User Guide - City of Courtenay
Contents
1. may COURTENAY Engineering City of Courtenay Subdivision Application Approval Process User Guide CA URTENA 1915 2015 Tel 250 334 4441 Email engineering courtenay ca followus BO courtenay ca This User Guide is to assist you in understanding the City s Subdivision Approval Procedures Adherence to this guide does not guarantee application approval The right to grant subdivision is at the sole discretion of the Approving Officer Upon review of the material anyone interested in submitting an application is encouraged to request a pre application meeting with Staff to better understand both general and site specific requirements Table of Contents What ISSUDGIVISION i s5s is05 cssnssascssecsxsdscacsesdsuseseddesussen ae covsds tues cadra ues Sadues oadedpssen ates ands uesusdecasseodSdees adsusadaa has nadssacaxsdbsleagelsabeasadetlaasa ths 3 Why you need to obtain the City s Approval for SUDCIVISION cecceseesseseesessessesesteseesessecsesnesnesnesessessesnesneenseessessesnesneensenseeseeeneens 3 Who is involved in The Subdivision PROCESS jainsiaasiuodiueniounudanunnnancoinudndedinnnunonenananoduHennnanGads 3 The Subdivision Application Approval Process 3 cicdichisacs a E A E R R a 5 Te PreApplicaton MGCL F E enaere roa eoe eea EEE stg ca E E EN p E E Aa AEA aeaa E A REE ERE REE 5 2 APPICIIGTSUDMIS SIO eee E EEE E E EE EEE EEE 5 3 Internal DART and External ROVIQW cccccccccssssssssssssssss
2. is a combination of meeting the policy documents including the Zoning and various other City bylaws requirements and having adequate services and capacity to service the additional lots Ensuring the land is suitable for the intended purpose the role of the Approving Officer is to exercise an understanding of Provincial legislation and municipal regulations with consideration of the long term public good before approving or denying subdivision The review and approval process for subdivisions is necessary to ensure that all statutory and City Bylaw requirements are addressed including but not limited to e Size and shape of lots buildable area e Roads lanes and emergency vehicles access e Parks open space and walkways e Preservation of natural features ravines streams trees etc e Compatibility of subdivision pattern with surrounding neighbourhood e Sanitary sewer water drainage street lights and other services and unicipal infrastructure such as protection of opportunity for future development for lands adjacent to or beyond the lands being subdivided Who is involved in the Subdivision Process Approving Officer All subdivision must receive the approval of the Approving Officer The Approving Officer is a statutory official with separate and independent jurisdiction from the local government Mayor and City Council City of Courtenay Subdivision User Guide last updated 5 May 2015 3 Engineering Departme
3. most projects e any fees required by other utility companies or agencies e plan registration by a solicitor or notary public e cash in lieu of parkland dedication if applicable and e other fees as determined through the subdivision process Subdivision application fees are non refundable Application fees are required at the time of subdivision application submission To calculate the processing fee subtract the number of parent parcels from the number of lots proposed If the applicant has questions regarding fee calculation please contact the Engineering Department Please note legal fees for document registration of discharge are the responsibility of the applicant to be determined prior to Subdivision Approval Fees for fee simple and bare land strata subdivision proposals see page 3 for definitions e Application Fee 600 e Processing Fee For each additional lot 150 Fees for strata conversions see page 3 for definition e Application Fee 500 e Inspection Fee 100 e Processing Fee For each additional lot 100 Refer to the City of Courtenay Fees and Charges Bylaw No 1637 for all current application fees City of Courtenay Subdivision User Guide last updated 5 May 2015 8
4. If appropriate the Approving Officer will approve the subdivision by signing the final subdivision plan 8 Plan Registration Once signed by the Approving Officer plans are returned to the application and are ready to be registered at the Land Title Office by the Applicant or Applicant s Solicitor along with other documents which may have been required restrictive covenants right of ways etc This is the process that creates legal title for each new parcel defined on the subdivision plan The plans must be registered within 2 months of signing by the Approving Officer City of Courtenay Subdivision User Guide last updated 5 May 2015 7 Timetable for the Subdivision Application Approval Process The amount of time to process a subdivision application is largely dependent upon the complexity of the application The time it takes to complete the requirements for subdivision is largely dependent on the preparedness of the applicant and ability of the applicant to meet the established requirements in a timely and complete manner Costs Involved in Obtaining Approval for a Subdivision The subdivision applicant is responsible to pay for the following costs where applicable e application fee e on site and off site servicing costs e Development Cost Charges DCC s e current assessed property taxes e BC Land Surveyor plan preparation and signing fees e consultant fees engineers architects solicitors etc are typically hired for
5. are required Check the Subdivision Control Bylaw for servicing and access requirements 2 Application Submission When you are ready to proceed complete an application form All subdivision applications must be accompanied by e Completed application form signed by the registered owners and agent acting on behalf of the owner If represented by an agent a letter of agency is required to be signed and submitted by the owner e Certificate of Title dated no more than 5 days prior to the date of the application as well as a copy of any all easements Statutory Rights of Way SRW and or or covenants registered on Title e Application Fee e Design brief outlining high level servicing requirements and how services will be provided for the subdivision based on design criteria City of Courtenay Subdivision User Guide last updated 5 May 2015 5 e Aplan or sketch in metric showing proposed roadways lots with dimensions existing and proposed easements and right of ways and existing buildings e Legal survey plan showing property boundaries topography and bylaw sized trees e Ministry of the Environment s Site Profile for Contaminated Sites available at the front counter e Written statement on conformance to Sustainability Evaluation Checklist as required and e Written statement on conformance to the Affordable Housing Policy as required Applicants should ensure that all information provided is clear consistent and that no subm
6. ch may apply Official Community Plan OCP Courtenay s OCP divides the City into land use designations Each designation allows specific types of land uses and zoning categories Check the OCP for the designation of the subject property and the land uses of zoning allowed within that designation Also check if the subject property is within a Development Permit Area Development Permits regulate form and character signage siting landscaping screening lighting and parking through a complementary approval process Local Area Plans LAP Courtenay has prepared more detailed plans for specific areas in the City Check to see if your property is located within one of these areas and if so that your proposed subdivision adheres to the plan Zoning Bylaw Each property in Courtenay has specific zoning requirements Check the zoning map for the existing zoning on the subject property and then check the Zoning Bylaw to find the regulations for that zone If the present zoning does not allow for the proposed subdivision rezoning and or OCP amendment may be required in advance of subdivision approval Engineering Services All developments must meet City standards for sanitary sewer storm water disposal water supply roads sidewalks traffic controls and street lighting These services are provided at the developer s expense Check with the Engineering Department to see if the required services are available or whether additional services
7. d patterns e Dedication of parkland linear open space and walkways City of Courtenay Subdivision User Guide last updated 5 May 2015 6 e Legal agreements documents and plans including legal survey plans Restrictive Covenants and Easements e Tree removal permit e Certification of non encroachment showing the location of existing buildings and site services being retained including wells septic fields and utility lines e Geotechnical engineer s report regarding soil stability and conditions for construction e Sewerage system filed with the Health Authority if applicable e Payment of applicable development cost charges sanitary sewer storm sewer and water connection fees administration inspection fees warranty charges taxes and other charges e Payment of the current year s property taxes e Executed Servicing Agreement with the City for works and services required for the development and e Requirements from outside agencies as referred by the Approving Officer or Engineering Department have been adequately met 6 Completion or Security of Works and Services All services are requires to be installed at the owner s expense prior to final subdivision approval unless the owner provides security for the works and enters into a subdivision servicing agreement with the Municipality to complete the required works by a specified date A Servicing Agreement requires the Applicant to provide e Acost estimate of t
8. eived Staff will determine which external review agencies are required It is the responsibility of the Applicant to coordinate and seek approval from these external agencies A list of potential review agencies is provided on Page 3 4 Preparation of the PLR The Approving Officer collects compiles and reviews all internal and external review comments and reviews relevant legislation and City Bylaws in order to determine if a proposal is eligible for Preliminary Layout Review PLR letter issuance The PLR is a letter outlining all the subdivision completion requirements that must be satisfied by the Applicant An initial calculation of Development Cost Charges DCC s and other Municipal fees are also provided by Staff and included in the PLR letter The PLR is valid for six months with the possibility of up to a 6 month extension where progress on the project is demonstrated 5 Completion of the PLR Requirements by the Applicant The PLR outlines all the subdivision completion requirements that must be satisfied by the Applicant Requirements may include infrastructure improvements road paving water sanitary and stormwater system upgrades etc legal agreements and environmental protection requirements Typical requirements that must be met prior to final approval include e Engineered construction drawings for all required works within or beyond the boundary of the subdivided lands e Subdivision Plan lot dimensions roa
9. equately address PLR requirements you may need to hire consultants such as Civil Engineer P Eng is typically the coordinating professional and the engineer of record The Civil Engineer will ensure the engineering components of the PLR are satisfied including ensuring that all connections to City services will be adequately sized based on the calculated need Surveyor BCLS will prepare a legal plan of the subdivision upon which the PLR is based This information will form the base from which civil engineering plans are required required for servicing approval A qualified surveyor is also responsible for preparing and signing your final plan of subdivision before it is submitted to the Approving Officer for approval The surveyor may also be involved in submitting the approved plan to the Land Title Office for registration Avboristis a person certified by the International Society of Arboriculture available to provide advice on the classification and resiliency of trees Properties that qualify according to the Tree Management and Protection Bylaw No 2461 are required to retain such professional services Geotechnical Engineer P Eng will ensure the structural integrity of soils for proposed works and services and may be required to comment on constructability within upon the proposed lots Traffic Engineer P Eng provides traffic studies related to the impact of traffic generated by the proposed subdivision on existing infrastructure a
10. he proposed subdivision servicing works including engineering fees construction costs with the appropriate contingency sum and warranty deposit amount This estimate must be certified by a Professional Engineer and forms the basis of the security required by the Applicant for execution of the agreement e Security in the amount of cost estimate above augmented by the contingency required by the City over and above that identified in the estimate The Engineering Division will advise the Applicant of the current security requirements e Liability insurance where the construction of works is proposed to extend into City controlled lands or road dedication The Engineering Division will advise the Applicant of the current insurance requirements 7 Subdivision Approval Once the Servicing Agreement and other conditions of the PLR have been addressed applicants may submit an application for subdivision approval to the Approving Officer In doing so you must provice e Acover letter identifying the request and providing the documentation demonstrating that all the conditions of the PLR have been met e The final survey plan as prepared by a B C Land Surveyor BCLS e Payment of all application fees and or outstanding service connection or other fees as applicable e Proof that all property taxes are paid in full e Payment for the applicable Development Cost Charge amount e Provide all other required documentation as defined in the PLR
11. issions are conflicting Upon receipt of your application Courtenay staff may ask for additional information such a traffic study soil stability study or tree preservation plan where applicable 3 Internal DART and External Review The Development Application Review Team DART was formed in September 2014 to improve internal circulation of information and efficiencies when reviewing development applications The DART holds bi monthly meetings with key staff from departments responsible for development subdivision and capital project delivery DART provides the following benefits and efficiencies to the application review process e Inter Department internal review is initiated early in the development process providing an opportunity for staff to share knowledge and project background ask questions seek clarity and engage in open discussion e Helps identify and resolve conflicting goals objectives and standards early in the development process e Impacts of decisions on various departments can be identified and issues resolved more efficiently and openly e Platform for high level foundational questions resulting in new initiatives or regulatory changes to be discussed New projects are reviewed by DART and comments are provided to the Application within 2 weeks of the meeting Additional questions from the Applicant can be directed to the Engineering Department in writing after initial PLR comments are rec
12. nd provides any recommendations regarding upgrades and or timing of upgrades to the road network City of Courtenay Subdivision User Guide last updated 5 May 2015 4 e Acoustical Engineer P Eng is required to mitigate sound from development in urban areas e Biologist RPBio QEP is required to ensure the long term protection of sensitive habitat where any type of watercourse including creeks ravines rivers lakes ponds or swamps are present or adjacent to the subject property e Solicitoris required to review all legal agreements and documents and witness the execution of and on occasion coordinate the registration of subdivision plans The solicitor is responsible for registering documents in a specific order and or preparing and registering the discharge of documents and charges on title that are no longer needed The Subdivision Application Approval Process TE E Internal amp Completion o a poe tales External PLR Prep of PLR wats amp Approval Register eeting Submission 7 Services Plan Review Req s 1 Pre Application Meeting The pre application meeting is an opportunity for initial discussion with Staff regarding the applicant s development intentions The more information the applicant is able to gather before submitting an application the more efficiently the process is likely to proceed It is strongly encouraged to discuss your proposal with staff to identify any plans policies and regulations whi
13. nt The Engineering Department coordinates the subdivision process ensures technical compliance with the servicing standards that have been established in the Subdivision Control Bylaw provides recommendations to the Approving Officer and plays a major role in assisting the applicant to satisfy the various requirements of the process Other City Departments Through the Development Application Review Team DART City Staff can collectively review applications to ensure adherence to applicable bylaws Key attendees include anager of Planning Chair Development Engineer Approving Officer anager of Parks anager of Public Works Land Use Planner Fire Department Building Inspector External Agencies Subdivision applications are referred to various external agencies for review and comments These agencies include Comox Valley Regional District CVRD Agriculture Land Commission ALC Department of Fisheries and Oceans DFO Canada Provincial Ministries responsible for Agriculture Environment Natural Resources Health Transportation School District No 71 Utilities B C Hydro Terasen Gas Telus Canada Post Land Title Office All subdivision must be registered in the Victoria Land Title Office at which time they are assigned a legal description and a property identification number PID Consultants The subdivision of property typically requires the outside expertise of qualified professions To ad
14. sssssssssssssusssssisisisisisisisisisisisisisisisisisisisisisisitisisisisisisisesieeeeeeeees 6 Az Preparation OL LAS PER cea ee E e aE aeaa a EEEE a e Ea E E a EE RE dp aenetins 6 5 Completion of the PLR Requirements by the APPliCAnt ces ceseecessesessestestesessessessesnesnesessessessesnseseessesiesneensenseeseeteeentens 6 6 Completion or Security of Works and ServiCESrossresecore os tton on ne O eGON OTE OOE ONTEN 7 7 SUBGIVISIOMMADDIOVAl sonssncnusnaneunee deur ORAE REEE SEE AEREA EEE ET EPE ORAE EEEREN RNE EEEE TE REE EE REENER TEESE 7 8 Plan RESISthATOM tecssalseateinisactad wan dondaucwdnde dua ad a EE E Ea EA rT ES NE EE E E TEE R 7 Timetable for the Subdivision Application Approval ProCeSs c ccceessesssssessesessesessessessesseeecsessesstsaesaeeecsessesatsatsaeeessesseeateaseass 8 Costs Involved in Obtaining Approval for a SUDGIVISION eeeececesesestesneseesecsessesnesesessessestesnesesessecsesueanssnssesieciesneeneenseeseeeneenees 8 City of Courtenay Subdivision User Guide last updated 5 May 2015 2 What is Subdivision Subdivision Subdivision is the process of altering legal property boundaries and creating new parcels of land with individual legal description and Parcel Identifier PID There are several types of subdivision e Fee Simple subdividing land into two or more parcels e Bare Land Strata creates strata lots within one parcel of land where the owners of each strata lot created have joint ownership o
15. ver common lands common property within the Bare Land Strata Plan e Building Strata creates individual units within a building which have separate titles allowing each unit to be sold separately However each unit has joint ownership of common elements of the building or complex e Phased Strata either Bare Land Strata or Building Strata that is built out over several phases as regulated by the Strata Property Act e Strata Conversion of an Existing Building Dwelling converts an existing building dwelling e g apartment building to strata titled units for individual ownership Why you need to obtain the City s Approval for Subdivision The Approving Officer is appointed under the Land Title Act and by the Strata Property Act to make decisions and exercise discretionary powers with respect to the subdivision of land Authority to approve or deny a subdivision application is at the sole discretion of the Approving Officer through Provincial Legislation and contained in the Courtenay Subdivision Control Bylaw as well as several key provincial statutes It is the responsibility of the Approving Officer to ensure that subdivisions are in accordance with Provincial statues regulations and local government bylaws regulating subdivision and zoning Rg The subdivision of land can be a complicated process involving overlapping interests and approval or denial is at the sole discretion of the Approving Officer The ability to subdivide