 010101010 oo GI gt uauondo 461099 05 2013 Seite 9 9 vw NIECHINOL GE Accessories for Sample Gas Probe GAS 222 Sample tubes Downstream filters Capacitive vessel In situ filters Cal gas connections Pneumatic actuators Extensions Adapter flanges 3 2 way solenoid valves Blowback controllers Page 2 4 Page 8 5 7 For general information see data sheet Sample gas probes GAS 222 DE461000 B hler Technolo
104. r Sonde liegen zutreffende Normen u gesetzliche Regelungen beachten Bringen Sie elektrische Betriebsmittel die zur Instandhaltung ge ffnet werden m ssen m glichst in einen staubfreien Raum Falls dies nicht m glich ist verhindern Sie das Eindringen von Staub in das Geh use Wartung des Filterelementes Die Sonden sind mit einem Partikelfilter ausger stet der je nach Schmutzanfall gewechselt werden muss Vor dem Filterwechsel ist die Wetterhaube zu entriegeln und aufzustellen BX460016 09 2012 Art Nr 90 310 95 17 Bedienungs und Installationsanleitung Installation and Operation Instruction Ww Gasentnahmesonden Sample Gas Probes n UU MERA Baureihe Serie 222 xx ATEX 2 TECHNOLOGIES GEFAHR Elektrische Spannung Gefahr eines elektrischen Schlages Trennen Sie das Ger t bei allen Arbeiten vom Netz Sichern Sie das Ger t gegen unbeabsichtigtes Wiedereinschalten Der Anschluss darf nur von geschultem Fachpersonal vorgenommen werden Achten Sie auf die korrekte Spannungsversorgung GEFAHR Giftige atzende Gase Messgas kann gesundheitsgefahrdend sein Stellen Sie vor Beginn der Wartungsarbeiten die Gaszufuhr ab und sichern Sie sie gegen unbeabsichtigtes Aufdrehen Sch tzen Sie sich bei der Wartung vor giftigen tzenden Gasen Tragen Sie die entsprechende Schutzausr stung Den Griff am hinteren Ende der Sonde unter leichtem Eindr cken um 90 drehen Griff muss dann waage recht stehen und hera
105. roubleshooting If you need help or more information call 49 0 2102 498955 or your local agent If the device doesn t work correctly after elimination of failures and turning power the device must checked by the manufacturer Please ship the device with suitable packing to B hler Technologies GmbH Service HarkortstraBe 29 40880 Ratingen Germany In Addition attach the filled in and signed Declaration of Decontamination status to the packing Otherwise your repair order cannot be processed The form can be requested by e mail to service buehler technologies com 9 1 Disposal Regard the local regulations for disposal of electric and electronic equipment 10 Attached documents Declaration of conformity KX460007 Declaration of Contamination status Data sheet accessories DD DE DA 461099 Data sheet of delivered probe inserted DD DE DA46 44 BX460016 09 2012 Art Nr 90 310 95 Bedienungs und Installationsanleitung Installation and Operation Instruction Cr e Gasentnahmesonden Sample Gas Probes BUHLER Baureihe Serie 222 xx ATEX 2 TECHNOLOGIES 11 List of chemical resistance Teflon Viton sone PTEE FPM E O Ethane 2 1 0 110 20 GH Pen 10 10 110 10 GH 10 1 0 120 110 10 1 0 20 10 a ooa O o o o ___ 11 ____ monoxide 10 1 0 HOH
106. rungen zum 8 4 PIOQUKIDESCHLEIDUNG aan en 8 4 1 Allgemeine Beschreibung 8 4 2 VST CHUN IAG NE Ts 9 5 Transport und 9 6 Aufbauen und 9 6 1 WOM Te EE 9 6 2 Anschluss der Gasleitungen 10 6 3 Anschluss der R cksp lung und des Druckluftbeh lters f r GAS 22 35 ATEX2 31 ATEX2 nd TATEA EEN 12 6 4 miden EE 13 7 Betrieb und Wartung 15 7 1 ES E 15 7 2 Vor 1 1 17 7 8 200 0652 2222 E A 2 17 7 4 Sonden GAS 222 35 31 ATEX 2 und 21 2 19 1 9 R cksp lung des Eintrittsfilters im Drozessstrom 20 7 5 1 Manuelle R CKSP IUNG E 20 75 2 Automausche TUCKS Haw E a 20 7 5 3 Beheizter Druckbeh lter 20 7 6 Eer elc MERLO Ec 21 8 Fehlersuche und 0 12 22 9 Instandsetzung und 50700 9 23 9 1 m
107. sche Sonden mit R cksp lung sind nicht fur die Entnahme von explosionsfahigen Gasgemischen geeignet GEFAHR Explosionsgefahr durch adiabatische Kompression Das Auftreten hoher Gastemperaturen durch adiabatische Kompression beim R cksp len ist m glich F hren Sie die R cksp lung nie bei explosionsf higen Gasen durch Bei Sonden die f r die Entnahme von brennbarem Gas verwendet werden darf die R cksp lung nur mit Stickstoff Inertgas erfolgen Die Druckluftleitungen sind mittels geeigneter Verschraubung sorgf ltig und fachgerecht anzuschlie en Ist die Sonde mit einem Druckluftbeh lter zur effizienten R cksp lung ausger stet Option so ist in der Druckluftzuf hrung unmittelbar vor dem Druckluftbeh lter ein manuelles Absperrventil einzubauen Kugel hahn Bei Sonden die f r die Entnahme von brennbarem Gas verwendet werden darf die R cksp lung nur mit Stickstoff Inertgas erfolgen Das R cksp len von explosiven Gasen ist nicht zul ssig Der Betriebsdruck der zur R cksp lung ben tigten Druckluft Inertgas muss immer ber dem Prozessdruck liegen Erforderliche Druckdifferenz min 3 bar GEFAHR Bruch des Druckgasbehalters Maximaler Betriebsdruck fur den Druckgasbehalter 10 bar 12 BX460016 09 2012 Art Nr 90 310 95 Bedienungs und Installationsanleitung Installation and Operation Instruction e Gasentnahmesonden Sample Gas Probes OLE Baureihe Serie 222 xx ATEX 2 TEC
108. schild und f r Anwendungen f r die es vorgesehen ist verwendet wird die Betriebsmittel in eigensicheren Stromkreisen betrieben werden DIN EN 60079 14 und DIN EN 61241 14 beachten berwachungsvorrichtungen Schutzvorrichtung korrekt angeschlossen sind die Service und Reparaturarbeiten von B hler Technologies GmbH durchgef hrt werden soweit sie nicht in dieser Anleitung beschrieben sind Ovriginalersatzteile verwendet werden Das Errichten elektrischer Anlagen in explosionsgefahrdeten Bereichen erfordert in Deutschland die Beach tung folgender Vorschriften EN 60079 14 DIN VDE 0165 T1 Errichten elektrischer Anlagen in explosionsgef hrdeten Bereichen EN 61241 14 DIN VDE 0165 T2 Elektrische Betriebsmittel zur Verwendung in Bereichen mit brennba rem Staub Auswahl Errichtung und Instandhaltung ElexV Verordnung ber elektrische Anlagen in explosionsgef hrdeten R umen Im Ausland sind die entsprechenden Landesvorschriften zu beachten Diese Bedienungsanleitung ist Teil des Betriebsmittels Der Hersteller beh lt sich das Recht vor die Leis tungs die Spezifikations oder die Auslegungsdaten ohne Vorank ndigung zu ndern Bewahren Sie die Anleitung f r den sp teren Gebrauch auf 4 BX460016 09 2012 Art Nr 90 310 95 Bedienungs und Installationsanleitung Installation and Operation Instruction Cr e Gasentnahmesonden Sample Gas Probes BUHLER Baureihe Serie 222 xx ATEX 2 TEC
109. signation GAS as well as the respective type number is indicated there e g GAS 222 31 ATEX 2 This manual refers to various subtypes of the GAS 222 xx probes All probes include a self regulating ATEX heater and a temperature alarm sensor All probes have a self control ATEX heating band and depending on the type an intake filter filter in the process and or an outlet filter filter in the probe GAS 222 20 ATEX 2 Probe with downstream filter GAS 222 21 ATEX 2 Probe with in situ and or downstream filter shut off valve and blow back port GAS 222 31 ATEX 2 Probe with in situ filter shut off valve and blow back port GAS 222 35 ATEX 2 Probe with replaceable in situ filter and blow back port Accessories for these see data sheet DE461099 attached probes BX460016 09 2012 Art Nr 90 310 95 29 Bedienungs und Installationsanleitung Installation and Operation Instruction NW Gasentnahmesonden Sample Gas Probes BUHLER Baureihe Serie 222 xx 2 TECHNOLOGIES 4 2 Included items in delivery 1x sample gas probe with weather protection shield 1x flange gasket and screws 1x operation instruction Accessories are listed as separate positions on the order 5 Transport and storing regulations The sample gas probe should be only transported in the original case or in appropriate packing Protect the sample gas probe against heat and humidity The sample gas probe must be stored in roofed dry vibration und du
110. sserstoff 7 40 40 10 10 0 keine Angabe vorhanden keine Aussage m glich 1 sehr gut best ndig geeignet 2 gut best ndig geeignet 3 eingeschr nkt geeignet 4 nicht geeignet Die Angaben beziehen sich auf eine Temperatur von 20 C erste Ziffer und 50 C zweite Ziffer Wichtiger Hinweis Die Tabellen wurden aufgrund von Angaben verschiedener Rohstoffhersteller aufgelistet Die Werte beziehen sich ausschlie lich auf Labortests mit Rohstoffen Daraus gefertigte Bauteile unterliegen oftmals Einfl ssen die in Labortests nicht erkannt werden k nnen Temperatur Druck Materialspannungen Einwirkung chemischer Substanzen Konstruktionsmerkmale etc Die angegebenen Werte k nnen aus diesen Gr nden nur als Richtlinie dienen In Zweifelsf llen empfehlen wir unbedingt einen Test durchzuf hren Ein Rechtsanspruch kann aus diesen Angaben nicht abgeleitet werden wir schlie en jegliche Gew hr und Haftung aus Allein die che mische und mechanische Best ndigkeit reicht nicht f r die Beurteilung der Gebrauchsf higkeit eines Produktes aus insbesondere sind z B die Vorschriften bei brennbaren Fl ssigkeiten Ex Schutz zu ber cksichtigen Best ndigkeit gegen ber anderen Medien auf Anfrage 24 BX460016 09 2012 Art Nr 90 310 95 Bedienungs und Installationsanleitung Installation and Operation Instruction NW Gasentnahmesonden Sample Gas Probes a UU MERA Baureihe Serie 222 xx ATEX 2 TECHNOLOGIES 12 Betriebstag
111. st free room Temperature should be between 20 C 4 F and 60 C 140 6 Installation and connection 6 1 Mounting DANGER Application in explosive areas Flammable gases and dust can ignite or explode The gas sampling probe may not be used beyond its specifications The sampling of gases or gas mixtures which are also explosive in the absence of fair is not permitted DANGER Risk of explosion from carrying over when extracting from zone 20 21 22 If the particle size of the dusts to be filtered is smaller than the grade of filtration of the applied filter elements a carrying over from the process to the probe must be expected The grade of filtration of the applied filter elements must be significantly smaller than the average particle size of the dusts in the process gas DANGER 30 BX460016 09 2012 Art Nr 90 310 95 Risk of explosion from flame propagation Install a flame barrier if there is a risk of flame propagation from the process Bedienungs und Installationsanleitung Installation and Operation Instruction C13 5 Gasentnahmesonden Sample Gas Probes 4207 TUR Baureihe Serie 222 xx ATEX 2 TECHNOLOGIES DANGER Risk of explosion from the ignition of dust If the probe is used in a dusty environment remove the dust layer from all components regularly Also remove the dust layer from under the thermal insulation of the probe GAS 222 20 ATEX 2 and from the heating band The ignition temperature
112. t be observed DANGER Risk of explosion from opening the magnetic valve housing The magnetic valve is a closed system It may not be disassembled As protection against short circuits there must a fuse max x lb according to IEC 60127 2 1 or a motor circuit breaker with a short circuit and thermal quick trip adjusted to the rated current connected upstream from the magnet For very low rated magnet currents you may select the fuse with the smallest rating according to IEC standards This can either be connected separately upstream or mounted in the respective supply device The fuse voltage rating must be the same as or larger than the nominal voltage of the magnet The brea king capacity of the fuse link must be the same of larger than the maximum anticipated short circuit current at the installation site The nominal fuse rating 15 indicated on the magnet Example BX460016 09 2012 Art Nr 90 310 95 35 Bedienungs und Installationsanleitung Installation and Operation Instruction Gasentnahmesonden Sample Gas Probes ISS Baureihe Serie 222 xx 2 TECHNOLOGIES 7 Operation and Maintenance 7 1 Indication of risk The sample gas probe should not be operated out of the range of its specifications All repairs must be carried out by B hler authorised personnel only Only perform modifications servicing or mounting described in this manual Only use original spare parts Regard
113. tion Equipment may only be used in areas where normal operation cannot cause frequent ignitable electrostatic discharges Only clean plastic housing components and labels with a damp cloth Protect equipment against the effects of external impact DANGER Damage to the housing or components The maximum operating pressure and temperature range of the drive system may not be exceeded Drive system is under pressure Never loosen or remove the cap or existing accessories when the drive system is under pressure Never open the drive system with the function single acting This may only be carried out in the production plant Do not attach any levers or tools to the drive screw Levers or tools on the drive screw can whip around when the air chucking or auxiliary voltage is turned back on and lead to severe injuries or damages BX460016 09 2012 Art Nr 90 310 95 37 Bedienungs und Installationsanleitung Installation and Operation Instruction NW Gasentnahmesonden Sample Gas Probes a UU MERA Baureihe Serie 222 xx ATEX 2 TECHNOLOGIES 7 2 Check before operation Please check that all tubes and electric fittings have no damages and are mounted correctly no part of the sample gas probe is demounted e g cover the protective and surveillance devices are installed and functioning e g flame trap the inlet and outlet tubes of the sample gas probe not closed the ambient parameters ar
114. truction NW Gasentnahmesonden Sample Gas Probes a ISTE Baureihe Serie 222 xx ATEX 2 TECHNOLOGIES 7 2 Vor Inbetriebnahme Kontrollieren Sie dass die Schlauch und Elektroanschlusse auf nicht besch digt und korrekt montiert sind keine Teile der Gasentnahmesonde demontiert sind die Schutz und berwachungsvorrichtungen vorhanden und funktionsf hig sind z B Flammensperre der Gas Ein und Ausgang der Gasentnahmesonde nicht zugesperrt ist1 die Umgebungsparameter eingehalten werden Leistungsschildangaben beachten Spannung und Frequenz auf dem Typenschild mit Netzwerten bereinstimmen der Temperaturkontakt energiebegrenzt angeschlossen ist Umax 30V Imax 100mA die elektrischen Anschl sse fest angezogen und dass die berwachungseinrichtungen vorschriftsm ig angeschlossen und eingestellt sind alle Anschlusskabel zugentlastet montiert sind alle Schutzma nahmen durchgef hrt sind Erdung die Leitungseinf hrungen sachgem abgedichtet sind 7 3 Sonde GAS 222 20 ATEX GEFAHR Explosionsgefahr durch Entzunden von Staub Wenn die Sonde in staubiger Umgebung eingesetzt wird entfernen Sie regelm ig die Staubschicht von allen Bauteilen Entfernen Sie die Staubschicht auch unter der W rmeisolierung der Sonde GAS 222 20 ATEX 2 Die Z ndtemperatur bzw Glimmtemperatur vorhandener brennbarer St ube bzw Staubschichten muss deutlich ber der maximalen Oberfl chentemperatur de
115. und Installationsanleitung Installation and Operation Instruction e Gasentnahmesonden Sample Gas Probes u GE EE Baureihe Serie 222 xx 2 TECHNOLOGIES 6 2 Tube fittings The following table shows the tube fittings of the sample gas probe probe reservoir ball valve oer 222 01 oneumatics 3 2 way solenoid valve 150 2 tube 21 4 7 filling adapter condensate drain Se G1 8 G1 4 1 4 7 depends on the model 2 GAS 222 xx ANSI and GAS 222 xx AMEX types only The sample tubes must be connected with appropriate fittings This is as well for the optional calibration ports The probes of the series GAS 222 21 31 35 have a flush connection in G3 8 This is open without a factory installed back flush unit Before commissioning the flush connection is to be closed gas tight DANGER Toxic caustic gases Explosive or toxic gases can form through a leaky or opened back flush connection The connection fitting NPT 74 for the sample tube on heated probes should be as short as possible and the insulation of the sample tube should fit into the probe insulation as close as possible For carrying out this step remove the insulation by loosing the fixing bolts breakage hazard The insulation is brittle Handle with care dont drop it When the sample tube is installed fix it with the bracket Longer sample tubes may require more fixing brackets on their way down to the system A
116. usziehen Das verschmutzte Filterelement abziehen und die Dichtfl chen kontrollie ren Vor Aufstecken des neuen Filterelementes die Dichtung am Griffstopfen Dichtung geh rt zum Liefer umfang des Filterelementes erneuern Den Griff dann mit neuem Filter einf hren und unter leichtem Ein dr cken um 90 drehen Griff muss dann senkrecht stehen Durch Ziehen am Griff pr fen ob das Fil terelement fest sitzt Bei herausgenommenem Filter kann erforderlichenfalls auch das Entnahmerohr durch Ausblasen oder mittels eines Reinigungsstabes von innen gereinigt werden i HINWEIS Die Keramikfilterelemente sind von ihrer Beschaffenheit sehr zerbrechlich Daher die Elemente vorsichtig handhaben und nicht fallen lassen Die Filterelemente aus Edelstahl k nnen in einem Ultraschallbad gereinigt und fters wieder verwendet werden in diesem Falle verwenden Sie auf jeden Fall neue Dichtungen an Filter und Griffstopfen Bruchgefahr Hintere Filteraufnahme nicht besch digen Ji HINWEIS Die Wetterschutzhaube l sst sich nur wieder schlie en wenn der Griff vollst ndig in der Senkrechten steht Dazu die Haube durch leichtes Anheben aus der Verriegelungsst tze l sen und dann herunterklappen Auf richtiges Einrasten der Haubenverriegelung achten 18 BX460016 09 2012 Art Nr 90 310 95 Bedienungs und Installationsanleitung Installation and Operation Instruction e Gasentnahmesonden Sample Gas Probes u SURLER Baureihe S
117. x jx px 11 I RR PPX XY XI 2 2 1 000 2 0 20102669 866600 780800 660820 684800 5 Bulyoo e uonoeuuoo y 104 Bui uonoeuuoo YSNyyoe 40 m s Hulyoo7 0 10 ysem yoeq 104 pod ajdwes Jo Bug X X X X L8 Jod ajdwes Jo Bug 69 800 uJuJz LO yoeq JO Bui 721 8006 Z1800 LEESCCIV 444 LLECZCZCOY 60620097 7000097 wwg od ajdwes Bus od ajdwes Jo Buy YOOUD 8 uonoeuuoo sef 8 uonoeuuoo seb 499U9 9 sef 9 uonoeuuoo seb 54 081 6 ISNV 1edepy suondo 19414114 LO t sf i os o gt gt gt EN X XXX XXX X X X HEN See LL IXIXIX JXIXIXIX xXx XIX veocecov SBUN O jo 195 XIX xxx Xxxx 010209 UOA SBUL O jo 195 ___ 1 482009 OOM 3911 4 1 11 XIXIXIX 9 22297
Download Pdf Manuals
Related Search
Related Contents
manuel d`utilisation owner`s manual El sistema viene con los siguientes componentes: MANUAL DE INSTRUCCIONES Untitled HygroPalm HP21 Hand-Held Indicator User Guide HP21 手持表使用 Untitled - CFA Eve Manuel d`utilisation Polk Audio DXi350 User's Manual GRX-1200R Manual V7 - Remote Control Golf Cart Professional VersionⅢ Copyright © All rights reserved.
Failed to retrieve file