Home
Installation Manual EnviroShield - Thermo-Cell
Contents
1. Walls Above and Below Grade The first step is to cut or pierce a point of entry for the hose approximately 305 mm 12 to 406 mm 16 inches from the top of the cavity The hose can then be lowered into the cavity such that the end of the hose sits 152 mm 6 to 305 mm 127 inches off the bottom of the cavity The machine can then be started and insulation injected into the cavity 9 0 As the cavity fills insulation material will pack around the nozzle until excessive back pressure causes the hose to back up Once this occurs the hose should be immediately withdrawn up the cavity approximately 305 mm 12 such that the hose unblocks and the next section of the cavity begins to fill with insulation The process of raising the hose and allowing it to back up in successive stages is repeated until the portion of the cavity below the hose entrance is completely filled with insulation The por tion of the cavity above the hose entrance is filled by quickly inverting the nozzle and filling the remainder of the cavity with insulation until the hose backs up Sloped or Cathedral Ceilings The installation procedure for ceilings is the same as wall procedure except that cavities longer than 3 metres 10 feet must be blown in stages This is due to the fact that it is difficult to lower the hose more than 3 metres down the cavity without having the hose bunch and it is more dif ficult to control hose direction When filling cavities
2. im Nu 3 dee el i N installation Manual EnviroShield Wall System Insulation Enviroshield is ia dense pack cellulose insulation system that is ntended for application in walls Cellulose insulation ceilings and floors behind mesh or poly utilizing provides seamless Weathershield or ProCell Green insulation coverage Cellulose insulation is not only a natural choice for the environmentally conscious consumer but one that outperforms both thermally and acoustically With a superior R value of 3 8 per inch EnviroShield provides excellent cover age perfect fit and greater density and is a sound alternative to other fibrous insulations Our insulation delivers long term fire retardant protection and unlike other insulation products will not melt or propagate fire Safe and easy to install it does not itch or contain any formaldehyde or harmful emissions It is specially Superior thermal treated to repel insects and rodents and will not promote the growth of harmful and acoustical mold and fungi properties comfort With over 87 recycled content and many performance benefits cellulose is a natural choice for all your insulation needs Start saving today save on product cost and get immediate rewards in energy savings Contact us today for more iinformation EnviroShield is available coast to coast Walls EnviroShie
3. SJJEM JIEU PJJIUSOJIAUJ JIEM M9ed esueg 21220 DISIUGOJIAU U OZVZLH JNO www thermocell com Machine Registration Form Installation Card Certification Card Sample THERMO CELL INDUSTRIES LTD Ai Ls Thermo Cell Industries Limited is a leading Canadian manufacturer of thermal and acoustical insulation specialty fibres and hydroseeding mulch Thermo Cell s products are actively marketed under the Weathershield Pro Cell and Celumulch trademarks For more information on Enviro contact Thermo Cell at 123 Clement Street Vars Ontario KOA Tel 613 443 5100 Fax 613 443 5160 Toll Free 1 800 267 1433 1822 Plains Road Debert Nova Scotia BOM 160 Tel 902 662 3600 Fax 902 662 2882 Toll Free 1 877 575 3600 MMM W029 MMM
4. cea saz 11 TOM ian io 11 105 Inrormatton e 11 100 double SIN OO TING r iste e Eu ER ORIS ES HUN a 11 11 0 MP CERO EISE 12 12 0 Cautions and Limitations d slam d cd bcd 12 iu pc Y Y 12 12 2 Below Grade a 13 1977 Mille 13 Appendix A CAN ULC 5703 09 Standard Appendix B Coverage Chart Products utilized for EnviroShield are manufactured in Canada and are available coast to coast EnviroShield 1 0 2 0 2 1 2 2 3 0 3 1 3 2 3 3 4 0 4 1 General The Enviro Shield Insulation System provides a unique and controlled way to insulate new build ings with loose fill cellulose insulation The system not only describes how to prepare and insu late assemblies but also defines and lists suitable materials and equipment The benefits of insulating buildings with loose fill cellulose insulation is that it provides the end user with a product offering superior thermal and acoustical resistance properties These proper ties are achieved by the products ability to resist heat losses due to air infiltration and convection The reduction in losses are achieved because the insulation makes contact with all cavity sur faces can conform around fixtures plumbing and wiring and is compressed to a density higher than conventional batt type
5. Using channels or furring fasten the poly to the face of each framing member Placement and fastening of furring may be done on either 400 mm 16 spacing for 19 mm x 64 mm 1 x3 furring or 600 mm 24 spacing for 19 mm x 89 mm 1 x4 furring Furring must be fastened to the framing with not less than 51 mm 2 nails Placement and fastening of resilient channels should be done on 400 mm 16 spacing and fastened to the framing with not less than 51 mm 2 nails For more details please consult your local building office Once the furring has been applied the vapour barrier can be further secured to the face of each stud using 13 mm 2 staples spaced every 76 mm 3 to 102 mm 4 apart If required an additional RSI 0 5 R 2 8 can be obtained on stud walls to achieve a total rating of RSI 4 0 R 22 8 if the vapour barrier is loosely applied to the assembly and not fastened to the face of each stud This will allow the insulation to bulge up between the channels or furring and onto the stud faces thereby increasing the effective insulation depth to 19 mm 3 4 In this ap plications the film should be initially hung to the top of the wall section through the use of 13 mm 2 staples spaced every 150 mm 67 to 300 mm 12 apart Once secured the barrier should then be loosely draped and stapled to the bottom plate of the wall such that there are no folds or wrinkles in the film Strapping can then be applied by working from the
6. The installer shall also ensure that the cavities are prepared in accordance with this manual and that the machine is in good working order and set to the predetermined calibration settings Density Verification The installer should verify material density at the beginning during and at the end of each job A density check can be performed using one of two following methods The first method suitable for both wall and ceiling applications requires the installer to keep track of the number of bags of insulation blown for a specific area By dividing the total area blown by the bags of insulation used the coverage bag can be determined By comparing this value to the appropriate value given in Table 1 of Appendix A the installer can determine how close he or she is to the target density of 48 kg m or 40 5 kg m 3 0 Ib ft 2 5 Ib ft The second method designed specifically for wall applications requires the installer to keep track of the number of bags used and the number of cavities blown By dividing the number of cavities blown by the appropriate cavity bag value given in Table 2 of Appendix A the installer can determine the number of bags required By comparing this value to the actual number of bags used the installer can determine whether the cavities are being under or over blown If the actual value is less than the design theoretical value then the equipment should be ad justed By increasing the amount of air and or reducing
7. Thermo Cell Industries Limited Retaining Membrane Both 6 mil CGSB polyethylene vapour barrier and spun polypropylene netting are suitable membranes in which to install the insulation behind The following sections discuss in more detail usage and limitations more fully and describe various methods and materials suitable to securely fasten the membrane to the face of framing members Vapour Barrier Film The vapour barrier system is designed to eliminate the need to apply both a mesh and a vapour barrier to the exterior wall However its installation requires more skill since loosely fitting poly will stretch and bulge to a greater extent Cavities with excessive bulge will in turn make drywall installation more difficult The use of this vapour barrier film is suitable for use on standard wood and steel frame construction It can be secured to the wall using either drywall shims resilient channels or wood or steel furring The use vapour barrier membranes with the drywall shim fastening method 15 limited for use on standard 400 mm 16 centre wood or steel frame construction due to the inability of the vapour barrier to resist excessive bulging at greater framing member spacing If framing member are spaced greater than 400 mm 16 the use of wood or steel furring must be employed Netting The use of netting to insulate cavities has the advantages of being easier to install does not required drywall shims and allows a wall to be insulated
8. behind vapour barrier remember to blow sufficient material around the hose entrance approx 300 to 600 mm 1 2 ft prior to blowing the next stage This will prevent insu lation from spilling out of the pierced membrane when the next stage 15 blown In open web truss systems it should be noted that the hose must be inserted and lowered along the side of the cavity closest to the previously insulated cavity This will prevent excessive mate rial from spilling into the adjacent uninsulated cavity and thus reduce the potential problem of trying to lower the hose down an obstructed cavity If insulation does spill into the adjacent cav ity prior to blowing the hose should be forced as deeply as possible into the material This will help ensure the insulation in this area is adequately packed In cases where it is not possible to adequately force the hose into the material or the material does not get adequately packed upon filling another hole should be made in the middle of the soft area and additional insulation blown in Post Installation Procedures Upon completion of the job the installer should perform a visual inspection to ensure all cavities have been filled and are firm to the touch The installer should then determine if the correct num ber of bags where installed If the actual number of bags 15 less than the calculated the installer should then establish which cavities are softer than the others and top up those cavities This can be
9. done by piercing a hole in the soft area physically compressing the material by hand inserting the hose and filling the created void A quick hammer test can also be performed on any suspect cavities This is done by hitting the studs rafters or trusses of randomly selected cavities with a heavy hammer a number of times The material the cavity should not slip move any way if the correct amount of insulation has been installed If the material within the cavity moves then additional insulation should be packed into the cavity Once the installer is satisfied with the outcome of the job the wall cavities exhibiting excessive bulge i e greater than 13 mm 2 can be rolled Do not push the roller below the face of the framing members Over compression of the material in the cavity may result in separation and 10 0 10 1 10 2 10 3 10 4 or settlement problems slight bulge is always desirable in order to ensure continuous contact of the insulation with the drywall For vapour barrier systems once the cavities have passed inspection the pierced poly should be repaired and sealed with sheathing tape or using caulking and a strip of 6 mil polyethylene vapour barrier Quality Control Pre Inspection The installer is responsible for ensuring all fire codes are adhered to as it re lates to insulating around recessed light fixtures not approved for insulation contact chimneys flue or other heat emitting devices
10. of Ensure feeder does hopper material not run low or out of material Under blown Not enough air Reduce air Too much material Reduce material Material is packing Do not over fill or in the hose pack the feeder Hose Blocks Not enough air Increase air Too much material Decrease material Loss of air pressure Repair hose and or due to leaking hose replace feeder seals or feeder seals Too much hose Check hose length or increase air or decrease material to compensate for extra hose Staple Popping Over blowing cavities See Overblown Cavities Feeder low or out of material Incorrect type size number orientation or spacing of staples 11 0 Areas of Application The EnviroShield system is intended to be used to insulate conventional exterior walls ceilings and floors of new buildings which employ wood or steel framing members in combination with an rigid exterior surface and polyethylene vapour barrier or netting membrane located on the inside surface Ensure feeder does not run low or out of material Ensure the correct Staples are used and orientation is perpen dicular to the grain of the wood 12 0 12 1 12 2 13 0 The system can also be used to insulate interior load bearing non load bearing walls joist headers rim joists and basement walls Cautions and Limitations General To avoid possible irritation to the skin eyes and throat the installer should wear a NIOSH OSHA app
11. 8 0 installation Procedures sese eee eee 5 8 1 Retaining 5 8 1 1 Vapour Barrier Wood Frame 5 8 1 1 1 Drywall Shim Fastening 6 0 1 1 2 Furring Resilient Fastening 222 2 6 0 1 2 Vapour Barrier Steel Frame 6 8 1 2 1 Drywall Shim Fastening 1 8 1 2 2 Furring Resilient Channel Fastening Method 1 8 13 Netting Wood Frame Construction 2 222 1 1 EnviroShield 8 1 3 1 Direct Method 00000202000 9 8 1 3 2 Furring Resilient Channel Method 8 8 1 4 Netting Steel Construction Loretta sata ck too tnt dee 8 8 2 FINO FTOCE OUTE 8 i e 8 8 2 2 Walls Above and Below 8 0 2 3 Sloped or Cathedral Ceilings sess 9 9 0 Post Installation 5 sse 9 10 0 Quality Control ei eree 10 0 10 arri 10 10 2 Density Verification ii 10 Qualy 0
12. ace concrete basement walls shall not occur before 45 days after casting of the concrete It is not recommended to insulate basement walls in areas prone to flooding or sewer back up In order to reduce potential damage caused when flooding or sewer back up occurs it is recommended that the bottom 150 mm 6 to 200 mm 87 of the basement wall be blocked off and left un insulated Warranty The installed insulation is guaranteed in accordance with the information card and against settlement for the normal life of the building provided the material is installed according to this manual Settlement liability will be limited to the installation of additional insulation provided a copy of the information card and proof of purchase is supplied to Thermo Cell In no event shall Thermo Cell be responsible or liable for any other damages arising from the improper installation whether such damages be direct indirect consequential or otherwise This warranty excludes all damages resulting from defects or deterioration in the structure physical or mechanical abuse and or acts of nature APPENDIX TABLE 1 ENVIROSHIELD COVERAGE CHARTS Le om os o em moe me oo oe Lue m2 Steel Stud Wall Construction n m r em om Ca mm an xo mem zo se we mo When utilizing the drywa
13. ate 21042 au SI eso nj aoo JSOD pue pue eso n eo Jo y JO je Jepisuoo uiejs s e JOPUN peJnjoejnueuu SI W9JSAS jem PJSIUSOJIAU7 y ui pesn 9u Se D SERT C LIIS o 1 07 T nime uu 9977 ep oes un Ins seseq juos 1 029 ep 591 jeulwou 91 GZ uo peseq ae 198 INDI uonenjeA3 q 10006 ne 90 9 001015002 e 10 95 59 97 euigjs s e uojes oue jnejejsur un Jed esod e uoronujsuoo ep www thermocell com 800704 uonenjeA3 9105 404045000 gor 9 uo sefeJeno WEISKS OU eouepioooe SJOJJEJSLI panao Aq pejejsul eq JSALI uonejnsui uoronujsuoo Mau 10 4 E per Gg O Toro wen wr sinbay soes 266 Jed zuawasanosay eoenng aun Jed asse 508 91712550 92488159 sDeg 199 Pun Jed SSEJN poom Burue QURISISOY WOU L ANN 5 SININ
14. d ASTM C7339 Weathershield ProCell Insulation is guaranteed in accordance with R Value stated above the normal life of the building provided the material is installed according to manufacturer s instructions The liability of Thermo Cell will be limited to the replacement of defective insulation or installation of additional insulation provided a copy of this completed card and proof of purchase is supplied to Thermo Cell In no event shall Thermo Cell be responsible or liable for any damages arising from the improper installation or use of defective material whether such damages be direct indirect consequential or otherwise This warranty excludes all damages to the insulation resulting from defects or deteriora tion in the structure physical or mechanical abuse and or acts of nature THERMO CELL INDUSTRIES LIMITED An ISO 9001 2008 Certified Company 1 800 267 1433 123 Clement Street Vars Ont Tel 613 443 5100 1822 Plains Rd Debert N S Tel 902 662 3600 Web Site www thermocell com C C M C 08251 L 12420 Sept 12 E MOM a Fih s Li Wiens Mi adra Sek hit TANTI A AT M E 3 ti T T M 1 m li i ETA RL NAA GT du d ZH 4 kW ila i 1 A eit pet Naf A P i MISI ah SI MS Y rni o iit d v NC OE M LX Lu he N uL L
15. d of acoustical caulking placed on the foundation wall The film joints should overlap by 150 mm and be sealed with caulking or approved sheathing tape Once the barrier is applied to the foundation wall the interior wood frame wall can be erected In order to provide additional protection against moisture damage the bottom wall plate should be placed a minimum of 19 mm 3 4 of the basement floor When installing full height insulation excess vapour barrier extending out from the bottom of the frame wall can be folded up and fas tened to the studs to provide additional protection against moisture damage When not installing full height insulation cut the excess off at the bottom of the wall Sloped or Cathedral Ceiling Ventilation All sloped ceiling spaces require unobstructed con tinuous ventilation along the length of the cavity Please check local and provincial building codes for specific requirements To provide continuous ventilation along the length of the roof rafters or trusses cardboard or foam vents may be employed Cardboard vents can be secured along the length of the rafters or to top cord and webs of trusses using standard 13 mm 2 deep staples spaced 75 to 100 mm 3 4 apart Foam vents can be secured directly to the roof 9 0 8 1 8 1 1 1 8 1 1 2 sheathing using 13 mm 2 deep staples The adjoining ends of foam vents should be separated from one another by a 25 mm 1 gap Installation Procedures Retai
16. ding Manufactured By THERMO CELL INDUSTRIES LIMITED Head Office Maritime Division 123 Clement Street 1822 Plains Road Vars Ontario Debert Nova Scotia K0A 3H0 160 613 443 5100 902 662 3600 EnviroShield TABLE OF CONTENTS 1 0 CG re ee ee a pi 1 2 0 ADDFOVAIS ______ 1 3 0 NIE L se a 1 4 0 Installer aa Miti 1 4 1 cp 1 4 2 EIR ARNO Messen rates aunt hector 2 9 0 Na T Tm 2 9 1 I EDD M 2 5 2 Retaining Membrane esse eee 2 9 41 Baier a 2 92A a na 2 5 3 Vapour Banier 3 9 4 daa mec 3 5 5 3 6 0 BIOWINO EGUIPMENE ici 3 6 1 zm 3 6 2 eT TET 3 6 3 CANDAN ON ta sis a 3 6 4 Field 3 6 5 EQUIPMent MaintenNaNC iri 4 7 0 Pre Installation 4 7 1 BEG AU _____ 4 7 2 a 4 7 3 2 OT E 4 9 1 Above a 4 0 2 oean E 4 7 4 Sloped or Cathedral Ceiling 2 2 2212221 5
17. e ability of the air used during insulation application to freely travel out of the cavity through the pre stamped wire and plumbing openings located on each stud Thus the rate at which the insulation can be installed may be increased without the risk of the hose blocking In circumstances where a vapour barrier is not required or netting is specified on the job the netting can be fastened to the framing members with either resilient channel metal furring steel strapping or drywall shims The procedures to fasten the netting using the different fastening systems is the same as vapour barrier procedures described in sections 8 1 2 PLEASE NOTE If a structure has not been designed to accommodate strapped walls and ceilings the home owner builder and the building inspector should be consulted prior to employing this fastening system This will ensure that appropriate allowances for the application of the vapour barrier electrical boxes window extensions and other fixtures are made prior to the installation of the channels furring Filling Procedure General Prior to installing the insulation adjust the equipment to the pre calibrated settings and ensure the hopper is filled with insulation One operator should remain with the machine at all times and ensure the hopper is maintained at a constant level If the hopper is allowed to empty or over filled the blowing parameters will change resulting too high or low an installed density respectively
18. gs should then be adjusted such that a target installed density of 48 kg m 3 00 p c f or 45 kg m 2 8 Ib ft can be consistently achieved throughout the test wall or ceiling assembly respectively To verify the target density use procedure 10 2 ADensity verification The calibration settings hose specification motor speed if applicable membrane type and type of framing should then be recorded and placed in the manual See Appendix Equipment Maintenance Equipment maintenance shall be the responsibility of the licensee If deemed necessary equipment may be subject to periodic checkups by a qualified Thermo Cell employee It is strongly recommended that components susceptible to wear e g feeder seals be replaced in accordance with a regular overall maintenance program Indications that components are worn can be characterized by the need to turn air settings high and feed settings low in order to achieve sufficient blowing pressure or the inability of the equipment to achieve maintain a constant air pressure through the blowing cycle 7 0 7 1 7 2 7 3 7 4 Pre Installation Procedures Caution Maintain building electrical gas and oil safety code clearances between the insulation and heat emitting devices such as fuel burning appliances chimney pipes ducts and vents to these appliances at least 50 mm and recessed light fixtures at least 75 mm unless approved for insulation contact Bag Usage The con
19. in a shorter period of time Netting is suitable for use on standard wood or steel frame construction having framing members spaced up to 600 mm 24 centres For wood framed walls with framing members spaced up to 24 centre and cathedral ceilings with framing member spaced no more than 16 the netting can be fastened directly to the framing members with standard 13 mm 2 staples Netting for all other applications should be fastened the framing members with either resilient channels or wood furring Vapour Barrier Patch Either 6 mil CGSB polyethylene film used in conjunction with acoustical caulking or sheathing tape approved by Thermo Cell is suitable to repair pierced vapour barrier Air Flow Vents Cardboard or polystyrene air flow vents approved by Thermo Cell are required to provide adequate ventilation in sloped or cathedral ceiling applications 9 5 6 0 6 1 6 2 6 3 6 4 6 5 Plastic Strapping 16 mm wide 5 8 polyester PET plastic strapping can be used for vari ous wood and steel frame applications to fasten vapour barrier retaining membrane to structural members Blowing Equipment Equipment The EnviroShield system can be used with any commercially available blowing equipment provided it has suitable air flow and material feed controls and is in good working order However it is recommended that you consult with a Thermo Cell representative on determining the suitability of your equipmen
20. insulations Approvals Insulation Debert Facility CCMC Listing 08251 Vars Ottawa Facility CCMC listing 08251 Insulating system CCMC Report 12420 standards Insulation CAN ULC S703 09 Vapour Barrier CAN CGSB 51 34 86 Insulating System CCMC Masterformat 07215 5 Installer Requirements General Installers must conduct all installations in accordance with the manual The in staller should carefully read this manual and become familiar with system principles installation and quality control procedures prior to installing insulation Any individual may install insulation under the Enviro Shield System provided they have been certified by Thermo Cell or are acting under the guidance of a certified instructor or installer 4 2 5 0 5 1 5 2 5 3 5 4 Certification Installers seeking certification must successfully complete a training program by a designated certified instructor for all application types e g standard wood frame steel stud cathedral ceilings etc The installer shall be thoroughly instructed on system principles installation and quality control procedures for all application types in order to ensure the insulation 15 installed to its proper density Upon successful completion of the training program certified installers will be issued a certification card Materials Insulation The system has been designed to be used exclusively with Weathershield ProCell Insulation manufactured by
21. ld Versatile Easy amp Safe to install WALLS MUR Thermal Resistance Framing Wood Mass per Unit Area Coverage per Bag Bags Required Resistance Thermique Ossature Bois Masse par Unit de Surface Recouvrement par Sac Quantit de Sacs Requis RSI Value 23 128 38x89 2x4 37 08 313 26 320 36 Weathershield ProCell Greenl are manufactured in accordance with CAN ULC S703 09 Standard for Cellulose Fibre insulation for Buildings and have been evaluated by Canadian Construction Materials Centre CCMC 08251 L Increased Fire Resistance The insulation used in the EnviroShield wall system is manufactured under a certified quality management system If you consider all of the environmental advantages of cellulose insulation and combine this with its perfor a 4 mance safety and cost effectiveness cellulose is the right choice naturally Environmentally Preferred 87 Recycled Content ENVIROSHIELD LOOSE FILL INSULATION APPLICATION MANUAL Wall System I mL d T NET c amp d D TE Lj 1 i a E LEE c AC ss 4 4 ADVANTAGES AND BENEFITS High Stable R Value e Controls air Leakage and Convection e Reduces Conduction Prevents Formation of Condensation Moisture e Cooler Summers Seamless Blanket Cover High Density To Resist Air Movement Sound Deadening Ability e Lasts The Lifetime of the Buil
22. ll shim fastening system the effective thermal resistance and material requirements are increased iby approximately R0 34 510 06 and 2 respectively Steel stud values apply regardless of stud spacing For wood frame construction on 24 centre spacing add 3 to the material requirements Effective thermal resistance can be increased by R2 7 RSI 0 48 by installing insulation behind loosely hung vapour barrier which is fastened to the assembly with 1 thick nominal strapping furring The corresponding increase in material requirements for 2x4 and 2x6 s are 18 and 11 respectively Sloped or Cathedral Ceiling Applications pfs aoe a m o or so os eat o o o Values apply regardless of framing member spacing TABLE 2 COVERAGE CHARTS BASED ON CAVITIES BAG 38 X 89 mm 2 x 4 Wood Frame Construction Stud Spacing Wall Height Cavities Bag 38 X 140 mm 2 x 6 Wood Frame Construction Stud Spacing Wall Height Cavities Bag 30 91 mm 2 x 4 Steel Frame Construction Stud Spacing Wall Height sf we 30 X 152 mm 2 x 6 Steel Frame Construction Stud Spacing Wall EE Cavities Bag To calculate the number of bags required divide the total number of cavities by the appropriate cavity bag value APPENDIX Manufacturer s Warranty Thermo Cell Industries Ltd warrants that Weathershield Insulation is manufactured to meets or exceed CAN ULC S703 an
23. ning Membrane The following sections describes how to fasten the both vapour barrier or netting membranes to either wood or steel frame assemblies For below grade applications we recommend using netting only unless the basement Is in an area with more than 5000 heating degree days this case install a layer of vapour barrier over the netting Vapour Barrier Wood Frame Construction Polyethylene vapour barrier can be installed using either the plastic strapping or resilient chan nel wood furring fastening method Plastic strapping is employed on standard 400 mm 16 construction and the wood furring method is used on 600 mm 24 centre construction or in as semblies requiring a minimum RSI 4 R 22 Resilient channels may be used in place of wood furring and has the added benefit of providing additional sound insulation value Plastic Strapping Method Initially fastened to the top bottom and sides of all wall or ceiling sections through the use of standard 13 mm 2 staples spaced every 76 mm 3 to 102 mm 4 apart Using 15 mm 5 8 or wider plastic strapping and a minimum 13 mm 2 long heavy gauge steel staples spaced approximately 152 mm 6 apart fasten the poly to the face of each stud and top plate Furring Resilient Fastening Method Initially secure the film to the top bottom and sides of all wall or ceiling sections through the use of 13 mm 2 staples spaced every 76 mm 3 to 102 mm 4 apart
24. odate strapped walls and ceilings the home owner builder and the building inspector should be consulted prior to employing this fastening system This will ensure that appropriate allowances for the application of the vapour barrier electrical boxes window extensions and other fixtures are made prior to the installation of the channels furring 8 1 3 1 8 1 3 2 8 1 4 8 2 8 2 1 Netting Wood Frame Construction For wood framed walls with framing members spaced up to 24 centre and cathedral ceil ings with framing member spaced no more than 16 O C the netting can be fastened directly to the framing members with standard 13 mm 2 staples Netting for all other applications i e ceilings with framing members spaced more that 16 on centre should be fastened the framing members with either resilient channels or wood furring Direct Method Initially fastened to the top bottom and sides of all wall or ceiling sections through the use of standard 13 mm 2 staples spaced every 76 mm 3 to 102 mm 4 apart Once completed fastening the netting to all remaining framing members using the same staples and staple spacing Furring Resilient Channel Method Use the procedure defined in 8 1 1 2 Netting Steel Construction The use of netting in steel frame construction has no direct benefit over vapour barrier in terms of ease and speed of application or speed at which the insulation can be installed This is due to th
25. roved dust mask eye protection gloves and suitable work clothing during material handling or installation Only CGSB approved vapour barrier or netting approved by Thermo Cell can be used as a re taining membrane with this system Only sheathing tape or strips of CGSB vapour barrier used in conjunction with acoustical caulking and can be used to repair the pierced vapour barrier The building shell must be in place with windows rain screen and drainage mechanisms con structed before the insulation 15 installed All installed insulation must be protected against possible mechanical damage or physical abuse and should be protected by a rigid covering such as gypsum board plywood OSB etc Additionally polyethylene vapour barrier will expand and contract when exposed to tempera ture fluxuations To protect against possible sagging of the insulation due to expanding and contracting vapour barrier all insulation installed behind vapour barrier must also be protected by a rigid covering Below Grade Installation of the loose fill cellulose insulation system shall be limited to basement walls that have an explicit drainage layer on the exterior of the basement wall from ground level to footing i e semi rigid dimpled polyethylene products exterior insulations or the exterior face of the concrete must have waterproofing or damp proofing If damp proofing then all cracks must be sealed to prevent future water entry Installations on cast in pl
26. t Blowing equipment should be equipped with 23 to 45 metres 75 to 150 of hose The hose may be comprised of either 44 mm 2 64 mm 2 2 or 76 2 mm 3 diameter hose or any combination thereof When installing insulation directly behind vapour barrier it is recommenced that a membrane piercing nozzle be used on the end of the hose Inspection Ensure the blowing equipment is in good working order and has no missing broken or worn parts Calibration Calibrations are based on the type of membrane length s and diameter s of the hose type of framing framing member spacing and depth Calibrations should be performed with a filled hopper and maintained at a full level throughout the calibration test Equipment sup plied by Thermo Cell has been pre calibrated All other equipment will have to be field calibrated Field Calibration The initial field calibration step will be to roughly adjust the feed gate and air settings As a general rule the feed gate should be set to deliver material at a rate of 400 450 kg 875 1000 Ib per hour for solid wood frame vapour barrier configurations and depending on the capability of the equipment 510 680 kg 1125 1500 Ib per hour for all other configurations The air should then be adjusted such that the hose can be blocked with a reasonable amount of force 1 kg 2 2 Ib pressure Test cavities should be prepared and blown according to section 7 0 and 8 0 The air and or feed gate settin
27. te ensuring a taut surface is achieved For non load bearing steel studs i e less than 0 69 mm 027 thick the vapour barrier can alternately be applied to the assembly using plastic strapping and 9 5 mm 3 87 wide by 13 mm 2 deep heavy gauge staples spaced approximately 152 mm 6 apart The membranes can be fastened to the face of each cavity using the same procedure as outlined in section 8 1 1 1 Furring Resilient Channel Fastening Method Secure the film across the top member of the assembly using of 13 mm 2 steel screws with washers or with screws and channel furring strip The hung film can then be fastened to the framing members by applying the channel furring in a successive fashion working from the top of the assembly to the bottom Ensure the membrane 15 as tight as possible as each successive channel furring is applied Placement and fastening of the channels furring can be done on 400 mm 16 centres for 600 mm 24 spaced members or 600 mm 24 centres for 300 mm 12 or 400 mm 16 spaced members Channels should be fastened to the members with not less than 13 mm 27 steel drill screws For more details please consult with your local building office Once the channels furring have been applied the vapour barrier can be further secured to the face of each member using steel drill screws with washers spaced every 152 mm 6 to 203 mm 8 apart PLEASE NOTE If a structure has not been designed to accomm
28. the amount of material the cavity density can be increased If density problems persist please refer to trouble shooting guide 10 6 If problems still persist it is the responsibility of the installer to contact a Thermo Cell representative immediately such that appropriate action can be taken Quality Monitoring Throughout the job the installer shall ensure through periodic bag counts that the correct amount of material is being installed If quality problems are encountered on the job the contractor should consult with the manufacturer prior to continuing with the job in order to resolve the problem It is also strongly recommended that the installer keep a copy of the information card which is given to the customer or builder on file in event of a warranty claim Post Inspection The installer shall be responsible for visually and physically inspecting the job to verify that all wall and ceiling cavities contain enough insulation and are firm to the touch A random hammer test should also be performed If any under blown areas are located the installer should top up the cavity 10 5 Information Cards Upon request the installer shall fill out and provide the home owner 5 tomer or builder an information card 10 6 Trouble Shooting The following chart can be used as a guideline for common installation problems PROBLEM CAUSE SOLUTION Overblown Too much air Reduce air Not enough material Increase material Feeder low or out
29. top of the assembly to the bottom When applying the strapping ensure the film remains loose 8 1 2 1 8 1 2 2 PLEASE NOTE If a structure has not been designed to accommodate strapped walls and ceil ings the home owner builder and the building inspector should be consulted prior to installing the channels furring This will ensure that appropriate allowances for the application of the vapour barrier electrical boxes window extensions and other fixtures are made prior to the installation of the channels furring Vapour Barrier Steel Frame Construction Polyethylene vapour barrier can be installed with either a dry wall shim or resilient channel steel furring fastening method As in wood frame construction the drywall shim method is only used on standard 400 mm 167 centre construction and the resilient channel steel furring method is used on 600 mm 24 centre construction or in assemblies requiring a minimum RSI 4 22 similarly the use of resilient channels has the added benefit of providing additional sound insula tion over steel furring Plastic Strapping Method For load bearing steel studs initially secure the membrane to the top bottom and sides of all wall or ceiling sections through the use of standard 13 mm 2 steel drill screws and drywall shims Using additional shims and a minimum 13 mm 2 long steel drill screws spaced approximately 152 mm 6 apart fasten the poly to the face of each stud and top pla
30. tractor should determine the total wall and or ceiling area to be insulated excluding openings The number of bags of insulation required can then be determined using Table 1 located in Appendix A Wall Preparation Above Grade Check with the builder and or local building inspector for sealing requirements of the wall ceiling window and door frames If a vapour barrier retaining membrane is used ensure all preparation is complete prior to the application of membrane If mesh is used assemblies should be sealed after the insulation has been installed behind the mesh but prior to or during the application of the vapour barrier Below Grade To protect insulation from potential moisture damage due to leaking basement walls it is recommended that a continuous moisture barrier such as CGSB polyethylene film or air barrier be used against the foundation wall Prior to insulating any below grade walls notify your local building office that the base ment walls will be blown and if necessary provide them with a copy of the CCMC report It is also important to inform the builder in advance that a barrier must be applied to the foundation wall prior to the construction of the wood frame wall If using air barrier it should extend the full height of the wall When installing the vapour bar rier ensure that it is placed approximately 152 mm 6 above the grade line Fastening of the barrier to the foundation wall may be accomplished with a bea
Download Pdf Manuals
Related Search
Related Contents
Sony PlayStation 2 User's Manual SeroCP™ IgG - Savyon Diagnostics Ltd Application Platform for Healthcare - 日本電気 Model 940 USERS MANUAL Bedienungsanleitung Metro HRS-83BA Use and Care Manual I-SAC C1 取扱説明書 Copyright © All rights reserved.
Failed to retrieve file